Subway station distribution transformer capacity calculation method and system for optimizing simultaneous coefficient

By optimizing the capacity calculation method of the distribution transformer capacity of the subway station, using historical operating data and load analysis, the capacity of the distribution transformer at the subway station is optimized, and the problem of high distribution transformer capacity is solved, achieving energy saving, emission reduction and cost reduction.

CN118970897APending Publication Date: 2024-11-15BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO LIMITED +1
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202411007333.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The capacity calculation method of the existing subway station distribution transformer capacity has led to a high capacity of distribution transformer, resulting in large electricity consumption and serious waste, and failure to achieve economic operation, which violates the national energy conservation and emission reduction requirements.

Method used

By collecting and classifying the historical operation data of subway stations, calculating the required coefficients and power factors of each power-using equipment group, and obtaining the simultaneous coefficients based on the actual load. Optimizing the capacity calculation method and system of the power distribution transformer in the subway station, setting up the transformer optimization degree evaluation model. , evaluate whether the transformer is selected reasonably.

Benefits of technology

It reduces the transformer capacity, reduces unnecessary power loss, reduces energy consumption, realizes energy conservation and emission reduction, reduces operating costs, optimizes load matching, reduces grid pressure, and saves space and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118970897A_ABST
    Figure CN118970897A_ABST
Patent Text Reader

Abstract

The invention discloses a metro station distribution transformer capacity calculation method and system for optimizing a simultaneous coefficient, and the method comprises the steps: collecting the historical operation data of a transformer of an existing metro station, carrying out the classification according to a coincidence type, and carrying out the calculation of the capacity of the transformer according to the actual power utilization condition of each power utilization equipment group of each type; obtaining a demand coefficient and a power factor of each electric equipment group; obtaining a simultaneous coefficient according to the demand coefficient and the power factor in combination with the actual load of the transformer; and obtaining operation data of an electric equipment group of the newly-built subway station, determining a demand coefficient, a power factor and a simultaneous coefficient of the newly-built subway station according to the historical operation data, calculating the capacity of a transformer required by the newly-built subway station, and setting the transformer with the corresponding capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of transformer setting in subway stations, and more specifically, relates to a method and system for calculating the capacity of distribution transformers in subway stations with optimized simultaneity coefficients. Background Art

[0002] With the rapid development of my country's subway, the subway in my country's large cities has been built on a large scale, the travel of urban residents has been significantly improved, and the level of technical equipment has been rapidly improved, which has played a positive role in the development of my country's national economy. During the operation period, the distribution transformer in the mainline station substation is the main power supply equipment for the subway station load. It provides power to the subway station through a 35(10) / 0.4kV distribution transformer.

[0003] According to the investigation, the capacity of the distribution transformers in subway stations under the current situation is generally high and the load rate is low, and the economic operation of the distribution transformers in subway stations has not yet been achieved. Due to the inappropriate selection of the capacity of the distribution transformer, the transformer no-load loss P0 is large, the load loss Pw is high, and the grid redundancy is high. In the case of 10kV distributed power supply, the demand for 10kV external power supply is high, resulting in a certain waste. The calculation of the capacity of the distribution transformer is determined by both the demand coefficient and the simultaneous coefficient, and the selection of the demand coefficient is also very important. In the selection of the capacity of the station distribution transformer, selecting the appropriate demand coefficient and simultaneous coefficient can effectively select the capacity of the station distribution transformer, thereby avoiding the selection of the distribution transformer capacity is too large, which not only increases the construction cost, but also increases the power loss, which does not meet the national energy conservation and emission reduction requirements. Therefore, it is particularly important to reasonably select the capacity of the station substation distribution transformer. It is of great significance.

[0004] At present, the capacity selection of distribution transformers in domestic subway stations is generally calculated using the required coefficient method in the "Industrial and Civil Power Distribution Design Manual". The active power simultaneous coefficient KΣp can be 0.8~0.9, and the reactive power simultaneous coefficient KΣq can be 0.93~0.97. When simplifying the calculation, the two coefficients can be the same. Generally, the more electrical equipment there are, the smaller the simultaneous coefficient. The capacity of the distribution transformer calculated by this calculation method is generally high, the power consumption is large, and there is waste in the system. Taking the standard island station of the A-type 6-car marshaling line as an example, the total installed capacity of the distribution transformer in the station can reach up to 2000kVA.

[0005] In recent years, my country's urban rail transit has developed rapidly, and observation and statistical methods can be used to accumulate the power load of stations. Subway stations have relatively more electrical equipment, reaching 60 to 70 circuits. The simultaneous coefficient of distribution transformers should be reduced on the basis of the former value, but choosing the appropriate simultaneous coefficient for calculation is also a difficult problem.

[0006] The selection of the simultaneous coefficient will directly affect the capacity of the distribution transformer, but it should also be based on the different classifications of the station load. First, the required coefficient of the power load should be determined, and then the simultaneous coefficient should be given, so as to achieve accurate load prediction effects, reduce the problem of excessive distribution transformer capacity caused by differences in equipment capacity, and achieve energy conservation and emission reduction effects. Summary of the invention

[0007] In order to solve the above technical problems, the present invention proposes a method for calculating the capacity of a distribution transformer in a subway station by optimizing the simultaneity coefficient, comprising:

[0008] Collect historical operation data of transformers in existing subway stations and classify them according to the categories they meet. According to the actual power consumption of each power-consuming equipment group in each category, obtain the demand coefficient and power factor of each power-consuming equipment group;

[0009] According to the required coefficient and the power factor, and in combination with the actual load of the transformer, a simultaneous coefficient is obtained;

[0010] The operation data of the power equipment group of the newly built subway station is obtained, and the demand coefficient, power factor and simultaneity coefficient of the newly built subway station are determined with reference to the historical operation data, so as to calculate the capacity of the transformer required for the newly built subway station and set a transformer of corresponding capacity.

[0011] Furthermore, it also includes: setting a transformer optimization degree evaluation model to evaluate the transformers installed in subway stations.

[0012] Furthermore, the transformer optimization degree evaluation model includes:

[0013]

[0014] Among them, Optimization Ratio is the transformer optimization evaluation index. The smaller the transformer optimization evaluation index is, the more the selected transformer can meet the needs of the subway station. total is the total power demand of the subway station, C ran is the capacity of the transformer, η is the efficiency of the transformer, P peak is the peak power demand of the subway station, P averate is the average power demand of the subway station, α is the first adjustment factor, Time peak is the time ratio of the peak period, Time offr-peak is the time proportion of the off-peak period, β is the second adjustment factor, Load_Factor is the load factor of the transformer, γ is the third adjustment factor, Utilization_Factor is the utilization factor of the transformer, and δ is the fourth adjustment factor.

[0015] Furthermore, the utilization factor Utilization_Factor of the transformer includes:

[0016]

[0017] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, 1{P actual (t)>0} is the indicator function, which indicates the actual power demand P of the subway station at time t. actual (t) takes the value of 1 when it is greater than 0, otherwise it takes the value of 0.

[0018] Furthermore, the load factor Load_Factor of the transformer includes:

[0019]

[0020] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, P actual (t) is the actual power demand of the subway station at time t.

[0021] Furthermore, the items are classified according to the categories they meet, wherein the categories include: electronic information, water pumps, elevator doors, small power, lighting, ventilation and air conditioning, and civil air defense.

[0022] The present invention also provides a subway station distribution transformer capacity calculation system for optimizing the simultaneity coefficient, comprising:

[0023] The historical information acquisition module is used to collect the historical operation data of transformers in existing subway stations, classify them according to the categories they meet, and obtain the demand coefficient and power factor of each power equipment group based on the actual power consumption of each power equipment group in each category;

[0024] A simultaneous coefficient determination module is used to obtain a simultaneous coefficient according to the required coefficient and the power factor and in combination with an actual load of the transformer;

[0025] A transformer module is set up to obtain the operating data of the power equipment group of the newly built subway station, and determine the demand coefficient, power factor and simultaneity coefficient of the newly built subway station with reference to the historical operating data, so as to calculate the capacity of the transformer required for the newly built subway station and set a transformer of corresponding capacity.

[0026] Furthermore, it also includes: setting a transformer optimization degree evaluation model to evaluate the transformers installed in subway stations.

[0027] Furthermore, the transformer optimization degree evaluation model includes:

[0028]

[0029] Among them, Optimization Ratio is the transformer optimization evaluation index. The smaller the transformer optimization evaluation index is, the more the selected transformer can meet the needs of the subway station. total is the total power demand of the subway station, C ran is the capacity of the transformer, η is the efficiency of the transformer, P peak is the peak power demand of the subway station, P averate is the average power demand of the subway station, α is the first adjustment factor, TIme peak is the time ratio of the peak period, Time offr-peak is the time proportion of the off-peak period, β is the second adjustment factor, Load_Factor is the load factor of the transformer, γ is the third adjustment factor, Utilization_Factor is the utilization factor of the transformer, and δ is the fourth adjustment factor.

[0030] Furthermore, the utilization factor Utilization_Factor of the transformer includes:

[0031]

[0032] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, 1{P actual (t)>0} is the indicator function, which indicates the actual power demand P of the subway station at time t. actual (t) takes the value of 1 when it is greater than 0, otherwise it takes the value of 0.

[0033] Compared with the prior art, the above technical solution conceived by the present invention has the following beneficial effects:

[0034] 1. Energy saving and emission reduction: Reducing the capacity of the transformer can reduce unnecessary power loss and reduce energy consumption, thereby achieving the goal of energy saving and emission reduction.

[0035] 2. Reduce operating costs: Transformers with smaller capacity usually have lower no-load losses and load losses, which can reduce electricity operating costs, especially in long-term operation.

[0036] 3. Optimize load matching: By reasonably reducing the capacity, the actual load demand can be better matched and the waste caused by excessive transformer capacity can be avoided.

[0037] 4. Reduce grid pressure: Reducing capacity helps to reduce the burden on the grid and improve grid stability and reliability.

[0038] 5. Save space and cost: Transformers with smaller capacity are smaller in size, and the required installation space is correspondingly reduced, while the equipment cost will also be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 is a flow chart of the method of embodiment 1 of the present invention;

[0040] Figure 2 is a system structure diagram of Embodiment 2 of the present invention;

[0041] Figure 3 is a flow chart of the method of embodiment 5 of the present invention;

[0042] Figure 4 is a schematic diagram of obtaining required coefficients according to Embodiment 5 of the present invention;

[0043] Figure 5 This is a typical substation main wiring diagram of Example 5 of the present invention. DETAILED DESCRIPTION

[0044] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0045] The method provided by the present invention can be implemented in the following terminal environment, and the terminal may include one or more of the following components: a processor, a storage medium, and a display screen. The storage medium stores at least one instruction, and the instruction is loaded and executed by the processor to implement the method described in the following embodiment.

[0046] The processor may include one or more processing cores. The processor uses various interfaces and lines to connect various parts in the entire terminal, and executes various functions of the terminal and processes data by running or executing instructions, programs, code sets or instruction sets stored in the storage medium, and calling data stored in the storage medium.

[0047] The storage medium may include a random access memory (RAM) or a read-only memory (ROM). The storage medium may be used to store instructions, programs, codes, code sets or instructions.

[0048] The display is used to show the interactive cross-section of each application.

[0049] All subscripts in the formulas of the present invention are only used to distinguish parameters and have no actual meaning.

[0050] In addition, those skilled in the art can understand that the structure of the above terminal does not constitute a limitation on the terminal, and the terminal may include more or fewer components, or combine certain components, or arrange the components differently. For example, the terminal also includes components such as a radio frequency circuit, an input unit, a sensor, an audio circuit, and a power supply, which will not be described in detail here.

[0051] Example 1

[0052] like Figure 1 As shown, an embodiment of the present invention provides a method for calculating the capacity of a distribution transformer in a subway station by optimizing a simultaneous coefficient, comprising:

[0053] Step 101, collect historical operation data of transformers in existing subway stations, classify them according to the categories they meet, and obtain the demand coefficient and power factor of each power equipment group according to the actual power consumption of each power equipment group in each category;

[0054] Specifically, they are classified according to the categories they meet, including: electronic information, water pumps, elevator doors, small power, lighting, ventilation and air conditioning, and civil air defense.

[0055] Step 102, obtaining a simultaneous coefficient according to the required coefficient and the power factor and in combination with the actual load of the transformer;

[0056] Step 103, obtaining the operating data of the power equipment group of the newly built subway station, referring to the historical operating data, determining the demand coefficient, power factor and simultaneity coefficient of the newly built subway station, thereby calculating the capacity of the transformer required for the newly built subway station, and setting a transformer of corresponding capacity.

[0057] Specifically, it also includes: setting a transformer optimization degree evaluation model to evaluate the transformers installed in subway stations.

[0058] Specifically, the transformer optimization degree evaluation model includes:

[0059]

[0060] Among them, Optimization Ratio is the transformer optimization evaluation index. The smaller the transformer optimization evaluation index is, the more the selected transformer can meet the needs of the subway station. total is the total power demand of the subway station, C ran is the capacity of the transformer, η is the efficiency of the transformer, P peak is the peak power demand of the subway station, P averate is the average power demand of the subway station, α is the first adjustment factor, Time peak is the time ratio of the peak period, Timeoffr-peak is the time proportion of the off-peak period, β is the second adjustment factor, Load_Factor is the load factor of the transformer, γ is the third adjustment factor, Utilization_Factor is the utilization factor of the transformer, and δ is the fourth adjustment factor.

[0061] Specifically, the utilization factor Utilization_Factor of the transformer includes:

[0062]

[0063] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, 1{P actual (t)>0} is the indicator function, which indicates the actual power demand P of the subway station at time t. actual (t) takes the value of 1 when it is greater than 0, otherwise it takes the value of 0.

[0064] Specifically, the load factor Load_Factor of the transformer includes:

[0065]

[0066] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, P actual (t) is the actual power demand of the subway station at time t.

[0067] Example 2

[0068] like Figure 2 As shown, the embodiment of the present invention further provides a system for calculating the capacity of a distribution transformer in a subway station with optimized simultaneity coefficient, comprising:

[0069] The historical information acquisition module is used to collect the historical operation data of transformers in existing subway stations, classify them according to the categories they meet, and obtain the demand coefficient and power factor of each power equipment group based on the actual power consumption of each power equipment group in each category;

[0070] Specifically, they are classified according to the categories they meet, including: electronic information, water pumps, elevator doors, small power, lighting, ventilation and air conditioning, and civil air defense.

[0071] A simultaneous coefficient determination module is used to obtain a simultaneous coefficient according to the required coefficient and the power factor and in combination with an actual load of the transformer;

[0072] A transformer module is set up to obtain the operating data of the power equipment group of the newly built subway station, and determine the demand coefficient, power factor and simultaneity coefficient of the newly built subway station with reference to the historical operating data, so as to calculate the capacity of the transformer required for the newly built subway station and set a transformer of corresponding capacity.

[0073] Specifically, it also includes: setting a transformer optimization degree evaluation model to evaluate the transformers installed in subway stations.

[0074] Specifically, the transformer optimization degree evaluation model includes:

[0075]

[0076] Among them, Optimization Ratio is the transformer optimization evaluation index. The smaller the transformer optimization evaluation index is, the more the selected transformer can meet the needs of the subway station. total is the total power demand of the subway station, C ran is the capacity of the transformer, η is the efficiency of the transformer, P peak is the peak power demand of the subway station, P averate is the average power demand of the subway station, α is the first adjustment factor, Time peak is the time ratio of the peak period, Time offr-peak is the time proportion of the off-peak period, β is the second adjustment factor, Load_Factor is the load factor of the transformer, γ is the third adjustment factor, Utilization_Factor is the utilization factor of the transformer, and δ is the fourth adjustment factor.

[0077] Specifically, the utilization factor Utilization_Factor of the transformer includes:

[0078]

[0079] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, 1{P actual (t)>0} is the indicator function, which indicates the actual power demand P of the subway station at time t. actual (t) takes the value of 1 when it is greater than 0, otherwise it takes the value of 0.

[0080] Specifically, the load factor Load_Factor of the transformer includes:

[0081]

[0082] Among them, t 1 is the start time of the time period, t2 is the end time of the time period, P actual (t) is the actual power demand of the subway station at time t.

[0083] Example 3

[0084] The embodiment of the present invention further proposes a storage medium storing a plurality of instructions, wherein the instructions are used to implement the method for calculating the capacity of distribution transformers in a subway station with optimized simultaneity coefficient.

[0085] Optionally, in this embodiment, the above storage medium may be located in any computer terminal in a computer terminal group in a computer network, or in any mobile terminal in a mobile terminal group.

[0086] Optionally, in this embodiment, the storage medium is configured to store program codes for executing the following steps: Step 101, collecting historical operation data of transformers of existing subway stations, and classifying them according to compliance categories, and obtaining a demand coefficient and a power factor of each power consumption group according to actual power consumption of each power consumption group in each category;

[0087] Specifically, they are classified according to the categories they meet, including: electronic information, water pumps, elevator doors, small power, lighting, ventilation and air conditioning, and civil air defense.

[0088] Step 102, obtaining a simultaneous coefficient according to the required coefficient and the power factor and in combination with the actual load of the transformer;

[0089] Step 103, obtaining the operating data of the power equipment group of the newly built subway station, referring to the historical operating data, determining the demand coefficient, power factor and simultaneity coefficient of the newly built subway station, thereby calculating the capacity of the transformer required for the newly built subway station, and setting a transformer of corresponding capacity.

[0090] Specifically, it also includes: setting a transformer optimization degree evaluation model to evaluate the transformers installed in subway stations.

[0091] Specifically, the transformer optimization degree evaluation model includes:

[0092]

[0093] Among them, Optimization Ratio is the transformer optimization evaluation index. The smaller the transformer optimization evaluation index is, the more the selected transformer can meet the needs of the subway station. total is the total power demand of the subway station, C ran is the capacity of the transformer, η is the efficiency of the transformer, P peakis the peak power demand of the subway station, P averate is the average power demand of the subway station, α is the first adjustment factor, TIme peak is the time ratio of the peak period, Time offr-peak is the time proportion of the off-peak period, β is the second adjustment factor, Load_Factor is the load factor of the transformer, γ is the third adjustment factor, Utilization_Factor is the utilization factor of the transformer, and δ is the fourth adjustment factor.

[0094] Specifically, the utilization factor Utilization_Factor of the transformer includes:

[0095]

[0096] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, 1{P actual (t)>0} is the indicator function, which indicates the actual power demand P of the subway station at time t. actual (t) takes the value of 1 when it is greater than 0, otherwise it takes the value of 0.

[0097] Specifically, the load factor Load_Factor of the transformer includes:

[0098]

[0099] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, P actual (t) is the actual power demand of the subway station at time t.

[0100] Example 4

[0101] An embodiment of the present invention also proposes an electronic device, including a processor and a storage medium connected to the processor, wherein the storage medium stores multiple instructions, and the instructions can be loaded and executed by the processor to enable the processor to execute a method for calculating the capacity of a distribution transformer in a subway station with an optimized simultaneity coefficient.

[0102] Specifically, the electronic device of this embodiment may be a computer terminal, and the computer terminal may include: one or more processors, and a storage medium.

[0103] Among them, the storage medium can be used to store software programs and modules, such as a method for calculating the capacity of a distribution transformer in a subway station with optimized simultaneous coefficients in an embodiment of the present invention, and corresponding program instructions / modules. The processor executes various functional applications and data processing by running the software programs and modules stored in the storage medium, that is, realizing the above-mentioned method for calculating the capacity of a distribution transformer in a subway station with optimized simultaneous coefficients. The storage medium may include a high-speed random storage medium, and may also include a non-volatile storage medium, such as one or more magnetic storage systems, flash memory, or other non-volatile solid-state storage media. In some instances, the storage medium may further include a storage medium remotely arranged relative to the processor, and these remote storage media may be connected to the terminal via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0104] The processor can call the information and application program stored in the storage medium through the transmission system to execute the steps: Step 101, collect the historical operation data of the transformers of the existing subway stations, and classify them according to the conformity categories, and obtain the demand coefficient and power factor of each power consumption group according to the actual power consumption of each power consumption group in each category;

[0105] Specifically, they are classified according to the categories they meet, including: electronic information, water pumps, elevator doors, small power, lighting, ventilation and air conditioning, and civil air defense.

[0106] Step 102, obtaining a simultaneous coefficient according to the required coefficient and the power factor and in combination with the actual load of the transformer;

[0107] Step 103, obtaining the operating data of the power equipment group of the newly built subway station, referring to the historical operating data, determining the demand coefficient, power factor and simultaneity coefficient of the newly built subway station, thereby calculating the capacity of the transformer required for the newly built subway station, and setting a transformer of corresponding capacity.

[0108] Specifically, it also includes: setting a transformer optimization degree evaluation model to evaluate the transformers installed in subway stations.

[0109] Specifically, the transformer optimization degree evaluation model includes:

[0110]

[0111] Among them, Optimization Ratio is the transformer optimization evaluation index. The smaller the transformer optimization evaluation index is, the more the selected transformer can meet the needs of the subway station. total is the total power demand of the subway station, C ranis the capacity of the transformer, η is the efficiency of the transformer, P peak is the peak power demand of the subway station, P averate is the average power demand of the subway station, α is the first adjustment factor, Time peak is the time ratio of the peak period, Time offr-peak is the time proportion of the off-peak period, β is the second adjustment factor, Load_Factor is the load factor of the transformer, γ is the third adjustment factor, Utilization_Factor is the utilization factor of the transformer, and δ is the fourth adjustment factor.

[0112] Specifically, the utilization factor Utilization_Factor of the transformer includes:

[0113]

[0114] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, 1{P actual (t)>0} is the indicator function, which indicates the actual power demand P of the subway station at time t. actual (t) takes the value of 1 when it is greater than 0, otherwise it takes the value of 0.

[0115] Specifically, the load factor Load_Factor of the transformer includes:

[0116]

[0117] Among them, t 1 is the start time of the time period, t 2 is the end time of the time period, P actual (t) is the actual power demand of the subway station at time t.

[0118] Example 5

[0119] like Figure 3 As shown, a method for calculating the capacity of a distribution transformer in a subway station with optimized simultaneity coefficient of the present invention comprises:

[0120] Collect historical operation data of existing stations, classify various loads into seven categories, obtain the demand coefficient and power factor of electrical equipment according to load characteristics and measured data, obtain the simultaneous coefficient according to the equipment power in the design stage of the station, call the statistical demand coefficient and power factor, and combine the actual load rate to obtain the simultaneous coefficient. Import the load data of the new station, call the simultaneous coefficient, demand coefficient and power factor, calculate the capacity, input the distribution transformer capacity sequence, and select the transformer capacity according to the normal load rate of 60% to 75%; if the abnormal situation check does not meet the transformer increase by one level, the single transformer operation condition check, cut off the three-level load, whether the load rate is less than or equal to 110%, if so, then judge the fire protection operation condition check, cut off the non-fire protection load, whether the load rate is less than or equal to 110%, if so, then judge the civil air defense operation condition check, only for civil air defense load, the load rate is less than or equal to 110%, if so, complete the transformer economic operation analysis.

[0121] According to the "Industrial and Civil Power Distribution Design Manual", the load calculation methods include the need coefficient method, the utilization coefficient method, the unit index method, etc. The load calculation of the low-voltage distribution transformer of urban rail transit generally adopts the need coefficient method. This method can be used to group the various electrical equipment within the distribution trunk line of the substation according to type. The calculated load of the distribution trunk line is the sum of the calculated loads of each electrical equipment group, multiplied by the simultaneous coefficient.

[0122] Calculate the power consumption of the power equipment group:

[0123] Active power: P c =K d P e

[0124] Reactive power: Q c =P c tanψ

[0125] Calculate the power of the station substation:

[0126] Active power: P c =K ΣP Σ(K d P e )

[0127] Reactive power: Q c =K Σq Σ(K d P e tanψ)

[0128] Calculate the apparent power and current:

[0129] Apparent power:

[0130] Calculate the current:

[0131] In the above types

[0132] P c ——Calculate active power, kW;

[0133] Q c ——Calculate reactive power, kVar;

[0134] S c ——Calculate the apparent power, kVA;

[0135] I c ——Calculate the current, A;

[0136] P e ——Equipment power of the power-consuming equipment group, kW;

[0137] K d ——Required coefficient, see Table 1;

[0138] cosψ——power factor;

[0139] tanψ——Calculate the tangent value of the load power factor angle, see Table 1;

[0140] K ΣP ——active power simultaneity factor;

[0141] K Σq ——reactive power simultaneity factor;

[0142] U n ——System nominal voltage (line voltage), kV.

[0143] The feet are marked with c, d and e

[0144] c——Calculated value, for example, Pc is the calculated power

[0145] e——rated value, for example Pe is the rated power

[0146] d——need, for example, Kd is the need coefficient;

[0147] φ——Power factor angle

[0148] Selection of simultaneous coefficients for distribution transformers in subway station substations:

[0149] The simultaneity coefficient is also called the staggered coefficient or the maximum load overlap coefficient. For urban subway lines, reactive power compensation devices or active filtering and reactive power compensation combined devices are generally installed to compensate reactive power to the maximum extent. The load of subway stations is mainly concentrated in the station, and the active power simultaneity coefficient and reactive power simultaneity coefficient can be selected to be the same value. The load circuits of subway stations are generally 60 to 70 circuits, and some stations even have more circuits. Generally, the more electrical equipment there are, the smaller the simultaneity coefficient is. After investigating many domestic subway stations, the simultaneity coefficient of the distribution transformer of the station substation should be selected as 0.6.

[0150] like Figure 4 As shown in the figure, the required coefficient and power factor selection of electrical equipment in subway stations:

[0151] There are many loads in subway stations, especially underground stations, which are more complex. They can be divided into 7 categories according to the electrical equipment groups, mainly electronic information, water pumps, elevator doors, small power, lighting, ventilation and air conditioning, and civil air defense. Among them, the demand coefficient of the electronic information category can be 0.4~0.7. The automatic ticket vending system equipment requires a low value because the ticket gates are intermittently used and the ticket machines are intermittently on standby. The demand coefficient of water pumps can be 0.6~0.8. The wastewater pump only intermittently participates in interval drainage at ordinary times, so the low value of 0.6 can be taken. The rainwater pump is only used when it rains and there is water accumulation, and the value is 0.2. The elevator door category includes elevators, escalators, and platform doors. The elevators mainly serve the disabled, the elderly, and passengers with large luggage. They work similarly to the intermittent operation of platform doors, so the demand coefficient can be 0.3. The demand coefficient of escalators can be 0.6. The required coefficient of power can be 0.4 to 0.8. The frequency of electricity consumption of security inspection machines is relatively high, so a high value of 0.8 can be taken. There are relatively many types of small power loads for fire protection. When there is a dedicated fire protection load, 0.4 is taken, and when all are combined fire protection loads, 0.8 is taken; the required coefficient of lighting can be 0.7 to 0.9. The public area lamps of ground stations are turned off during the day, so a low value of 0.7 is selected. The public area lighting of underground stations is turned on all year round, so a high value of 0.9 is selected; the required coefficient of ventilation and air conditioning can be 0.6 to 0.65, which is obtained by comparing the maximum load value measured on site with the ventilation and air conditioning mode table. In addition, variable frequency energy-saving technologies are also widely used. Civil air defense equipment is not applicable under normal circumstances, so the required coefficient is 0.

[0152] Table 1

[0153]

[0154]

[0155] like Figure 5 As shown, station distribution transformer selection and verification:

[0156] In combination with the above research conclusions, this paper takes the standard island station of Type A 6-car marshaling line, where two distribution transformers with a capacity of 1000kVA are installed, as an example to verify the transformer capacity.

[0157] Normal operating conditions:

[0158] Under normal operating conditions, the two distribution transformers operate separately and are responsible for supplying power to all loads within the power supply range. Each distribution transformer supplies power to a different 0.4kV low-voltage bus and its loads.

[0159] According to the above algorithm, the load rate of each transformer is about 60% to 75% at this time.

[0160] Single power supply operation conditions:

[0161] When an AC 0.4kV incoming power supply fails, the three-level load of the entire station is cut off, and a single transformer supplies power to all the first and second level loads within the power supply range of the substation. This is the single power supply operating condition.

[0162] According to the above algorithm, the load rate of each transformer is about 95% to 105% at this time.

[0163] Fire operation mode:

[0164] When a fire occurs, all non-fire loads are automatically cut off, and the remaining fire loads are still supplied by the two distribution transformers in normal operating conditions.

[0165] According to the above algorithm, the load rate of each transformer is about 35% to 40% at this time.

[0166] In summary, for a standard island station on a Type A 6-carriage line, installing two 1000kVA distribution transformers can meet the demand under various operating conditions.

[0167] Economic analysis:

[0168] The common capacity levels of distribution transformers can be divided into 315kVA, 500kVA, 630kVA, 800kVA, 1000kVA, 1250kVA, 1600kVA, and 2000kVA. The original plan indicated that the station usually selected two 1250kVA distribution transformers. According to the above algorithm, the transformer capacity can be reduced to two 1000kVA, and the capacity reduction ratio can reach 20%, saving about 13% of investment. Reducing the installed capacity can increase the transformer operating load rate by 12%.

[0169] In addition, according to the current manufacturing level of domestic dry-type power transformers, under the premise of ensuring power supply safety and reliability, the most economical operating state can be achieved when the transformer load rate is 60%-75%, thereby reducing the transformer's own losses in long-term operation and further saving energy consumption.

[0170] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0171] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0172] In the several embodiments provided by the present invention, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the system embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0173] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0174] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0175] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only storage medium (ROM, Read-Only Memory), random access storage medium (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0176] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A method for calculating the capacity of distribution transformers in subway stations by optimizing the simultaneity coefficient, characterized in that: include: Collect historical operation data of transformers in existing subway stations and classify them according to the categories they meet. According to the actual power consumption of each power-consuming equipment group in each category, obtain the demand coefficient and power factor of each power-consuming equipment group; According to the required coefficient and the power factor, and in combination with the actual load of the transformer, a simultaneous coefficient is obtained; The operation data of the power equipment group of the newly built subway station is obtained, and the demand coefficient, power factor and simultaneity coefficient of the newly built subway station are determined with reference to the historical operation data, so as to calculate the capacity of the transformer required for the newly built subway station and set a transformer of corresponding capacity.

2. A method for calculating the capacity of distribution transformers in a subway station with optimized simultaneity coefficient according to claim 1, characterized in that: Also includes: A transformer optimization degree evaluation model is set up to evaluate the transformers installed in subway stations.

3. A method for calculating the capacity of distribution transformers in a subway station with optimized simultaneity coefficient as claimed in claim 2, characterized in that: The transformer optimization degree evaluation model includes: Among them, Optimization Ratio is the transformer optimization evaluation index. The smaller the transformer optimization evaluation index is, the more the selected transformer can meet the needs of the subway station. total is the total power demand of the subway station, C ran is the capacity of the transformer, η is the efficiency of the transformer, P peak is the peak power demand of the subway station, P averate is the average power demand of the subway station, α is the first adjustment factor, Time peak is the time ratio of the peak period, Time offr-peak is the time proportion of the off-peak period, β is the second adjustment factor, Load_Factor is the load factor of the transformer, γ is the third adjustment factor, Utilization_Factor is the utilization factor of the transformer, and δ is the fourth adjustment factor.

4. A method for calculating the capacity of distribution transformers in a subway station with optimized simultaneity coefficient as claimed in claim 3, characterized in that: The utilization factor of the transformer includes: Among them, t1 is the start time of the time period, t2 is the end time of the time period, actual (t)>0} is the indicator function, which indicates the actual power demand P of the subway station at time t. actual (t) takes the value of 1 when it is greater than 0, otherwise it takes the value of 0.

5. A method for calculating the capacity of distribution transformers in a subway station with optimized simultaneity coefficient as claimed in claim 3, characterized in that: The load factor Load_Factor of the transformer includes: Among them, t1 is the start time of the time period, t2 is the end time of the time period, P actual (t) is the actual power demand of the subway station at time t.

6. A method for calculating the capacity of distribution transformers in a subway station with optimized simultaneity coefficient according to claim 1, characterized in that: Classification is carried out according to the categories that meet the requirements, including: electronic information, water pumps, elevator doors, small power, lighting, ventilation and air conditioning, and civil defense.

7. A subway station distribution transformer capacity calculation system with optimized simultaneity coefficient, characterized in that: include: The historical information acquisition module is used to collect the historical operation data of transformers in existing subway stations, classify them according to the categories they meet, and obtain the demand coefficient and power factor of each power equipment group based on the actual power consumption of each power equipment group in each category; A simultaneous coefficient determination module is used to obtain a simultaneous coefficient according to the required coefficient and the power factor and in combination with an actual load of the transformer; A transformer module is set up to obtain the operating data of the power equipment group of the newly built subway station, and determine the demand coefficient, power factor and simultaneity coefficient of the newly built subway station with reference to the historical operating data, so as to calculate the capacity of the transformer required for the newly built subway station and set a transformer of corresponding capacity.

8. A subway station distribution transformer capacity calculation system for optimizing simultaneity coefficient according to claim 7, characterized in that: Also includes: A transformer optimization degree evaluation model is set up to evaluate the transformers installed in subway stations.

9. A subway station distribution transformer capacity calculation system for optimizing simultaneity coefficient according to claim 8, characterized in that: The transformer optimization degree evaluation model includes: Among them, Optimization Ratio is the transformer optimization evaluation index. The smaller the transformer optimization evaluation index is, the more the selected transformer can meet the needs of the subway station. total is the total power demand of the subway station, C ran is the capacity of the transformer, η is the efficiency of the transformer, P peak is the peak power demand of the subway station, P averate is the average power demand of the subway station, α is the first adjustment factor, Time peak is the time ratio of the peak period, Time offr-peak is the time proportion of the off-peak period, β is the second adjustment factor, Load_Factor is the load factor of the transformer, γ is the third adjustment factor, Utilization_Factor is the utilization factor of the transformer, and δ is the fourth adjustment factor.

10. A subway station distribution transformer capacity calculation system for optimizing simultaneity coefficient according to claim 9, characterized in that: The utilization factor of the transformer includes: Among them, t1 is the start time of the time period, t2 is the end time of the time period, actual (t)>0} is the indicator function, which indicates the actual power demand P of the subway station at time t. actual (t) takes the value of 1 when it is greater than 0, otherwise it takes the value of 0.

Citation Information

Cited By

  • Transformer parameter determination method and device, equipment, storage medium and product

    CN121598450A

  • Transformer parameter determination method and device, equipment, storage medium and product

    CN121598450B

  • Generation method and device of power distribution scheme, equipment, storage medium and product

    CN121599428A

  • Power distribution scheme generation method, device, equipment, storage medium and product

    CN121599428B