Digitized intelligent workshop supervision method, system and equipment
Through the digital smart workshop supervision method, workshop equipment data is acquired and analyzed in real time, and the operating status is adjusted, which solves the problem of untimely monitoring in traditional workshop supervision and improves the supervision effect and production efficiency.
Patent Information
- Application Number
- CN202411219484.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional workshop supervision relies on manual labor, which requires time for data collection, analysis and decision-making, and cannot achieve real-time or near-real-time monitoring and adjustment, resulting in poor supervision effects.
Adopt a digital smart workshop supervision method to obtain real-time operation data of workshop equipment through monitoring operations, conduct working condition analysis, determine supervision methods, adjust equipment operating status, and optimize production parameters and processes.
It achieves real-time response, reduces the impact of faults on production, improves supervision effects, detects and handles abnormal situations in a timely manner, avoids production interruptions and equipment damage, and optimizes equipment efficiency and output rate.
Smart Images

Figure CN118734232A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of digital workshop supervision, and in particular, relates to a digital smart workshop supervision method, system and equipment. Background Art
[0002] The workshop is the main area in a factory where products are produced or parts are processed. Depending on the product type and production process, the workshop can be divided into various types, such as electronic workshop, mechanical workshop, chemical workshop, assembly workshop, etc.
[0003] The traditional workshop supervision process relies on manual work (such as manually recording equipment data and operating conditions). Since data collection, analysis and decision-making take time, real-time or near real-time monitoring and adjustment cannot be achieved, which leads to poor supervision results. Summary of the invention
[0004] The embodiments of the present application provide a digital smart workshop supervision method, system and equipment, which can solve the problem that in the process of workshop supervision, manual work is relied upon, data collection, analysis and decision-making require time, and real-time or near real-time monitoring and adjustment cannot be achieved, which leads to poor supervision results.
[0005] In a first aspect, an embodiment of the present application provides a digital smart workshop supervision method, which is applied to a digital smart workshop supervision device, and the method includes: Monitoring a first operation; wherein the first operation is used to instruct the digital smart workshop supervision device to supervise the workshop equipment; Acquiring operation data of the workshop equipment based on the first operation; Performing operating condition analysis based on the operating data, and determining a workshop supervision method; wherein the workshop supervision method is used to adjust the operating status of the workshop equipment.
[0006] The above technical solutions in the embodiments of the present application have at least the following technical effects: The digital smart workshop supervision method provided by this application, first, by monitoring the first operation used to instruct the digital smart workshop supervision equipment to supervise the workshop equipment, it is helpful to obtain the operation data of the workshop equipment in real time when the operation data of the workshop equipment is needed in the future, and it can also provide data support for the subsequent timely adjustment of production parameters to achieve immediate response, reduce the impact of failures on production, and help improve the subsequent supervision effect. Then, based on the first operation to obtain the operation data of the workshop equipment, the status and performance of the workshop equipment can be understood in real time, which helps to quickly respond to any abnormal situation or operation problems in the future, and take necessary measures in time to avoid potential production interruptions or equipment damage, which helps to improve the subsequent supervision effect. Finally, according to the operating data, the working condition analysis is carried out to determine the workshop supervision method, and the fluctuation of key indicators such as the operating efficiency and output rate of the workshop equipment can be found, and then the bottleneck factors affecting the efficiency can be identified, so as to adjust the operation status of the workshop equipment in a targeted manner, such as optimizing the equipment parameter settings, adjusting the production process, optimizing the workers' operation process, etc., which helps to improve the supervision effect.
[0007] In a second aspect, an embodiment of the present application provides a digital smart workshop supervision system, which is applied to a digital smart workshop supervision device and is used to implement the digital smart workshop supervision method of the first aspect. The digital smart workshop supervision system includes: A monitoring unit, configured to monitor a first operation; wherein the first operation is used to instruct the digital smart workshop monitoring device to monitor workshop equipment; an acquisition unit, configured to acquire the operation data of the workshop equipment based on the first operation; A determination unit is used to perform a working condition analysis based on the operating data and determine a workshop supervision method; wherein the workshop supervision method is used to adjust the operating status of the workshop equipment.
[0008] In a third aspect, an embodiment of the present application provides a digital smart workshop supervision device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the digital smart workshop supervision method described in any one of the first aspects above is implemented.
[0009] It can be understood that the beneficial effects of the second to third aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0011] Figure 1 It is a flowchart of a digital smart workshop supervision method provided by an embodiment of the present application; Figure 2 This is a schematic diagram of the implementation process after step S100 in the digital smart workshop supervision method provided in one embodiment of the present application; Figure 3 It is a flowchart of a digital smart workshop supervision method provided by another embodiment of the present application; Figure 4 It is a schematic diagram of the implementation process after step S130 in the digital smart workshop supervision method provided in one embodiment of the present application; Figure 5 It is a schematic diagram of the implementation process after step S140 in the digital smart workshop supervision method provided in one embodiment of the present application; Figure 6 It is a flowchart of a digital smart workshop supervision method provided by another embodiment of the present application; Figure 7 It is a schematic diagram of the implementation process of step S180 in the digital smart workshop supervision method provided in one embodiment of the present application; Figure 8 It is a schematic diagram of the implementation process of step S300 in the digital smart workshop supervision method provided in one embodiment of the present application; Fig. 9 It is a structural diagram of a digital smart workshop supervision system provided in an embodiment of the present application; Fig.10 It is a structural diagram of the digital smart workshop monitoring equipment provided in the embodiment of the present application. DETAILED DESCRIPTION
[0012] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0013] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0014] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0015] As used in the specification of this application and the appended claims, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting" depending on the context. Similarly, the phrase "if it is determined" or "if the described condition or event is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce the described condition or event is detected" or "in response to detecting the described condition or event" depending on the context.
[0016] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0017] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0018] In related technologies, a workshop is the main area in a factory where products are produced or parts are processed. Depending on the product type and production process, workshops can be divided into various types, such as electronic workshops, mechanical workshops, chemical workshops, assembly workshops, etc.
[0019] The traditional workshop supervision process relies on manual work (such as manually recording equipment data and operating conditions). Since data collection, analysis and decision-making take time, real-time or near real-time monitoring and adjustment cannot be achieved, which leads to poor supervision results.
[0020] To solve the above problems, the embodiments of the present application provide a digital smart workshop supervision method, system and equipment.
[0021] In this method, first, by monitoring the first operation used to instruct the digital intelligent workshop supervision equipment to supervise the workshop equipment, it is helpful to obtain the operation data of the workshop equipment in real time when the operation data of the workshop equipment is needed in the future, and it can also provide data support for the subsequent timely adjustment of production parameters to achieve immediate response, reduce the impact of failures on production, and help improve the subsequent supervision effect. Then, based on the first operation, the operation data of the workshop equipment is obtained, and the status and performance of the workshop equipment can be understood in real time, which helps to quickly respond to any abnormal situation or operation problems in the future, and take necessary measures in time to avoid potential production interruptions or equipment damage, which helps to improve the subsequent supervision effect. Finally, according to the operation data, the working condition analysis is carried out to determine the workshop supervision method, and the fluctuation of key indicators such as the operation efficiency and output rate of the workshop equipment can be found, and then the bottleneck factors affecting the efficiency can be identified, so as to adjust the operation status of the workshop equipment in a targeted manner, such as optimizing the equipment parameter settings, adjusting the production process, optimizing the workers' operation process, etc., which helps to improve the supervision effect.
[0022] The digital smart workshop supervision method provided in the embodiment of the present application can be applied to a digital smart workshop supervision device. At this time, the digital smart workshop supervision device is the executor of the digital smart workshop supervision method provided in the embodiment of the present application. The embodiment of the present application does not impose any restrictions on the specific type of the digital smart workshop supervision device.
[0023] For example, the digital smart workshop supervision equipment may include a digital smart workshop supervision device and a control device electrically connected to the digital smart workshop supervision device. For example, the digital smart workshop supervision device may include a sensor, a data acquisition device, and a digital smart workshop supervision system installed in the digital smart workshop supervision device. The sensor is used to monitor the operating status and physical parameters of the workshop equipment. For example, the sensor may be a temperature sensor, a pressure sensor, a flow meter, an electric meter, etc. The data acquisition device is used to collect data provided by the sensor, including the operating parameters of the equipment, key indicators in the production process, and environmental condition data, and store it in a secure database. The digital smart workshop supervision system can use data analysis tools and algorithms to process and analyze the data collected in real time to identify anomalies, trends, and optimization opportunities. For example, based on the analysis of energy consumption data, the digital smart workshop supervision system can identify the peaks and valleys of energy consumption, as well as the specific reasons for energy waste, and control the digital smart workshop supervision equipment through the control device to make corresponding adjustments, which can optimize energy use strategies, reduce energy waste, implement intelligent energy-saving measures, and minimize energy costs.
[0024] For example, the control device can be a single-chip microcomputer, a mobile phone, a tablet computer, a notebook computer, an ultra-mobile personal computer (UMPC), a netbook, a desktop computer, a computing device or a computer connected to a wireless modem, a laptop computer, a handheld communication device, a handheld computing device, etc.
[0025] In order to better understand the digital smart workshop supervision method provided in the embodiment of the present application, the specific implementation process of the digital smart workshop supervision method provided in the embodiment of the present application is exemplarily introduced below.
[0026] Figure 1 A schematic flow chart of a digital smart workshop supervision method provided in an embodiment of the present application is shown, and the digital smart workshop supervision method includes: S100, monitoring a first operation, wherein the first operation is used to instruct a digital smart workshop monitoring device to monitor workshop equipment.
[0027] It can be understood that the first operation can be defined as a certain trigger condition or event, such as pressing a button to start supervision, sending a supervision command (such as which workshop equipment needs to be supervised or a parameter or an indicator of the workshop equipment in the production process, etc.), or a change in the sensor signal. For example, a button or switch can be set for the operator to manually trigger the first operation to control the digital smart workshop supervision equipment to supervise the workshop equipment. For another example, a set of logical rules or algorithms are designed to determine whether the sensor signal reaches the threshold or condition for triggering the supervision command to trigger the supervision program. For example, when the sensor detects that parameters such as temperature, pressure, and vibration exceed the safety range, the supervision program is triggered to control the digital smart workshop supervision equipment to supervise the workshop equipment. For another example, a supervision instruction from an operator is received through communication to control the digital smart workshop supervision equipment to supervise the workshop equipment.
[0028] With such a setting, by monitoring the first operation, it is helpful to obtain the operating data of the workshop equipment in real time when the operating data of the workshop equipment is needed in the future. It can also provide data support for the subsequent timely adjustment of production parameters to achieve immediate response, reduce the impact of faults on production, and help improve subsequent supervision effects.
[0029] In one possible implementation, see Figure 2 The workshop equipment includes a first workshop device and a second workshop device. In step S100, after monitoring the first operation, the digital smart workshop supervision method further includes: S110, in response to a first operation, the digital smart workshop monitoring device monitors first production data of a first workshop device. The first operation is used to instruct the digital smart workshop monitoring device to monitor and analyze whether the production process of the first workshop device is abnormal.
[0030] It can be understood that a response rule can be set to execute the first operation and parse the content of the first operation when an instruction triggering the first operation is detected. The content of the first operation may include which workshop equipment needs to be supervised or a certain parameter or indicator of the workshop equipment in the production process, so that the digital intelligent workshop supervision equipment can supervise the first production data of the first workshop device. The first production data may include temperature parameters, vibration parameters, etc. of the first workshop device in the production process, and these parameters are analyzed to identify whether there are abnormal conditions. Abnormal conditions may include sudden data fluctuations, values beyond the set range, or patterns that do not match historical data.
[0031] With such a configuration, in response to the first operation, the digital smart workshop monitoring equipment monitors the first production data of the first workshop device, which can quickly discover problems in the production process, reduce downtime and production interruptions, and help improve subsequent monitoring effects.
[0032] S120, in the process of supervising the first production data of the first workshop device, if the digital intelligent workshop supervision device does not obtain the response signal fed back by the second workshop device, the digital intelligent workshop supervision device sends a second production data acquisition signal to the second workshop device. The response signal is used by the digital intelligent workshop supervision device to determine the second production data of the second workshop device. The second workshop device and the first workshop device are devices responsible for different production stages under the same production task. The second production data acquisition signal is used to instruct the second workshop device to feed back the second production data to the digital intelligent workshop supervision device, so that the digital intelligent workshop supervision device can supervise the production process of the second workshop device.
[0033] It can be understood that the communication protocol or physical interface between the digital intelligent workshop supervision device and the first workshop device and the second workshop device can be determined by wired connection or wireless connection. In the process of supervising the first production data of the first workshop device, the digital intelligent workshop supervision device will periodically detect whether the response signal fed back by the second workshop device is received, which can be done by polling or event triggering. If no feedback signal is received, that is, the response of the second workshop device is not obtained, the digital intelligent workshop supervision device will determine that it is necessary to send a second production data acquisition signal to the second workshop device. The second production data acquisition signal can be a specific command or instruction to instruct the second workshop device to feedback the second production data to the digital intelligent workshop supervision device. For example, after the second workshop device receives the second production data acquisition signal sent by the digital intelligent workshop supervision device, it will prepare and send the second production data. The digital intelligent workshop supervision device receives the second production data of the second workshop device. The second production data may include the temperature parameters, vibration parameters, etc. of the second workshop device during the production process. The production process of the second workshop device can be supervised based on the second production data. The supervision process may include analyzing the second production data, alarm processing, production task adjustment, etc. to ensure the normal operation of the production process.
[0034] For example, the first workshop device can be a rough processing of raw materials, for example, melting and shaping steel. The second workshop is responsible for fine processing, for example, fine carving, cutting or spraying of the finished product. In this case, the operation of the second workshop device must be carried out after the first workshop device is completed to ensure the integrity and quality of the product. Therefore, the second workshop device needs to wait for the first workshop device to be completed before it can start working. Therefore, in the early stage of production of the first workshop device (just starting the first production task), the digital smart workshop supervision device cannot obtain the response signal fed back by the second workshop device, that is, the second workshop device is still in the waiting process at this time, and there is no processing object or product, resulting in the inability to feedback the second production data. For example, when the first workshop device completes the first production task and is performing the second generation task, the second workshop device can process the product corresponding to the first production task. Therefore, the second workshop device has a processing object or product, so the second workshop device can feedback the second production data to the digital smart workshop supervision device after receiving the second production data acquisition signal sent by the digital smart workshop supervision device.
[0035] For example, the first workshop device may be a work area for producing component A, and the second workshop device may be a work area for assembling or processing components. When the first workshop device completes the first production task and is preparing to carry out the second generation task, the second workshop device may initiate a task instruction to adjust production to the first workshop to instruct the first workshop device to produce component B. Therefore, the production task of the second workshop device is to assemble or process component B, rather than assembling or processing component A that has been produced by the first workshop device. Therefore, the operation of the second workshop device must be carried out after the first workshop device completes component B. At this time, the second workshop device is also in a waiting process and has no processing object or product, resulting in the inability to feedback the second production data.
[0036] With such a configuration, in the process of supervising the first production data of the first workshop device, if the digital intelligent workshop supervision equipment does not obtain the response signal fed back by the second workshop device, the digital intelligent workshop supervision equipment sends a second production data acquisition signal to the second workshop device, which helps to obtain and integrate the production data of the first workshop device and the second workshop device, so as to realize real-time monitoring of the entire production process, ensure the integrity and timeliness of the production data, help the production activities of different workshops and different stages to operate in coordination, and improve the subsequent supervision effect.
[0037] In one possible implementation, see Figure 3 , the digital smart workshop supervision method also includes: S130, after the digital smart workshop supervision equipment sends the second production data acquisition signal to the second workshop device and still fails to obtain a response signal from the second workshop device, the digital smart workshop supervision equipment stops sending the second production data acquisition signal to the second workshop device and confirms whether the production task of the first workshop device is completed.
[0038] It can be understood that after sending the second production data acquisition signal, the digital smart workshop supervision can set a predetermined timeout period, for example, set to 30 seconds. If no response signal is received from the second workshop device during this period, it can be considered that the second workshop device has no processing object or product or has a fault, etc., and after exceeding the preset timeout period, the timeout handler is automatically triggered to suspend sending the second production data acquisition signal to the second workshop device. At the same time, the production task status of the first workshop device will be checked, including confirming whether the task has been completed or is in progress or is a sequence of production tasks, for example, confirming whether the production task is the first production task or the second production task. For example, the first workshop device can be for rough processing of raw materials, such as melting and shaping steel, while the second workshop is responsible for fine processing, such as fine carving, cutting or spraying of the shaped products. In this case, the operation of the second workshop device must be carried out after the first workshop device is completed to ensure the integrity and quality of the product. Therefore, the second workshop device needs to wait for the first workshop device to be completed before it can start working. Therefore, even if the second workshop device receives the second production data acquisition signal, it cannot feedback the second production data to the digital intelligent workshop supervision equipment. Therefore, the sending of the second production data acquisition signal to the second workshop device can be suspended first, and after determining that the first workshop device is completed, the second workshop device can send the second production data acquisition signal to the second workshop device during the production task to obtain the second production data.
[0039] With such a configuration, after the digital smart workshop supervision equipment sends the second production data acquisition signal to the second workshop device and still fails to obtain a response signal from the second workshop device, the digital smart workshop supervision equipment suspends sending the second production data acquisition signal to the second workshop device and confirms whether the production task of the first workshop device is completed. The digital smart workshop supervision equipment can focus on monitoring the first workshop device when only the first workshop device is executing the production task. This dynamic adjustment can efficiently track key production stages, ensure the continuity and efficiency of the production line, and help improve subsequent supervision effects.
[0040] In one possible implementation, see Figure 4 In step S130, the digital smart workshop monitoring device stops sending the second production data acquisition signal to the second workshop device, including: S131, when the digital smart workshop supervision device sends the second production data acquisition signal to the second workshop device for the first time, record the signal quantity of the second production data acquisition signal sent from the first time. The signal quantity is used to reflect the number of signals sent by the digital smart workshop supervision device to the second workshop device, or the number of signals sent by the digital smart workshop supervision device to the second workshop device when the production task of the first workshop device is completed.
[0041] It is understandable that a signal counter may be set to record the number of second production data acquisition signals sent to the second workshop device. When the digital intelligent workshop supervision device sends the second production data acquisition signal to the second workshop device for the first time, the number of signals begins to be recorded, which can be achieved by a dedicated signal counter or event recorder. For example, there may be a database table or log file to record the timestamp and number of each signal sent.
[0042] With such a configuration, when the digital intelligent workshop supervision equipment sends the second production data acquisition signal to the second workshop device for the first time, the signal amount of the second production data acquisition signal sent from the first time is recorded, so that the activity level of the second workshop device can be quantified, and the progress of the production process can be timely understood. For example, when the second production data acquisition signal is sent to the second workshop device for multiple times, no response signal is received from the second workshop device, so that it can be known that the second workshop device has no processing object or product or has a fault, etc., which is helpful for making corresponding adjustments based on this information and helps to improve the subsequent supervision effect.
[0043] S132: When the signal amount is greater than or equal to the preset signal amount, the digital intelligent workshop monitoring equipment stops sending the second production data acquisition signal to the second workshop device.
[0044] It is understandable that a preset signal quantity can be defined, that is, the maximum data of the second production data acquisition signal sent by the digital smart workshop supervision device, for example, 5, 6 or 7, etc. Before each preparation to send the second production data acquisition signal, check whether the current value of the signal counter reaches or exceeds the preset signal quantity. If the value of the counter is greater than or equal to the preset signal quantity, the digital smart workshop supervision device suspends sending the second production data acquisition signal to the second workshop device.
[0045] For example, when the first workshop device just starts to process the first production task, the operation of the second workshop device must be completed before the first workshop device is completed. Therefore, if the signal amount is greater than or equal to the preset signal amount during the waiting process (that is, the second workshop device is waiting for the first workshop device to complete the production task), the digital smart workshop supervision device can suspend sending the second production data acquisition signal to the second workshop device. When the first workshop device completes the first production task, the second workshop device can initiate a task instruction to adjust production to the first workshop to instruct the first workshop device to produce component B. Therefore, the production task of the second workshop device is to assemble or process component B, rather than assembling or processing component A in the first production task that the first workshop device has completed. Therefore, the operation of the second workshop device must be carried out after the first workshop device completes component B. At this time, the second workshop device is also in the waiting process. Therefore, when the signal amount is greater than or equal to the preset signal amount during the waiting process (that is, the second workshop device is waiting for the first workshop device to complete the changed production task), the digital smart workshop supervision device can also suspend sending the second production data acquisition signal to the second workshop device.
[0046] With such a setting, when the signal volume is greater than or equal to the preset signal volume, the digital intelligent workshop supervision equipment suspends sending the second production data acquisition signal to the second workshop device, which can effectively avoid excessive impact of data traffic on the network. For example, in high traffic conditions, the system may be overloaded, resulting in service interruption or performance degradation. By managing the signal volume, this problem can be avoided, ensuring that the system can operate stably under various loads, providing continuous and reliable supervision services, and helping to improve subsequent supervision effects.
[0047] In a possible implementation, the digital smart workshop supervision method also includes: When the digital smart workshop monitoring device stops sending the second production data acquisition signal to the second workshop device, the production information is obtained, wherein the production information includes information reflecting whether the second workshop device has a fault, or whether the second workshop device needs to wait for the first workshop device to complete the production task before processing the product produced by the first workshop device.
[0048] It is understood that data can be cached in local storage during the suspension of data transmission. For example, the second workshop device can write relevant production data (such as product number, production timestamp, operation status such as fault or non-fault) into a shared local database or cache, and the digital smart workshop supervision device can periodically poll the local storage to obtain the latest production information, including information on whether the second workshop device has a fault or whether the second workshop device needs to wait for the first workshop device to complete the production task before processing on the product produced by the first workshop device.
[0049] With such a setting, when the digital smart workshop supervision equipment stops sending the second production data acquisition signal to the second workshop device, obtaining production information can help plan the production sequence and resource allocation in advance, avoid backlog of raw materials or supply shortage, and ensure the smooth progress of the production process. This helps to improve overall production efficiency, reduce inventory costs, and achieve lean production and just-in-time production.
[0050] S140, when it is determined that the production task of the first workshop device is completed, the digital intelligent workshop monitoring equipment resumes the acquisition task of sending the second production data acquisition signal to the second workshop device.
[0051] It is understandable that whether the production task status of the first workshop device has been marked as completed or has reached the predetermined production target can be confirmed by monitoring the production task status or the achievement of production indicators. When it is determined that the production task of the first workshop device is completed, the production task status of the first workshop device is updated to the digital smart workshop supervision system. After confirming that the production task of the first workshop device is completed, the digital smart workshop supervision system can send a notification or signal to the digital smart workshop supervision device, indicating that the second production data acquisition signal can continue to be sent to the second workshop device.
[0052] With such a setting, when it is determined that the production task of the first workshop device is completed, the digital intelligent workshop supervision equipment resumes the task of sending the second production data acquisition signal to the second workshop device. The strategy and operation can be adjusted in time to reduce the waiting time of the second workshop device. This helps to speed up the overall production rhythm, shorten the production cycle, and help improve the overall supervision effect.
[0053] In one possible implementation, see Figure 5 S140, when it is determined that the production task of the first workshop device is completed, the digital smart workshop monitoring device resumes the task of sending the second production data acquisition signal to the second workshop device, including: S141, when the production information includes information reflecting that the second workshop device has changed from a faulty state to a non-faulty state, and it is determined that the production task of the first workshop device is completed, the digital smart workshop supervision equipment resumes the task of sending the second production data acquisition signal to the second workshop device, so that the digital smart workshop supervision equipment can supervise the production process of the second workshop device.
[0054] It can be understood that a fault status monitoring unit is set on the second workshop device to monitor production information, and a notification is sent when the production information indicates that the second workshop device changes from a fault state to a non-fault state, such as a state change notification. The state information of the second workshop device can be obtained through a sensor. For example, if the operating power of the second workshop device is in the fault range, then the state fault state of the second workshop device is determined. A task completion monitoring unit is set on the first workshop device. When the production task is completed, a completion signal is sent. The task status of the first workshop device can be queried regularly or on demand to determine whether its production task has been completed. Deploy a centralized event management system to integrate the state change information from each workshop device, and formulate a clear event processing logic. When a key event (such as a change from a fault state to a non-fault state and the completion of the task of the first workshop device) is received, the corresponding operation is automatically triggered, that is, the digital smart workshop supervision equipment resumes the acquisition task of sending the second production data acquisition signal to the second workshop device.
[0055] With such a configuration, when the production information includes information reflecting that the second workshop device has changed from a faulty state to a non-faulty state, and it is determined that the production task of the first workshop device is completed, the digital smart workshop supervision equipment resumes the task of sending the second production data acquisition signal to the second workshop device, so that the digital smart workshop supervision equipment can supervise the production process of the second workshop device, and can perform supervision immediately after the fault of the second workshop device is restored, which helps to improve the supervision effect.
[0056] S142, when the production information includes information reflecting that the second workshop device needs to wait for the first workshop device to complete the production task before processing the product produced by the first workshop device, and when it is determined that the production task of the first workshop device is completed, the digital smart workshop supervision equipment resumes the task of sending the second production data acquisition signal to the second workshop device, so that the digital smart workshop supervision equipment can supervise the production process of the second workshop device.
[0057] It can be understood that when the production information is parsed and obtained, if the content of the production information indicates that the second workshop device needs to wait for the first workshop device to complete the production task before processing the product produced by the first workshop device, the task status of the first workshop device can be queried regularly or on demand to determine whether its production task has been completed. When it is determined that the production task of the first workshop device is completed, the digital smart workshop supervision equipment resumes the task of sending the second production data acquisition signal to the second workshop device.
[0058] With such a configuration, when the production information includes information reflecting that the second workshop device needs to wait for the first workshop device to complete the production task before processing the product produced by the first workshop device, and when it is determined that the production task of the first workshop device is completed, the digital smart workshop supervision equipment resumes the task of sending the second production data acquisition signal to the second workshop device, so that the digital smart workshop supervision equipment can supervise the production process of the second workshop device, and can automatically trigger the supervision task of the second workshop equipment, reducing manual intervention and waiting time, ensuring the continuity and efficiency of supervision, and helping to improve the supervision effect.
[0059] In a possible implementation, the digital smart workshop supervision method also includes: In the process of monitoring the first production data of the first workshop device, if the first production data indicates abnormal data, a reminder message is generated and the sending of the second production data acquisition signal to the second workshop device is suspended. The reminder message is used to remind the operator that the production process of the first workshop device is abnormal.
[0060] It can be understood that sensors and data acquisition equipment are installed on the first workshop device to collect the first production data in real time. The range or threshold of normal production data is set based on experience and historical data. Use real-time data analysis tools (such as streaming processing platforms) to monitor the first production data to detect whether it exceeds the set threshold. When abnormal data is detected, reminder information is automatically generated. This can be achieved by writing scripts or programs to package the abnormal data and related information into notification messages. The reminder information can be sent to operators and managers via SMS, emails, display screens in the workshop, or other instant messaging tools. After detecting abnormal data, the sending of the second production data acquisition signal to the second workshop device can be suspended.
[0061] For example, when the second workshop device needs to process the product just produced by the first workshop device, after the operator handles and resolves the abnormality of the first workshop device, the second production data acquisition signal can be restored to the second workshop device. When the second workshop device does not need to process the first product just produced by the first workshop device, but processes the second product subsequently produced by the first workshop device, after the operator handles and resolves the abnormality of the first workshop device, the second production data acquisition signal can be restored to the second workshop device.
[0062] With such a configuration, in the process of supervising the first production data of the first workshop device, if the first production data indicates abnormal data, a reminder message is generated, and the sending of the second production data acquisition signal to the second workshop device is suspended. Abnormal situations can be discovered and handled in time, and small problems that are not solved in time can be avoided from turning into major failures, thus reducing maintenance costs and effectively preventing defective products that may appear in the production process, thereby improving the quality of the final product.
[0063] In one possible implementation, see Figure 6 , the digital smart workshop supervision method also includes: S150, the digital smart workshop supervision equipment continuously monitors the first production data of the first workshop device.
[0064] It can be understood that various sensors, such as temperature, pressure, vibration, position, energy consumption and other sensors, are installed on the first workshop device to collect the first production data of the first workshop device in real time. These sensors are connected to the digital smart workshop monitoring equipment through the Internet of Things technology to achieve real-time data transmission and processing, so that the digital smart workshop monitoring equipment can analyze the first production data in real time and identify abnormal states or trend changes, so as to achieve the purpose of continuously monitoring the first production data of the first workshop device.
[0065] With such a configuration, the digital intelligent workshop supervision equipment continuously monitors the first production data of the first workshop device, and can realize continuous and efficient monitoring of the first production data of the first workshop device, ensuring the stability of the production process and product quality, while improving production efficiency and resource utilization efficiency.
[0066] S160, when the second workshop device initiates a production task to the first workshop device or the second workshop device receives a production task from the first workshop device, the digital smart workshop supervision device keeps monitoring the first production data of the first workshop device, and the digital smart workshop supervision device monitors the second workshop device receiving the production task from the first workshop device. The first workshop device is electrically connected to the second workshop device.
[0067] For example, the first workshop device originally processes product A, and the second workshop device fine-processes product A to obtain product B. When the processing requirements change, for example, when the first workshop device is ready to perform a new task, it will send a signal or instruction containing detailed task information (such as task type, required materials, expected output, etc.) to the second workshop device through an electrical connection. At this time, the first workshop device changes to processing product C, and the second workshop device can fine-process product C to obtain product D. At the same time, the first workshop device continues to process product A after processing product C. In this case, the digital smart workshop supervision device keeps monitoring the first production data of the first workshop device, that is, continues to monitor the first production data of product A that the first workshop device continues to process after processing product C. At the same time, the digital smart workshop supervision device monitors the second workshop device receiving the production task from the first workshop device, that is, monitors the process of the second workshop device fine-processing product C.
[0068] With such a configuration, when the second workshop device initiates a production task to the first workshop device or the second workshop device receives a production task from the first workshop device, the digital smart workshop supervision equipment keeps monitoring the first production data of the first workshop device, and the digital smart workshop supervision equipment monitors the second workshop device receiving the production task from the first workshop device.
[0069] S170, when the second workshop device refuses to run the production task from the first workshop device, the digital intelligent workshop supervision equipment continues to monitor the first production data of the first workshop device.
[0070] It can be understood that the digital smart workshop supervision equipment can automatically identify whether the second workshop device refuses to execute the production task from the first workshop device, and obtain the reason for the refusal if the refusal is confirmed, including but not limited to insufficient resources of the second workshop device, failure of the second workshop device, adjustment of the production priority of the second workshop device, etc. Regardless of whether the second workshop executes the task, the digital smart workshop supervision equipment should continue to monitor the first production data of the first workshop device, including but not limited to the operating status, production progress, material consumption, energy use, etc. of the first workshop device. If data anomalies are found during the supervision process, such as decreased production efficiency, equipment failure warning, etc., the relevant personnel can be notified immediately and displayed on the supervision equipment so that timely measures can be taken later.
[0071] With this arrangement, when the second workshop device refuses to run the production task from the first workshop device, the digital intelligent workshop supervision equipment continues to monitor the first production data of the first workshop device, and can understand the production status and operation status of the first workshop device in real time. Even when the second workshop refuses to perform the task, it can have more flexibility to adjust the entire production process, avoid decision-making errors due to lack of information, and help improve the overall supervision effect.
[0072] S180, when the second workshop device runs the production task from the first workshop device, the second workshop device sends the second production data to the digital smart workshop supervision equipment in response to the second production data acquisition signal, and the digital smart workshop supervision equipment maintains or suspends supervision of the first workshop device.
[0073] It can be understood that when the second workshop device receives the production task pushed by the first workshop device, it will start the receiving process and start executing the task. In the process of executing the task, the second production data is sent to the digital smart workshop supervision device in response to the second production data acquisition signal, so that the digital smart workshop supervision device can analyze the second production data to identify the abnormality in the production process of the second workshop device. At the same time, during the supervision of the second production data of the second workshop device, the real-time monitoring of the first production data of the first workshop device can be suspended, or the first production data of the first workshop device can be supervised at a specific frequency as needed to maintain the transparency of the overall production status. For example, after completing the last production task, the first workshop device can suspend the real-time monitoring of the first workshop device. For another example, for production processes that are not very important, the first production data of the first workshop device can be supervised at a specific frequency to reduce the supervision power consumption of the digital smart workshop supervision device.
[0074] With such a configuration, when the second workshop device runs the production task from the first workshop device, the second workshop device sends the second production data to the digital intelligent workshop supervision device in response to the second production data acquisition signal, and the digital intelligent workshop supervision device maintains or suspends supervision of the first workshop device, thereby achieving real-time synchronization of production data. This enables the supervision device to instantly access and analyze the production status and performance indicators of the second workshop device, thereby making more accurate and timely decisions or adjustments.
[0075] In one possible implementation, see Figure 7 , S180, when the second workshop device runs the production task from the first workshop device, the second workshop device sends the second production data to the digital smart workshop supervision device in response to the second production data acquisition signal, and the digital smart workshop supervision device maintains or suspends supervision of the first workshop device, including: S181, in response to the second operation, the second workshop device runs the production task from the first workshop device, and the digital intelligent workshop supervision equipment maintains and supervises the first production data of the first workshop device.
[0076] It can be understood that the complete production task information of the first workshop device can be obtained, including task details, priority, and the amount of tasks that have not been completed. In the case of obtaining that there are still unfinished production tasks for the first workshop device, a signal is sent to the digital smart workshop supervision device, indicating that even if the current production task is completed, there are still unfinished tasks to be processed, that is, the digital smart workshop supervision device is still required to maintain the supervision of the first production data of the first workshop device. The second operation can be click, touch, keyboard and mouse collaborative operation, automatic triggering and other operations. For example, when the operator knows that there are still unfinished production tasks for the first workshop device, he can click on the interactive interface of the digital smart workshop supervision device to maintain supervision, so that the second workshop device runs the production tasks from the first workshop device, and the digital smart workshop supervision device maintains the supervision of the first production data of the first workshop device. For another example, a trigger program can be set to automatically trigger the second operation when there are still unfinished production tasks for the first workshop device, so that the second workshop device runs the production tasks from the first workshop device, and the digital smart workshop supervision device maintains the supervision of the first production data of the first workshop device.
[0077] With such a setting, in response to the second operation, the second workshop device runs the production task from the first workshop device, and the digital intelligent workshop supervision equipment maintains the first production data of the first workshop device for supervision, so that the production status and task progress of each workshop can be understood in real time, thereby optimizing the allocation of monitoring resources, avoiding waste of resources and duplication of work, and helping to improve the supervision effect.
[0078] Alternatively, S182, in response to the third operation, the second workshop device runs the production task from the first workshop device, and the digital intelligent workshop supervision device suspends supervision of the first workshop device. The second operation and the third operation are different operations, the second operation is used to indicate that the first workshop device has other unfinished production tasks after running and completing the current production task, and the third operation is used to indicate that the first workshop device has no other unfinished production tasks after running and completing the current production task.
[0079] It can be understood that the complete production task information of the first workshop device can be obtained, including task details, priority, and the amount of tasks that have not been completed. When it is obtained that the first workshop device has no unfinished production tasks, a signal is sent to the digital smart workshop supervision device, indicating that the first workshop device has completed all production tasks and there are no production tasks to be processed, that is, there is no need for the digital smart workshop supervision device to maintain the supervision of the first production data of the first workshop device. The third operation can be click, touch, keyboard and mouse collaborative operation, automatic triggering and other operations. For example, when the operator knows that the first workshop device has no unfinished production tasks, he can click on the interactive interface of the digital smart workshop supervision device to maintain supervision, so that the second workshop device runs the production tasks from the first workshop device, and the digital smart workshop supervision device suspends supervision of the first workshop device. For another example, a trigger program can be set to automatically trigger the third operation when there are no unfinished production tasks in the first workshop device, so that the second workshop device runs the production tasks from the first workshop device, and the digital smart workshop supervision device suspends supervision of the first workshop device.
[0080] With such a setting, in response to the third operation, the second workshop device runs the production task from the first workshop device, and the digital intelligent workshop supervision equipment suspends the supervision of the first workshop device. The production status and task progress of each workshop can be understood in real time, thereby optimizing the allocation of monitoring resources, avoiding waste of resources and duplication of work, and helping to improve the supervision effect.
[0081] S200: Acquire operation data of workshop equipment based on a first operation.
[0082] It can be understood that the first operation is analyzed to clarify the goals and requirements of data collection, for example, which parameters need to be monitored (temperature, pressure, speed, etc.), what is the frequency of data collection (real-time, per second, per hour, etc.), and according to the requirements of the first operation, appropriate sensors are selected for data acquisition to obtain the operation data of the workshop equipment, which may include the temperature data, vibration data, pressure data, energy consumption data, etc. of the workshop equipment. For example, if the vibration of the rotating equipment in the workshop equipment during the production process needs to be obtained, the vibration data can be obtained in real time through the vibration sensor for subsequent supervision tasks.
[0083] With such a setting, by obtaining the operating data of the workshop equipment based on the first operation, the status and performance of the workshop equipment can be understood in real time, which will help to quickly respond to any abnormal situations or operating problems in the future, and take necessary measures in time to avoid potential production interruptions or equipment damage, which will help to improve subsequent supervision effects.
[0084] S300, analyzing the working condition according to the operating data, and determining a workshop supervision method, wherein the workshop supervision method is used to adjust the operating status of the workshop equipment.
[0085] It can be understood that, first, useful features are extracted from the operating data. For example: average value: represents the average state of the equipment in a certain period of time, maximum / minimum value: reflects the extreme working condition of the equipment, standard deviation: measures the degree of fluctuation of the data, and analyzes the trend of the data through moving average, weighted average and other methods. For example, 7 vibration index data [10, 15, 12, 14, 13, 16, 18] are extracted from the operating data, and the average of the first three data is calculated to obtain the first moving average value of (10+15+12) / 3=12.33. Move the window to the right by one data point, calculate the average of the second to fourth data, and obtain the second moving average value of (15+12+14) / 3=13.67. By analogy, all moving average values can be calculated, and then the trend of the vibration index data can be analyzed, showing an increasing trend. Then, the equipment working conditions are classified, such as normal working conditions, abnormal working conditions, fault working conditions and warning working conditions. For example, when the vibration of the workshop equipment exceeds the normal range but does not reach the fault level, it is marked as "warning working condition"; when it exceeds the set threshold, it is marked as "fault working condition". Finally, the workshop supervision method is formulated according to the working condition analysis results. For example, normal working conditions: maintain the current operating status of the equipment, and conduct regular inspections and maintenance. Warning working conditions: take preventive measures, such as reducing the load of workshop equipment and increasing the cooling time. Abnormal working conditions: immediately notify maintenance personnel to conduct on-site inspections and repairs. Fault working conditions: emergency shutdown, comprehensive overhaul and troubleshooting. For another example, time series analysis or machine learning models (such as ARIMA, LSTM) can be used to predict the future status of the equipment and identify abnormalities (such as equipment that is about to fail). For predicted abnormal equipment, set an advance maintenance plan and adjust the operating time or frequency to reduce the downtime of failures. For example, normal working conditions: the temperature of the conveyor belt motor of the workshop equipment is between 60-70℃, maintain the existing operation, and lubricate and maintain it regularly. Warning condition: When the motor temperature is between 75-85℃, reduce the load on the conveyor belt and increase the cooling time. Abnormal condition: When the motor temperature exceeds 85℃, immediately notify the maintenance personnel to check the cooling system and the motor itself. Fault condition: When the motor temperature exceeds 90℃, emergency stop, detailed inspection and maintenance.
[0086] With such settings, working condition analysis is performed based on operating data and the workshop supervision method is determined. Fluctuations in key indicators such as the operating efficiency and output rate of workshop equipment can be discovered, and bottleneck factors affecting efficiency can be identified to adjust the operating status of workshop equipment in a targeted manner, such as optimizing equipment parameter settings, adjusting production processes, and optimizing workers' operating procedures, which helps to improve supervision results.
[0087] In one possible implementation, see Figure 8, S300, analyzes the working conditions based on the operating data and determines the workshop supervision method, including: S310, analyzing the acquired operation data of the workshop equipment to identify abnormal operating data of the workshop equipment.
[0088] It can be understood that, first of all, a reasonable range of various parameters is set, and when the actual value exceeds this range, it can be judged as abnormal. For example, for a temperature sensor, the normal range is between 20°C and 40°C. If it suddenly jumps to 60°C, it may indicate that there is a fault in the workshop equipment. Then, the abnormal situation is identified by monitoring the trend of data changes. For example, for a pressure sensor, if the pressure value continues to rise or fall beyond the normal fluctuation range, it means that there is a problem with the equipment. Then, use signal processing technology to perform spectral analysis on the data collected by the sensor to find abnormal frequency components. For example, for a vibration sensor, abnormal frequency components indicate that there is a fault in the equipment. The machine learning algorithm or model is trained through historical data (for example, historical data is classified by label, marked as "normal" or "faulty" status, data is divided into training set and test set, 70%-80% of the data is used for training, 20%-30% of the data is used for testing, a suitable machine learning model is selected, and it is trained with the training set, and verified with the test set to obtain the final machine learning algorithm or model), so that the machine learning algorithm or model can identify abnormal conditions similar to known fault modes. For example, a certain device will have a specific vibration pattern before a fault occurs, and the fault can be predicted by the pattern recognition algorithm. Finally, a comprehensive judgment is made by combining multiple parameters, because a single parameter may be affected by external factors. For example, a comprehensive analysis is performed by combining multiple sensor parameters such as temperature, humidity and pressure to determine whether the device is in an abnormal state. For example, for each sensor parameter, according to historical data and normal operating status, reasonable upper and lower thresholds are determined (due to changes in the environment and operating conditions, the parameter threshold can be dynamically adjusted as needed). The situation beyond the threshold range can be regarded as a potential abnormality. Analyze the correlation between different parameters and understand their internal connections. When certain parameters change, other related parameters will also change, which can be used as a basis for abnormal judgment (for example, if the production efficiency of the equipment suddenly drops, you can check the relevant current and vibration data. For example, if you find that the current increase is followed by the increase in vibration and the increase in temperature, it means that the increase in current causes the increase in vibration and the increase in temperature). According to the relative importance of each parameter, design a comprehensive scoring algorithm, and summarize the status signals of different parameters in a weighted manner to obtain an overall score to judge the status of the equipment. For example, suppose there are 4 parameters to evaluate the status of the equipment: temperature, vibration, current and pressure. You can set their relative importance and assign weights to each parameter, such as 30% for temperature, 25% for vibration, 20% for current, and 25% for pressure. For each parameter's measured value (or standardized value), multiply it by the corresponding weight and add them up to get an overall score.For example, if the temperature is 80, the vibration is 3, the current is 10, and the pressure is 150, the calculation method is overall score = (0.3×80) + (0.25×3) + (0.2×10) + (0.25×150) = 64.25. The status score can be pre-defined: 30-60 is abnormal status, 60-80 is good status, and 80-100 is excellent status.
[0089] With such a setting, the acquired operation data of the workshop equipment is analyzed to identify the abnormal operating data of the workshop equipment, so that potential faults and abnormal conditions can be discovered and handled in a timely manner, and equipment shutdown due to faults can be avoided, thereby improving the operation efficiency of the equipment.
[0090] S320, matching the abnormal operating condition data with a preset fault diagnosis library to determine a workshop supervision method corresponding to the identified abnormal operating condition data.
[0091] For example, the preset fault diagnosis library contains fault type A: feature 1, feature 2, feature 3, fault type B: feature 4, feature 5, feature 6, fault type C: feature 7, feature 8, feature 9. For the detected abnormal working condition data, the following features are extracted: feature 1, feature 3, feature 5. The extracted features are compared with the features in the fault diagnosis library, and the similarity between each fault type and the extracted features is calculated. The fault type with the highest similarity is selected. For example, feature 1 and feature 3 match fault type A, and feature 5 matches fault type B. According to the similarity, fault type A is the cause of the current abnormality. For fault type A, the preset supervision method can be: reduce the operating speed of the equipment, check and replace specific components.
[0092] With this setting, the abnormal operating condition data is matched with the preset fault diagnosis library to determine the workshop supervision method corresponding to the identified abnormal operating condition data. This can quickly and accurately identify the problems of the equipment or production line, greatly improving the efficiency compared to the traditional supervision method that relies on manual experience.
[0093] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0094] Corresponding to the digital smart workshop supervision method described in the above embodiment, the embodiment of the present application also provides a digital smart workshop supervision system, and each unit of the system can implement each step of the digital smart workshop supervision method. Fig. 9 A structural block diagram of a digital smart workshop supervision system provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.
[0095] Reference Fig. 9 , the digital smart workshop supervision system includes: The monitoring unit is used to monitor a first operation, wherein the first operation is used to instruct the digital smart workshop monitoring device to monitor the workshop equipment.
[0096] The acquiring unit is used to acquire the operation data of the workshop equipment based on the first operation.
[0097] The determination unit is used to perform working condition analysis based on the operating data and determine the workshop supervision method, wherein the workshop supervision method is used to adjust the operating status of the workshop equipment.
[0098] It should be noted that the information interaction, execution process, etc. between the above-mentioned systems / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0099] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In actual applications, the above-mentioned functions can be assigned to different functional units as needed, that is, the internal structure of the digital intelligent workshop supervision system can be divided into different functional units to complete all or part of the functions described above. The functional units in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0100] The present application also provides a digital smart workshop monitoring device. Fig.10 This is a schematic diagram of the structure of a digital smart workshop monitoring device provided in one embodiment of the present application. Fig.10 As shown, the digital intelligent workshop monitoring device 6 of this embodiment includes: at least one processor 60 ( Fig.10 Only one is shown), at least one memory 61 ( Fig.10 Only one is shown in the figure) and a computer program 62 stored in the at least one memory 61 and executable on the at least one processor 60. When the processor 60 executes the computer program 62, the digital smart workshop supervision device 6 implements the steps in any of the above-mentioned digital smart workshop supervision method embodiments, or the digital smart workshop supervision device 6 implements the functions of each unit in the above-mentioned system embodiments.
[0101] Exemplarily, the computer program 62 may be divided into one or more units, which are stored in the memory 61 and executed by the processor 60 to complete the present application. The one or more units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 62 in the digital smart workshop supervision device 6.
[0102] For example, the digital smart workshop supervision device 6 may include a digital smart workshop supervision device and a control device electrically connected to the digital smart workshop supervision device. For example, the digital smart workshop supervision device may include a sensor, a data acquisition device, and a digital smart workshop supervision system installed in the digital smart workshop supervision device. The sensor is used to monitor the operating status and physical parameters of the workshop equipment. For example, the sensor may be a temperature sensor, a pressure sensor, a flow meter, an electric meter, etc. The data acquisition device is used to collect data provided by the sensor, including the operating parameters of the equipment, key indicators in the production process, and environmental condition data, and store it in a secure database. The digital smart workshop supervision system can use data analysis tools and algorithms to process and analyze the data collected in real time to identify anomalies, trends, and optimization opportunities. For example, based on the analysis of energy consumption data, the digital smart workshop supervision system can identify the peaks and troughs of energy consumption, as well as the specific reasons for energy waste, and control the digital smart workshop supervision device 6 through the control device to make corresponding adjustments, which can optimize energy use strategies, reduce energy waste, implement intelligent energy-saving measures, and minimize energy costs. The digital smart workshop supervision device 6 may include, but is not limited to, a processor 60 and a memory 61. Those skilled in the art can understand that Fig.10 It is only an example of the digital smart workshop supervision device 6 and does not constitute a limitation of the digital smart workshop supervision device 6. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, buses, etc.
[0103] The processor 60 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0104] In some embodiments, the memory 61 may be an internal storage unit of the digital smart workshop supervision device 6, such as a hard disk or memory of the digital smart workshop supervision device 6. In other embodiments, the memory 61 may also be an external storage device of the digital smart workshop supervision device 6, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the digital smart workshop supervision device 6. Further, the memory 61 may also include both an internal storage unit and an external storage device of the digital smart workshop supervision device 6. The memory 61 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program, etc. The memory 61 may also be used to temporarily store data that has been output or is to be output.
[0105] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.
[0106] An embodiment of the present application provides a computer program product. When the computer program product runs on a digital smart workshop supervision device, the digital smart workshop supervision device implements the steps in any of the above method embodiments.
[0107] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the digital smart workshop supervision equipment, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), electrical carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.
[0108] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0109] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0110] In the embodiments provided in the present application, it should be understood that the disclosed digital smart workshop supervision equipment, digital smart workshop supervision system and digital smart workshop supervision method can be implemented in other ways. For example, the digital smart workshop supervision equipment and digital smart workshop supervision system embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0111] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0112] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A digital intelligent workshop supervision method, characterized in that: The method is applied to digital smart workshop monitoring equipment, and the method includes: Monitoring a first operation; wherein the first operation is used to instruct the digital smart workshop supervision device to supervise the workshop equipment; Acquiring operation data of the workshop equipment based on the first operation; Performing working condition analysis based on the operating data to determine a workshop supervision method; wherein the workshop supervision method is used to adjust the operating status of the workshop equipment; The workshop equipment includes a first workshop device and a second workshop device. After monitoring the first operation, the method further includes: In response to a first operation, the digital smart workshop supervision device supervises first production data of the first workshop device; wherein the first operation is used to instruct the digital smart workshop supervision device to supervise and analyze whether the production process of the first workshop device is abnormal; In the process of supervising the first production data of the first workshop device, if the digital intelligent workshop supervision equipment does not obtain the response signal fed back by the second workshop device, the digital intelligent workshop supervision equipment sends a second production data acquisition signal to the second workshop device; wherein, the response signal is used by the digital intelligent workshop supervision equipment to determine the second production data of the second workshop device; the second workshop device and the first workshop device are devices responsible for different production stages under the same production task; the second production data acquisition signal is used to instruct the second workshop device to feed back the second production data to the digital intelligent workshop supervision equipment, so that the digital intelligent workshop supervision equipment can supervise the production process of the second workshop device.
2. The digital smart workshop supervision method according to claim 1, characterized in that: The method further comprises: After the digital smart workshop supervision device sends the second production data acquisition signal to the second workshop device, and if the response signal fed back by the second workshop device is still not obtained, the digital smart workshop supervision device stops sending the second production data acquisition signal to the second workshop device, and confirms whether the production task of the first workshop device is completed; When it is determined that the production task of the first workshop device is completed, the digital intelligent workshop supervision equipment resumes the acquisition task of sending the second production data acquisition signal to the second workshop device.
3. The digital smart workshop supervision method according to claim 2, characterized in that: The digital smart workshop monitoring device suspends sending the second production data acquisition signal to the second workshop device, including: When the digital smart workshop supervision device sends the second production data acquisition signal to the second workshop device for the first time, the signal amount of the second production data acquisition signal sent is recorded from the first time; wherein the signal amount is used to reflect the number of signals sent by the digital smart workshop supervision device to the second workshop device, or, when the production task of the first workshop device is completed, the number of signals sent by the digital smart workshop supervision device to the second workshop device; When the signal amount is greater than or equal to the preset signal amount, the digital intelligent workshop supervision equipment suspends sending the second production data acquisition signal to the second workshop device.
4. The digital smart workshop supervision method according to claim 2, characterized in that: The method further comprises: When the digital smart workshop supervision equipment suspends sending the second production data acquisition signal to the second workshop device, production information is obtained; wherein the production information includes information reflecting whether the second workshop device has a fault, or information reflecting whether the second workshop device needs to wait for the first workshop device to complete the production task before processing the product produced by the first workshop device.
5. The digital smart workshop supervision method according to claim 4, characterized in that: When it is determined that the production task of the first workshop device is completed, the digital smart workshop monitoring device resumes the task of sending the second production data acquisition signal to the second workshop device, including: When the production information includes information reflecting that the second workshop device changes from a faulty state to a non-faulty state, and it is determined that the production task of the first workshop device is completed, the digital smart workshop supervision device resumes the acquisition task of sending the second production data acquisition signal to the second workshop device, so that the digital smart workshop supervision device can supervise the production process of the second workshop device; When the production information includes information reflecting that the second workshop device needs to wait for the first workshop device to complete the production task before performing processing on the product produced by the first workshop device, and when it is determined that the production task of the first workshop device is completed, the digital intelligent workshop supervision device resumes the acquisition task of sending the second production data acquisition signal to the second workshop device, so that the digital intelligent workshop supervision device can supervise the production process of the second workshop device.
6. The digital smart workshop supervision method according to claim 4, characterized in that: The method further comprises: The digital smart workshop monitoring device continuously monitors the first production data of the first workshop device; In the case where the second workshop device initiates a production task to the first workshop device or the second workshop device receives a production task from the first workshop device, the digital smart workshop supervision device keeps monitoring the first production data of the first workshop device, and the digital smart workshop supervision device monitors the second workshop device receiving the production task from the first workshop device; wherein the first workshop device is electrically connected to the second workshop device; In the case where the second workshop device refuses to run the production task from the first workshop device, the digital smart workshop supervision device keeps monitoring the first production data of the first workshop device; When the second workshop device runs the production task from the first workshop device, the second workshop device sends the second production data to the digital smart workshop supervision device in response to the second production data acquisition signal, and the digital smart workshop supervision device maintains or suspends supervision of the first workshop device.
7. The digital smart workshop supervision method according to claim 6, characterized in that: In the case where the second workshop device runs the production task from the first workshop device, the second workshop device sends the second production data to the digital smart workshop supervision device in response to the second production data acquisition signal, and the digital smart workshop supervision device maintains or suspends supervision of the first workshop device, including: In response to the second operation, the second workshop device runs the production task from the first workshop device, and the digital smart workshop supervision device keeps supervising the first production data of the first workshop device; Alternatively, in response to the third operation, the second workshop device runs the production task from the first workshop device, and the digital intelligent workshop supervision device suspends supervision of the first workshop device; wherein the second operation and the third operation are different operations, the second operation is used to indicate that the first workshop device has other unfinished production tasks after running and completing the current production task, and the third operation is used to indicate that the first workshop device has no other unfinished production tasks after running and completing the current production task; The performing of working condition analysis based on the operating data and determining the workshop supervision method includes: Analyzing the acquired operating data of the workshop equipment to identify abnormal operating condition data of the workshop equipment; The abnormal operating condition data is matched with a preset fault diagnosis library to determine a workshop supervision method corresponding to the identified abnormal operating condition data.
8. A digital intelligent workshop supervision system, characterized in that: Applied to a digital smart workshop supervision device, used to implement the digital smart workshop supervision method according to any one of claims 1 to 7, the digital smart workshop supervision system comprising: A monitoring unit, configured to monitor a first operation; wherein the first operation is used to instruct the digital smart workshop monitoring device to monitor workshop equipment; an acquisition unit, configured to acquire the operation data of the workshop equipment based on the first operation; A determination unit is used to perform a working condition analysis based on the operating data and determine a workshop supervision method; wherein the workshop supervision method is used to adjust the operating status of the workshop equipment.
9. A digital intelligent workshop monitoring device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Smart factory remote real-time monitoring regulation and control cloud platform based on industrial internet
CN113535765A
Intelligent panel processing workshop data processing method and terminal
CN115423289A
Production control system based on intelligent factory
CN117008550A
Production management method and system for injection production equipment
CN117452894A
Intelligent factory production online monitoring system based on big data
CN118071144A
Cited By
Smelting equipment monitoring method and system based on operation data analysis
CN119624087A
Digital workshop supervision system and method based on artificial intelligence
CN120469363A
An artificial intelligence-based digital workshop supervision system and method
CN120469363B
