Phosphorite management system for ultra-deep vertical shaft

By using data collection, risk assessment and execution modules in the ultra-deep shaft phosphate rock management system, the mine environment is detected and regulated in real time, environmental pollution and safety issues in underground mining are solved, and operational safety and equipment efficiency are improved.

CN118735151APending Publication Date: 2024-10-01GUIZHOU LUFA IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410610633.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

During the underground phosphate mining process, mine environmental pollution and excessive gas and carbon monoxide are serious problems, affecting the health and safety of workers. There is a lack of effective intelligent management systems for real-time detection and regulation.

Method used

Design an ultra-deep shaft phosphate mine management system, including a data collection module, a risk assessment early warning module and an execution module. It builds a risk assessment model through cluster analysis, random forest model and BP neural network, detects mine air data in real time, and identifies key pollution. information, and regulates the environment through the ventilation system, issuing alarms and notifications.

Benefits of technology

Real-time monitoring and control of the mine environment is achieved, pollution conditions are perceived early, operation safety is improved, accidents are reduced, operation vehicle route planning efficiency is improved, and equipment failure rates are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735151A_ABST
    Figure CN118735151A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of mining area management, in particular to an ultra-deep vertical shaft phosphorite management system, which comprises a data acquisition module, a risk assessment early warning module and an execution module, and is characterized in that the data acquisition module, the risk assessment early warning module and the execution module are connected; according to the scheme, the working environment of an underground mine can be regulated and controlled through an intelligent algorithm in a mining area, the pollution condition of the mine can be sensed as soon as possible, emergency measures can be taken at the first time, real-time route planning is carried out on the working vehicle, the working efficiency of the vehicle is improved, accidents caused by influences such as collision are reduced, and the working efficiency is improved. In the process, self-inspection is carried out on own equipment, so that the fault condition of each piece of equipment is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of mining area management, in particular to an ultra-deep vertical shaft phosphate mine management system. Background Art

[0002] Phosphate rock refers to the general term for economically exploitable phosphate minerals. With the changes in the international energy situation and the accelerated development of new energy industries, phosphate rock resources have received more and more attention and the number of mining areas has gradually increased.

[0003] Because most phosphate mines are buried underground, the room-and-pillar method is often used as the main mining method. However, underground mining is often accompanied by environmental pollution. Excessive gas and carbon monoxide will affect the health of workers and even cause accidents. An ultra-deep shaft phosphate mine management system is needed to adjust the environmental pollution in the mine through intelligent means to improve the safety of mine operations. Summary of the invention

[0004] In order to solve the above problems, the present invention provides an ultra-deep vertical shaft phosphate mine management system, which can detect and regulate the working environment in the mine in real time and notify the user end when the mine air data exceeds the standard.

[0005] To achieve the above object, the technical solution adopted by the present invention is:

[0006] An ultra-deep vertical shaft phosphate mine management system includes a data acquisition module, a risk assessment and early warning module, and an execution module, wherein the data acquisition module, the risk assessment and early warning module, and the execution module are connected;

[0007] The data acquisition module is used to collect mine air data and perform pre-processing;

[0008] The risk assessment and early warning module is used to perform risk assessment on the preprocessed data through a risk assessment model, and is also used to issue an alarm signal when the risk assessment result does not meet the requirements;

[0009] The execution module is used to adjust the ventilation system or send alarm information to the user terminal according to the alarm signal;

[0010] The method for constructing the risk assessment model comprises the following steps:

[0011] S1. Use cluster analysis method to classify gas value and carbon monoxide value data to obtain harmful gas index; calculate the ratio of temperature and humidity to obtain the working environment index;

[0012] S2. Taking the adverse working environment as the explanatory variable, the harmful gas index and the working environment index as the response variables, a random forest model was constructed to rank the importance of the adverse working environment to identify key pollution information;

[0013] S3. With key pollution information as input variables, harmful gas index and working environment index as output variables, a BP artificial neural network is constructed to quantify the response relationship between the two.

[0014] Furthermore, step S1 includes the following steps:

[0015] S11, normalization processing: normalizing the gas value and the carbon monoxide value;

[0016] S12, initializing cluster centers: randomly selecting several data objects in the data space as initial cluster centers;

[0017] S13, initializing clusters: calculating the Euclidean distance between all data objects and the initial cluster center, and dividing each data object into the initial cluster center with the smallest Euclidean distance to form an initial cluster;

[0018] S14, updating the cluster center: calculating the average value of the data objects of each initial cluster, and taking the average value as the new cluster center;

[0019] S15. Determine the final cluster: repeatedly calculate the Euclidean distance between all data objects and the new cluster center, divide each data object into the new cluster center with the smallest Euclidean distance to form a new cluster; calculate the average value of each new cluster as the new cluster center again until the new cluster center no longer changes, determine the final cluster, and determine the harmful gas index corresponding to each final cluster according to the gas value and carbon monoxide value data characteristics of the final cluster.

[0020] Further, step S2 includes the following steps:

[0021] S21, randomly select L samples from the data set as the training set;

[0022] S22, randomly and non-repetitively extracting N variables of adverse working environment conditions as split points, and using the Gini coefficient to determine the optimal split points for dividing the harmful gas index and the working environment index variables to generate a decision tree;

[0023] S23, repeat the operations of steps S21-S22 M times to obtain M decision trees and generate a random forest;

[0024] S24, calculating the prediction error of each decision tree in the random forest for out-of-bag data;

[0025] S25, adding random disturbance of the variable of the adverse working environment in the out-of-bag data, and calculating the prediction error of each decision tree of the random forest for the random disturbance;

[0026] S26. Sort the importance of variables for adverse operating environment conditions according to the prediction error of random forest for out-of-bag data;

[0027] S27. Select the top n adverse working environment conditions ranked by importance as key pollution information.

[0028] Further, step S3 includes the following steps:

[0029] S31, determining the number and quantity of neuron layers of the neural network, wherein the neurons include an input layer, a hidden layer, and an output layer, wherein the input layer is key pollution information, and the output layer is a harmful gas index and an operating environment index;

[0030] S32, the input data is calculated through the neural network, starting from the input layer, passing through the hidden layers layer by layer, and finally reaching the output layer. In each neuron, the weighted sum is calculated according to the input data and the weight, and finally the output of the neuron is obtained through the activation function;

[0031] S33, comparing the output of the neural network with the expected output, and calculating the error;

[0032] S34, starting from the output layer, back-propagating the error layer by layer according to the error, and adjusting the connection weights and biases using the gradient descent algorithm according to the error;

[0033] S35, repeating steps S32 to S34 until the error reaches a preset error threshold;

[0034] S36. Use an independent test data set to test the trained neural network and use the determination coefficient to evaluate the predictive performance of the model.

[0035] Furthermore, the risk assessment and early warning module is used to perform the following process:

[0036] When the mine air data value is greater than the historical average of the workable environment and less than the historical maximum value of the workable environment, the execution module is activated to start ventilation at maximum power;

[0037] When the mine air data is greater than the historical maximum value of the workable environment, the execution module is activated to start ventilation at maximum power and notify the user end;

[0038] Among them, mine air data includes carbon monoxide values, carbon dioxide values, gas values, temperature values ​​and humidity values.

[0039] Furthermore, it also includes a transportation management module, which is used to perform the following steps:

[0040] Initialize relevant parameters, including: the number of operating vehicles, the importance factor of the GPS sensor route, the importance factor of the heuristic function, the disappearance degree of the historical route, the historical route constant and the maximum number of iterations;

[0041] Construct the solution space, randomly place each working vehicle at different starting points, and determine the current candidate road set for each working vehicle;

[0042] Update the historical route to calculate the length of the path passed by each working vehicle and record the shortest path in the current iteration; at the same time, update the coincidence of the GPS sensor lines on the connection path of each node;

[0043] Determine whether to terminate. If the maximum number of iterations has not been reached, clear the historical route record table and return to the step to construct the solution space; otherwise, terminate the calculation and output the best path.

[0044] Furthermore, it also includes a transportation management module, which is implemented using an improved method based on the A* algorithm.

[0045] Furthermore, the ventilation system is arranged beside the mine hoist for ventilating the mine;

[0046] The ventilation system includes a main pipeline, an air intake fan, a PLC controller and a pipeline branch; the air intake fan is fixedly connected to the upper end of the main pipeline, the PLC controller is wired to the air intake fan, the pipeline branch is fixedly connected to the lower end of the main pipeline, and the pipeline branch extends to various places in the mining area.

[0047] Furthermore, an air filter, a heating element and a noise reduction device are arranged at the lower end of the main pipeline.

[0048] Furthermore, it also includes a self-checking module, which is used to perform fault detection on the electrical equipment involved in the system and generate a fault diagnosis report.

[0049] The beneficial effects of the present invention are:

[0050] 1. The present invention uses a risk assessment and early warning module to control the working environment of underground mines through intelligent algorithms in the mining area, so as to perceive the pollution situation of the mines early and take emergency measures in the first place.

[0051] 2. The present invention improves the operating efficiency of vehicles by performing real-time route planning for operating vehicles through the transport management module, and reduces the occurrence of accidents caused by impacts such as collisions.

[0052] 3. The present invention uses a self-check module to handle the self-check of the system's own equipment, reduce the failure of each device, and reduce the loss caused by equipment failure. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 is a schematic diagram of the ultra-deep vertical shaft phosphate mine management system of the present invention;

[0054] Figure 2 It is a flow chart of the steps of the ant colony algorithm of the present invention. DETAILED DESCRIPTION

[0055] Embodiment 1:

[0056] See also Figure 1 and Figure 2 As shown, the present invention relates to an ultra-deep vertical shaft phosphate mine management system, comprising a data acquisition module, a risk assessment and early warning module and an execution module, wherein the data acquisition module, the risk assessment and early warning module and the execution module are connected;

[0057] Each module is connected by a communication unit, which includes: a repeater, a hub, a switch, a bridge and a 5G signal transmitter. In view of the poor signal in underground mines and the easy interruption, in order to avoid the loss of communication in special circumstances, signal relay equipment and 5G signal transmitters are selected to amplify the signal strength through signal relay and then transfer it to each module stably and quickly through the 5G signal transmitter.

[0058] The data acquisition module acquires data through a sensor monitoring network unit, and the sensor monitoring network unit includes: a sensor network unit and a monitoring network unit;

[0059] The sensor network unit is used to collect and pre-process the mine air data and mine electrical data; various sensors are connected by multi-node and multi-level wires to provide a stable and diversified data source for the data acquisition module.

[0060] Sensor types include: gas sensor, carbon monoxide sensor, oxygen sensor, temperature sensor, humidity sensor, gas sensor, voltage sensor, current sensor, power factor sensor and frequency sensor. The above sensors are fixedly connected to the pillars, top wall and electrical equipment of the mine area according to the scale of the mine. For the stability of signal transmission, wired connection is preferred;

[0061] Mobile working vehicles or mechanical equipment need to be loaded with GPS sensors and gyroscope sensors, which are fixedly connected to the working vehicles or mechanical equipment through wireless reception;

[0062] The mine hoist is the most frequently used mechanical equipment by the mine workers during operation in the mine area. Therefore, the GPS sensor, gyroscope sensor, temperature sensor, humidity sensor and gas sensor need to be fixed on the top wall of the cage through wireless connection, and the length of the traction rope is measured through the pull-wire displacement sensor to determine the height of the mine hoist.

[0063] All the sensors installed above need to be given custom names to identify their specific locations and transmission types;

[0064] The monitoring network unit is formed by the camera devices fixedly connected to the inner wall of the mine cave, the shaft hoist system, the mobile working vehicles, the vicinity of the mechanical equipment and the slope mine wall, and the image data obtained by each camera device forms a monitoring network unit;

[0065] The sensor network unit data and the monitoring network unit data are transmitted to the data acquisition module through the communication unit;

[0066] The data acquisition module is used to collect the raw data of the sensor monitoring network unit and perform pre-processing;

[0067] The data acquisition module includes: a data acquisition unit, a preprocessing unit and a data storage unit;

[0068] Data acquisition unit: used to obtain real-time transmission data from sensors and monitoring images inside the mine;

[0069] Preprocessing unit: used to preprocess the data collected by the data acquisition unit to reduce duplicate and useless target features;

[0070] Data storage unit: used to store data after pre-processing and screening.

[0071] The user terminal includes a data display interface and a user control interface, wherein:

[0072] The data display interface is used to display the sensor data after visual processing, which is convenient for operators to obtain and analyze the sensor data;

[0073] The user control interface is for operators to analyze the acquired data and perform manual intervention. The interface communicates with the designated location through the communication unit for command;

[0074] The user end stores the transmitted data and automatically generates a log by filtering and matching the data. The log is adjusted according to the needs for management and planning.

[0075] The risk assessment and early warning module is used to perform risk assessment on the preprocessed data through a risk assessment model, and is also used to issue an alarm signal when the risk assessment result does not meet the requirements;

[0076] The execution module is used to adjust the ventilation system or send alarm information to the user terminal according to the alarm signal;

[0077] The method for constructing the risk assessment model comprises the following steps:

[0078] S1. Data processing: Use cluster analysis method to classify gas value and carbon monoxide value data to obtain harmful gas index; calculate the ratio of temperature and humidity to obtain the working environment index;

[0079] S2. Identification of key information: Taking the adverse working environment as the explanatory variable, the harmful gas index and the working environment index as the response variables, a random forest model is constructed to rank the importance of the adverse working environment to identify key pollution information;

[0080] S3. Key relationship model: With key pollution information as input variables, harmful gas index and working environment index as output variables, a BP artificial neural network model is constructed to quantify the response relationship between the two.

[0081] Specifically, in step S1, the cluster analysis method is configured as a K-means clustering method, comprising the following steps:

[0082] S11, normalization processing: normalizing the gas value and the carbon monoxide value;

[0083] S12, initializing cluster centers: randomly selecting several data objects in the data space as initial cluster centers;

[0084] S13, initializing clusters: calculating the Euclidean distance between all data objects and the initial cluster center, and dividing each data object into the initial cluster center with the smallest Euclidean distance to form an initial cluster;

[0085] S14, updating the cluster center: calculating the average value of the data objects of each initial cluster, and taking the average value as the new cluster center;

[0086] S15. Determine the final cluster: repeatedly calculate the Euclidean distance between all data objects and the new cluster center, divide each data object into the new cluster center with the smallest Euclidean distance to form a new cluster; calculate the average value of each new cluster as the new cluster center again until the new cluster center no longer changes, determine the final cluster, and determine the harmful gas index corresponding to each final cluster according to the gas value and carbon monoxide value data characteristics of the final cluster.

[0087] Furthermore, in step S11, the normalization process is calculated using the following formula:

[0088]

[0089] Where Y i is the normalized data sample of the ith gas value and carbon monoxide value; K i is the i-th gas value and carbon monoxide value data sample; K maxIndicates the maximum value of all gas and carbon monoxide value data samples; K min Indicates the minimum value of all gas and carbon monoxide value data samples.

[0090] Furthermore, in step S13, the Euclidean distance is calculated by the formula:

[0091]

[0092] In the formula, d(x,Ci) represents the Euclidean distance function; x is the normalized data object; Ci represents the i-th cluster center; n is the number of samples in the data set; x is the j Represents the data object of the jth variable in the data set; Ci j represents the i-th cluster center of the j-th variable.

[0093] Furthermore, in step S1, the working environment index is calculated by the following formula:

[0094] R k =L k / S k

[0095] In the formula, R k represents the kth working environment index; L k represents the kth temperature value; S k Represents the kth humidity value.

[0096] Specifically, in step S2, constructing a random forest model to rank the importance of the adverse working environment conditions includes the following steps:

[0097] S21, randomly select L samples from the data set as the training set;

[0098] S22, randomly and non-repetitively extracting N variables of adverse working environment conditions as split points, and using the Gini coefficient to determine the optimal split points for dividing the harmful gas index and the working environment index variables to generate a decision tree;

[0099] S23, repeat the operations of steps S21-S22 M times to obtain M decision trees and generate a random forest;

[0100] S24, calculating the prediction error of each decision tree in the random forest for out-of-bag data;

[0101] S25, adding random disturbance of the variable of the adverse working environment in the out-of-bag data, and calculating the prediction error of each decision tree of the random forest for the random disturbance;

[0102] S26. Sort the importance of variables for adverse operating environment conditions according to the prediction error of random forest for out-of-bag data;

[0103] S27. Select the top n adverse working environment conditions ranked by importance as key pollution information.

[0104] It should be noted that the top n operating environment adverse condition variables are ranked in importance, and n depends on the value at which the prediction error begins to increase after the nth operating environment adverse condition variable is added to the model.

[0105] Furthermore, in step S23, the M decision trees and the value of M are determined as follows:

[0106] Using O decision trees as the step size, generate random forests with different numbers of decision trees;

[0107] Calculate the prediction error of the random forest for the test sample;

[0108] Select the random forest with the smallest prediction error and determine the number of decision trees M.

[0109] Furthermore, in step S26, the importance of the adverse working environment is ranked according to the prediction error of the random forest on the out-of-bag data, and the calculation formula is as follows:

[0110]

[0111] Where: PIM represents the importance of the variable of the adverse working environment; M is the number of decision trees in the random forest; Represents the prediction error of the kth decision tree for the out-of-bag data with random disturbance of the i-th operating environment adverse condition variable; errOOB k represents the prediction error of the k-th decision tree for out-of-bag data without adding random perturbations.

[0112] Specifically, in step S3, the BP artificial neural network model includes the following construction steps:

[0113] S31. Determine the model structure: determine the number of neuron layers and quantity of the neural network, wherein the neurons include an input layer, a hidden layer, and an output layer, wherein the input layer is key pollution information, and the output layer is a harmful gas index and an operating environment index;

[0114] S32, forward propagation: The input data is calculated through the neural network, starting from the input layer, passing through the hidden layers layer by layer, and finally reaching the output layer. In each neuron, the weighted sum is calculated based on the input data and weights, and finally the output of the neuron is obtained through the activation function;

[0115] S33, calculating error: comparing the output of the neural network with the expected output, and calculating the error;

[0116] It should be noted that the expected output here refers to the actual value of the output vector sample.

[0117] S34, back propagation: Based on the error, starting from the output layer, back propagate the error layer by layer, and adjust the connection weights and biases using the gradient descent algorithm based on the error;

[0118] S35, repeat iteration: repeat step S32 to step S34 until the error reaches a preset error threshold;

[0119] S36. Model evaluation: Use an independent test data set to test the trained neural network and use the determination coefficient to evaluate the predictive performance of the model.

[0120] Furthermore, in step S31, the model structure has five hidden layers, and the number of layers of the input layer and the output layer is the same as the number of samples; connection weights and biases are provided between the input layer units and the hidden layer units, and between the hidden layer units and the output layer units, and activation functions are provided for the hidden layer and the output layer. The calculation formulas for the neuron outputs of the hidden layer and the output layer are as follows:

[0121]

[0122] Where y is the neuron output; x i is the input; b is the bias; w i is the connection weight between neurons; F is the activation function; k is the number of inputs.

[0123] Further, in step S33, the calculation error is calculated as follows:

[0124]

[0125] Where E is the output layer unit error function; t l is the expected output; z l Output layer output.

[0126] Through the above method, the key pollution information on the impact of gas value, carbon monoxide value, temperature and humidity on the working environment can be analyzed more efficiently.

[0127] After confirming the above information, when the data collected by the data acquisition module meets the pollution conditions, the risk assessment and early warning module will be activated to remotely control and adjust the ventilation system, increase the wind force through the ventilation system, thereby affecting the air balance in the mine and diluting the harmful gas index to reach a safe level; if the pollution conditions are difficult to eliminate in a short time, all mine workers must be notified to evacuate and work can only be carried out after it is confirmed that the pollution has been eliminated.

[0128] Furthermore, the risk assessment and early warning module can also be implemented through the following process:

[0129] Calculate average and maximum values ​​based on historical workable environment data of mine air data;

[0130] When the mine air data value is greater than the historical average of the workable environment and less than the historical maximum value of the workable environment, the execution module is activated to start ventilation at maximum power;

[0131] When the mine air data is greater than the historical maximum value of the workable environment, the execution module is activated to start ventilation at maximum power and notify the user end;

[0132] Among them, mine air data includes carbon monoxide values, carbon dioxide values, gas values, temperature values ​​and humidity values.

[0133] In order to conduct real-time route planning for operating vehicles to improve vehicle operating efficiency, reduce accidents caused by collisions and other factors, and improve mine operating safety, this system is equipped with a transportation management module.

[0134] The transportation management module is used to adjust the trajectory of working vehicles. This module is based on the technical solution improved by the ant colony algorithm, which facilitates efficient driving in the mine, improves work efficiency and reduces accident risks. The specific method of the transportation management module includes the following steps:

[0135] According to the internal structure of the mine, a weighted graph G = (N, A) with N nodes is defined, where N represents the node set N = 1, 2, ..., n; A represents the edge, A = (i, j) | i, j∈N. The distance (weight) between nodes is set to (d ij ) n×n ,The objective function is to minimize the sum of the distances from the starting point to the end point.

[0136] Assume that the number of vehicles in the entire mine is m, the number of path nodes is n, and the distance between node i and node j is d. ij (i,j=1,2,...,n), the overlap degree of GPS sensor lines on the path connecting node i and node j at time t is τ ij (t), at the initial moment, the overlap of GPS sensor lines on the connection paths between nodes is the same, set to τ ij (0) = τ0;

[0137] The working vehicle k (k = 1, 2, ..., m) determines its next visited node according to the overlap of GPS sensor lines on the connection path between each node. It represents the probability of the working vehicle transferring from node i to node j at time t, and its calculation formula is as follows:

[0138]

[0139] where ηij (t) is the heuristic function, η ij (t) = 1 / d ij , represents the expected degree of transfer of the working vehicle from node i to node j, allow k (k=1,2,...,m) is the set of nodes to be visited by vehicle k. At the beginning, allow k There are (n-1) elements in it, which includes all nodes except the departure node of vehicle k. As time goes by, allow k The elements in α continue to decrease until it is empty, which means that all nodes have been visited. α is the importance factor of the GPS sensor route. The larger its value, the greater the possibility that the operating vehicle will choose the path it has traveled before, and the randomness of the search path will be weakened. The smaller its value, the smaller the search range of the vehicle group will be, and it is easy to fall into the local optimum. The general value range is [0, 5]. β is the importance factor of the heuristic function. The larger its value, the greater the role of the heuristic function in the transfer, that is, the operating vehicle will transfer to the node with a short distance with a greater probability, and the vehicle group will be more likely to choose a local shorter path. At this time, the convergence speed of the algorithm is accelerated, but the randomness is not high, and it is easy to get the local relative optimum. The general value range is [0, 5].

[0140] After calculating the transition probability between nodes, the roulette method is used to select the next node to be visited; first calculate the cumulative probability q of each individual j , and its calculation formula is as follows:

[0141]

[0142] where q j It is equivalent to the span on the turntable. The larger the span, the easier it is to choose. 1 represents the number of optional paths for the next step. Then a (0,1) decimal r is randomly generated and compared with all q j and r, select the smallest q that is greater than r j , the q j The corresponding index j is the target point that the k-th operating vehicle should select in the next step when on the i-th path.

[0143] R = rand(0,1)

[0144] J=index{min[q j >r]}

[0145] While the GPS sensor is planning the route, the historical routes on the connection paths between nodes gradually disappear. Let the parameter ρ (0 < ρ < 1, generally taking values from 0.1 to 0.99) represent the degree of disappearance of the historical routes. When all the operating vehicles complete one cycle, the GPS sensing line coincidence degree on the connection paths between nodes needs to be updated. The calculation formula is as follows:

[0146]

[0147] Among them, represents the pheromone concentration released by the k-th operating vehicle on the connection path between node i and node j; Δτ ij represents the sum of the GPS sensing line coincidence degrees of all operating vehicles on the connection path between node i and node j.

[0148] The route update model uses the Ant-Cycle model, and the calculation formula is as follows:

[0149]

[0150] Among them, Q is the historical route constant (a positive constant), representing the total amount of historical routes left by the operating vehicle in one cycle. L k is the total length of the path passed by the k-th operating vehicle.

[0151] According to the above content, the algorithm steps of the actual operation are as Figure 2 shown. The specific steps are as follows;

[0152] 1. Initialize the relevant parameters, such as the number of operating vehicles m, the importance factor α of the GPS sensing route, the importance factor β of the heuristic function, the degree of disappearance ρ of the historical route, the historical route constant Q, and the maximum number of iterations itermax;

[0153] 2. Construct the solution space, randomly place each operating vehicle at different starting points, and determine the current candidate road set for each operating vehicle;

[0154] 3. Update the historical route, calculate the path length L passed by each operating vehicle k (k = 1, 2,..., m), record the optimal solution (the shortest path) in the current iteration; at the same time, update the GPS sensing line coincidence degree on the connection paths between nodes;

[0155] 4. Judge whether to terminate. If iter < itermax, then let iter = iter + 1, clear the historical route record table, and return to step 2; otherwise, terminate the calculation and output the optimal solution.

[0156] The shortest route can be planned based on the real-time situation. In addition, the stability of the vehicle can be learned through the gyroscope sensor. If the gyroscope sensor data is abnormal, it can be determined whether the operating vehicle has rolled over or other serious situations, and corresponding measures can be implemented in time.

[0157] Communication units are also used in data transmission and transmission units with wireless devices. The use of 5G can further improve the timely response of data.

[0158] Furthermore, the transportation management module can also use a technical solution based on the A* algorithm to implement this function. The specific operations are as follows:

[0159] The A* algorithm is a heuristic search algorithm that updates the estimate F to perform the search;

[0160] F=G+H

[0161] Among them, F is the total cost of the current node, G is the moving distance from the starting node to the current node (actual cost), and H is the estimated moving distance from the current node to the end point (estimated cost).

[0162] The G cost is calculated as the sum of the distances of all edges from the starting point to the current node; the heuristic functions for calculating the H cost include Manhattan distance, diagonal distance (Chebyshev distance), and Euclidean distance.

[0163] In addition, please note the following points:

[0164] When calculating H, obstacles in the path should be ignored. This is an estimate of the remaining distance rather than the actual value, so the H cost is an estimated cost.

[0165] When performing global map path planning, the environment information is converted into a grid map, where each grid represents an area of ​​the environment and the obstacle area is marked as an obstacle grid, so the obstacle nodes are known.

[0166] It is known that the A* algorithm guarantees that the conditions for finding the shortest path meet the following two points:

[0167] The heuristic function h(n) must satisfy monotonicity (i.e. the estimated cost will not exceed the actual cost from node n to the target node);

[0168] (2) The map must be feasible, that is, there are no inaccessible areas or insurmountable obstacles. The formula is the distance from point a (x1, y1) to point b (x2, y2) in the two-dimensional coordinate axis.

[0169] The Manhattan distance calculation formula described above is:

[0170] D=|x2-x1|+|y2-y1|

[0171] If the map only allows movement in four directions: up, down, left, and right, this formula can be used;

[0172] The diagonal distance (Chebyshev distance) formula described above is:

[0173] D=max(|x2-x1|+|y2-y1|)

[0174] If the map allows movement in eight directions, this formula can be used and the estimate will be more accurate;

[0175] The Euclidean distance calculation formula described above is:

[0176]

[0177] This formula can be used if the map allows movement in any direction.

[0178] The logic of applying the A* algorithm to this system is as follows:

[0179] 1. Initialize the start node S, the final node G, the list open, closed, and the global map (grid map);

[0180] 2. Starting from the starting node S, put S as a square to be checked and put it into the open list;

[0181] 3. Find the reachable squares around the starting node S (up to eight), put them into the open list, and set their parent node to S;

[0182] 4. Delete the start node S from the "open list" and put S into the closed list;

[0183] 5. Calculate the F value of each surrounding square: F = G + H;

[0184] 6. Select the square a with the smallest F value from the open list and put it from the open list to the closed list;

[0185] 7. Check all adjacent squares of a:

[0186] 1) Obstacles and squares in the close list are not considered;

[0187] 2) If these squares are not in the open list, add them to the open list, calculate the F value of these squares, and set the parent node to a;

[0188] 3) If an adjacent square c is already in the open list, calculate the new path from S to square c (that is, the path through a), and determine whether the parent node and F value need to be updated: if the G value of the new node c is lower, change the parent square to square a, recalculate the F value, and the H value does not need to be changed (because the estimated cost of the square to reach the target point is fixed). If the G value of the new node c is higher, it means that the new path cost is higher, and the value does not change (the G value remains unchanged and is not updated);

[0189] 8. Continue to find the block with the smallest F value from the open list, delete it from the open list, add it to the close list, and then continue to find the surrounding blocks that can be reached, and repeat this cycle;

[0190] 9. End judgment: When the target block G appears in the open list, it means that the path has been found; when there is no data in the open list, it means that there is no suitable path. According to this algorithm, the transportation management module can also achieve the purpose of path planning.

[0191] Furthermore, a ventilation system is arranged beside the mine hoist for ventilation in the mine, and includes a main pipeline, an air intake fan, a PLC controller, and a pipeline branch; the air intake fan is fixedly connected to the upper end of the main pipeline, the PLC controller is wired to the air intake fan, the pipeline branch is fixedly connected to the lower end of the main pipeline, and the pipeline branch extends to various places in the mining area;

[0192] The ventilation system is installed next to the mine hoist because it only needs to be widened and renovated on the basis of the original shaft, which reduces the implementation cost;

[0193] The branch pipes at the lower end of the main pipe are fixed on the top wall of the mine. The branch pipes are branched and extended according to the needs. Each ventilation opening is provided with a movable baffle. For the area that does not need ventilation, it is only necessary to block the air outlet with the movable baffle. The PLC controller is wirelessly connected with the execution module and the user end, and the wind force is adjusted according to the received information.

[0194] An air filter, a heating unit and a noise reduction device are arranged at the lower end of the main pipeline for filtering and heating the incoming air. The heating unit only works within a safe range in an environment with relatively low temperature. The noise reduction device is used to eliminate noise at the air inlet and improve the quality of the working environment for workers.

[0195] Furthermore, in order to reduce the failure of each device and reduce the losses caused by equipment failure, the system is provided with a self-check module;

[0196] The self-check module is used to self-check the fault detection of the electrical equipment involved in this system, and generate a fault diagnosis report after diagnosis and analysis. The specific steps are as follows:

[0197] The data acquisition module is used to obtain real-time mine electrical data including voltage, current, temperature, power factor and frequency, and the mine electrical data is preprocessed; the preprocessed data is analyzed through the Bayesian network model to identify abnormal modes and faults in the electrical device; based on the results of the above model output, a fault diagnosis report is generated, which includes the fault type, fault location, fault cause and treatment measures of the electrical device. The self-check module is used to improve the inspection efficiency of the equipment and make corresponding operations in time.

[0198] For frequently used equipment and core electrical devices in the system, redundant backup is selected to avoid line paralysis and affect production efficiency during equipment maintenance or failure.

[0199] The above implementation modes are merely descriptions of the preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary engineering and technical personnel in the field shall fall within the protection scope determined by the claims of the present invention.

Claims

1. An ultra-deep shaft phosphate mine management system, comprising a data acquisition module, a risk assessment and early warning module and an execution module, wherein the data acquisition module is connected to the execution module via the risk assessment and early warning module; in, The data acquisition module is used to collect mine air data and perform pre-processing; The risk assessment and early warning module is used to perform risk assessment on the preprocessed data through a risk assessment model, and is also used to issue an alarm signal when the risk assessment result does not meet the requirements; The execution module is used to adjust the ventilation system or send alarm information to the user terminal according to the alarm signal; The method for constructing the risk assessment model comprises the following steps: S1. Use cluster analysis method to classify gas value and carbon monoxide value data to obtain harmful gas index; calculate the ratio of temperature and humidity to obtain the working environment index; S2. Taking the adverse working environment as the explanatory variable, the harmful gas index and the working environment index as the response variables, a random forest model was constructed to rank the importance of the adverse working environment to identify key pollution information; S3. With key pollution information as input variables, harmful gas index and working environment index as output variables, a BP artificial neural network is constructed to quantify the response relationship between the two.

2. The ultra-deep vertical shaft phosphate mine management system according to claim 1, It is characterized in that Step S1 includes the following steps: S11, normalization processing: normalizing the gas value and the carbon monoxide value; S12, initializing cluster centers: randomly selecting several data objects in the data space as initial cluster centers; S13, initializing clusters: calculating the Euclidean distances between all data objects and the initial cluster centers, and dividing each data object into the initial cluster centers with the smallest Euclidean distances to form initial clusters; S14, updating the cluster center: calculating the average value of the data objects of each initial cluster, and taking the average value as the new cluster center; S15. Determine the final cluster: repeatedly calculate the Euclidean distance between all data objects and the new cluster center, divide each data object into the new cluster center with the smallest Euclidean distance to form a new cluster; calculate the average value of each new cluster as the new cluster center again until the new cluster center no longer changes, determine the final cluster, and determine the harmful gas index corresponding to each final cluster according to the gas value and carbon monoxide value data characteristics of the final cluster.

3. The ultra-deep vertical shaft phosphate mine management system according to claim 1, It is characterized in that Step S2 includes the following steps: S21, randomly select L samples from the data set as the training set; S22, randomly and non-repetitively extracting N variables of adverse working environment conditions as split points, and using the Gini coefficient to determine the optimal split points for dividing the harmful gas index and the working environment index variables to generate a decision tree; S23, repeat the operations of steps S21-S22 M times to obtain M decision trees and generate a random forest; S24, calculating the prediction error of each decision tree in the random forest for out-of-bag data; S25, adding random disturbance of the variable of the adverse working environment in the out-of-bag data, and calculating the prediction error of each decision tree of the random forest for the random disturbance; S26. Sort the importance of variables for adverse operating environment conditions according to the prediction error of random forest for out-of-bag data; S27. Select the top n adverse working environment conditions ranked by importance as key pollution information.

4. The ultra-deep vertical shaft phosphate mine management system according to claim 1, It is characterized in that Step S3 includes the following steps: S31, determining the number and quantity of neuron layers of the neural network, wherein the neurons include an input layer, a hidden layer, and an output layer, wherein the input layer is key pollution information, and the output layer is a harmful gas index and an operating environment index; S32, the input data is calculated through the neural network, starting from the input layer, passing through the hidden layers layer by layer, and finally reaching the output layer. In each neuron, the weighted sum is calculated according to the input data and the weight, and finally the output of the neuron is obtained through the activation function; S33, comparing the output of the neural network with the expected output, and calculating the error; S34, starting from the output layer, back-propagating the error layer by layer according to the error, and adjusting the connection weights and biases using the gradient descent algorithm according to the error; S35, repeating steps S32 to S34 until the error reaches a preset error threshold; S36. Use an independent test data set to test the trained neural network and use the determination coefficient to evaluate the predictive performance of the model.

5. The ultra-deep vertical shaft phosphate mine management system according to claim 1, It is characterized in that The risk assessment and early warning module is used to perform the following processes: When the mine air data value is greater than the historical average of the workable environment and less than the historical maximum value of the workable environment, the execution module is activated to start ventilation at maximum power; When the mine air data is greater than the historical maximum value of the workable environment, the execution module is activated to start ventilation at maximum power and notify the user end; Among them, mine air data includes carbon monoxide values, carbon dioxide values, gas values, temperature values ​​and humidity values.

6. The ultra-deep vertical shaft phosphate mine management system according to claim 1, It is characterized in that Also included is a transportation management module, the transportation management module is used to perform the following steps: Initialize relevant parameters, including: the number of operating vehicles, the importance factor of the GPS sensor route, the importance factor of the heuristic function, the disappearance degree of the historical route, the historical route constant and the maximum number of iterations; Construct the solution space, randomly place each working vehicle at different starting points, and determine the current candidate road set for each working vehicle; Update the historical route to calculate the length of the path passed by each working vehicle and record the shortest path in the current iteration; at the same time, update the coincidence of the GPS sensor lines on the connection path of each node; Determine whether to terminate. If the maximum number of iterations has not been reached, clear the historical route record table and return to the step to construct the solution space; otherwise, terminate the calculation and output the best path.

7. The ultra-deep vertical shaft phosphate mine management system according to claim 1, It is characterized in that It also includes a transportation management module, which is implemented using an improved method based on the A* algorithm.

8. The ultra-deep vertical shaft phosphate mine management system according to claim 1, It is characterized in that The ventilation system is arranged beside the mine hoist and is used for ventilation in the mine; The ventilation system includes a main pipeline, an air intake fan, a PLC controller and a pipeline branch; the air intake fan is fixedly connected to the upper end of the main pipeline, the PLC controller is wired to the air intake fan, the pipeline branch is fixedly connected to the lower end of the main pipeline, and the pipeline branch extends to various places in the mining area.

9. The ultra-deep vertical shaft phosphate mine management system according to claim 8, It is characterized in that An air filter, a heating element and a noise reduction device are arranged at the lower end of the main pipeline.

10. The ultra-deep vertical shaft phosphate mine management system according to claim 1, It is characterized in that It also includes a self-checking module, which is used to perform fault detection on the electrical equipment involved in the system and generate a fault diagnosis report.