Mixing station storage material distribution method and system, electronic equipment and storage medium

By monitoring the storage tank inventory of the mixing station and automatically generating the storage tank allocation plan, the problem of low efficiency and accuracy of material proportioning in the mixing station is solved, the quality and safety of concrete production are improved, and operators are prevented from secretly The risk of adjusting the mix ratio.

CN118735154APending Publication Date: 2024-10-01PINMING TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410639400.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

When the existing mixing station information management system is producing concrete mix proportions, it fails to accurately obtain the inventory of raw material storage tanks, resulting in low material proportioning efficiency and accuracy, and the operator may bypass the tester to adjust the concrete without permission. The mix ratio leads to cutting corners.

Method used

By monitoring the inventory of storage tanks, the required amount of each raw material is determined based on the concrete mix ratio of the target task and the planned construction volume. Based on the inventory data and preset storage tank selection rules, a storage tank allocation plan is generated and automatically selected. The storage tank is sent to the industrial computer MES system to ensure the monitoring and control of raw material input.

Benefits of technology

It improves the efficiency and accuracy of material proportioning in the mixing station, reduces the risk of manual misoperation and cutting corners, and achieves quality standardization of concrete production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735154A_ABST
    Figure CN118735154A_ABST
Patent Text Reader

Abstract

The invention relates to a mixing station storage material distribution method, which comprises the following steps: monitoring the stock of a storage tank to obtain the stock data of the storage tank, and determining the required amount of each raw material according to the concrete mix proportion of a target task and the planned construction amount, and generating a storage tank distribution scheme of the target task based on the inventory data, the required amount of the raw materials and a preset storage tank selection rule. According to the invention, the problems of low material proportioning efficiency and low material proportioning accuracy of the mixing station are solved. The system automatically produces a storage tank distribution scheme according to the storage tank inventory, the target task mix proportion and the planned construction amount, and the material proportioning efficiency and accuracy of the mixing station are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of concrete construction, and in particular to a mixing station storage material distribution method, system, electronic equipment and storage medium. Background Art

[0002] At present, when the mixing station information management (ERP) system issues concrete mix production to the industrial computer MES system, the tester often uses the exhaustive method to list all the permutations and combinations of raw material storage tanks because the inventory in the raw material storage tank is not clear, and then the operator selects the appropriate combination from them. This leads to a large workload for the tester and increases the risk of misoperation and unreasonable use of the mixing station storage tank. At the same time, the mix ratio selection authority and the raw material storage tank selection authority cannot be separated, so that the operator can bypass the tester to adjust the concrete mix ratio privately, which may lead to cutting corners.

[0003] Currently, no effective solution has been proposed for the problem of low efficiency and accuracy of material proportioning in mixing plants in related technologies. Summary of the invention

[0004] The embodiments of the present application provide a mixing station material storage distribution method, system, electronic device and storage medium to at least solve the problem of low material proportioning efficiency and accuracy in the mixing station in the related art.

[0005] In a first aspect, an embodiment of the present application provides a method for distributing storage materials in a mixing station, the method being applied to an information management system of a mixing station, the method comprising:

[0006] Monitor the inventory of storage tanks and obtain the inventory data of storage tanks;

[0007] Determine the required amount of each raw material according to the concrete mix ratio and planned construction volume of the target task;

[0008] Based on the inventory data, the required amount of raw materials and preset storage tank selection rules, a storage tank allocation plan for the target task is generated.

[0009] In some embodiments, generating a storage tank allocation plan for a target task based on the inventory data, the required amount of raw materials and a preset storage tank selection rule includes:

[0010] Determining a selection order of storage tanks according to the preset storage tank selection rule and the inventory data;

[0011] Based on the selection order of the storage tanks and the required amount of the raw materials, a target storage tank corresponding to each raw material is obtained;

[0012] According to the target storage tanks corresponding to the raw materials, a storage tank allocation plan for the target task is obtained.

[0013] In some embodiments, obtaining the target storage tank corresponding to each raw material based on the selection order of the storage tanks and the required amount of the raw materials includes:

[0014] Based on the selection order of the storage tanks, determining the first storage tank corresponding to each raw material;

[0015] Acquire a first storage volume of the first storage tank from the inventory data;

[0016] A substitute storage tank is selected according to the first storage amount and the required amount of the raw material, and a target storage tank for the raw material is determined according to the first storage tank and the substitute storage tank.

[0017] In some embodiments, selecting a substitute storage tank according to the first storage amount and the required amount of the raw material, and determining a target storage tank for the raw material according to the first storage tank and the substitute storage tank comprises:

[0018] According to the first storage volume, it is determined whether the first storage tank can meet the required amount of the raw materials.

[0019] If yes, the first storage tank is used as the target storage tank for the raw materials.

[0020] If not, then according to the selection order of the storage tanks, a substitute storage tank for the raw material is determined, and the first storage tank and the substitute storage tank are used as target storage tanks for the raw material.

[0021] In some embodiments, the method further comprises:

[0022] Establish connection with industrial computer MES system;

[0023] The concrete mix ratio and the storage tank allocation plan are sent to the industrial computer MES system to instruct the industrial computer MES system to control and monitor the raw material input according to the concrete mix ratio and the storage tank allocation plan.

[0024] In some embodiments, determining the required amount of each raw material according to the concrete mix ratio of the target task and the planned construction volume includes:

[0025] Obtaining the concrete mix ratio of the target task from the preset concrete mix ratios of each task;

[0026] Obtaining the planned construction volume of the target task;

[0027] The required amount of each raw material is determined according to the concrete mix ratio of the target task and the planned construction volume.

[0028] In some embodiments, the method further comprises:

[0029] When a modification instruction is received, the storage tank allocation plan of the target task is modified in response to the modification instruction.

[0030] In a second aspect, an embodiment of the present application provides an information management system for a mixing station, the system comprising: a monitoring module, a required quantity determination module and a solution generation module, wherein:

[0031] The monitoring module is used to monitor the inventory of the storage tank and obtain the inventory data of the storage tank;

[0032] The required quantity determination module is used to determine the required quantity of each raw material according to the concrete mix ratio and planned construction quantity of the target task;

[0033] The solution generation module is used to generate a storage tank allocation solution for the target task based on the inventory data, the required amount of raw materials and preset storage tank selection rules.

[0034] In a third aspect, an embodiment of the present application provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the mixing station storage material distribution method as described in the first aspect above is implemented.

[0035] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the mixing station storage material distribution method as described in the first aspect above.

[0036] Compared with the related art, the storage tank allocation method for a mixing station provided in the embodiment of the present application obtains the storage tank inventory data by monitoring the storage tank inventory, determines the required amount of each raw material according to the concrete mix ratio and planned construction volume of the target task, and generates a storage tank allocation plan for the target task based on the inventory data, the required amount of the raw materials and the preset storage tank selection rules, thereby solving the problem of low efficiency and accuracy of the material ratio of the mixing station. The system automatically produces a storage tank allocation plan based on the storage tank inventory, the target task mix ratio and the planned construction volume, thereby improving the efficiency and accuracy of the material ratio of the mixing station. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0038] Figure 1 is a schematic diagram of an application environment of a mixing station material storage distribution method according to an embodiment of the present application;

[0039] Figure 2 is a flow chart of a mixing station storage material distribution method according to an embodiment of the present application;

[0040] Figure 3 is a schematic diagram of storage tank inventory data according to an embodiment of the present application;

[0041] Figure 4 is a flow chart of a storage tank allocation method according to an embodiment of the present application;

[0042] Figure 5 is a flow chart of a storage tank substitute algorithm according to an embodiment of the present application;

[0043] Figure 6 is a structural block diagram of a mixing station information management system according to an embodiment of the present application;

[0044] Figure 7 It is a schematic diagram of the internal structure of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0045] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0046] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.

[0047] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.

[0048] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantitative limitation, and may represent the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "multiple" involved in this application refers to two or more. "And / or" describes the association relationship of associated objects, indicating that there may be three relationships, for example, "A and / or B" can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects before and after are in an "or" relationship. The terms "first", "second", "third", etc. involved in this application are only used to distinguish similar objects and do not represent a specific ordering of the objects.

[0049] Figure 1 Schematic diagram of the application environment of the mixing station material distribution method according to the embodiment of the present application. The mixing station material distribution method provided by the present application can be applied to Figure 1 In the application environment shown. Figure 1 As shown, the server 10 monitors the inventory of storage tanks to obtain inventory data of the storage tanks, determines the required amount of each raw material according to the concrete mix ratio and planned construction volume of the target task, and generates a storage tank allocation plan for the target task based on the inventory data, the required amount of raw materials and preset storage tank selection rules.

[0050] This embodiment provides a method for distributing stored materials in a mixing station, which is applied to an information management (ERP) system of a mixing station. Figure 2 is a flow chart of a mixing station material distribution method according to an embodiment of the present application, such as Figure 2 As shown, the process includes the following steps:

[0051] Step S201, monitor the inventory of the storage tank to obtain the inventory data of the storage tank.

[0052] Install an inventory monitoring device for storage tanks at the mixing plant, through which the ERP system obtains the inventory data of the storage tanks in real time. Figure 3 is a schematic diagram of storage tank inventory data according to an embodiment of the present application, such as Figure 3As shown, the inventory data includes the number of storage tanks for each raw material and the storage capacity in each storage tank.

[0053] Step S202, determining the required amount of each raw material according to the concrete mix ratio of the target task and the planned construction volume.

[0054] In some embodiments, step S202 specifically includes:

[0055] Step S2021, obtaining the concrete mix ratio of the target task from the preset concrete mix ratios of each task.

[0056] The tester sets up all the construction mixes required for the infrastructure project in the ERP system in advance. When producing the storage tank allocation plan for the target task, the system can automatically obtain the concrete mix of the target task from the pre-set construction mix, or the tester can manually allocate the concrete mix for the target task from the pre-set construction mix.

[0057] Step S2022, obtaining the planned construction volume of the target task.

[0058] The planned construction volume of the target task can be pre-set or input by the tester in real time.

[0059] Step S2023, determine the required amount of each raw material according to the concrete mix ratio of the target task and the planned construction volume.

[0060] The ERP system determines the specific quantities of all raw materials that need to be consumed based on the assigned mix ratio and planned construction volume.

[0061] For example, the concrete mix ratio per cubic meter assigned to the target task is as follows

[0062] The amount of raw material 1 is X1 / m 3 , the amount of raw material 2 is X2 / m 3 , the amount of raw material 3 is X3 / m 3 , ...., the amount of raw material N is X N / m 3 , where N is a natural number greater than 1.

[0063] Known condition 2: The planned volume of the pouring is Y m 3

[0064] Then the required amount of raw material 1 S1 = X1*Y;

[0065] Then the required amount of raw material 2 S2 = X2*Y;

[0066] Then the required amount of raw material 3 S3 = X3*Y; ......

[0068] Then the required amount of raw material N is S N =X N *Y.

[0069] Continue to refer to Figure 2 After obtaining the inventory data of the storage tank and the required quantity of each raw material for the target task, execute step S203.

[0070] Step S203, generating a storage tank allocation plan for the target task based on inventory data, required quantities of raw materials and preset storage tank selection rules.

[0071] In some embodiments, step S203 specifically includes:

[0072] Step S2031, determining the selection order of the storage tanks according to the preset storage tank selection rules and inventory data.

[0073] Step S2032, based on the selection order of the storage tanks and the required amount of raw materials, obtain the target storage tanks corresponding to each raw material.

[0074] The storage tank selection rules are pre-set according to actual conditions, including but not limited to giving priority to the storage tank with the least storage capacity, giving priority to the storage tank with the largest storage capacity, and flexibly selecting any storage tank.

[0075] Step S2033, obtaining a storage tank allocation plan for the target task based on the target storage tanks corresponding to each raw material.

[0076] Assume that raw material 1 has 3 storage tanks, with storage capacities of C1, C2, and C3 respectively.

[0077] When the storage tank selection rule is to give priority to the storage tank with the least storage capacity, min(C1, C2, C3) is used.

[0078] When the storage tank selection rule is to give priority to the storage tank with the largest storage capacity, max(C1, C2, C3) is used.

[0079] In some embodiments, the mixing station storage material distribution method further includes:

[0080] When a modification instruction is received, the storage tank allocation plan of the target task is modified in response to the modification instruction.

[0081] The production tester of the mixing station checks the storage tanks automatically allocated by the ERP system. If he is not satisfied with the automatic allocation results, he can intervene and adjust them manually.

[0082] In some embodiments, the method further comprises:

[0083] Establish a connection with the industrial computer MES system, send the concrete mix ratio and storage tank allocation plan to the industrial computer MES system, and instruct the industrial computer MES system to control and monitor the raw material input according to the concrete mix ratio and storage tank allocation plan.

[0084] The ERP system sends the storage tank allocation plan to the industrial computer MES system. After the operator confirms that the plan is correct in the MES system, he sends the production instructions.

[0085] The construction mix ratio and storage tank allocation plan of the MES system are directly obtained from the ERP system, and are not entered by the industrial computer operator. This prevents the operator from bypassing the tester and privately adjusting the concrete mix ratio, which leads to cutting corners. The operating authority of the two different positions of tester and operator in the production of the concrete mixing plant is completely separated to achieve standardization of concrete production quality.

[0086] Figure 4 is a flow chart of a storage tank allocation method according to an embodiment of the present application, such as Figure 4 As shown, the flow chart includes the following steps:

[0087] Step S401, calculating the required amount of each raw material according to the target pouring task information and the proportion information corresponding to the pouring task;

[0088] Step S402, based on the automatic selection rule of the material storage tank, according to the inventory information and demand of each raw material, obtain the material storage tank allocation plan for the target pouring task;

[0089] Step S403, the ERP system sends the storage tank allocation plan to the industrial computer MES system, and the operator confirms the storage tank allocation plan in the MES system;

[0090] Step S404: After the operator confirms, the industrial computer MES system controls the concrete production according to the received storage tank allocation plan.

[0091] The ERP system automatically allocates storage tanks for pouring tasks based on the mix ratio and raw material inventory, greatly reducing the difficulty of operating the mixing station's information system, reducing the possibility of manual errors, improving the efficiency and accuracy of allocation, and at the same time reducing the consumption of human resources.

[0092] Through the above steps S201 to S203, the inventory of the storage tank is monitored to obtain the inventory data of the storage tank, and the required amount of each raw material is determined according to the concrete mix ratio of the target task and the planned construction volume. Based on the inventory data, the required amount of raw materials and the preset storage tank selection rules, the storage tank allocation plan for the target task is generated, which solves the problem of low efficiency and accuracy of material ratio of the mixing station. The system automatically produces a storage tank allocation plan based on the storage tank inventory, the target task mix ratio and the planned construction volume, which improves the efficiency and accuracy of material ratio of the mixing station.

[0093] In some embodiments, in order to avoid insufficient storage in a single storage tank, which may lead to discontinuous feeding of raw materials and production interruption during concrete production, this embodiment also sets a substitute algorithm. After setting the substitute algorithm, step S2032 specifically includes:

[0094] Step S301, based on the selection order of the storage tanks, determine the first storage tank corresponding to each raw material.

[0095] Step S302, obtaining a first storage capacity of a first storage tank from inventory data.

[0096] Step S303, selecting a substitute storage tank according to the first storage amount and the required amount of raw materials, and determining a target storage tank for the raw materials according to the first storage tank and the substitute storage tank.

[0097] For storage tanks with extremely low reserves that cannot meet the pouring task, the system will select and allocate one or more substitute storage tanks at the same time to automatically continue the feeding production, ensuring the continuity of raw material feeding during the concrete production process, achieving uninterrupted production and ensuring the quality of concrete production.

[0098] The selection of the substitute storage tank specifically includes: judging whether the first storage tank can meet the required amount of raw materials based on the first storage quantity, and if so, using the first storage tank as the target storage tank for the raw materials; if not, determining the substitute storage tank for the raw materials based on the selection order of the storage tanks, and using the first storage tank and the substitute storage tank as the target storage tanks for the raw materials.

[0099] Assume that raw material 1 has 3 storage tanks, with storage capacities of C1, C2, and C3 respectively.

[0100] When the storage tank selection rule is to give priority to the storage tank with the smallest storage capacity, min(C1, C2, C3) is used, and the first storage tank obtained is C1. If the storage capacity of C1 does not meet the required amount of raw material 1, min(C2, C3) is continued to be used as a substitute.

[0101] Assume that min(C2, C3) is C3. If the storage capacity of C1 plus C3 meets the required amount of raw material 1 in the target task, then C1 and C3 are used as the target storage tanks for raw material 1, and their use order is determined, that is, C1 is used first, and C3 is used when the storage capacity of C1 is exhausted.

[0102] If the storage capacity of C1 plus C3 does not meet the required amount of raw material 1, C2 will continue to be used as the second backup storage tank. If the total storage capacity of C1, C2 and C3 meets the required amount of raw material 1, C1, C2 and C3 will be used as the target storage tanks for raw material 1, and their use order will be determined, that is, C1 will be used first, and C3 will be used when the storage capacity of C1 is exhausted, and C2 will be used when the storage capacity of C3 is exhausted.

[0103] In the case that the reserves of all storage tanks for a certain raw material do not meet the required amount of the raw material, a prompt message of insufficient raw material can be produced to remind the staff.

[0104] Figure 5 is a flow chart of a storage tank replacement algorithm according to an embodiment of the present application, such as Figure 5 As shown, the process includes the following steps:

[0105] Step S501, assuming that in the concrete production process, raw material A uses tank 1#, and the storage of tank 1# is monitored in real time;

[0106] Step S502: If it is predicted that tank 1 will be exhausted in the next batch of production based on the required amount of raw material A and the storage capacity of tank 1, a replacement plan is initiated;

[0107] Step S503, restart the automatic selection, and select a substitute storage tank from the raw material A storage tanks except the 1# tank;

[0108] Step S504, selecting a substitute storage tank according to a preset storage tank selection rule, for example, the selected substitute storage tank is tank 3#;

[0109] Step S505, calculating the amount of raw material A required after the 1# tank is used up in the next batch of production;

[0110] Step S506, generating a feeding plan for the next batch of production according to the calculation results.

[0111] Introducing a replacement plan for storage tanks with insufficient reserves can ensure the continuity of concrete production and avoid interruptions in concrete production and impacts on concrete quality due to manual switching of storage tanks after a certain storage tank has run out.

[0112] Through the above steps, the ERP system automatically allocates storage tanks for pouring tasks according to the mix ratio and raw material inventory, which greatly reduces the difficulty of operating the mixing station information system, reduces the possibility of manual misoperation, improves the efficiency and accuracy of allocation, and reduces the consumption of human resources. The construction mix ratio and storage tank allocation plan of the MES system are obtained directly from the ERP system, and are not entered by the industrial computer operator. This prevents the operator from bypassing the tester and privately adjusting the concrete mix ratio, resulting in shoddy work. Introducing a substitute plan for storage tanks with insufficient reserves can ensure the continuity of concrete production and avoid the interruption of concrete production due to manual switching of storage tanks after a certain storage tank is used up, which affects the quality of concrete.

[0113] It should be noted that the steps shown in the above process or the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0114] This embodiment also provides a mixing plant information management system, which is used to implement the above embodiments and preferred implementations, and will not be repeated here. As used below, the terms "module", "unit", "subunit", etc. can be a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0115] Figure 6 is a structural block diagram of a material storage distribution system for a mixing station according to an embodiment of the present application, such as Figure 6 As shown, the system includes: a monitoring module 61 , a required quantity determination module 62 and a solution generation module 63 .

[0116] The monitoring module 61 is used to monitor the inventory of the storage tank and obtain the inventory data of the storage tank.

[0117] The required quantity determination module 62 is used to determine the required quantity of each raw material according to the concrete mix ratio of the target task and the planned construction quantity.

[0118] The solution generation module 63 is used to generate a storage tank allocation solution for the target task based on inventory data, the required amount of raw materials and preset storage tank selection rules.

[0119] In some embodiments, the solution generation module 63 includes: a sequence determination module, a target storage tank determination module and an allocation solution acquisition module.

[0120] An order determination module is used to determine the selection order of the storage tanks according to the preset storage tank selection rules and inventory data;

[0121] The target storage tank determination module is used to obtain the target storage tank corresponding to each raw material based on the selection order of the storage tanks and the required amount of raw materials.

[0122] The allocation plan acquisition module is used to obtain the storage tank allocation plan for the target task according to the target storage tanks corresponding to each raw material.

[0123] In some of the embodiments, the target storage tank determination module includes: a first storage tank determination module, a storage volume acquisition module and a substitute solution module.

[0124] The first material storage tank determination module is used to determine the first material storage tank corresponding to each raw material based on the selection order of the material storage tanks.

[0125] The storage quantity acquisition module is used to acquire the first storage quantity of the first storage tank from the inventory data.

[0126] The substitute solution module is used to select a substitute storage tank according to the first storage quantity and the required quantity of the raw material, and determine the target storage tank for the raw material according to the first storage tank and the substitute storage tank.

[0127] In some of the embodiments, the substitute plan module is used to determine, based on the first storage quantity, whether the first storage tank can meet the required amount of raw materials. If so, the first storage tank is used as the target storage tank for the raw materials. If not, the substitute storage tank for the raw materials is determined based on the selection order of the storage tanks, and the first storage tank and the substitute storage tank are used as the target storage tanks for the raw materials.

[0128] In some of the embodiments, the system further includes: an information sending module.

[0129] The information sending module is used to establish a connection with the industrial computer MES system, and send the concrete mix ratio and storage tank allocation plan to the industrial computer MES system to instruct the industrial computer MES system to control and monitor the raw material input according to the concrete mix ratio and storage tank allocation plan.

[0130] In some of the embodiments, the required quantity determination module 62 includes: a mix ratio acquisition module, a construction quantity acquisition module and a calculation module.

[0131] The mix ratio acquisition module is used to obtain the concrete mix ratio of the target task from the preset concrete mix ratios of each task.

[0132] The construction volume acquisition module is used to obtain the planned construction volume of the target task.

[0133] The calculation module is used to determine the required amount of each raw material based on the concrete mix ratio and planned construction volume of the target task.

[0134] In some of these embodiments, the system further includes: a modification module.

[0135] The modification module is used to respond to the modification instruction and modify the storage tank allocation plan of the target task when the modification instruction is received.

[0136] It should be noted that the above modules can be functional modules or program modules, and can be implemented by software or hardware. For modules implemented by hardware, the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.

[0137] This embodiment further provides an electronic device, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.

[0138] Optionally, the electronic device may further include a transmission device and an input / output device, wherein the transmission device is connected to the processor, and the input / output device is connected to the processor.

[0139] Optionally, in this embodiment, the processor may be configured to perform the following steps through a computer program:

[0140] S1, monitor the inventory of the storage tank and obtain the inventory data of the storage tank.

[0141] S2, determine the required amount of each raw material based on the concrete mix ratio of the target task and the planned construction volume.

[0142] S3, based on inventory data, required amount of raw materials and preset storage tank selection rules, generates a storage tank allocation plan for the target task.

[0143] It should be noted that the specific examples in this embodiment can refer to the examples described in the above embodiments and optional implementation modes, and this embodiment will not be described in detail here.

[0144] In one embodiment, Figure 7 is a schematic diagram of the internal structure of an electronic device according to an embodiment of the present application, such as Figure 7 As shown, an electronic device is provided, which may be a server, and its internal structure diagram may be as shown in Figure 7As shown. The electronic device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the electronic device is used to store data. The network interface of the electronic device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a mixing station storage material distribution method is implemented.

[0145] Those skilled in the art will understand that Figure 7 The structure shown in the figure is merely a block diagram of a partial structure related to the scheme of the present application, and does not constitute a limitation on the electronic device to which the scheme of the present application is applied. The specific electronic device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0146] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0147] Those skilled in the art should understand that the technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0148] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A method for distributing storage materials in a mixing station, characterized in that: The method is applied to the information management system of a mixing station, and the method comprises: Monitor the inventory of storage tanks and obtain the inventory data of storage tanks; Determine the required amount of each raw material according to the concrete mix ratio and planned construction volume of the target task; Based on the inventory data, the required amount of raw materials and preset storage tank selection rules, a storage tank allocation plan for the target task is generated.

2. The method according to claim 1, characterized in that The generating of a storage tank allocation scheme for a target task based on the inventory data, the required amount of raw materials and a preset storage tank selection rule comprises: Determining a selection order of storage tanks according to the preset storage tank selection rule and the inventory data; Based on the selection order of the storage tanks and the required amount of the raw materials, a target storage tank corresponding to each raw material is obtained; According to the target storage tanks corresponding to the raw materials, a storage tank allocation plan for the target task is obtained.

3. The method according to claim 2, characterized in that The obtaining of the target storage tanks corresponding to the raw materials based on the selection order of the storage tanks and the required amount of the raw materials includes: Based on the selection order of the storage tanks, determining the first storage tank corresponding to each raw material; Acquire a first storage volume of the first storage tank from the inventory data; A substitute storage tank is selected according to the first storage amount and the required amount of the raw material, and a target storage tank for the raw material is determined according to the first storage tank and the substitute storage tank.

4. The method according to claim 3, characterized in that The selecting a substitute storage tank according to the first storage amount and the required amount of the raw material, and determining a target storage tank for the raw material according to the first storage tank and the substitute storage tank comprises: According to the first storage volume, it is determined whether the first storage tank can meet the required amount of the raw materials. If yes, the first storage tank is used as the target storage tank for the raw materials. If not, then according to the selection order of the storage tanks, a substitute storage tank for the raw material is determined, and the first storage tank and the substitute storage tank are used as target storage tanks for the raw material.

5. The method according to claim 1, characterized in that The method further comprises: Establish connection with industrial computer MES system; The concrete mix ratio and the storage tank allocation plan are sent to the industrial computer MES system to instruct the industrial computer MES system to control and monitor the raw material input according to the concrete mix ratio and the storage tank allocation plan.

6. The method according to claim 1, characterized in that Determining the required amount of each raw material according to the concrete mix ratio and planned construction volume of the target task includes: Obtaining the concrete mix ratio of the target task from the preset concrete mix ratios of each task; Obtaining the planned construction volume of the target task; The required amount of each raw material is determined based on the concrete mix ratio of the target task and the planned construction volume.

7. The method according to claim 1, characterized in that The method further comprises: When a modification instruction is received, the storage tank allocation plan of the target task is modified in response to the modification instruction.

8. A material storage distribution system for a mixing station, characterized in that: The system includes: a monitoring module, a required quantity determination module and a solution generation module, wherein: The monitoring module is used to monitor the inventory of the storage tank and obtain the inventory data of the storage tank; The required quantity determination module is used to determine the required quantity of each raw material according to the concrete mix ratio and planned construction quantity of the target task; The solution generation module is used to generate a storage tank allocation solution for the target task based on the inventory data, the required amount of raw materials and preset storage tank selection rules.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the mixing station storage material distribution method according to any one of claims 1 to 7 is implemented.

10. A storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the mixing station storage material distribution method according to any one of claims 1 to 7 is implemented.

Citation Information

Cited By

  • Concrete mixing station production monitoring method and system

    CN120215396A