Power-traffic network optimal scheduling method based on time-space diagram attention network charging load prediction

Predicting electric vehicle traffic flow through the spatio-temporal graph attention network and combining it with power system collaborative dispatch solves the problem of increased grid energy consumption in traditional methods and achieves more efficient charging load prediction and power system stability.

CN118735158APending Publication Date: 2024-10-01HOHAI UNIV
View PDF 0 Cites 7 Cited by

Patent Information

Application Number
CN202410677189.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Traditional electric vehicle charging load prediction methods ignore the interaction and spatiotemporal changes between the power system and the transportation network, resulting in limited prediction accuracy, which in turn increases the energy consumption of the power grid.

Method used

Using a method based on the spatiotemporal graph attention network, combined with the collaborative scheduling of the power system and transportation network, the traffic flow is predicted through the spatiotemporal graph convolution network, and an improved queuing theory model is used to convert the traffic flow into charging load, taking into account the charging station capacity and User behavior, combined with photovoltaic and energy storage systems for optimal scheduling.

Benefits of technology

It improves the accuracy of charging load prediction, reduces the energy consumption of the power grid, and improves the stability and energy utilization efficiency of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735158A_ABST
    Figure CN118735158A_ABST
Patent Text Reader

Abstract

The invention discloses a power-traffic network optimal scheduling method based on time-space diagram attention network charging load prediction, and the method achieves the optimal scheduling of a power-traffic network based on the precise prediction of the charging load of an electric vehicle through the dynamic time-space dependence of the time-space diagram attention network mining charging load. A time-space diagram attention network is adopted to predict traffic flow, and a traffic flow prediction model based on the time-space diagram attention network is constructed; charging station capacity limitation and electric vehicle user behaviors are considered, traffic flow is converted into electric vehicle charging loads through an improved queuing theory model, operation constraints of a power grid are considered, and a power-traffic network optimal scheduling model based on time-space diagram attention network charging load prediction is constructed. According to the method, the practical situation that the current power grid and the traffic network have cooperative operation obstacles is considered, accurate prediction of the charging load is guaranteed through the space-time diagram attention network, and optimal scheduling of the power-traffic network is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of electricity-transportation network collaborative optimization, and specifically relates to an optimal scheduling method for an electricity-transportation network based on charging load prediction of a spatiotemporal graph attention network. Background Art

[0002] With the widespread promotion of electric vehicles, the charging load introduced into the power network has increased the complexity of power system planning and operation, and posed new challenges to the stability and operation of the power grid. The volatility and uncertainty of electric vehicle charging load, especially during peak hours, cause the so-called "peak-on-peak" phenomenon, which refers to the peak of power grid load and the peak of electric vehicle charging demand occurring at the same time, further exacerbating the load pressure on the power grid. Therefore, accurate prediction of electric vehicle charging load, especially during peak hours, becomes crucial for the optimal dispatch of power systems and power grid planning.

[0003] However, traditional load forecasting methods often ignore the interaction between the power system and the transportation network, as well as the dynamic changes in time and space, resulting in limited prediction accuracy. Furthermore, due to the lack of accurate charging load forecasting, the energy consumption of the power grid also increases. Therefore, it is urgent to develop an optimal scheduling method for power-transportation networks based on charging load forecasting of spatiotemporal graph attention networks to improve the prediction accuracy of charging loads and improve the energy efficiency of the power grid. Summary of the invention

[0004] Purpose of the invention: The technical problem to be solved by the present invention is to provide an optimal scheduling method for the power-transportation network based on the prediction of charging load by the spatiotemporal graph attention network in view of the deficiencies in the prior art. The present invention takes into account the coordination of the power system and the transportation system, introduces the spatiotemporal graph attention network model to predict the traffic flow of electric vehicles in the transportation network, converts the traffic flow of electric vehicles into charging load by taking into account the capacity limitation of the charging station and the behavior of electric vehicle users, introduces grid-related constraints, and coordinates the scheduling of the power-transportation network. The present invention can not only realize the accurate prediction of the charging load of electric vehicles, but also takes into account the charging behavior of electric vehicle users on this basis, thereby ensuring the coordinated operation of the power-transportation network.

[0005] Technical solution: In order to solve the above technical problems, the present invention provides an optimal scheduling method for power-transportation network based on charging load prediction of spatiotemporal graph attention network, which includes the following steps:

[0006] Step 1: Obtain the network coefficient and operation coefficient of the power grid model, wherein the network coefficient includes the power grid topology, line resistance and impedance, and the operation coefficient includes the power generation coefficient of the generator set, the charging and discharging coefficient of the energy storage system, the photovoltaic inverter coefficient, and the charging station parameters;

[0007] Step 2: Obtaining grid load demand, photovoltaic output, and traffic flow dataset scenario data;

[0008] Step 3: Take the traffic flow, speed and occupancy rate of the traffic network in the past time period as input, and the traffic flow of the traffic network in the future time period as output, add the attention mechanism to the spatiotemporal graph convolutional network for training, and establish a traffic flow prediction model based on the spatiotemporal graph attention network;

[0009] Step 4: Based on the traffic flow prediction model based on the spatiotemporal graph attention network in step 3, the traffic flow, speed and occupancy rate of the traffic network in the past time period are input to predict the traffic flow in the future time period;

[0010] Step 5: Based on the traffic flow in the future time period predicted in step 4, the capacity limitation of the charging station and the behavior of electric vehicle users are considered on the basis of queuing theory to obtain an improved queuing theory model, and the predicted traffic flow is mapped to the charging load using the improved queuing theory model;

[0011] Step 6. For the obtained network coefficient, operation coefficient, scenario data of the power grid and the predicted charging load, with the power grid operation constraints, energy storage operation constraints and charging load coupling constraints as constraints, and the minimum power grid operation energy consumption as the objective function, the model is solved using a mixed integer optimization solver to optimize the power grid and obtain the optimal scheduling plan for the power-transportation network based on the charging load prediction of the spatiotemporal graph attention network.

[0012] Furthermore, the attention mechanism in step 3 is:

[0013] SAM=Vs·τ((XW1)W2(W3X) T +bs)(B-1)

[0014]

[0015] TAM=V t ·τ((X T W4)W5(W6X)+b t )(B-3)

[0016]

[0017] Where X represents the input feature matrix of the traffic network, SAM represents the spatial attention matrix, and V s represents the weight matrix used for weighted output in spatial attention, W1, W2, W3 represent the weight matrix used for linear transformation of input sequence in spatial attention, b s represents the bias vector used to adjust the output in spatial attention, τ represents the activation function, SAMi,j Indicates the mutual influence degree of the spatial matrix nodes, SAM' i,j represents the mutual influence degree of the standardized spatial matrix nodes, N' represents the number of spatial nodes in the transportation network, TAM represents the temporal attention matrix, V t represents the weight matrix used for weighted output in temporal attention, W4, W5, W6 represent the weight matrix used for linear transformation of input sequence in temporal attention, b t represents the bias vector used to adjust the output in temporal attention, TAM i,j Indicates the mutual influence degree of the time matrix nodes, TAM' i,j represents the mutual influence degree of the standardized time matrix nodes, T h Indicates the length of the forecast time dimension.

[0018] Furthermore, in step 3, the spatiotemporal graph convolutional network with attention mechanism is:

[0019]

[0020] In the formula, represents the input feature matrix of the traffic network adjusted by the temporal attention matrix, TAM' represents the standardized temporal attention matrix, and g θ represents the convolution kernel, * G represents the graph convolution operation, L represents the Laplacian matrix, θ m represents the Chebyshev coefficient matrix, T m (·) represents Chebyshev polynomial, M represents the order of Chebyshev polynomial, represents the normalized Laplacian matrix, I U represents the identity matrix, represents the maximum eigenvalue of the Laplacian matrix, ⊙ represents the Hadamard product operation, ReLU(·) represents the nonlinear activation function, SAM' represents the standardized spatial attention matrix, Φ represents the time dimension convolution parameter, * represents the standard convolution operation, and X' represents the new traffic network input feature matrix after adjustment.

[0021] Furthermore, in step 4, the traffic flow in the future time period is predicted to be:

[0022]

[0023] In the formula, FC(·) represents the fully connected layer, Represents the predicted traffic flow.

[0024] Furthermore, in step 5, the charging load obtained by mapping the predicted traffic flow using the improved queuing theory model is:

[0025]

[0026]

[0027] In the formula, λ e represents the average arrival rate of electric vehicles, π e represents the penetration rate of electric vehicles, represents the probability of electric vehicle charging, μ e represents the average service rate of charging piles at charging stations, ρ e represents the average utilization rate of charging piles in the charging station, σ represents the parameter of the electric vehicle's tendency to refuse to queue, δ represents the parameter of the user's impatience, k represents the number of electric vehicles, C represents the number of charging piles, N represents the capacity of the charging station, P0 represents the probability that there is no electric vehicle in the charging station, P k represents the probability that there are k electric vehicles in the charging station, represents the number of occupied charging piles predicted at time t, represents the rated power of the charging pile at node i, represents the charging load of the charging station predicted at time t at node i.

[0028] Furthermore, in step 6, the relevant operating constraints of the charging load prediction model based on the spatiotemporal graph attention network are as follows:

[0029] (1) Grid operation constraints:

[0030]

[0031]

[0032] In the formula, and They represent the active power and reactive power of line ij at time t respectively; They represent the resistance, reactance and impedance of line ij respectively; represents the current of circuit ij at time t; H(j) represents the set of child nodes connected to node j; and They represent the active power and reactive power of line jh at time t respectively; and They represent the active power output and reactive power output of the photovoltaic power plant at node j at time t respectively; and They represent the discharge and charge of energy storage at node j at time t respectively; and They represent the active and reactive loads of node j at time t respectively; U j,t represents the square of the voltage amplitude at node j at time t; U i,trepresents the square of the voltage amplitude at node i at time t; Represents the upper limit of the current of circuit ij; and They represent the lower and upper limits of the square voltage amplitude at node i respectively; represents the reactive power output limit of the photovoltaic at node i; represents the capacity of the photovoltaic at node i;

[0033] (2) Energy storage operation constraints:

[0034]

[0035] In the formula, and are binary variables representing the energy storage charging and discharging states at node i at time t; and They represent the energy storage charging and discharging power at node i at time t respectively; and They represent the energy storage charging and discharging power at node i at time t respectively; represents the maximum power of energy storage charging and discharging at node i; and Respectively represent the energy storage charging and discharging efficiency at node i; and Respectively represent the energy storage capacity at node i at time t and time t+1; Indicates the maximum amount of energy that can be stored at node i;

[0036] (3) Charging load coupling constraints:

[0037]

[0038] In the formula, represents the active load of node i at time t; represents the normal power load at node i at time t.

[0039] Furthermore, in step 5, the objective function for minimizing the energy consumption of power grid operation is:

[0040]

[0041] In the formula, Indicates the energy consumption of power grid operation; T E represents the time period set; H(0) represents the node set connected to the root node of the power grid; C sub.t and They represent the power price and power purchase quantity of the upper main grid of the distribution network at time t respectively; C ESS represents the energy storage charging and discharging cost; S(i) represents the energy storage set connected to node i; ζ represents the penalty coefficient; It represents the power purchased by the upper main grid of the distribution network at time t according to the forecast optimization.

[0042] Beneficial effects: Compared with the prior art, the technical solution of the present invention has the following beneficial effects:

[0043] Compared with the basic scheme of traditional charging load prediction, the technical scheme of the present invention predicts electric vehicle traffic flow by introducing an attention mechanism to mine the spatiotemporal dependency of data, and converts it into charging load through the improved queuing theory model of charging stations, and combines the photovoltaic system and energy storage system to form an integrated photovoltaic storage and charging model and incorporate it into the power grid for optimization. The results of the example test show that the method proposed by the present invention can improve the accuracy of charging load prediction compared with the existing method, take into account the queuing behavior of electric vehicle users during charging, reduce the energy consumption of the power grid, and improve the stability of the power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 is a flow chart of the method of the present invention;

[0045] Figure 2 This is an example diagram of a power grid model considering the predicted charging load of electric vehicles;

[0046] Figure 3 This is a comparison chart of the predicted value and the actual value of charging load under different methods. DETAILED DESCRIPTION

[0047] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent modifications of the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

[0048] like Figure 1 As shown, the present invention provides an optimal scheduling method for power-transportation network based on charging load prediction of spatiotemporal graph attention network, the method comprising the following steps:

[0049] Step 1: Obtain the network coefficient and operation coefficient of the power grid model, wherein the network coefficient includes the power grid topology, line resistance and impedance, and the operation coefficient includes the power generation coefficient of the generator set, the charging and discharging coefficient of the energy storage system, the photovoltaic inverter coefficient, and the charging station parameters;

[0050] Step 2: Obtaining grid load demand, photovoltaic output, and traffic flow dataset scenario data;

[0051] Step 3: Take the traffic flow, speed and occupancy rate of the traffic network in the past time period as input, and the traffic flow of the traffic network in the future time period as output, add the attention mechanism to the spatiotemporal graph convolutional network for training, and establish a traffic flow prediction model based on the spatiotemporal graph attention network;

[0052] Step 4: Based on the traffic flow prediction model based on the spatiotemporal graph attention network in step 3, the traffic flow, speed and occupancy rate of the traffic network in the past time period are input to predict the traffic flow in the future time period;

[0053] Step 5: Based on the traffic flow in the future time period predicted in step 4, the capacity limitation of the charging station and the behavior of electric vehicle users are considered on the basis of queuing theory to obtain an improved queuing theory model, and the predicted traffic flow is mapped to the charging load using the improved queuing theory model;

[0054] Step 6. For the obtained network coefficient, operation coefficient, scenario data of the power grid and the predicted charging load, with the power grid operation constraints, energy storage operation constraints and charging load coupling constraints as constraints, and the minimum power grid operation energy consumption as the objective function, the model is solved using a mixed integer optimization solver to optimize the power grid and obtain the optimal scheduling plan for the power-transportation network based on the charging load prediction of the spatiotemporal graph attention network.

[0055] Furthermore, the attention mechanism in step 3 is:

[0056] SAM=Vs·τ((XW1)W2(W3X) T +bs)(C-1)

[0057]

[0058] TAM=V t ·τ((X T W4)W5(W6X)+b t )(C-3)

[0059]

[0060] Where X represents the input feature matrix of the traffic network, SAM represents the spatial attention matrix, and V s represents the weight matrix used for weighted output in spatial attention, W1, W2, W3 represent the weight matrix used for linear transformation of input sequence in spatial attention, b s represents the bias vector used to adjust the output in spatial attention, τ represents the activation function, SAM i,j Indicates the mutual influence degree of the spatial matrix nodes, SAM' i,jrepresents the mutual influence degree of the standardized spatial matrix nodes, N' represents the number of spatial nodes in the transportation network, TAM represents the temporal attention matrix, V t represents the weight matrix used for weighted output in temporal attention, W4, W5, W6 represent the weight matrix used for linear transformation of input sequence in temporal attention, b t represents the bias vector used to adjust the output in temporal attention, TAM i,j Indicates the mutual influence degree of the time matrix nodes, TAM' i,j represents the mutual influence degree of the standardized time matrix nodes, T h Indicates the length of the forecast time dimension.

[0061] Furthermore, in step 3, the spatiotemporal graph convolutional network with attention mechanism is:

[0062]

[0063] In the formula, represents the input feature matrix of the traffic network adjusted by the temporal attention matrix, TAM' represents the standardized temporal attention matrix, and g θ represents the convolution kernel, * G represents the graph convolution operation, L represents the Laplacian matrix, θ m represents the Chebyshev coefficient matrix, T m (·) represents Chebyshev polynomial, M represents the order of Chebyshev polynomial, represents the normalized Laplacian matrix, I U represents the identity matrix, represents the maximum eigenvalue of the Laplacian matrix, ⊙ represents the Hadamard product operation, ReLU(·) represents the nonlinear activation function, SAM' represents the standardized spatial attention matrix, Φ represents the time dimension convolution parameter, * represents the standard convolution operation, and X' represents the new traffic network input feature matrix after adjustment.

[0064] Furthermore, in step 4, the traffic flow in the future time period is predicted to be:

[0065]

[0066] In the formula, FC(·) represents the fully connected layer, Represents the predicted traffic flow.

[0067] Furthermore, in step 5, the charging load obtained by mapping the predicted traffic flow using the improved queuing theory model is:

[0068]

[0069]

[0070] In the formula, λ e represents the average arrival rate of electric vehicles, π e represents the penetration rate of electric vehicles, represents the probability of electric vehicle charging, μ e represents the average service rate of charging piles at charging stations, ρ e represents the average utilization rate of charging piles in the charging station, σ represents the parameter of the electric vehicle's tendency to refuse to queue, δ represents the parameter of the user's impatience, k represents the number of electric vehicles, C represents the number of charging piles, N represents the capacity of the charging station, P0 represents the probability that there is no electric vehicle in the charging station, P k represents the probability that there are k electric vehicles in the charging station, represents the number of occupied charging piles predicted at time t, represents the rated power of the charging pile at node i, represents the charging load of the charging station predicted at time t at node i.

[0071] Furthermore, in step 6, the relevant operating constraints of the charging load prediction model based on the spatiotemporal graph attention network are as follows:

[0072] (1) Grid operation constraints:

[0073]

[0074]

[0075] In the formula, and They represent the active power and reactive power of line ij at time t respectively; They represent the resistance, reactance and impedance of line ij respectively; represents the current of circuit ij at time t; H(j) represents the set of child nodes connected to node j; and They represent the active power and reactive power of line jh at time t respectively; and They represent the active power output and reactive power output of the photovoltaic power plant at node j at time t respectively; and They represent the discharge and charge of energy storage at node j at time t respectively; and They represent the active and reactive loads of node j at time t respectively; U j,t represents the square of the voltage amplitude at node j at time t; U i,t represents the square of the voltage amplitude at node i at time t; Represents the upper limit of the current of circuit ij; and They represent the lower and upper limits of the square voltage amplitude at node i respectively; represents the reactive power output limit of the photovoltaic at node i; represents the capacity of the photovoltaic at node i;

[0076] (2) Energy storage operation constraints:

[0077]

[0078] In the formula, and are binary variables representing the energy storage charging and discharging states at node i at time t; and They represent the energy storage charging and discharging power at node i at time t respectively; and They represent the energy storage charging and discharging power at node i at time t respectively; represents the maximum power of energy storage charging and discharging at node i; and Respectively represent the energy storage charging and discharging efficiency at node i; and Respectively represent the energy storage capacity at node i at time t and time t+1; Indicates the maximum amount of energy that can be stored at node i;

[0079] (3) Charging load coupling constraints:

[0080]

[0081] In the formula, represents the active load of node i at time t; represents the normal power load at node i at time t.

[0082] Furthermore, in step 5, the objective function for minimizing the energy consumption of power grid operation is:

[0083]

[0084] In the formula, Indicates the energy consumption of power grid operation; T E represents the time period set; H(0) represents the node set connected to the root node of the power grid; C sub.t and They represent the power price and power purchase quantity of the upper main grid of the distribution network at time t respectively; C ESS represents the energy storage charging and discharging cost; S(i) represents the energy storage set connected to node i; ζ represents the penalty coefficient; It represents the power purchased by the upper main grid of the distribution network at time t according to the forecast optimization.

[0085] Case Analysis

[0086] The following example illustrates the superiority of the optimal scheduling method for power-transportation network based on time-space graph attention network charging load prediction in the present invention. Figure 2 The improved IEEE 33-node power system shown in FIG. 1 is a schematic diagram of an improved IEEE 33-node power system. In order to compare the superiority of the method proposed in the present invention, the optimal dispatching method for power-transportation network based on long short-term memory network charging load prediction and the optimal dispatching method for power-transportation network based on spatiotemporal graph attention network charging load prediction proposed in the present invention are respectively used for power-transportation network coordinated dispatching. The present invention is implemented through the GAMS optimization platform and the Gurobi solver is used to solve the nonlinear programming problem.

[0087] Based on this example, the prediction performance and scheduling results of the optimal scheduling method for power-transportation network based on long short-term memory network charging load prediction and the optimal scheduling method for power-transportation network based on spatiotemporal graph attention network charging load prediction proposed in the present invention are compared (the results are shown in Table 1), and the prediction results and true values ​​of the optimal scheduling method for power-transportation network based on long short-term memory network charging load prediction and the optimal scheduling method for power-transportation network based on spatiotemporal graph attention network charging load prediction proposed in the present invention are compared (the results are shown in Table 2). Figure 3 ). This shows that the prediction performance and results of the spatiotemporal graph attention network are better than those of the long short-term memory network that only mines time dependencies by mining the spatiotemporal dependencies of data. Compared with the charging load prediction of the long short-term memory network, the charging load prediction of the spatiotemporal graph attention network improves the prediction accuracy by adding the spatiotemporal attention mechanism (Table 1 and Figure 3 ), and the power-transportation network scheduling result of the charging load prediction of the spatiotemporal graph attention network is 1.1% lower than that of the power-transportation network scheduling result of the charging load prediction of the long short-term memory network, indicating that the spatiotemporal graph attention network has reduced the system operation consumption on the basis of improving the prediction accuracy.

[0088] Table 1 Comparison of prediction performance and scheduling results of different methods

[0089]

[0090]

[0091] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered by the protection scope of the present invention.

Claims

1. An optimal scheduling method for power-transportation network based on charging load prediction using spatiotemporal graph attention network, It is characterized in that The following steps are involved: Step 1: Obtain the network coefficient and operation coefficient of the power grid model, wherein the network coefficient includes the power grid topology, line resistance and impedance, and the operation coefficient includes the power generation coefficient of the generator set, the charging and discharging coefficient of the energy storage system, the photovoltaic inverter coefficient, and the charging station parameters; Step 2: Obtaining grid load demand, photovoltaic output, and traffic flow dataset scenario data; Step 3: Take the traffic flow, speed and occupancy rate of the traffic network in the past time period as input, and the traffic flow of the traffic network in the future time period as output, add the attention mechanism to the spatiotemporal graph convolutional network for training, and establish a traffic flow prediction model based on the spatiotemporal graph attention network; Step 4: Based on the traffic flow prediction model based on the spatiotemporal graph attention network in step 3, the traffic flow, speed and occupancy rate of the traffic network in the past time period are input to predict the traffic flow in the future time period; Step 5: Based on the traffic flow in the future time period predicted in step 4, the capacity limitation of the charging station and the behavior of electric vehicle users are considered on the basis of queuing theory to obtain an improved queuing theory model, and the predicted traffic flow is mapped to the charging load using the improved queuing theory model; Step 6. For the obtained network coefficient, operation coefficient, scenario data of the power grid and the predicted charging load, with the power grid operation constraints, energy storage operation constraints and charging load coupling constraints as constraints, and the minimum power grid operation energy consumption as the objective function, the model is solved using a mixed integer optimization solver to optimize the power grid and obtain the optimal scheduling plan for the power-transportation network based on the charging load prediction of the spatiotemporal graph attention network.

2. According to claim 1, a method for optimal scheduling of power-transportation network charging load prediction based on spatiotemporal graph attention network, It is characterized in that The attention mechanism in step 3 is: SAM=Vs·τ((XW 1 )W 2 (W 3 X) T +bs)(A-1) THERE=V t τ((X T IN 4 )IN 5 (IN 6 X)+b t )(A-3) Where X represents the input feature matrix of the traffic network, SAM represents the spatial attention matrix, and V s represents the weight matrix used to weight the output in spatial attention, W 1 , W 2 , W 3 represents the weight matrix used to linearly transform the input sequence in spatial attention, b s represents the bias vector used to adjust the output in spatial attention, τ represents the activation function, SAM i,j Indicates the mutual influence degree of the spatial matrix nodes, SAM' i,j represents the mutual influence degree of the standardized spatial matrix nodes, N' represents the number of spatial nodes in the transportation network, TAM represents the temporal attention matrix, V t represents the weight matrix used to weight the output in temporal attention, W 4 , W 5 , W 6 represents the weight matrix used to linearly transform the input sequence in temporal attention, b t represents the bias vector used to adjust the output in temporal attention, TAM i,j Indicates the mutual influence degree of the time matrix nodes, TAM' i,j represents the mutual influence degree of the standardized time matrix nodes, T h Indicates the length of the forecast time dimension.

3. According to claim 2, a method for optimal scheduling of power-transportation network charging load prediction based on spatiotemporal graph attention network, It is characterized in that In step 3, the spatiotemporal graph convolutional network with attention mechanism is: In the formula, represents the input feature matrix of the traffic network adjusted by the temporal attention matrix, TAM' represents the standardized temporal attention matrix, and g θ represents the convolution kernel, * G represents the graph convolution operation, L represents the Laplacian matrix, θ m represents the Chebyshev coefficient matrix, T m (·) represents Chebyshev polynomial, M represents the order of Chebyshev polynomial, represents the normalized Laplacian matrix, I U represents the identity matrix, represents the maximum eigenvalue of the Laplacian matrix, ⊙ represents the Hadamard product operation, ReLU(·) represents the nonlinear activation function, SAM' represents the standardized spatial attention matrix, Φ represents the time dimension convolution parameter, * represents the standard convolution operation, and X' represents the new traffic network input feature matrix after adjustment.

4. According to claim 3, a method for optimal scheduling of power-transportation network charging load prediction based on spatiotemporal graph attention network, It is characterized in that In step 4, the traffic flow in the future time period is predicted to be: In the formula, FC(·) represents the fully connected layer, Represents the predicted traffic flow.

5. According to claim 4, a method for optimal scheduling of power-transportation network charging load prediction based on spatiotemporal graph attention network, It is characterized in that In step 5, the charging load obtained by mapping the predicted traffic flow using the improved queuing theory model is: In the formula, λ e represents the average arrival rate of electric vehicles, π e represents the penetration rate of electric vehicles, represents the probability of electric vehicle charging, μ e represents the average service rate of charging piles at charging stations, ρ e represents the average utilization rate of charging piles at the charging station, σ represents the parameter of electric vehicles' refusal to queue, δ represents the parameter of user impatience, k represents the number of electric vehicles, C represents the number of charging piles, N represents the capacity of the charging station, and P 0 represents the probability that there is no electric vehicle in the charging station, P k represents the probability that there are k electric vehicles in the charging station, represents the number of occupied charging piles predicted at time t, represents the rated power of the charging pile at node i, represents the charging load of the charging station predicted at time t at node i.

6. According to claim 5, a method for optimal scheduling of power-transportation network based on charging load prediction of spatiotemporal graph attention network, It is characterized in that In step 6, the relevant operating constraints of the charging load prediction model based on the spatiotemporal graph attention network are as follows: (1) Grid operation constraints: In the formula, and They represent the active power and reactive power of line ij at time t respectively; They represent the resistance, reactance and impedance of line ij respectively; represents the current of circuit ij at time t; H(j) represents the set of child nodes connected to node j; and They represent the active power and reactive power of line jh at time t respectively; and They represent the active power output and reactive power output of the photovoltaic power plant at node j at time t respectively; and They represent the discharge and charge of energy storage at node j at time t respectively; and They represent the active and reactive loads of node j at time t respectively; U j,t represents the square of the voltage amplitude at node j at time t; U i,t represents the square of the voltage amplitude at node i at time t; Represents the upper limit of the current of circuit ij; and They represent the lower and upper limits of the square voltage amplitude at node i respectively; represents the reactive power output limit of the photovoltaic at node i; represents the capacity of the photovoltaic at node i; (2) Energy storage operation constraints: In the formula, and are binary variables representing the energy storage charging and discharging states at node i at time t; and They represent the energy storage charging and discharging power at node i at time t respectively; and They represent the energy storage charging and discharging power at node i at time t respectively; represents the maximum power of energy storage charging and discharging at node i; and Respectively represent the energy storage charging and discharging efficiency at node i; and Respectively represent the energy storage capacity at node i at time t and time t+1; Indicates the maximum amount of energy that can be stored at node i; (3) Charging load coupling constraints: In the formula, represents the active load of node i at time t; represents the normal power load at node i at time t.

7. According to claim 6, a method for optimal scheduling of power-transportation network charging load prediction based on spatiotemporal graph attention network, It is characterized in that In step 5, the objective function for minimizing the energy consumption of power grid operation is: In the formula, Indicates the energy consumption of power grid operation; T E represents the time period set; H(0) represents the node set connected to the root node of the power grid; C sub.t and They represent the power price and power purchase quantity of the upper main grid of the distribution network at time t respectively; C ESS Represents the cost of charging and discharging energy storage; S(i) represents the energy storage set connected to node i; ζ represents the penalty coefficient; It represents the power purchased by the upper main grid of the distribution network at time t according to the forecast optimization.

Citation Information

Cited By

  • Operation reliability evaluation method and device, electronic equipment and computer storage medium

    CN120197494A

  • Comprehensive space-time flexibility analysis method for electric vehicle under dynamic traffic flow

    CN120222460A

  • A comprehensive spatiotemporal flexibility analysis method for electric vehicles under dynamic traffic flow

    CN120222460B

  • Charging control strategy analysis method and system for electric vehicle charging pile

    CN120716515A

  • Power-traffic network charging load prediction method and system, and storage medium

    CN121300210A