Pelletizing feeding quantity scheduling method

By combining the differential autoregressive moving average model with real-time data, a pelletizing feeding volume schedule is generated, which solves the problem of low efficiency caused by manual dependence, achieves more accurate and efficient feeding control, and optimizes production plans and resources. use.

CN118735240APending Publication Date: 2024-10-01JIANGSU JINHENG INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410706737.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The pelletizing feed volume relies on manual labor, resulting in low efficiency, unreasonable feeding plans, slow delivery speed, poor predictability, and low optimization.

Method used

By obtaining the historical data of pellet consumption, using the differential autoregressive moving average model to fit the planned production of pellets in the preset period, and combining the real-time pellet data and maintenance plan data, the feeding schedule data is generated, including the current remaining production time. , feeding rate and planned feeding amount per unit time.

Benefits of technology

It improves the accuracy and efficiency of the pelletizing feeding amount, optimizes the production plan, reduces downtime, and improves resource utilization and overall production performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735240A_ABST
    Figure CN118735240A_ABST
Patent Text Reader

Abstract

The invention provides a pellet pelletizing feeding amount scheduling method. The pellet pelletizing feeding amount scheduling method comprises the steps that pellet consumption historical data is obtained; fitting the pellet consumption historical data through a differential autoregressive moving average model to generate a pellet planned yield in a preset time period; acquiring real-time pellet data and pellet maintenance plan data; the real-time pellet data comprises the current pellet yield and the current remaining time; the pellet maintenance plan data comprises planned maintenance time; according to the planned pellet yield in the preset time period and the current pellet yield, the remaining planned yield is calculated; and according to the residual planned yield, the real-time pellet data and the pellet maintenance plan data, feeding amount scheduling data are generated, and the feeding amount scheduling data comprise the current residual production time, the feeding rate and the unit time feeding planned amount, so that the problem that the efficiency is low due to the fact that the pelletizing feeding amount depends on manpower is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pelletizing, and in particular to a method for scheduling feed quantity for pelletizing. Background Art

[0002] Pelletizing is a process in which finely ground iron ore concentrate or other iron-containing powder is mixed with a small amount of additives, and then rolled into balls by a pelletizing machine under the condition of water wetting. In order to ensure the continuity of production, improve the quality and production efficiency of pellets, save costs and protect the environment, it is necessary to accurately predict the planned output of pelletizing and accurately control the feed rate.

[0003] In the related technology, most pelletizing plants still rely on manual experience for feeding in the pelletizing stage, and plan the pelletizing feeding amount and organize production by manual scheduling, which will lead to unreasonable feeding plans, slow issuance speed, poor predictability, and low degree of optimization, resulting in low efficiency of pelletizing. Summary of the invention

[0004] The present application provides a pelletizing feed scheduling method to solve the problem of low efficiency caused by manual reliance on pelletizing feed.

[0005] The present application provides a method for scheduling pelletizing feed quantity, comprising: Obtain historical data on pellet consumption; Fitting the pellet consumption historical data through a differential autoregressive moving average model to generate a pellet production plan for a preset period; Acquire real-time pelletizing data and pelletizing maintenance plan data; the real-time pelletizing data includes current pelletizing output and current remaining time; the pelletizing maintenance plan data includes planned maintenance time; Calculating the remaining planned production by using the planned production of pellets during the preset period and the current production of pellets; Feeding quantity scheduling data is generated by the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data. The feeding quantity scheduling data includes: the current remaining production time, the feeding rate and the planned feeding quantity per unit time.

[0006] The above method predicts the planned pellet production in the preset period based on the historical data of pellet consumption, and then automatically generates feeding quantity scheduling data based on the planned pellet production in the preset period, the real-time pellet data and the pellet maintenance plan data, thereby solving the problem of low efficiency caused by manual reliance on feeding quantity for pelletizing.

[0007] Optionally, obtain pellet consumption history data, including: Obtain the historical pellet product delivery records from the database; The historical data of pellet consumption is generated through the historical pellet finished product delivery records.

[0008] Generating historical data on pellet consumption through the historical pellet finished product delivery records not only has high accuracy and reliability, but also the historical pellet finished product delivery records can be traced back to specific production batches, time and location, which helps to quickly locate the cause of the problem when it occurs and improve the efficiency of problem solving.

[0009] Optionally, fitting the pellet consumption historical data through a differential autoregressive moving average model to generate a pellet production plan for a preset period includes: generating a historical pellet consumption sequence according to the pellet consumption historical data; According to the unit root test, whether the historical pellet consumption series is a stable series: If the historical pellet consumption sequence is an unstable sequence, converting the unstable sequence into a stable sequence through a difference operation; If the historical pellet consumption sequence is a stability sequence, Ljung-Box test is used to test whether the stability sequence is a stable white noise sequence; If the stability sequence is a stable white noise sequence, deleting the stable white noise sequence; If the stability sequence is a stable non-white noise sequence, generating an autocorrelation coefficient graph and a partial correlation coefficient graph; Determining the autoregressive order and the moving average order according to the autocorrelation coefficient graph and the partial correlation coefficient graph; An ARMA model is established according to the autoregressive order and the moving average order to generate a planned pellet production for a preset period of time.

[0010] The ARMA model is established based on the historical data of pellet consumption, which has strong flexibility and adaptability and can more accurately predict the planned output of pellets in the preset period.

[0011] Optionally, the formula for the statistic of the Ljung-Box test is: Q(m)=n(n+2)∑(k=1 to m)(r(k)^2) / (nk); Where: n is the sample size; m is the maximum lag period to be tested; r(k) is the k-th order autocorrelation coefficient.

[0012] The Ljung-Box test comprehensively considers the autocorrelations of multiple lag orders, and the test is more comprehensive, which helps to more accurately determine the correlation characteristics of time series data.

[0013] Optionally, the formula for the unit root test is: Δyt=α+βt+γyt-1+δ1Δyt-1+δ2Δyt-2+...+δpΔyt-p+εt; Where: Δyt is the first-order difference of the time series yt; α is the constant term; βt is the time trend term; γ is the coefficient; δ1 to δp are the coefficients of the lagged difference terms; εt is the error term.

[0014] The formula of the unit root test provides a comprehensive and flexible method to analyze the characteristics and dynamic relationships of time series data by comprehensively considering factors such as time trend, first-order difference, lagged difference term and error term.

[0015] Optionally, the differential operation formula is: Δf(x)=f(x+1)-f(x); Among them, f(x+1) represents the observation value at time x+1; f(x) represents the observation value at time x; Δf(x) represents the difference or change value at time x.

[0016] The differential operation formula quickly and effectively converts the unstable sequence into a stable sequence through a simple subtraction operation, thereby improving the stability of the model and the accuracy of the prediction.

[0017] Optionally, obtain real-time pelletizing data and pelletizing maintenance planning data, including: Collect weighing data in real time through the discharging belt scale of the pelletizing machine; Obtain the weighing data and current time through the MODBUS protocol to generate current pellet production and current remaining time; Obtain maintenance plan in maintenance system; The start time and end time of the shutdown maintenance of the pelletizing machine are obtained through the maintenance plan data to calculate the planned maintenance time.

[0018] The above method collects weighing data in real time through the discharging belt scale, which can realize the automatic monitoring of pellet production and improve the real-time and accuracy of data collection; uses the MODBUS protocol to obtain weighing data and current time, which can effectively ensure the efficiency and reliability of data transmission; obtains the maintenance plan in the maintenance system to calculate the planned maintenance time, which helps to manage more accurately.

[0019] Optionally, the feed rate scheduling data is generated by using the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data, including: Determine whether the planned pellet production for the preset period has been entered: If not entered, the remaining planned output is 0 and the current pelletizing machine feeding rate is 0; If it has been entered, determine whether there is a maintenance plan within the current remaining time: If the maintenance plan does not exist, the formula for the current remaining production time is: Δt mleave =t mend -t now ; Where: t mend The time stamp of the plan end; t now is the current timestamp; If the maintenance plan exists, the current remaining production time is calculated according to the planned maintenance time. The formula for the current remaining production time is: Δt mleave =t mend -t now –Δt m ; Where: t mend The time stamp of the plan end; t now is the current timestamp; Δt m It is the planned maintenance time in milliseconds.

[0020] The above method ensures the integrity and accuracy of data by checking whether the planned pellet production in the preset period has been entered and whether there is a maintenance plan, optimizes the production plan, improves production efficiency and resource utilization, and reduces downtime. The method is easy to automate.

[0021] Optionally, generating feed rate scheduling data through the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data further includes: The remaining average feed rate is calculated by the planned pellet production in the preset period, the current pellet production and the current remaining production time. The formula for the remaining average feed rate is: V avg =(X mplan -X mpro ) / Δt mleave ; Where: X mplan Planned pellet production for a preset period; X mpro is the current pellet production; Δt mleave Current remaining production time; Determine whether the current time is the planned maintenance time: If the current time is the planned maintenance time, the feed rate at the current time is 0; If the current time is not the planned maintenance time, the feed rate at the current time is the remaining average feed rate.

[0022] The above method helps to improve the overall production performance by calculating and adjusting the remaining average feed rate in real time, optimizing production control, improving production efficiency and resource utilization, and reducing production delays.

[0023] Optionally, generating feed rate scheduling data through the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data further includes: Calculate the planned feed quantity per unit time according to the remaining planned output and the current remaining time; Determine whether the current time is within the unit time and whether there is a maintenance plan within the unit time: If the current time is within the unit time and there is no maintenance plan for the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t now ; Where: t dend The unit end timestamp; t now is the current timestamp; If the current time is within the unit time and there is a maintenance plan for the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t now –Δt d ; Where: t dend The unit end timestamp; t now is the current timestamp; Δt d Plan maintenance time per unit time; If the current time is not within the unit time and there is no maintenance plan within the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t dstart ; Where: t dend The unit end timestamp; t dstart The unit start timestamp; If the current time is not within the unit time and there is a maintenance plan within the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t dstart -Δt d ; Where: t dend The unit end timestamp; t dstart The unit starts the timestamp; Δt dPlan maintenance time per unit time; The planned material feeding quantity per unit time is calculated by the unit production time and the planned material feeding quantity per unit time.

[0024] The above method optimizes production control, improves production efficiency and resource utilization, reduces production delays, and helps achieve production goals and improve overall production performance by calculating and adjusting the planned feeding quantity per unit time in real time.

[0025] It can be seen from the above technical scheme that the present application provides a method for scheduling feed quantity for pelletizing, including: obtaining historical data on pellet consumption; fitting the historical data on pellet consumption through a differential autoregressive moving average model to generate a planned pellet production for a preset period; obtaining real-time pellet data and pellet maintenance plan data; the real-time pellet data includes the current pellet production and the current remaining time; the pellet maintenance plan data includes the planned maintenance time; calculating the remaining planned production through the planned pellet production for the preset period and the current pellet production; generating feeding quantity scheduling data through the remaining planned production, the real-time pellet data and the pellet maintenance plan data, the feeding quantity scheduling data including: the current remaining production time, the feeding rate and the planned feeding quantity per unit time, so as to solve the problem of low efficiency caused by manual reliance on pelletizing feeding quantity. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solution of the present application, the drawings required for use in the embodiments are briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.

[0027] Figure 1 It is a flow chart of the pelletizing feed scheduling method described in the embodiment of the present application; Figure 2 It is a schematic diagram of the process of obtaining historical data of pellet consumption in the method for scheduling pelletizing feed amount in an embodiment of the present application; Figure 3 It is a schematic diagram of the process of generating a planned pellet production in a preset time period in the pelletizing feed scheduling method described in an embodiment of the present application. DETAILED DESCRIPTION

[0028] The following embodiments are described in detail, and examples thereof are shown in the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The implementations described in the following embodiments do not represent all implementations consistent with the present application. They are only examples of systems and methods consistent with some aspects of the present application as detailed in the claims.

[0029] To solve the problem of low efficiency caused by manual feeding of pelletizing materials, see Figure 1 , Figure 1 The present invention provides a method for scheduling the feeding amount of pelletizing pellets, including: S100: Obtain historical data of pellet consumption.

[0030] S200: Fitting the pellet consumption history data through a differential autoregressive moving average model to generate a pellet production plan for a preset period.

[0031] S300: Acquire real-time pelletizing data and pelletizing maintenance plan data.

[0032] The real-time pelletizing data includes the current pelletizing output and the current remaining time; the pelletizing maintenance plan data includes the planned maintenance time.

[0033] S400: Calculate the remaining planned production by using the planned production of pellets in the preset time period and the current production of pellets.

[0034] S500: Generate feed rate scheduling data according to the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data.

[0035] The feeding quantity scheduling data includes: the current remaining production time, the feeding rate and the planned feeding quantity per unit time.

[0036] It should be understood that the Autoregressive Integrated Moving Average Model (ARIMA) is an important tool for analyzing and predicting time series data. Specifically, it includes three parts: autoregression (AR), difference (I) and moving average (MA), among which the autoregressive part means that the current value of a time series can be linearly combined from its past value and an error term; the difference part is used to make non-stationary data stable; the moving average part is used to indicate that the current observation value is not only affected by its own past value, but also by random interference at past moments. Since the autoregressive difference moving average model is relatively simple and only requires univariate time series data for prediction, it is suitable for predicting the planned production of pellets in the preset period. In the embodiment of the present application, the preset period can be selected as monthly; the unit time can be selected as daily.

[0037] The above method predicts the planned pellet production in the preset period based on the historical data of pellet consumption, and then automatically generates feeding quantity scheduling data based on the planned pellet production in the preset period, the real-time pellet data and the pellet maintenance plan data, thereby solving the problem of low efficiency caused by manual reliance on feeding quantity for pelletizing.

[0038] In some embodiments, see Figure 2 , Figure 2 The present invention is a flow chart of obtaining the historical data of pellet consumption in a pelletizing feed scheduling method. The historical data of pellet consumption is obtained, including: S110: Obtain historical pellet product delivery records from the database.

[0039] S120: Generate historical data on pellet consumption based on the historical pellet finished product delivery records.

[0040] Generating historical data on pellet consumption through the historical pellet finished product delivery records not only has high accuracy and reliability, but also the historical pellet finished product delivery records can be traced back to specific production batches, time and location, which helps to quickly locate the cause of the problem when it occurs and improve the efficiency of problem solving.

[0041] In some embodiments, see Figure 3 , Figure 3 The present invention is a flow chart of generating a planned pellet production in a preset period in a pelletizing feed scheduling method. The historical pellet consumption data is fitted by a differential autoregressive moving average model to generate a planned pellet production in a preset period, including: S210: Generate a historical pellet consumption sequence according to the pellet consumption historical data.

[0042] S220: Check whether the historical pellet consumption sequence is a stability sequence based on the unit root.

[0043] S230: If the historical pellet consumption sequence is an unstable sequence, convert the unstable sequence into a stable sequence through a differential operation.

[0044] S240: If the historical pellet consumption sequence is a stability sequence, a Ljung-Box test is performed to determine whether the stability sequence is a stable white noise sequence.

[0045] S250: If the stability sequence is a stable white noise sequence, delete the stable white noise sequence.

[0046] S260: If the stability sequence is a stable non-white noise sequence, generate an autocorrelation coefficient graph and a partial correlation coefficient graph.

[0047] S270: Determine the autoregressive order and the moving average order according to the autocorrelation coefficient graph and the partial correlation coefficient graph.

[0048] S280: Establishing an ARMA model according to the autoregressive order and the moving average order to generate a planned pellet production for a preset period of time.

[0049] It should be understood that the ARMA model is a powerful time series analysis tool that can more accurately describe and predict the behavior of time series data by combining the characteristics of the autoregressive and moving average models. Since the ARMA model calculation requires the use of a stability sequence, otherwise the prediction effect will be affected, the unit root test can be used to test whether the time series has a stationary statistical method. The Ljung-Box test is a statistical test for detecting whether there is autocorrelation in a time series. This test is mainly used to analyze time series data to determine whether a sequence is a white noise sequence, providing a basis for establishing a suitable ARMA model. In time series analysis, white noise refers to the absence of any correlation between the values ​​of each period of a sequence, that is, the terms of the sequence are independent and identically distributed.

[0050] The ARMA model is established based on the historical data of pellet consumption, which has strong flexibility and adaptability and can more accurately predict the planned output of pellets in the preset period.

[0051] In some embodiments, the formula for the statistic of the Ljung-Box test is: Q(m)=n(n+2)∑(k=1 to m)(r(k)^2) / (nk); Where: n is the sample size; m is the maximum lag period to be tested; r(k) is the k-th order autocorrelation coefficient.

[0052] The Ljung-Box test comprehensively considers the autocorrelations of multiple lag orders, and the test is more comprehensive, which helps to more accurately determine the correlation characteristics of time series data.

[0053] In some embodiments, the formula for the unit root test is: Δyt=α+βt+γyt-1+δ1Δyt-1+δ2Δyt-2+...+δpΔyt-p+εt; Where: Δyt is the first-order difference of the time series yt; α is the constant term; βt is the time trend term; γ is the coefficient; δ1 to δp are the coefficients of the lagged difference term; εt is the error term.

[0054] It should be understood that the time trend term βt helps to capture the dynamic characteristics of the data more accurately; the first-order difference Δyt is used to eliminate the non-stationarity in the data, making the analysis more accurate and stable; the lagged difference terms δ1 to δp can take into account the impact of past difference terms on current differences, thereby better capturing the dynamic relationship of the time series; the error term εt can take into account random interference factors in the model, making the model more adaptable and flexible; the parameters (α, β, γ, δ1 to δp) enable the model to better adapt to different types of time series data and improve the accuracy of prediction.

[0055] The formula of the unit root test provides a comprehensive and flexible method to analyze the characteristics and dynamic relationships of time series data by comprehensively considering factors such as time trend, first-order difference, lagged difference term and error term.

[0056] In some embodiments, the differential operation is performed as follows: Δf(x)=f(x+1)-f(x); Among them, f(x+1) represents the observation value at time x+1; f(x) represents the observation value at time x; Δf(x) represents the difference or change value at time x.

[0057] The differential operation formula quickly and effectively converts the unstable sequence into a stable sequence through a simple subtraction operation, thereby improving the stability of the model and the accuracy of the prediction.

[0058] In some embodiments, obtaining real-time pelletizing data and pelletizing maintenance plan data includes: Collect weighing data in real time through the discharging belt scale of the pelletizing machine; Obtain the weighing data and current time through the MODBUS protocol to generate current pellet production and current remaining time; Obtain maintenance plan in maintenance system; The start time and end time of the shutdown maintenance of the pelletizing machine are obtained through the maintenance plan data to calculate the planned maintenance time.

[0059] It should be understood that the MODBUS protocol is an application layer message transmission protocol that enables communication between devices. Obtaining the weighing data and the current time through the MODBUS protocol can ensure that each weighing data corresponds to a specific time node, thereby improving the accuracy of the data. In an embodiment of the present application, the weighing data and the current time obtained in minutes can be stored in a database. According to the production principle of the pelletizing machine, the feed amount of the pelletizing machine can be regarded as roughly equivalent to the pellet output. The Maintenance and Repair System (M&R) is a set of integrated tools and processes for monitoring, planning, managing and executing equipment maintenance and repair activities. There is no order between the two steps of real-time collection of weighing data and obtaining a maintenance plan, and they can be completed in parallel.

[0060] The above method collects weighing data in real time through the discharging belt scale, which can realize the automatic monitoring of pellet production and improve the real-time and accuracy of data collection; uses the MODBUS protocol to obtain weighing data and current time, which can effectively ensure the efficiency and reliability of data transmission; obtains the maintenance plan in the maintenance system to calculate the planned maintenance time, which helps to manage more accurately.

[0061] In some embodiments, the feed rate scheduling data is generated by using the remaining planned production, the real-time pelletizing data, and the pelletizing maintenance plan data, including: Determine whether the planned pellet production for the preset period has been entered: If not entered, the remaining planned output is 0 and the current pelletizing machine feeding rate is 0; If it has been entered, determine whether there is a maintenance plan within the current remaining time: If the maintenance plan does not exist, the formula for the current remaining production time is: Δt mleave =t mend -t now ; Where: t mend The time stamp of the plan end; t now is the current timestamp; It should be understood that, for example, if the preset time period is the current month, the timestamp at the end of the current month is t mend is 30, the current timestamp is t now If it is the 10th, then the remaining production time of the month is Δt mleave For 20 days.

[0062] If the maintenance plan exists, the current remaining production time is calculated according to the planned maintenance time. The formula for the current remaining production time is: Δt mleave =t mend -t now –Δt m ; Where: t mend The time stamp of the plan end; t now is the current timestamp; Δt m It is the planned maintenance time in milliseconds.

[0063] It should be understood that, for example, if the preset time period is the current month, the timestamp at the end of the current month is t mend is 30, the current timestamp is t now The remaining planned maintenance time for the month is Δt. m is 1 day, then the remaining production time Δt in that month mleave For 19 days.

[0064] The above method ensures the integrity and accuracy of data by checking whether the planned pellet production in the preset period has been entered and whether there is a maintenance plan, optimizes the production plan, improves production efficiency and resource utilization, and reduces downtime. The method is easy to automate.

[0065] In some embodiments, generating feed rate scheduling data by using the remaining planned production, the real-time pelletizing data and the pelletizing maintenance plan data further includes: The remaining average feed rate is calculated by the planned pellet production in the preset period, the current pellet production and the current remaining production time. The formula for the remaining average feed rate is: V avg =(X mplan -X mpro ) / Δt mleave ; Where: X mplan Planned pellet production for a preset period; X mpro is the current pellet production; Δt mleave Current remaining production time; It should be understood that, for example, if the preset period is the current month, the group's planned output for the current month is X. mplan is 30 tons, the current pellet production is X mpro The remaining production time for the month is Δt. mleave is 20 days, then the remaining average feed rate V avg 1 ton / day.

[0066] Determine whether the current time is the planned maintenance time: If the current time is the planned maintenance time, the feed rate at the current time is 0; If the current time is not the planned maintenance time, the feed rate at the current time is the remaining average feed rate, that is: V now =V avg .

[0067] The above method helps to improve the overall production performance by calculating and adjusting the remaining average feed rate in real time, optimizing production control, improving production efficiency and resource utilization, and reducing production delays.

[0068] In some embodiments, generating feed rate scheduling data by using the remaining planned production, the real-time pelletizing data and the pelletizing maintenance plan data further includes: Calculate the planned feed quantity per unit time according to the remaining planned output and the current remaining time; Determine whether the current time is within the unit time and whether there is a maintenance plan within the unit time: If the current time is within the unit time and there is no maintenance plan for the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t now ; Where: tdend The unit end timestamp; t now is the current timestamp; It should be understood that, for example, if the unit time is the day, the end time stamp of the day is t dend is 24 o'clock, the current timestamp is t now is 10 o'clock, then the production time of the day is Δt dleave For 14 hours.

[0069] If the current time is within the unit time and there is a maintenance plan for the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t now –Δt d ; Where: t dend The unit end timestamp; t now is the current timestamp; Δt d Plan maintenance time per unit time; It should be understood that, for example, if the unit time is the day, the end time stamp of the day is t dend is 24 o'clock, the current timestamp is t now is 10 o'clock, and the planned maintenance time for the day is Δt d is 1 hour, then the production time of the day is Δt dleave For 13 hours.

[0070] If the current time is not within the unit time and there is no maintenance plan within the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t dstart ; Where: t dend The unit end timestamp; t dstart The unit start timestamp; It should be understood that, for example, if the unit time is the day, the end time stamp of the day is t dend is 24 o'clock, and the start time stamp of the day is 0 o'clock, then the production time of the day is Δt dleave For 24 hours.

[0071] If the current time is not within the unit time and there is a maintenance plan within the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t dstart -Δt d ; Where: t dend The unit end timestamp; t dstart The unit starts the timestamp; Δtd Plan maintenance time per unit time; It should be understood that, for example, if the unit time is the day, the end time stamp of the day is t dend is 24 o'clock, the start time of the day is 0 o'clock, and the planned maintenance time of the day is Δt d is 1 hour, then the production time of the day is Δt dleave For 23 hours.

[0072] The planned material feeding quantity per unit time is calculated by the unit production time and the planned material feeding quantity per unit time.

[0073] It should be understood that the calculation formula for the planned feeding amount per unit time is: X dplan =V avg ×Δt dleave ; Among them, V avg is the remaining average feed rate; Δt dleave The unit production time.

[0074] It should be understood that, for example, if the unit time is the day, the remaining average feed rate V avg 1 ton / day, daily production time Δt dleave If the working time is 12 hours, the planned feeding amount for the day is 0.5 tons.

[0075] The planned maintenance time per unit time is the sum of the accumulated planned maintenance time per unit time.

[0076] The above method optimizes production control, improves production efficiency and resource utilization, reduces production delays, and helps achieve production goals and improve overall production performance by calculating and adjusting the planned feeding quantity per unit time in real time.

[0077] It can be seen from the above technical scheme that the embodiment of the present application provides a method for scheduling the feeding amount of pelletizing, including: obtaining historical data of pellet consumption; fitting the historical data of pellet consumption through a differential autoregressive moving average model to generate a planned pellet production for a preset period of time; obtaining real-time pellet data and pellet maintenance plan data; the real-time pellet data includes the current pellet production and the current remaining time; the pellet maintenance plan data includes the planned maintenance time; calculating the remaining planned production through the planned pellet production for the preset period of time and the current pellet production; generating feeding amount scheduling data through the remaining planned production, the real-time pellet data and the pellet maintenance plan data, the feeding amount scheduling data including: the current remaining production time, the feeding rate and the planned feeding amount per unit time, so as to solve the problem of low efficiency caused by the reliance on manual labor for the feeding amount of pelletizing.

[0078] Similar parts between the embodiments provided in this application can be referenced to each other. The specific implementation methods provided above are only a few examples under the general concept of this application and do not constitute a limitation on the protection scope of this application. For those skilled in the art, any other implementation methods expanded based on the scheme of this application without creative work belong to the protection scope of this application.

Claims

1. A method for scheduling pelletizing feed quantity, characterized in that: include: Obtain historical data on pellet consumption; Fitting the pellet consumption historical data through a differential autoregressive moving average model to generate a pellet production plan for a preset period; Obtain real-time pelletizing data and pelletizing maintenance plan data; The real-time pellet data includes current pellet production and current remaining time; The pelletizing maintenance plan data includes a planned maintenance time; Calculating the remaining planned production by using the planned production of pellets during the preset period and the current production of pellets; Feeding quantity scheduling data is generated by the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data. The feeding quantity scheduling data includes: the current remaining production time, the feeding rate and the planned feeding quantity per unit time.

2. The pelletizing feed scheduling method according to claim 1, characterized in that: Get historical data on pellet consumption, including: Obtain the historical pellet product delivery records from the database; The historical data of pellet consumption is generated through the historical pellet finished product delivery records.

3. The pelletizing feed scheduling method according to claim 1, characterized in that: The pellet consumption historical data is fitted by a differential autoregressive moving average model to generate a pellet production plan for a preset period, including: generating a historical pellet consumption sequence according to the pellet consumption historical data; According to the unit root test, whether the historical pellet consumption series is a stable series: If the historical pellet consumption sequence is an unstable sequence, converting the unstable sequence into a stable sequence through a difference operation; If the historical pellet consumption sequence is a stability sequence, Ljung-Box test is used to test whether the stability sequence is a stable white noise sequence; If the stability sequence is a stable white noise sequence, deleting the stable white noise sequence; If the stability sequence is a stable non-white noise sequence, generating an autocorrelation coefficient graph and a partial correlation coefficient graph; Determining the autoregressive order and the moving average order according to the autocorrelation coefficient graph and the partial correlation coefficient graph; An ARMA model is established according to the autoregressive order and the moving average order to generate a planned pellet production for a preset period of time.

4. The pelletizing feed scheduling method according to claim 3, characterized in that: The formula for the statistic of the Ljung-Box test is: Q(m)=n(n+2)∑(k=1 to m)(r(k)^2) / (nk); Where: n is the sample size; m is the maximum lag period to be tested; r(k) is the k-th order autocorrelation coefficient.

5. The pelletizing feed scheduling method according to claim 3, characterized in that: The formula for the unit root test is: Δyt=α+βt+γyt-1+δ1Δyt-1+δ2Δyt-2+...+δpΔyt-p+εt; Where: Δyt is the first-order difference of the time series yt; α is the constant term; βt is the time trend term; γ is the coefficient; δ1 to δp are the coefficients of the lagged difference terms; εt is the error term.

6. The pelletizing feed scheduling method according to claim 3, characterized in that: The formula for the difference operation is: Δf(x)=f(x+1)-f(x); Among them, f(x+1) represents the observation value at time x+1; f(x) represents the observation value at time x; Δf(x) represents the difference or change value at time x.

7. The pelletizing feed scheduling method according to claim 1, characterized in that: Get real-time pelletizing data and pelletizing maintenance planning data, including: Collect weighing data in real time through the discharging belt scale of the pelletizing machine; Obtain the weighing data and current time through the MODBUS protocol to generate current pellet production and current remaining time; Obtain maintenance plan in maintenance system; The start time and end time of the shutdown maintenance of the pelletizing machine are obtained through the maintenance plan data to calculate the planned maintenance time.

8. The pelletizing feed scheduling method according to claim 7, characterized in that: Generate feed rate scheduling data through the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data, including: Determine whether the planned pellet production for the preset period has been entered: If not entered, the remaining planned output is 0 and the current pelletizing machine feeding rate is 0; If it has been entered, determine whether there is a maintenance plan within the current remaining time: If the maintenance plan does not exist, the formula for the current remaining production time is: Δt mleave =t mend -t now ; Where: t mend The time stamp of the plan end; t now is the current timestamp; If the maintenance plan exists, the current remaining production time is calculated according to the planned maintenance time. The formula for the current remaining production time is: Δt mleave =t mend -t now –Δt m ; Where: t mend The time stamp of the plan end; t now is the current timestamp; Δt m It is the planned maintenance time in milliseconds.

9. The pelletizing feed scheduling method according to claim 8, characterized in that: Generate feed rate scheduling data through the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data, and also include: The remaining average feed rate is calculated by the planned pellet production in the preset period, the current pellet production and the current remaining production time. The formula for the remaining average feed rate is: V avg =(X mplan -X mpro ) / Δt mleave ; Where: X mplan Planned pellet production for a preset period; X mpro is the current pellet production; Δt mleave Current remaining production time; Determine whether the current time is the planned maintenance time: If the current time is the planned maintenance time, the feed rate at the current time is 0; If the current time is not the planned maintenance time, the feed rate at the current time is the remaining average feed rate.

10. The pelletizing feed scheduling method according to claim 9, characterized in that: Generate feed rate scheduling data through the remaining planned output, the real-time pelletizing data and the pelletizing maintenance plan data, and also include: Calculate the planned feed quantity per unit time according to the remaining planned output and the current remaining time; Determine whether the current time is within the unit time and whether there is a maintenance plan within the unit time: If the current time is within the unit time and there is no maintenance plan for the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t now ; Where: t dend The unit end timestamp; t now is the current timestamp; If the current time is within the unit time and there is a maintenance plan for the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t now –Δt d ; Where: t dend The unit end timestamp; t now is the current timestamp; Δt d Plan maintenance time per unit time; If the current time is not within the unit time and there is no maintenance plan within the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t dstart ; Where: t dend The unit end timestamp; t dstart The unit start timestamp; If the current time is not within the unit time and there is a maintenance plan within the unit time, the calculation formula for the unit production time is: Δt dleave =t dend -t dstart -Δt d ; Where: t dend The unit end timestamp; t dstart The unit starts the timestamp; Δt d Plan maintenance time per unit time; The planned material feeding quantity per unit time is calculated by the unit production time and the planned material feeding quantity per unit time.