Construction system and method of gooseneck corridor at the upper gate of double-line water-saving ship lock

By using a combination of formwork structure and adjustable support components on the double-line water-saving ship lock, the problem of high difficulty in construction of gooseneck corridor is solved, the stability and safety of construction are achieved, and the smooth progress of the pouring process is ensured. .

CN118756677BActive Publication Date: 2024-11-26CCCC FIRST HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411237890.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-26
Estimated Expiration
2044-09-05

AI Technical Summary

Technical Problem

Due to its special shape and height difference, the construction difficulty of gooseneck corridor is relatively high, and the existing technology is difficult to effectively solve this problem.

Method used

The construction system of the double-line water-saving ship lock head gooseneck corridor is adopted, including the formwork structure, adjustable support components and the stop-retreat structure. Through multi-layer casting and fixing steel bars, the formwork is realized by combining the plane and curved support frames. Stable construction and angle adjustment to prevent threads from loosening.

Benefits of technology

The stable construction of the formwork and flexible angle adjustment are achieved, ensuring the safety and efficiency of construction, and avoiding the thread loosening caused by impact or vibration during pouring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756677B_ABST
    Figure CN118756677B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of corridor construction, and in particular to a system and method for constructing a gooseneck corridor at a gate head of a double-line water-saving ship lock. The construction system of the gooseneck corridor comprises a template structure installed on a construction ground, wherein a flat section of an outer template structure is supported above an inner template structure by a flat support frame below, and an arc section of the outer template structure is supported above an inner template structure by an arc support frame below, a special-shaped template box is provided in the outer template structure above the arc support frame, and adjustable support components are installed on both the outer template structure and the inner template structure; a multi-layer casting method is used to build and fix the template while casting, and the template has good stability; an adjustable support component is used, and the angle can be adjusted according to the angle requirements of different use positions, so as to facilitate template construction; a stop structure is designed so that the adjustment handle can only be rotated and adjusted in one direction, and can be automatically locked to prevent the thread from loosening due to impact or vibration during the casting process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of corridor construction, and in particular to a system and method for constructing a gooseneck corridor at an upper lock head of a double-line water-saving ship lock. Background Art

[0002] The double-line water-saving ship lock is a design that reduces the amount of water required for each ship to pass through by setting up water-saving pools on both sides of the ship lock. The two independent channels of the ship lock can be used alternately to further save water. This design saves water resources while increasing the ship lock's capacity.

[0003] The gooseneck corridor is a channel of a specific shape located at the upper lock head. Its name comes from its shape similar to the neck of a goose. The main function of the gooseneck corridor is to guide the water flow during the operation of the lock. It can also buffer and stabilize the water flow to prevent excessive water flow from causing damage to the lock structure.

[0004] The gooseneck corridor is difficult to construct due to its special shape and large vertical height difference at both ends. Summary of the invention

[0005] The purpose of the present invention is to provide a reasonably designed double-line water-saving ship lock upper gooseneck corridor construction system and method in view of the defects and shortcomings of the prior art, which can solve the above-mentioned defects.

[0006] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a construction system for a gooseneck corridor at the gate head of a double-line water-saving ship lock, wherein the gooseneck corridor is an inclined corridor structure shaped like a gooseneck, and the construction system of the gooseneck corridor comprises a template structure installed on the construction ground, wherein the template structure comprises an inner template structure and an outer template structure, wherein the template installation structure in the inner template structure and the outer template structure is the same, and the outer template structure is arranged above the inner template structure; the plane section of the outer template structure is supported above the inner template structure by a plane support frame below, and the arc section of the outer template structure is supported above the inner template structure by an arc support frame below, and a special-shaped template box is arranged in the outer template structure above the arc support frame, and adjustable support components are installed on the outer template structure and the inner template structure; concrete casting layers are cast on the outer side of the outer template structure and the inner side of the inner template structure, and the outer template structure is connected to the concrete casting layer on the outer side thereof by a plurality of groups of anti-pull structures, and the inner template structure is connected to the concrete casting layer on the inner side thereof by a plurality of groups of inner pull structures, and the structures of the inner pull structure and the anti-pull structure are the same;

[0007] The adjustable support assembly includes a plurality of groups of double U-shaped beams for supporting, each group of double U-shaped beams includes a plurality of double U-shaped beams evenly arranged along a straight line, the two ends of the plurality of double U-shaped beams are respectively connected to support steel beams, the openings of the support steel beams are downwardly arranged, and a rotating connection structure is connected between two adjacent support steel beams, a connecting plate is provided on the outer side of the support steel beam, an adjusting plate is connected to the bottom of the connecting plate, an adjusting rotating seat is provided in the adjusting plate, an adjusting screw is rotatably connected in the adjusting rotating seat, an adjusting handle is provided between the adjusting screws on two adjacent adjusting plates, a symmetrical internal thread groove is provided on the inner side of the adjusting handle, two adjusting screws are connected to the adjusting handle by threads, and a plurality of groups of stop structures are provided in the adjusting handle along the internal thread groove;

[0008] The anti-retraction structure includes an anti-retraction groove opened at the internal thread groove in the adjustment handle, and an anti-retraction steel ball is movably arranged in the anti-retraction groove. The anti-retraction groove is a flat-top cone, and the direction of the anti-retraction groove matches the direction of the internal thread groove.

[0009] Preferably, the inner pulling structure includes a plurality of fixed steel bars buried in the concrete pouring layer, and the inner formwork structure includes a plurality of interconnected back ribs and formwork laid on the back ribs, the back ribs are connected to the fixed steel bars through a plurality of connecting bars, and the connecting bars and the back ribs are connected through fixings.

[0010] Preferably, a thread is provided on one end of the connecting rib, an internal thread is provided in the fixing piece, and the fixing piece is connected to the one end of the connecting rib via the thread.

[0011] Preferably, an anti-slip texture is provided in the smaller end of the anti-recessing groove.

[0012] Preferably, the adjustment handle is provided with grip anti-slip grooves.

[0013] Preferably, the arc surface support frame is a disc-type support frame, and a plurality of adjustable support rods are arranged therein to form a triangular support frame together with the arc surface support frame.

[0014] Preferably, the planar support frame is a disc-type full-height support frame.

[0015] Preferably, a construction method of a double-line water-saving ship lock upper lock gooseneck corridor construction system comprises the following steps:

[0016] Step 1: Determine the height difference between the two ends of the corridor, determine the thickness of each concrete pouring layer, and calculate the setting angle of the adjustable support component at each installation position. After leveling the construction ground, pour the first concrete pouring layer with concrete as the foundation, and bury the fixed steel bars at the same time;

[0017] Step 2: After the concrete solidifies, build a flat support frame and a curved support frame according to the needs, wherein the curved support frame is equipped with a suitable support rod according to the upper outer formwork structure to overcome the lateral pressure;

[0018] Step 3. Adjust the angle of the adjustable support assembly: according to the angle required by the installation location, turn the adjustment handle to drive the two double U-shaped beams to rotate to the required angle, and then install them on the scaffolding of the flat support frame and the curved support frame;

[0019] Step 4: Lay the inner and outer formwork structures: install the back ribs at the designated position, connect the back ribs to the pre-buried fixed steel bars using connecting bars, and lay the wood, formwork, and special-shaped formwork boxes;

[0020] Step 5: Pour concrete into a new concrete pouring layer on the inner side of the inner formwork structure and the outer side of the outer formwork structure, and bury and fix steel bars at the same time;

[0021] Step 6: After the concrete solidifies, repeat steps 3-5;

[0022] Step 7: When you reach the upper arc of the gooseneck corridor, repeat steps 2-5 until you reach the top.

[0023] After adopting the above structure, the beneficial effects of the present invention are:

[0024] 1. Use a multi-layer pouring method to bury fixed steel bars, so that the formwork can be built and fixed while pouring, and the formwork has good stability.

[0025] 2. Using adjustable support components, the angle can be adjusted according to the angle requirements of different usage positions, thus facilitating template construction.

[0026] 3. The anti-retraction structure is designed so that the adjustment handle can only be adjusted in one direction. It will automatically lock when turned in the opposite direction to prevent the thread from loosening due to impact or vibration during the pouring process, thus ensuring safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall construction structure of the present invention;

[0028] Figure 2 It is a structural schematic diagram of the inner pulling structure in the inner template structure of the present invention;

[0029] Figure 3 It is a structural schematic diagram of the adjustable support assembly in the present invention;

[0030] Figure 4 is a front-to-back cross-sectional view of the adjustment handle of the present invention;

[0031] Figure 5is a longitudinal cross-sectional view of the adjustment handle of the present invention;

[0032] Figure 6 It is a schematic diagram of the adjustable support assembly of the present invention when it is installed and used;

[0033] Figure 7 It is a partial side view of the adjustable support assembly after installation in the present invention.

[0034] Description of reference numerals:

[0035] 1. Construction ground; 2. Concrete pouring layer; 3. Plane support frame; 4. Arc support frame; 5. Inner pulling structure; 5-1. Fixed steel bars; 5-2. Connecting bars; 6. Counter-pulling structure; 7. Back ribs; 8. Formwork; 9. Fixing parts; 10. Double U-shaped beam; 11. Rotary connection structure; 12. Connecting plate; 13. Adjusting plate; 14. Adjusting rotating seat; 15. Adjusting screw; 16. Adjusting handle; 17. Anti-slip pattern of the handle; 18. Internal thread groove; 19. Anti-retraction groove; 20. Anti-slip texture; 21. Anti-retraction steel ball; 22. Special-shaped formwork box; 23. Inner formwork structure; 24. Outer formwork structure; 25. Support steel beam; 26. Support connection block; 27. Scaffolding. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] See also Figure 1-Figure 7 As shown, the gooseneck corridor is an inclined corridor structure shaped like a gooseneck. The construction system of the gooseneck corridor includes a template structure installed on the construction ground 1, and the template structure includes an inner template structure 23 and an outer template structure 24. The template installation structure in the inner template structure 23 and the outer template structure 24 is the same, and the outer template structure 24 is arranged above the inner template structure 23; the plane section of the outer template structure 24 is supported above the inner template structure 23 by a plane support frame 3 below, and the arc section of the outer template structure 24 is supported on the inner template by an arc support frame 4 below. Above the structure 23, a special-shaped formwork box 22 is provided in the outer formwork structure 24 above the arc support frame 4, and adjustable support components are installed on the outer formwork structure 24 and the inner formwork structure 23; the outer side of the outer formwork structure 24 and the inner side of the inner formwork structure 23 are cast with concrete casting layers 2, the outer formwork structure 24 is connected to the concrete casting layer 2 on its outer side through several groups of anti-pull structures 6, and the inner formwork structure 23 is connected to the concrete casting layer 2 on its inner side through several groups of inner pull structures 5, and the structures of the inner pull structures 5 and the anti-pull structures 6 are the same.

[0038] See also Figure 1-Figure 7 As shown, the adjustable support assembly includes a plurality of groups of double U-shaped beams 10 for supporting, each group of double U-shaped beams 10 includes a plurality of double U-shaped beams 10 evenly arranged along a straight line, and the two ends of the plurality of double U-shaped beams 10 are respectively connected to support steel beams 25, the opening of the support steel beams 25 is set downward, and a rotating connection structure 11 is connected between two adjacent support steel beams 25, and a connecting plate 12 is provided on the outer side of the support steel beams 25, and an adjusting plate 13 is connected to the bottom of the connecting plate 12, and an adjusting rotating seat 14 is provided in the adjusting plate 13, and an adjusting screw 15 is rotatably connected to the adjusting rotating seat 14, and the adjacent An adjusting handle 16 is provided between the adjusting screws 15 on the two adjusting plates 13, and a symmetrical internal thread groove 18 is provided on the inner side of the adjusting handle 16. The two adjusting screws 15 are connected to the adjusting handle 16 by threads, and a plurality of groups of stop structures are provided along the internal thread groove 18 in the adjusting handle 16. The stop structures include a stop groove 19 provided at the internal thread groove 18 in the adjusting handle 16, and a stop steel ball 21 is movably provided in the stop groove 19. The stop groove 19 is a flat-top cone, and the direction of the stop groove 19 matches the direction of the internal thread groove 18. The adjusting handle 16 is provided with a grip anti-slip pattern 17;

[0039] An anti-skid texture 20 is formed in the smaller end of the anti-retraction groove 19 .

[0040] When the adjusting handle 16 is rotated forward, the adjusting handle 16 pulls the two adjusting screws 15 inward through the thread, thereby driving the connecting plate 12 to rotate inward along the rotating connecting structure 11 through the two adjusting plates 13, thereby adjusting the angle between the two double U-shaped beams 10, and in the process of forward rotation, the rotation of the adjusting screw 15 will drive the anti-recognition steel ball 21 to move to a larger position on the rear side of the anti-recognition groove 19, so that the anti-recognition steel ball 21 can rotate freely, and the rotation of the adjusting handle 16 is not affected. When it is rotated into place, when the adjusting handle 16 rotates, the thread will drive the anti-recognition steel ball 21 to a smaller position in the anti-recognition groove 19, and gradually push it outward while rolling to tighten the thread. At the same time, after the anti-recognition steel ball 21 contacts the anti-slip texture 20, it is gradually fixed as the friction force increases, thereby preventing the adjusting handle 16 from loosening due to vibration.

[0041] See also Figure 1-Figure 7 As shown, the inner pulling structure 5 includes a plurality of fixed steel bars 5-1 buried in the concrete casting layer 2, and the inner formwork structure 23 includes a plurality of interconnected back ribs 7 and a formwork 8 laid on the back ribs 7. The back ribs 7 are connected to the fixed steel bars 5-1 through a plurality of connecting bars 5-2, and the connecting bars 5-2 are connected to the back ribs 7 through fixing parts 9.

[0042] The fixed steel bars 5 - 1 are used as supporting points, and the template 8 is pulled and fixed through the connecting bars 5 - 2 to increase the strength of the template 8 .

[0043] See also Figure 1-Figure 4 As shown, the arc support frame 4 is a disc-type support frame, and a plurality of adjustable support rods are provided to form a triangular support frame;

[0044] The plane support frame 3 is a disc-type full-height support frame.

[0045] The use of a disc-type support frame makes the support frame highly flexible. Different support rods can be installed according to the requirements of the construction location, and the installation can be performed by adjusting the length of the support rods. The stable triangular structure enables the support frame to withstand lateral forces.

[0046] A construction method for a gooseneck corridor construction system at the upper gate of a double-line water-saving ship lock comprises the following steps:

[0047] Step 1: Determine the height difference between the two ends of the corridor, such as Figure 1 As shown in , the vertical height difference of the gooseneck corridor is thirty-five meters. Taking three meters as the single-layer casting height, twelve layers are required. Among them, the inner formwork structure 23 and the outer formwork structure 24 and the separately cast structures are divided according to the height according to the design shape of the corridor: the inner formwork structure 23 is cast as the bottom formwork, and the outer formwork structure 24 is cast as the top formwork. From bottom to top, the first layer is the arc-starting section template, the second layer is the second arc-starting section, the third layer is the bottom formwork inclined surface, the top formwork third arc-starting section, the fourth to ninth layers are inclined surfaces, the tenth layer is the fourth arc-starting section, the eleventh layer is the fifth arc-starting section, until the twelfth layer.

[0048] Step 2, after partially leveling the construction ground 1, build a scaffolding 27, and weld a support connection block 26 for support on the scaffolding 27 according to the curvature of the installation position, and then hoist the unit of the adjustable support assembly above the support connection block 26, adjust the position so that the support connection block 26 enters the support steel beam 25 and weld the two, hoist the units of the adjustable support assembly in turn and connect them, and drive the two double U-shaped beams 10 to rotate by adjusting the handle 16 to reach the required angle, and after the installation is completed, lay the wooden squares and the template and fix them with wire, build the arc section template, and pour the first concrete pouring layer 2, i.e. the arc section, with concrete as the foundation, and at the same time embed the fixed steel bars 5-1 in the concrete as the subsequent connection support, and each layer of pouring is poured with a bottom of ten centimeters, and the fixed steel bars 5-1 are all embedded;

[0049] Step 3, after the concrete solidifies, remove the formwork, repeat the installation of the adjustable support assembly in the manner of step 2, and build the second arc section formwork, install the back rib 7 at the specified position, use the connecting rib 5-2 to connect the back rib 7 to the pre-buried fixed steel bar 5-1, and connect it with the fixing piece 9, which is convenient for installation and can be easily removed and reused after pouring. Panels are provided for both the straight section and the curved section, and support ribs need to be added when the height of the panel in the curved section is not enough. The support ribs are spliced ​​by bending, connected by pins and screws, and supported by double U-beams;

[0050] Step 4: wait for the concrete to solidify, remove the template of the second arc section, build the plane support frame 3 and the arc support frame 4, wherein the arc support frame 4 is equipped with a suitable support rod according to the upper outer template structure 24 to overcome the lateral pressure;

[0051] Step 5: When installing the adjustable support assembly on the curved support frame 4, the density of the supporting scaffolding 27 and the transverse rods can be increased to enhance the lateral support of the template;

[0052] Step 6, install the back rib 7 at the designated position, use the connecting rib 5-2 to connect the back rib 7 to the pre-buried fixed steel bar 5-1, fix it with the fixing piece 9, and lay the template 8, and use the special-shaped template box 22 in the arc section to complete the third arc section template construction, and the inclined surface of the bottom mold, that is, the inner template structure 23, is a straight section, which can be directly installed with a straight support rib, and also connected and installed with the connecting rib 5-2 and the fixing piece 9 to complete the bottom mold inclined surface template construction, and pour;

[0053] Step 7: Construct layer by layer by removing the lower formwork, building the upper formwork and then pouring. The fourth to ninth layers are slopes and only need to be built with straight support ribs. The ninth layer needs to add curved support ribs upwards for support construction.

[0054] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.

Claims

1. Construction system of gooseneck corridor at the upper gate of double-line water-saving ship lock. The gooseneck corridor is an inclined corridor structure shaped like a goose neck, which is characterized by: The construction system comprises a template structure installed on a construction ground (1), the template structure comprising an inner template structure (23) and an outer template structure (24), the template installation structure in the inner template structure (23) and the outer template structure (24) being the same, and the outer template structure (24) being arranged above the inner template structure (23); the flat surface section of the outer template structure (24) is supported above the inner template structure (23) by a flat support frame (3), the curved surface section of the outer template structure (24) is supported above the inner template structure (23) by a curved surface support frame (4), and the curved surface support frame (4) is supported above the inner template structure (23). A special-shaped formwork box (22) is provided in a square outer formwork structure (24), and assembled adjustable support components are installed on the outer formwork structure (24) and the inner formwork structure (23); a concrete pouring layer (2) is poured on the outer side of the outer formwork structure (24) and the inner side of the inner formwork structure (23); the outer formwork structure (24) is connected to the concrete pouring layer (2) on the outer side thereof through a plurality of groups of anti-pull structures (6), and the inner formwork structure (23) is connected to the concrete pouring layer (2) on the inner side thereof through a plurality of groups of inner pull structures (5), and the structures of the inner pull structures (5) and the anti-pull structures (6) are the same; The adjustable support assembly comprises a plurality of groups of double U-shaped beams (10) for supporting, each group of double U-shaped beams (10) comprises a plurality of double U-shaped beams (10) evenly arranged along a straight line, the two ends of the plurality of double U-shaped beams (10) are respectively connected to support steel beams (25), the openings of the support steel beams (25) are arranged downward, a rotating connection structure (11) is connected between two adjacent support steel beams (25), a connecting plate (12) is provided on the outer side of the support steel beam (25), and the bottom of the connecting plate (12) is connected to the support steel beam (25). An adjusting plate (13) is connected, an adjusting rotating seat (14) is provided in the adjusting plate (13), an adjusting screw (15) is rotatably connected in the adjusting rotating seat (14), an adjusting handle (16) is provided between the adjusting screws (15) on two adjacent adjusting plates (13), a symmetrical internal thread groove (18) is provided on the inner side of the adjusting handle (16), the two adjusting screws (15) are connected to the adjusting handle (16) by threads, and a plurality of groups of stop structures are provided in the adjusting handle (16) along the internal thread groove (18); The anti-retraction structure comprises an anti-retraction groove (19) provided at the internal thread groove (18) in the adjusting handle (16), an anti-retraction steel ball (21) being movably arranged in the anti-retraction groove (19), the anti-retraction groove (19) being in a flat-topped cone shape, and the direction of the anti-retraction groove (19) matches the direction of the internal thread groove (18); The inner tension structure (5) comprises a plurality of fixed steel bars (5-1) embedded in the concrete pouring layer (2); the inner formwork structure (23) comprises a plurality of mutually connected back ribs (7) and a formwork (8) laid on the back ribs (7); the back ribs (7) are connected to the fixed steel bars (5-1) via a plurality of connecting bars (5-2); the connecting bars (5-2) and the back ribs (7) are connected via fixing members (9); The construction method of the construction system comprises the following steps: Step 1, determine the height difference between the two ends of the corridor, determine the thickness of each concrete pouring layer (2), and calculate the setting angle of the adjustable support assembly at each installation position. After partially leveling the construction ground (1), use concrete to pour the first concrete pouring layer (2) as the foundation, and bury the fixed steel bars (5-1); Step 2: after the concrete solidifies, a flat support frame (3) and a curved support frame (4) are constructed according to the requirements, wherein suitable support rods are selected in the curved support frame (4) according to the upper outer formwork structure (24) to overcome the lateral pressure; Step 3, adjust the angle of the adjustable support assembly: according to the angle required by the installation location, turn the adjustment handle (16) to drive the two double U-shaped beams (10) to rotate to reach the required angle, and then install them on the scaffolding (27) of the flat support frame (3) and the curved support frame (4); Step 4, laying the inner formwork structure (23) and the outer formwork structure (24): installing the back rib (7) at the designated position, connecting the back rib (7) to the pre-buried fixed steel bars (5-1) using the connecting bars (5-2), and laying the wooden planks, formwork (8) and special-shaped formwork boxes (22); Step 5, pouring a new concrete pouring layer (2) with concrete on the inner side of the inner formwork structure (23) and the outer side of the outer formwork structure (24), and embedding and fixing steel bars (5-1); Step 6: After the concrete solidifies, repeat steps 3-5; Step 7: When you reach the upper arc of the gooseneck corridor, repeat steps 2-5 until you reach the top.

2. The double-line water-saving ship lock upper lock gooseneck corridor construction system according to claim 1 is characterized by: One end of the connecting rib (5-2) is provided with a thread, the fixing piece (9) is provided with an internal thread, and the fixing piece (9) is connected to one end of the connecting rib (5-2) via the thread.

3. The double-line water-saving ship lock upper lock gooseneck corridor construction system according to claim 2 is characterized by: An anti-slip texture (20) is formed in the smaller end of the anti-retraction groove (19).

4. The double-line water-saving ship lock upper lock gooseneck corridor construction system according to claim 3 is characterized by: The adjusting handle (16) is provided with a grip anti-slip pattern (17).

5. The double-line water-saving ship lock upper lock gooseneck corridor construction system according to claim 4 is characterized by: The arc surface support frame (4) is a disc-type support frame, and a plurality of adjustable support rods are arranged therein to form a triangular support frame together with the arc surface support frame.

6. The double-line water-saving ship lock upper lock gooseneck corridor construction system according to claim 5 is characterized by: The planar support frame (3) is a disc-type full-height support frame.