Pre-buried equipment and method for construction foundation of civil engineering

By using construction and embedding equipment with embedded steel plates, anchor bars and embedded bolts in civil construction, combined with the design of movable grooves, sliding grooves and adjustment bases, the problems of inconvenient installation and insufficient stability of embedded parts are solved, and the problem of Higher installation accuracy and stability.

CN118756829BActive Publication Date: 2024-11-29INNER MONGOLIA LUDIAN MENGYUAN POWER ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411254933.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-29
Estimated Expiration
2044-09-09

AI Technical Summary

Technical Problem

The existing embedded parts have problems such as inconvenient installation and insufficient stability during the installation process, resulting in inaccurate location, unsafe structure under load, and damage to the base layer.

Method used

The construction and embedding equipment including embedded steel plates, anchor bars and embedded bolts is adopted. Through the design of movable grooves and sliding grooves of the anchor bars, the cooperation between the embedded bolts and the adjustment base is achieved to achieve accurate horizontal adjustment and stable positioning of the embedded steel plates.

Benefits of technology

Improve the installation accuracy and stability of embedded parts, reduce the risk of loosening or displacement caused by external forces, avoid base layer damage caused by equipment pressure transmission, and enhance the stability of embedded bolts through filling of epoxy resin adhesive. sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756829B_ABST
    Figure CN118756829B_ABST
Patent Text Reader

Abstract

The invention discloses a pre-embedded equipment and method for the construction of civil construction foundation, belongs to the technical field of pre-embedded parts, and aims to solve the problems of inconvenient installation and insufficient stability of existing pre-embedded parts during installation; the invention cooperates with the screw of the embedded base through an adjusting rod to improve the accuracy and stability of equipment installation; the initial positioning of the embedded parts by the adjusting base at the initial stage of construction and the plug-in cooperation with the embedded bolts avoids the displacement of the embedded parts during concrete construction; the extended reinforcing ribs on the outer wall of the anchor bar increase the contact area with the concrete, enhance the stability of the entire embedded part in the concrete layer, and reduce the risk of loosening or displacement of the embedded part due to external force; after the concrete solidifies, the embedded bolt is separated from the adjusting base by rotating the nut, so that the entire embedded part is in a suspended state, and the situation that the embedded bolt directly transmits the pressure of the upper equipment to the base and then damages the base layer is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of embedded parts, and in particular to construction embedded equipment and a method for a civil construction foundation. Background Art

[0002] Embedded parts are components that are pre-buried in the concrete structure during the structural construction process. They usually consist of two parts: one part is the parts embedded in the concrete, and the other part is the parts that will be connected or function with the embedded parts in the later stage. Embedded parts serve as the basis for subsequent structure or equipment installation. For example, they are used to fix the base of steel structure columns and connect curtain wall keels in buildings. Through embedded parts, different structural components can be firmly connected together to ensure the stability and integrity of the entire building structure. In some large-scale equipment installation projects, embedded parts can provide reliable support and fixing points for the equipment to prevent shaking or displacement during operation.

[0003] At present, most embedded parts are welded by anchor bars and anchor plates. The anchor bars can be made into straight, curved or hooked shapes. There are three main ways to fix embedded parts:

[0004] One is to connect with the steel frame. The disadvantages of this method are: when pouring concrete, the position of the embedded parts may be inaccurate due to the deformation or displacement of the steel frame; when the embedded parts are subjected to a large load, a large stress concentration may be generated at the connection part of the steel frame, affecting the safety of the structure;

[0005] The second is to connect with the base layer, such as pouring concrete on the roof and setting embedded parts on the concrete, with the bottom of the embedded parts directly fixed to the roof. This connection method may cause the base layer, such as the floor slab, to be damaged under the pressure of the equipment; especially when the equipment is heavy or generates large vibrations during operation, the base layer is more susceptible to damage;

[0006] The third is the embedded parts connected to the external formwork. The defect of this method is: when the concrete pouring area is large, the distance between the embedded parts and the fixed formwork at the edge is far, which may lead to inaccurate positioning. During the pouring process, due to factors such as the flow and vibration of concrete, the embedded parts may shift, affecting their installation accuracy. In addition, if the formwork is not firmly fixed or is hit during construction, the position of the embedded parts will also deviate.

[0007] These three installation methods all have disadvantages, which may eventually lead to inconvenience in the installation of embedded parts and insufficient stability. Summary of the invention

[0008] The purpose of the present invention is to provide a construction pre-embedded device and method for civil construction foundation, which solves the problem that the existing pre-embedded parts in the background technology are inconvenient to install and have insufficient stability during installation.

[0009] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: pre-embedded equipment for construction of civil construction foundation, including pre-embedded steel plates and anchor bars arranged below the pre-embedded steel plates, as well as pre-embedded bolts movably arranged inside the anchor bars, and an adjustment base arranged below the pre-embedded bolts, the pre-embedded steel plates are placed on the surface of the concrete layer for installing the equipment, the anchor bars are provided with four groups, the anchor bars are fixedly welded at the four corners of the bottom of the pre-embedded steel plates, and are buried below the concrete layer, the interior of the anchor bars is through-connected from top to bottom, and movable grooves and sliding grooves communicating with each other are arranged above and below the interior of the anchor bars, and extended reinforcing bars are evenly distributed on the outer wall of the anchor bars, and the extended reinforcing bars are used to increase the contact with the concrete The contact area is increased to enhance stability. The embedded bolt passes through the anchor bar up and down. The outside of the embedded bolt is fixedly connected to the limit plate, and the limit plate is movably connected to the inside of the movable groove. The outside of the embedded bolt is located above the limit plate and is provided with a threaded groove, and the embedded bolt passes through the embedded steel plate upward and extends, and the external thread of the embedded bolt is connected with a nut. The outside of the embedded bolt is located above the limit plate and is provided with a filler, and the filler is located between the limit plate and the bottom of the embedded steel plate, and the bottom of the embedded bolt extends downward to the outside of the anchor bar, and the adjusting base is placed at the bottom of the concrete layer and fixedly connected to the base layer, and the top of the adjusting base corresponds to the bottom of the embedded bolt.

[0010] Furthermore, the embedded steel plate is provided with a pipe through-hole, the embedded bolt extends upward to the top of the embedded steel plate through the pipe through-hole, and the embedded bolt is slidably connected to the pipe through-hole, and the embedded bolt fits tightly to the inner wall of the pipe through-hole.

[0011] Furthermore, a gasket is provided on the outside of the embedded bolt and below the nut, and the gasket is fixedly welded to the top of the embedded steel plate, and the nut is rotatably connected to the gasket.

[0012] Furthermore, the inner diameter of the movable groove is larger than the outer diameter of the limiting plate, the outside of the filler is a sealed packaging bag, and the sealed packaging bag is wrapped with epoxy resin adhesive.

[0013] Furthermore, the diameter of the sliding groove is larger than the diameter of the embedded bolt, and the surface of the embedded bolt is evenly distributed with preset holes.

[0014] Furthermore, the adjustment base includes an embedded base and an adjustment rod movably installed on the top of the embedded base, and a positioning groove is arranged on the top of the adjustment rod.

[0015] Furthermore, a fixing portion corresponding to the positioning groove is provided at the bottom of the embedded bolt, and the fixing portion is inserted into the interior of the positioning groove.

[0016] Furthermore, a screw rod is arranged in the middle of the top of the embedded base, and a spiral groove corresponding to the screw rod is arranged at the lower part of the inner part of the adjusting rod.

[0017] Furthermore, fixing holes penetrating from top to bottom are provided at the four corners of the embedded base.

[0018] Another technical solution proposed by the present invention: a method for installing pre-buried equipment for construction of a civil construction foundation, comprising the following steps:

[0019] S1. Material preparation: Check whether the embedded steel plates, anchor bars, embedded bolts, and adjustment bases are complete and whether the quality meets the requirements. In particular, check whether the preset holes on the surface of the embedded bolts are clear, whether the various parts of the adjustment base, such as the spiral grooves of the adjustment rods, are accurately processed, prepare the required fillers, ensure that the sealed packaging bags are intact, and the epoxy resin adhesive inside is of good quality. At the same time, prepare rivets and other fixing materials;

[0020] S2. Measurement and positioning: According to the design drawings, accurately measure the installation position of the embedded steel plate at the construction site and mark it on the base. At the same time, determine the installation position of the adjustment base to ensure that it corresponds to the bottom of the embedded bolts and the error is controlled within the allowable range;

[0021] S3. Installation of embedded parts: Assemble and weld the embedded steel plate, anchor bar and embedded bolt. During assembly, the filler is sleeved on the outside of the embedded bolt and located above the movable groove. The embedded bolt passes through the tube hole and is fixed by a nut. The gasket connected to the nut is welded to the top of the embedded steel plate. Then the anchor bar is sleeved on the outside of the embedded bolt and fits the bottom of the embedded steel plate. The part of the bottom of the embedded bolt exposed below the anchor bar is coated with a release agent. The anchor bar and the embedded steel plate are connected by welding. The fixed part at the bottom of the embedded bolt is inserted into the positioning groove at the top of the adjusting rod. At this time, the horizontality of the embedded steel plate can be adjusted by preliminarily rotating the adjusting rod and using the cooperation of the screw rod and the spiral groove to make the embedded steel plate in a horizontal state.

[0022] S4. Concrete pouring: During the pouring process, care should be taken to avoid excessive impact and disturbance of concrete on embedded components. The layered pouring method should be adopted, and the thickness of each layer of concrete should be controlled within an appropriate range. At the same time, attention should be paid to the vibration intensity and position to avoid the vibrator directly touching the embedded components. Special personnel should be arranged to monitor the position and status of the embedded components during the concrete pouring process. Once displacement or other abnormal conditions are found, the pouring should be stopped in time and adjustments should be made;

[0023] S5. Adjustment and separation of embedded bolts: After the concrete solidifies, the embedded steel plate and anchor bars are fixed. At this time, the position of the embedded bolts is adjusted by rotating the nuts to move the embedded bolts upward. The limit plates squeeze the fillers, breaking the sealed packaging bags and causing the epoxy resin adhesive to flow out. As the embedded bolts continue to move upward, since the diameter of the limit plates is smaller than the movable groove, the epoxy resin adhesive in the packaging bypasses the limit plates and eventually flows downward along the gap between the inner wall of the sliding groove and the outside of the embedded bolts, filling the preset holes. When the embedded bolts are completely separated from the adjustment base, the entire embedded part is in a suspended state and the construction is completed.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] The embedded equipment and method for construction of civil engineering foundation provided by the present invention can accurately adjust the horizontality of the embedded steel plate by cooperating with the screw of the embedded base through the adjusting rod, so as to ensure that the embedded steel plate is in an accurate horizontal position when the equipment is installed, thereby improving the accuracy and stability of equipment installation. The adjusting base can initially position the embedded components at the initial stage of construction and plug and match with the embedded bolts, thereby making it possible for the embedded components of the entire embedded system to be displaced during the construction process such as concrete pouring. The extended reinforcement ribs of the outer wall of the anchor bar increase the contact area with the concrete, thereby enhancing the stability of the entire embedded component in the concrete layer, reducing the risk of loosening or displacement of the embedded components due to external forces, and improving the stability of the entire embedded component in the concrete layer. After the soil solidifies, the embedded bolt is separated from the adjusting base by rotating the nut, so that the entire embedded part is in a suspended state, which prevents the embedded bolt from directly transmitting the pressure of the upper equipment to the base and then damaging the base. When the embedded bolt moves upward, the limit plate squeezes the filler, causing the internal epoxy resin adhesive to flow out and fill the gap between the inner wall of the sliding groove and the outside of the embedded bolt and the preset hole. The epoxy resin adhesive plays a role of fixing and bonding, enhancing the stability of the embedded bolt in the anchor bar, thereby improving the firmness of the entire embedded part structure, which enables the embedded part to better withstand various loads and external forces during long-term use, thereby ensuring the reliability of its connection. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0027] Figure 2 It is a disassembled diagram of the overall structure of the present invention;

[0028] Figure 3 It is a cross-sectional view of the overall structure of the present invention;

[0029] Figure 4 It is an exploded view of the embedded steel plate, anchor bar and filler structure of the present invention;

[0030] Figure 5It is a schematic diagram of the embedded bolt structure of the present invention;

[0031] Figure 6 An exploded view of the adjustable base structure of the present invention;

[0032] Figure 7 It is a schematic diagram of the embedded parts of the present invention before and after casting.

[0033] In the figure: 1. embedded steel plate; 11. pipe perforation; 2. anchor bar; 21. movable groove; 22. sliding groove; 23. extended reinforcing rib; 3. embedded bolt; 31. threaded groove; 32. limit plate; 33. nut; 34. gasket; 35. preset hole; 36. fixing part; 4. adjustment base; 41. embedded base; 42. screw; 43. adjustment rod; 44. positioning groove; 45. fixing hole; 5. filler. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] In order to solve the technical problems of inconvenient installation and insufficient stability of existing embedded parts during installation, such as Figure 1-Figure 7 As shown, the following preferred technical solutions are provided:

[0036] like Figure 1-2 As shown, the pre-buried equipment for the construction of the civil construction foundation includes a pre-buried steel plate 1 and an anchor bar 2 arranged below the pre-buried steel plate 1, and also includes an embedded bolt 3 movably arranged inside the anchor bar 2, and an adjustment base 4 arranged below the embedded bolt 3. The pre-buried steel plate 1 is placed on the surface of the concrete layer for installing the equipment. Four groups of anchor bars 2 are arranged. The anchor bars 2 are fixedly welded at the four corners of the bottom of the pre-buried steel plate 1 and buried below the concrete layer. The interior of the anchor bar 2 is connected from top to bottom, as shown in FIG. Figure 3-4 As shown, the anchor bar 2 is provided with a movable groove 21 and a sliding groove 22 connected to each other from top to bottom, and the outer wall of the anchor bar 2 is evenly distributed with extended reinforcing ribs 23, which are used to increase the contact area with the concrete and enhance stability. Figure 5As shown, the embedded bolt 3 passes through the anchor bar 2 up and down, the outside of the embedded bolt 3 is fixedly connected to the limiting plate 32, the limiting plate 32 is movably connected to the inside of the movable groove 21, the outside of the embedded bolt 3 is located above the limiting plate 32 and is provided with a threaded groove 31, and the embedded bolt 3 passes through the embedded steel plate 1 upward and extends, the outside of the embedded bolt 3 is threadedly connected with a nut 33, the outside of the embedded bolt 3 is located above the limiting plate 32 and is provided with a filler 5, and the filler 5 is located between the limiting plate 32 and the bottom of the embedded steel plate 1, the bottom of the embedded bolt 3 extends downward to the outside of the anchor bar 2, the adjusting base 4 is placed at the bottom of the concrete layer and fixedly connected to the base layer, and the top of the adjusting base 4 corresponds to the bottom of the embedded bolt 3; the embedded steel plate 1 is positioned by the cooperation of the adjusting base 4 and the embedded bolt 3, after the concrete solidifies, the embedded steel plate 1 and the anchor bar 2 are fixed, the position of the embedded bolt 3 is adjusted by the nut 33, the embedded bolt 3 is separated from the adjusting base 4, and the entire embedded part is in a suspended state at this time.

[0037] like Figure 4-5 As shown, the embedded steel plate 1 is provided with a pipe through-hole 11, the embedded bolt 3 extends upward through the pipe through-hole 11 to the top of the embedded steel plate 1, and the embedded bolt 3 is slidably connected to the pipe through-hole 11, the embedded bolt 3 is tightly fitted to the inner wall of the pipe through-hole 11, and a gasket 34 is provided on the outside of the embedded bolt 3 below the nut 33, and the gasket 34 is fixedly welded to the top of the embedded steel plate 1, and the nut 33 is rotatably connected to the gasket 34.

[0038] like Figure 3 As shown, the inner diameter of the movable groove 21 is larger than the outer diameter of the limiting plate 32, the outside of the filler 5 is a sealed packaging bag, and the sealed packaging bag is wrapped with epoxy resin adhesive. The diameter of the sliding groove 22 is larger than the diameter of the embedded bolt 3, and the surface of the embedded bolt 3 is evenly distributed with preset holes 35. When the embedded bolt 3 moves upward, the limiting plate 32 squeezes the filler 5 to break the package. Since the diameter of the limiting plate 32 is smaller than the movable groove 21, the epoxy resin adhesive in the package bypasses the limiting plate 32 and finally flows downward along the gap between the inner wall of the sliding groove 22 and the outside of the embedded bolt 3, and fills the preset holes 35.

[0039] like Figure 6As shown, the adjusting base 4 includes an embedded base 41 and an adjusting rod 43 movably installed on the top of the embedded base 41, a positioning groove 44 is arranged on the top of the adjusting rod 43, a fixing portion 36 corresponding to the positioning groove 44 is arranged on the bottom of the embedded bolt 3, the fixing portion 36 is inserted into the inside of the positioning groove 44, a screw rod 42 is arranged in the middle of the top of the embedded base 41, a spiral groove corresponding to the screw rod 42 is arranged at the lower part of the adjusting rod 43, the height of the adjusting rod 43 can be adjusted by the cooperation of the screw rod 42 and the spiral groove, and then the horizontal degree of the embedded steel plate 1 is adjusted, and the four corners of the embedded base 41 are provided with fixing holes 45 penetrating from top to bottom, and the embedded base 41 is fixed to the base by rivets passing through the fixing holes 45, as shown in FIG. Figure 7 As shown, the left side shows the state of pouring concrete, and the right side shows the view after the embedded bolts 3 are separated from the adjustment base 4 after the concrete solidifies.

[0040] In order to further better explain the above embodiment, the present invention also provides an implementation scheme, a method for installing pre-buried equipment for construction of civil construction foundation, comprising the following steps:

[0041] S1. Material preparation: Check whether the embedded steel plate 1, anchor bar 2, embedded bolt 3, and adjustment base 4 are complete and whether the quality meets the requirements. In particular, check whether the preset hole 35 on the surface of the embedded bolt 3 is clear, whether the various components of the adjustment base 4 such as the spiral groove of the adjustment rod 43 are accurately processed, prepare the required filler 5, ensure that its sealed packaging bag is intact, and the epoxy resin adhesive inside is of good quality, and prepare rivets and other fixing materials;

[0042] S2. Measurement and positioning: According to the design drawings, accurately measure the installation position of the embedded steel plate 1 at the construction site and mark it on the base. At the same time, determine the installation position of the adjustable base 4 to ensure that it corresponds to the bottom of the embedded bolt 3 and the error is controlled within the allowable range;

[0043] S3. Installation of embedded parts: Assemble and weld the embedded steel plate 1, anchor bar 2 and embedded bolt 3. During assembly, the filler 5 is sleeved on the outside of the embedded bolt 3 and located above the movable groove 21. The embedded bolt 3 passes through the tube through-hole 11 and is fixed by the nut 33. The gasket 34 rotatably connected to the nut 33 is welded to the top of the embedded steel plate 1. Then the anchor bar 2 is sleeved on the outside of the embedded bolt 3 and fits the bottom of the embedded steel plate 1. The part of the bottom of the embedded bolt 3 exposed below the anchor bar 2 is coated with a release agent. The anchor bar 2 and the embedded steel plate 1 are connected by welding. The fixing part 36 at the bottom of the embedded bolt 3 is inserted into the positioning groove 44 at the top of the adjusting rod 43. At this time, the horizontality of the embedded steel plate 1 can be adjusted by preliminarily rotating the adjusting rod 43 and utilizing the cooperation of the screw 42 and the spiral groove so that the embedded steel plate 1 is in a horizontal state.

[0044] S4. Concrete pouring: During the pouring process, care should be taken to avoid excessive impact and disturbance of concrete on embedded components. The layered pouring method should be adopted, and the thickness of each layer of concrete should be controlled within an appropriate range. At the same time, attention should be paid to the vibration intensity and position to avoid the vibrator directly touching the embedded components. Special personnel should be arranged to monitor the position and status of the embedded components during the concrete pouring process. Once displacement or other abnormal conditions are found, the pouring should be stopped in time and adjustments should be made;

[0045] S5. Adjustment and separation of embedded bolts: After the concrete solidifies, the embedded steel plate 1 and the anchor bar 2 are fixed. At this time, the position of the embedded bolt 3 is adjusted by rotating the nut 33 to move the embedded bolt 3 upward. The limit plate 32 squeezes the filler 5 to break the sealed packaging bag and the epoxy resin adhesive flows out. As the embedded bolt 3 continues to move upward, since the diameter of the limit plate 32 is smaller than the movable groove 21, the epoxy resin adhesive in the package bypasses the limit plate 32 and eventually flows downward along the gap between the inner wall of the sliding groove 22 and the outside of the embedded bolt 3, and fills the preset hole 35. When the embedded bolt 3 is completely separated from the adjustment base 4, the entire embedded part is in a suspended state and the construction is completed.

[0046] Working principle: The adjusting base 4 is fixed to the base by rivets, and the positioning groove 44 at the top of the adjusting rod 43 is plugged into the fixing part 36 at the bottom of the embedded bolt 3 to achieve preliminary positioning and provide a basis for subsequent installation. The adjusting rod 43 cooperates with the screw 42 of the embedded base 41 through the spiral groove to adjust the height, which is used to accurately adjust the horizontality of the embedded steel plate 1. Before pouring concrete, a filler 5 is placed between the limit plate 32 and the bottom of the embedded steel plate 1. After the concrete solidifies, since the outer surface of the embedded bolt 3 is relatively smooth and coated with a release agent, the bonding force between it and the concrete is relatively small When the nut 33 rotates, the torque is large. Rotating the nut 33 makes the embedded bolt 3 move upward and separate from the adjustment base 4, and the embedded part is suspended in the air to prevent the equipment pressure from being transmitted to the base and damaging the base. When the embedded bolt 3 moves upward, the limit plate 32 squeezes the filler 5, and the epoxy resin adhesive inside it flows out, flows downward along the inner wall of the sliding groove 22 and the external gap of the embedded bolt 3 and fills the preset hole 35, which plays a fixing and bonding role, enhances the stability of the embedded bolt 3 in the anchor bar 2, and the extended reinforcement rib 23 of the anchor bar 2 increases the contact area with the concrete, ensuring the overall stability of the embedded part.

[0047] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0048] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A pre-buried construction equipment for a civil construction foundation, comprising a pre-buried steel plate (1) and anchor bars (2) arranged below the pre-buried steel plate (1), characterized in that: It also includes an embedded bolt (3) movably arranged inside the anchor bar (2), and an adjustment base (4) arranged below the embedded bolt (3). The embedded steel plate (1) is placed on the surface of the concrete layer for installing equipment. The anchor bar (2) is provided with four groups. The anchor bar (2) is fixedly welded at the four corners of the bottom of the embedded steel plate (1) and is buried below the concrete layer. The inside of the anchor bar (2) is penetrated from top to bottom. The inside of the anchor bar (2) is provided with a movable groove (21) and a sliding groove (22) connected to each other from top to bottom. The outer wall of the anchor bar (2) is evenly distributed with extended reinforcing ribs (23). The extended reinforcing ribs (23) are used to increase the contact area with the concrete and enhance stability. The embedded bolts (3) penetrate the anchor bar (2) from top to bottom. The external fixed connection of the embedded bolts (3) A limit plate (32) is connected, the limit plate (32) is movably connected to the inside of the movable groove (21), the outside of the embedded bolt (3) is located above the limit plate (32) and is provided with a thread groove (31), and the embedded bolt (3) penetrates the embedded steel plate (1) upward and extends, the outside of the embedded bolt (3) is threadedly connected with a nut (33), the outside of the embedded bolt (3) is located above the limit plate (32) and is provided with a filler (5), and the filler (5) is located between the limit plate (32) and the bottom of the embedded steel plate (1), the bottom of the embedded bolt (3) extends downward to the outside of the anchor bar (2), the adjustment base (4) is placed at the bottom of the concrete layer and is fixedly connected to the base layer, and the top of the adjustment base (4) corresponds to the bottom of the embedded bolt (3); The embedded steel plate (1) is provided with a pipe through-hole (11), the embedded bolt (3) extends upward through the pipe through-hole (11) to the top of the embedded steel plate (1), and the embedded bolt (3) is slidably connected to the pipe through-hole (11), and the embedded bolt (3) is tightly fitted to the inner wall of the pipe through-hole (11); A gasket (34) is provided outside the embedded bolt (3) and below the nut (33), and the gasket (34) is fixedly welded to the top of the embedded steel plate (1), and the nut (33) and the gasket (34) are rotatably connected; The adjusting base (4) comprises a pre-embedded base (41) and an adjusting rod (43) movably mounted on the top of the pre-embedded base (41), and a positioning groove (44) is provided on the top of the adjusting rod (43); The bottom of the embedded bolt (3) is provided with a fixing portion (36) corresponding to the positioning groove (44), and the fixing portion (36) is inserted into the interior of the positioning groove (44); The inner diameter of the movable groove (21) is larger than the outer diameter of the limiting plate (32); the outside of the filler (5) is a sealed packaging bag, and the sealed packaging bag is wrapped with epoxy resin adhesive.

2. The pre-buried construction equipment for civil construction foundation according to claim 1, characterized in that: The diameter of the sliding groove (22) is greater than the diameter of the embedded bolt (3), and the surface of the embedded bolt (3) is evenly distributed with preset holes (35).

3. The pre-buried construction equipment for civil construction foundation according to claim 1, characterized in that: A screw rod (42) is provided in the middle of the top of the embedded base (41), and a spiral groove corresponding to the screw rod (42) is provided at the lower part of the inside of the adjustment rod (43).

4. The pre-buried construction equipment for civil construction foundation according to claim 3, characterized in that: The four corners of the embedded base (41) are provided with fixing holes (45) penetrating vertically.

5. A method for installing pre-buried equipment for construction of a civil construction foundation according to any one of claims 1 to 4, characterized in that: The following steps are involved: S1. Material preparation: Check whether the embedded steel plate (1), anchor bar (2), embedded bolt (3), and adjustment base (4) are complete and whether the quality meets the requirements. In particular, check whether the preset hole (35) on the surface of the embedded bolt (3) is clear, whether the various components of the adjustment base (4) such as the spiral groove of the adjustment rod (43) are accurately processed, prepare the required filler (5), ensure that its sealed packaging bag is intact, and the epoxy resin adhesive inside is of good quality, and prepare rivets and other fixing materials; S2. Measurement and positioning: According to the design drawings, accurately measure the installation position of the embedded steel plate (1) at the construction site and mark it on the base. At the same time, determine the installation position of the adjustment base (4) to ensure that it corresponds to the bottom of the embedded bolt (3) and the error is controlled within the allowable range; S3. Installation of embedded parts: The embedded steel plate (1), anchor bar (2) and embedded bolt (3) are assembled and welded. During assembly, the filler (5) is sleeved on the outside of the embedded bolt (3) and located above the movable groove (21). The embedded bolt (3) passes through the pipe through-hole (11). The embedded bolt (3) is fixed by a nut (33). The gasket (34) rotatably connected to the nut (33) is welded to the top of the embedded steel plate (1). Then, the anchor bar (2) is sleeved on the outside of the embedded bolt (3) and is fixed to the embedded steel plate. (1) The bottom is fitted, a mold release agent is applied to the part of the bottom of the embedded bolt (3) exposed below the anchor bar (2), the anchor bar (2) and the embedded steel plate (1) are connected by welding, and the fixing part (36) at the bottom of the embedded bolt (3) is inserted into the positioning groove (44) at the top of the adjusting rod (43). At this time, the horizontality of the embedded steel plate (1) can be adjusted by initially rotating the adjusting rod (43) and utilizing the cooperation of the screw rod (42) and the spiral groove, so that the embedded steel plate (1) is in a horizontal state; S4. Concrete pouring: During the pouring process, care should be taken to avoid excessive impact and disturbance of concrete on embedded components. The layered pouring method should be adopted, and the thickness of each layer of concrete should be controlled within an appropriate range. At the same time, attention should be paid to the vibration intensity and position to avoid the vibrator directly touching the embedded components. Special personnel should be arranged to monitor the position and status of the embedded components during the concrete pouring process. Once displacement or other abnormal conditions are found, the pouring should be stopped in time and adjustments should be made; S5. Adjustment and separation of embedded bolts: After the concrete solidifies, the embedded steel plate (1) and the anchor bar (2) are fixed. At this time, the position of the embedded bolt (3) is adjusted by rotating the nut (33), so that the embedded bolt (3) moves upward, and the limit plate (32) squeezes the filler (5), so that the sealed packaging bag breaks and the epoxy resin adhesive flows out. As the embedded bolt (3) continues to move upward, since the diameter of the limit plate (32) is smaller than the movable groove (21), the epoxy resin adhesive in the package bypasses the limit plate (32) and finally flows downward along the gap between the inner wall of the sliding groove (22) and the outside of the embedded bolt (3), and fills the preset hole (35). When the embedded bolt (3) is completely separated from the adjustment base (4), the entire embedded part is in a suspended state, and the construction is completed.

Citation Information

Patent Citations

  • Special wind-resistant device in building seismic isolation engineering and using method thereof