Dilute brine proportioning process for sodium hypochlorite generator
The dilute brine proportioning process controlled by the Venturi tube and PID algorithm solves the problem of unstable flow and concentration caused by damage to the saturated brine crystal, achieves efficient and stable preparation of sodium hypochlorite solution, and improves production efficiency and equipment reliability.
Patent Information
- Application Number
- CN202411081480.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-10-15
AI Technical Summary
During the on-site preparation of sodium hypochlorite solution, crystals in saturated brine damage pump components, affecting precise flow control and concentration stability, resulting in low production costs and energy efficiency, and it is difficult to accurately adjust the concentration of dilute brine using traditional methods.
A venturi tube is used to generate negative pressure through power water to suck saturated brine, and the flow rate and concentration are detected in real time through a flow meter and conductivity meter. The PID algorithm is used to control the electric regulating valve to achieve constant flow and constant concentration control of dilute brine, forming a closed-loop regulation. system, avoiding the use of traditional pumps.
It achieves stable control of the concentration of dilute brine, improves the accuracy and stability of the production process, saves equipment costs, avoids damage to pump components, and significantly improves production efficiency and consistency of dilute brine.
Smart Images

Figure CN118767724A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of on-site preparation of sodium hypochlorite solution, in particular to a dilute brine proportioning process for a sodium hypochlorite generator. Background Art
[0002] The on-site preparation of sodium hypochlorite solution involves a complex chemical engineering process, usually using sodium chloride (table salt) as the only raw material. The table salt is first dissolved into saturated brine, and then diluted to obtain dilute brine with a concentration of about 3%. This dilute brine is processed by diaphragmless electrolysis technology and converted into a sodium hypochlorite solution with a concentration of about 0.8%. During the preparation process, two pumps are used to transport saturated brine and clean water respectively, and the flow rate is adjusted to achieve the target concentration of the dilute brine.
[0003] However, the presence of crystals in saturated brine can damage key pump components such as diaphragms and one-way valves, thus affecting the precise control of flow and the life of the pump. In addition, flow regulation without feedback control can easily lead to fluctuations in brine concentration. Too low a concentration will affect the final concentration of sodium hypochlorite, while too high a concentration will waste raw salt. Therefore, it is crucial to ensure a stable dilute brine concentration and effective pump system maintenance, which is not only related to product quality, but also directly affects production costs and energy consumption efficiency. In summary, the preparation process of sodium hypochlorite solution requires meticulous process control and optimization to ensure optimal production efficiency and economy. Summary of the invention
[0004] The object of the present invention is to provide a dilute brine proportioning process for a sodium hypochlorite generator to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A dilute brine proportioning process for a sodium hypochlorite generator, the specific steps are as follows:
[0007] S1. Preparation work, ensure the stable operation of the sodium hypochlorite generator, and check the pressure at the power water inlet to ensure it is within the range of 2-4 bar;
[0008] S2, start the system, start the controller, flow meter and conductivity meter;
[0009] S3, power water flow control, the flow meter detects the power water flow provided on site and transmits the data to the controller, and the controller calculates the opening control signal of the electric regulating valve 1 through the PID algorithm;
[0010] S4, adjusting the electric control valve 1, the controller converts the calculated opening control signal into a 4-20mA signal and transmits it to the electric control valve 1, the electric control valve 1 adjusts its opening according to the received signal, and feeds back the actual opening 4-20mA signal to the controller;
[0011] S5, Venturi tube operation, the power water passes through the Venturi tube to produce a negative pressure effect, and saturated brine is sucked from the saturated brine pipeline;
[0012] S6, dilute brine preparation, the pumped saturated brine is mixed with the power water in the venturi tube to form dilute brine;
[0013] S7, conductivity detection, the conductivity of the dilute brine is detected by the conductivity meter, and the conductivity meter converts the measured data into a 4-20mA signal and transmits it to the controller;
[0014] S8, dilute brine concentration control, the controller receives the signal from the conductivity meter, performs analog-to-digital conversion, obtains the concentration value of the dilute brine, and calculates the opening control signal of the electric regulating valve 2 according to the PID algorithm;
[0015] S9, adjusting the electric control valve 2. The controller converts the calculated opening control signal into a 4-20mA signal and transmits it to the electric control valve 2. The electric control valve 2 adjusts its opening according to the received signal and feeds back the actual opening 4-20mA signal to the controller.
[0016] S10, the concentration of the dilute brine is stable, the controller compares the actual opening with the set value, and modifies the opening control signal of the electric regulating valve 2 according to the comparison result to achieve closed-loop regulation and stable control of the concentration of the dilute brine;
[0017] S11. Monitoring and adjustment: Continuously monitor the operation of the controller and related instruments, and make adjustments and maintenance as needed;
[0018] S12, shut down, shut down or adjust system parameters as needed. Through the above steps, the system can achieve constant flow and constant concentration control of the dilute brine of the sodium hypochlorite generator, ensuring stable and efficient operation of the production process.
[0019] As a further preferred embodiment of the present invention: the Venturi tube has inlet one, inlet two and an outlet, inlet one is connected to electric regulating valve one, the other end of the electric regulating valve one is connected to a flow meter, the other end of the flow meter is connected to a power water inlet, the pressure at the power water inlet is 2-4 bar, inlet two is connected to electric regulating valve two, the other end of the electric regulating valve two is connected to a saturated brine pipeline, and a conductivity meter is installed at the outlet.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] The present invention utilizes power water to generate negative pressure through a venturi tube to draw saturated brine, thereby realizing the preparation process of dilute brine. The power water flow is detected in real time by a flow meter, and is fed back and adjusted by a power water electric regulating valve to ensure constant flow control and realize a closed-loop control system. Secondly, the concentration of dilute brine is detected by conductivity, and is fed back to the saturated brine electric regulating valve to adjust the flow of saturated brine, thereby stabilizing the concentration of dilute brine, and further optimizing the control accuracy and stability of the production process.
[0022] In addition, the present invention adopts the technical route of the Venturi effect, fully utilizes the pressure of the on-site power water, avoids the use of traditional saturated brine pumps and clean water pumps, significantly saves equipment costs, and at the same time, eliminates the risk of saturated brine pumps being damaged by salt crystals, improves the reliability and stability of the dilute brine proportioning equipment, and greatly improves the consistency of dilute brine concentration and production efficiency;
[0023] In summary, the present invention not only has innovative breakthroughs in technology, but also brings significant advantages in economy and reliability, and brings important improvements and development opportunities to the preparation process of sodium hypochlorite solution. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A structural schematic block diagram of a dilute brine proportioning process for a sodium hypochlorite generator. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] Example 1
[0027] See also Figure 1 This embodiment provides a dilute brine proportioning process for a sodium hypochlorite generator, and the specific steps are as follows:
[0028] S1. Preparation work, ensure the stable operation of the sodium hypochlorite generator, and check the pressure at the power water inlet to ensure it is within the range of 2-4 bar;
[0029] S2, start the system, start the controller, flow meter and conductivity meter;
[0030] S3, power water flow control, the flow meter detects the power water flow provided on site and transmits the data to the controller, and the controller calculates the opening control signal of the electric regulating valve 1 through the PID algorithm;
[0031] S4, adjusting the electric control valve 1, the controller converts the calculated opening control signal into a 4-20mA signal and transmits it to the electric control valve 1, the electric control valve 1 adjusts its opening according to the received signal, and feeds back the actual opening 4-20mA signal to the controller;
[0032] S5, Venturi tube operation, the power water passes through the Venturi tube to produce a negative pressure effect, and saturated brine is sucked from the saturated brine pipeline;
[0033] S6, dilute brine preparation, the pumped saturated brine is mixed with the power water in the venturi tube to form dilute brine;
[0034] S7, conductivity detection, the conductivity of the dilute brine is detected by the conductivity meter, and the conductivity meter converts the measured data into a 4-20mA signal and transmits it to the controller;
[0035] S8, dilute brine concentration control, the controller receives the signal from the conductivity meter, performs analog-to-digital conversion, obtains the concentration value of the dilute brine, and calculates the opening control signal of the electric regulating valve 2 according to the PID algorithm;
[0036] S9, adjusting the electric control valve 2. The controller converts the calculated opening control signal into a 4-20mA signal and transmits it to the electric control valve 2. The electric control valve 2 adjusts its opening according to the received signal and feeds back the actual opening 4-20mA signal to the controller.
[0037] S10, the concentration of the dilute brine is stable, the controller compares the actual opening with the set value, and modifies the opening control signal of the electric regulating valve 2 according to the comparison result to achieve closed-loop regulation and stable control of the concentration of the dilute brine;
[0038] S11. Monitoring and adjustment: Continuously monitor the operation of the controller and related instruments, and make adjustments and maintenance as needed;
[0039] S12, shut down, shut down or adjust system parameters as needed. Through the above steps, the system can achieve constant flow and constant concentration control of the dilute brine of the sodium hypochlorite generator, ensuring stable and efficient operation of the production process.
[0040] Furthermore, the Venturi tube has inlet one, inlet two and an outlet. Inlet one is connected to electric regulating valve one, the other end of which is connected to a flow meter, the other end of which is connected to a power water inlet, and the pressure at the power water inlet is 2-4 bar. Inlet two is connected to electric regulating valve two, the other end of which is connected to a saturated brine pipeline, and a conductivity meter is installed at the outlet.
[0041] The venturi tube is used to generate negative pressure under certain conditions to pump saturated brine. The electric regulating valve 1 and the electric regulating valve 2: adjust the flow of power water and saturated brine through the PID control algorithm to control the concentration of dilute brine. The flow meter and the conductivity meter monitor the flow of power water, and the conductivity meter measures the conductivity of dilute brine to determine its concentration. The signals of the flow meter and the conductivity meter are received, and the opening of the electric regulating valve is calculated and adjusted through the PID algorithm to maintain a constant flow and concentration of dilute brine. The flow and concentration of dilute brine are stabilized through closed-loop control, which improves the stability and efficiency of the production process, avoids the pump equipment used in traditional methods, reduces the waste of electric energy and damage to equipment, such as avoiding the wear and damage to the diaphragm of the metering pump. This design can effectively control the quality and mass production of dilute brine in industrial production, while improving energy utilization efficiency and equipment life.
[0042] Working principle: The negative pressure effect generated by the power water passing through the Venturi tube draws saturated brine into the Venturi tube and mixes with the power water to form dilute brine. The flow meter outputs the flow data of the power water through a 4-20mA signal and transmits it to the controller. The controller calculates and adjusts the opening of the electric control valve 1 through the PID algorithm based on the received flow data to ensure a constant flow of the power water. The conductivity of the dilute brine is measured by a conductivity meter, and the signal is converted into a 4-20mA signal and transmitted to the controller. The controller again calculates and adjusts the opening of the electric control valve 2 through the PID algorithm to maintain a constant concentration of the dilute brine.
[0043] It should be noted that the above embodiments are only specific and clear descriptions of the technical solutions and technical features of the present application. For those skilled in the art, solutions or features that belong to the prior art or common knowledge are not described in detail in the above embodiments.
[0044] In addition, the technical solutions of the present application are not limited to the above-mentioned embodiments. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.
Claims
1. A dilute brine proportioning process for a sodium hypochlorite generator, It is characterized in that The specific steps are as follows: S1. Preparation work, ensure the stable operation of the sodium hypochlorite generator, and check the pressure at the power water inlet to ensure it is within the range of 2-4 bar; S2, start the system, start the controller, flow meter and conductivity meter; S3, power water flow control, the flow meter detects the power water flow provided on site and transmits the data to the controller, and the controller calculates the opening control signal of the electric regulating valve 1 through the PID algorithm; S4, adjusting the electric control valve 1, the controller converts the calculated opening control signal into a 4-20mA signal and transmits it to the electric control valve 1, the electric control valve 1 adjusts its opening according to the received signal, and feeds back the actual opening 4-20mA signal to the controller; S5, Venturi tube operation, the power water passes through the Venturi tube to produce a negative pressure effect, and saturated brine is sucked from the saturated brine pipeline; S6, dilute brine preparation, the pumped saturated brine is mixed with the power water in the venturi tube to form dilute brine; S7, conductivity detection, the conductivity of the dilute brine is detected by the conductivity meter, and the conductivity meter converts the measured data into a 4-20mA signal and transmits it to the controller; S8, dilute brine concentration control, the controller receives the signal from the conductivity meter, performs analog-to-digital conversion, obtains the concentration value of the dilute brine, and calculates the opening control signal of the electric regulating valve 2 according to the PID algorithm; S9, adjusting the electric control valve 2. The controller converts the calculated opening control signal into a 4-20mA signal and transmits it to the electric control valve 2. The electric control valve 2 adjusts its opening according to the received signal and feeds back the actual opening 4-20mA signal to the controller. S10, the concentration of the dilute brine is stable, the controller compares the actual opening with the set value, and modifies the opening control signal of the electric regulating valve 2 according to the comparison result to achieve closed-loop regulation and stable control of the concentration of the dilute brine; S11. Monitoring and adjustment: Continuously monitor the operation of the controller and related instruments, and make adjustments and maintenance as needed; S12, shut down, shut down or adjust system parameters as needed. Through the above steps, the system can achieve constant flow and constant concentration control of the dilute brine of the sodium hypochlorite generator, ensuring stable and efficient operation of the production process.
2. A dilute brine proportioning process for a sodium hypochlorite generator according to claim 1, Features: The venturi tube has inlet one, inlet two and an outlet. Inlet one is connected to electric regulating valve one, the other end of which is connected to a flow meter, the other end of which is connected to a power water inlet, and the pressure at the power water inlet is 2-4 bar. Inlet two is connected to electric regulating valve two, the other end of which is connected to a saturated brine pipeline, and a conductivity meter is installed at the outlet.
Citation Information
Cited By
Automatic accurate preparation device of gas medicament solution and control method thereof
CN121209607A
Direct drinking water purification treatment equipment
CN121494131A