On-line cooling device and method during profile steel hot rolling
The circulating spray cooling technology of the online cooling device solves the problem of low cooling efficiency of the cold water pool during the hot rolling cooling process of section steel, achieves efficient cooling and flexible cooling operations, and reduces costs and interference.
Patent Information
- Application Number
- CN202410936697.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-12
AI Technical Summary
The cold water pool lacks circulating cooling during the cooling process of existing section steel hot rolling, resulting in slow heat dissipation and low cooling efficiency.
Design an online cooling device for hot-rolled steel sections. The spray module is used to spray and cool the section steel through the main water pipe and the spray pipe group to form a circulating spray system. The manual throttle valve and pneumatic ball valve are used to control the water flow speed to adapt to the situation. Different cooling needs, and real-time monitoring and adjustment of cooling operations during the cooling process to improve cooling efficiency.
Circulating spray cooling technology significantly improves the cooling efficiency of section steel, reduces equipment costs, avoids interference from damaged spray pipe groups without affecting the cooling process, and improves the flexibility and accuracy of the cooling device.
Smart Images

Figure CN118768398A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of hot-rolled steel performance testing, and in particular to an online cooling device and method for hot-rolled steel. Background Art
[0002] Steel sections are the parts that the train wheels directly contact and roll on. They mainly bear the weight of the train, provide driving guidance, and disperse pressure. Subway tracks usually use heavy steel sections, such as 60kg / m manganese steel, to adapt to the characteristics of high loads and frequent use.
[0003] High-strength steel is prone to tempering softening at high temperatures, reducing its strength and toughness. Therefore, it is very necessary to test the characteristics and laws of high-temperature tempering behavior of steel sections, in order to provide a theoretical basis and technical support for safety prediction, prevention and improvement during use. The test process is as follows: the steel section is placed in the air at room temperature, and then subjected to high-temperature tempering treatment at different temperatures. Then, the tempered samples are subjected to tensile tests to measure their strength, toughness, ductility and other performance parameters. At the same time, the test samples are subjected to metallographic structure analysis to observe the microstructural characteristics. Then, the temperature is lowered, and the test samples are re-observed.
[0004] The prior art has the following problems: in the final cooling process, the steel section is generally cooled after hot rolling, and then heated again and placed in a cold water pool or oil pool for cooling to perform heat treatment on the steel section; however, since the cold water pool has a lot of cold water but lacks circulating cooling, the heat dissipation is slow and the cooling efficiency is low, and there is still room for improvement. Summary of the invention
[0005] In order to improve the problem that although the cold water pool has a lot of cold water, it lacks circulating cooling, so the water temperature of the continuous production pool rises, the heat dissipation is slow, and the cooling efficiency is low, the present application provides an online cooling device and method for hot rolling of steel sections.
[0006] In a first aspect, the present application provides an online cooling device for hot-rolled steel, which adopts the following technical solution: An online cooling device for hot-rolling steel sections, comprising: A steel feeding module is used to move the steel sections. The steel feeding module includes a roller table, a conveying roller and a motor. The conveying roller is rotatably connected to the roller table. There are several conveying rollers arranged along the length direction of the roller table. The driving shaft of the motor is connected to the conveying roller by transmission. A spray module is used to spray the steel sections on the steel feeding module. The spray module includes a main water pipe and a spray pipe group. The main water pipe is arranged on one side of the steel feeding module. The number of the spray pipe groups is several and they are arranged along the length direction of the main water pipe. One group of the spray pipe groups is arranged between two adjacent conveying rollers and located on the upper side of the conveying rollers. The spray pipe group includes several spray pipes and several nozzles. The spray pipe is connected to the main water pipe. The nozzle is arranged on the side of the spray pipe away from the main water pipe and is connected to the spray pipe. The nozzle is set toward the steel sections on the steel feeding module.
[0007] By adopting the above technical solution, the steel section is sprayed by spraying, so that the same lower temperature water is continuously used to take away the temperature of the steel section in time, forming a circulating spraying system, thereby improving the cooling effect of the cooling device on the steel section.
[0008] Optionally, the plurality of nozzles of the same spray pipe group are arranged in a spiral shape with the steel section on the steel inlet module as the axis.
[0009] By adopting the above technical solution and spiral arrangement, the number of nozzles in the same spray pipe group is reduced while ensuring uniform spraying, thereby reducing equipment costs while ensuring the spraying effect and saving a lot of costs.
[0010] Optionally, the spray pipe is provided with a manual throttle valve and a pneumatic ball valve.
[0011] By adopting the above technical solution, the water flow rate on the spray pipe can be controlled through the control of the manual throttle valve and the pneumatic ball valve, so as to provide different flow rates for different cooling needs, thereby improving the adaptability of the cooling device.
[0012] Optionally, also include: The water inlet module is used to supply water to the main water pipe. The water inlet module includes a self-priming pump and a secondary water pipe. The secondary water pipe is connected to the main water pipe. The self-priming pump is arranged on the secondary water pipe and is connected to the secondary water pipe. A check valve is provided on the secondary water pipe.
[0013] In a second aspect, the present application provides an online cooling method for hot-rolled steel, which adopts the following technical solution: An online cooling method for hot-rolled steel, applied to the above-mentioned online cooling device for hot-rolled steel, comprises: receiving input of expected steel section temperature and steel section specifications; Receive the signal that the steel section is ready to enter; When receiving the steel section ready to enter signal, obtain the current steel section temperature; Generate a cooling operation based on the current steel section temperature, the expected steel section temperature and the steel section specifications, wherein the cooling operation includes a conveyor roller rotation operation, a self-priming pump water pumping operation and a nozzle water spraying operation; The cooling device is controlled to perform a cooling operation.
[0014] By adopting the above technical scheme, the steel sections are sprayed by spraying, so that the same low temperature water is continuously supplied to promptly take away the temperature on the steel sections, forming a circulating spraying system, thereby improving the cooling effect of the cooling device on the steel sections; and different cooling schemes are adopted for different steel sections, thereby improving the intelligence of the cooling device for cooling the steel sections.
[0015] Optionally, also include: Obtaining the final steel temperature after the cooling device performs the cooling operation; Calculate the actual cooling rate based on the current steel temperature, the end steel temperature and the expected steel temperature; When the actual cooling rate is less than the preset critical required cooling rate, a repeated cooling operation is generated based on the end steel temperature, the expected steel temperature and the steel specifications; Controlling the cooling device to perform repeated cooling operations and updating the end steel temperature and the actual cooling rate until the actual cooling rate is greater than the critical required cooling rate; The cooling operation is updated based on the cooling operation and the repeated cooling operation when the actual cooling rate is greater than the critical required cooling rate.
[0016] By adopting the above technical solution, when the effect brought by the cooling operation is not satisfactory, it means that the cooling operation is not optimal. Then the operations in the subsequent remedial process should also be counted in the cooling operation. Therefore, the cooling operation needs to be updated to establish the correct mapping relationship between the cooling operation and different cooling requirements, thereby improving the accuracy of the cooling operation.
[0017] Optionally, the method for updating the cooling operation based on the cooling operation and the repeated cooling operation includes: Disassembly based on the cooling operation to obtain the conveying roller conveying speed, spraying speed and spraying time; Disassembling based on repeated cooling operation to obtain repeated conveying roller conveying speed, repeated spraying speed and repeated spraying time; The conveying roller conveying speed is updated based on the conveying roller conveying speed, the repeated conveying roller conveying speed, the spraying speed, the repeated spraying speed, the spraying time length, and the repeated spraying time length.
[0018] Optionally, a method for checking the spraying duration is also included, the method comprising: Obtain the current cooling operation point, the current steel section temperature and the temperature detection sensor number of the current steel section temperature; Determine the adjacent temperature detection sensor number based on the current cooling operation point and the temperature detection sensor number, and determine the acquisition time based on the conveying speed of the conveying roller and the preset segment length; After the acquisition time has passed, the adjacent steel section temperatures corresponding to the adjacent temperature detection sensor numbers are acquired; The spraying temperature difference is calculated based on the temperature of the adjacent steel section and the temperature of the current steel section; When the spray temperature difference falls within the preset natural cooling range, the spray duration is updated based on the acquisition time, and a preset spray pipe group damage signal is output; When the spray temperature difference does not fall within the natural cooling range, the spray duration is directly output.
[0019] By adopting the above technical solution, when one of the spray pipe groups is damaged, it means that the steel section is not sprayed in the area when passing through the position corresponding to the spray pipe group. The actual spray time should be appropriately reduced according to the spray time at this position, thereby improving the accuracy of the spray time statistics.
[0020] Optionally, the method further includes a method for controlling the cooling device to perform a cooling operation before repair after outputting a signal that the spray pipe group is damaged, the method comprising: Analyzing the cooling spray pipe group number based on the cooling operation to form a current cooling spray number group; The cooling spray pipe group number that outputs the spray pipe group damage signal is defined as the abnormal pipe group number; Based on the abnormal pipe group number, the current cooling spray number group is modified to obtain a replacement cooling spray number group, wherein the number of cooling spray pipe group numbers in the replacement cooling spray number group is consistent with the number of cooling spray pipe group numbers in the current cooling spray number group and does not include the abnormal pipe group number; When the replacement cooling spray number group exists, updating the cooling operation based on the replacement cooling spray number group to obtain the replacement cooling operation; After outputting the signal of damage to the sprinkler pipe group, the cooling device is controlled to perform a replacement cooling operation before maintenance.
[0021] By adopting the above technical solution, the spraying operation is performed by switching to a position where no damaged spray pipe group is present, thereby avoiding interference from the damaged spray pipe group without affecting the entire cooling process, thereby improving the cooling flexibility of the cooling device.
[0022] Optionally, another method for controlling the cooling device to perform a cooling operation before repair after outputting a signal indicating that the spray pipe group is damaged is also included, the method comprising: Determine the abnormal location based on the temperature detection sensor number; Determine the maximum spray length based on the abnormal location; Determine the segmented steel specifications based on the maximum spray length and steel specifications; Generate segmented cooling operation based on current steel temperature, expected steel temperature and segmented steel specifications; The cooling device is controlled to perform a staged cooling operation.
[0023] By adopting the above technical solution, the steel section is divided into several sections for cooling, thereby avoiding the interference of the damaged spray pipe group without affecting the entire cooling process, thereby improving the cooling flexibility of the cooling device.
[0024] In summary, the present application includes at least the following beneficial technical effects: 1. The steel is sprayed by spraying, so that the same low temperature water can continuously take away the temperature of the steel in time, forming a circulating spraying system, which improves the cooling effect of the cooling device on the steel; 2. Avoid the interference of damaged spray pipe groups without affecting the entire cooling process, thereby improving the cooling flexibility of the cooling device. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a flow chart of an online cooling method during hot rolling of steel sections in an embodiment of the present application.
[0026] Figure 2 It is a structural schematic diagram of an online cooling device during hot rolling of steel sections in an embodiment of the present application.
[0027] Figure 3 yes Figure 2 Sectional view along AA direction.
[0028] Figure 4 yes Figure 2 Cross-sectional view along the BB direction.
[0029] Figure 5 It is a flowchart of a method for updating a cooling operation based on a cooling operation and a repeated cooling operation in an embodiment of the present application.
[0030] Figure 6 It is a flow chart of the method for checking the spraying duration in the embodiment of the present application.
[0031] Figure 7 It is a flow chart of a method for controlling a cooling device to perform a cooling operation before maintenance after outputting a signal of a damage to a spray pipe group in an embodiment of the present application.
[0032] Figure 8 It is a flow chart of another method for controlling the cooling device to perform cooling operation before maintenance after outputting a signal of damage to the spray pipe group in an embodiment of the present application.
[0033] Explanation of the reference numerals: 1. Steel feeding module; 11. Roller table; 12. Conveying roller; 13. Motor; 2. Spraying module; 21. Main water pipe; 22. Spraying pipe group; 221. Spraying pipe; 222. Spraying head; 223. Manual throttle valve; 224. Pneumatic ball valve; 3. Water inlet module; 31. Self-priming pump; 32. Auxiliary water pipe; 33. Check valve. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-Figure 8 It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0035] The present application embodiment discloses an online cooling method for hot-rolled steel. Figure 1 , a method for online cooling during hot rolling of steel sections comprises: Step 100: receiving input of expected steel section temperature and steel section specifications.
[0036] like Figure 2 As shown, the online cooling method during hot rolling of steel sections is mainly applied to the online cooling device during hot rolling of steel sections, and the online cooling device during hot rolling of steel sections comprises a steel feeding module 1, a spray module 2 and a water inlet module 3. The steel feeding module 1 is installed on the ground, and is used to transport and cool the steel sections that have been tested. The spray module 2 is installed on one side of the steel feeding module 1 and extends to the upper side of the steel feeding module 1, and is used to spray the steel sections on the steel feeding module 1. The water inlet module 3 is installed on one side of the spray module 2 and is connected to the spray module 2, and is used to supply water to the spray module 2.
[0037] Reference Figure 2 The steel feeding module 1 includes a roller 11, a conveyor roller 12 and a motor 13. The roller 11 is installed on the ground, and the conveyor roller 12 is rotatably connected to the roller 11. There are several conveyor rollers 12 and they are arranged along the length direction of the roller 11, so that the steel in contact with the conveyor roller 12 moves along the length direction of the roller 11. The driving shaft of the motor 13 is connected to the conveyor roller 12 in a transmission manner. Here, one motor 13 can drive one conveyor roller 12 to rotate, or one motor 13 can drive several adjacent conveyor rollers 12 to rotate. Here, one motor 13 drives several adjacent conveyor rollers 12 to rotate as an example. One motor 13 transmits the rotation to one of the conveyor rollers 12 through a belt. The conveyor roller 12 serves as an active roller, and the remaining conveyor rollers 12 are mutually transmitted through belts to realize that one motor 13 drives several adjacent conveyor rollers 12 to rotate.
[0038] Reference Figure 2 and Figure 3The spray module 2 includes a main water pipe 21 and a spray pipe group 22. The main water pipe 21 is installed on one side of the steel feeding module 1, and is installed on one side of the roller 11 and is arranged parallel to the roller 11 as an example, so as to serve as the main transmission channel for cooling water. There are several spray pipe groups 22 and they are arranged along the length direction of the main water pipe 21. One group of spray pipe groups 22 is located between two adjacent conveying rollers 12 and on the upper side of the conveying rollers 12 to spray the parts of the steel.
[0039] The spray pipe group 22 includes a plurality of spray pipes 221 and a plurality of spray heads 222. The spray pipe 221 is connected to the main water pipe 21, and the spray head 222 is located on the side of the spray pipe 221 away from the main water pipe 21 and is connected to the spray pipe 221. The spray head 222 is arranged toward the steel section on the steel inlet module 1 to spray the steel section. Here, the plurality of spray heads 222 of the same spray pipe group 22 are arranged in a spiral shape with the steel section on the steel inlet module 1 as the axis to cover all exposed surfaces of the steel section.
[0040] Reference Figure 3 A manual throttle valve 223 and a pneumatic ball valve 224 are installed on the spray pipe 221 to facilitate manual adjustment and automatic adjustment.
[0041] Reference Figure 2 and Figure 4 The water inlet module 3 includes a self-priming pump 31 and a secondary water pipe 32. The secondary water pipe 32 is connected to the main water pipe 21. The self-priming pump 31 is installed on the secondary water pipe 32 and communicates with the secondary water pipe 32 to pump external water resources into the secondary water pipe 32 and then provide it to the main water pipe 21. A check valve 33 is installed on the secondary water pipe 32 to prevent water from flowing back.
[0042] The expected temperature of the steel section is the temperature to which the steel section needs to be cooled. This is a temperature set manually and can be obtained by manually inputting into the system. The steel section specification is the specification of the steel section that needs to be cooled after the test, which includes the cross-sectional specification and the length specification. It can also be obtained by manually inputting based on the actual measurement results.
[0043] Step 101: Receive a signal indicating that the steel section is ready to enter.
[0044] The steel section entry signal is a signal that the steel section has completed the test and is ready to enter the steel entry module 1 and move to the spraying area. Here, the signal can be obtained by manually pressing a signal button or a switch button, in order to start the entire device.
[0045] Step 102: upon receiving a steel section ready entry signal, obtaining the current steel section temperature.
[0046] The current steel temperature is the temperature of the steel when it enters the steel feeding module 1. Here, it can be measured by the temperature sensor on the conveyor roller 12 when it enters the roller table 11 or contacts the first conveyor roller 12. When the steel is ready to enter signal is received, it means that the steel is about to start cooling, so the cooling temperature is the current temperature, and the cooling start time is the current start time.
[0047] Step 103: Generate a cooling operation based on the current steel section temperature, the expected steel section temperature and the steel section specifications.
[0048] The cooling operation is an operation that needs to be performed to cool the steel on the steel feeding module 1 from the current steel temperature to the expected steel temperature. Here, the temperature starting from entering the steel feeding module 1 is the current steel temperature, and the temperature ending at leaving the steel feeding module 1 is the expected steel temperature. The cooling operation includes the conveyor roller rotation operation, the self-priming pump water pumping operation, and the nozzle water spraying operation. The conveyor roller rotation operation includes the conveyor roller rotation direction, rotation speed, and rotation duration. The self-priming pump water pumping operation includes the water pumping speed and water pumping duration. The nozzle water spraying operation includes the spraying speed and spraying duration.
[0049] Here, the corresponding cooling operation can be found by searching the database. The database stores the mapping relationship between the current steel temperature, the expected steel temperature, the steel specifications and the cooling operation. The staff in this field records the different current steel temperatures, steel specifications and the expected steel temperatures when the cooling operation is finally released based on a large number of actual tests. When the system receives the corresponding current steel temperature, expected steel temperature and steel specifications, it automatically finds the corresponding cooling operation from the database and outputs it.
[0050] Here, an equivalent empirical formula can also be obtained through multiple tests, and then the corresponding cooling operation can be calculated by substituting the corresponding size specifications.
[0051] Step 104: Control the cooling device to perform a cooling operation.
[0052] Step 105: Obtaining the final steel temperature after the cooling device performs the cooling operation.
[0053] The end steel temperature is the temperature of the steel leaving the steel feeding module 1 after the cooling device performs the cooling operation. The acquisition method is still the same as the current steel temperature acquisition method, that is, the temperature sensor at the entry position of the steel feeding module 1 is acquired.
[0054] Step 106: Calculate the actual cooling rate based on the current steel section temperature, the end steel section temperature and the expected steel section temperature.
[0055] The actual cooling rate is the cooling efficiency after the cooling operation. The calculation method is to first calculate the difference between the current steel temperature and the end steel temperature, which is the actual cooling temperature, then calculate the difference between the current steel temperature and the expected steel temperature, which is the theoretical cooling temperature, and finally divide the actual cooling temperature by the theoretical cooling temperature to get the actual cooling rate.
[0056] Step 107: When the actual cooling rate is less than the preset critical required cooling rate, a repeated cooling operation is generated based on the end steel section temperature, the expected steel section temperature and the steel section specifications.
[0057] The critical required cooling rate is the cooling rate that is considered to meet the cooling standard only when it exceeds this value. The repeated cooling operation is the cooling operation required to continue cooling to the expected temperature of the steel section when the steel section temperature is ended. The generation of the cooling operation here has been introduced in the previous step 103, and will not be repeated here.
[0058] When the actual cooling rate is less than the critical required cooling rate, it means that the cooling is not up to standard and needs to be continued, so the repeated cooling operation is continued.
[0059] Step 108: Control the cooling device to perform repeated cooling operations and update the end steel section temperature and the actual cooling rate until the actual cooling rate is greater than the critical required cooling rate.
[0060] Step 109: When the actual cooling rate is greater than the critical required cooling rate, the cooling operation is updated based on the cooling operation and the repeated cooling operation.
[0061] When it is greater than, it means that the cooling is successful. It should be noted that if one cooling operation is greater than, it means that the cooling operation is correct and no update is required. If repeated cooling operations are required to make the actual cooling rate greater than the critical required cooling rate, it means that the cooling operation needs to be updated, and at this time the operation can be updated according to the total number of operations performed.
[0062] Here, the repeated cooling operation can be performed multiple times, that is, if the actual cooling rate is still less than the critical required cooling rate when the cooling device is controlled to perform the repeated cooling operation, it is necessary to continue to generate repeated cooling operations and then continue cooling. Therefore, the repeated cooling operation during update is the sum of all generated repeated cooling operations.
[0063] Reference Figure 5 The method for updating the cooling operation based on the cooling operation and the repeated cooling operation includes: Step 200: Disassemble based on the cooling operation to obtain the conveying speed of the conveying roller, the spraying speed and the spraying time.
[0064] The conveying speed of the conveying roller 12 is the speed at which the conveying roller 12 is equivalent to advancing the steel section when rotating during the cooling operation. The spraying speed is the spraying speed of the spray pipe 221 during the cooling operation. The spraying duration is the duration of the spraying of the spray pipe 221 during the cooling operation. These contents are included in the contents of the cooling operation here, so disassembly only needs to extract them.
[0065] Step 201: Disassemble based on the repeated cooling operation to obtain the repeated conveying roller 12 conveying speed, repeated spraying speed and repeated spraying time.
[0066] The repeated conveying roller conveying speed is the speed at which the conveying roller 12 is equivalent to advancing the steel section when rotating during the repeated cooling operation. The repeated spraying speed is the spraying speed of the spray pipe 221 during the repeated cooling operation. The repeated spraying duration is the duration of the spraying of the spray pipe 221 during the repeated cooling operation. These contents are included in the contents of the repeated cooling operation here, so disassembly only needs to extract them.
[0067] Step 202: updating the conveying speed of the conveying roller based on the conveying speed of the conveying roller, the repeated conveying speed of the conveying roller, the spraying speed, the repeated spraying speed, the spraying time and the repeated spraying time.
[0068] Different conveying roller speeds, repeated conveying roller speeds, spraying speeds, repeated spraying speeds, spraying times and repeated spraying times will result in different cooling times for the relative steel sections. Therefore, the conveying roller speed is updated by comprehensively considering all influencing factors. Here, all the contents can be converted into the spraying time at the same steel section position, that is, the steel section position of unit length.
[0069] Reference Figure 6 , and also includes a method for checking the spraying duration, the method comprising: Step 300: Obtain the current cooling operation point, the current steel section temperature and the number of the temperature detection sensor that obtains the current steel section temperature.
[0070] The current cooling operation point is the stage at which the cooling operation has been executed. The content includes the conveying speed of the conveying roller at this moment, the conveying direction of the conveying roller, the spraying speed and the duration of the spraying. The current steel section temperature is the temperature of the current position of a certain section of the steel section. The method of obtaining here is to arrange temperature sensors along the roller 11, and the temperature of the steel section is obtained on one of the sensors. The temperature detection sensor number is the number of the detection sensor when the current steel section temperature is obtained. The method of obtaining is to receive the corresponding number when the corresponding temperature is received. The purpose of the numbering is to determine which temperature detection sensor it is, so as to determine which position the temperature is detected. It should be noted here that the temperature detection sensors are arranged on both sides of a group of spray pipe groups 22 to detect the effect of the spray pipe group 22.
[0071] Step 301: Determine the adjacent temperature detection sensor numbers based on the current cooling operation point and the temperature detection sensor numbers, and determine the acquisition time based on the conveying speed of the conveying roller and the preset segment length.
[0072] The adjacent temperature detection sensor number is the number of the temperature sensor adjacent to the temperature detection sensor number. Here, the current transmission direction needs to be determined through the current cooling operation point, so as to determine the adjacent temperature detection sensor number. For example: if the numbering sequence of the temperature detection sensors is gradually increasing from top to bottom, then if the current transmission direction is downward, then the adjacent temperature detection sensor number is the temperature detection sensor number plus one. The segment length is the length of the segment between each adjacent detection sensor number, that is, the length from the position corresponding to the temperature detection sensor number to the position corresponding to the adjacent detection sensor number. The acquisition time is the time for the same position on the steel section to cool from the position corresponding to the temperature detection sensor number to the position corresponding to the adjacent detection sensor number. The calculation method is to divide the segment length by the conveying speed of the conveying roller.
[0073] Step 302: After the acquisition time has passed, the adjacent steel section temperatures corresponding to the adjacent temperature detection sensor numbers are acquired.
[0074] The adjacent steel segment temperature is the temperature detected by the sensor corresponding to the adjacent temperature detection sensor number after the acquisition time. Here, after the acquisition time, the steel originally at the position corresponding to the temperature detection sensor number reaches the position corresponding to the adjacent detection sensor number.
[0075] Step 303: Calculate the spraying temperature difference based on the temperature of the adjacent steel sections and the temperature of the current steel section.
[0076] The spray temperature difference is the temperature difference of the steel section before and after spraying. It is calculated by subtracting the temperature of the adjacent steel section from the current steel section temperature.
[0077] Step 304: When the spraying temperature difference falls within the preset natural cooling range, the spraying duration is updated based on the acquisition time, and a preset spray pipe group damage signal is output.
[0078] The natural cooling range is the range of reduced temperatures for natural cooling. Here, the numerical range is the range obtained artificially after a large number of tests, which includes the cooling temperature difference of steel sections at higher temperatures and the cooling temperature difference of steel sections at lower temperatures. Since natural cooling is different from cold water cooling, the effect of cold water cooling is much greater than that of natural cooling. Therefore, here, the range only takes the cooling temperature difference at higher temperatures as the boundary point. The spray pipe group damage signal is a signal that the corresponding spray pipe group 22 is damaged. Here, the signal can be output in the form of a flashing signal light. For example, a signal light that can display the status of the spray pipe group 22 is set at the position of the corresponding spray pipe group 22. When the green light is on, it indicates that the corresponding spray pipe group 22 is working normally, and when the red light is on, it indicates that the spray pipe group 22 is abnormal.
[0079] If it falls here, it means that the spray cooling effect here does not exist, and the spray pipe group 22 is damaged, so there is no spray duration here, and the spray duration needs to be subtracted from the acquisition time.
[0080] Step 305: directly outputting the spraying duration when the spraying temperature difference does not fall within the natural cooling range.
[0081] When the spray temperature difference does not fall within the natural cooling range, it means that the spray effect exists, so the spray duration can be directly output.
[0082] Reference Figure 7 , and also includes a method for controlling the cooling device to perform a cooling operation before maintenance after outputting a signal of damage to the spray pipe group, the method comprising: Step 400: Analyze the cooling spray pipe group numbers based on the cooling operation to form a current cooling spray number group.
[0083] The cooling spray pipe group number is the number of the spray pipe group 22 that needs to perform the cooling operation and is part of the cooling operation. The purpose of setting the number here is to determine which group of spray pipe groups 22. The current cooling spray number group is a collection of cooling spray pipe group numbers.
[0084] Step 401: define the cooling spray pipe group number that outputs the spray pipe group damage signal as the abnormal pipe group number.
[0085] Step 402: modify the current cooling spray number group based on the abnormal pipe group number to obtain a replacement cooling spray number group.
[0086] The replacement cooling spray number group is a number group of spray pipe groups 22 that can replace the current cooling spray number group to work. It should be noted here that the number of cooling spray pipe group numbers in the replacement cooling spray number group is consistent with the number of cooling spray pipe group numbers in the current cooling spray number group and does not include abnormal pipe group numbers. Therefore, the correction method here is to determine the starting number or the last number of the spray pipe groups 22 adjacent to each other on both sides according to the abnormal pipe group number, and then determine the number before and after according to the length of the current cooling spray number group. For example: the number of current cooling spray number groups is 8, and the abnormal pipe group number is 10, then the replacement cooling spray number group is 2-9 or 11-18. If the abnormal pipe group number is 5, then the replacement cooling spray number group is 6-13.
[0087] Step 403: When the replacement cooling spray number group exists, update the cooling operation based on the replacement cooling spray number group to obtain a replacement cooling operation.
[0088] The replacement cooling operation is a cooling operation performed by the replacement cooling spray number group. The updating method here is to calculate the transmission time between the current cooling spray number group and the replacement cooling spray number group, and then postpone or advance the transmission time of all operations. When the replacement cooling spray number group exists, it means that it can be found according to step 402, then the replacement cooling operation can be used for operation.
[0089] Step 404: After outputting the signal of the damage of the spray pipe group, the cooling device is controlled to perform a replacement cooling operation before maintenance.
[0090] Here, the cooling device is controlled to perform a replacement cooling operation, so that the replacement cooling spray number group works to achieve the work of the current cooling spray number group.
[0091] Reference Figure 8 , and also includes another method of controlling the cooling device to perform a cooling operation before maintenance after outputting a signal of damage to the spray pipe group, the method comprising: Step 500: Determine the abnormal location based on the temperature detection sensor number.
[0092] The abnormal position is the position where the temperature detection sensor number that outputs the signal of the damage of the sprinkler pipe group is located. The determination method can be a database search method, that is, the database stores the mapping relationship between the temperature detection sensor number and the abnormal position, and the coordinates of the position are obtained by the staff in this field while numbering the temperature detection sensor. When the system receives the corresponding temperature detection sensor number, it automatically searches for the corresponding abnormal position from the database for output.
[0093] Step 501: Determine the maximum spray length based on the abnormal position.
[0094] The maximum spray length is the maximum length of the steel material that can be sprayed. The method used here is the length from the starting position of the steel to the abnormal position. For example, if a temperature detection sensor is set every 1 meter and the temperature detection sensor number is 5, the maximum spray length is 5 meters.
[0095] Step 502: Determine the segmented steel specifications based on the maximum spray length and the steel specifications.
[0096] The segmented steel specifications are the specifications of each section of steel after segmentation according to the maximum spray length. The method of determination is to subtract a number of maximum spray lengths from the steel specifications. For example, if the length of the steel specification is 20 meters and the maximum spray length is 5 meters, then the segmented steel specifications of each section are 5 meters, and the specific specifications for each section are: 0-5 meters, 5-10 meters, 10-15 meters and 15-20 meters. If the length of the steel specification is 18 meters, then the last section is 3 meters, that is, the specific specifications for each section are: 0-5 meters, 5-10 meters, 10-15 meters and 15-18 meters.
[0097] Step 503: Generate a segmented cooling operation based on the current steel section temperature, the expected steel section temperature and the segmented steel section specifications.
[0098] The segmented cooling operation is the segmented cooling operation corresponding to the case where the whole steel is regarded as a steel formed by splicing multiple segmented steels. The current steel temperature here is the starting temperature of each segment. The generation method is introduced in step 103 and will not be repeated here.
[0099] Step 504: Control the cooling device to perform a staged cooling operation.
[0100] It should be noted that although the cooling operation is performed in sections, the corresponding steel sections are still whole steel sections and are not disassembled or sawn.
[0101] The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Any feature disclosed in this specification (including the abstract and drawings), unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.
Claims
1. An online cooling device for hot-rolled steel, characterized in that: include: A steel feeding module (1) is used to move steel sections, the steel feeding module (1) comprising a roller table (11), a conveying roller (12) and a motor (13), the conveying roller (12) being rotatably connected to the roller table (11), the conveying rollers (12) being in a plurality and arranged along the length direction of the roller table (11), and the driving shaft of the motor (13) being transmission-connected to the conveying roller (12); A spray module (2) is used for spraying the steel sections on the steel feeding module (1), the spray module (2) comprising a main water pipe (21) and a spray pipe group (22), the main water pipe (21) being arranged at one side of the steel feeding module (1), the spray pipe groups (22) being a plurality and arranged along the length direction of the main water pipe (21), one group of the spray pipe groups (22) being arranged between two adjacent conveying rollers (12) and located on the upper side of the conveying rollers (12), the spray pipe group (22) comprising a plurality of spray pipes (221) and a plurality of spray heads (222), the spray pipes (221) being connected to the main water pipe (21), the spray heads (222) being arranged at a side of the spray pipe (221) away from the main water pipe (21) and being connected to the spray pipe (221), and the spray heads (222) being arranged toward the steel sections on the steel feeding module (1).
2. The online cooling device for hot-rolled steel according to claim 1, characterized in that: The plurality of spray heads (222) of the same spray pipe group (22) are arranged in a spiral shape with the steel section on the steel feed module (1) as an axis.
3. The online cooling device for hot-rolled steel according to claim 1, characterized in that: The spray pipe (221) is provided with a manual throttle valve (223) and a pneumatic ball valve (224).
4. The online cooling device for hot-rolled steel according to claim 1, characterized in that: Also includes: The water inlet module (3) is used to supply water to the main water pipe (21), the water inlet module (3) comprising a self-priming pump (31) and a secondary water pipe (32), the secondary water pipe (32) being connected to the main water pipe (21), the self-priming pump (31) being arranged on the secondary water pipe (32) and being in communication with the secondary water pipe (32), and the secondary water pipe (32) being provided with a check valve (33).
5. An online cooling method for hot-rolled steel, applied to an online cooling device for hot-rolled steel as claimed in any one of claims 1 to 4, characterized in that: include: receiving input of expected steel section temperature and steel section specifications; Receive the signal that the steel section is ready to enter; When receiving the steel section ready to enter signal, obtain the current steel section temperature; Generate a cooling operation based on the current steel section temperature, the expected steel section temperature and the steel section specifications, wherein the cooling operation includes a conveyor roller rotation operation, a self-priming pump water pumping operation and a nozzle water spraying operation; The cooling device is controlled to perform a cooling operation.
6. The method for online cooling during hot rolling of steel sections according to claim 5, characterized in that: Also includes: Obtaining the final steel temperature after the cooling device performs the cooling operation; Calculate the actual cooling rate based on the current steel temperature, the end steel temperature and the expected steel temperature; When the actual cooling rate is less than the preset critical required cooling rate, a repeated cooling operation is generated based on the end steel temperature, the expected steel temperature and the steel specifications; Controlling the cooling device to perform repeated cooling operations and updating the end steel section temperature and the actual cooling rate until the actual cooling rate is greater than the critical required cooling rate; The cooling operation is updated based on the cooling operation and the repeated cooling operation when the actual cooling rate is greater than the critical required cooling rate.
7. The method for online cooling during hot rolling of steel sections according to claim 5, characterized in that: The method for updating the cooling operation based on the cooling operation and the repeated cooling operation includes: Disassembly based on the cooling operation to obtain the conveying roller conveying speed, spraying speed and spraying time; Disassembling based on repeated cooling operation to obtain repeated conveying roller conveying speed, repeated spraying speed and repeated spraying time; The conveying roller conveying speed is updated based on the conveying roller conveying speed, the repeated conveying roller conveying speed, the spraying speed, the repeated spraying speed, the spraying time length, and the repeated spraying time length.
8. The method for online cooling during hot rolling of steel sections according to claim 5, characterized in that: The invention also includes a method for checking the spraying duration, which method includes: Obtain the current cooling operation point, the current steel section temperature and the temperature detection sensor number of the current steel section temperature; Determine the adjacent temperature detection sensor number based on the current cooling operation point and the temperature detection sensor number, and determine the acquisition time based on the conveying speed of the conveying roller and the preset segment length; After the acquisition time has passed, the adjacent steel section temperatures corresponding to the adjacent temperature detection sensor numbers are acquired; The spraying temperature difference is calculated based on the temperature of the adjacent steel section and the temperature of the current steel section; When the spray temperature difference falls within the preset natural cooling range, the spray duration is updated based on the acquisition time, and a preset spray pipe group damage signal is output; When the spray temperature difference does not fall within the natural cooling range, the spray duration is directly output.
9. The method for online cooling during hot rolling of steel sections according to claim 8, characterized in that: The method also includes a method for controlling the cooling device to perform a cooling operation before repair after outputting a signal of damage to the spray pipe group, the method comprising: Analyzing the cooling spray pipe group number based on the cooling operation to form a current cooling spray number group; The cooling spray pipe group number that outputs the spray pipe group damage signal is defined as the abnormal pipe group number; Based on the abnormal pipe group number, the current cooling spray number group is modified to obtain a replacement cooling spray number group, wherein the number of cooling spray pipe group numbers in the replacement cooling spray number group is consistent with the number of cooling spray pipe group numbers in the current cooling spray number group and does not include the abnormal pipe group number; When the replacement cooling spray number group exists, updating the cooling operation based on the replacement cooling spray number group to obtain the replacement cooling operation; After outputting the signal of damage to the sprinkler pipe group, the cooling device is controlled to perform a replacement cooling operation before maintenance.
10. The method for online cooling during hot rolling of steel sections according to claim 8, characterized in that: Also included is another method for controlling the cooling device to perform a cooling operation before repair after outputting a signal of damage to the spray pipe group, the method comprising: Determine the abnormal location based on the temperature detection sensor number; Determine the maximum spray length based on the abnormal location; Determine the segmented steel specifications based on the maximum spray length and steel specifications; Generate segmented cooling operation based on current steel temperature, expected steel temperature and segmented steel specifications; The cooling device is controlled to perform a staged cooling operation.
Citation Information
Patent Citations
System and process for cooling after H-shaped steel is hot-rolled
CN102069097A
Ultrafast cooling control method for H-shaped steel
CN102363161A
Cooling system for rolled stripe continuously-casting production line and control method thereof
CN102553950A
After-rolling closed-loop controlled-cooling system for hot-rolled rods and wires and control method
CN110479776A
Method of and device for cooling back surface of hot-rolled steel strip
JP2009279651A