Parallel working platform for adjusting poses of large parts
By designing a parallel work platform and taking advantage of the high precision and large working space of the parallel mechanism, the problem of insufficient posture adjustment accuracy and flexibility in the processing of large parts is solved, and efficient and safe processing results are achieved.
Patent Information
- Application Number
- CN202411073985.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-15
AI Technical Summary
Existing posture adjustment equipment used for processing large parts has low processing accuracy under special posture conditions, cannot take into account multiple processing methods, and has a small working space, making it difficult to meet the rapid adjustment needs of large parts.
Design a parallel working platform, including four parallel mechanisms arranged in parallel between the support platform and the base support plate. Each parallel mechanism consists of a fixed platform, a moving platform, a first branch, a second branch and a third branch. Through the moving pair , rotating pairs, connecting rods, ball hinges and Hooke hinges to achieve posture adjustment with high precision and large working space.
It achieves high-precision posture adjustment of large parts, with strong flexibility and adaptability, improves processing efficiency and surface quality, reduces equipment wear and safety risks, and improves the consistency and reliability of parts.
Smart Images

Figure CN118769221A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a processing device, in particular to a parallel working platform used for adjusting the position and posture of large parts. Background Art
[0002] Large parts are widely used in aircraft, military equipment, energy industry, etc. These fields usually require high-precision and high-efficiency processing technology to meet their specific industrial needs. Large parts are usually large in size and weight and complex in structure. The processing includes many different processes, such as milling, drilling, turning and threading, etc. The parts need to be adjusted in position and posture to ensure that the parts are in the correct position and posture during the processing. In view of the above characteristics, the existing equipment for parts processing has low processing accuracy under special posture conditions and cannot take into account the various processing methods of large parts.
[0003] Compared with traditional serial mechanisms, parallel mechanisms have the characteristics of superior dynamic performance, high motion accuracy, compact structure, and strong bearing capacity, and have been widely used in actual production. Based on the above advantages, relevant researchers have designed a variety of parallel mechanisms for posture adjustment, but most of them have problems such as small working space and narrow rotation angle, which makes it difficult to meet the rapid adjustment of multiple degrees of freedom during part processing. Therefore, in order to meet the needs of improving the accuracy and flexibility of posture adjustment of large parts during processing, it is very necessary to propose a parallel working platform for posture adjustment of large parts. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies in the above-mentioned background technology and to provide a parallel working platform for adjusting the posture of large parts, which should have the characteristics of high processing accuracy, large working space and simple structure.
[0005] The technical solution of the present invention is:
[0006] A parallel working platform for adjusting the posture of large parts, comprising a support platform and a base support plate, characterized in that four parallel mechanisms are arranged in parallel between the support platform and the base support plate;
[0007] The parallel mechanism comprises a fixed platform, a moving platform, and two first branches and a second branch arranged in parallel between the moving platform and the fixed platform; the fixed platform is arranged on the top surface of the base support plate, and the moving platform is connected and arranged on the bottom surface of the support platform;
[0008] The first branch includes a first moving pair, a first rotating pair, a first connecting rod and a first Hooke's joint which are sequentially connected between the fixed platform and the moving platform;
[0009] The second branch includes a second moving pair, a first ball joint, a second connecting rod and a second rotating pair which are sequentially connected between the fixed platform and the movable platform;
[0010] The first moving pairs in the two first branches are coaxially arranged and perpendicular to the axis of the second moving pair in the second branch;
[0011] The first rotating shaft of the first Hooke's joint is connected to the moving platform, and the second rotating shaft of the first Hooke's joint is connected to the first connecting rod;
[0012] In the two first branches, the first rotation axes of the two first Hooke's joints are coaxially arranged, and the two first rotation secondary axes are parallel to each other.
[0013] The first moving pair comprises a first moving pair guide rail and a first moving pair slider which is slidably matched with the first moving pair guide rail, and the first moving pair slider is connected to the first rotating pair;
[0014] The second moving pair comprises a second moving pair guide rail and a second moving pair slider slidably matched with the second moving pair guide rail, and the second moving pair slider is connected to the first ball joint;
[0015] The ball head of the first ball joint is arranged on the second connecting rod, and the first ball joint ball shell matched with the ball head of the first ball joint is arranged on the second movable auxiliary sliding block.
[0016] The two first movable secondary guide rails and one second movable secondary guide rail are both horizontally fixed on the top surface of the fixed platform; the two first movable secondary guide rails and one second movable secondary guide rail do not contact each other.
[0017] The four moving platforms of the four parallel mechanisms are arranged on the bottom surface of the support platform, the four fixed platforms of the four parallel mechanisms are arranged on the top surface of the bottom support plate, and the four parallel mechanisms are arranged symmetrically about the normal line of the bottom surface of the support platform.
[0018] A plurality of docking pins are arranged on the top surface of the base support plate, and the top surfaces of all the docking pins are in the same plane and connected to the bottom surface of the fixed platform.
[0019] The parallel mechanism also includes a third branch;
[0020] The third branch includes a third moving pair, a second ball joint, a third connecting rod and a third ball joint which are sequentially connected between the fixed platform and the moving platform; the ball shell of the third ball joint is arranged on the moving platform, and the ball head of the third ball joint is connected to the third connecting rod.
[0021] The third movable pair comprises a third movable pair guide rail and a third movable pair slider slidably matched with the third movable pair guide rail, and the third movable pair slider is connected to the second ball joint;
[0022] The ball head of the second ball joint and the ball head of the third ball joint are arranged at two ends of the third connecting rod, and the ball shell of the second ball joint is arranged on the third movable auxiliary sliding block.
[0023] The third movable secondary guide rail is horizontally fixed on the top surface of the fixed platform and is coaxially arranged with the second movable secondary guide rail; the two first movable secondary guide rails and the second movable secondary guide rail and the third movable secondary guide rail are arranged in a cross shape and do not contact each other.
[0024] The first moving pair and the second moving pair are driving pairs; the third moving pair is a driving pair.
[0025] The beneficial effects of the present invention are:
[0026] The present invention can flexibly change the posture of parts during the processing, and has significant advantages such as strong reconfigurability, good adaptability, and a large working space range. It helps to optimize the processing path of processing tools, reduce idle strokes, improve processing efficiency and surface quality, and achieve high-precision processing of large parts under different processing requirements. At the same time, it prevents the processing equipment from being subjected to unnecessary loads or stresses due to improper postures, causing equipment wear or damage, and reduces safety risks during operation. The parallel work platform selected by the present invention for adjusting the posture of large parts has the advantages of high processing accuracy, large working space, simple structure, and strong bearing capacity, which is conducive to improving the consistency and reliability of parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the three-dimensional structure of Example 1 of the present invention.
[0028] Figure 2 It is a schematic diagram of the three-dimensional structure of the parallel mechanism in Example 1.
[0029] Figure 3 for Figure 2 Schematic diagram of the three-dimensional structure of the three branches in the parallel mechanism shown.
[0030] Figure 4 for Figure 2 A schematic diagram of the three-dimensional structure of the first branch in the parallel mechanism shown.
[0031] Figure 5 for Figure 2 Schematic diagram of the three-dimensional structure of the second branch in the parallel mechanism shown.
[0032] Figure 6 It is a schematic diagram of the three-dimensional structure of Example 2 of the present invention.
[0033] Figure 7 It is a schematic diagram of the three-dimensional structure of the parallel mechanism in Example 2.
[0034] Figure 8 for Figure 7 Schematic diagram of the three-dimensional structure of the four branches in the parallel mechanism shown.
[0035] Fig. 9 for Figure 7 Schematic diagram of the three-dimensional structure of the third branch in the parallel mechanism shown.
[0036] Reference numerals:
[0037]
[0038] DETAILED DESCRIPTION
[0039] The present invention is further described below with reference to the embodiments shown in the accompanying drawings.
[0040] Example 1
[0041] Figure 1 The parallel working platform shown in the figure for adjusting the posture of large parts includes a support platform 5, a base support plate 6 and four parallel mechanisms 7 arranged in parallel between the support platform and the base support plate; each parallel mechanism includes a moving platform 4, a fixed platform 3 and two first branches 1 and a second branch 2 arranged in parallel between the moving platform 4 and the fixed platform 3; the bottom surface of the fixed platform 3 is arranged on the top surface of the base support plate 6, and the bottom surface of the support platform 5 is arranged on the top surface of the moving platform 4 (it can be seen from the figure: a columnar protrusion arranged on the top surface of each moving platform 4 can be tightly matched with the opening on the support platform 5, thereby realizing a fixed connection between the moving platform and the support platform).
[0042] The first branch 1 includes a first moving pair 11, a first rotating pair 12, a first connecting rod 13 and a first Hooke's joint 14 which are sequentially connected between the fixed platform 3 and the moving platform 4; the first rotating shaft of the first Hooke's joint 14 is connected to the moving platform 4, one end of the first connecting rod 13 is connected to the second rotating shaft of the first Hooke's joint 14, and the other end of the first connecting rod 13 is connected to the first moving pair 11 through the first rotating pair 12.
[0043] The second branch 1 includes a second movable pair 21, a first ball joint 22, a second connecting rod 23 and a second rotating pair 24 which are sequentially connected between the fixed platform 3 and the movable platform 4. One end of the second connecting rod 23 is connected to the second rotating pair 24, and the other end of the second connecting rod 23 is connected to the second movable pair 21 through the first ball joint 22.
[0044] The first moving pair 11 includes a first moving pair guide rail 15 and a first moving pair slider 16 . The first moving pair slider 16 is connected to the first rotating pair 12 , and the first moving pair slider 16 is slidably matched with the first moving pair guide rail 15 .
[0045] The second moving pair 21 includes a second moving pair guide rail 25 and a second moving pair slider 26 ; the second moving pair slider 26 is connected to the first ball joint 22 , and the second moving pair slider 26 is slidably matched with the second moving pair guide rail 25 .
[0046] The second rotation shaft 18 of the first Hooke's joint 14 is connected to the first connecting rod 13 , and the first rotation shaft of the first Hooke's joint 14 is connected to the moving platform 4 .
[0047] The ball head of the first ball joint 22 is arranged on the second connecting rod 23 , and the ball shell of the first ball joint 22 matched with the ball head of the first ball joint is connected to the second movable auxiliary slider 26 .
[0048] Two first movable auxiliary guide rails 15 and one second movable auxiliary guide rail 14 are both horizontally fixed on the fixed platform 3 .
[0049] The two first branches 1 are symmetrically arranged on one second branch 2, and the two first movable secondary guide rails 15 are coaxially arranged, and the second movable secondary guide rail 25 is perpendicular to the axis of the first movable secondary guide rail 15 and does not contact each other.
[0050] The four parallel mechanisms 7 are arranged symmetrically with respect to the normal line of the bottom surface of the supporting platform 5 .
[0051] A plurality of docking pins 61 are arranged on the top surface of the base support plate 6 , and the top surfaces of all the docking pins are in the same plane; the bottom surface of the fixed platform 3 is arranged on the top surfaces of several docking pins 61 at the same time.
[0052] In this embodiment, the first moving pair 11 and the second moving pair 21 are both driving pairs.
[0053] Example 2
[0054] The difference between this embodiment and embodiment 1 is that a third branch 8 is added to the parallel mechanism 7 of this embodiment, and the rest are the same.
[0055] The third branch 8 includes a third movable pair 81, a second ball joint 82, a third connecting rod 83 and a third ball joint 84 which are sequentially connected between the fixed platform 3 and the movable platform 4. The ball shell of the third ball joint 84 is arranged on the movable platform 4. One end of the third connecting rod 83 is connected to the ball head of the third ball joint 84, and the other end of the third connecting rod 83 is connected to the third movable pair 81 through the second ball joint 82.
[0056] The third movable pair 81 includes a third movable pair guide rail 85 and a third movable pair slider 86 slidably matched with the third movable pair guide rail. The third movable pair slider 86 is connected to the second ball joint 82 .
[0057] The ball head of the second ball joint 82 and the ball head of the third ball joint 84 are arranged at two ends of the third connecting rod 83, and the ball shell of the second ball joint 82 is arranged on the third movable auxiliary slider.
[0058] The third movable auxiliary guide rail 85 is horizontally fixed to the top surface of the fixed platform 3. The third movable auxiliary guide rail 85 is coaxially arranged with the second movable auxiliary guide rail 25. The axes of the two first movable auxiliary guide rails 15, the axes of the second movable auxiliary guide rail 25 and the axis of the third movable auxiliary guide rail 85 are arranged in a cross shape and do not contact each other.
[0059] In this embodiment, the third moving pair 81 is also a driving pair.
[0060] In view of the fact that posture adjustment during the processing of large parts is a key link to ensure processing quality, improve production efficiency, ensure operational safety and reduce costs. The parallel working platform provided by the present invention can realize flexible and high-precision processing of large parts at multiple angles. By cooperating with the docking pins on the fixed platform and the base support plate, the parallel mechanism can be moved over a large range on the base support plate. When the parallel working platform starts to perform the processing task, the parts to be processed are fixed on the support platform. By adjusting the movement of the parallel working platform, processing within the optimal stiffness range can be achieved to meet the high standards of industrial applications.
[0061] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essence of the present invention. In the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other arbitrarily.
Claims
1. A parallel working platform for adjusting the posture of large parts, comprising a supporting platform (5) and a base supporting plate (6), Features: Four parallel mechanisms (7) are arranged in parallel between the support platform (5) and the base support plate (6); The parallel mechanism (7) comprises a fixed platform (3), a movable platform (4), and two first branches (1) and a second branch (2) arranged in parallel between the movable platform and the fixed platform; the fixed platform (3) is arranged on the top surface of the base support plate (6), and the movable platform (4) is connected and arranged on the bottom surface of the support platform (5); The first branch (1) comprises a first moving pair (11), a first rotating pair (12), a first connecting rod (13) and a first Hooke's joint (14) which are sequentially connected between the fixed platform (3) and the moving platform (4); The second branch (2) comprises a second moving pair (21), a first ball joint (22), a second connecting rod (23) and a second rotating pair (24) which are sequentially connected between the fixed platform (3) and the moving platform (4); The first moving pairs (11) in the two first branches (1) are coaxially arranged and perpendicular to the axis of the second moving pair (21) in the second branch.
2. The parallel working platform for adjusting the posture of large parts according to claim 1, Features: The first rotating shaft of the first Hooke's joint (14) is connected to the moving platform, and the second rotating shaft of the first Hooke's joint (14) is connected to the first connecting rod (13); in the two first branches, the first rotating shafts of the two first Hooke's joints (14) are coaxially arranged, and the axes of the two first rotating pairs (12) are parallel to each other.
3. The parallel working platform for adjusting the posture of large parts according to claim 2, Features: The first moving pair (11) comprises a first moving pair guide rail (15) and a first moving pair slider (16) slidably matched with the first moving pair guide rail, and the first moving pair slider (16) is connected to the first rotating pair (12); The second movable pair (21) comprises a second movable pair guide rail (25) and a second movable pair slider (26) slidably matched with the second movable pair guide rail, and the second movable pair slider (26) is connected to the first ball joint (22); The ball head of the first ball joint (22) is arranged on the second connecting rod (23), and the first ball joint ball shell matched with the ball head of the first ball joint is arranged on the second movable auxiliary sliding block (26).
4. The parallel working platform for adjusting the posture of large parts according to claim 3, It is characterized in that The two first movable auxiliary guide rails (15) and the one second movable auxiliary guide rail (14) are both horizontally fixed on the top surface of the fixed platform (3); The two first movable auxiliary guide rails (15) and one second movable auxiliary guide rail (25) do not contact each other.
5. The parallel working platform for adjusting the posture of large parts according to claim 4, Features: The four moving platforms (4) in the four parallel mechanisms (7) are arranged on the bottom surface of the support platform (5), the four fixed platforms (3) in the four parallel mechanisms (7) are arranged on the top surface of the bottom support plate (6), and the four parallel mechanisms (7) are arranged symmetrically with respect to the normal line of the bottom surface of the support platform (5).
6. The parallel working platform for adjusting the posture of large parts according to claim 5, Features: A plurality of docking pins (61) are arranged on the top surface of the base support plate (6), and the top surfaces of all the docking pins are located in the same plane and are connected to the bottom surface of the fixed platform 3.
7. The parallel working platform for adjusting the posture of large parts according to claim 6, Features: The parallel mechanism (7) further includes a third branch (8); The third branch (8) comprises a third movable pair (81), a second ball joint (82), a third connecting rod (83) and a third ball joint (84) which are sequentially connected between the fixed platform (3) and the movable platform (4); the ball shell of the third ball joint (84) is arranged on the movable platform (4), and the ball head of the third ball joint (84) is connected to the third connecting rod (83).
8. The parallel working platform for adjusting the posture of large parts according to claim 7, Features: The third movable pair (81) comprises a third movable pair guide rail (85) and a third movable pair slider (86) slidably matched with the third movable pair guide rail, and the third movable pair slider (86) is connected to the second ball joint (82); The ball head of the second ball joint (82) and the ball head of the third ball joint (84) are arranged at two ends of the third connecting rod (83), and the ball shell of the second ball joint (82) is arranged on the third movable auxiliary slider (86).
9. The parallel working platform for adjusting the posture of large parts according to claim 8, Features: The third movable secondary guide rail (85) is horizontally fixed to the top surface of the fixed platform (3) and is coaxially arranged with the second movable secondary guide rail (25); the two first movable secondary guide rails (15) and the second movable secondary guide rail (25) and the third movable secondary guide rail (85) are arranged in a cross shape and do not contact each other.
10. The parallel working platform for adjusting the posture of large parts according to claim 9, Features: The first movable pair (11) and the second movable pair (21) are driving pairs; the third movable pair (81) is a driving pair.
Citation Information
Patent Citations
Aircraft component attitude adjusting assembly system based on parallel mechanism with six degrees of freedom and debugging method
CN101907893A
Six-degree-of-freedom location posture adjusting device for automatic assembly of large parts
CN106041799A
Intelligent self-stabilizing docking platform for unmanned plane
CN106184800A
Three-degree-of-freedom parallel mechanism with diversified operation modes
CN108972509A
Parallel posture-adjusting type all-terrain rotary drilling machine
CN109882071A
Cited By
Parallel type six-degree-of-freedom moving in-place milling and grinding robot
CN119795139A
