A magnesium thermal reduction titanium sponge production process and equipment

By using a rounded bench-shaped reactor and an inert gas circulation heat recovery device in the magnesium thermal reduction method, the problems of uneven temperature and low heat utilization efficiency in the magnesium thermal reduction method are solved, and the production efficiency and product quality of titanium sponge are improved. Effective recovery and utilization of heat is achieved.

CN118773455BActive Publication Date: 2024-11-29NORTH CHINA UNIVERSITY OF SCIENCE AND TECHNOLOGY +1

Patent Information

Application Number
CN202411274172.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-29
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

The production cost of titanium sponge is low in efficiency and unstable in the quality of the product. It is mainly due to the uneven temperature in the reactor and the difficulty in fully utilized heat, which leads to the sintering of the sponge into lumps, affecting the purity and consistency of the product.

Method used

Design a magnesium thermal reduction titanium sponge production equipment, adopts rounded bench-shaped reactor components, equipped with temperature control components and inert gas circulation heat recovery and feeding device, and recycle heat after mixing inert gas with titanium tetrachloride, and uniformly control the reaction temperature , improve reaction efficiency and product quality.

Benefits of technology

The temperature in the reactor is uniformly controlled, the production efficiency and product quality of titanium sponge are improved, the heat released by chemical reactions is fully utilized, the energy consumption loss is reduced, and the purity and consistency of the product is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118773455B_ABST
    Figure CN118773455B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of titanium metallurgical equipment and technology, and in particular, relates to a magnesium thermal reduction titanium sponge production process and equipment. A magnesium thermal reduction titanium sponge production equipment includes: a reactor assembly; a temperature control assembly, which is used to control and monitor the temperature in the reactor assembly; an inert gas circulation heat recovery feeding device, and the discharge end of the inert gas circulation heat recovery feeding device is located at the bottom of the reactor assembly; a support mesh plate, which is connected to the discharge end of the inert gas circulation heat recovery feeding device; a magnesium chloride discharge port, which is connected and arranged on one side of the bottom of the reactor assembly; a condensing furnace connecting pipe, and the air inlet end of the condensing furnace connecting pipe is connected and arranged on the top of the reactor assembly, one of the air outlet ends is connected to the top of the inert gas circulation heat recovery feeding device, and the other air outlet end is connected to the condensing furnace. The present invention also includes a magnesium thermal reduction titanium sponge production process. The present invention can improve the uniformity of the temperature inside the reactor during the titanium sponge production process and improve the reaction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of titanium metallurgical equipment and technology, and in particular relates to a production process and equipment for magnesium thermal reduction of titanium sponge. Background Art

[0002] With the growing global demand for high-performance metal materials, especially the rapid development of aerospace, new energy, biomedicine and other fields, the production efficiency and product quality of sponge titanium, as an important raw material for titanium production, have become the focus of industry attention. At present, the preparation processes of titanium at home and abroad mainly include metal thermal reduction and molten salt electrolysis, among which magnesium thermal reduction is the only process method that can achieve industrial production of titanium metal.

[0003] The method of preparing titanium sponge by magnesium thermal reduction has been developed for more than 80 years, but it still faces some problems, such as high production cost, low efficiency and little improvement in product quality. Specifically, the reduction of titanium tetrachloride by magnesium metal is a strong exothermic reaction. At present, the top feeding method is adopted to add titanium tetrachloride to the surface of liquid magnesium metal. The heat release of the reaction is mainly concentrated on the surface of magnesium liquid and the gas phase area above the liquid surface. In addition, due to the limitation of the thermal conductivity of the reactor material and the lack of a stirring device inside the reactor, it is difficult to achieve completely uniform heat transfer inside the reactor. Therefore, the uneven temperature in the reactor causes the heat generated by the reaction to be not fully utilized, and the excessively high local temperature easily causes the titanium sponge to sinter into a lump, affecting the progress of the reaction and the stability of the product quality. When titanium sponge is formed, it adheres to the reactor wall, and the outer layer of titanium sponge is easily contaminated by the reactor wall. The titanium sponges in the reactor are mutually bonded and under the buoyancy of the solution, a part of the titanium sponge accumulates and grows along the gas-liquid interface in the reactor, and finally collapses and falls under the action of gravity. The iron of the reactor wall enters the central area of ​​the reactor, resulting in product purity and consistency that are difficult to meet the requirements of titanium production. Therefore, a magnesium thermal reduction titanium sponge production process and equipment are urgently needed to solve the problem. Summary of the invention

[0004] The purpose of the present invention is to provide a magnesium thermal reduction process and equipment for producing titanium sponge. Based on the defects existing in the current production process, the present invention is committed to designing a new process and equipment for producing titanium sponge by magnesium thermal reduction, so as to realize the control of the chemical reaction rate in the reactor, make the temperature field in the reactor more uniform, improve the production efficiency of titanium sponge in the reduction reactor and the quality of titanium sponge products, and fully recycle and utilize the heat released by the chemical reaction in the reactor.

[0005] To achieve the above object, the present invention provides the following solutions:

[0006] A magnesium thermal reduction titanium sponge production device, comprising:

[0007] A reactor assembly, wherein the reactor assembly is an inverted truncated cone structure;

[0008] A temperature control component, installed on the inner wall of the reactor component, for controlling and monitoring the temperature inside the reactor component;

[0009] An inert gas circulation heat recovery feeding device is arranged on one side of the reactor assembly, and a discharge end of the inert gas circulation heat recovery feeding device is located at the bottom of the reactor assembly;

[0010] A supporting mesh plate, the supporting mesh plate being axially connected to the inner side of the bottom of the reactor assembly, and the supporting mesh plate being connected to the discharge end of the inert gas circulation heat recovery feeding device;

[0011] A magnesium chloride discharge port is arranged on one side of the bottom of the reactor assembly and is located below the supporting mesh plate;

[0012] A condensing furnace connecting pipe, wherein the air inlet end of the condensing furnace connecting pipe is connected to the top of the reactor assembly, one of the air outlet ends of the condensing furnace connecting pipe is connected to the top of the inert gas circulation heat recovery feeding device, and the other air outlet end of the condensing furnace connecting pipe is connected to the condensing furnace.

[0013] Preferably, the reactor assembly comprises a reactor body, a reactor cover is sealedly mounted on the top of the reactor body, and a metal magnesium feeding port is provided on the reactor cover;

[0014] The reactor body is an inverted truncated cone structure;

[0015] The reactor body comprises a gas phase zone, a titanium sponge generation zone and a liquid phase zone from top to bottom.

[0016] Preferably, the angle between the inclined surface of the reactor body and the vertical direction is 5-15°.

[0017] Preferably, the temperature control assembly comprises an electric heating device, a water cooling tube and a temperature measuring thermocouple arranged on the inner wall of the reactor body, the electric heating device and the water cooling tube are both coiled and arranged on the inner wall of the reactor body, and the electric heating device and the water cooling tube are located in the titanium sponge production area;

[0018] The fixed end of the temperature measuring thermocouple is fixedly connected to the inner wall of the reactor body, the detection end of the temperature measuring thermocouple is arranged in the reactor body, and a plurality of temperature measuring thermocouples are provided and evenly arranged in the gas phase zone, the titanium sponge generation zone and the liquid phase zone.

[0019] Preferably, the inert gas circulation heat recovery feeding device includes a titanium tetrachloride and inert gas mixing device, one end of the titanium tetrachloride and inert gas mixing device is connected to the air inlet end of the pumping part, the air outlet end of the pumping part is connected to the air inlet end of a plurality of blowing holes, the plurality of blowing holes are arranged on the supporting mesh plate, the air outlet ends of the blowing holes are located in the liquid phase region, a space is left between the bottom of the supporting mesh plate and the bottom of the reactor body, the space is filled with magnesium chloride and is connected to the magnesium chloride discharge port; the top of the titanium tetrachloride and inert gas mixing device is connected to a titanium tetrachloride feeding port, the other end of the titanium tetrachloride and inert gas mixing device is connected to the bottom of the heat recovery part, and the top of the heat recovery part is connected to one of the air outlet ends of the condensing furnace connecting pipe.

[0020] Preferably, the air pumping part comprises a pressure pump, the air outlet end of the pressure pump is connected to the air inlet ends of the plurality of air holes, and the air inlet end of the pressure pump is connected to one end of the titanium tetrachloride and inert gas mixing device.

[0021] Preferably, the heat recovery part includes a gas circulation and waste heat recovery device, the top end of the gas circulation and waste heat recovery device is connected to one of the gas outlet ends of the condensing furnace connecting pipe, and the bottom end of the gas circulation and waste heat recovery device is connected to the other end of the titanium tetrachloride and inert gas mixing device.

[0022] Preferably, the blowing hole is a circular hole with a diameter of 0.1-5 mm or a slit with a width of 0.1-2 mm and a length of 5-50 mm.

[0023] Preferably, the number of the blowing holes is 1-30 / m 2 .

[0024] A magnesium thermal reduction titanium sponge production process, using the above-mentioned magnesium thermal reduction titanium sponge production equipment, comprises the following steps:

[0025] Step 1, adding magnesium chloride solution into the reactor assembly, adding a metal magnesium ingot onto the magnesium chloride solution, and after the magnesium ingot is melted, making the lower end of the magnesium liquid be located 200-400 mm above the supporting mesh plate;

[0026] Step 2, heating the reactor assembly through the temperature control assembly, closing the connection between the condensing furnace connecting pipe and the condensing furnace, circulating the inert gas in the reactor assembly through the inert gas circulation heat recovery feeding device, introducing liquid titanium tetrachloride into the reactor assembly through the inert gas circulation heat recovery feeding device, and the liquid titanium tetrachloride is mixed with the inert gas and enters the reactor assembly to react with the magnesium liquid to generate sponge titanium and magnesium chloride, and the excess magnesium chloride is discharged from the magnesium chloride discharge port;

[0027] Step 3. During the entire reaction process, the magnesium chloride solution is intermittently discharged, and the height of the magnesium liquid is always 200-400 mm above the supporting mesh plate. When the amount of sponge titanium generated reaches the upper limit of the reactor assembly, the addition of metallic magnesium is stopped. At this time, the magnesium chloride solution is completely discharged, and the connection between the condensing furnace connecting pipe and the inert gas circulation heat recovery feeding device is closed. The unreacted magnesium and residual magnesium chloride evaporate, enter the condensing furnace through the condensing furnace connecting pipe, and are condensed into a solid state in the condensing furnace, thereby achieving separation from the sponge titanium and obtaining a relatively pure sponge titanium.

[0028] Compared with the prior art, the present invention has the following advantages and technical effects:

[0029] When in use, magnesium chloride is added into the reactor component, and a metal magnesium ingot is added onto the magnesium chloride. After heating by the temperature control component, a magnesium chloride solution and a magnesium liquid are formed. The remaining amount of magnesium chloride needs to be controlled to ensure that the lower end of the magnesium liquid is located 200-400 mm above the supporting mesh plate; the connection between the condensing furnace connecting pipe and the condensing furnace is closed, and the inert gas is circulated in the reactor component through the inert gas circulation heat recovery feeding device, and liquid titanium tetrachloride is introduced into the reactor component through the inert gas circulation heat recovery feeding device. After the liquid titanium tetrachloride is mixed with the inert gas, it enters the reactor component and reacts with the magnesium liquid to form sponge titanium and magnesium chloride. The excess magnesium chloride is discharged by The magnesium chloride is discharged intermittently from the discharge port; the unreacted titanium tetrachloride and the inert gas mixture return to the inert gas circulation heat recovery feeding device to recover the heat, and titanium tetrachloride is supplemented and introduced into the reactor assembly again for reaction. When the amount of sponge titanium generated reaches the upper limit of the reactor assembly, the addition of metallic magnesium is stopped. After the magnesium chloride solution is completely discharged, the connection between the condensing furnace connecting pipe and the inert gas circulation heat recovery feeding device is closed, and the unreacted magnesium and residual magnesium chloride evaporate, enter the condensing furnace through the condensing furnace connecting pipe, and are condensed into a solid state in the condensing furnace, thereby realizing separation from the sponge titanium and obtaining a relatively pure sponge titanium.

[0030] The present invention sets the reactor assembly into an inverted truncated cone structure, and the inclined surface provides an upward support for the generated titanium, while increasing the upper space of the reactor assembly to avoid the collapse phenomenon in the production process of sponge titanium; the titanium tetrachloride solution is mixed with an inert gas and then introduced into the reactor assembly from the bottom, thereby increasing the contact area between titanium tetrachloride and magnesium liquid and improving the reaction efficiency. At the same time, the bubbles stir the solution inside the reactor to even out the temperature inside the reactor; adding magnesium liquid during the reaction is conducive to absorbing excess heat, and the inert gas circulation heat recovery feeding device can also recover the heat in the titanium tetrachloride raw material and titanium tetrachloride and the inert gas, thereby reducing energy consumption loss. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative labor:

[0032] Figure 1 It is a schematic diagram of the structure of the present invention;

[0033] Figure 2 This is a schematic diagram of the supporting mesh structure of the present invention;

[0034] Among them, 1. Reactor top cover; 2. Metal magnesium feeding port; 3. Reactor body; 4. Temperature measuring thermocouple; 5. Electric heating device; 6. Water cooling pipe; 7. Magnesium chloride discharge port; 8. Support mesh plate; 9. Blowing hole; 10. Pressure pump; 11. Titanium tetrachloride and inert gas mixing device; 12. Titanium tetrachloride feeding port; 13. Gas circulation and waste heat recovery device; 14. Condensation furnace connecting pipe. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0037] Reference Figure 1-2 The present invention discloses a magnesium thermal reduction titanium sponge production device, comprising:

[0038] The reactor assembly is an inverted truncated cone structure;

[0039] A temperature control component, installed on the inner wall of the reactor component, used to control and monitor the temperature inside the reactor component;

[0040] An inert gas circulation heat recovery feeding device is arranged on one side of the reactor assembly, and a discharge end of the inert gas circulation heat recovery feeding device is located at the bottom of the reactor assembly;

[0041] A support mesh plate 8, the support mesh plate 8 is axially connected to the inner side of the bottom of the reactor assembly, and the support mesh plate 8 is connected to the discharge end of the inert gas circulation heat recovery feeding device;

[0042] A magnesium chloride discharge port 7 is connected and arranged at one side of the bottom of the reactor assembly and is located below the supporting mesh plate 8;

[0043] The condensing furnace connecting pipe 14 has an air inlet end connected to the top of the reactor assembly, one of the air outlet ends of the condensing furnace connecting pipe 14 is connected to the top of the inert gas circulation heat recovery feeding device, and the other air outlet end of the condensing furnace connecting pipe 14 is connected to the condensing furnace.

[0044] When in use, magnesium chloride is added into the reactor assembly, and a metal magnesium ingot is added onto the magnesium chloride. After heating by the temperature control assembly, a magnesium chloride solution and a magnesium liquid are formed. The remaining amount of magnesium chloride needs to be controlled to ensure that the lower end of the magnesium liquid is located 200-400 mm above the supporting mesh plate 8; the connection between the condensing furnace connecting pipe 14 and the condensing furnace is closed, and the inert gas is circulated in the reactor assembly through the inert gas circulation heat recovery feeding device, and liquid titanium tetrachloride is introduced into the reactor assembly through the inert gas circulation heat recovery feeding device. After the liquid titanium tetrachloride is mixed with the inert gas, it enters the reactor assembly and reacts with the magnesium liquid to generate sponge titanium and magnesium chloride, and the excess chloride Magnesium is intermittently discharged from the magnesium chloride discharge port; the unreacted titanium tetrachloride and inert gas mixture return to the inert gas circulation heat recovery feeding device to recover the heat, and titanium tetrachloride is supplemented and introduced into the reactor assembly again for reaction. When the amount of sponge titanium generated reaches the upper limit of the reactor assembly, the addition of metallic magnesium is stopped, and after the magnesium chloride solution is completely discharged, the connection between the condensing furnace connecting pipe and the inert gas circulation heat recovery feeding device is closed, and the unreacted magnesium and residual magnesium chloride evaporate, enter the condensing furnace through the condensing furnace connecting pipe, and are condensed into a solid state in the condensing furnace, thereby realizing separation from the sponge titanium and obtaining a relatively pure sponge titanium.

[0045] The present invention sets the reactor assembly into an inverted truncated cone structure, and the inclined surface provides an upward support for the generated titanium, while increasing the upper space of the reactor assembly to avoid the collapse phenomenon in the production process of sponge titanium; the titanium tetrachloride solution is mixed with an inert gas and then introduced into the reactor assembly from the bottom, thereby increasing the contact area between titanium tetrachloride and magnesium liquid and improving the reaction efficiency. At the same time, the bubbles stir the solution inside the reactor to even out the temperature inside the reactor; adding magnesium liquid during the reaction is conducive to absorbing excess heat, and the inert gas circulation heat recovery feeding device can also recover the heat in the titanium tetrachloride raw material and titanium tetrachloride and the inert gas, thereby reducing energy consumption loss.

[0046] According to a further optimized solution, the reactor assembly includes a reactor body 3, a reactor cover 1 is sealedly installed on the top of the reactor body 3, and a metal magnesium feeding port 2 is opened on the reactor cover 1;

[0047] The reactor body 3 is an inverted truncated cone structure;

[0048] The reactor body 3 is composed of a gas phase zone, a titanium sponge production zone and a liquid phase zone from top to bottom.

[0049] According to a further optimization scheme, the angle between the inclined surface of the reactor body 3 and the vertical direction is 5-15°.

[0050] The reactor body 3 is set as an inverted truncated cone reactor, and the inclination angle is set to 5-15°. The existence of the inclination angle provides upward support for the titanium generated in the reactor, and at the same time increases the upper space of the reactor body 3 to avoid the collapse during the production of sponge titanium. A metal magnesium feeding port 2 is set on the reactor top cover 1 at the top of the reactor body 3 for adding metal magnesium raw materials during the reaction process.

[0051] Further optimizing the scheme, the temperature control assembly includes an electric heating device 5, a water cooling tube 6 and a temperature measuring thermocouple 4 arranged on the inner wall of the reactor body 3, the electric heating device 5 and the water cooling tube 6 are both coiled and arranged on the inner wall of the reactor body 3, and the electric heating device 5 and the water cooling tube 6 are located in the titanium sponge production area;

[0052] The fixed end of the temperature measuring thermocouple 4 is fixedly connected to the inner wall of the reactor body 3, and the detection end of the temperature measuring thermocouple 4 is arranged in the reactor body 3. There are multiple temperature measuring thermocouples 4, which are evenly arranged in the gas phase area, sponge titanium generation area and liquid phase area.

[0053] To further optimize the solution, the inert gas circulation heat recovery feeding device includes a titanium tetrachloride and inert gas mixing device 11, one end of the titanium tetrachloride and inert gas mixing device 11 is connected to the air inlet end of the pumping part, and the air outlet end of the pumping part is connected to the air inlet end of a plurality of blowing holes 9, and the plurality of blowing holes 9 are arranged on the supporting mesh plate 8, and the air outlet ends of the blowing holes 9 are located in the liquid phase region. A space is left between the bottom of the supporting mesh plate 8 and the bottom of the reactor body 3, and the space is filled with magnesium chloride and is connected to the magnesium chloride discharge port 7; the top of the titanium tetrachloride and inert gas mixing device 11 is connected to a titanium tetrachloride feeding port 12, and the other end of the titanium tetrachloride and inert gas mixing device 11 is connected to the bottom of the heat recovery part, and the top of the heat recovery part is connected to one of the air outlet ends of the condensing furnace connecting pipe 14.

[0054] According to a further optimized solution, the gas pumping part includes a pressure pump 10, the gas outlet end of the pressure pump 10 is connected to the gas inlet ends of the plurality of gas blowing holes 9, and the gas inlet end of the pressure pump 10 is connected to one end of a titanium tetrachloride and inert gas mixing device 11.

[0055] To further optimize the solution, the heat recovery section includes a gas circulation and waste heat recovery device 13, the top of the gas circulation and waste heat recovery device 13 is connected to one of the gas outlet ends of the condensing furnace connecting pipe 14, and the bottom of the gas circulation and waste heat recovery device 13 is connected to the other end of the titanium tetrachloride and inert gas mixing device 11.

[0056] According to a further optimized solution, the blowing hole 9 is a round hole with a diameter of 0.1-5 mm or a slit with a width of 0.1-2 mm and a length of 5-50 mm.

[0057] Further optimization scheme, the number of blowing holes 9 is 1-30 / m 2 .

[0058] The reactor body 3 is divided into three regions from top to bottom, each of which has two interfaces, namely interface I and interface II. The region above interface I is a gas phase region, including metallic magnesium, titanium tetrachloride and a small amount of magnesium chloride vapor; the region between interface I and interface II is a titanium sponge generation region, which is mainly magnesium liquid and titanium sponge generated by the reaction; the region below interface II is a liquid phase region, which is a magnesium chloride liquid phase and part of the titanium sponge generated.

[0059] The titanium tetrachloride feeding port 12 is arranged above the titanium tetrachloride and inert gas mixing device 11. Under the drive of the pressure pump 10, the inert gas and titanium tetrachloride are sprayed into the liquid magnesium chloride area through each blowing hole 9. After the titanium tetrachloride is vaporized in the high-temperature liquid magnesium chloride, it rises with the inert gas into the metal magnesium liquid and undergoes a chemical reaction to form sponge titanium. The blowing holes 9 are round holes with a diameter of 0.1-5 mm or slits with a width of 0.1-2 mm and a length of 5-50 mm, and the number is 1-30 / m 2 ; The inert gas is argon.

[0060] At the same time, a gas circulation and waste heat recovery device 13 is provided in the novel reactor system to recover heat from titanium tetrachloride raw material and titanium tetrachloride and inert gas. According to the different output of titanium sponge in the reactor, the reactor has different sizes and structures, and its process parameters such as feeding speed and pressure are different, as shown in Table 1.

[0061] Table 1 Reactor dimensions and feeding process parameters

[0062]

[0063] The present application provides a magnesium thermal reduction titanium sponge production process, based on the above-mentioned magnesium thermal reduction titanium sponge production equipment, comprising the following steps:

[0064] Step 1: Add magnesium chloride solution into the reactor assembly, add magnesium ingot on the magnesium chloride solution, and after the magnesium ingot is melted, make the lower end of the magnesium liquid be 200-400mm above the supporting mesh plate 8;

[0065] Step 2: heating the reactor assembly through the temperature control assembly, closing the connection between the condensing furnace connecting pipe 14 and the condensing furnace, circulating the inert gas in the reactor assembly through the inert gas circulation heat recovery feeding device, introducing liquid titanium tetrachloride into the reactor assembly through the inert gas circulation heat recovery feeding device, and the liquid titanium tetrachloride is mixed with the inert gas and enters the reactor assembly to react with the magnesium liquid to generate sponge titanium and magnesium chloride, and the excess magnesium chloride is discharged from the magnesium chloride discharge port 7;

[0066] Step 3. During the entire reaction process, the magnesium chloride solution is intermittently discharged, and the height of the magnesium liquid is always 200-400 mm above the supporting mesh plate 8. When the amount of sponge titanium generated reaches the upper limit of the reactor assembly, the addition of metallic magnesium is stopped. At this time, the magnesium chloride solution is completely discharged, and the connection between the condensing furnace connecting pipe 14 and the inert gas circulation heat recovery feeding device is closed. The unreacted magnesium and residual magnesium chloride evaporate, enter the condensing furnace through the condensing furnace connecting pipe 14, and are condensed into a solid state in the condensing furnace, thereby achieving separation from the sponge titanium and obtaining a relatively pure sponge titanium.

[0067] The specific process of producing titanium sponge by this device is as follows:

[0068] 1. Preparation

[0069] First, a certain amount of magnesium chloride is added to the reactor body 3 and the liquid level reaches the horizontal position of interface II after melting, and interface II is always kept 200-400mm above the support mesh 8 during the entire reaction process to ensure that the blowing hole 9 does not contact the metal magnesium liquid, and to prevent the titanium tetrachloride in the blowing hole 9 from reacting with the metal magnesium to form sponge titanium and block the blowing hole 9. Then, metal magnesium is added and made to reach the position of interface I after melting.

[0070] 2. Heating stage

[0071] The reactor body 3 is heated by the electric heating device 5 to melt the metal magnesium; when the temperature inside the reactor body 3 reaches 670-700°C, an inert gas is introduced into the reactor body 3 through the blowing holes 9 on the supporting mesh plate 8 to start stirring the metal magnesium liquid and magnesium chloride, ensuring that the blowing holes 9 are unobstructed.

[0072] After passing into inert gas for a period of time, liquid titanium tetrachloride is mixed with inert gas, blown into reactor body 3 through blowing hole 9 on supporting mesh plate 8, under the high temperature effect of liquid magnesium chloride, titanium tetrachloride liquid becomes gaseous state rapidly, enters liquid magnesium chloride, and then rises into magnesium liquid region and reacts with metallic magnesium. The pressure that provides by regulating pressure pump 10 is controlled to be blown into the feed rate of inert gas flow and titanium tetrachloride. Metallic titanium is generated in magnesium liquid, and is settled on the supporting mesh plate 8 at the bottom. Along with the carrying out of reaction, the amount of metallic magnesium in reactor reduces, and metallic magnesium is added through metallic magnesium feed port 2, and the magnesium liquid level is kept highly stable. In the whole reaction process, the product magnesium chloride is extracted and discharged through magnesium chloride discharge port 7, but the magnesium chloride liquid level is guaranteed to be at 200-400mm on supporting mesh plate 8.

[0073] When the amount of titanium sponge produced reaches the maximum capacity limit of the reactor, stop adding materials and the reaction ends. Draw out all the magnesium chloride liquid, open the connection between the condenser connecting pipe 14 and the condenser, and use the electric heating device 5 to heat the reactor body 3. As the temperature gradually rises, the unreacted magnesium and the remaining magnesium chloride begin to evaporate, and the distillation temperature is controlled between 950-1000°C. The evaporated material diffuses into the condenser through the condenser connecting pipe 14 under vacuum conditions and condenses into a solid state in the condenser, thereby achieving separation from the titanium sponge and obtaining a relatively pure titanium sponge.

[0074] 3. Circulation and waste heat recovery

[0075] The magnesium thermal reduction reaction is an exothermic reaction that generates a large amount of chemical heat. By adding metallic magnesium in batches, part of the reaction heat is used to melt the metallic magnesium, and part is taken out of the reactor through the inert gas and titanium tetrachloride gas. Therefore, by setting up a gas circulation and waste heat recovery device 13, titanium tetrachloride is condensed in the gas circulation and waste heat recovery device 13, and heat is released to form titanium tetrachloride liquid as a raw material to return to the titanium tetrachloride and inert gas mixing device 11. The gas recycling is realized, and the heat in the gas is recovered at the same time. On the other hand, by adjusting the ratio of the inert gas to the titanium tetrachloride flow rate, the reaction rate of titanium tetrachloride and metallic magnesium liquid is regulated, and the controllability of the production of sponge titanium is increased.

[0076] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0077] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A magnesium thermal reduction titanium sponge production equipment, characterized in that: include: A reactor assembly, wherein the reactor assembly is an inverted truncated cone structure; A temperature control component, installed on the inner wall of the reactor component, for controlling and monitoring the temperature inside the reactor component; An inert gas circulation heat recovery feeding device is arranged on one side of the reactor assembly, and a discharge end of the inert gas circulation heat recovery feeding device is located at the bottom of the reactor assembly; A supporting mesh plate (8), the supporting mesh plate (8) being axially connected to the inner side of the bottom of the reactor assembly, the supporting mesh plate (8) being connected to the discharge end of the inert gas circulation heat recovery feeding device; A magnesium chloride discharge port (7) is arranged on one side of the bottom of the reactor assembly and is located below the support mesh plate (8); A condensing furnace connecting pipe (14), wherein an air inlet end of the condensing furnace connecting pipe (14) is connected to the top of the reactor assembly, one of the air outlet ends of the condensing furnace connecting pipe (14) is connected to the top of the inert gas circulation heat recovery feeding device, and the other air outlet end of the condensing furnace connecting pipe (14) is connected to a condensing furnace; The reactor assembly comprises a reactor body (3), a reactor top cover (1) is sealedly mounted on the top of the reactor body (3), and a metal magnesium feeding port (2) is provided on the reactor top cover (1); The reactor body (3) is an inverted truncated cone structure; The reactor body (3) comprises, from top to bottom, a gas phase zone, a titanium sponge production zone and a liquid phase zone; The inert gas circulation heat recovery feeding device comprises a titanium tetrachloride and inert gas mixing device (11), one end of the titanium tetrachloride and inert gas mixing device (11) is connected to the air inlet end of the pumping part, the air outlet end of the pumping part is connected to the air inlet end of a plurality of blowing holes (9), the plurality of blowing holes (9) are arranged on the supporting mesh plate (8), the air outlet ends of the blowing holes (9) are located in the liquid phase region, a space is left between the bottom of the supporting mesh plate (8) and the bottom of the reactor body (3), the space is filled with magnesium chloride and is connected to the magnesium chloride discharge port (7); the top of the titanium tetrachloride and inert gas mixing device (11) is connected to the titanium tetrachloride feeding port (12), the other end of the titanium tetrachloride and inert gas mixing device (11) is connected to the bottom of the heat recovery part, and the top of the heat recovery part is connected to one of the air outlet ends of the condensing furnace connecting pipe (14); The gas pumping unit comprises a pressure pump (10), the gas outlet end of the pressure pump (10) is connected to the gas inlet ends of the plurality of gas blowing holes (9), and the gas inlet end of the pressure pump (10) is connected to one end of the titanium tetrachloride and inert gas mixing device (11); The heat recovery section comprises a gas circulation and waste heat recovery device (13), the top end of the gas circulation and waste heat recovery device (13) is connected to one of the gas outlet ends of the condensing furnace connecting pipe (14), and the bottom end of the gas circulation and waste heat recovery device (13) is connected to the other end of the titanium tetrachloride and inert gas mixing device (11).

2. The magnesium thermal reduction titanium sponge production equipment according to claim 1, characterized in that: The angle between the inclined surface of the reactor body (3) and the vertical direction is 5-15°.

3. The magnesium thermal reduction titanium sponge production equipment according to claim 1, characterized in that: The temperature control component comprises an electric heating device (5), a water cooling tube (6) and a temperature measuring thermocouple (4) arranged on the inner wall of the reactor body (3); the electric heating device (5) and the water cooling tube (6) are both coiled and arranged on the inner wall of the reactor body (3); the electric heating device (5) and the water cooling tube (6) are located in the titanium sponge production area; The fixed end of the temperature measuring thermocouple (4) is fixedly connected to the inner wall of the reactor body (3), and the detection end of the temperature measuring thermocouple (4) is arranged in the reactor body (3). A plurality of the temperature measuring thermocouples (4) are provided and are evenly arranged in the gas phase region, the titanium sponge generation region and the liquid phase region.

4. The magnesium thermal reduction titanium sponge production equipment according to claim 1, characterized in that: The blowing hole (9) is a circular hole with a diameter of 0.1-5 mm or a slit with a width of 0.1-2 mm and a length of 5-50 mm.

5. The magnesium thermal reduction titanium sponge production equipment according to claim 1, characterized in that: The number of the blowing holes (9) is 1-30 / m 2 .

6. A magnesium thermal reduction titanium sponge production process, using a magnesium thermal reduction titanium sponge production equipment according to any one of claims 1 to 5, characterized in that: The steps include: Step 1, adding a magnesium chloride solution into the reactor assembly, adding a metal magnesium ingot onto the magnesium chloride solution, and after the magnesium ingot is melted, making the lower end of the magnesium liquid be located 200-400 mm above the supporting mesh plate (8); Step 2: heating the reactor component by the temperature control component, closing the connection between the condensing furnace connecting pipe (14) and the condensing furnace, circulating the inert gas in the reactor component by the inert gas circulation heat recovery feeding device, introducing liquid titanium tetrachloride into the reactor component by the inert gas circulation heat recovery feeding device, and mixing the liquid titanium tetrachloride with the inert gas and entering the reactor component to react with the magnesium liquid to generate sponge titanium and magnesium chloride, and the excess magnesium chloride is discharged from the magnesium chloride discharge port (7); Step 3: During the entire reaction process, the magnesium chloride solution is intermittently discharged, and the height of the magnesium solution is always 200-400 mm above the supporting mesh plate (8). When the amount of sponge titanium generated reaches the upper limit of the reactor assembly, the addition of metallic magnesium is stopped. At this time, the magnesium chloride solution is completely discharged, and the connection between the condensing furnace connecting pipe (14) and the inert gas circulation heat recovery feeding device is closed. The unreacted magnesium and residual magnesium chloride evaporate and enter the condensing furnace through the condensing furnace connecting pipe (14), and are condensed into a solid state in the condensing furnace, thereby achieving separation from the sponge titanium and obtaining pure sponge titanium.

Citation Information

Patent Citations

  • Forced convection magnesium heat method titanium sponge production reduction system capable of recovering waste heat

    CN106834746A

  • Apparatus for making sponge iron by direct-cooled combination method

    CN1851015A

Cited By

  • Titanium sponge reduction reactor

    CN120796743A