Load prediction method, device, equipment, program product and engineering machinery

By obtaining the current status and terrain information of the mining machinery and using the neural network model to predict the load situation at the next moment, the problem of insufficient real-time and accuracy of load prediction in the existing technology is solved, and it is suitable for complex operating environments.

CN118774192AActive Publication Date: 2024-10-15SANY HEAVY MACHINERY

Patent Information

Application Number
CN202411116677.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-15
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

Existing mining machinery load prediction methods have shortcomings in real-time performance and accuracy, and are difficult to effectively cope with the nonlinearity and uncertainty in sensor technology and complex operating environments, resulting in challenges for stable control and efficient operations.

Method used

By obtaining the current status, pressure and terrain information of the excavating machinery, the pre-trained neural network model is used to predict the terrain and status information at the next moment, thereby determining the pressure and load conditions of the operating mechanism and achieving real-time load prediction.

Benefits of technology

It achieves real-time and accurate prediction of excavation machinery load, reduces computational complexity, does not rely on specific soil and material parameters, is suitable for complex and changeable operating environments, and improves the real-time and applicability of prediction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774192A_ABST
    Figure CN118774192A_ABST
Patent Text Reader

Abstract

The invention provides a load prediction method and device, equipment, a program product and engineering machinery. The method comprises the steps that current state detection information of an operation mechanism, current pressure detection information of the operation mechanism and current terrain detection information of an excavation area are obtained; according to the current terrain detection information and the current state detection information, determining terrain prediction information of the excavation area and state prediction information of the operation mechanism at the next moment; according to the terrain prediction information, the state prediction information and the current pressure detection information, the pressure prediction information of the operation mechanism at the next moment is determined, and the pressure prediction information is used for determining the load of the engineering machinery. According to the method, real-time load prediction of the engineering machinery can be realized, a complex soil or material model does not need to be established, the calculation complexity is reduced, the prediction real-time performance is improved, the method conforms to the complex and changeable working conditions of the working environment of the excavating machinery, and the method has wide applicability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of engineering machinery, and in particular to a load prediction method, device, equipment, program product and engineering machinery. Background Art

[0002] When excavators and other construction machinery are performing excavation operations, their load conditions directly affect the stability and energy efficiency of the entire machine. Real-time and accurate prediction of the load of construction machinery is of vital importance for evaluating the instantaneous power output of the entire machine, planning energy-saving and efficient excavation trajectories, and designing fully automatic excavation control strategies.

[0003] Limited by sensor technology and complex and changeable working environment, the load of excavators shows strong nonlinearity and uncertainty, which brings great challenges to the stable control and efficient operation of the whole machine. The existing load prediction methods of excavators have many limitations and shortcomings in engineering applications. The industry urgently needs a new load prediction method that can accurately predict the load of excavators in real time. Summary of the invention

[0004] In view of this, the embodiments of the present application are dedicated to providing a load prediction method, device, equipment, program product and engineering machinery, which can predict the load force of the excavator in real time and accurately.

[0005] According to a first aspect of an embodiment of the present application, a load prediction method is provided, which is applied to an engineering machine, wherein the engineering machine includes an operating mechanism, and the operating mechanism is used to perform an excavation operation. The method includes:

[0006] Acquire current state detection information of the operating mechanism, current pressure detection information of the operating mechanism, and current terrain detection information of the excavation area, wherein the current state detection information includes a posture detection value and / or a speed detection value of the operating mechanism at the current moment;

[0007] Determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment according to the current terrain detection information and the current state detection information;

[0008] Determining the pressure prediction information of the operating mechanism at the next moment according to the terrain prediction information, the state prediction information and the current pressure detection information;

[0009] According to the pressure prediction information of the operating mechanism at the next moment, the load prediction value of the operating mechanism at the next moment is determined.

[0010] Optionally, determining the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment according to the current terrain detection information and the current state detection information includes:

[0011] The terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment are determined based on the current terrain detection information, the preset target terrain information, the current state detection information and the historical state detection information of the operating mechanism in the past preset time period.

[0012] Optionally, determining the pressure prediction information of the operating mechanism at the next moment according to the terrain prediction information, the state prediction information and the current pressure detection information includes:

[0013] Determine a first pressure change amount according to a terrain change amount between the current terrain detection information and the terrain prediction information, and a state change amount between the current state detection information and the state prediction information, wherein the first pressure change amount represents a predicted pressure change amount of the operating mechanism between a current moment and a next moment;

[0014] The pressure prediction information of the operating mechanism at the next moment is determined according to the first pressure change amount and the current pressure detection information.

[0015] Optionally, the determining of a first pressure change amount according to a terrain change amount between the current terrain detection information and the terrain prediction information, and a state change amount between the current state detection information and the state prediction information, and determining pressure prediction information of the operating mechanism at a next moment according to the first pressure change amount and the current pressure detection information, includes:

[0016] The current terrain detection information, the terrain prediction information, the current state detection information, the state prediction information and the current pressure detection information are input into a pre-trained first pressure prediction model, and the first pressure prediction model determines a first pressure change based on the terrain change between the current terrain detection information and the terrain prediction information, and the state change between the current state detection information and the state prediction information, and determines the pressure prediction information of the operating mechanism at the next moment based on the first pressure change and the current pressure detection information.

[0017] Optionally, the first pressure prediction model is a time series neural network model, and determining the first pressure change amount according to the terrain change amount between the current terrain detection information and the terrain prediction information and the state change amount between the current state detection information and the state prediction information includes:

[0018] The first pressure change amount and the hidden state at the current moment are determined based on the terrain change amount between the current terrain detection information and the terrain prediction information, the state change amount between the current state detection information and the state prediction information, and the hidden state at the previous moment. The hidden state at the previous moment includes the model input information within a preset time period in the past and the intermediate state information corresponding to the model input information.

[0019] Optionally, the determining, based on the current terrain detection information and the current state detection information, the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment, and the determining, based on the terrain prediction information, the state prediction information and the current pressure detection information, the pressure prediction information of the operating mechanism at the next moment, includes:

[0020] Inputting the current state detection information, the current pressure detection information and the current terrain detection information into a pre-trained second pressure prediction model to obtain pressure prediction information of the operating mechanism at the next moment, wherein the second pressure prediction model is a time series neural network model, and the second pressure prediction model includes a first submodule and a second submodule;

[0021] The first submodule is used to determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment according to the current terrain detection information, the current state detection information, the preset target terrain information and the historical state detection information in the past preset time period in the hidden state at the previous moment;

[0022] The second submodule is used to determine the first pressure change according to the terrain change between the current terrain detection information and the terrain prediction information, the state change between the current state detection information and the state prediction information, and the hidden state at the previous moment, and to determine the pressure prediction information of the operating mechanism at the next moment according to the first pressure change and the current pressure detection information, wherein the hidden state at the previous moment includes the model input information within a preset time period in the past and the intermediate state information corresponding to the model input information.

[0023] According to a second aspect of an embodiment of the present application, a load prediction device is provided, which is applied to an engineering machine, wherein the engineering machine includes an operating mechanism, and the operating mechanism is used to perform an excavation operation. The device includes:

[0024] A data acquisition unit, used to acquire current state detection information of the operating mechanism, current pressure detection information of the operating mechanism, and current terrain detection information of the excavation area, wherein the current state detection information includes a posture detection value and / or a speed detection value of the operating mechanism at a current moment;

[0025] A first prediction unit, configured to determine terrain prediction information of the excavation area and state prediction information of the operating mechanism at a next moment according to the current terrain detection information and the current state detection information;

[0026] A second prediction unit, configured to determine pressure prediction information of the operating mechanism at a next moment according to the terrain prediction information, the state prediction information and the current pressure detection information;

[0027] The load prediction unit is used to determine the load prediction value of the operating mechanism at the next moment according to the pressure prediction information of the operating mechanism at the next moment.

[0028] According to a third aspect of an embodiment of the present application, a computer program product is provided, comprising computer program instructions, which, when executed by a processor, enable the processor to implement a load prediction method as described in any one of the first aspects of the embodiments of the present application.

[0029] According to a fourth aspect of an embodiment of the present application, there is provided a load prediction device, including a memory and a processor;

[0030] The memory is connected to the processor and is used to store programs;

[0031] The processor is used to implement the load prediction method as described in any one of the first aspects of the embodiments of the present application by running the program in the memory.

[0032] According to a fifth aspect of the embodiments of the present application, there is provided an engineering machine, comprising:

[0033] An operating mechanism, a detection device, and a load prediction device as described in the third aspect of an embodiment of the present application, wherein:

[0034] The detection device comprises a first detection device, a second detection device and a third detection device, wherein the first detection device, the second detection device and the third detection device are respectively connected to the load prediction device for communication;

[0035] The operating mechanism is used to perform excavation operations;

[0036] The first detection device is used to collect the current state detection value of the operating mechanism in real time;

[0037] The second detection device is used to collect the current pressure detection value of the operating mechanism in real time;

[0038] The third detection device is used to collect the terrain information of the current area to be excavated in real time.

[0039] Optionally, the engineering machinery is an excavator;

[0040] The working mechanism comprises a boom, a dipper arm and a bucket;

[0041] The first detection device includes a boom state detection device, a dipper arm state detection device and a bucket state detection device;

[0042] The second detection device includes a boom pressure detection device, a dipper arm pressure detection device and a bucket pressure detection device.

[0043] The load prediction method provided in the embodiment of the present application first obtains the current state detection information of the operating mechanism, the current pressure detection information of the operating mechanism and the current terrain detection information of the excavation area in real time; then, based on the current terrain detection information and the current state detection information, determines the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment; finally, based on the terrain prediction information, the state prediction information and the current pressure detection information, determines the pressure prediction information of the operating mechanism at the next moment.

[0044] The load prediction method provided in the embodiment of the present application, on the one hand, can continuously and accurately automatically predict the pressure prediction information of the operating mechanism at the next moment by acquiring the current state detection information of the operating mechanism, the current pressure detection information of the operating mechanism and the current terrain detection information of the excavation area in real time, and then predict the load condition of the operating mechanism at the next moment, thereby meeting the real-time and accuracy requirements of the excavator for load prediction; on the other hand, there is no need to establish complex soil and material models, which reduces the complexity of calculation and improves the real-time performance of the prediction. It is also independent of specific soil and material parameters, which reduces the prediction error caused by changes in soil or material types, conforms to the complex and changeable actual working conditions of the excavator's operating environment, and has a wider applicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.

[0046] Figure 1 A schematic diagram of the structure of an engineering machinery provided in an embodiment of the present application.

[0047] Figure 2 A flow chart of a load prediction method provided in an embodiment of the present application.

[0048] Figure 3 A schematic diagram of a processing flow for determining pressure prediction information of an operating mechanism at the next moment provided in an embodiment of the present application.

[0049] Figure 4 A schematic diagram of another processing flow for determining pressure prediction information of an operating mechanism at the next moment provided in an embodiment of the present application.

[0050] Figure 5 A schematic diagram of the structure of a long-term and short-term neural network provided in an embodiment of the present application.

[0051] Figure 6 A flow chart of another load prediction method provided in an embodiment of the present application.

[0052] Figure 7 A schematic diagram of the structure of a load prediction device provided in an embodiment of the present application.

[0053] Figure 8 A schematic diagram of the structure of a load prediction device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0054] The technical solution of the embodiment of the present application is applicable to various scenarios where the load of excavators needs to be predicted, such as mining, infrastructure construction, earthwork engineering, river dredging, etc. In these scenarios, it is usually necessary to understand the load of the excavator in real time and accurately and adjust the operation strategy in time to prevent the machine from overloading or inefficient operation, thereby ensuring operation efficiency, machine safety and cost control. The technical solution of the embodiment of the present application can continuously and accurately automatically predict the pressure prediction information of the operating mechanism at the next moment, and then predict the load of the engineering machinery at the next moment, meeting the real-time and accuracy requirements of the excavator for load prediction.

[0055] The technical solution provided in the embodiments of the present application can be exemplarily applied to hardware devices such as processors, electronic devices, servers (including cloud servers), or packaged into software programs to be run. When the hardware device executes the processing of the technical solution of the embodiments of the present application, or the above-mentioned software program is run, the automatic splitting of the target task and the automatic calling of the application program interface required for the task can be achieved to complete the purpose of the target task. The embodiments of the present application only exemplarily introduce the specific processing of the technical solution of the present application, and do not limit the specific implementation form of the technical solution of the present application. Any technical implementation form that can execute the processing of the technical solution of the present application can be adopted by the embodiments of the present application.

[0056] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0057] Before introducing this application solution, the relevant technologies are first introduced:

[0058] When excavators and other construction machinery are performing excavation operations, their load conditions directly affect the stability and energy efficiency of the entire machine. Real-time and accurate prediction of the load of construction machinery is of vital importance for evaluating the instantaneous power output of the entire machine, planning energy-saving and efficient excavation trajectories, and designing fully automatic excavation control strategies.

[0059] Limited by sensor technology and complex and changeable working environment, the load of excavators shows strong nonlinearity and uncertainty, which brings great challenges to the stable control and efficient operation of the whole machine. Existing excavator load prediction methods have many limitations and shortcomings in engineering applications. For example, although the discrete unit method and the finite element method have high simulation accuracy, their computational overhead involves a large number of numerical iterations, which seriously limits their application in real-time controllers. Although the analytical expression method has high computational efficiency, its accuracy is overly dependent on material property parameters, such as density, hardness, moisture and composition. In the real world, the properties of materials vary greatly and are uneven, and parameter calibration and identification are required for each type of material. All of these hinder the engineering application of traditional excavator load prediction methods. The industry urgently needs a new load prediction method that can accurately predict the load of excavators in real time.

[0060] In view of this, the embodiments of the present application are committed to providing a load prediction method, device, equipment, program product and engineering machinery, which can predict the load force of the excavator in real time and accurately, and will be described in detail one by one in the following embodiments.

[0061] Exemplary construction machinery

[0062] For ease of understanding, firstly, an exemplary introduction to the implementation environment of the load prediction method provided in the embodiment of the present application is given. Figure 1 , Figure 1 It is a structural schematic diagram of an engineering machinery, and the load prediction method provided in the present application can be exemplarily applied to the engineering machinery.

[0063] like Figure 1 As shown, the engineering machinery includes a first detection device 110 , a second detection device 120 , a third detection device 130 , an operating mechanism 140 and a load prediction device 150 .

[0064] The first detection device 110, the second detection device 120, and the third detection device 130 are respectively connected in communication with the load prediction device 150. It should be noted that the communication connection may be a wireless communication connection or a wired communication connection or any combination thereof, and may be a direct communication connection or an indirect communication connection or any combination thereof, which is not limited in this application.

[0065] The operating mechanism 140 is a part of the engineering machinery that directly participates in the excavation operation and is used to perform the excavation operation. Optionally, the operating mechanism 140 includes a first component and a second component, wherein the second component is a part that directly contacts the material and performs excavation, and the first component is connected between the main body of the engineering machinery and the second component, and is used to support and operate the second component.

[0066] The first detection device 110 is used to collect the current state detection value of the operating mechanism in real time, such as the posture detection value related to the posture of the operating mechanism at the current moment, the speed detection value related to the moving speed of the operating mechanism at the current moment, etc., and send the collected current state detection value to the load prediction device 150 through the communication network, and the load prediction device 150 can obtain the current state detection value of the operating mechanism. Optionally, the first detection device 110 includes at least one posture sensor (such as an inertial measurement unit (IMU), a laser radar, a depth camera, a camera, an ultrasonic sensor, an angle sensor, etc.) and / or at least one speed sensor (such as a photoelectric encoder, a Doppler radar or a laser speed meter, etc.).

[0067] The second detection device 120 is used to collect the current pressure detection value of the operating mechanism in real time, and send the collected current pressure detection value to the load prediction device 150 through the communication network, so that the load prediction device 150 can obtain the current state detection value of the operating mechanism. Optionally, the second detection device 120 can be a pressure sensor, a pressure transmitter, a hydraulic system built-in pressure detection module and other types of pressure detection devices.

[0068] The third detection device 130 is used to collect the terrain information of the current area to be excavated in real time, and send the collected terrain information to the load prediction device 150 through the communication network, so that the load prediction device 150 can obtain the current state detection value of the working mechanism. Optionally, the third detection device 130 can be a variety of terrain perception and measurement devices such as laser radar, depth camera, ultrasonic sensor array, etc.

[0069] It should be noted that the types, number of installations and installation locations of the first detection device 110, the second detection device 120 and the third detection device 130 are all determined based on factors such as the actual required detection accuracy, the complexity of the operating mechanism and the budget, and this application does not impose any restrictions on this.

[0070] The load prediction device 150 is responsible for executing the load prediction method provided by the present application. Specifically, firstly, the current state detection information of the operating mechanism, the current pressure detection information of the operating mechanism and the current terrain detection information of the excavation area are obtained, and the current state detection information includes the posture detection value and / or speed detection value of the operating mechanism at the current moment; then, based on the current terrain detection information and the current state detection information, the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment are determined; finally, based on the terrain prediction information, the state prediction information and the current pressure detection information, the pressure prediction information of the operating mechanism at the next moment is determined, and the pressure prediction information is used to determine the load of the engineering machinery. As for other specific implementations of the load prediction method, they will be specifically expanded in the subsequent content and will not be described in detail here.

[0071] The load prediction device 150 can be various types of processing devices, which can be a separately set processor or integrated on other controllers, such as a vehicle controller. The specific type of the load prediction device 150 is determined according to the application scenario and performance requirements, and this application does not limit this.

[0072] As an optional implementation, the engineering machine is an excavator. The working mechanism includes a boom, a dipper arm and a bucket, the first detection device includes a boom state detection device, a dipper arm state detection device and a bucket state detection device, and the second detection device includes a boom pressure detection device, a dipper arm pressure detection device and a bucket pressure detection device.

[0073] Exemplary Methods

[0074] Figure 2 A flow chart of a load prediction method provided in an embodiment of the present application. Figure 2 As shown, the load prediction method provided in this embodiment can be exemplarily applied to Figure 1 The engineering machinery in the embodiment is specifically executed by a load prediction device in the engineering machinery, and includes steps S201-S204:

[0075] S201, obtaining current state detection information of the operating mechanism, current pressure detection information of the operating mechanism, and current terrain detection information of the excavation area, wherein the current state detection information includes a posture detection value and / or a speed detection value of the operating mechanism at a current moment.

[0076] The current state detection information of the operating mechanism can be understood as the actual operation state information of the operating mechanism of the engineering machinery at the current moment.

[0077] Optionally, a first detection device is installed on or near the engineering machinery to collect the operating mechanism status parameters of the engineering machinery in real time, and send the collected operating mechanism status parameters to the load prediction device. The load prediction device determines the current status detection information of the operating mechanism based on the received operating mechanism status parameters at the current moment.

[0078] The current state detection information includes a posture detection value and / or a speed detection value of the working mechanism at the current moment.

[0079] Optionally, the construction machinery is provided with a posture detection device which can directly detect the posture detection value of the working mechanism at the current moment.

[0080] Optionally, the engineering machinery is provided with a posture detection device, which can detect posture parameters related to the posture of the working mechanism, and calculate the posture detection value of the working mechanism at the current moment based on the posture parameters detected at the current moment and the pre-set and stored engineering machinery structural parameters.

[0081] Exemplarily, the construction machinery is an excavator, and the posture detection equipment includes a boom angle sensor, a dipper arm angle sensor, and a bucket angle sensor. The posture detection equipment collects the angles of the boom, dipper arm, and bucket in real time, and combines the pre-set and stored excavator structural parameters to calculate the posture detection values ​​of the boom, dipper arm, and bucket at the current moment.

[0082] Optionally, the construction machinery is provided with a speed sensor (such as an encoder, a tachometer generator, etc.), which can directly detect the speed of the working mechanism at the current moment, or detect a speed parameter related to the current speed of the working mechanism, so as to calculate the speed of the working mechanism at the current moment. Exemplarily, the construction machinery is an excavator, and the posture detection device includes a boom speed sensor, a dipper arm speed sensor, and a bucket speed sensor, which can collect the speeds of the boom, dipper arm, and bucket in real time.

[0083] It should be noted that the current state detection information may also include acceleration information, temperature information and other information related to the operating state of the operating mechanism, which is determined according to actual application scenarios and requirements.

[0084] The current pressure detection information of the operating mechanism may be understood as the actual pressure value borne or generated by the operating mechanism at the current moment.

[0085] Optionally, the mechanical equipment adopts a hydraulic system, and the current pressure detection information of the operating mechanism can be understood as the hydraulic force of the operating mechanism at the current moment.

[0086] Optionally, the engineering machinery is provided with a second detection device (such as a pressure sensor, etc.) which can detect the pressure detection information of the operating mechanism in real time.

[0087] Exemplarily, the construction machinery is an excavator using a hydraulic system, the second detection equipment includes a boom pressure sensor, a dipper arm pressure sensor and a bucket pressure sensor, and the current pressure detection information of the working structure includes the hydraulic pressure of the boom liquid cylinder, the hydraulic pressure of the dipper arm liquid cylinder and the hydraulic pressure of the bucket liquid cylinder.

[0088] The status detection information and pressure detection information of the operating mechanism are dynamically changing, and can reflect the working status of the operating mechanism in real time, providing an important basis for subsequent load prediction.

[0089] The current terrain detection information of the excavation area can be understood as the terrain feature data of the excavation area corresponding to the engineering machinery at the current moment, covering the terrain conditions in the current excavation area, such as slope, depression, ground protrusions and the like.

[0090] Optionally, a third detection device (such as a lidar, a binocular camera, etc.) installed on the engineering machinery is used to scan or photograph the excavation area in real time, and invalid information (such as trees, stones, step boundaries, the excavator's own working device, etc.) in the data collected by the sensor is filtered out through point cloud or visual semantic segmentation technology, thereby generating a three-dimensional terrain model of the current excavation area of ​​the engineering machinery, and then obtaining the terrain feature data of the current excavation area, that is, the current terrain detection information of the excavation area.

[0091] Optionally, other related existing technologies may be used to obtain current terrain detection information of the excavation area, such as using a drone equipped with a high-definition camera or a video camera to perform aerial photography to obtain current terrain detection information of the excavation area, such as using a global positioning system (GPS) to obtain precise location information of the excavation area, and combining with a geographic information system (GIS) database to obtain current terrain detection information of the excavation area.

[0092] Furthermore, in the actual working process, the excavation area of ​​the engineering machinery may be relatively wide, while the operating mechanism of the engineering machinery usually only operates within a specific working plane at a certain moment. Therefore, when analyzing the current terrain detection information of the excavation area, more attention should be paid to the terrain information of the plane where the operating mechanism is located at the current moment.

[0093] As an optional implementation manner, the current terrain detection information of the excavation area can be understood as the terrain feature data of the working plane corresponding to the engineering machinery at the current moment.

[0094] Optionally, after obtaining the three-dimensional terrain data of the current excavation area of ​​the engineering machinery, the terrain feature data corresponding to the current working plane is screened out from the three-dimensional terrain model of the current excavation area. This process can reduce the amount of data processing and analysis, effectively improve the overall execution efficiency of load prediction, and save computing power.

[0095] Optionally, the current working plane of the engineering machinery is determined according to the current working position and posture of the working mechanism.

[0096] Optionally, the current working plane of the engineering machinery is determined by measuring the rotation angle of the rotating platform of the engineering machinery and / or the pre-planned excavation angle.

[0097] S202: Determine terrain prediction information of the excavation area and state prediction information of the working mechanism at the next moment according to the current terrain detection information and the current state detection information.

[0098] In the actual operation process, the terrain information of the excavation area is a dynamically changing parameter, which changes continuously with the continuous excavation operation of the engineering machinery. Specifically, the excavation action of the operating mechanism at each moment will cause an immediate change in the terrain of the excavation area. This change is based on the terrain of the excavation area at the previous moment and the real-time excavation action of the operating mechanism, and the excavation action of the operating mechanism is directly related to the current state information of the operating mechanism (such as position, posture, speed, acceleration and other key parameters). It can be seen that the terrain information of the excavation area at the current moment and the current state information of the operating mechanism are directly related to the terrain information of the excavation area at the next moment. Comprehensively considering the terrain information of the excavation area at the current moment and the current state information of the operating mechanism, the terrain prediction information of the excavation area at the next moment can be predicted.

[0099] In the actual operation process, the state information of the operating mechanism is also a dynamically changing parameter, and its change is affected by the terrain information of the excavation area at the previous moment and the state information of the operating mechanism at the previous moment. Specifically, the terrain information of the excavation area provides the operating mechanism with the environmental conditions for movement, and determines the resistance and support that the operating mechanism may encounter during the movement. For example, if the current terrain is steep, then the operating mechanism may encounter greater resistance at the next moment, which in turn affects its operating state; the state information of the operating mechanism at the previous moment reflects the movement ability of the operating mechanism under the current terrain. The state change of the operating mechanism is continuous, and the current state information provides the basis for the state information at the next moment. It can be seen that the terrain information of the excavation area at the current moment and the current state information of the operating mechanism are directly related to the state information of the operating mechanism at the next moment. Comprehensively considering the terrain information of the excavation area at the current moment and the current state information of the operating mechanism, the state information of the operating mechanism at the next moment can be predicted.

[0100] As an optional implementation method, step S202 is implemented based on the processing concept of a neural network model. In this implementation method, step S202 includes: inputting the current terrain detection information of the excavation area and the current state detection information of the operating mechanism into a pre-trained first prediction model, and the first prediction model determines the terrain prediction information of the excavation area at the next moment and the state prediction information of the operating mechanism at the next moment based on the current terrain detection information of the excavation area and the current state detection information of the operating mechanism.

[0101] Specifically, in this embodiment, a first prediction model is pre-trained. Optionally, the first prediction model can be obtained by performing prediction training on the first training sample, and the first training sample includes the sample's current terrain detection information, the sample's current state detection information, and the label information (the labeled terrain prediction information of the excavation area at the next moment and the labeled state prediction information of the operating mechanism at the next moment). The first training is to enable the first prediction model to determine the terrain prediction information of the excavation area at the next moment and the state prediction information of the operating mechanism at the next moment based on the sample's current terrain detection information and the sample's current state detection information in the first training sample, and the loss function determined based on the terrain prediction information and state prediction information output by the model and the labeled terrain prediction information and labeled state prediction information in the label information to meet the preset requirements. The trained first prediction model can capture the complex relationship between the terrain information of the excavation area and the state of the operating mechanism, and then determine the terrain prediction information of the excavation area at the next moment and the state prediction information of the operating mechanism at the next moment based on the current terrain detection information of the excavation area and the current state detection information of the operating mechanism.

[0102] Optionally, the first prediction model can be implemented based on a variety of deep learning neural network structures, such as CNN (Convolutional Neural Networks) network structure, RNN (Recurrent Neural Networks) network structure, CRNN (Convolutional Recurrent Neural Network) network structure, LSTM (Long Short-Term Memory) network structure, GRU (Gated Recurrent Unit) network structure, etc., which is not limited in this application.

[0103] Optionally, step S202 may also be implemented based on one or more combinations of various processing concepts such as physical models, time series prediction or rule prediction, simulation prediction, etc., which is not limited in the present application.

[0104] S203: Determine the pressure prediction information of the operating mechanism at the next moment according to the terrain prediction information, the state prediction information and the current pressure detection information.

[0105] When the operating mechanism is performing excavation operations, its stress state is a dynamic and continuously changing process. The stress of the operating mechanism at a certain moment does not exist in isolation, but is closely related to the previous stress state, that is, the pressure of the operating mechanism at a certain moment is evolved on the basis of the pressure at the previous moment and is affected by the pressure information at the previous moment. Specifically, due to the inertia of the object and the continuity of the force, the pressure on the operating mechanism at the current moment will continue to have an effect at the next moment, unless there are other external factors that significantly change this stress state. For example, if the operating mechanism is currently under a great pressure, then due to the inertia and the continuity of the force, it is likely to still be under a large pressure at the next moment, unless the terrain changes suddenly or the operating mechanism suddenly stops moving.

[0106] The terrain information of the excavation area provides the external conditions of the working environment of the engineering machinery. There is an interaction between the engineering machinery and the terrain of the excavation area. The terrain characteristics (such as undulation, slope, etc.) affect the stress state of the engineering machinery. The terrain prediction information of the excavation area at the next moment provides the terrain characteristics that the engineering machinery will face at the next moment, which can help predict the pressure information of the engineering machinery operating mechanism at the next moment. For example, if the terrain prediction information of the excavation area at the next moment indicates that the terrain will become more rugged, then the operating mechanism may need to withstand greater resistance, resulting in increased pressure.

[0107] The state information of the operating mechanism affects the way the operating mechanism interacts with the excavated materials and the surrounding environment, and shows the interaction with the terrain features, which affects the pressure information of the operating mechanism. The state prediction information of the operating mechanism at the next moment provides the predicted operating state of the operating mechanism at the next moment, which can help predict the pressure information of the construction machinery operating mechanism at the next moment. For example, if the state prediction information of the operating mechanism at the next moment indicates that the operating mechanism will perform faster or larger excavation actions, the operating mechanism may need to withstand greater pressure.

[0108] According to the above content, the terrain prediction information of the excavation area at the next moment, the state prediction information of the operating mechanism at the next moment, and the current pressure detection information of the operating mechanism will all affect the pressure information of the operating mechanism at the next moment. Combining these three kinds of information and considering the joint action and mutual influence between the three can better predict the pressure information of the operating mechanism at the next moment.

[0109] Specifically, after obtaining the terrain prediction information of the excavation area at the next moment, the state prediction information of the operating mechanism at the next moment, and the current pressure detection information of the operating mechanism, the first strategy is executed to conduct a comprehensive analysis of the terrain prediction information of the excavation area, the state prediction information of the operating mechanism, and the current pressure detection information of the operating mechanism, so as to determine the pressure prediction information of the operating mechanism at the next moment.

[0110] As an optional implementation, the first strategy can be implemented based on the processing concept of dynamic change analysis, including: determining the first pressure change according to the terrain change between the current terrain detection information and the terrain prediction information, and the state change between the current state detection information and the state prediction information, wherein the first pressure change represents the predicted pressure change of the operating mechanism between the current moment and the next moment; determining the pressure prediction information of the operating mechanism at the next moment according to the first pressure change and the current pressure detection information. This will be specifically expanded in the subsequent content and will not be elaborated here.

[0111] As an optional implementation method, the first strategy can also be implemented based on the processing concept of the neural network model. Optionally, step S203 includes: inputting the terrain prediction information, the state prediction information and the current pressure detection information into a pre-trained second prediction model, and the second prediction model determines the pressure prediction information of the operating mechanism at the next moment based on the terrain prediction information, the state prediction information and the current pressure detection information.

[0112] Specifically, in this embodiment, a second prediction model is pre-trained. Optionally, the second prediction model is obtained by performing the first pressure prediction training on the second training sample. The second training sample includes the sample's second moment terrain information, the sample's second moment state information and the sample's first moment pressure information, wherein the second moment is the moment after the first moment, and the sample label of the second training sample is the annotated second moment pressure information. The first pressure prediction training is to enable the second prediction model to predict the second moment pressure information based on the sample's second moment terrain information, the sample's second moment state information and the sample's first moment pressure information, and the loss function value determined based on the model's predicted second moment pressure information and the annotated second moment pressure information meets the preset requirements. The trained second prediction model can predict the second moment pressure information based on the input second moment terrain information, second moment state information and first moment pressure information.

[0113] The second prediction model can be implemented based on a variety of deep learning neural network structures, such as CNN (Convolutional Neural Networks) network structure, RNN (Recurrent Neural Networks) network structure, CRNN (Convolutional Recurrent Neural Network) network structure, etc., which is not limited in this application.

[0114] S204. Determine a load prediction value of the operating mechanism at the next moment according to the pressure prediction information of the operating mechanism at the next moment.

[0115] The pressure prediction information determined in step S203 is crucial for determining the load of the operating mechanism. By accurately predicting the load of the operating mechanism, it is possible to optimize operating efficiency, reduce energy consumption, increase the service life of the equipment, and ensure operating safety. As for the specific implementation method of determining the load of the operating mechanism based on the pressure information of the operating mechanism, it can be implemented with reference to the relevant existing technology, and this application does not limit this.

[0116] As an optional implementation method, the load prediction value of the operating mechanism at the next moment is determined based on the pressure information of the operating mechanism, including: determining the driving force prediction value of the operating mechanism at the next moment based on the pressure prediction information of the operating mechanism at the next moment, and representing the load condition of the operating mechanism at the next moment with the driving force prediction value.

[0117] Among them, the driving force of the operating mechanism can be understood as the force generated by the operating mechanism actuator (such as a hydraulic cylinder) during the working process to push the load to move, and the pressure of the operating mechanism is the key factor in generating the driving force.

[0118] Specifically, after determining the pressure prediction information of the working mechanism at the next moment, the driving force prediction value of the working mechanism at the next moment can be determined by calculating according to the pressure prediction information and the geometric parameters of the actuator of the working mechanism. Taking the working mechanism using a hydraulic cylinder as an example, the driving force of the working mechanism is the hydraulic force, which is equal to the pressure multiplied by the effective working area of ​​the piston of the hydraulic cylinder.

[0119] Furthermore, when the working mechanism performs a specific action, the working state of the working mechanism actuator will change, thereby affecting the effective working area of ​​the working mechanism actuator (such as the effective working area of ​​the piston of the hydraulic cylinder). Therefore, before determining the driving force prediction value of the working mechanism at the next moment based on the pressure prediction information and the geometric parameters of the working mechanism actuator, it is necessary to first determine the working state of the working mechanism actuator (such as the rod chamber of the hydraulic cylinder is pressurized or the rodless chamber is pressurized) based on the posture information in the state prediction information of the working mechanism at the next moment, and then determine the geometric parameters of the working mechanism actuator (such as the effective working area of ​​the first piston corresponding to the rod chamber being pressurized or the effective area of ​​the second piston when the rodless chamber is pressurized).

[0120] The load prediction method provided in the embodiment of the present application first obtains the current state detection information of the operating mechanism, the current pressure detection information of the operating mechanism and the current terrain detection information of the excavation area in real time; then, based on the current terrain detection information and the current state detection information, determines the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment; finally, based on the terrain prediction information, the state prediction information and the current pressure detection information, determines the pressure prediction information of the operating mechanism at the next moment.

[0121] The load prediction method provided in the embodiment of the present application, on the one hand, can continuously and accurately automatically predict the pressure prediction information of the operating mechanism at the next moment by acquiring the current state detection information of the operating mechanism, the current pressure detection information of the operating mechanism and the current terrain detection information of the excavation area in real time, and then predict the load condition of the operating mechanism at the next moment, thereby meeting the real-time and accuracy requirements of the excavator for load prediction; on the other hand, there is no need to establish complex soil and material models, which reduces the complexity of calculation and improves the real-time performance of the prediction. It is also independent of specific soil and material parameters, which reduces the prediction error caused by changes in soil or material types, conforms to the complex and changeable actual working conditions of the excavator's operating environment, and has a wider applicability.

[0122] As an optional implementation method, after determining the pressure prediction information at the next moment, the weld stress of the engineering machinery at the next moment can also be determined according to the pressure prediction information at the next moment. As for the specific implementation method of determining the weld stress of the engineering machinery according to the pressure information of the operating mechanism, it can be implemented with reference to the relevant existing technology, and this application does not limit this.

[0123] As an optional implementation method, step S202 "determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment based on the current terrain detection information and the current state detection information" includes: determining the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment based on the current terrain detection information, the preset target terrain information, the current state detection information and the historical state detection information of the operating mechanism within the past preset time period.

[0124] Specifically, after obtaining the current state detection information of the operating mechanism and the current terrain detection information of the excavation area, the preset target terrain information and the stored historical state detection information of the operating mechanism are further combined to comprehensively determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment.

[0125] Among them, the current terrain detection information is the terrain data obtained in real time, reflecting the immediate status of the excavation area; the current state detection information is the operating state information obtained in real time, reflecting the immediate status of the operating mechanism; the preset target terrain information is the final target terrain state of this excavation operation, that is, the terrain state that is expected to be achieved after the completion of this excavation operation. The target terrain information provides the direction and target of this excavation operation. By comparing with the current terrain detection information, it can predict the possible excavation direction required to reach the target terrain; the historical state information state detection information can reflect the state changes of the operating mechanism in the past preset time period, and can reflect the movement trend and operation mode of the operating mechanism. For example, if the operating mechanism has been excavating at a certain speed for a period of time in the past, it can help predict that the operating mechanism may continue to maintain this speed for excavation in a short period of time in the future. Combining the above four aspects of information, it is possible to more accurately predict the terrain of the excavation area and the state of the operating mechanism at the next moment.

[0126] This implementation method can also be realized based on the processing concept of the neural network model.

[0127] Optionally, a third prediction model is pre-trained, and the current terrain detection information, the preset target terrain information, the current state detection information, and the historical state detection information are input into the pre-trained third prediction model, and the third prediction model outputs the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment. The training of the third prediction model can be performed by using a third training sample containing the above four types of information. The label information of the third training sample is the labeled terrain prediction information and the labeled state prediction information at the next moment. After the training is completed, the third prediction model will be able to accurately predict the terrain and state at the next moment based on the real-time terrain detection information, the target terrain information, the state detection information, and the historical state information.

[0128] Optionally, a fourth prediction model is pre-trained, and the fourth prediction model is a time series neural network model. The current terrain detection information, the preset target terrain information, and the current state detection information are input into the pre-trained fourth prediction model, and the fourth prediction model outputs the current terrain detection information, the preset target terrain information, and the current state detection information. The fourth prediction model is implemented based on a neural network structure containing a time series such as LSTM or GRU, and can memorize historical input information. Therefore, there is no need to input the historical state detection information of the operating mechanism in the past preset time period. After receiving the input current terrain detection information, preset target terrain information, and current state detection information, the fourth prediction model will determine the terrain prediction information of the excavation area at the next moment and the state prediction information of the operating mechanism based on the current terrain detection information, the preset target terrain information, the current state detection information, and the state detection information of the historical moment of the historical input.

[0129] In this implementation, the process of determining the terrain prediction information of the excavation area at the next moment and the status prediction information of the operating mechanism becomes more complex and accurate. It not only relies on the current terrain detection information and the current status detection information of the operating mechanism, but also takes into account the preset target terrain information and the historical status detection information of the operating mechanism in the past preset time period. That is, it not only takes into account the immediate environment and status, but also incorporates the target and historical data, thereby improving the accuracy and reliability of the prediction.

[0130] Furthermore, in addition to the current terrain detection information, the preset target terrain information, the current state detection information, and the historical state detection information of the operating mechanism in the past preset time period, the historical terrain detection information in the past preset time period can be further combined to determine the terrain prediction information of the excavation area at the next moment and the state prediction information of the operating mechanism, so as to further improve the accuracy of the prediction. The specific implementation can refer to the implementation ideas of the aforementioned embodiments, and will not be described in detail here.

[0131] As an optional implementation, the first strategy in step S203 is implemented based on the processing concept of dynamic change analysis, such as Figure 3 As shown, step S203 includes steps S301-S302:

[0132] S301. Determine a first pressure change amount based on a terrain change amount between the current terrain detection information and the terrain prediction information, and a state change amount between the current state detection information and the state prediction information. The first pressure change amount represents a predicted pressure change amount of the operating mechanism between a current moment and a next moment.

[0133] The state change of the operating mechanism (such as speed increase, digging depth change, etc.) will change the way it interacts with the excavated materials and the surrounding environment, resulting in changes in its force state, and then corresponding pressure changes. The state change between the current state detection information and the state prediction information of the operating mechanism reflects the state change that will occur between the current moment and the next moment of the operating mechanism, and can be used to evaluate the pressure changes that the operating mechanism may face at the next moment.

[0134] The terrain change in the excavation area will lead to changes in the contact mode between the operating mechanism and the excavated materials, the support conditions, etc., which will in turn change the pressure of the operating mechanism. The terrain change between the current terrain detection information and the terrain prediction information of the excavation area reflects the terrain changes that will occur in the excavation area between the current moment and the next moment, and can be used to evaluate the pressure changes that the operating mechanism may face at the next moment.

[0135] Specifically, after obtaining the current terrain detection information and terrain prediction information of the excavation area and the current state detection information and state prediction information of the operating mechanism, they are analyzed to determine the terrain change amount between the current terrain detection information and the terrain prediction information of the excavation area, as well as the state change amount between the current state detection information and the state prediction information of the operating mechanism, and a comprehensive analysis is performed on the above-mentioned terrain change amounts and state change amounts, and the impact of the terrain change amounts and the state change amounts on the pressure of the operating mechanism is comprehensively considered to determine the predicted pressure change amount of the operating mechanism between the current moment and the next moment, that is, the first pressure change amount.

[0136] The first pressure change reflects the possible change in the pressure on the operating mechanism from the current moment to the next moment due to the change in the terrain and the state of the operating mechanism.

[0137] As an optional implementation method, after determining the terrain change and state change between the current moment and the next moment, a variety of methods can be used to analyze the impact of the terrain change and state change on the pressure of the operating mechanism to determine the first pressure change of the operating mechanism between the current moment and the next moment. For example, the pressure change can be estimated based on a physical model or empirical formula, or a machine learning algorithm can be used to learn and predict the pressure change pattern.

[0138] As an optional implementation method, after determining the terrain change and state change between the current moment and the next moment, the terrain change and the state change are input into a pre-trained pressure change determination model, and the first pressure change determination model determines the first pressure change based on the terrain change and the state change.

[0139] In this implementation, a pressure change determination model is pre-trained, and the training of the pressure change determination model can be performed by using training samples including the terrain change of the excavation area and the state change of the operating mechanism. The label information of the training sample is the labeled first pressure change of the operating mechanism. The trained pressure change determination model can learn the complex relationship between the terrain change, the state change and the pressure change, and predict the first pressure change of the operating mechanism based on the input data (i.e., the current terrain detection information, the terrain prediction information, the current state detection information and the state prediction information).

[0140] Of course, the current terrain detection information, terrain prediction information, current state detection information and state prediction information can also be directly input into the pre-trained pressure change amount determination model, but in this way, the training samples and training methods of the pressure change amount determination model are changed accordingly to adapt to the new input and output. The trained pressure change amount determination model can determine the terrain change amount between the current terrain detection information and the terrain prediction information, and determine the state change amount between the current state detection information and the state prediction information, and predict the first pressure change amount of the operating mechanism based on the terrain change amount and the state change amount.

[0141] S302: Determine the pressure prediction information of the operating mechanism at the next moment according to the first pressure change and the current pressure detection information.

[0142] According to the above content, the first pressure change reflects the change in pressure on the operating mechanism from the current moment to the next moment due to changes in the terrain and the state of the operating mechanism. Then, after determining the first pressure change, the pressure prediction information of the operating mechanism at the next moment can be determined based on the first pressure change between the current moment and the next moment and the pressure detection information at the current moment.

[0143] This implementation method takes into account the changes in the operating state of the operating mechanism between the current moment and the next moment (such as an increase or decrease in speed, a change in excavation action, etc.) and the changes in terrain (such as terrain undulations, etc.) rather than static values. It can better capture the impact of changes in operating state and terrain on the pressure on the operating mechanism, thereby better adapting to the dynamic changes in the pressure of the operating mechanism and providing more accurate, more adaptable to dynamic environments, more noise-resistant and more interpretable pressure prediction results.

[0144] Further, as an optional implementation, step S301 and step S302 are implemented based on the processing concept of the neural network model, such as Figure 4 As shown, step S203 includes step S401:

[0145] S401, input the current terrain detection information, the terrain prediction information, the current state detection information, the state prediction information and the current pressure detection information into a pre-trained first pressure prediction model, and the first pressure prediction model determines a first pressure change according to a terrain change between the current terrain detection information and the terrain prediction information, and a state change between the current state detection information and the state prediction information, and determines pressure prediction information of the operating mechanism at the next moment according to the first pressure change and the current pressure detection information.

[0146] Specifically, in the embodiment of the present application, a first pressure prediction model is pre-trained. The first pressure prediction model is obtained by performing a second pressure prediction training on a fourth training sample. The fourth training sample includes terrain information at the first moment of the sample, terrain information at the second moment of the sample, state information at the first moment of the sample, state information at the second moment of the sample, and pressure information at the first moment of the sample, wherein the second moment is the moment after the first moment. The sample label of the fourth training sample is the pressure information at the second moment. The second pressure prediction training is performed so that the first pressure prediction model can determine the first pressure change according to the terrain change between the terrain information at the first moment of the sample and the terrain information at the second moment of the sample, and the state change between the state information at the first moment of the sample and the state information at the second moment of the sample, and determine the pressure prediction information at the second moment according to the first pressure change and the pressure information at the first moment of the sample.

[0147] After obtaining the current terrain detection information and terrain prediction information of the excavator, the current state detection information and state prediction information of the operating mechanism, and the current pressure detection information through steps S201 and S202, these information are input into a pre-trained first pressure prediction model. The first pressure prediction model can predict the pressure prediction information of the operating mechanism at the next moment based on the terrain change between the current terrain detection information and the terrain prediction information of the excavation area, the state change between the current state detection information and the state prediction information of the operating mechanism, and the current pressure detection information.

[0148] The first pressure prediction model can be implemented based on a variety of deep learning neural network structures, such as CNN (Convolutional Neural Networks) network structure, RNN (Recurrent Neural Networks) network structure, CRNN (Convolutional Recurrent Neural Network) network structure, etc., which is not limited in this application.

[0149] Further, as an optional implementation, the first pressure prediction model is a time series neural network model, and the first pressure model determines the first pressure change amount according to the terrain change amount between the current terrain detection information and the terrain prediction information, and the state change amount between the current state detection information and the state prediction information, including:

[0150] The first pressure change amount and the hidden state at the current moment are determined based on the terrain change amount between the current terrain detection information and the terrain prediction information, the state change amount between the current state detection information and the state prediction information, and the hidden state at the previous moment. The hidden state at the previous moment includes the model input information within a preset time period in the past and the intermediate state information corresponding to the model input information.

[0151] Specifically, the first pressure prediction model can be implemented based on any type of neural network structure with intrinsic time series, such as RNN (Recurrent Neural Networks), LSTM (Long Short-Term Memory networks), GRU (Gated Recurrent Unit), etc., and this application does not limit this.

[0152] Time series neural network is a neural network model specially designed for processing time series data. It combines the advantages of neural networks and time series analysis, can effectively capture the timing information and patterns in time series data, and perform tasks such as prediction and classification.

[0153] In a time series neural network, the hidden state is the key information passed to the next moment. The hidden state is calculated at the end of each time step, contains all the important information in the historical sequence, and serves as one of the inputs of the next time step (in addition to the external input of the next time step). The information in the hidden state is crucial for subsequent predictions and decisions. In this way, the hidden state acts as a bridge for information transmission, allowing the network to remember and use past information to affect future outputs. In this implementation, the hidden state at the previous moment includes the model input information within the past preset time period and the intermediate state information corresponding to the model input information.

[0154] In this implementation, the first pressure prediction model can capture the timing dependencies and dynamic changes in the input data of historical time steps, such as the timing information and dependencies of one or more data including the terrain information of the excavation area, the status information of the excavator operating mechanism, and the pressure information of the operating mechanism, thereby assisting the input information of the current time step to predict the pressure prediction information of the operating mechanism at the next moment, thereby achieving more accurate prediction.

[0155] Preferably, in order to solve the problem of gradient disappearance or gradient explosion, the first pressure prediction model is implemented using LSTM neural networks (Long Short-Term Memory networks).

[0156] In addition to the hidden state, in LSTM neural networks (Long Short-Term Memory networks), the cell state is updated at each time step according to the output of the forget gate and the input gate. The updated cell state not only contains the relevant information of the current time step, but also retains the long-term dependency information of the previous time step. The updated cell state will be passed to the LSTM unit of the next time step and continue to participate in the subsequent calculation and update process. Unlike the hidden state, the cell state is more stable and not easily affected by short-term input fluctuations. Through the fine control of the forget gate, input gate, and output gate, the effective retention and update of long-term information is achieved.

[0157] Furthermore, because the excavation operation cycle of construction machinery is relatively slow and the correlation with various information in the excavation process is high, on the basis of the ordinary long-term and short-term neural network structure, the network's weakened weights for the past moments and the feedforward mechanism of the past moments are added.

[0158] Specifically, Figure 5 As shown, in the embodiment of the present application, a weight w is added to the memory cell c in the hidden layer of the common long short-term memory neural network, C t-1 =C′ t-1 w, so that as time increases, the weight of important information in the previous sequence recorded in the memory cell c gradually decreases.

[0159] σ is the activation layer of the neural network, σ=F(W i A i +b i ), where W i , b i is the neural network parameter, A i is the state quantity.

[0160] Figure 6 A flow chart of another load prediction method provided in an embodiment of the present application. Figure 6 As shown, the load prediction method provided in the embodiment of the present application includes steps S601-S603:

[0161] S601, obtaining current state detection information of the operating mechanism, current pressure detection information of the operating mechanism, and current terrain detection information of the excavation area, wherein the current state detection information includes a posture detection value and / or a speed detection value of the operating mechanism at a current moment.

[0162] Step S601 and Figure 2 Corresponding to step S201 in the illustrated embodiment, the specific content of step S601 can refer to step S201 and will not be elaborated here.

[0163] S602: Input the current state detection information, the current pressure detection information and the current terrain detection information into a pre-trained second pressure prediction model to obtain the pressure prediction information of the operating mechanism at the next moment.

[0164] The second pressure prediction model includes a first submodule and a second submodule, wherein the first submodule is used to determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment based on the current terrain detection information and the current state detection information; the second submodule is used to determine the pressure prediction information of the operating mechanism at the next moment based on the terrain prediction information, the state prediction information and the current pressure detection information.

[0165] In this embodiment, a second pressure prediction model is pre-built and pre-trained.

[0166] First, construct a second pressure prediction model. Construct the first submodule and the second submodule separately, and combine the first submodule and the second submodule according to a preset rule, so that in the constructed second pressure prediction model, the current state detection information and the current pressure detection information in the input of the second pressure prediction model are used as the input of the first submodule, the output of the first submodule (the terrain prediction information of the excavation area and the state prediction information of the operating mechanism) and the current pressure detection information in the input of the second pressure prediction model are used as the output of the second submodule, and the output of the second submodule is used as the output of the second pressure prediction model.

[0167] Secondly, train the second pressure prediction model. After constructing the second pressure prediction model, use the data set consisting of the current working mechanism state information of the sample - the current excavation area terrain information of the sample - the current working mechanism pressure information of the sample as the fifth training sample and the sample label corresponding to the fifth training sample (marking the working mechanism pressure information at the next moment) to perform the third pressure prediction training on the constructed second pressure prediction model, and obtain the trained second pressure prediction model.

[0168] The third pressure prediction training aims to enable the second pressure prediction model to generate pressure prediction information of the operating mechanism at the next moment and to enable the loss function value determined by the pressure prediction information output by the model and the pressure information of the operating mechanism at the next moment to meet the preset requirements. The trained second pressure prediction model can determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment based on the input current terrain detection information of the excavation area and the current state detection information of the operating mechanism, and determine the pressure prediction information of the operating mechanism at the next moment based on the terrain prediction information, the state prediction information and the input current pressure detection information of the operating mechanism.

[0169] As an optional implementation, the second pressure prediction model is a time series neural network model.

[0170] The fourth prediction model is implemented based on a neural network structure that contains time series, such as LSTM or GRU, and is able to memorize historical input information. Therefore, there is no need to input historical status detection information of the operating mechanism within a preset time period in the past.

[0171] In this implementation, optionally, the first submodule can be specifically used to determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment based on the current terrain detection information, the current state detection information, the preset target terrain information and the historical state detection information of the operating mechanism within the past preset time period that has been historically input.

[0172] Optionally, the first submodule can be specifically used to determine the terrain prediction information of the excavation area at the next moment and the state prediction information of the operating mechanism based on the current terrain detection information, the current state detection information, the preset target terrain information, the historical state detection information of the operating mechanism within the past preset time period, and the historical terrain detection information of the excavation area within the past preset time period.

[0173] As an optional implementation method, the second sub-module can be specifically used to determine the first pressure change based on the terrain change between the current terrain detection information and the terrain prediction information, and the state change between the current state detection information and the state prediction information, and determine the pressure prediction information of the operating mechanism at the next moment based on the first pressure change and the current pressure detection information.

[0174] S603: Determine a load prediction value of the operating mechanism at the next moment according to the pressure prediction information of the operating mechanism at the next moment.

[0175] Step S603 and Figure 2 Corresponding to step S204 in the illustrated embodiment, the specific content of step S603 can refer to step S204 and will not be elaborated here.

[0176] Exemplary Devices

[0177] Corresponding to the above-mentioned load prediction method, an embodiment of the present application also provides a load prediction device. Figure 7 is a schematic diagram of the structure of a load prediction device provided in an embodiment of the present application, such as Figure 7 As shown, the load prediction device provided in the embodiment of the present application is applied to engineering machinery, the engineering machinery includes an operating mechanism, the operating mechanism is used to perform excavation operations, and the device includes:

[0178] A data acquisition unit 701 is used to determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment according to the current terrain detection information and the current state detection information;

[0179] A first prediction unit 702, configured to determine terrain prediction information of the excavation area and state prediction information of the operating mechanism at a next moment according to the current terrain detection information and the current state detection information;

[0180] A second prediction unit 703, configured to determine pressure prediction information of the operating mechanism at a next moment according to the terrain prediction information, the state prediction information and the current pressure detection information, wherein the pressure prediction information is used to determine the load of the engineering machinery;

[0181] The load prediction unit 704 is used to determine the load prediction value of the operating mechanism at the next moment according to the pressure prediction information of the operating mechanism at the next moment.

[0182] The load prediction device provided in the embodiment of the present application, on the one hand, can continuously and accurately automatically predict the pressure prediction information of the operating mechanism at the next moment by acquiring the current state detection information of the operating mechanism, the current pressure detection information of the operating mechanism and the current terrain detection information of the excavation area in real time, and then predict the load condition of the operating mechanism at the next moment, thereby meeting the real-time and accuracy requirements of the excavator for load prediction; on the other hand, there is no need to establish complex soil and material models, which reduces the complexity of calculation and improves the real-time performance of the prediction. It is also independent of specific soil and material parameters, which reduces the prediction error caused by changes in soil or material types, conforms to the complex and changeable actual working conditions of the excavator's operating environment, and has a wider applicability.

[0183] Optionally, the first prediction unit 702 may be specifically configured to:

[0184] The terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment are determined based on the current terrain detection information, the preset target terrain information, the current state detection information and the historical state detection information of the operating mechanism in the past preset time period.

[0185] Optionally, the second prediction unit 703 may be specifically configured to:

[0186] Determine a first pressure change amount according to a terrain change amount between the current terrain detection information and the terrain prediction information, and a state change amount between the current state detection information and the state prediction information, wherein the first pressure change amount represents a predicted pressure change amount of the operating mechanism between a current moment and a next moment;

[0187] The pressure prediction information of the operating mechanism at the next moment is determined according to the first pressure change amount and the current pressure detection information.

[0188] Optionally, the second prediction unit 703 may be specifically configured to:

[0189] The current terrain detection information, the terrain prediction information, the current state detection information, the state prediction information and the current pressure detection information are input into a pre-trained first pressure prediction model, and the first pressure prediction model determines a first pressure change based on the terrain change between the current terrain detection information and the terrain prediction information, and the state change between the current state detection information and the state prediction information, and determines the pressure prediction information of the operating mechanism at the next moment based on the first pressure change and the current pressure detection information.

[0190] Optionally, the first pressure prediction model is a time series neural network model, and determining the first pressure change amount according to the terrain change amount between the current terrain detection information and the terrain prediction information and the state change amount between the current state detection information and the state prediction information includes:

[0191] The first pressure change amount and the hidden state at the current moment are determined based on the terrain change amount between the current terrain detection information and the terrain prediction information, the state change amount between the current state detection information and the state prediction information, and the hidden state at the previous moment. The hidden state at the previous moment includes the model input information within a preset time period in the past and the intermediate state information corresponding to the model input information.

[0192] Optionally, the first prediction unit 702 and the second prediction unit 703 may be combined into one unit, which may be specifically used for:

[0193] Inputting the current state detection information, the current pressure detection information and the current terrain detection information into a pre-trained second pressure prediction model to obtain pressure prediction information of the operating mechanism at the next moment, wherein the second pressure prediction model is a time series neural network model, and the second pressure prediction model includes a first submodule and a second submodule;

[0194] The first submodule is used to determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment according to the current terrain detection information, the current state detection information, the preset target terrain information and the historical state detection information in the past preset time period in the hidden state at the previous moment;

[0195] The second submodule is used to determine the first pressure change according to the terrain change between the current terrain detection information and the terrain prediction information, the state change between the current state detection information and the state prediction information, and the hidden state at the previous moment, and to determine the pressure prediction information of the operating mechanism at the next moment according to the first pressure change and the current pressure detection information, wherein the hidden state at the previous moment includes the model input information within a preset time period in the past and the intermediate state information corresponding to the model input information.

[0196] The load prediction device provided in this embodiment belongs to the same application concept as the load prediction method provided in the above embodiments of this application, can execute the load prediction method provided in any of the above embodiments of this application, and has the corresponding functional modules and beneficial effects of executing the load prediction method. For technical details not fully described in this embodiment, please refer to the specific processing content of the load prediction method provided in the above embodiments of this application, which will not be repeated here.

[0197] Exemplary Electronic Devices

[0198] Another embodiment of the present application also provides a load prediction device, see Figure 8 As shown, the device includes:

[0199] Memory 200 and processor 210;

[0200] The memory 200 is connected to the processor 210 and is used to store programs;

[0201] The processor 210 is used to implement the load prediction method disclosed in any of the above embodiments by running the program stored in the memory 200.

[0202] Specifically, the load prediction device may further include: a bus, a communication interface 220 , an input device 230 and an output device 240 .

[0203] The processor 210, the memory 200, the communication interface 220, the input device 230 and the output device 240 are connected to each other via a bus.

[0204] A bus may include a pathway that transfers information between components of a computer system.

[0205] The processor 210 may be a general-purpose processor, such as a general-purpose central processing unit (CPU), a microprocessor, etc., or an application-specific integrated circuit (ASIC), or one or more integrated circuits for controlling the execution of the program of the scheme of the present invention. It may also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0206] The processor 210 may include a main processor, and may also include a baseband chip, a modem, and the like.

[0207] The memory 200 stores a program for executing the technical solution of the present invention, and may also store an operating system and other key services. Specifically, the program may include a program code, and the program code includes a computer operation instruction. More specifically, the memory 200 may include a read-only memory (ROM), other types of static storage devices that can store static information and instructions, a random access memory (RAM), other types of dynamic storage devices that can store information and instructions, a disk storage, a flash, and the like.

[0208] The input device 230 may include a device for receiving data and information input by a user, such as a keyboard, a mouse, a camera, a scanner, a light pen, a voice input device, a touch screen, a pedometer, or a gravity sensor.

[0209] Output device 240 may include devices that allow information to be output to a user, such as a display screen, printer, speaker, etc.

[0210] The communication interface 220 may include any transceiver or the like to communicate with other devices or communication networks, such as Ethernet, Radio Access Network (RAN), Wireless Local Area Network (WLAN), etc.

[0211] The processor 210 executes the program stored in the memory 200 and calls other devices, which can be used to implement each step of any load prediction method provided in the above embodiments of the present application.

[0212] Exemplary computer program products and storage media

[0213] In addition to the above-mentioned methods and devices, an embodiment of the present application may also be a computer program product, which includes computer program instructions, which, when executed by a processor, enable the processor to execute the steps of the load prediction method according to various embodiments of the present application described in the above-mentioned "Exemplary Method" section of this specification.

[0214] The computer program product may be written in any combination of one or more programming languages ​​to write program codes for performing the operations of the embodiments of the present application, including object-oriented programming languages, such as Java, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.

[0215] In addition, the embodiment of the present application may also be a storage medium on which a computer program is stored. The computer program is executed by a processor in the load prediction method according to various embodiments of the present application described in the above “Exemplary Method” section of this specification, and specifically the following steps may be implemented:

[0216] S201, obtaining current state detection information of the operating mechanism, current pressure detection information of the operating mechanism, and current terrain detection information of the excavation area, wherein the current state detection information includes a posture detection value and / or a speed detection value of the operating mechanism at a current moment.

[0217] S202: Determine terrain prediction information of the excavation area and state prediction information of the working mechanism at the next moment according to the current terrain detection information and the current state detection information.

[0218] S203: Determine the pressure prediction information of the operating mechanism at the next moment according to the terrain prediction information, the state prediction information and the current pressure detection information.

[0219] S204. Determine a load prediction value of the operating mechanism at the next moment according to the pressure prediction information of the operating mechanism at the next moment.

[0220] For the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the order of the actions described, because according to the present application, some steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0221] It should be noted that each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments, and the same or similar parts between the embodiments can be referred to each other. For the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0222] The steps in the methods of each embodiment of the present application can be adjusted in order, combined and deleted according to actual needs, and the technical features recorded in each embodiment can be replaced or combined.

[0223] The modules and sub-modules in the devices and terminals in the various embodiments of the present application can be combined, divided and deleted according to actual needs.

[0224] In the several embodiments provided in the present application, it should be understood that the disclosed terminals, devices and methods can be implemented in other ways. For example, the terminal embodiments described above are only schematic, for example, the division of modules or submodules is only a logical function division, and there may be other division methods in actual implementation, for example, multiple submodules or modules can be combined or integrated into another module, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or modules, which can be electrical, mechanical or other forms.

[0225] The modules or submodules described as separate components may or may not be physically separated, and the components of the modules or submodules may or may not be physical modules or submodules, that is, they may be located in one place, or they may be distributed on multiple network modules or submodules. Some or all of the modules or submodules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0226] In addition, each functional module or submodule in each embodiment of the present application may be integrated into one processing module, or each module or submodule may exist physically separately, or two or more modules or submodules may be integrated into one module. The above-mentioned integrated modules or submodules may be implemented in the form of hardware or in the form of software functional modules or submodules.

[0227] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0228] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented directly by hardware, software units executed by a processor, or a combination of the two. The software units may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.

[0229] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including a..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0230] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A load prediction method, It is characterized in that Applied to engineering machinery, the engineering machinery includes an operating mechanism, the operating mechanism is used to perform excavation operations, and the method includes: Acquire current state detection information of the operating mechanism, current pressure detection information of the operating mechanism, and current terrain detection information of the excavation area, wherein the current state detection information includes a posture detection value and / or a speed detection value of the operating mechanism at the current moment; Determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment according to the current terrain detection information and the current state detection information; Determining the pressure prediction information of the operating mechanism at the next moment according to the terrain prediction information, the state prediction information and the current pressure detection information; According to the pressure prediction information of the operating mechanism at the next moment, the load prediction value of the operating mechanism at the next moment is determined.

2. The method according to claim 1, It is characterized in that The determining, based on the current terrain detection information and the current state detection information, terrain prediction information of the excavation area at the next moment and state prediction information of the operating mechanism includes: The terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment are determined based on the current terrain detection information, the preset target terrain information, the current state detection information and the historical state detection information of the operating mechanism in the past preset time period.

3. The method according to claim 1, It is characterized in that The step of determining the pressure prediction information of the operating mechanism at the next moment according to the terrain prediction information, the state prediction information and the current pressure detection information includes: Determine a first pressure change amount according to a terrain change amount between the current terrain detection information and the terrain prediction information, and a state change amount between the current state detection information and the state prediction information, wherein the first pressure change amount represents a predicted pressure change amount of the operating mechanism between a current moment and a next moment; The pressure prediction information of the operating mechanism at the next moment is determined according to the first pressure change amount and the current pressure detection information.

4. The method according to claim 3, It is characterized in that The determining of a first pressure change amount according to a terrain change amount between the current terrain detection information and the terrain prediction information, and a state change amount between the current state detection information and the state prediction information, and determining pressure prediction information of the operating mechanism at a next moment according to the first pressure change amount and the current pressure detection information, comprises: The current terrain detection information, the terrain prediction information, the current state detection information, the state prediction information and the current pressure detection information are input into a pre-trained first pressure prediction model, and the first pressure prediction model determines a first pressure change based on the terrain change between the current terrain detection information and the terrain prediction information, and the state change between the current state detection information and the state prediction information, and determines the pressure prediction information of the operating mechanism at the next moment based on the first pressure change and the current pressure detection information.

5. The method according to claim 4, It is characterized in that The first pressure prediction model is a time series neural network model, and the first pressure change amount is determined according to the terrain change amount between the current terrain detection information and the terrain prediction information, and the state change amount between the current state detection information and the state prediction information, including: The first pressure change amount and the hidden state at the current moment are determined based on the terrain change amount between the current terrain detection information and the terrain prediction information, the state change amount between the current state detection information and the state prediction information, and the hidden state at the previous moment. The hidden state at the previous moment includes the model input information within a preset time period in the past and the intermediate state information corresponding to the model input information.

6. The method according to claim 1, It is characterized in that The determining, based on the current terrain detection information and the current state detection information, the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment, and the determining, based on the terrain prediction information, the state prediction information and the current pressure detection information, the pressure prediction information of the operating mechanism at the next moment, comprises: Inputting the current state detection information, the current pressure detection information and the current terrain detection information into a pre-trained second pressure prediction model to obtain pressure prediction information of the operating mechanism at the next moment, wherein the second pressure prediction model is a time series neural network model, and the second pressure prediction model includes a first submodule and a second submodule; The first submodule is used to determine the terrain prediction information of the excavation area and the state prediction information of the operating mechanism at the next moment according to the current terrain detection information, the current state detection information, the preset target terrain information and the historical state detection information in the past preset time period in the hidden state at the previous moment; The second submodule is used to determine the first pressure change according to the terrain change between the current terrain detection information and the terrain prediction information, the state change between the current state detection information and the state prediction information, and the hidden state at the previous moment, and to determine the pressure prediction information of the operating mechanism at the next moment according to the first pressure change and the current pressure detection information, wherein the hidden state at the previous moment includes the model input information within a preset time period in the past and the intermediate state information corresponding to the model input information.

7. A load prediction device, It is characterized in that Applied to engineering machinery, the engineering machinery includes an operating mechanism, the operating mechanism is used to perform excavation operations, and the device includes: A data acquisition unit, used to acquire current state detection information of the operating mechanism, current pressure detection information of the operating mechanism, and current terrain detection information of the excavation area, wherein the current state detection information includes a posture detection value and / or a speed detection value of the operating mechanism at a current moment; A first prediction unit, configured to determine terrain prediction information of the excavation area and state prediction information of the operating mechanism at a next moment according to the current terrain detection information and the current state detection information; A second prediction unit, configured to determine pressure prediction information of the operating mechanism at a next moment according to the terrain prediction information, the state prediction information and the current pressure detection information; The load prediction unit is used to determine the load prediction value of the operating mechanism at the next moment according to the pressure prediction information of the operating mechanism at the next moment.

8. A computer program product, It is characterized in that The method comprises computer program instructions, which, when executed by a processor, enable the processor to implement the load prediction method according to any one of claims 1 to 6.

9. A load prediction device, It is characterized in that including memory and processor; The memory is connected to the processor and is used to store programs; The processor is used to implement the load prediction method according to any one of claims 1 to 6 by running the program in the memory.

10. A construction machine, It is characterized in that include: An operating mechanism, a detection device, and a load prediction device as claimed in claim 9, wherein: The detection device comprises a first detection device, a second detection device and a third detection device, wherein the first detection device, the second detection device and the third detection device are respectively connected to the load prediction device for communication; The operating mechanism is used to perform excavation operations; The first detection device is used to collect the current state detection value of the operating mechanism in real time; The second detection device is used to collect the current pressure detection value of the operating mechanism in real time; The third detection device is used to collect the terrain information of the current area to be excavated in real time.

11. The construction machine according to claim 10, It is characterized in that The engineering machinery is an excavator; The working mechanism comprises a boom, an arm and a bucket; The first detection device includes a boom state detection device, a dipper arm state detection device and a bucket state detection device; The second detection device includes a boom pressure detection device, a dipper arm pressure detection device and a bucket pressure detection device.

Citation Information

Patent Citations

  • Three-dimensional graphic rendering display method and device for mining engineering operation result

    CN114411867A

  • Excavator load prediction method based on radial basis function neural network

    CN115478574A

  • Shovel and method for controlling same

    EP3159455A1

  • System and Method for Detecting a Crest

    US20140032030A1

Cited By

  • Mining electric shovel multi-target excavation trajectory planning method based on sine transition S-shaped curve

    CN121636980A