Drainage device and method for road engineering

By introducing a cleaning and sealing anti-odor mechanism into the road drainage device, the problems of filter plate clogging and odor in hot weather are solved, achieving efficient drainage and environmental protection.

CN118774231AInactive Publication Date: 2024-10-15SHANXI WEILIDA BUILDING DECORATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411080076.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The filter plates in the road drainage system are easily clogged with debris, resulting in reduced drainage efficiency and prone to odor in hot weather.

Method used

A road drainage device is designed, which includes a cleaning mechanism and a sealing and anti-odor mechanism. The cleaning mechanism automatically cleans debris on the filter plate through components such as water receiving plates, transmission strips, and elastic ropes; the sealing and anti-odor mechanism uses thermal sleeves, air bags, and sealing plates to seal the movable gaps of the cleaning mechanism to prevent odors from escaping.

Benefits of technology

It effectively prevents the filter plate from clogging, ensures drainage efficiency, and seals out odors in hot weather to prevent sewage odor from affecting the environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774231A_ABST
    Figure CN118774231A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of road drainage, in particular to a drainage device for road engineering and a method thereof.The drainage device comprises a road drainage mechanism, the road drainage mechanism comprises a drainage pipeline, a filter plate is arranged at the top of the drainage pipeline, and a mounting frame is fixedly connected to the top of the drainage pipeline; the inner wall of the mounting frame is fixedly connected with the surface of the filter plate, the tops of the two sides of the inner wall of the drainage pipeline are movably connected with cleaning mechanisms through shaft pins, a sealing deodorization mechanism is embedded in the mounting frame, and each cleaning mechanism comprises a water receiving plate. Rainwater can be discharged through the road drainage mechanism, the cleaning mechanism can be continuously started to continuously clean a filter plate of the road drainage mechanism in the drainage process of the road drainage mechanism, and the sealing deodorization mechanism can be started to seal a movable gap of the cleaning mechanism in hot weather, so that odor is prevented from being emitted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of road drainage, and in particular to a drainage device and method for road engineering. Background Art

[0002] Road drainage is an important engineering measure to ensure the stability of the roadbed and the life of the road. The design and maintenance of the road drainage system plays a key role in the safety of traffic operation, the durability of the road surface and the city's flood control capacity. During the road drainage process, the sewage will first be filtered through the filter plate and enter the sewer, but the sewage on the road will cause foreign objects such as branches and leaves on the road to block the filter plate, resulting in the current sewer being unable to drain smoothly, reducing the drainage efficiency. Summary of the invention

[0003] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0004] In view of the above problems existing in the existing drainage device for road engineering, the present invention is proposed.

[0005] Therefore, the object of the present invention is to provide a drainage device for road engineering, the purpose of which is to clean the drainage process to prevent blockage and prevent odor in hot weather.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: comprising a road drainage mechanism, the road drainage mechanism comprising a drainage pipe, a filter plate is arranged on the top of the drainage pipe, a mounting frame is fixedly connected to the top of the drainage pipe, the inner wall of the mounting frame is fixedly connected to the surface of the filter plate, the tops of both sides of the inner wall of the drainage pipe are movably connected to a cleaning mechanism through an axle pin, and a sealing and deodorizing mechanism is embedded in the interior of the mounting frame; The cleaning mechanism comprises a water receiving plate, the outer sides of both sides of the water receiving plate are movably connected with the front and rear sides of both sides of the inner wall of the drainage pipe through axle pins, a water receiving groove is provided on the inner side of the top of the water receiving plate, a limit plate is provided on the outer side of the top of the water receiving plate, the outer side of the limit plate is fixedly connected to the top of both sides of the inner wall of the drainage pipe, two transmission bars are provided on the top of the filter plate, and the bottom of the transmission bar is fixedly connected with a scraper bar for cleaning the filter plate, both sides of the inner side of the bottom of the inner wall of the water receiving groove are fixedly connected with a transmission elastic rope, the other end of the transmission elastic rope passes through the four corners of the filter plate and is fixedly connected to the two sides of the outer side of the transmission bar, the front and rear sides of the top of both sides of the inner wall of the drainage pipe are fixedly connected with a reset elastic rope, the other end of the reset elastic rope passes through the two sides of the top of the filter plate and is fixedly connected to the two sides of the bottom of the transmission bar, an emergency drainage assembly is provided on the outer side of the top of the water receiving plate, and both sides of the top of the mounting frame are fixedly connected with a blocking assembly, and the inner side of the water receiving plate is arranged in an arc.

[0007] As a preferred solution of the drainage device for road engineering described in the present invention, wherein: the sealing and deodorizing mechanism includes a heat-conducting sleeve, which is embedded in the interior of the mounting frame, mounting grooves are provided on both sides of the top of the drainage pipe, a heat-conducting plate is provided inside the mounting groove, the top of the heat-conducting plate is fixedly connected to both sides of the bottom of the heat-conducting sleeve, a movable groove is provided at the bottom of the inner side of the inner wall of the mounting groove, an air bag is fixedly connected to the top of the inner wall of the movable groove, the outer side of the air bag is in contact with the bottom of the inner side of the heat-conducting plate, sealing plates for sealing both sides of the water receiving plate are provided at the top of both sides of the inner wall of the drainage pipe, a pull rope is fixedly connected to the bottom of the inner side of the air bag, the other end of the pull rope passes through the interior of the drainage pipe and is fixedly connected to both sides of the top of the sealing plate, and reset components are fixedly connected to both sides of the bottom of the sealing plate.

[0008] As a preferred solution of the drainage device for road engineering described in the present invention, wherein: the emergency drainage component includes a connecting groove, the connecting groove is opened on the outer side of the top of the water receiving plate, a water receiving box is arranged inside the connecting groove, the outer sides of both sides of the water receiving box are movably connected to the outer sides of both sides of the inner wall of the connecting groove through axle pins, the outer sides of both sides of the top of the water receiving plate are fixedly connected with a connecting frame, the top of the inner wall of the connecting frame is fixedly connected with a first tension spring, and the other end of the first tension spring is fixedly connected to both sides of the bottom of the inner wall of the water receiving box.

[0009] As a preferred solution of the drainage device for road engineering described in the present invention, the blocking assembly includes a blocking horizontal bar, the bottom of which is fixedly connected to the two sides of the top of the mounting frame, the outer side of the top of the blocking horizontal bar is inclined, the top of the blocking horizontal bar is fixedly connected with a rubber vertical bar, a plurality of the rubber vertical bars are arranged and distributed at equal distances, and a limiting component is provided on the inner side of the blocking horizontal bar.

[0010] As a preferred solution of the drainage device for road engineering described in the present invention, the limiting component includes a limiting groove, the limiting groove is opened on the inner side of the blocking cross bar, both sides of the transmission bar are fixedly connected with limiting sliders, and the surface of the limiting slider is slidably connected to the inner wall of the limiting groove.

[0011] As a preferred solution of the drainage device for road engineering described in the present invention, the reset assembly includes a second tension spring, one end of the second tension spring is fixedly connected to both sides of the bottom of the sealing plate, the other end of the second tension spring is fixedly connected to a connecting plate, and the outer side of the connecting plate is fixedly connected to the front and rear sides of the top of both sides of the inner wall of the drainage pipe.

[0012] As a preferred solution of the drainage device for road engineering of the present invention, a magnetic block is embedded on the inner side of the inner wall of the connecting groove, and the outer side of the magnetic block is magnetically adsorbed to the inner side of the water receiving box.

[0013] As a preferred solution of the drainage device for road engineering of the present invention, drainage holes are provided at the bottom of the inner sides of both sides of the inner wall of the water receiving trough, and the top of the outer side of the inner wall of the water receiving trough is inclined.

[0014] The beneficial effects of the present invention are as follows: when it rains, rainwater will be discharged through the road drainage mechanism and the cleaning mechanism will be continuously activated to clean the filter plate of the road drainage mechanism; in hot weather, the sealing and deodorizing mechanism will be activated to seal and prevent the odor from emanating.

[0015] In view of the above-mentioned problems existing in the existing drainage devices for road engineering, the present invention is proposed.

[0016] Therefore, the object of the present invention is to provide a method for using a drainage device for road engineering, the purpose of which is to clean the drainage process to prevent blockage and prevent odor in hot weather.

[0017] In order to solve the above technical problems, the present invention provides the following technical solutions: comprising: When it rains, rainwater will be discharged through the road drainage mechanism; During the rain, rainwater discharged from the road drainage mechanism will activate the cleaning mechanism to clean the road drainage mechanism; When the weather is hot, the sealing and deodorizing mechanism will be activated to seal the movable gap of the cleaning mechanism.

[0018] As a preferred embodiment of the method for using the drainage device for road engineering of the present invention, the method comprises: When it rains, rainwater will be discharged through the road drainage mechanism, thus ensuring the effect of road drainage and flood discharge and avoiding waterlogging on the road; During the rain, the rainwater discharged by the road drainage mechanism will activate the cleaning mechanism to continuously scrape and clean the debris, branches and leaves on the road drainage mechanism to both sides to avoid blockage and affect the drainage efficiency; When the weather is hot, the sealing and odor-proof mechanism will be activated to seal the movable gap of the cleaning mechanism, so that the odor of sewage evaporated in the road drainage mechanism can be blocked by the sealing and odor-proof mechanism to prevent the odor of sewage from spreading and affecting the ambient air.

[0019] The beneficial effects of the present invention are as follows: when it rains, rainwater will be discharged through the road drainage mechanism. During the drainage process using the road drainage mechanism, the cleaning mechanism will be continuously activated to continuously clean the filter plate of the road drainage mechanism. In hot weather, the sealing and odor-proof mechanism will be activated to seal the movable gap of the cleaning mechanism to prevent the odor from emanating. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them: Figure 1 The present invention provides an overall structural diagram.

[0021] Figure 2 This is a schematic diagram of the cross-sectional structure of the drainage pipe provided by the present invention.

[0022] Figure 3 A schematic exploded view of parts of the mounting frame provided by the present invention.

[0023] Figure 4 This is a schematic diagram of the cross-sectional structure of the water receiving plate provided by the present invention.

[0024] Figure 5 This is a schematic exploded view of the parts of the transmission bar provided by the present invention.

[0025] Figure 6 The present invention provides Figure 2 Enlarged structural diagram at A in the middle. DETAILED DESCRIPTION

[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0027] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0028] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0029] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0030] Reference Figures 1 to 6 , which is the first embodiment of the present invention, provides a drainage device for road engineering. Through the method of using the drainage device for road engineering, the road drainage mechanism 100 is used to drain water, and the cleaning mechanism 200 is driven to clean during the drainage process. In hot weather, the sealing and deodorizing mechanism 300 is driven to seal and deodorize.

[0031] When it rains, rainwater will be discharged through the road drainage mechanism 100, thereby ensuring the effect of road drainage and flood discharge and avoiding road surface water accumulation; During the rain, the rainwater discharged by the road drainage mechanism 100 will activate the cleaning mechanism 200 to continuously scrape and clean the debris, branches and leaves on the road drainage mechanism 100 to both sides to avoid blockage and thus affect the drainage efficiency; When the weather is hot, the sealing and odor-proofing mechanism 300 is activated to seal the movable gap of the cleaning mechanism 200, so that the odor of the sewage evaporated in the road drainage mechanism 100 is blocked by the sealing and odor-proofing mechanism 300, preventing the odor of the sewage from escaping and affecting the ambient air. Reference Figure 2 , 3 and Figure 6, which is the second embodiment of the present invention, provides a drainage device for road engineering. Through the sealing and odor-proofing mechanism 300, when the weather is relatively hot, the sealing and odor-proofing mechanism 300 will seal the movable gap of the water receiving plate 201, so that the odor inside the drainage pipe 101 will no longer dissipate.

[0032] The sealing and deodorizing mechanism 300 includes a heat-conducting sleeve 301, which is embedded in the interior of the mounting frame 103. Mounting grooves 302 are provided on both sides of the top of the drainage pipe 101. A heat-conducting plate 303 is provided inside the mounting groove 302. The top of the heat-conducting plate 303 is fixedly connected to both sides of the bottom of the heat-conducting sleeve 301. A movable groove 304 is provided at the bottom of the inner side of the inner wall of the mounting groove 302. An air bag 305 is fixedly connected to the top of the inner wall of the movable groove 304. The outer side of the air bag 305 contacts the bottom of the inner side of the heat-conducting plate 303. Sealing plates 306 for sealing both sides of the water docking plate 201 are provided at the top of both sides of the inner wall of the drainage pipe 101. A pull rope 307 is fixedly connected to the bottom of the inner side of the air bag 305. The other end of the pull rope 307 passes through the interior of the drainage pipe 101 and is fixedly connected to both sides of the top of the sealing plate 306. Reset components 308 are fixedly connected to both sides of the bottom of the sealing plate 306.

[0033] The reset assembly 308 includes a second tension spring 308a, one end of which is fixedly connected to both sides of the bottom of the sealing plate 306, and the other end of the second tension spring 308a is fixedly connected to a connecting plate 308b, and the outer side of the connecting plate 308b is fixedly connected to the front and rear sides of the top of both sides of the inner wall of the drainage pipe 101.

[0034] Specifically, when the ambient weather is relatively hot, the heat-conducting sleeve 301 will transfer heat to the airbag 305 for heating, so that the gas inside the airbag 305 will gradually expand after being heated, thereby pulling the pull rope 307 to drive the sealing plate 306 to seal the movable gap of the water receiving plate 201, thereby preventing the odor generated by the evaporation of sewage inside the drainage pipe 101 from leaking out and causing environmental odor. At the same time, the second tension spring 308a above the connecting plate 308b will be pulled to generate tension, so that when the airbag 305 cools down and contracts, the tension of the second tension spring 308a can be used to drive the sealing plate 306 to reset, thereby preventing the sealing plate 306 from getting stuck and unable to reset, thereby improving the smoothness of use.

[0035] Furthermore, in the case of hot weather, the mounting frame 103 will be subjected to heat conduction from the ground, and then the mounting frame 103 will conduct the heat to the heat-conducting sleeve 301, and then the heat-conducting sleeve 301 will continue to conduct the heat to the heat-conducting plate 303, and then the heat-conducting plate 303 with increased heat will heat the airbag 305, so that the gas inside the airbag 305 will gradually expand after being heated, and at this time, the bottom of the airbag 305 will expand downward under the limit of the movable groove 304, and then the airbag 305 will pull one end of the pull rope 307 The second tension spring 308a above the connecting plate 308b is pulled to generate a tension force, so that when the airbag 305 cools down and contracts, the tension force of the second tension spring 308a can be used to drive the sealing plate 306 to return to its original position, thereby preventing the sealing plate 306 from being stuck and unable to return to its original position.

[0036] It should be noted that the mounting frame 103, the heat-conducting sleeve 301 and the heat-conducting plate 303 are all made of metallic copper. The good thermal conductivity of metallic copper is utilized to improve the reaction speed of the expansion and contraction of the airbag 305. The penetration point of the pulling rope 307 is higher than the position of the sealing plate 306, thereby ensuring the pulling stability of the sealing plate 306 by the pulling rope 307. In addition, the gas stored in the airbag 305 is helium. The characteristic of helium that its volume changes quickly when heated or cooled is utilized to improve the contraction and expansion speed of the airbag 305.

[0037] Reference Figure 2 Figure 4 , which is the third embodiment of the present invention, provides a drainage device for road engineering. Through the emergency drainage component 208, when it rains suddenly under hot weather and the water receiving plate 201 cannot be tilted due to the sealing of the sealing plate 306, the emergency drainage component 208 can temporarily drain the water.

[0038] The emergency drainage assembly 208 includes a connecting groove 208a, which is opened on the outer side of the top of the water receiving plate 201. A water receiving box 208b is arranged inside the connecting groove 208a. The outer sides of both sides of the water receiving box 208b are movably connected to the outer sides of both sides of the inner wall of the connecting groove 208a through axle pins. The outer sides of both sides of the top of the water receiving plate 201 are fixedly connected with a connecting frame 208c, and the top of the inner wall of the connecting frame 208c is fixedly connected with a first tension spring 208d, and the other end of the first tension spring 208d is fixedly connected to both sides of the bottom of the inner wall of the water receiving box 208b.

[0039] Specifically, when it rains suddenly under hot weather, the water receiving plate 201 cannot be tilted due to the sealing of the sealing plate 306. Excessive water will flow into the water receiving box 208b through the inclined inner wall of the water receiving trough 202 on the outside, and the rainwater will be poured out through the water receiving box 208b for discharge until the air bag 305 cools down, so that the pressure inside the air bag 305 is reduced, and then the tension of the second tension spring 308a is released, thereby pulling the sealing plate 306 to reset, and the movable gap of the water receiving plate 201 is no longer sealed. Then the water receiving plate 201 can continue to drain water and pull the transmission sleeve through the transmission elastic rope 206 to drive the scraper 205 to clean the top of the filter plate 102. At this time, the water receiving box 208b can be stopped from being used, so as to avoid rainwater accumulating on the top of the water receiving plate 201 for a long time, causing the water receiving plate 201 to be unable to continue to drain water, thereby causing drainage obstruction and causing waterlogging on the road.

[0040] Furthermore, when it rains suddenly under hot weather, the rainwater dripping on the ground will flow to the top of the drainage pipe 101 and be filtered by the filter plate 102 installed on the mounting frame 103, so that foreign matters such as branches and leaves carried by the rainwater are filtered and remain on the filter plate 102, and then the filtered rainwater will enter the drainage pipe 101 and be received and stored by the water receiving groove 202 provided on the water receiving plate 201. At this time, the water receiving plate 202 01 Due to the sealing of the sealing plate 306, the water receiving plate 201 cannot be tilted, and excessive water will flow into the water receiving box 208b through the inner wall of the water receiving groove 202 which is inclined. At the same time, the heat conducting sleeve 301 will gradually cool down as the outside temperature decreases. When the water inside the water receiving box 208b gradually increases, making the overall weight of the water receiving box 208b greater than the sum of the suction force of the magnetic block 208e on the water receiving box 208b and the tension of the first tension spring 208d, the water receiving box 208b will tilt. The inner side is tilted to pour out the rainwater inside, and at the same time, the magnetic block 208e and the water receiving box 208b are separated and no longer adsorbed. At this time, the overall weight of the water receiving box 208b is much greater than the weight of the first tension spring 208d, so that the water receiving box 208b can pour out more rainwater, and then the tension of the first tension spring 208d is used to reset, and then the magnetic block 208e is magnetically adsorbed to the water receiving box 208b again, and then the cycle is repeated until the heat conductive sleeve 301 drops to a certain temperature and conducts the temperature so that the heat conductive plate 303 is cooled down in the same manner as the airbag 305, so that the pressure inside the airbag 305 is reduced, and then the airbag 305 will shrink, so that the tension of the second tension spring 308a on the connecting plate 308b is released, thereby pulling the sealing plate 306 to reset, and the movable gap of the water receiving plate 201 is no longer sealed. Then the water receiving plate 201 can continue to drain water and pull the transmission sleeve through the transmission elastic rope 206 to drive the scraper 205 to clean the top of the filter plate 102. At this time, the water receiving box 208b can be stopped.

[0041] The remaining structure is the same as that of Example 2.

[0042] Reference Figures 1 to 6 , which is the fourth embodiment of the present invention. This embodiment is different from the third embodiment in that: this embodiment provides a drainage device for road engineering.

[0043] When it rains, rainwater dripping on the ground will flow to the top of the drainage pipe 101 and be filtered through the filter plate 102 installed on the mounting frame 103, so that foreign matter such as branches and leaves carried by the rainwater will be filtered and remain on the filter plate 102, and then the filtered rainwater will enter the drainage pipe 101.

[0044] The rainwater entering the drainage pipe 101 will be received and stored by the water receiving groove 202 provided on the water receiving plate 201, and the rainwater in the water receiving groove 202 can be discharged through the drainage hole 202a. When the rainfall increases, the impurities to be filtered on the filter plate 102 will increase. At this time, the collection speed of the rainwater by the water receiving groove 202 is greater than the drainage speed of the drainage hole 202a, and then the rainwater in the water receiving groove 202 will gradually increase, so that the overall weight of the inner side of the water receiving plate 201 will increase, and then the drainage will cause the inner side of the water receiving plate 201 to gradually tilt downward, and in the process of the inner side of the water receiving plate 201 gradually tilting downward, the transmission elastic rope 20 The elastic tension of the transmission elastic rope 206 generated by pulling down the transmission elastic rope 206 with one end of the reset elastic rope 207 is greater than the elastic tension of the reset elastic rope 207, so that the other end of the transmission elastic rope 206 pulls the transmission bar 204 to move outward, and then the transmission bar 204 drives the scraper bar 205 to clean and push the debris branches and leaves filtered on the top of the filter plate 102 to the outside. When the inner side of the water receiving plate 201 tilts downward to a certain position, the rainwater in the water receiving trough 202 will be completely poured out and discharged through the drainage pipe 101. At the same time, the rainwater in the water receiving plate 201 will reduce the overall weight after being discharged. At this time, the transmission elastic rope 206 will release the elastic tension and pull the water from the water receiving plate 201. The water receiving plate 201 is driven to reset, and then the limiting plate 203 is used to limit the maximum movable space of the water receiving plate 201 to prevent the water receiving plate 201 from rotating too much when resetting, thereby affecting normal use. At the same time, the elastic tension of the resetting elastic rope 207 is also released to drive the transmission bar 204 and the scraper bar 205 to move inward and reset. Then the water receiving groove 202 on the water receiving plate 201 will continue to collect rainwater, and the inner side of the water receiving plate 201 is arranged in an arc shape, so as to avoid the situation that the two water receiving plates 201 cannot be closed during the reset process. In this way, the top of the filter plate 102 can be continuously cleaned, and the scraper bar During the movement and cleaning process of scraper 205, the blocking horizontal bar 209a can be set to block the rainwater on the front and rear sides, preventing the rainwater from carrying impurities, branches, leaves and other foreign objects from entering the inner side of scraper 205 from the front and rear sides during the process of scraper 205 moving outward, causing the scraper 205 to be unable to clean the foreign objects in the middle. At the same time, by setting a plurality of rubber vertical bars 209b, the drifting impurities, branches and leaves can be blocked when there is a lot of rain. At the same time, the rubber vertical bars 209b are soft and the outer side of the blocking horizontal bar 209a is inclined, thereby ensuring that the blocking horizontal bar 209a and the rubber vertical bars 209b do not affect the walking of pedestrians.

[0045] In the case of hot weather, the mounting frame 103 will be subjected to heat conduction from the ground, and then the mounting frame 103 will conduct the heat to the heat-conducting sleeve 301, and then the heat-conducting sleeve 301 will continue to conduct the heat to the heat-conducting plate 303, and then the heat-conducting plate 303 with increased heat will heat the airbag 305, so that the gas inside the airbag 305 will gradually expand after being heated, and at this time, the bottom of the airbag 305 will expand downward under the limit of the movable groove 304, and then the airbag 305 will pull one end of the pull rope 307 to move downward The other end of the pulling rope 307 pulls the sealing plate 306 to move upward. At this time, the sealing plate 306 can seal the movable gap of the water receiving plate 201 to prevent the odor generated by the evaporation of sewage in the drainage pipe 101 from leaking out and causing environmental odor. At the same time, the second tension spring 308a above the connecting plate 308b will be pulled to generate tension, so that when the airbag 305 cools down and contracts, the tension of the second tension spring 308a can be used to drive the sealing plate 306 to return to its original position, thereby preventing the sealing plate 306 from being stuck and unable to return to its original position.

[0046] When it rains suddenly under hot weather, the rainwater dripping on the ground will flow to the top of the drainage pipe 101 and be filtered by the filter plate 102 installed on the mounting frame 103, so that foreign matters such as branches and leaves carried by the rainwater are filtered and remain on the filter plate 102. Then, the filtered rainwater will enter the drainage pipe 101 and be received and stored by the water receiving groove 202 opened on the water receiving plate 201. At this time, the water receiving plate 201 is Due to the sealing of the sealing plate 306, the water receiving plate 201 cannot be tilted, and excessive water will flow into the inside of the water receiving box 208b through the inner wall of the water receiving groove 202 which is inclined. At the same time, the heat conductive sleeve 301 will gradually cool down as the outside temperature decreases. When the water inside the water receiving box 208b gradually increases, making the overall weight of the water receiving box 208b greater than the sum of the suction force of the magnetic block 208e on the water receiving box 208b and the tension of the first tension spring 208d, the water receiving box 208b will tilt inward. The rainwater inside is poured out obliquely, and at the same time, the magnetic block 208e and the water receiving box 208b are separated and no longer adsorbed. At this time, the weight of the water receiving box 208b as a whole is much greater than the weight of the first tension spring 208d, so that the water receiving box 208b can pour out more rainwater, and then the tension of the first tension spring 208d is used to reset, and then the magnetic block 208e is magnetically adsorbed to the water receiving box 208b again, and then the cycle is repeated until the heat conductive sleeve 301 drops to a certain temperature and conducts the temperature so that the heat conductive plate 301 03 is cooled in the same manner as the airbag 305, so that the pressure inside the airbag 305 is reduced, and then the airbag 305 will shrink, so that the tension of the second tension spring 308a on the connecting plate 308b is released, thereby pulling the sealing plate 306 to reset, and the movable gap of the water receiving plate 201 is no longer sealed. Then the water receiving plate 201 can continue to drain water and pull the transmission sleeve through the transmission elastic rope 206 to drive the scraper 205 to clean the top of the filter plate 102. At this time, the water receiving box 208b can stop being used.

[0047] When the road drainage mechanism 100 is used for drainage, rainwater will continuously drive the water receiving plate 201 in the cleaning mechanism 200 to tilt up and down, and then the water receiving plate 201 will drive the scraper 205 to scrape the debris, branches and leaves filtered above the filter plate 102 in the road drainage mechanism 100 to both sides for cleaning. At the same time, the sealing and deodorizing mechanism 300 can be used to seal and deodorize when the weather is hot.

[0048] Importantly, it should be noted that the construction and arrangement of the present application shown in a number of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible, for example, the size, scale, structure, shape and proportion of various elements, and parameter values ​​such as temperature, pressure, etc., mounting arrangements, use of materials, color, directional changes, etc., without substantially departing from the novel angles and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure of the execution function described herein, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the present invention is not limited to a specific embodiment, but extends to a variety of modifications that still fall within the scope of the appended claims. In addition, in order to provide a concise description of the exemplary embodiments, all features of the actual embodiments may not be described, that is, those features that are not relevant to the best mode currently considered to carry out the invention, or those features that are not relevant to implementing the invention.

[0049] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A drainage device for road engineering, characterized in that: The road drainage mechanism (100) comprises a drainage pipe (101), a filter plate (102) is arranged on the top of the drainage pipe (101), a mounting frame (103) is fixedly connected to the top of the drainage pipe (101), the inner wall of the mounting frame (103) is fixedly connected to the surface of the filter plate (102), the tops of both sides of the inner wall of the drainage pipe (101) are movably connected to cleaning mechanisms (200) via axle pins, and a sealing and deodorizing mechanism (300) is embedded inside the mounting frame (103); The cleaning mechanism (200) comprises a water receiving plate (201), the outer sides of both sides of the water receiving plate (201) are movably connected to the front side and the rear side of both sides of the inner wall of the drainage pipe (101) through axle pins, a water receiving groove (202) is provided on the inner side of the top of the water receiving plate (201), a limiting plate (203) is provided on the outer side of the top of the water receiving plate (201), the outer side of the limiting plate (203) is fixedly connected to the top of both sides of the inner wall of the drainage pipe (101), two transmission bars (204) are provided on the top of the filter plate (102), the bottom of the transmission bar (204) is fixedly connected to a scraper bar (205) for cleaning the filter plate (102), and two inner sides of the bottom of the inner wall of the water receiving groove (202) are provided. The sides of the water receiving plate (201) are fixedly connected with a transmission elastic rope (206), the other end of the transmission elastic rope (206) passes through the four corners of the filter plate (102) and is fixedly connected to the two sides of the outer side of the transmission bar (204), the front side and the rear side of the top of the two sides of the inner wall of the drainage pipe (101) are fixedly connected with a reset elastic rope (207), the other end of the reset elastic rope (207) passes through the two sides of the top of the filter plate (102) and is fixedly connected to the two sides of the bottom of the transmission bar (204), the outer side of the top of the water receiving plate (201) is provided with an emergency drainage component (208), the two sides of the top of the installation frame (103) are fixedly connected with a blocking component (209), and the inner side of the water receiving plate (201) is arranged in a circular arc.

2. The drainage device for road engineering according to claim 1, characterized in that: The sealing and deodorizing mechanism (300) comprises a heat-conducting sleeve (301), the heat-conducting sleeve (301) being embedded in the interior of the installation frame (103), installation grooves (302) being provided on both sides of the top of the drainage pipe (101), a heat-conducting plate (303) being provided inside the installation groove (302), the top of the heat-conducting plate (303) being fixedly connected to both sides of the bottom of the heat-conducting sleeve (301), a movable groove (304) being provided at the bottom of the inner wall of the installation groove (302), and an air bag (305) being fixedly connected to the top of the inner wall of the movable groove (304). ), the outer side of the airbag (305) is in contact with the bottom of the inner side of the heat conducting plate (303), the tops of both sides of the inner wall of the drainage pipe (101) are provided with sealing plates (306) for sealing both sides of the water receiving plate (201), the bottom of the inner side of the airbag (305) is fixedly connected with a pull rope (307), the other end of the pull rope (307) passes through the interior of the drainage pipe (101) and is fixedly connected to both sides of the top of the sealing plate (306), and the two sides of the bottom of the sealing plate (306) are fixedly connected with reset components (308).

3. The drainage device for road engineering according to claim 1, characterized in that: The emergency drainage assembly (208) comprises a connecting groove (208a), wherein the connecting groove (208a) is arranged on the outer side of the top of the water receiving plate (201), and a water receiving box (208b) is arranged inside the connecting groove (208a), and the outer sides of both sides of the water receiving box (208b) are movably connected to the outer sides of both sides of the inner wall of the connecting groove (208a) through axle pins, and the outer sides of both sides of the top of the water receiving plate (201) are fixedly connected to a connecting frame (208c), and the top of the inner wall of the connecting frame (208c) is fixedly connected to a first tension spring (208d), and the other end of the first tension spring (208d) is fixedly connected to both sides of the bottom of the inner wall of the water receiving box (208b).

4. The drainage device for road engineering according to claim 3, characterized in that: The blocking assembly (209) comprises a blocking horizontal bar (209a), the bottom of the blocking horizontal bar (209a) being fixedly connected to two sides of the top of the mounting frame (103), the outer side of the top of the blocking horizontal bar (209a) being inclined, the top of the blocking horizontal bar (209a) being fixedly connected to a rubber vertical bar (209b), a plurality of the rubber vertical bars (209b) being provided and distributed at equal distances, and a limiting component (209c) being provided on the inner side of the blocking horizontal bar (209a).

5. The drainage device for road engineering according to claim 4, characterized in that: The limiting component (209c) comprises a limiting groove (209c-1), the limiting groove (209c-1) being arranged on the inner side of the blocking horizontal bar (209a), both sides of the transmission bar (204) being fixedly connected to limiting sliders (209c-2), and the surface of the limiting slider (209c-2) being slidably connected to the inner wall of the limiting groove (209c-1).

6. The drainage device for road engineering according to claim 5, characterized in that: The reset assembly (308) comprises a second tension spring (308a), one end of the second tension spring (308a) being fixedly connected to two sides of the bottom of the sealing plate (306), the other end of the second tension spring (308a) being fixedly connected to a connecting plate (308b), the outer side of the connecting plate (308b) being fixedly connected to the front side and the rear side of the top of two sides of the inner wall of the drainage pipe (101).

7. The drainage device for road engineering according to claim 6, characterized in that: A magnetic block (208e) is inlaid on the inner side of the inner wall of the connection groove (208a), and the outer side of the magnetic block (208e) is magnetically adsorbed to the inner side of the water receiving box (208b).

8. The drainage device for road engineering according to claim 7, characterized in that: Drain holes (202a) are provided at the bottom of the inner sides of both sides of the inner wall of the water receiving trough (202), and the top of the outer side of the inner wall of the water receiving trough (202) is arranged in an inclined manner.

9. A method for using a drainage device for road engineering, characterized in that: The drainage device for road engineering according to any one of claims 1 to 8 comprises: When it rains, rainwater will be discharged through the road drainage mechanism (100); During rain, rainwater discharged from the road drainage mechanism (100) will activate the cleaning mechanism (200) to clean the road drainage mechanism (100); When the weather is hot, the sealing and deodorizing mechanism (300) is activated to seal the movable gap of the cleaning mechanism (200).

10. The method for using the drainage device for road engineering according to claim 9, characterized in that: include, When it rains, rainwater will be discharged through the road drainage mechanism (100), thereby ensuring the effect of road drainage and flood discharge and avoiding water accumulation on the road; During rain, rainwater discharged from the road drainage mechanism (100) will activate the cleaning mechanism (200) to continuously scrape and clean debris, branches and leaves on both sides of the road drainage mechanism (100), thereby avoiding blockage and affecting drainage efficiency; When the weather is relatively hot, the sealing and odor-proofing mechanism (300) is activated to seal the movable gap of the cleaning mechanism (200), so that the odor of the sewage evaporated in the road drainage mechanism (100) is blocked by the sealing and odor-proofing mechanism (300), thereby preventing the odor of the sewage from escaping and affecting the ambient air.