A flow delay test method for a network cooling system

By testing and optimizing the flow delay time of the cooling system in the network-type SVG system, the problem of failure to effectively consider the flow delay under high-volume overload conditions in the prior art is solved, and the cooling medium is realized at low flow The stable operation ensures the stability and reliability of the system.

CN118776951BActive Publication Date: 2024-11-22CHANGZHOU BORI ELECTRIC POWER AUTOMATION EQUIP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411244633.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-22
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

The existing network-type SVG supporting cooling system fails to effectively consider the flow delay test under high-volume overload conditions, resulting in the inability to achieve better cooling control effects, affecting the operating efficiency and reliability of the system.

Method used

By testing the pump-cutting and starting time of the two pumps in the cooling system in the mesh-type SVG system, the original pump overlap time and the flow drop establishment time, the working condition with the longest flow delay time is selected as the basis, and combined with The flow delay safety value ensures that the cooling medium can operate stably at low flow and avoids system shutdown.

Benefits of technology

It realizes low flow time measurement of cooling medium under the most demanding working conditions, ensures that the cutting pump failure does not affect the stable operation of the system, ensures that the cooling medium in the cooling system is in the best state, quickly and efficiently removes the heat generated by the power module, and supports the structure of the network. Stable operation of the SVG system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118776951B_ABST
    Figure CN118776951B_ABST
Patent Text Reader

Abstract

The present invention relates to a flow delay test method for a meshed cooling system, which uses a cooling system matched with a meshed SVG as a carrier, and within the low flow capacity of the junction temperature of the meshed SVG valve group, tests the pump cut-and-start time, the original pump overlap time, and the flow drop establishment time of the two pumps in the cooling system to obtain the flow delay time. The present invention can accurately measure the time required for the low flow of the cooling medium in the meshed SVG system under the most demanding working conditions, so as to set the flow delay, so that a single fault such as pump cut does not affect the stable operation of the system; at the same time, combined with the tolerance of the power module in the meshed SVG valve group, it is ensured that the valve group components will not be affected by low flow in a short period of time. The reliability of its operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of networked water cooling, and in particular relates to a flow delay testing method for a networked cooling system. Background Art

[0002] In recent years, the construction of new power systems has accelerated, and the problem of voltage stability in large power grids has become prominent. The control technology of grid-type SVG has been developed as needed. By improving the overload capacity of devices and short-term energy storage technology, the inertia support and voltage support of the power grid are improved, and the system damping level is improved, which enhances the stability of the system. The application is becoming more and more extensive. The improvement of high-overload capacity has also further increased the requirements for the supporting cooling system.

[0003] Compared with the cooling systems of conventional SVG, SVC and other equipment, the cooling system of the mesh-type SVG has the characteristics of thick main pipe diameter and large flow. The power of the configured water pump is also correspondingly larger. The flow of the cooling system is relatively slow to establish. In order to ensure that a single failure such as water pump operation does not affect the operation of the system, the setting of the flow delay is crucial to ensure the safe and efficient operation of the cooling system and the mesh-type SVG system and avoid "tripping".

[0004] However, the flow delay setting of the existing cooling system supporting the mesh-type SVG only focuses on the flow delay setting of traditional SVG equipment, without testing the flow delay from the perspective of high-overload conditions, and without considering the characteristics of long pipe diameter, large flow and high-power water pumps, and cannot achieve a better cooling control effect. Especially for the cooling system under the requirements of meshing, there is no clear flow delay test method, and the power devices cannot be cooled according to the optimal cooling solution, which affects the efficiency and reliability of the operation of the mesh-type SVG. Summary of the invention

[0005] The purpose of the present invention is to provide a flow delay test method for a meshed cooling system to solve the problem of poor operating stability of the meshed SVG system.

[0006] A flow delay test method for a networked cooling system of the present invention is implemented as follows:

[0007] A flow delay test method for a meshed cooling system takes the cooling system of a meshed SVG as a carrier and tests the pump cut-and-start time, original pump overlap time, and flow drop establishment time of two pumps in the cooling system within the low flow capacity of the junction temperature of the meshed SVG valve group to obtain the flow delay time.

[0008] Furthermore, the two pumps in the cooling system are connected in parallel and serve as backup for each other, and the two pumps' pump-cutting and pump-starting operating conditions include the following three:

[0009] First, timed pump switching: the two pumps switch to work at a fixed time;

[0010] Second, pump failure and pump switching: if the original pump fails, switch to the standby pump;

[0011] Third, switch back to the original pump if the pump fails: when the standby pump fails during scheduled pump switching, switch back to the original pump;

[0012] Among the three working conditions of pump cutting and pump starting, the one with the longest flow delay time is selected as the basis for flow delay calculation of the network-type SVG system.

[0013] Furthermore, the flow delay time t 流量延时 The calculation method is as follows:

[0014] t 流量延时1 =t 泵故障切泵 + t 流量跌落建立1 ,

[0015] t 流量延时2 =t 切泵故障回切泵 +t 流量跌落建立2 -t 原泵重叠 ,

[0016] t 流量延时 =max{t 流量延时1 , t 流量延时2}+t 流量延时安全值 ,

[0017] And t 流量延时 +t 流量延时安全值 ≤t 低流量构网阀组结温承受能力 ;

[0018] Among them, t 泵故障切泵 is the pump failure cut-off time, t 流量跌落建立1 The flow drop build-up time under pump failure and pump-cutting conditions, t 切泵故障回切泵 The pump failure re-switching time, t 流量跌落建立2 is the flow drop establishment time under the condition of switching back the pump due to pump failure, t 原泵重叠 is the original pump overlap time, t 流量延时安全值 is the set flow delay safety value time, t 低流量构网阀组结温承受能力 It is the time that the simulated junction temperature of the mesh-type SVG valve group withstands at low flow.

[0019] Furthermore, the pump failure switching time is the time it takes for the original pump to fail and for the standby pump to be soft-started successfully.

[0020] Furthermore, the pump failure switching back to pump time is the time elapsed when the standby pump fails and switches back to the original pump during the scheduled pump switching and the original pump is soft-started successfully.

[0021] Furthermore, the original pump overlap time is the time during which the original pump is kept running while the pump is cut under the condition of scheduled pump cutting.

[0022] Furthermore, the flow drop establishment time is the time from when the inlet valve flow of the cooling medium drops below the low flow setting value when the pump is cut off, to when the inlet valve flow rises above the low flow setting value after the pump is started.

[0023] Furthermore, the simulated junction temperature withstand time of the meshed SVG valve group at low flow, that is, the time the junction temperature of the meshed SVG valve group withstands when the inlet flow of the cooling medium is lower than the low value of the flow setting under the two working conditions of pump failure and pump cutting or pump cutting failure and pump back cutting.

[0024] Furthermore, the low flow setting value is the minimum flow value required for heat dissipation of the set meshed SVG valve group.

[0025] Furthermore, the inlet valve flow rate of the cooling medium is monitored by a flow transmitter in the cooling system.

[0026] After adopting the above technical solution, the present invention has the following beneficial effects:

[0027] (1) The present invention can accurately measure the time required for low flow rate of cooling medium in the most demanding working conditions of the networked SVG system, so as to set the flow delay, so that a single fault such as pump cutting does not affect the stable operation of the system;

[0028] (2) The present invention can ensure that the flow rate of the cooling medium in the cooling system is in the optimal operating state, and quickly and efficiently remove the heat generated by the power module in the meshed SVG valve group to support the stable operation of the meshed SVG system;

[0029] (3) The present invention combines the tolerance of the power module in the network-type SVG valve group to ensure that the valve group components will not be affected by low flow in a short period of time and their operating reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0031] Figure 1 It is a schematic structural diagram of a closed pure water cooling system equipped with the network-type SVG in the present invention;

[0032] Figure 2 is a curve diagram of the real-time inlet flow rate of the cooling medium-time in the second working condition in the embodiment of the present invention;

[0033] Figure 3 is a curve diagram of the real-time inlet flow rate of the cooling medium-time in the third working condition in the embodiment of the present invention;

[0034] In the figure: pumps 1, 2, electric valve 3, external cooling equipment 4, water supply device 5, deionization treatment circuit 6, pressure stabilizing system 7, network type SVG valve group 8, pressure transmitter 9, flow transmitter 10. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] The cooling system of the mesh-type SVG system is characterized by thick pipe diameter, large flow and long circuit. When a fault occurs and the pump is cut off, the flow builds up slowly and a flow delay needs to be set to prevent the system from shutting down and tripping due to the cooling medium's inlet valve pressure or inlet valve flow being too low.

[0038] When the pump is cut off, the inlet valve pressure drops faster than the inlet valve flow. The delay setting gives priority to the inlet valve flow. In this way, the flow delay obtained on the basis of the inlet valve flow can also meet the delay requirements of the inlet valve pressure.

[0039] A flow delay test method for a meshed cooling system takes the cooling system of a meshed SVG as a carrier and tests the pump cut-and-start time, original pump overlap time, and flow drop establishment time of two pumps in the cooling system within the low flow capacity of the junction temperature of the meshed SVG valve group to obtain the flow delay time.

[0040] The flow delay obtained in the present application is to ensure that the stable operation of the meshed SVG system is not affected when a pump-cut failure (i.e., pump-cut and pump-start) causes a flow drop.

[0041] like Figure 1 As shown, the cooling system equipped with the mesh-type SVG is a closed pure water cooling system, which includes two pumps (i.e., the main circulation pump in the cooling system), an external cooling device, a water replenishment device, a pressure stabilizing system, a deionization treatment circuit, and a cooled mesh-type SVG valve group, wherein a pressure transmitter and a flow transmitter are provided on the valve inlet main pipe of the mesh-type SVG valve group.

[0042] The cooling medium is driven by a pump that provides flow circulation power, and the flow of internal and external circulation is controlled by an electric valve. After the cooling medium is cooled by an external cooling device, the power module (i.e., the cooled device) in the flow network type SVG valve group takes away the heat of the cooled device and flows back to the pump inlet. The pressure transmitter and flow transmitter on the inlet valve main pipe monitor whether the flow and pressure of the cooling medium meet the cooling requirements.

[0043] The two pumps in the cooling system are connected in parallel and serve as backup for each other, and the two pumps' pump-cutting and pump-starting operating conditions include the following three:

[0044] First, timed pump switching: the two pumps switch to work at a scheduled time.

[0045] Specifically, the pumps are switched at a scheduled time, that is, the two pumps are switched periodically to avoid any pump running for a long time and affecting its service life.

[0046] Second, pump failure and pump switching: if the original pump fails, switch to the standby pump.

[0047] Third, switch back to the pump when the pump fails: When the standby pump fails during the scheduled pump switching, switch back to the original pump.

[0048] Among the three working conditions of pump cutting and pump starting, the one with the longest flow delay time is selected as the basis for flow delay calculation of the network-type SVG system.

[0049] Specifically, the above three pump cutting and starting conditions all have a corresponding pump cutting and starting time. When setting the flow delay time of the network-type SVG system, it is necessary to select the longest time as the basis, so that the flow delay requirements of the above three pump cutting and starting conditions can be met.

[0050] Specifically, the flow delay time t 流量延时 The calculation method is as follows:

[0051] t 流量延时1 =t 泵故障切泵 + t 流量跌落建立1 ,

[0052] t 流量延时2 =t 切泵故障回切泵 +t 流量跌落建立2 -t 原泵重叠 ,

[0053] t 流量延时 =max{t 流量延时1 , t 流量延时2}+t 流量延时安全值 ,

[0054] And t 流量延时 +t 流量延时安全值 ≤t 低流量构网阀组结温承受能力;

[0055] Among them, t 泵故障切泵 is the pump failure cut-off time, t 流量跌落建立1 The flow drop build-up time under pump failure and pump-cutting conditions, t 切泵故障回切泵 The pump failure re-switching time, t 流量跌落建立2 is the flow drop establishment time under the condition of switching back the pump due to pump failure, t 原泵重叠 is the original pump overlap time, t 流量延时安全值 is the set flow delay safety value time, t 低流量构网阀组结温承受能力 It is the time that the simulated junction temperature of the mesh-type SVG valve group withstands at low flow.

[0056] The pump failure switching time is the time it takes to successfully soft-start the standby pump when the original pump fails.

[0057] The cooling system is connected with a wave recording device, which can be set to record the parameters of the system at various times, and can display the relationship between the instantaneous value of the operating current of the two pumps and time in the form of a waveform curve. The instantaneous current of the pump starts from near zero to near the rated current and tends to be stable, indicating that the pump soft start is successful.

[0058] In the pump failure and pump cutting condition, the original pump fails and the current drops as the starting time, and the standby pump current rises to a stable value, that is, near its rated current as the ending time. The time period from the starting time to the ending time is the pump failure and pump cutting time.

[0059] The start time and the end time can be obtained through a pump current instantaneous value-time waveform curve on a wave recording device connected to the system.

[0060] The pump failure switching back time is the time elapsed when the standby pump fails and switches back to the original pump during the scheduled pump switching and the original pump is soft-started successfully.

[0061] In the pump failure switching-back pump working condition, the scheduled pump switching is the starting time, the standby pump fails to start successfully due to the fault and the original pump is successfully restarted as the end time, and the time period from the starting time to the end time is the pump failure switching-back pump time.

[0062] The start time and the end time can be obtained through the main pump timing switching action time and the pump current instantaneous value-time waveform on the recording device connected to the system.

[0063] The original pump overlap time is the time during which the original pump is kept running while the pump is cut off under the condition of scheduled pump cutting.

[0064] Specifically, when the power of the original pump is large, exceeding 75KW (not included), the original pump overlap time is set as small as possible to prevent excessive pump start current during soft start. In this case, the original pump overlap time is selected as 0s; in other cases, the original pump overlap time can be selected as 2s to compensate for the drop in flow during the pump cutting process.

[0065] The flow drop establishment time is the time from when the inlet valve flow of the cooling medium drops below the low flow setting value when the pump is cut off, to when the inlet valve flow rises above the low flow setting value after the pump is started.

[0066] Specifically, when the inlet valve flow rate of the cooling medium drops below the low flow setting value, the timing starts, that is, this time is the starting time. After the pump is successfully cut off, the inlet valve flow rate will continue to decrease and then rise again, until the inlet valve flow rate rises above the low flow setting value and the timing is immediately stopped, that is, this time is the end time. The time period from the start time to the end time is the flow drop establishment time.

[0067] The simulated junction temperature withstand time of the mesh-type SVG valve group at low flow, that is, the time that the junction temperature of the mesh-type SVG valve group withstands when the inlet flow of the cooling medium is lower than the low flow setting value under the two working conditions of pump failure and pump cutting or pump cutting failure and pump back cutting.

[0068] The SVG valve group generates heat during operation, and the cooling medium cools the valve group. If the cooling medium flow rate is too low for a long time, the valve group will be damaged by overheating. Therefore, the flow delay time t 流量延时 The set flow delay safety value time t 流量延时安全值 The sum cannot be greater than the time t that the simulated junction temperature of the meshed SVG valve group withstands at low flow 低流量构网阀组结温承受能力 , that is, the time t that the simulated junction temperature of the mesh-type SVG valve group withstands at low flow 低流量构网阀组结温承受能力 within the range.

[0069] Among them, low flow means that the inlet flow of the cooling medium is lower than the low value of the flow setting.

[0070] At low flow rates, the time that the junction temperature of the mesh-type SVG valve group withstands is obtained through simulation experiments.

[0071] The flow rate setting low value is the minimum flow rate value required for the heat dissipation of the set mesh-type SVG valve group.

[0072] The low flow setting value can be set according to the rated inlet flow of the meshed SVG valve group.

[0073] Preferably, the low flow rate setting value is 80% of the rated inlet flow rate of the mesh-type SVG valve group.

[0074] In actual applications, the traffic delay time will fluctuate slightly. In order to leave a certain margin, a traffic delay safety value is added when calculating the traffic delay time.

[0075] The flow delay safety value is selected as 20% of the time that the simulated junction temperature of the mesh-type SVG valve group withstands at low flow.

[0076] Among the above three pump cutting and starting conditions, compared with the scheduled pump cutting and pump failure pump cutting, the original pump has an original pump overlap time to continue working during the scheduled pump cutting, and the flow rate is established faster. Therefore, compared with these two conditions, the flow delay setting selects the pump failure pump cutting condition with slower flow rate establishment. Therefore, the flow delay time is calculated based on the two conditions of pump failure pump cutting and pump failure pump cutting back.

[0077] In order to monitor the inlet valve flow rate of the cooling medium in real time, the inlet valve flow rate of the cooling medium is monitored by a flow transmitter in the cooling system.

[0078] The flow transmitter monitors the inlet flow of the cooling medium in real time. During the test, the t 流量跌落建立1 and t 流量跌落建立2 .

[0079] Calculate the flow delay time t 流量延时 Finally, when the cooling system causes the inlet flow of the cooling medium to drop below the low flow setting value due to any of the above three working conditions, the meshed SVG system will not stop operating directly, but will continue to operate normally during the flow delay time. During this delay time, the inlet flow of the cooling medium will definitely rise again to above the low flow setting value, thereby avoiding the problem of system shutdown and ensuring the stable operation of the system. Moreover, during this flow delay time, even if the inlet flow is below the low flow value, the system will not be damaged by overheating.

[0080] Example

[0081] In this embodiment, the parameters of the two pumps are consistent, that is, the power of the pump is 75KW, so the original pump overlap time t is set 流量延时 The flow rate is set to 2s, which can prevent a large drop in flow rate when the pump is cut off at a fixed time; the low flow rate setting value is 80% of the rated inlet flow rate of the mesh-type SVG valve group (in this implementation, the rated inlet flow rate is 2900L / min, and the low flow rate setting value is 2320L / min), and the simulation test is performed based on the low flow rate setting value to obtain the simulated junction temperature withstand time t of the mesh-type SVG valve group at low flow rate 低流量构网阀组结温承受能力 , its value is about 10s, so the flow delay safety value time is taken as 2s. Then the second working condition, pump failure pump cutting, is tested to obtain the flow delay time t under this working condition 流量延时1Then the third working condition, i.e., the pump failure, is tested to obtain the flow delay time t under this working condition. 流量延时2 .

[0082] After testing, a curve chart of the real-time inlet flow rate and time of the cooling medium under the corresponding working conditions is drawn, such as Figure 2 As shown in the figure, the flow delay time t of the second working condition is when the pump fails and the pump is cut off. 流量延时1 About 3.6s; Figure 3 As shown in the figure, the delay time t of the third working condition is the pump failure back-to-pump working condition 流量延时2 About 5.8s; t 流量延时2 >t 流量延时1 , that is, the most severe working condition is to switch back to the pump when the pump fails. At this time, the flow delay time t of the network type SVG is calculated. 流量延时 :

[0083] t 流量延时 = t 流量延时2 +2s=5.8s+2s=7.8s, which is less than the time that the simulated junction temperature of the meshed SVG valve group can withstand at low flow, that is, 10s. Therefore, in this embodiment, when the flow delay time of the meshed SVG is set to 7.8s, it can effectively ensure that the flow drop caused by the pump cutting failure does not affect the stable operation of the system.

[0084] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A flow delay test method for a networked cooling system, characterized in that: Taking the cooling system of the meshed SVG as the carrier, and within the low flow capacity of the meshed SVG valve group junction temperature, the pump cut-off and start-up time, the original pump overlap time, and the flow drop establishment time of the two pumps in the cooling system are tested to obtain the flow delay time; The two pumps in the cooling system are connected in parallel and serve as backup for each other, and the two pumps' pump-cutting and pump-starting operating conditions include the following three conditions: First, timed pump switching: the two pumps switch to work at a fixed time; Second, pump failure and pump switching: if the original pump fails, switch to the standby pump; Third, switch back to the original pump if the pump fails: when the standby pump fails during scheduled pump switching, switch back to the original pump; Among the three working conditions of pump cutting and pump starting, the one with the longest flow delay is selected as the basis for flow delay calculation of the networked SVG system. The flow delay time t 流量延时 The calculation method is as follows: t 流量延时1 =t 泵故障切泵 + t 流量跌落建立1 , t 流量延时2 =t 切泵故障回切泵 +t 流量跌落建立2 -t 原泵重叠 , t 流量延时 =max{t 流量延时1 ,t 流量延时2 }+t 流量延时安全值 , And t 流量延时 +t 流量延时安全值 ≤t 低流量构网阀组结温承受能力 ; Among them, t 泵故障切泵 is the pump failure cut-off time, t 流量跌落建立1 The flow drop build-up time under pump failure and pump-cutting conditions, t 切泵故障回切泵 The pump failure re-switching time, t 流量跌落建立2 is the flow drop establishment time under the condition of switching back the pump due to pump failure, t 原泵重叠 is the original pump overlap time, t 流量延时安全值 is the set flow delay safety value time, t 低流量构网阀组结温承受能力 It is the time that the simulated junction temperature of the mesh-type SVG valve group withstands at low flow; The pump failure switching time is the time when the original pump fails and the standby pump is switched to a soft start successfully; In the pump failure switching condition, the original pump fails and the current of the original pump drops as the starting time, and the current of the standby pump rises to a stable value, that is, near its rated current as the ending time. The time period from the starting time to the ending time is the pump failure switching time. The pump failure switching back time is the time elapsed when the standby pump fails and switches back to the original pump and the original pump is soft-started successfully during the scheduled pump switching; In the pump failure switching back pump working condition, the start time is the scheduled pump switching start, the end time is the successful restart of the original pump due to the failure of the standby pump to start, and the time period from the start time to the end time is the pump failure switching back pump time; The original pump overlap time is the time during which the original pump is kept running while the pump is switched off under the condition of scheduled pump switching. The flow drop establishment time is the time from when the inlet valve flow of the cooling medium drops below the low flow setting value when the pump is cut off to when the inlet valve flow rises above the low flow setting value after the pump is started; The simulated junction temperature of the meshed SVG valve group withstands the time when the flow rate is low, that is, the time when the junction temperature of the meshed SVG valve group withstands the time when the inlet flow rate of the cooling medium is lower than the low value of the flow setting under the two working conditions of pump failure and pump cutting or pump cutting failure and pump back cutting; The flow rate setting low value is the minimum flow rate value required for the heat dissipation of the set mesh-type SVG valve group.

2. The flow delay test method of the networked cooling system according to claim 1 is characterized in that: The inlet flow rate of the cooling medium is monitored by a flow transmitter in the cooling system.