The invention relates to a foundation pit structure construction method which comprises the following steps: step 1, a field manufacturing procedure: drilling an underground groove and manufacturing a reinforcement cage on site, then dynamically detecting the reinforcement cage by a detection mechanism, and meanwhile, installing a plurality of first sensors on the reinforcement cage by an installation mechanism; 2, a positioning and mounting procedure: after a detection mechanism dynamically detects and is matched with hoisting to adjust the mounting position of the first sensor, drilling a plurality of measuring holes in cooperation with a
punching mechanism, and meanwhile, mounting a second sensor in each measuring hole in assistance of a mounting mechanism; and 3, a pouring
pile-forming procedure is carried out, specifically, a
punching mechanism supports deformation of the reinforcement cage to adjust stress, meanwhile, a mounting mechanism is assisted to
mount a supporting
cushion block to support the reinforcement cage to keep the stress, and under monitoring of a first sensor and a second sensor, the position and speed of
cement pouring
pile-forming are adjusted in real time. The problems that in the foundation pit construction process, manpower consumption is large, construction efficiency is low, the technology is unreasonable, and errors exist in
monitoring data are solved.