Welding control device and control system for yacht production

Through the welding control device and control system for yacht production, small-area multiple welding and zinc material welding technology are adopted to solve the problem of easy corrosion and low flatness at the chassis frame welding, and the welding depth and corrosion resistance are improved.

CN118789190BActive Publication Date: 2024-11-19JIANGSU HAIDE YACHTING CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411273189.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-19
Estimated Expiration
2044-09-12

Smart Images

  • Figure CN118789190B_ABST
    Figure CN118789190B_ABST
Patent Text Reader

Abstract

The invention discloses a welding control device for yacht production and a control system thereof, which relates to the technical field of yacht production welding, and comprises a welding transfer mechanism, a welding control mechanism, and a control system. The welding transfer mechanism comprises four groups of flipping assemblies installed on the ground, and a clamping assembly arranged on each group of flipping assemblies. The welding control mechanism comprises a slide rail assembly, and a mechanical arm welding assembly arranged on the slide rail assembly. The control system connects the flipping assembly, the clamping assembly, the slide rail assembly, and the mechanical arm welding assembly, and controls the flipping assembly, the clamping assembly, the slide rail assembly, and the mechanical arm welding assembly. By first welding the top part which is not easy to contact water, the stability, welding strength, and flatness of the chassis frame are determined, and then the lower part of the steel pipe is welded with zinc material to improve its corrosion resistance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of yacht production welding, in particular to a welding control device for yacht production and a control system thereof. Background Art

[0002] With the vigorous development of the global yacht industry, welding technology in the yacht production process is becoming increasingly important as a key link. Most of the yacht structures are installed on the chassis by welding or other connection methods, so the quality requirements for the chassis are high. With the advancement of technology, the manufacturing process of the chassis is also different, and the equipment matching the chassis manufacturing process is also different. The current chassis frame has the problem of easy corrosion at the weld and low flatness. When solving this problem, how to add anti-corrosion zinc blocks during the welding process cannot be solved. Therefore, it is necessary to design a welding control device and its control system for boat production. Summary of the invention

[0003] The object of the present invention is to provide a welding control device and a control system for yacht production to solve the problems raised in the above background technology.

[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: A welding control device for yacht production and a control system thereof, comprising a welding transfer mechanism, a welding control mechanism, and a control system, wherein the welding transfer mechanism comprises four groups of flipping assemblies installed on the ground and a clamping assembly arranged on each group of flipping assemblies;

[0005] The welding control mechanism includes a slide rail assembly and a mechanical arm welding assembly arranged on the slide rail assembly;

[0006] The control system connects the flip assembly, the clamping assembly, the slide rail assembly, and the robotic arm welding assembly, and controls the flip assembly, the clamping assembly, the slide rail assembly, and the robotic arm welding assembly.

[0007] According to the above technical solution, the flip assembly includes a first slide rail arranged on the ground, a first power supply assembly is arranged at the end of the first slide rail, a second slide rail is slidably connected to the first slide rail, a second power supply assembly is arranged at the end of the second slide rail, and a support column is slidably connected to the second slide rail;

[0008] The second slide rail is connected to the first power supply assembly, and the control system drives the second slide rail to move on the first slide rail through the first power supply assembly;

[0009] The support column is connected to the second power supply assembly, and the control system drives the support column to move on the second slide rail through the second power supply assembly;

[0010] Every two support columns on the same second slide rail form a group, and two matching electric-controlled bearing seats are fixedly installed on the top of each group of support columns. Each electric-controlled bearing seat has a built-in motor, and the control system drives the electric-controlled bearing seat to operate through the built-in motor of the electric-controlled bearing seat;

[0011] Each electrically controlled bearing seat comprises a housing fixed on the top of a support column, a first motor is arranged in the housing, and a lower metal plate is fixedly mounted on the output ends of the two first motors on each group of support columns;

[0012] An upper metal plate with welding feet is fixedly mounted on the top of the lower metal plate.

[0013] According to the above technical solution, the clamping assembly includes a double-pass mounting pile that can be detachably mounted on the top of the metal plate, a protruding first mounting groove is arranged on one side of the double-pass mounting pile, and a protruding second mounting groove is arranged on the other side of the double-pass mounting pile and adjacent to the first mounting groove, the four groups of first mounting grooves are all at the same horizontal height, and all groove surfaces are arranged in parallel, and the four groups of second mounting grooves are all at the same horizontal height, and all groove surfaces are arranged in parallel.

[0014] According to the above technical solution, a hollow area for welding is provided on the top of the double-pass mounting pile.

[0015] According to the above technical solution, a fixed structure is arranged in the first mounting groove and the second mounting groove, and the fixed structure includes a top rail fixedly installed on the top of the inner side wall of the first mounting groove and the second mounting groove, a sliding support is slidably connected to the top rail, a sleeve frame is fixedly installed at the bottom of the sliding support, and four groups of support rod assemblies are arranged on the inner side wall of the sleeve frame.

[0016] According to the above technical solution, each group of support rod assemblies includes a first clamping rod for clamping a round steel pipe and two second clamping rods for clamping a square steel pipe. A first clamping rod in each group of support rod assemblies is located between the two second clamping rods, and a groove is provided in the middle area of ​​the inner side wall of the sleeve frame. The first clamping rod is fixedly installed in the groove so that the first clamping rod is retracted into the two second clamping rods.

[0017] According to the above technical solution, the slide rail assembly includes four columns, a first beam is fixedly installed on every two columns, a third slide rail is fixedly installed on the first beam, the third slide rail is slidably connected to the second beam, a fourth slide rail is fixedly installed on the second beam, and the fourth slide rail is slidably connected to the robotic arm welding assembly.

[0018] According to the above technical solution, the robotic arm welding assembly includes a sliding structure slidably connected to the fourth slide rail, a steel plate is fixedly installed on the sliding structure, a motor box is fixedly installed on the side wall of the steel plate, the output end of the motor box passes through the steel plate and a fifth slide rail is fixedly installed at the end, a robotic arm rod is slidably connected to the fifth slide rail, a welding plate is fixedly installed at the bottom of the robotic arm rod, and a magnetic attraction plate is fixedly installed on the top of the robotic arm rod.

[0019] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention, by providing four groups of clamping components, adopts a small area and multiple welding method for detection, thereby improving the welding depth of the weld. If the welding is completed directly in one time, the welding depth of the steel pipe connection cannot be ensured, and the area of ​​each subsequent welding area is the reinforced welding area of ​​the preset value. Each time the four corners of the chassis frame are welded once, the inspection is performed once until all the top welds of the chassis frame are welded. At this time, the top of the chassis frame has a high flatness.

[0020] By setting up a robotic arm welding assembly, the top part that is not easily exposed to water is welded first to determine the stability, welding strength and flatness of the chassis frame, and then the lower area of ​​the steel pipe is welded with zinc material to improve its corrosion resistance. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0022] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0023] Figure 2 The overall explosion structure of the present invention is schematically shown in FIG. Figure 1 ;

[0024] Figure 3 The overall explosion structure of the present invention is schematically shown in FIG. Figure 2 ;

[0025] Figure 4 The welding transfer mechanism of the present invention is schematically shown in FIG. Figure 1 ;

[0026] Figure 5 It is a structural schematic diagram of the welding control mechanism of the present invention;

[0027] Figure 6 The welding transfer mechanism of the present invention is schematically shown in FIG. Figure 2 ;

[0028] Figure 7 It is a schematic diagram of the structure of the flip assembly of the present invention;

[0029] Figure 8 is a schematic diagram of the flip angle of the flip assembly of the present invention;

[0030] Fig. 9 The present invention Figure 5 A schematic diagram of the enlarged structure of the middle A area;

[0031] Fig.10 This is a schematic diagram of the double-pass installation pile of the present invention. Figure 1 ;

[0032] Fig.11 This is a schematic diagram of the double-pass installation pile of the present invention. Figure 2 ;

[0033] Fig.12 is a schematic diagram of a chassis frame of the present invention;

[0034] In the figure: 1. welding transfer mechanism; 2. welding control mechanism; 3. flip assembly; 4. clamping assembly; 5. slide rail assembly; 6. robot arm welding assembly; 7. first slide rail; 8. first power supply assembly; 9. second slide rail; 10. second power supply assembly; 11. support column; 12. electric control bearing seat; 13. housing; 14. first motor; 15. lower metal plate; 16. upper metal plate; 17. double-pass mounting pile; 18. first mounting groove; 19. second mounting groove ; 20. Top rail; 21. Sliding support; 22. Fixed structure; 23. Socket frame; 24. Support rod assembly; 25. First clamping rod; 26. Second clamping rod; 27. Groove; 28. Column; 29. ​​First crossbeam; 30. Third slide rail; 31. Second crossbeam; 32. Fourth slide rail; 33. Sliding structure; 34. Steel plate; 35. Motor box; 36. Fifth slide rail; 37. Robot arm rod; 38. Welding plate; 39. Magnetic plate; 40. Hollow area. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] See also Figure 1-12 The present invention provides a technical solution: a welding control device for yacht production and a control system thereof, comprising a welding transfer mechanism 1, a welding control mechanism 2, and a control system. The welding transfer mechanism 1 comprises four groups of flip assemblies 3 installed on the ground, and a clamping assembly 4 arranged on each group of flip assemblies 3;

[0037] The welding control mechanism 2 includes a slide rail assembly 5 and a mechanical arm welding assembly 6 arranged on the slide rail assembly 5;

[0038] The control system is connected to the flip assembly 3, the clamping assembly 4, the slide rail assembly 5, and the robotic arm welding assembly 6, and controls the flip assembly 3, the clamping assembly 4, the slide rail assembly 5, and the robotic arm welding assembly 6;

[0039] The frame in the yacht structure is welded. The welding process is to fix four steel pipes, and weld the joints of every two steel pipes to form a complete chassis frame. This chassis frame is used for yacht equipment.

[0040] The flip assembly 3 includes a first slide rail 7 arranged on the ground, a first power supply assembly 8 is arranged at the end of the first slide rail 7, a second slide rail 9 is slidably connected to the first slide rail 7, a second power supply assembly 10 is arranged at the end of the second slide rail 9, and a support column 11 is slidably connected to the second slide rail 9;

[0041] The second slide rail 9 is connected to the first power supply assembly 8, and the control system drives the second slide rail 9 to move on the first slide rail 7 through the first power supply assembly 8;

[0042] The support column 11 is connected to the second power supply assembly 10, and the control system drives the support column 11 to move on the second slide rail 9 through the second power supply assembly 10;

[0043] Every two support columns 11 on the same second slide rail 9 form a group, and two matching electric-controlled bearing seats 12 are fixedly installed on the top of each group of support columns 11. Each electric-controlled bearing seat 12 has a built-in motor, and the control system drives the electric-controlled bearing seat 12 to operate through the built-in motor of the electric-controlled bearing seat 12;

[0044] Each electrically controlled bearing seat 12 includes a housing 13 fixed to the top of the support column 11, a first motor 14 is arranged in the housing 13, and a lower metal plate 15 is fixedly installed at the output ends of the two first motors 14 on each group of support columns 11;

[0045] An upper metal plate 16 with welding feet is fixedly mounted on the top of the lower metal plate 15;

[0046] The control system drives the first motor 14 to operate, and then the first motor 14 drives the lower metal plate 15 to flip, and the flipping of the lower metal plate 15 drives the upper metal plate 16 to flip, and the flipping of the upper metal plate 16 drives the clamping assembly 4 thereon to flip;

[0047] The clamping assembly 4 includes a double-pass mounting pile 17 detachably mounted on the top of the upper metal plate 16, a protruding first mounting groove 18 is arranged on one side of the double-pass mounting pile 17, and a protruding second mounting groove 19 is arranged on the other side of the double-pass mounting pile 17 and adjacent to the first mounting groove 18, the four groups of first mounting grooves 18 are all at the same level, and all the groove surfaces are arranged in parallel, and the four groups of second mounting grooves 19 are all at the same level, and all the groove surfaces are arranged in parallel;

[0048] The double-pass mounting pile 17 is connected to the upper metal plate 16 by electromagnetic adsorption;

[0049] A hollow area 40 for welding is provided at the top of the double-pass mounting pile 17, and the entire structure of the double-pass mounting pile 17 is a detachable structure, which is convenient for removing the chassis frame later;

[0050] A fixing structure 22 is provided in the first mounting groove 18 and the second mounting groove 19. The fixing structure 22 includes a top rail 20 fixedly installed on the top of the inner side wall of the first mounting groove 18 and the second mounting groove 19. A sliding support 21 is slidably connected to the top rail 20. A sleeve frame 23 is fixedly installed at the bottom of the sliding support 21. Four groups of support rod assemblies 24 are provided on the inner side wall of the sleeve frame 23. Each group of support rod assemblies 24 includes a first clamping rod 25 for clamping a round steel pipe and two second clamping rods 26 for clamping a square steel pipe. A first clamping rod 25 in each group of support rod assemblies 24 is located between the two second clamping rods 26, and a groove 27 is provided in the middle area of ​​the inner side wall of the sleeve frame 23. The first clamping rod 25 is fixedly installed in the groove 27 so that the first clamping rod 25 is retracted into the two second clamping rods 26. Both the first clamping rod 25 and the second clamping rod 26 are retractable structures, which will not be described in detail here.

[0051] The end of the first clamping rod 25 has a curvature to better fit the round steel pipe;

[0052] The slide rail assembly 5 includes four columns 28, a first beam 29 is fixedly mounted on every two columns 28, a third slide rail 30 is fixedly mounted on the first beam 29, a second beam 31 is slidably connected to the third slide rail 30, a fourth slide rail 32 is fixedly mounted on the second beam 31, and the fourth slide rail 32 is slidably connected to the robot arm welding assembly 6;

[0053] The robot arm welding assembly 6 includes a sliding structure 33 slidably connected to the fourth slide rail 32. The sliding structure 33 is a prior art architecture. A steel plate 34 is fixedly installed on the sliding structure 33. A motor box 35 is fixedly installed on the side wall of the steel plate 34. The output end of the motor box 35 passes through the steel plate 34 and a fifth slide rail 36 is fixedly installed at the end. A robot arm rod 37 is slidably connected to the fifth slide rail 36. A welding plate 38 is fixedly installed at the bottom of the robot arm rod 37, and a magnetic suction plate 39 is fixedly installed on the top of the robot arm rod 37.

[0054] The second crossbeam 31 is driven by the control system to move along the third slide rail 30 to adjust the lateral position of the robot arm welding assembly 6; the robot arm welding assembly 6 is driven by the control system to move along the fourth slide rail 32 to adjust the longitudinal position of the robot arm welding assembly 6; the robot arm rod 37 is driven by the control system to move up and down along the fifth slide rail 36 to adjust the height of the robot arm rod 37; the motor box 35 is driven by the control system to operate, and the operation of the motor box 35 drives the entire fifth slide rail 36 to rotate, thereby realizing the angle adjustment of the robot arm rod 37.

[0055] A total of four groups of clamping assemblies 4 are provided in the welding control device, and the four groups of clamping assemblies 4 are marked as a1, a2, a3, and a4. The steps for installing the steel pipe are as follows:

[0056] The control system drives the four groups of flipping assemblies 3 to move in opposite directions on the second slide rails 9, so that the distance between the two groups of flipping assemblies 3 on each second slide rail 9 is maximized, and then the control system drives the flipping assemblies 3 to move in opposite directions along the first slide rails 7, so that the distance between the two groups of flipping assemblies 3 on each first slide rail 7 is maximized. The purpose of this process is to prepare for manual installation of steel pipes or installation of steel pipes by a robot arm;

[0057] The control system drives the sliding support 21 to move along the top rail 20 toward the notch of the first installation groove 18, thereby reducing the moving path of the steel pipe, and inserting the first steel pipe from the notch of the first installation groove 18 in a1. When part of the first steel pipe enters the sleeve frame 23 in the first installation groove 18, the control system selects a clamping rod that matches the shape of the steel pipe. The square steel pipe is fixedly clamped using two second clamping rods 26, and the round steel pipe is fixedly clamped using the first clamping rod 25. The fixed clamping process is to drive the clamping rod to extend and then fix the steel pipe by the control system. The square steel pipe uses two second clamping rods 26 to fix and clamp its four side walls, which can effectively fix and clamp the steel pipe. The round steel pipe is fixedly clamped at equal angles by a first clamping rod 25. During the clamping and fixing of one end of the first steel pipe, the entire steel pipe needs to be kept in a relatively horizontal state. After the fixation and clamping of one end of the first steel pipe is completed, the other end of the first steel pipe is started to be fixed and clamped. The process is as follows: driving a2 along the second slide rail 9 Move toward direction a1 until the other end of the first steel pipe enters the sleeve frame 23 in the first installation groove 18 of a2. At this time, the control system drives the matching clamping rod to fix and clamp the other end of the first steel pipe. At this time, the first steel pipe is fixed and clamped;

[0058] According to the above process, the second steel pipe is fixed and clamped through a3 and a4;

[0059] After the first and second steel pipes are fixed and clamped, the third steel pipe is fixed and clamped, and one end of the third steel pipe is inserted into the sleeve frame 23 in the second installation groove 19 of a1. At this time, the control system drives the matching clamping rod to fix and clamp one end of the third steel pipe. After one end of the third steel pipe is fixed and clamped, the control system drives the two sleeve frames 23 in a1 to move, so that the first steel pipe and the third steel pipe are tightly connected. During the execution of this process, the first steel pipe and the third steel pipe need to be kept relatively horizontal, and the connection steps are controlled by the program in the control system. After the control is completed, the above process is repeated for one end of the fourth steel pipe and inserted into the sleeve frame 23 in the second installation groove 19 of a2, so that the fourth steel pipe and the first steel pipe are tightly connected. At this time, the two ends of the first steel pipe are respectively connected to the third steel pipe and the fourth steel pipe, and then the control system drives a3 , a4 moves toward a1 and a2 until the third steel pipe is inserted into the sleeve frame 23 in the second installation groove 19 in a3, and the fourth steel pipe is inserted into the sleeve frame 23 in the second installation groove 19 in a4, and the above sleeve frame 23 movement process is repeated, so that the four steel pipes form a frame shape with the assistance of the eight sleeve frames 23, and then the control system drives a nearby mechanical arm rod 37 to move to the top of the connection between the first steel pipe and the third steel pipe, and the control system drives the mechanical arm rod 37 to descend to drive the welding plate 38 to descend, and enter the double-pass installation pile 17 through the hollow area 40 at the connection between the first steel pipe and the third steel pipe, and weld the connection between the first steel pipe and the third steel pipe. Because the plate area of ​​the welding plate 38 is smaller than the area required to be welded at the connection between the first steel pipe and the third steel pipe, only part of the area can be welded at a time through the welding plate 38;

[0060] The welding process of the chassis frame is to weld the connection between the first steel pipe and the third steel pipe once, and then weld the connection between the first steel pipe and the fourth steel pipe once by repeating the above welding steps for the connection between the steel pipes, weld the connection between the second steel pipe and the third steel pipe once, and weld the connection between the second steel pipe and the fourth steel pipe once, so that the four steel pipes are welded into an incompletely welded chassis frame. If the connection between the first steel pipe and the third steel pipe is directly completely welded, that is, the connection between the first steel pipe and the third steel pipe is welded multiple times through the welding plate 38, then the connection between the first steel pipe and the fourth steel pipe will cause displacement deviation. The purpose of this process is to reduce the probability of misalignment of the connection between the steel pipes caused by the stress generated by welding in the process of completing the initial forming of the chassis frame through a small area of ​​welding area;

[0061] After the chassis frame is initially formed, the control system drives one of the mechanical arms 37 to move to the connection between the first steel pipe and the third steel pipe, ready for welding, and the other mechanical arm 37 moves to the connection between the second steel pipe and the fourth steel pipe, ready for welding. The two mechanical arms 37 cooperate with the welding plate 38 to weld together, and the chassis frame is further reinforced by welding the two diagonal connections. The reinforced welding area is a preset value. After the reinforcement is completed, the first weld strength test is started. The test process is that the control system drives a1 and a2 to flip inward, and a3 and a4 also flip inward. The chassis frame that has completed the reinforcement welding is stress tested through the flipping movement of the flipping component 3. The control system controls the flipping The flipping angle of component 3 is within a reasonable range. The standard for detecting whether the chassis frame is damaged is to observe whether the steel pipe welding is cracked. If the welding of the chassis frame is damaged after the flip component 3 is flipped at a preset angle, the control system will re-weld the connection between the first steel pipe and the third steel pipe, and the connection between the second steel pipe and the fourth steel pipe until the test is qualified. If the welding of the chassis frame is not damaged after the flip component 3 is flipped at a preset angle, the next step of welding will be started. The control system drives one of the mechanical arms 37 to move to the connection between the first steel pipe and the fourth steel pipe to prepare for welding, and the other mechanical arm 37 moves to the connection between the second steel pipe and the third steel pipe to prepare for welding, and continues to perform weld strength testing. Until the inspection is qualified, the inspection strength of the chassis frame is improved by welding the two diagonal connections once and inspecting them once. If the connections at the four corners are all welded in advance, the inspection strength is low. This chassis frame is suitable for underwater equipment and is continuously corroded. The probability of the weld being corroded and damaged in the water is greater than that on the ground. Therefore, a weld strength test is required after each welding is completed, and a small area and multiple welding method is used for testing to increase the welding depth of the weld. If the welding is completed directly in one time, the welding depth of the steel pipe connection cannot be ensured, and the area of ​​each subsequent welding area is the reinforced welding area of ​​the preset value. Each time the four corners of the chassis frame are welded, they are inspected once until the top weld of the chassis frame is fully The welding is completed, and the top of the chassis frame is now flat. Then, the redundant structure on the double-pass mounting pile 17 is manually removed, and a zinc sheet or a zinc block is inserted into the unwelded part below the weld of the chassis frame. The zinc sheet or the zinc block is welded to the steel pipe by a welding gun. At this time, the welded chassis frame has been fixed and formed, and there is no need to consider the flatness of the chassis frame, which reduces the probability of welding errors. At this time, the two mechanical arm rods 37 can be driven by the control system to move to the top of the third steel pipe and the fourth steel pipe, and the two mechanical arm rods 37 can be controlled to rotate until the magnetic suction plate 39 faces downward. At this time, the control system controls the magnetic suction plate 39 to descend and fix the chassis frame, and the entire chassis frame is driven to rise by the two mechanical arm rods 37, which makes it easier to weld the bottom of the chassis frame.

[0062] This welding method first welds the top part that is not easily exposed to water to determine the stability, welding strength, and flatness of the chassis frame, and then welds the lower area of ​​the steel pipe with zinc material to improve its corrosion resistance.

[0063] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0064] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A welding control device for yacht production, comprising a welding transfer mechanism (1), a welding control mechanism (2), and a control system, characterized in that: The welding transfer mechanism (1) comprises four groups of flipping assemblies (3) installed on the ground, and a clamping assembly (4) arranged on each group of the flipping assemblies (3); The welding control mechanism (2) comprises a slide rail assembly (5) and a mechanical arm welding assembly (6) arranged on the slide rail assembly (5); The control system is connected to the flip assembly (3), the clamping assembly (4), the slide rail assembly (5), and the robotic arm welding assembly (6), and controls the flip assembly (3), the clamping assembly (4), the slide rail assembly (5), and the robotic arm welding assembly (6); The clamping assembly (4) comprises a double-pass mounting pile (17) detachably mounted on the top of the upper metal plate (16); a protruding first mounting groove (18) is provided on one side of the double-pass mounting pile (17); a protruding second mounting groove (19) is provided on the other side of the double-pass mounting pile (17) and adjacent to the first mounting groove (18); four groups of the first mounting grooves (18) are all at the same horizontal height, and all groove surfaces are arranged in parallel; and four groups of the second mounting grooves (19) are all at the same horizontal height, and all groove surfaces are arranged in parallel; A fixed structure (22) is provided in each of the first mounting groove (18) and the second mounting groove (19), the fixed structure (22) comprising a top rail (20) fixedly mounted on the top of the inner side wall of the first mounting groove (18) and the second mounting groove (19), a sliding support (21) being slidably connected to the top rail (20), a sleeve frame (23) being fixedly mounted at the bottom of the sliding support (21), and four groups of support rod assemblies (24) being provided on the inner side wall of the sleeve frame (23).

2. The welding control device for yacht production according to claim 1, characterized in that: The flip assembly (3) comprises a first slide rail (7) arranged on the ground, a first power supply assembly (8) being arranged at the end of the first slide rail (7), a second slide rail (9) being slidably connected to the first slide rail (7), a second power supply assembly (10) being arranged at the end of the second slide rail (9), and a support column (11) being slidably connected to the second slide rail (9); The second slide rail (9) is connected to the first power supply assembly (8), and the control system drives the second slide rail (9) to move on the first slide rail (7) through the first power supply assembly (8); The support column (11) is connected to a second power supply assembly (10), and the control system drives the support column (11) to move on the second slide rail (9) via the second power supply assembly (10); Every two of the support columns (11) on the same second slide rail (9) form a group, and two matching electrically controlled bearing seats (12) are fixedly mounted on the top of each group of the support columns (11), and each electrically controlled bearing seat (12) has a built-in motor, and the control system drives the electrically controlled bearing seat (12) to operate via the built-in motor of the electrically controlled bearing seat (12); Each of the electrically controlled bearing seats (12) comprises a housing (13) fixed to the top of the support column (11), a first motor (14) being arranged in the housing (13), and a lower metal plate (15) being fixedly mounted on the output ends of the two first motors (14) on each group of the support columns (11); An upper metal plate (16) with welding feet is fixedly mounted on the top of the lower metal plate (15).

3. The welding control device for yacht production according to claim 2, characterized in that: A hollow area (40) for welding is provided on the top of the double-pass mounting pile (17).

4. The welding control device for yacht production according to claim 3, characterized in that: Each group of the support rod assemblies (24) comprises a first clamping rod (25) for clamping a round steel pipe and two second clamping rods (26) for clamping a square steel pipe. One of the first clamping rods (25) in each group of the support rod assemblies (24) is located between the two second clamping rods (26), and a groove (27) is provided in the middle area of ​​the inner side wall of the sleeve frame (23). The first clamping rod (25) is fixedly installed in the groove (27) so that the first clamping rod (25) is retracted into the two second clamping rods (26).

5. The welding control device for yacht production according to claim 4, characterized in that: The slide rail assembly (5) comprises four columns (28), a first crossbeam (29) is fixedly mounted on every two of the columns (28), a third slide rail (30) is fixedly mounted on the first crossbeam (29), the third slide rail (30) is slidably connected to a second crossbeam (31), a fourth slide rail (32) is fixedly mounted on the second crossbeam (31), and the fourth slide rail (32) is slidably connected to the robot arm welding assembly (6).

6. The welding control device for yacht production according to claim 5, characterized in that: The mechanical arm welding assembly (6) comprises a sliding structure (33) slidably connected to the fourth slide rail (32), a steel plate (34) fixedly mounted on the sliding structure (33), a motor box (35) fixedly mounted on the side wall of the steel plate (34), an output end of the motor box (35) passes through the steel plate (34) and a fifth slide rail (36) fixedly mounted on the end, a mechanical arm rod (37) slidably connected to the fifth slide rail (36), a welding plate (38) fixedly mounted on the bottom of the mechanical arm rod (37), and a magnetic attraction plate (39) fixedly mounted on the top of the mechanical arm rod (37).

7. The working method of the welding control device for yacht production according to claim 6, characterized in that: The control system controls the four groups of clamping assemblies (4), marks the four groups of clamping assemblies (4) as a1, a2, a3, a4, installs four steel pipes through a1, a2, a3, a4, and then welds the four steel pipes in steps.

Citation Information

Cited By

  • Device of multi directional position adjustment and level maintenance for welding machine

    KR1020250112357A

  • Device of multi directional position adjustment and level maintenance for welding machine

    KR102944210B1