Treatment equipment for high-water-content slurry of shield tunneling machine

By adopting the combined technology of seepage chamber, water collection chamber and electro-osmosis device in the shield machine mud treatment, gravity, atmospheric pressure and electro-osmosis are used to accelerate mud dehydration, which solves the problems of slow mud treatment speed and serious pollution in the existing technology. problem, achieving low energy consumption and efficient mud drying treatment.

CN118851535AInactive Publication Date: 2024-10-29ANHUI UNIVERSITY OF ARCHITECTURE
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411337079.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing shield machine mud treatment methods have problems such as large land occupation, high safety hazards and soil contamination, and the existing equipment cannot meet the demand in terms of energy consumption and processing speed.

Method used

An equipment including a seepage chamber, a water collection chamber and an electroosmosis device is designed, which uses gravity, atmospheric pressure and electroosmosis to accelerate mud dehydration. The water collection chamber purifies the water body through a vacuum pump unit and a water treatment chamber to reduce pollution.

Benefits of technology

It achieves rapid drying of shield machine mud, reduces energy consumption, avoids geological disasters and environmental pollution, and is suitable for large-volume mud processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118851535A_ABST
    Figure CN118851535A_ABST
Patent Text Reader

Abstract

The invention discloses treatment equipment for high-water-content slurry of a shield tunneling machine, and belongs to the technical field of shield tunneling machine slurry treatment.The treatment equipment for the high-water-content slurry of the shield tunneling machine comprises a seepage chamber, a water collecting chamber and an electroosmosis device.The seepage chamber comprises a cylindrical curing cabin and a conical confluence cabin; the curing cabin is assembled on the upper portion of the confluence cabin, water-containing slurry is contained in an inner cavity of the curing cabin, and water in the water-containing slurry flows downwards through the confluence cabin. The device accelerates the discharge of moisture in slurry through gravity, atmospheric pressure and electroosmosis, greatly accelerates the treatment speed of shield tunneling machine slurry, and meanwhile, the structure of the curing cabin facilitates one-time treatment of a large amount of shield tunneling machine slurry, so that the device is suitable for the working conditions that the shield tunneling machine operation slurry amount is huge and the slurry treatment speed is high; meanwhile, the energy consumption for treating unit slurry is still low, and the device is very suitable for dewatering treatment of large-batch slurry of the shield tunneling machine and has good practical application significance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shield machine mud treatment, and in particular relates to a treatment device for high-water-content mud of a shield machine. Background Art

[0002] At present, many cities in my country have entered a stage of rapid development of underground space resource development and utilization represented by subways. In the process of underground engineering construction, shield method is widely used due to its advantages such as high degree of automation, safe excavation and splicing of linings, fast excavation speed, and little interference with the ground environment. In shield construction, in order to ensure the stability of the excavation face and construction safety, bentonite is usually added to the mud. At the same time, in order to prevent fine-grained soil from sticking to the cutter and maintain the plastic flow of the mud, a large amount of water and a variety of polymer dispersants and stabilizers need to be added to the mud. Therefore, shield mud is a high-water-content thin mud containing a variety of additives. In today's new situation where more and more attention is paid to ecological and environmental protection, tunnel shield mud treatment has become a new and important practical issue in the field of underground engineering.

[0003] The existing shield machine mud treatment is mainly the landfill drying method, which is to dig a landfill pit on the ground, then fill the pit with mud, and use natural drying to evaporate and penetrate the moisture in the mud. This method will have the following problems in actual application: First, this method of mud treatment will occupy a large amount of land resources, and because the mud has a high water content, when bad weather occurs, it is easy to form landslides, mudslides and other geological disasters at the mud accumulation site, posing a great safety hazard; second, the shield mud contains a large amount of polymer additives, which are easy to cause soil and groundwater pollution during filling and drying.

[0004] There are also some devices for mud drying treatment in the prior art. For example, the document published by publication number CN116062967A proposes a mud drying treatment system and method, which is suitable for large-scale mud drying treatment. However, such large-scale mud drying treatment devices either use equipment for physical centrifugal separation and heating to separate water and clay, or use natural static slow separation. Although the technical direction of the former can quickly separate water and mud and dry quickly, it consumes a lot of energy in the operation and has a huge cost in the treatment of excavation mud of shield machines. However, if natural separation is used, the drying speed of the mud is too slow to meet the operation requirements, and both cannot be used in the field of shield machine mud treatment. Therefore, it is very necessary to design a new type of shield machine mud treatment equipment. Summary of the invention

[0005] The object of the present invention is to provide a device for processing high-water content slurry of a shield machine, so as to solve the problems in the existing slurry processing process of the shield machine proposed in the above background technology.

[0006] To achieve the above object, the present invention provides the following technical solution: a shield machine high-water slurry processing equipment, comprising: A seepage chamber, wherein the seepage chamber comprises a columnar solidification chamber and a conical confluence chamber, wherein the solidification chamber is mounted on the upper part of the confluence chamber, and water-containing slurry is contained in the inner cavity of the solidification chamber, and water in the water-containing slurry seeps downward through the confluence chamber; A water collection chamber, which is arranged below the seepage chamber to accommodate the water flowing in from the seepage chamber. A vacuum pump unit is connected to the outside of the water collection chamber, and the vacuum pump unit is used to keep the water collection chamber in a negative pressure environment. The water collection chamber is also connected to a group of water treatment chambers through a water pump and a pipeline, and the water treatment chamber is used to purify the water in the water collection chamber; An electro-osmosis device, the electro-osmosis device comprising a power supply, an anode metal plate and a cathode metal plate, the anode metal plate and the cathode metal plate being electrically connected to the positive and negative electrodes of the power supply respectively, the anode metal plate and the cathode metal plate both being adapted to the inner cavity of a solidification chamber, wherein the anode metal plate is arranged at the top of the inner cavity of the solidification chamber, and the cathode metal plate is arranged at the top of the inner cavity of a confluence chamber, the electro-osmosis device applying a directional current to water-containing slurry.

[0007] Preferably, the curing cabin and the confluence cabin are detachably connected, and a first hydraulic lifting device is provided at the periphery of the curing cabin, and the curing cabin performs lifting and lowering motion through the first hydraulic lifting device.

[0008] Preferably, a sealing hoop is provided on the outer side of the connection position between the solidification cabin and the merging cabin, and a stepped bayonet is provided at the contact position between the solidification cabin and the merging cabin.

[0009] Preferably, a top crossbeam is provided at the top of the first hydraulic lifting device, a second hydraulic lifting device is provided on the top crossbeam, the second hydraulic lifting device is fixedly connected to the anode metal plate, and the second hydraulic lifting device drives the anode metal plate to perform lifting movement.

[0010] Preferably, a slide is provided on one side of the curing cabin, and a push-out device is provided on the other side of the curing cabin.

[0011] Preferably, the power source of the electro-osmosis device is a direct current power source, and the electro-osmosis device is also provided with a current monitor.

[0012] Preferably, a plurality of groups of moisture content sensors are arranged on the inner wall of the curing chamber, and a moisture content sensor is arranged on the upper surface of the cathode metal plate.

[0013] Preferably, a layer of filter pad is detachably mounted on the upper surface of the cathode metal plate, and a water seepage groove is provided on the cathode metal plate.

[0014] Preferably, the water treatment chamber comprises a plurality of groups of physical precipitation chambers and chemical treatment chambers, and a return water pump is connected to the rear end of the water treatment chamber.

[0015] Preferably, the water collecting chamber is a sealed structure, a liquid level sensor is arranged in the water collecting chamber, and the air inlet end of the vacuum pump unit is arranged at the upper part of the water collecting chamber.

[0016] Compared with the prior art, the present invention has the following beneficial effects: 1. The device accelerates the discharge of water in the mud through gravity, atmospheric pressure and electro-osmosis, which greatly speeds up the processing speed of shield machine mud. At the same time, the structure of the solidification chamber is convenient for processing a large amount of shield machine mud at one time, which is suitable for the working conditions of shield machine operation with huge mud volume and fast mud processing speed; Second, the dehydration of mud in this technical solution relies on gravity, atmospheric pressure and electroosmosis. The energy consumption of this technical solution for processing unit mud is low, and it is very suitable for dehydration of large quantities of mud in shield machines, and has good practical application significance; 3. This technical solution can collect water containing dispersants and stabilizers in the shield machine mud through a water collection chamber to prevent mud accumulation and infiltration from polluting the soil and groundwater. The water collected in the water collection chamber can be purified through a water treatment chamber. The treated water can continue to be used as industrial water or be supplied to the shield machine for recycling, reducing environmental pollution and saving water resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the assembly structure of the seepage chamber and the water collection chamber of the present invention; Figure 2 It is a schematic diagram of the connection relationship between the anode metal plate and the curing cabin of the present invention; Figure 3 This is a schematic diagram of the assembly structure of the merging cabin of the present invention; Figure 4 It is a schematic diagram of the assembly structure of the water collecting chamber and the confluence chamber of the present invention; Figure 5 It is a schematic diagram of the structure of the ejection device of the present invention; Figure 6 It is a schematic diagram of the connection relationship between the water collection chamber and the water treatment chamber of the present invention; Figure 7 This is a schematic diagram of power-on time / loop current simulated in the laboratory.

[0018] In the figure: 1. solidification chamber; 11. sealing hoop; 2. confluence chamber; 21. stepped bayonet; 22. conductive support rod; 23. filter pad; 3. water collection chamber; 31. liquid level sensor; 4. vacuum pump unit; 5. water treatment chamber; 51. physical precipitation chamber; 52. chemical treatment chamber; 61. power supply; 62. anode metal plate; 63. cathode metal plate; 631. moisture content sensor; 632. seepage trough; 633. limit groove; 64. anode conductive wire; 65. cathode conductive wire; 7. first hydraulic lifting device; 71. hydraulic station; 72. fixed connecting frame; 73. piston rod; 74. first hydraulic cylinder; 8. second hydraulic lifting device; 81. top crossbeam; 82. second hydraulic cylinder; 9. ejection device; 91. fixed bracket; 92. third hydraulic cylinder; 93. push plate; 94. slide. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] Reference Figure 1-7 , a shield machine high-water content slurry processing equipment, comprising: The seepage chamber includes a columnar solidification chamber 1 and a conical confluence chamber 2. The solidification chamber 1 is mounted on the upper part of the confluence chamber 2. The water-containing slurry is contained in the inner cavity of the solidification chamber 1. The water in the water-containing slurry seeps downward through the confluence chamber 2. The water collecting chamber 3 is arranged below the seepage chamber to accommodate the water flowing in from the seepage chamber. The water collecting chamber 3 is externally connected to a vacuum pump unit 4, which is used to keep the water collecting chamber 3 in a negative pressure environment. The water collecting chamber 3 is also connected to a group of water treatment chambers 5 through a water pump and a pipeline, and the water treatment chambers 5 are used to purify the water in the water collecting chamber 3; The electro-osmosis device includes a power supply 61, an anode metal plate 62 and a cathode metal plate 63. The anode metal plate 62 and the cathode metal plate 63 are electrically connected to the positive and negative electrodes of the power supply 61 respectively. The anode metal plate 62 and the cathode metal plate 63 are both adapted to the inner cavity of the solidification chamber 1, wherein the anode metal plate 62 is arranged at the top of the inner cavity of the solidification chamber 1, and the cathode metal plate 63 is arranged at the top of the inner cavity of the confluence chamber 2. The electro-osmosis device applies a directional current to the water-containing slurry.

[0021] In view of the problem that the existing shield machine mud is difficult to handle and random accumulation can easily cause pollution and geological disasters, this scheme proposes a device dedicated to the dry treatment of shield machine mud. During use, the high-water content slurry generated by the shield machine operation is sent into the seepage chamber. In the seepage chamber, the high-water content slurry is quickly discharged through gravity, atmospheric pressure and electroosmosis, so that the mud is quickly dried. The treated mud is in a dry and solidified form, which is convenient for transportation and will not cause geological disasters due to accumulation. It has good practical application significance. In actual shield machine operations, the mud produced by shield machine excavation has the characteristics of high water content and huge discharge volume. Therefore, the shield machine mud processing equipment needs to have the functions of fast processing speed and large single processing volume. Conventional mud drying treatment equipment is generally used for sludge treatment, with small processing volume and huge energy consumption, and is not suitable for dehydration of large quantities of shield machine mud; In view of the above problems, in the present technical scheme, firstly, the shield machine mud is injected into the solidification chamber 1, and under the action of gravity, the water in the mud is squeezed downward by gravity to accelerate the dehydration of the mud; secondly, the internal air of the water collection chamber 3 is sucked by the vacuum pump unit 4, so that the interior of the water collection chamber 3 is a near-vacuum negative pressure environment, and the water in the mud seeps downward under the pressure of atmospheric pressure, further accelerating the dehydration of the mud; thirdly, the shield machine mud is energized through the electro-osmosis device, and under the action of electro-osmosis, the water in the mud flows to the negative electrode, and the cathode metal plate 63 of the electro-osmosis device is arranged at the bottom of the solidification chamber 1, thereby maximizing the acceleration of mud dehydration; in the present scheme, the dehydration of the shield machine mud mainly relies on gravity and atmospheric pressure, including the energy consumption of the electro-osmosis device and the vacuum pump unit 4. The energy consumption of the unit mud processed by the present technical scheme is relatively low, and it is very suitable for the dehydration treatment of large quantities of mud for shield machines, and has good practical application significance.

[0022] Furthermore, the curing cabin 1 and the confluence cabin 2 are detachably connected, and a first hydraulic lifting device 7 is provided on the periphery of the curing cabin 1 , and the curing cabin 1 performs lifting motion through the first hydraulic lifting device 7 .

[0023] like Figure 1 , Figure 2 and Figure 4As shown, a base and a first hydraulic cylinder 74 are provided at the bottom of the first hydraulic lifting device 7, a hydraulic station 71 is provided on one side of the base, a plurality of fixed connecting frames 72 are set on the periphery of the curing cabin 1, the outer side of the fixed connecting frame 72 is fixed to the hydraulic rod of the first hydraulic cylinder 74, the inner side of the fixed connecting frame 72 is sleeved and fixed on the curing cabin 1, the fixed connecting frame 72 connects the curing cabin 1 and the hydraulic rod, so that the curing cabin 1 and the hydraulic rod of the first hydraulic cylinder 74 perform synchronous lifting and lowering movements, and at the same time, the fixed connecting frame 72 can also reinforce and support the curing cabin 1 to ensure stable operation of the curing cabin 1; the hydraulic station 71 provides the pressure energy required for the hydraulic cylinder to work, pushes the hydraulic rod of the hydraulic cylinder to perform lifting and lowering movements, thereby driving the curing cabin 1 to rise and fall, and in this technical solution, the hydraulic station 71 is also used to drive the first hydraulic lifting device 7 and the ejection device 9 to move; In this solution, both the solidification chamber 1 and the confluence chamber 2 are made of high-molecular wear-resistant plastic or fiberglass to ensure the insulation of the equipment. The interior of the solidification chamber 1 and the confluence chamber 2 are coated with a layer of hydrophobic lubricating film to prevent water stagnation and mud from sticking to the surface of the solidification chamber 1 and the confluence chamber 2, thereby facilitating the rapid confluence and discharge of water in the mud.

[0024] Furthermore, a sealing hoop 11 is provided on the outer side of the connection position between the solidification cabin 1 and the merging cabin 2 , and a stepped bayonet 21 is provided at the contact position between the solidification cabin 1 and the merging cabin 2 .

[0025] like Figure 3 As shown, through this technical solution, a stepped bayonet 21 is provided at the connection position between the solidifying cabin 1 and the confluence cabin 2, and a sealing hoop 11 is provided on the outer side of the connection position between the solidifying cabin 1 and the confluence cabin 2, so as to facilitate the docking of the solidifying cabin 1 and the confluence cabin 2, thereby ensuring the sealing of the connection between the two; the sealing hoop 11 adopts pneumatic opening and closing, and the sealing ring inside the sealing hoop 11 expands when inflated to start the seal, and contracts when the air is discharged to close the seal, and the sealing hoop 11 is in a closed state when the solidifying cabin 1 and the confluence cabin 2 are docked for mud drying, so as to ensure a stable sealed connection between the solidifying cabin 1 and the confluence cabin 2, and after the mud drying is completed, the sealing ring is in an open state, and the solidifying cabin 1 can be effectively separated from the confluence cabin 2; in this solution, the mud sealing ring and the bayonet structure ensure the sealing of the connection between the solidifying cabin 1 and the confluence cabin 2, so that when the solidifying cabin 1 and the confluence cabin 2 are docked, moisture will not overflow from the docking position.

[0026] Furthermore, a top crossbeam 81 is provided at the top of the first hydraulic lifting device 7, and a second hydraulic lifting device 8 is provided on the top crossbeam 81. The second hydraulic lifting device 8 is fixedly connected to the anode metal plate 62, and the second hydraulic lifting device 8 drives the anode metal plate 62 to perform lifting and lowering movements.

[0027] like Figure 2As shown, first hydraulic lifting devices 7 are provided on both sides of the curing cabin 1 and the confluence cabin 2. The tops of the hydraulic rods of the two groups of laterally arranged first hydraulic lifting devices 7 are butted against each other through the top crossbeam 81. The two groups of first hydraulic lifting devices 7 move synchronously, thereby driving the curing cabin 1 and the top crossbeam 81 to do lifting and lowering movements. The setting height of the top crossbeam 81 is higher than the top of the curing cabin 1 by a certain distance, thereby reserving sufficient feeding space for the curing cabin 1. At the same time, the top crossbeam 81 is a mounting frame for the second hydraulic lifting device 8. The second hydraulic lifting device 8 includes a second hydraulic cylinder 82 and a connecting piece for fixing the second hydraulic cylinder 82. The piston rod 73 of the second hydraulic cylinder 82 is fixedly connected to the anode metal plate 62 through an insulating bushing. The second hydraulic cylinder 82 drives the piston rod 73 to do lifting and lowering movements, thereby driving the anode metal plate 62 to do lifting and lowering movements. At the same time, the anode metal plate 62 is electrically connected to the power supply 61 through the anode conductive wire 64. The insulating bushing is used for insulation to avoid leakage. In specific applications, during the feeding stage of the solidification chamber 1, the anode metal plate 62 is driven by the second hydraulic lifting device 8 to move upward and leave the interior of the solidification chamber 1, leaving enough space to facilitate the feeding of water-containing slurry from the top of the solidification chamber 1; after the slurry is fed, the anode metal plate 62 is driven by the second hydraulic lifting device 8 to move downward, contact the surface of the mud, and provide power supply current to the mud; in the process of mud solidification and shrinkage, the anode metal plate 62 is driven by the second hydraulic lifting device 8 to be pressed down, on the one hand to maintain contact with the mud to ensure current output, on the other hand, the second hydraulic lifting device 8 can also provide downward pressure to fully press down the mud to compact it, so that the water in the mud can penetrate faster, accelerate the solidification process of the mud, and help shorten the mud processing time.

[0028] Furthermore, a slide 94 is provided on one side of the curing cabin 1 , and a push-out device 9 is provided on the other side of the curing cabin 1 .

[0029] like Figure 4 , Figure 5 As shown, the ejection device 9, the slide 94 and the two groups of first hydraulic lifting devices 7 are cross-distributed on the periphery of the solidification chamber 1, wherein the slide 94 is arranged on the left side of the two groups of first hydraulic lifting devices 7, and the ejection device 9 is arranged on the right side of the two groups of first hydraulic lifting devices 7; the ejection device 9 includes a fixed bracket 91, a third hydraulic cylinder 92 and a push plate 93, wherein the push plate 93 and the third hydraulic cylinder 92 are both installed on the fixed bracket 91, and the push plate 93 is an arc-shaped plate body. When the mud is dried and solidified into a solid state, the first hydraulic lifting device 7 drives the solidification chamber 1 to rise, and the dried and consolidated soil in the solidification chamber 1 is exposed after the solidification chamber 1 is moved out, and the third hydraulic cylinder 92 drives the push plate 93 to move forward, thereby pushing the dried and consolidated soil and sending it out through the slide 94. In a specific implementation manner, the slide 94 can also use a conveyor belt device to directly send out the processed dried soil to achieve automatic transportation.

[0030] Furthermore, the power source 61 of the electro-osmosis device is a direct current power source 61, and a current monitor is also provided on the electro-osmosis device.

[0031] like Figure 2 , Figure 4 As shown, the power supply 61 of the electro-osmosis device is respectively connected to the anode metal plate 62 and the cathode metal plate 63 through the anode to provide power supply. Under the action of the electro-osmosis flow of the current, the water in the mud is enriched to the cathode metal plate 63, and finally discharged from the bottom of the cathode metal plate 63. In this scheme, the power supply 61 uses a DC power supply 61, and the direction of the current is fixed, so that the water in the mud is enriched to the cathode plate, thereby quickly draining the water; in the process of accelerating the drainage of the current output, the current monitor can detect the current value in the loop; like Figure 7 The figure shows the schematic diagram of the current value and the power-on time in the circuit under laboratory simulation conditions. The power supply 61 uses a 36V regulated DC power supply 61. It can be found from the figure that during the power-on process of the water-containing mud, the current change in the circuit is divided into three stages. In the first stage, the current in the circuit increases because the electric field breaks the equilibrium state of ions in the mud pores, and the hydrated cations drag the water molecules to migrate to the cathode. When the water molecules migrate, new through-type pore channels are opened in the mud, which increases the conductive paths of the mud, thereby increasing the current in the circuit. In the second stage, the current value in the circuit continues to decrease. There are many reasons for this. The main reason is that as the water in the mud moves out, the conductive path gradually decreases, the overall resistance of the mud increases, and the current value in the circuit gradually decreases; in the third stage, the current value in the circuit is stable, because the electrical osmosis in the mud has ended, the infiltrated bound water in the mud is completely discharged, and only bound water remains in the mud. The mud is dried and the resistance value is stable; based on the above findings, we found that after the infiltrated bound water in the mud is completely discharged, the current in the energized circuit is stable. Therefore, by monitoring the current value in the circuit with a current monitor, it is possible to determine whether the water-containing mud has been completely dried and to determine the time point when the equipment ends the treatment.

[0032] Furthermore, a plurality of groups of moisture content sensors 631 are arranged on the inner wall of the curing chamber 1 , and a moisture content sensor 631 is arranged on the upper surface of the cathode metal plate 63 .

[0033] The clay soil excavated by the shield machine can be in a flowing state, a plastic state, a semi-solid state and a solid state due to different water contents. In order to facilitate excavation, a large amount of water, dispersants and stabilizers need to be added to the soil during the excavation process, so that the shield machine mud appears in a liquid flowing state; in mud treatment, the stability of the flowing and plastic mud is poor, and random stacking and landfill treatment is likely to cause geological disasters. At the same time, the water containing a large amount of polymer dispersants and stabilizers inside cannot be fully discharged, and after soil accumulation and seepage, it causes a certain degree of pollution to the local soil and groundwater. Therefore, for the treatment of shield machine mud, it is necessary to fully discharge the water in the mud, thereby discharging the dispersants and stabilizers in the water body, reducing pollution, and transforming the shield machine mud into a solid or semi-solid state to improve stability and avoid geological disasters after accumulation; In the field of soil mechanics, the critical moisture content between the plastic state and the semi-solid state is called the plastic limit. Before processing the shield machine mud, the plastic limit value of the shield machine mud to be processed can be measured by the rubbing strip method and a professional liquid-plastic limit combined measuring instrument; multiple groups of moisture content sensors 631 inside the solidification chamber 1 are evenly arranged, and a circular array is arranged on the inner wall of the solidification chamber 1, so as to sense the moisture content of the mud (soil) on the inner wall of the solidification chamber 1. When the moisture content of the mud (soil) sensed by all groups of moisture content sensors 631 is lower than the measured plastic limit value, it means that most of the moisture inside the shield machine mud has been discharged, and the treated shield machine mud has met the processing and delivery requirements; in this scheme, under the action of the electro-osmosis device, the moisture in the mud will move toward the cathode metal The plate 63 is enriched, so the moisture content sensor 631 is set above the connection position between the solidification chamber 1 and the confluence chamber 2. When the moisture content of the bottom of the mud reaches the treatment requirement, it means that the treatment of the shield machine mud is fully completed. At the same time, the moisture content sensor 631 can be combined with the current value measured by the electric osmosis device to make a more accurate judgment on the state of the mud in the solidification chamber 1 to ensure that the treated mud meets the treatment requirements; by monitoring the current value in the loop and measuring the moisture content of the cement slurry in the solidification chamber 1 with the moisture content sensor 631, it can be accurately judged whether the mud is completely dried, ensuring that the infiltrated water in the mud is fully discharged, so that the treated mud is in a solid or semi-solid state, avoiding subsequent accumulation and causing geological damage.

[0034] Furthermore, a layer of filter pad 23 is detachably mounted on the upper surface of the cathode metal plate 63 , and a water seepage groove 632 is provided on the cathode metal plate 63 .

[0035] like Figure 3As shown, a plurality of water seepage grooves 632 are provided on the cathode metal plate 63, and the water in the mud seeps into the water collection chamber 3 through the water seepage grooves 632. The filter pad 23 uses a non-woven fabric mesh with a mesh diameter of less than 8 mm. The filter pad 23 is used to reduce the soil in the mud from flowing down through the water seepage grooves 632, and at the same time, it can avoid the blockage of the water seepage grooves 632 to a certain extent, and ensure the stability of the water seepage. In the specific implementation, the mesh diameter and thickness of the filter pad 23 need to be set according to the seepage speed, and it is not advisable to set the thickness too large and the mesh diameter too large, which will affect the seepage of the water in the mud. A plurality of groups of conductive support rods 22 are arranged on the inner wall of the junction cabin 2, and the plurality of groups of conductive support rods 22 are arranged in a ring array. A corresponding limiting groove 633 is opened at the bottom of the cathode metal plate 63. When the cathode metal plate 63 is installed, the conductive support rod 22 is inserted into the limiting groove 633, so that the cathode metal plate 63 is stably installed; at the same time, the conductive support rod 22 is electrically connected to the outer cathode conductive wire 65, so that the cathode metal plate 63 is connected to the power supply 61.

[0036] Furthermore, the water treatment chamber 5 includes a plurality of physical precipitation chambers 51 and chemical treatment chambers 52 , and a water return pump is connected to the rear end of the water treatment chamber 5 .

[0037] like Figure 6 As shown, the water treatment chamber 5 is used to purify the seepage water to reduce pollution. In this technical solution, multiple groups of physical sedimentation chambers 51 are used for sedimentation treatment and physical adsorption of mud and various solid impurities in the water body. The chemical treatment chamber 52 removes the dispersant and stabilizer in the water body by adding chemical additives to react with the additives in the water body. The treated water is sent out for secondary use through a return water pump. In a specific implementation method, the setting of the water treatment chamber 5 needs to be set according to the purpose of use and discharge requirements of the recycled water. In one implementation method, the treated water is supplied to the shield machine again. The water treatment chamber 5 only needs to A physical sedimentation chamber 51 is set to remove solid impurities in the water body. The dispersant and stabilizer in the water body can continue to play a role in the shield machine excavation, which reduces the consumption of dispersants and stabilizers to a certain extent, thereby saving costs; in another embodiment, the treated water is used as industrial water, and it is necessary to install a chemical treatment chamber 52 after the physical sedimentation chamber 51 to fully purify the water body and remove the high molecular dispersant and stabilizer in the water body. Furthermore, the water collecting chamber 3 is a sealed structure, and a liquid level sensor 31 is arranged in the water collecting chamber 3, and the air inlet end of the vacuum pump unit 4 is arranged at the upper part of the water collecting chamber 3.

[0038] Furthermore, the water collecting chamber 3 is a sealed structure, a liquid level sensor 31 is arranged in the water collecting chamber 3 , and an air inlet end of the vacuum pump unit 4 is arranged at the upper part of the water collecting chamber 3 .

[0039] The water collecting chamber 3 is a sealed structure. The vacuum pump unit 4 can be used to draw a near vacuum inside the water collecting chamber 3, thereby creating a negative pressure environment inside the water collecting chamber 3 and accelerating the seepage of water in the mud. The air inlet end of the vacuum pump unit 4 is arranged at the upper part of the water collecting chamber 3 to prevent the vacuum pump unit 4 from sucking water. The air inlet end of the vacuum pump unit 4 is also provided with a dehumidification device to eliminate moisture and protect the vacuum pump unit 4. At the same time, a liquid level sensor 31 is provided inside the water collecting chamber 3 to monitor the liquid level inside the water collecting chamber 3 and pump it out in time for treatment.

[0040] Working principle: In the first step, the solidification chamber 1 is fixed on the confluence chamber 2 through the first hydraulic lifting device 7, and the sealing hoop 11 is closed to keep the solidification chamber 1 and the confluence chamber 2 sealed. The anode metal plate 62 is lifted and moved out of the solidification chamber 1 under the drive of the second hydraulic lifting device 8; in the second step, the mud pump sends the shield machine mud through the top entrance of the solidification chamber 1. After the shield machine mud is sent in, the second hydraulic lifting device 8 drives the anode metal plate 62 to descend and press the upper surface of the mud; in the third step, the electric osmosis device is energized to maintain the current loop between the anode metal plate 62 and the cathode metal plate 63, and the vacuum pump unit 4 is running to extract the air inside the water collection chamber 3 to make it a negative pressure environment; in the fourth step, the moisture in the cement slurry in the solidification chamber 1 is discharged under the gravity. , atmospheric pressure and the electro-osmosis device, the seepage groove 632 of the cathode metal plate 63 enters the water collecting chamber 3, the current in the circuit is measured by the current monitor on the electro-osmosis device, and the water content in the lower part of the mud is measured in combination with the water content sensor 631, and the state of the shield machine mud after treatment is comprehensively judged. After the shield machine mud treatment meets the standards, the electro-osmosis device stops energizing; in the fifth step, the sealing ring is opened, and the first hydraulic lifting device 7 drives the solidification cabin 1 to rise. After the solidification cabin 1 is moved out, the pushing device 9 moves forward to push out the treated soil, and the treated shield machine soil is sent out through the slide 94; sixth, the water that converges and enters the water collecting chamber 3 is purified by the water treatment chamber 5, and finally sent out by the return water pump for reuse.

[0041] In the description of the present invention, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0042] In the description of the present invention, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In the present invention, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine different embodiments or examples described in the present invention and features of different embodiments or examples without contradiction.

[0043] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A shield machine high-water slurry processing equipment, characterized by: include: A seepage chamber, wherein the seepage chamber comprises a columnar solidification chamber and a conical confluence chamber, wherein the solidification chamber is mounted on the upper part of the confluence chamber, and water-containing slurry is contained in the inner cavity of the solidification chamber, and water in the water-containing slurry seeps downward through the confluence chamber; A water collection chamber, which is arranged below the seepage chamber to accommodate the water flowing in from the seepage chamber. A vacuum pump unit is connected to the outside of the water collection chamber, and the vacuum pump unit is used to keep the water collection chamber in a negative pressure environment. The water collection chamber is also connected to a group of water treatment chambers through a water pump and a pipeline, and the water treatment chamber is used to purify the water in the water collection chamber; An electro-osmosis device, the electro-osmosis device comprising a power supply, an anode metal plate and a cathode metal plate, the anode metal plate and the cathode metal plate being electrically connected to the positive and negative electrodes of the power supply respectively, the anode metal plate and the cathode metal plate both being adapted to the inner cavity of a solidification chamber, wherein the anode metal plate is arranged at the top of the inner cavity of the solidification chamber, and the cathode metal plate is arranged at the top of the inner cavity of a confluence chamber, the electro-osmosis device applying a directional current to water-containing slurry.

2. The shield machine high-water slurry processing equipment according to claim 1 is characterized by: The curing cabin and the confluence cabin are detachably connected, a first hydraulic lifting device is arranged at the periphery of the curing cabin, and the curing cabin is lifted and lowered by the first hydraulic lifting device.

3. The shield machine high-water slurry processing equipment according to claim 1 is characterized by: A sealing hoop is arranged on the outer side of the connection position between the solidification cabin and the merging cabin, and a stepped bayonet is arranged at the contact position between the solidification cabin and the merging cabin.

4. The shield machine high-water slurry processing equipment according to claim 2 is characterized by: A top crossbeam is arranged at the top of the first hydraulic lifting device, a second hydraulic lifting device is arranged on the top crossbeam, the second hydraulic lifting device is fixedly connected to the anode metal plate, and the second hydraulic lifting device drives the anode metal plate to perform lifting motion.

5. The shield machine high-water slurry processing equipment according to claim 1 is characterized by: A slide frame is arranged on one side of the curing cabin, and a push-out device is arranged on the other side of the curing cabin.

6. The shield machine high-water slurry processing equipment according to claim 1 is characterized by: The power source of the electro-osmosis device is a direct current power source, and the electro-osmosis device is also provided with a current monitor.

7. The device for processing high-water-content slurry of a shield machine according to claim 1, characterized in that At: A plurality of groups of moisture content sensors are arranged on the inner side wall of the curing chamber, and a moisture content sensor is arranged on the upper surface of the cathode metal plate.

8. The device for processing high-water-content slurry of a shield machine according to claim 1, characterized in that: A layer of filter pad is detachably mounted on the upper surface of the cathode metal plate, and a water seepage groove is provided on the cathode metal plate.

9. The shield machine high-water slurry processing equipment according to claim 1, characterized in that: The water treatment chamber comprises a plurality of groups of physical precipitation chambers and chemical treatment chambers, and a water return pump is connected to the rear end of the water treatment chamber.

10. The shield machine high-water slurry processing equipment according to claim 1, characterized in that: The water collecting chamber is a sealed structure, a liquid level sensor is arranged in the water collecting chamber, and the air inlet end of the vacuum pump unit is arranged at the upper part of the water collecting chamber.