Isolation plug for cementing in rope coring drilling hole and use method thereof

By using an isolation plug with upper and lower spring layers, elastic semicircular cover and fork-shaped protrusion combination in the drilling hole, the problem of mixing cement slurry with groundwater and drilling fluid is solved, and the effective isolation and solidification of cement slurry is achieved, which is suitable for small Diameter drilling and low-volume grout filling.

CN118855418BActive Publication Date: 2024-11-29SICHUAN JINZUAN DIZHI MINERAL RESOURCES EXPLORATION ENG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411348252.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-11-29
Estimated Expiration
2044-09-26

AI Technical Summary

Technical Problem

During drilling construction, mixing cement slurry with groundwater or drilling fluid leads to pollution and dilution, affecting the solidification effect of cement slurry. The existing technology lacks effective isolation measures, especially not suitable for small-diameter drilling and cement slurry filling, with less amount of cement slurry filling. The situation.

Method used

An isolation plug for filling cement in the borehole of rope center drilling is designed, using upper and lower spring layer structure, elastic semicircular cover and fork-shaped protrusion combination, sealing and grinding are achieved through expansion materials and auxiliary mechanisms to isolate cement slurry and Groundwater and drilling fluid ensure that the cement slurry solidifies at the predetermined location.

Benefits of technology

Effectively prevent the mixing of cement slurry with groundwater and drilling fluid, ensure that the cement slurry solidifies at a predetermined position, improves the sealing effect and operation stability, and is suitable for small diameter drilling and low cement slurry filling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118855418B_ABST
    Figure CN118855418B_ABST
Patent Text Reader

Abstract

The invention discloses an isolation plug for cementing in a rope coring drill hole and a use method thereof, and relates to the field of drilling technology. The invention comprises an air-filling chamber, a sealable air-filling port is fixedly installed at the bottom of the air-filling chamber, a thread is fixedly installed at the top of the air-filling chamber, a filling chamber is threadedly connected to the top of the thread, the filling chamber and the air-filling chamber are separated by the thread, a retaining spring chamber is fixedly installed at the top of the filling chamber, and the isolation plug is arranged as an upper and lower layered structure, and the solid protrusions of irregular mud are ground by an elastic semicircular cover and a fork-shaped protrusion, so that the poor sealing problem caused by the direct contact between the upper layer and the solid protrusions of the irregular mud can be effectively avoided, and the sealing performance of the isolation plug when it moves can be significantly improved. At the same time, the use method solves the problem that the displacement water and cement slurry, and the cement slurry and the original mud (or drilling fluid) in the hole are directly contacted in the cementing operation, which pollutes and dilutes each other and is not conducive to the solidification of the cement slurry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drilling, and in particular to an isolation plug for cementing in a rope coring drill hole and a use method thereof. Background Art

[0002] Rope coring drilling is a drilling method commonly used in mineral exploration and engineering surveys. The characteristic of this technology is that when coring, it is not necessary to lift out the entire drill pipe column in the borehole. Instead, a special salvage device with a wire rope is used to lift the inner tube at the bottom of the hole containing the core to the ground through the center hole of the drill pipe in the hole, thereby reducing the number of times the drill is lifted and lowered and the auxiliary time for lifting the drill tool, thereby improving the drilling efficiency.

[0003] During the drilling construction process, the method of pouring cement slurry into the hole is often used to protect the hole wall, plug leaks, and deal with accidents in the hole. The accuracy of the position of pouring cement slurry, the accuracy of the pouring amount, and the accuracy of the water-cement ratio affect the effect of pouring cement, that is, whether the cement slurry can solidify at the predetermined position and reach the ideal strength. Under different geological conditions, there may or may not be groundwater in the borehole. For the situation of pouring cement in the underwater local hole section when groundwater exists, the common method is: lower the drill pipe to the predetermined position, pour the prepared cement into the drill pipe at the hole mouth, and then send the pre-prepared displacement cement slurry to the bottom of the hole (if grouting in the hole section, a bridge needs to be built at the bottom of the pre-filling section), and then pull out the grouting pipe and wait for it to solidify. When groundwater exists, the groundwater and the original mud (drilling fluid) in the hole are easy to mix with the cement slurry, which leads to contamination and dilution of each other, and is not conducive to the solidification of the cement slurry.

[0004] In the prior art, there are no isolation measures between the displacement water and cement slurry, and between the cement slurry and the original mud (drilling fluid) in the hole. Generally, the borehole should be flushed with clean water before pouring cement slurry to prevent the original mud in the hole from contaminating the cement slurry. In the field of oil drilling, the amount of isolation fluid used is large and requires the use of additional materials for special preparation. It is not convenient to apply to small-diameter boreholes, especially when the amount of cement slurry poured is small. Summary of the invention

[0005] The present invention aims to provide an isolation plug for cementing in a rope core drilling hole and a method for using the isolation plug to solve the problem of no isolation measures when pouring cement slurry.

[0006] The present invention is achieved through the following technical solutions:

[0007] An isolation plug for cementing in a rope coring borehole comprises:

[0008] The inflation chamber has a sealable inflation port fixedly installed at its bottom, a thread fixedly installed at the top of the inflation chamber, a filling chamber threadedly connected to the top of the thread, the filling chamber and the inflation chamber are separated by the thread, and a retaining spring chamber fixedly installed on the top of the filling chamber ensures that appropriate contact pressure is maintained between the retaining spring chamber and the inner wall of the drill pipe, which helps to maintain the sealing performance and prevent moisture loss of the filling material.

[0009] Furthermore, the retaining spring chamber is composed of an upper retaining spring layer at the top and a lower retaining spring layer at the bottom. The diameter of the upper retaining spring layer is larger than the diameter of the lower retaining spring layer. The bottom of the upper retaining spring layer and the top of the lower retaining spring layer are smoothly connected by an arc-shaped plane. The upper and lower layers can provide a double sealing effect. The upper layer directly forms a close contact with the borehole wall, and the lower layer can assist the upper layer.

[0010] Furthermore, a retaining spring is fixedly installed on the top of the retaining spring chamber, and a slit is provided on the filling chamber to provide a flexible interface, allowing the isolation plug as a whole to have a certain expansion and contraction space when the temperature changes or the structure moves, thereby reducing damage caused by stress concentration.

[0011] Furthermore, an auxiliary mechanism is provided in the filling chamber, and the auxiliary mechanism includes a fixing rod, and the fixing rod is fixedly installed on the inner side wall of the filling chamber, so that the fixing rod can play an auxiliary role during the expansion or contraction of the filling chamber.

[0012] Furthermore, the top of the fixing rod extends to the lower retaining spring layer, and there are three fixing rods. The three fixing rods are symmetrically distributed around the central axis of the filling chamber in a triangular distribution, which is more stable during operation.

[0013] Furthermore, a circular hole is provided on the lower spring layer, and an elastic semicircular cover is fixedly installed outside the circular hole. The elastic semicircular cover is in a fully expanded state to just make up for the horizontal distance difference between the lower spring layer and the upper spring layer.

[0014] Furthermore, a fork-shaped protrusion is elastically mounted on the outside of the elastic semicircular cover, so that the solid protrusion surface of the irregular mud is ground to be smooth.

[0015] Furthermore, an elastic plate is fixedly mounted on the lower retaining spring layer, a push rod is fixedly mounted on the elastic plate, and a semicircular push plate is fixedly mounted on the outside of the push rod, which can push out the elastic semicircular cover to open it when expanding.

[0016] Furthermore, the outer portion of the semicircular push plate is arranged to fit the inner wall of the elastic semicircular cover, thereby effectively protecting the surface of the elastic semicircular cover and avoiding damage.

[0017] A method for using an isolation plug for cementing a hole in a rope coring drill hole, using the isolation plug for cementing a hole in a rope coring drill hole, comprising the following steps:

[0018] S1, inflation and connection, first open the inflation port to inflate the inflation chamber, close the inflation port, then thread the inflation chamber and the filling chamber together through the threaded connection, then fill the filling chamber with water-swellable material, place the No. 1 isolation plug inside the drill pipe, and then pour cement slurry into the drill pipe. The material in the filling chamber swells when it encounters water, so that the filling chamber begins to expand and drives the retaining spring chamber to expand together. The outer wall of the retaining spring chamber will be close to the inner wall of the drill pipe, and at this time, the No. 1 isolation plug will play a role in isolating the upper cement slurry and the lower mud;

[0019] S2. Pour cement slurry. When the designed amount of cement slurry is poured, the No. 2 isolation plug is put into the hole of the drill pipe. Then, displacement water is added into the drill pipe by using the water inlet pump. Under the pressure of displacement water, the No. 1 isolation plug and the No. 2 isolation plug will move downward. During the movement, the No. 1 isolation plug and the No. 2 isolation plug can use the elastic semicircular cover and fork-shaped protrusion to grind the irregular mud solid protrusion attached to the inner wall of the drill pipe. When the No. 1 isolation plug reaches the bottom of the drill pipe, due to the inner diameter of the pipe shoe, The diameter of the No. 1 isolation plug is smaller than the inner diameter of the drill pipe, so that the movement of the No. 1 isolation plug will be hindered by the pipe shoe, and the pump pressure will increase. At this time, it will remind the ground operator that the No. 1 isolation plug has reached the bottom of the drill pipe. Continue to increase the pressure. After gradually increasing the pressure, the No. 1 isolation plug will shrink appropriately and pass through the pipe shoe. When the No. 1 isolation plug passes through the drill pipe, the filling chamber and the retaining spring chamber will continue to expand and contact with the inner wall of the borehole. At the same time, the contact of water pressure and the self-stabilizing effect of the inflation chamber and the buoyancy of the mud will prevent the No. 1 isolation plug from continuing to sink.

[0020] S3. Continue to add displacement water. When the displacement water reaches the designed amount, the drill pipe can be directly raised to a certain distance so that the No. 2 isolation plug can pass through the pipe shoe. At this time, the No. 2 isolation plug will also stay on the inner wall of the borehole due to expansion. The No. 2 isolation plug plays the role of isolating the displacement water and cement slurry. Finally, the drill pipe is completely raised and the cement slurry is waited for to solidify. The overall operation is completed.

[0021] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0022] 1. The present invention provides a double sealing effect through the upper and lower layer designs of the spring chamber. The upper layer directly forms a close contact with the borehole wall, while the lower layer can assist the upper layer. The lower layer has a smaller diameter, which can help distribute the pressure more evenly during inflation or expansion, thereby enhancing the sealing effect. The lower layer has a smaller diameter than the upper layer, which can increase the stability of the isolation plug and prevent it from deflecting when the pressure changes.

[0023] 2. The present invention provides an elastic semicircular cover and a fork-shaped protrusion, wherein the fork-shaped protrusion contacts the solid protrusion of the irregular mud and flattens the protrusion in advance, thereby creating conditions for the close fit of the upper layer, and can significantly increase the contact area of ​​the isolation plug, thereby enhancing the overall sealing effect. The fork-shaped protrusion of the lower layer can preferentially contact and process the solid protrusion of the irregular mud, and can effectively avoid the poor sealing problem caused by the upper layer directly contacting the solid protrusion of the irregular mud;

[0024] 3. The present invention, by using this isolation plug, solves the problem that the displacement water and cement slurry, and the cement slurry and the original mud in the hole are in direct contact during the cementing operation, which causes contamination and dilution to each other and is not conducive to the solidification of the cement slurry. At the same time, it realizes the cement in place alarm and stops pumping the displacement water in time, thereby ensuring that the cement slurry fills the predetermined hole section, that is, it solves the technical problem of the cement slurry solidifying as expected and in accurate position. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0026] Figure 1 This is a schematic diagram of the external structure of the isolation plug after expansion of the present invention;

[0027] Figure 2 This is a schematic diagram of the external structure when viewed from above after the isolation plug is expanded;

[0028] Figure 3 It is a schematic diagram of the external local structure of the lower retaining spring layer;

[0029] Figure 4 It is a schematic diagram of the external local structure of the elastic plate;

[0030] Figure 5 It is a schematic diagram of the external local structure of the elastic semicircular cover;

[0031] Figure 6 It is a schematic diagram of the external partial structure of the semicircular push plate;

[0032] Figure 7 This is a schematic diagram of the insertion of the No. 1 isolation plug;

[0033] Figure 8 This is a schematic diagram of the No. 2 isolation plug being put into operation;

[0034] Fig. 9 A drill pipe schematic is presented for completeness.

[0035] The reference numerals represent: 1-inflation chamber, 2-inflation port, 3-thread, 4-filling chamber, 5-circlip chamber, 6-slit, 7-circlip, 8-fixing rod, 9-round hole, 10-elastic semicircular cover, 11-forked protrusion, 12-elastic plate, 13-push rod, 14-semicircular push plate, 51-upper circular spring layer, 52-lower circular spring layer, 101-drill hole, 102-drill rod, 103-mud, 104-No. 1 isolation plug, 105-cement slurry, 106-No. 2 isolation plug, 107-displacement water, 108-pipe boot. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical scheme and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments and drawings. The schematic implementation modes and descriptions of the present invention are only used to explain the present invention and are not intended to limit the present invention. It should be noted that the present invention is already in the actual development and use stage.

[0037] like Figures 1 to 6 As shown, the present invention provides an isolation plug for cementing in a rope coring drilling hole, comprising:

[0038] The inflatable chamber 1 has a sealable inflatable port 2 fixedly installed at its bottom. When the inflatable chamber 1 is used, the inflatable port 2 can be opened to inflate the inflatable chamber 1. After the inflation is completed, the inflatable port 2 can be sealed and closed using a sealing cover. A thread 3 is fixedly installed at the top of the inflatable chamber 1. A filling chamber 4 is threadedly connected to the top of the thread 3. The filling chamber 4 is separated from the inflatable chamber 1 by the thread 3 and is not affected by each other. A retaining spring chamber 5 is fixedly installed at the top of the retaining spring chamber 4. A retaining spring 7 is fixedly installed at the top of the retaining spring chamber 5. A slit 6 is provided on the filling chamber 4.

[0039] The spring chamber 5 is integrally composed of an upper spring layer 51 at the top and a lower spring layer 52 at the bottom. The diameter of the upper spring layer 51 is larger than that of the lower spring layer 52. The bottom of the upper spring layer 51 and the top of the lower spring layer 52 are smoothly connected by an arc-shaped plane.

[0040] In the above technical solution, the isolation plug is made of plastic and is plastically formed using a mold during production. When using the isolation plug, firstly, the inflation chamber 1 is installed at the bottom of the filling chamber 4 through the thread 3, and then the inflation port 2 is opened to inflate the inflation chamber 1. When the inflation chamber 1 is full, the inflation port 2 is closed to seal the inflation chamber 1, and then the water-swellable material is filled into the filling chamber 4 until it is filled to the horizontal surface of the top of the retaining spring chamber 5. Then, the isolation plug can be placed in the drill pipe. When the displacement water is added to push the isolation plug to move, the displacement water contacts the expansion material in the filling chamber 4, causing the expansion material to begin to expand. The expansion of the expansion material can expand the filling chamber 4, and the retaining spring will also be expanded. The reverse tension generated by the retaining spring can prevent the retaining spring from over-expanding, ensuring that the retaining spring chamber and the inner wall of the drill pipe maintain an appropriate contact pressure, which helps to maintain the sealing performance and prevent the water loss of the filling material. The expansion of the expansion material allows the retaining spring chamber 5 to be tightly attached to the inner wall of the drill pipe. The slit 6 on the isolation plug is designed mainly to provide a flexible interface, allowing the isolation plug as a whole to have a certain expansion and contraction space when the temperature changes or the structure moves, thereby reducing the damage caused by stress concentration. The slit can also be used to control the development of cracks, or to prevent the damage caused by stress concentration during construction. During the construction process, it is used as a division to facilitate more precise removal or repair. After the bottom air-filled chamber 1 is fully inflated, it can provide a guide during the movement of the isolation plug. After the isolation plug stops moving and the thrust formed by the pressure of the displacement water is separated, the pressure in the air-filled chamber 1 increases the effective weight of the bottom of the isolation plug, which helps to maintain the hydrostatic balance between the isolation plug and the cement slurry, so that after the external force is stopped, the isolation plug and the external cement slurry form a self-stabilizing effect. At the same time, the air-filled chamber 1 can also play a buffering role to reduce the displacement or falling off of the isolation plug caused by pressure fluctuations. In addition, the air-filled chamber 1 can also help maintain the isolation plug. shape, ensuring that it is correctly positioned in the pipeline, thereby improving the overall sealing effect, and the upper and lower layer design of the retaining spring chamber 5, the upper and lower layer structure can provide a double sealing effect, the upper layer directly forms a close contact with the borehole wall, and the lower layer can assist the upper layer, the lower layer has a smaller diameter, which can help to distribute the pressure more evenly during inflation or expansion, and enhance the sealing effect. The lower layer has a smaller diameter than the upper layer, which can increase the stability of the isolation plug and prevent it from shifting when the pressure changes. Finally, the isolation plug is divided into three parts: the inflation chamber 1, the filling chamber 4 and the retaining spring chamber 5. Each part has a clear division of labor, which makes the isolation plug easy to use and operate as a whole and has good sealing ability.

[0041] like Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6As shown, in the present invention, an auxiliary mechanism is also provided, which includes a fixing rod 8, which is fixedly mounted on the inner wall of the filling chamber 4, and the top of the fixing rod 8 extends to the lower spring layer 52. There are three fixing rods 8, and the three fixing rods 8 are symmetrically distributed around the central axis of the filling chamber 4, so that during the expansion or contraction of the filling chamber 4, the fixing rod 8 can play an auxiliary role, and the bottom of the filling chamber 4 can drive the upper part of the filling chamber 4 to pre-contract or expand when contracting and expanding, and when the expansion force and contraction force reach the upper part, it can be carried out faster. It has a good auxiliary effect in contraction and expansion. A circular hole 9 is opened on the lower spring layer 52, and an elastic semicircular cover 10 is fixedly installed outside the circular hole 9. A fork-shaped protrusion 11 is elastically installed outside the elastic semicircular cover 10. An elastic plate 12 is fixedly installed on the lower spring layer 52, and a push rod 13 is fixedly installed on the elastic plate 12. A semicircular push plate 14 is fixedly installed outside the push rod 13, and the outer side of the semicircular push plate 14 is arranged to fit the inner wall of the elastic semicircular cover 10. The full state of the elastic semicircular cover 10 being stretched just makes up for the horizontal distance difference between the lower spring layer 52 and the upper spring layer 51.

[0042] In the above technical solution, when the material in the filling chamber 4 expands when exposed to water, the filling chamber 4 and the retaining spring chamber 5 are stretched open, and the lower retaining spring layer 52 is also stretched open through the fixing rod 8. In the process of the lower retaining spring layer 52 being stretched open, the elastic plate 12 is stretched due to the lower retaining spring layer 52 being stretched, so that the elastic plate 12 is stretched and pushes the push rod 13 to move outward, and the push rod 13 drives the semicircular push plate 14 to move outward, and the semicircular push plate 14 can push the elastic semicircular cover 10 to bulge outward. As the material expands, the material enters the circular hole 9, and the material is gradually filled and accompanied by the expansion of the material, the material will push the fork-shaped protrusion 11 to bulge outward, and finally an elastic semicircular cover 10 is formed. The cover 10 and the fork-shaped protrusion 11 are in a fully full shape. When the isolation plug is pushed downward by the displacement water, the isolation plug will drive the upper retaining spring layer 51 and the lower retaining spring layer 52 of the retaining spring chamber 5 to move downward together. When encountering the solid protrusion of irregular mud, the lower retaining spring layer 52 will drive the elastic semicircular cover 10 to contact the solid protrusion of the irregular mud first, and the elastic semicircular cover 10 will drive the fork-shaped protrusion 11 to contact the solid protrusion of the irregular mud. As the lower retaining spring layer 52 moves downward with the isolation plug, the elastic semicircular cover 10 will perform surface friction with the fork-shaped protrusion 11 and the solid protrusion of the irregular mud, so that the fork-shaped protrusion 11 can grind the solid protrusion of the irregular mud through friction. The surface of the solid protrusion of the irregular mud is ground to be smooth, so that the upper retaining spring layer 51 can fit better when passing through, thereby improving the sealing performance. When the isolation plug is compressed and shrunk as a whole through the pipe boot, the fixing rod 8 will provide a pre-contraction effect, so that the elastic semicircular cover 10 and the fork-shaped protrusion 11 will be compressed by the pipe boot and retracted into the lower retaining spring layer 52. When the elastic semicircular cover 10 and the fork-shaped protrusion 11 are compressed and shrunk by the pipe boot, the mud attached to the surface will be cleaned off by the friction with the pipe boot, which has a cleaning effect. The setting of the semicircular push plate 14 can not only push the elastic semicircular cover 10 out and open it when it expands, but also can be used when the elastic semicircular cover 10 contacts the pipe boot. The pipe boot can utilize the arc surface of the semicircular push plate 14 to gradually compress the elastic semicircular cover 10 through an arc path instead of directly squeezing and compressing it, which can effectively protect the surface of the elastic semicircular cover 10 and avoid damage. Finally, by providing the elastic semicircular cover 10 and the fork-shaped protrusion 11, the fork-shaped protrusion 11 contacts the solid protrusion of the irregular mud, and the protrusion is flattened in advance, thereby creating conditions for the close fit of the upper layer, which can significantly increase the contact area of ​​the isolation plug, thereby enhancing the overall sealing effect. The fork-shaped protrusion 11 of the lower layer can preferentially contact and process the solid protrusion of the irregular mud, which can effectively avoid the poor sealing problem caused by the upper layer directly contacting the solid protrusion of the irregular mud.

[0043] like Figures 7 to 9 As shown, the present invention provides a method for using an isolation plug for cementing in a rope coring drilling hole, comprising the following steps:

[0044] S1, inflation and connection, first open the inflation port 2 to inflate the inflation chamber 1, close the inflation port 2, then thread the inflation chamber 1 and the filling chamber 4 through the thread 3, then fill the filling chamber 4 with water-swellable material, place the No. 1 isolation plug 104 inside the drill pipe 102, and then pour cement slurry 105 into the drill pipe 102. The material in the filling chamber 4 expands when it encounters water, so that the filling chamber 4 starts to expand and drives the retaining spring chamber 5 to expand together. The outer wall of the retaining spring chamber 5 will be close to the inner wall of the drill pipe 102, and at this time, the No. 1 isolation plug 104 will play a role in isolating the upper cement slurry 105 and the lower mud 103;

[0045] S2, pour cement slurry 105. When the cement slurry 105 reaches the designed amount, the No. 2 isolation plug 106 is put into the hole of the drill pipe 102, and then the displacement water 107 is added into the drill pipe 102 by using the water inlet pump. Under the pressure of the displacement water 107, the No. 1 isolation plug 104 and the No. 2 isolation plug 106 will move downward. During the movement, the No. 1 isolation plug 104 and the No. 2 isolation plug 106 can use the elastic semicircular cover 10 and the fork-shaped protrusion 11 to grind the irregular mud solid protrusions attached to the inner wall of the drill pipe 102 to ensure good sealing during movement. When the No. 1 isolation plug 104 reaches the bottom of the drill pipe 102 When the No. 1 isolation plug 104 is pushed down, the inner diameter of the pipe boot 108 is smaller than the inner diameter of the drill pipe 102, so that the movement of the No. 1 isolation plug 104 will be hindered by the pipe boot 108, and the pump pressure will increase. At this time, it will remind the ground operator that the No. 1 isolation plug 104 has reached the bottom of the drill pipe, which serves as an alarm. Continue to increase the pressure. The No. 1 isolation plug 104 will shrink appropriately after gradually increasing the pressure and pass through the pipe boot 108. When the No. 1 isolation plug 104 passes through the drill pipe, the filling chamber 4 and the retaining spring chamber 5 will continue to open and contact with the inner wall of the borehole 101. At the same time, the contact of the water pressure and the self-stabilizing effect of the inflation chamber 1 and the buoyancy of the mud will prevent the No. 1 isolation plug 104 from continuing to sink.

[0046] S3. Continue to add displacement water. After the displacement water reaches the designed amount, the drill pipe 102 can be directly raised upward for a certain distance so that the No. 2 isolation plug 106 can pass through the pipe shoe 108. At this time, the No. 2 isolation plug 106 will also stay on the inner wall of the borehole 101 due to expansion. The No. 2 isolation plug plays the role of isolating the displacement water 107 and the cement slurry 105. Finally, the drill pipe 102 is completely raised, and the cement slurry 105 is waited for to solidify. The overall operation is completed.

[0047] In summary, by setting the isolation plug as an upper and lower layered structure, and using the elastic semicircular cover 10 and the fork-shaped protrusion 11 to grind the solid protrusions of the irregular mud, the poor sealing problem caused by the direct contact between the upper layer and the solid protrusions of the irregular mud can be effectively avoided, and the sealing performance of the isolation plug when moving can be significantly improved. At the same time, the use method solves the problem that the displacement water and cement slurry, and the cement slurry and the original mud (or drilling fluid) in the hole are in direct contact during the cementing operation, which pollutes and dilutes each other and is not conducive to the solidification of the cement slurry. At the same time, the cement is in place alarm and the pumping of displacement water is stopped in time, so as to ensure that the cement slurry fills the predetermined hole section, that is, the technical problems of the expected solidification and accurate position of the cement slurry are solved at the same time. In addition, the internal volume of the rope coring drill pipe is much larger than the outer annular gap of the drill pipe, and the density of the cement slurry is greater than the density of the mud. Therefore, when the drill pipe is pulled out, the cement slurry is not easy to mix with the mud, which is conducive to the solidification of the cement slurry.

[0048] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. An isolation plug for cementing in a rope coring borehole, characterized in that: include: An inflatable chamber (1) having a sealable inflatable port (2) fixedly mounted on its bottom, a thread (3) fixedly mounted on the top of the inflatable chamber (1), a filling chamber (4) threadedly connected to the top of the thread (3), the filling chamber (4) being separated from the inflatable chamber (1) by the thread (3), and a retaining spring chamber (5) fixedly mounted on the top of the filling chamber (4); The retaining spring chamber (5) is integrally composed of an upper retaining spring layer (51) at the top and a lower retaining spring layer (52) at the bottom. The diameter of the upper retaining spring layer (51) is larger than the diameter of the lower retaining spring layer (52). The bottom of the upper retaining spring layer (51) and the top of the lower retaining spring layer (52) are smoothly connected via an arc-shaped plane. A retaining spring (7) is fixedly mounted on the top of the retaining spring chamber (5). A slit (6) is provided on the filling chamber (4).

2. The isolation plug for cementing in a rope coring borehole according to claim 1, characterized in that: An auxiliary mechanism is also provided in the filling chamber (4), the auxiliary mechanism comprising a fixing rod (8), the fixing rod (8) being fixedly mounted on the inner side wall of the filling chamber (4).

3. The isolation plug for cementing in a rope coring borehole according to claim 2, characterized in that: The top of the fixing rod (8) extends to the lower retaining spring layer (52), and there are three fixing rods (8), which are symmetrically distributed around the central axis of the filling chamber (4).

4. The isolation plug for cementing in a rope coring borehole according to claim 3, characterized in that: A circular hole (9) is formed on the lower retaining spring layer (52), an elastic semicircular cover (10) is fixedly mounted on the outside of the circular hole (9), a fork-shaped protrusion (11) is elastically mounted on the outside of the elastic semicircular cover (10), an elastic plate (12) is fixedly mounted on the lower retaining spring layer (52), a push rod (13) is fixedly mounted on the elastic plate (12), and a semicircular push plate (14) is fixedly mounted on the outside of the push rod (13).

5. The isolation plug for cementing in a rope coring borehole according to claim 4, characterized in that: The outer portion of the semicircular push plate is arranged to fit the inner side wall of the elastic semicircular cover (10).

6. A method for using an isolation plug for cementing in a rope coring borehole, characterized in that: The use of the isolation plug for cementing in a rope coring borehole according to claim 5 comprises the following steps: S1, inflation and connection, firstly, opening the inflation port (2) to fully inflate the inflation chamber (1), then closing the inflation port (2), then threading the inflation chamber (1) and the filling chamber (4) together through the thread (3), then filling the filling chamber (4) with water-swellable material, placing a No. 1 isolation plug (104) inside the drill rod (102), then pouring cement slurry (105) into the drill rod (102), the material in the filling chamber (4) expands when it comes into contact with water, causing the filling chamber (4) to expand and drive the retaining spring chamber (5) to expand together, the outer wall of the retaining spring chamber (5) will be closely attached to the inner wall of the drill rod (102), and at this time, the No. 1 isolation plug (104) will play a role in isolating the upper cement slurry (105) and the lower mud (103); S2, pouring cement slurry (105). When the cement slurry (105) reaches the designed amount, a No. 2 isolation plug (106) is inserted through the orifice of the drill pipe (102). Subsequently, displacement water (107) is added into the drill pipe (102) by using a water inlet pump. Under the pressure of the displacement water (107), the No. 1 isolation plug (104) and the No. 2 isolation plug (106) move downward. During the movement, the No. 1 isolation plug (104) and the No. 2 isolation plug (106) use the elastic semicircular cover (10) and the fork-shaped protrusion (11) to grind the irregular solid protrusions of mud (103) attached to the inner wall of the drill pipe (102). When the No. 1 isolation plug (104) reaches the bottom of the drill pipe (102), the pipe is The inner diameter of the boot (108) is smaller than the inner diameter of the drill pipe (102), so that the movement of the No. 1 isolation plug (104) will be hindered by the pipe boot (108), and the pump pressure will increase. At this time, the ground operator will be prompted that the No. 1 isolation plug (104) has reached the bottom of the drill pipe (102). Continue to increase the pressure. After gradually increasing the pressure, the No. 1 isolation plug (104) will moderately shrink and pass through the pipe boot (108). After the No. 1 isolation plug (104) passes through the drill pipe (102), the filling chamber (4) and the retaining spring chamber (5) will continue to expand and contact the inner wall of the borehole (101). At the same time, the contact of the water pressure and the self-stabilizing effect of the inflation chamber (1) and the buoyancy of the mud (103) will prevent the No. 1 isolation plug (104) from continuing to sink. S3, continue to add displacement water (107). After the displacement water (107) reaches the designed amount, the drill pipe (102) is directly lifted up a certain distance, so that the No. 2 isolation plug (106) passes through the pipe shoe (108). At this time, the No. 2 isolation plug (106) will also stay on the inner wall of the borehole (101) due to expansion. The No. 2 isolation plug (106) plays the role of isolating the displacement water (107) and the cement slurry (105). Finally, the drill pipe (102) is completely lifted up, and the cement slurry (105) is waited for to solidify. The overall operation is completed.

Citation Information

Patent Citations

  • Coal field drill hole leak blocking system

    CN102337859A

  • Hole sealing device and kit for downlink pressure measuring drill hole and using method of hole sealing device

    CN111927529A