Liquid storage and energy storage separation device, wellhead heat tracing device and wellhead heat tracing method

By designing a liquid storage energy storage separation device and a wellhead heating device in the oil field production fluid, and using spacer tanks and circulating water pumps to heat the sewage, the low oil-water separation efficiency and sewage treatment problems are solved, and efficient energy recycling and heavy oil utilization are achieved. Gathering and transportation heat requirements.

CN118855441AInactive Publication Date: 2024-10-29克拉玛依红山油田有限责任公司 +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411124599.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-11-23
Filing Date
2024-08-16
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing oil-water separation technology for produced liquids in oil fields is inefficient and cannot effectively store and reuse the separated water, resulting in waste of energy and difficulties in sewage treatment.

Method used

A liquid storage energy storage separation device and a wellhead heating device are designed to separate oil and water through main tanks and auxiliary tanks set at intervals, and use circulating water pumps and solar collectors to heat sewage to achieve reuse of sewage and production of liquids. of heat storage.

Benefits of technology

It significantly improves the oil-water separation efficiency, realizes efficient recycling of sewage, reduces energy consumption and sewage treatment costs, and meets the heat demand for heavy oil gathering and transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118855441A_ABST
    Figure CN118855441A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of oil field produced liquid heating, in particular to a liquid and energy storage separation device, a wellhead heat tracing device and a wellhead heat tracing method.The liquid and energy storage separation device comprises a main tank and a first auxiliary tank which are arranged in a spaced mode, and a first oil gas outlet hole is formed in the center of the upper end of the main tank. The oil-water separation device is reasonable and compact in structure, when the oil-water separation device is used, at least one wellhead produced liquid pipeline is communicated with the liquid inlet, so that produced liquid with higher temperature of the wellhead produced liquid pipelines enters the main tank to realize oil-water separation, and separated sewage with heat enters the first auxiliary tank; the high-temperature sewage in the first auxiliary tank can be injected into the heat tracing pipeline again to heat the produced liquid again, and the high-temperature sewage in the first auxiliary tank can also be injected into equipment needing to be heated, so that the function of separating the high-temperature sewage in the produced liquid out and recycling the high-temperature sewage can be achieved, and the effect of storing heat energy of the produced liquid is achieved; and then the liquid outlet of the main tank is communicated with a treatment station through a delivery pump, and separated oil can flow into the treatment station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oilfield produced fluid heating, and relates to a liquid storage and energy storage separation device, a wellhead heating device and a wellhead heating method. Background Art

[0002] Due to the high content of heavy components such as colloids and asphaltene, heavy oil has the characteristics of high density, high viscosity and poor fluidity at room temperature, which brings difficulties to its mining, transportation and refining, and limits the utilization of heavy oil. At present, domestic oil fields generally use steam injection to heat the collection and transportation of heavy oil. This technology can greatly reduce the viscosity of heavy oil and improve its fluidity. However, at the same time, the steam hot blending process has large heat loss and inconvenient operation. After the heavy oil is dehydrated at the back end, a large amount of high-temperature wastewater is generated. This part of the wastewater cannot be recycled and needs to be treated to meet the standards before it can be discharged, which results in a double waste of materials and energy.

[0003] Industrial oil-water separator is a device used to separate oil and water in wastewater, with the purpose of removing pollutants in wastewater to meet emission standards. According to its working principle and structural form, it can be divided into several types, such as gravity separation, centrifugal separation, filter layer separation, dissolved air flotation, and corrugated tube plate oil-water separator. Among them, the corrugated tube plate oil-water separator is a new method of industrial oil-water separation technology. Its principle is to use the special structure of the corrugated tube plate, introduce the oil-water mixture into the corrugated tube plate, and use the gravity, inertial centrifugal effect and wave effect of the corrugated tube plate to triple separate the oil, water and solid particles in the oil-water mixture, thereby achieving efficient separation.

[0004] Gravity separation is suitable for wastewater with low oil content, and its removal rate is about 50%. However, if the centrifugal force of the separation device is increased, its removal rate can be improved, but the requirements for the equipment are also higher; centrifugal separation is suitable for wastewater with high oil content, and its removal rate can reach 60% to 85%, but it has high requirements for centrifugal separation parameters and the size of solid particles in the water. In addition, the centrifugal separation method can also be combined with other separation methods to improve the separation effect; the filter layer separation method uses microporous filter materials to achieve oil-water separation, and its removal rate can reach 80%, but due to the influence of filter layer blockage, the separation effect will gradually decrease; the dissolved air flotation method uses bubbles to isolate the oil, colloids and plankton in the wastewater, and the removal rate is usually above 85%, but it requires the addition of chemicals, and has high requirements for factors such as the pH value of water, the type and concentration of oil and fat in the water, and the size of bubbles; the corrugated tube plate oil-water separator is suitable for wastewater with high oil and water content, and has the advantages of high efficiency, low energy consumption and greater adaptability, and the removal rate can reach more than 90%. The removal rate of industrial oil-water separators is affected by many factors, but its actual removal rate also needs to consider other factors, such as parameter control, pollutant properties and process conditions.

[0005] Based on the theory of crude oil "inversion point", when the water content is higher than the inversion point, the viscosity of the mixed liquid will drop significantly, and the mixed liquid will be transformed from a W / O (water-in-oil) emulsion to an O / W (oil-in-water) emulsion with good fluidity, which is conducive to the pipeline transportation of heavy oil. This theory provides a solution to the problem of large consumption of reduced pressure steam and high heat loss of high-temperature sewage. If part of the high-temperature de-oiled sewage is recycled in the heavy oil gathering and transportation process, it can not only meet the requirements of super-heavy oil gathering and transportation, but also save a lot of steam and recover part of the heat in the sewage, which is expected to achieve significant energy-saving effects.

[0006] A Chinese patent application document with publication number CN107189810A discloses a novel combined oil-gas-water three-phase separator based on solar thermal utilization technology, including an inlet pre-separator, a solar heat collection-heat exchange device, and a tank device. The novel combined oil-gas-water three-phase separator based on solar thermal utilization technology uses an inlet pre-separator to perform preliminary separation of gas, liquid, and solid phases, and then heats the oil-water emulsion through a solar heat collection-heat exchange device to change the viscosity of the oil-water phases to the greatest extent, thereby accelerating the separation of oil and water. The oil-water separation process is carried out in a horizontal tank device, in which the fluidity of heavy oil is poor, the oil-water separation efficiency is low, and energy waste is serious.

[0007] A Chinese patent document with the announcement number CN203547696U discloses an auxiliary device for heavy oil production, including a spiral separator, a spiral separator heating jacket, and a heating medium inlet pipe and a heating medium outlet pipe connected to the spiral separator heating jacket; the auxiliary device also includes a heating device, which includes a water supply tank and a solar collector group, the solar collector group is composed of a solar collector and a hot water storage tank, the outlet pipe of the water supply tank is connected to the water inlet pipe of the hot water storage tank; the outlet pipe and the return pipe of the hot water storage tank are respectively connected to the heating medium inlet pipe and the heating medium outlet pipe, forming a water circulation system. The auxiliary device for heavy oil production uses circulating water to heat the spiral separator, but when separating the produced heavy oil from water, additional power is still required, the energy saving effect is weak, and the separation efficiency is low. Summary of the invention

[0008] The present invention provides a liquid storage and energy storage separation device, a wellhead heating device and a wellhead heating method, which overcome the deficiencies of the above-mentioned prior art and can effectively solve the problems of low efficiency in the existing oil-water separation of produced fluid and inability to store separated water for reuse.

[0009] One of the technical solutions of the present invention is achieved through the following measures: a liquid storage and energy storage separation device comprises a main tank and a first auxiliary tank arranged at intervals, a first oil and gas outlet is arranged at the center of the upper end of the main tank, a first sand settling port is arranged at the center of the lower end of the main tank, a liquid inlet, a first oil inlet, a liquid outlet and a first water outlet are arranged at intervals from top to bottom on the outer side of the main tank corresponding to the position between the first oil and gas outlet and the first sand settling port, a second oil and gas outlet is arranged at the center of the upper end of the first auxiliary tank, a second sand settling port is arranged at the center of the lower end of the first auxiliary tank, and a first auxiliary tank corresponding to the position between the second oil and gas outlet and the second sand settling port is arranged. A first water inlet and a first drain outlet are arranged at intervals on the outer side, the vertical distance between the first water inlet and the lower end of the main tank is not greater than the vertical distance between the first water outlet and the lower end of the main tank, a first recovery pipe is fixedly connected between the first water outlet and the first water inlet, a first gas collecting pipe is fixedly connected between the first oil and gas outlet hole and the second oil and gas outlet hole, a vertically arranged external discharge pipe is fixedly connected to the first gas collecting pipe, a first oil return pipe is fixedly connected between the first gas collecting pipe corresponding to the position between the external discharge pipe and the first auxiliary tank and the first oil inlet, and a first check valve is arranged on the first oil return pipe.

[0010] The following is a further optimization and / or improvement of one of the above-mentioned technical solutions: As a preference, the above may also include an aeration mixer, a first exhaust pipe is fixedly connected between the upper end of the external exhaust pipe and the first inlet of the aeration mixer, a first liquid outlet pipe is fixedly connected between the liquid outlet and the second inlet of the aeration mixer, and a second check valve is installed on the external exhaust pipe.

[0011] As another preferred embodiment, the above may also include a second auxiliary tank, a second water outlet is provided on the outside of the main tank corresponding to the position of the first water outlet, a second oil inlet is provided on the outside of the main tank corresponding to the position of the first oil inlet, a third oil and gas outlet is provided at the center of the upper end of the second auxiliary tank, a third sand settling port is provided at the center of the lower end of the second auxiliary tank, a second water inlet and a second drain are provided at intervals above and below on the outside of the second auxiliary tank corresponding to the position between the third oil and gas outlet and the third sand settling port, a vertical distance between the second water inlet and the lower end of the main tank is not greater than a vertical distance between the second water outlet and the lower end of the main tank, a second recovery pipe is fixedly connected between the second water outlet and the second water inlet, a second air collecting pipe is fixedly connected between the first air collecting pipe corresponding to the position between the external discharge pipe and the main tank and the third oil and gas outlet, a second oil return pipe is fixedly connected between the second air collecting pipe corresponding to the position between the external discharge pipe and the second auxiliary tank and the second oil inlet, and a third check valve is provided on the second oil return pipe.

[0012] The above-mentioned main tank may be provided with a first main heat exchanger, the first auxiliary tank may be provided with a second main heat exchanger, the second auxiliary tank may be provided with a third main heat exchanger, the first electric heating coil may be coiled between the lower end of the first main heat exchanger and the inner side of the lower part of the main tank and between the lower end of the second main heat exchanger and the inner side of the lower part of the first auxiliary tank, and the second electric heating coil may be coiled between the lower end of the third main heat exchanger and the inner side of the lower part of the second auxiliary tank.

[0013] The vertical distance between the upper and lower ends of the first auxiliary tank is h 1 , the vertical distance between the first drain outlet and the lower end of the first auxiliary tank is h 2 , ; where n 1 The value range of is [1 / 6,1 / 4]; The vertical distance between the liquid inlet and the first oil inlet is h 3 ,h 3 >50cm, The vertical distance between the first oil inlet and the first water outlet is h 4 ,h 4 >100cm, The vertical distance between the first water outlet and the lower end of the first auxiliary tank is h 5, The vertical distance between the lower end of the main tank and the lower end of the first auxiliary tank is h 6 , ; where n 2 The value range of is [1 / 3,1 / 2]; The vertical distance between the liquid outlet and the lower end of the main tank is h 7 , ; where n 3 The value of is 1 / 4.

[0014] The second technical solution of the present invention is achieved through the following measures: a wellhead heating device, including a plurality of wellhead produced liquid outlet pipelines, each wellhead produced liquid outlet pipeline is provided with a one-way valve, and also includes a liquid storage and energy storage separation device, a delivery pump, a circulating water pump, a water collector, a water distributor and a control module. The liquid outlet end of each wellhead produced liquid outlet pipeline is fixedly connected to the water collector, and a liquid inlet pipeline is fixedly connected between the water collector and the liquid inlet of the liquid storage and energy storage separation device, a first hot water pipeline is fixedly connected between the first drain outlet of the liquid storage and energy storage separation device and the inlet of the circulating water pump, and a hot water pipeline is fixedly connected between the outlet of the circulating water pump and the water distributor. The second hot water pipeline, corresponding to each wellhead produced liquid outlet pipeline between the one-way valve and the water collector, is fixedly connected to the third hot water pipeline, the other end of each third hot water pipeline is fixedly connected to the water distributor, the first oil collecting pipeline is fixedly connected between the liquid outlet of the main tank or the outlet of the aeration mixer and the inlet of the delivery pump, the outlet of the delivery pump is fixedly connected to the second oil collecting pipeline, the first data acquisition module is installed on the second hot water pipeline, and the second data acquisition module is installed on each wellhead produced liquid outlet pipeline, the first data acquisition module and all the second data acquisition modules are connected to the control module, and the control module is connected to the circulating water pump.

[0015] The following is a further optimization and / or improvement of the second technical solution of the above invention: The above-mentioned can also include a gravity-flowing agitator corresponding one-to-one to the wellhead produced liquid outlet pipeline, the gravity-flowing agitator includes a shell, an impeller, a support frame and a rotating shaft, the shell includes a first straight pipe section, a tapered pipe section and a second straight pipe section which are fixedly connected together from left to right in sequence, the tapered pipe section is tapered with a larger left side and a smaller right side, a support frame is fixedly installed on the inner side of the right part of the first straight pipe section, a left-right rotating shaft is rotatably installed at the center of the left side of the support frame, an impeller is fixedly installed on the outer side of the left part of the rotating shaft, a front-to-back third straight pipe section is fixedly connected to the outer side of the front of the first straight pipe section corresponding to the impeller position, the upper inner wall of the third straight pipe section is tangent to the upper inner wall of the first straight pipe section, the liquid outlet end of the wellhead produced liquid outlet pipeline is fixedly connected to the corresponding left end of the first straight pipe section, the right end of the second straight pipe section is fixedly connected to the corresponding position of the water collector, and the outlet end of the third hot water pipeline is fixedly connected to the corresponding front end of the third straight pipe section.

[0016] The above may also include a solar collector and a circulation pump, a first heating pipe that is sealed and passes through the main tank is fixedly connected between the outlet of the solar collector and the inlet of the first main heat exchanger, a second heating pipe that is sealed and passes through the main tank is fixedly connected between the outlet of the first main heat exchanger and the inlet of the circulation pump, a circulation pipe is fixedly connected between the outlet of the circulation pump and the inlet of the solar collector, a third heating pipe that is sealed and passes through the first auxiliary tank is fixedly connected between the first heating pipe and the inlet of the second main heat exchanger, a fourth heating pipe that is sealed and passes through the first auxiliary tank is fixedly connected between the second heating pipe and the outlet of the second main heat exchanger, and the circulation pump is connected to a control module.

[0017] A fourth hot water pipeline may be fixedly connected between the second drain outlet and the first hot water pipeline, a fifth heating pipe sealed and passing through the second auxiliary tank may be fixedly connected between the third heating pipe and the inlet of the third main heat exchanger, and a sixth heating pipe sealed and passing through the second auxiliary tank may be fixedly connected between the second heating pipe corresponding to the position between the fourth heating pipe and the first main heat exchanger and the outlet of the third main heat exchanger.

[0018] The above-mentioned expandable tank is fixedly connected to the second heating tube by an expansion tube, a filter is provided on the second hot water pipeline corresponding to the position between the first data acquisition module and the water distributor, and each third hot water pipeline is provided with an isolation valve, a self-balancing valve and a flow meter at intervals along the medium flow direction.

[0019] The above may also include a heating device and a circulating heat pump, a first auxiliary heat exchanger is coiled between the lower end of the first main heat exchanger and the inner side of the lower part of the main tank, a second auxiliary heat exchanger is coiled between the lower end of the second main heat exchanger and the inner side of the lower part of the first auxiliary tank, a third auxiliary heat exchanger is coiled between the lower end of the third main heat exchanger and the inner side of the lower part of the second auxiliary tank, a first heat exchange pipe is fixedly connected between the outlet of the heating device and the inlet of the circulating heat pump, a second heat exchange pipe is fixedly connected between the outlet of the circulating heat pump and the inlet of the first auxiliary heat exchanger, and a third heat exchange pipe is fixedly connected between the outlet of the first auxiliary heat exchanger and the inlet of the heating device A fourth heat exchange tube is fixedly connected between the second heat exchange tube and the inlet of the second auxiliary heat exchanger, a fifth heat exchange tube is fixedly connected between the outlet of the second auxiliary heat exchanger and the third heat exchange tube, a sixth heat exchange tube is fixedly connected to the second heat exchange tube corresponding to the position between the fourth heat exchange tube and the first auxiliary heat exchanger, the other end of the sixth heat exchange tube is fixedly connected to the inlet of the third auxiliary heat exchanger, a seventh heat exchange tube is fixedly connected to the third heat exchange tube corresponding to the position between the fifth heat exchange tube and the first auxiliary heat exchanger, the other end of the seventh heat exchange tube is fixedly connected to the outlet of the third auxiliary heat exchanger, and the circulating heat pump is connected to the control module.

[0020] The third technical solution of the present invention is achieved by the following measures: A wellhead heating method comprises the following steps: Step 1: The produced fluid in the well enters the main tank through the wellhead produced fluid outlet pipeline, and the produced fluid in the well is separated into oil and water in the main tank, the first auxiliary tank and / or the second auxiliary tank, and the separated oil is transported to the processing station through the delivery pump and the second oil gathering pipeline; Step 2: After the separated sewage is heated by the main tank, the first auxiliary tank and / or the second auxiliary tank, the outlet water temperature of the first drain outlet and / or the second drain outlet reaches 80-85°C; Step 3, each second data acquisition module acquires data of the oil in the corresponding wellhead produced liquid outlet pipeline, the data including temperature, water content, liquid volume and single well back pressure; Step 4: determine whether the oil data in any wellhead produced liquid outlet pipeline meets at least one of the first determination condition set. If not, return to step 3. If satisfied, start water blending and gathering. The first determination condition set includes: Judgment condition 1: the temperature in the outlet pipeline of the wellhead produced liquid is greater than the first set temperature; Judgment condition 2: the water content in the wellhead produced liquid outlet pipeline is greater than the first set water content; Judgment condition three: the liquid volume in the wellhead produced liquid outlet pipeline is greater than the first set liquid volume; Judgment condition four: the single well back pressure is greater than the first set pressure value; Step 5: Each second data acquisition module continuously collects data of the oil in the corresponding wellhead produced liquid outlet pipeline, and determines whether the data of the oil in any wellhead produced liquid outlet pipeline meets at least one judgment condition in the second judgment condition set. If so, proceed to step 6; if not, continue to implement water mixing and gathering. The second judgment condition set includes: Judgment condition 1: the temperature in the outlet pipeline of the wellhead produced liquid is greater than the second set temperature; Judgment condition 2: the water content in the wellhead produced liquid outlet pipeline is greater than the second set water content; Judgment condition three: the liquid volume in the wellhead produced liquid outlet pipeline is greater than the second set liquid volume; Judgment condition four: the single well back pressure is less than the second set pressure value; Step six, adjust the constant flow of the self-operated balancing valve according to the change of the back pressure of the single well.

[0021] The following is a further optimization and / or improvement of the third technical solution of the above invention: The water mixing and gathering in the above step 4 includes: In the first step, the heated sewage passes through the first hot water pipeline, the circulating water pump, the second hot water pipeline, the water distributor and the third hot water pipeline and then enters the gravity mixer; The difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is compared with the set wellhead back pressure, and the control module adjusts the working frequency of the circulating water pump according to the comparison result so that the outlet pressure of the circulating water pump is greater than the maximum wellhead back pressure. In the second step, the gravity agitator mixes the produced fluid with the heated sewage to form an O / W emulsion. The evenly mixed emulsion enters the main tank again under the action of the pressure in the wellhead produced fluid outlet pipeline.

[0022] The above-mentioned method compares the difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline with the set wellhead back pressure, and the control module adjusts the working frequency of the circulating water pump according to the comparison result so that the outlet pressure of the circulating water pump is greater than the maximum wellhead back pressure, including: In the first step, the first data acquisition module acquires the outlet pressure of the circulating water pump, and each second data acquisition module acquires the pressure of the wellhead produced liquid outlet pipeline; The second step is to sort the wellhead produced liquid outlet pipeline pressures collected by all the second data collection modules to find the maximum value of the wellhead produced liquid outlet pipeline pressure; In the third step, if the difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is the same as the set wellhead back pressure value, the control module maintains the operating frequency of the circulating water pump; Step 4: If the difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is greater than the set wellhead back pressure value, the control module reduces the operating frequency of the circulating water pump; The fifth step is that if the difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is less than the set wellhead back pressure, the control module increases the operating frequency of the circulating water pump, and compares the increased operating frequency of the circulating water pump with the maximum operating frequency of the circulating water pump. If it is greater than or equal to, the control module issues an alarm and stops the circulating water pump at the same time. If it is less than, the circulating water pump operates at the increased operating frequency.

[0023] When the liquid storage and energy storage separation device is in use, at least one wellhead produced liquid pipeline is connected to the liquid inlet, so that the produced liquid with higher temperature from multiple wellhead produced liquid pipelines enters the main tank to achieve oil-water separation, and the separated wastewater with heat enters the first auxiliary tank. The high-temperature wastewater in the first auxiliary tank can be injected into the heating pipeline again to heat the produced liquid again, or the high-temperature wastewater in the first auxiliary tank can be injected into the equipment that needs to be heated, such as the heating pipeline. In this way, the high-temperature wastewater in the produced liquid can be separated and recycled, and it has the effect of storing the thermal energy of the produced liquid. Then the liquid outlet of the main tank is connected to the processing station via a delivery pump, and the separated oil and liquid can flow into the processing station. The present application can store the heat in the produced liquid while separating the oil and water in the produced liquid, and can recycle the heat in the produced liquid.

[0024] A wellhead heating device and a wellhead heating method, wherein the wellhead produced fluid flows into a liquid storage and energy storage separation device through a wellhead produced fluid outlet pipeline, a water collector and a liquid inlet pipeline, and the liquid storage and energy storage separation device separates oil and water from the produced fluid, and the produced fluid with higher temperature from multiple wellhead produced fluid pipelines enters the main tank to achieve oil and water separation, and the separated wastewater with heat enters the first auxiliary tank, and the high-temperature wastewater in the first auxiliary tank can be injected into the heating pipeline again to heat the produced fluid again, so that the high-temperature wastewater in the produced fluid can be separated and recycled, and has the effect of storing the thermal energy of the produced fluid, and at the same time, the separated oil can be transported to the heavy oil workstation through the first oil gathering pipeline, the delivery pump and the second oil gathering pipeline, which is convenient for subsequent processing, and the heat in the produced fluid can be stored while the oil and water are separated, and the heat in the produced fluid can be recycled.

[0025] The first data acquisition module and the second data acquisition module can measure the temperature of the sewage in the second hot water pipeline and the highest temperature of the produced liquid in all the wellhead produced liquid outlet pipelines. The control module compares the two temperatures and then adjusts the operating frequency of the circulating water pump to change the sewage flow rate flowing into the wellhead produced liquid outlet pipeline. The temperature of the sewage in the second hot water pipeline can also be monitored by the first data acquisition module, and the heating temperature of the produced liquid in the liquid storage and energy storage separation device can be adjusted to make the produced liquid temperature in the wellhead produced liquid outlet pipeline constant and consistent with the set value, thereby improving the economy and operability of the produced liquid viscosity reduction transportation.

[0026] Taking into account the heat loss caused by high-temperature sewage during the collection and transportation process, and the hot water mixed with heavy oil must meet certain temperature requirements, in order to promote green and low-carbon development and help achieve the carbon peak and carbon neutrality goals, this patent proposes a liquid storage and energy storage separation device, a wellhead heating device and a wellhead heating method, which provide a mature and reliable energy-saving and consumption-reducing technology for heavy oil collection and transportation, and has good prospects for promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Attached Figure 1 This is a schematic diagram of the main structure of the first embodiment.

[0028] Attached Figure 2 This is a schematic diagram of the main structure of the second embodiment.

[0029] Attached Figure 3 This is a schematic diagram of the main structure of Example 3.

[0030] Attached Figure 4 This is the density-temperature relationship diagram of heavy oil in Example 4.

[0031] Attached Figure 5 This is the viscosity-temperature relationship diagram of the heavy oil in Example 4.

[0032] Attached Figure 6 This is the standard oil sample curve diagram in Example 4.

[0033] Attached Figure 7 The main structure diagram of the fifth to seventh and ninth to thirteenth embodiments is shown in FIG. Figure 1 .

[0034] Attached Figure 8 This is a schematic diagram of the main structure of the self-flowing agitator in Example 6.

[0035] Attached Fig. 9 It is a schematic diagram of the three-dimensional structure of the self-flowing agitator in Example 6.

[0036] Attached Fig.10 The main structure diagram of the fifth to seventh and ninth to thirteenth embodiments is shown in FIG. Figure 2 .

[0037] Attached Fig.11The main structure diagram of the fifth to seventh and ninth to thirteenth embodiments is shown in FIG. Figure 3 .

[0038] Attached Fig.12 It is a circuit structure block diagram of embodiments five, seven, ten to thirteen.

[0039] Attached Fig.13 Flow chart of the methods of Embodiments 11 to 13.

[0040] The codes in the attached drawings are: 1 is the main tank, 2 is the first auxiliary tank, 3 is the first recovery pipe, 4 is the first gas collecting pipe, 5 is the external discharge pipe, 6 is the first oil return pipe, 7 is the first check valve, 8 is the first main heat exchanger, 9 is the second main heat exchanger, 10 is the aeration mixer, 11 is the first exhaust pipe, 12 is the first liquid outlet pipe, 13 is the second check valve, 14 is the second auxiliary tank, 15 is the second recovery pipe, 16 is the second gas collecting pipe, 17 is the second oil return pipe, 18 is the third check valve, 19 is the third check valve, 20 is the third check valve, 21 is the third check valve, 22 is the third check valve, 23 is the third check valve, 24 is the third check valve, 25 is the third check valve, 26 is the third check valve, 27 is the third check valve, 28 is the third check valve, 29 is the third check valve, 30 is the third check valve, 31 is the third check valve, 32 is the third check valve, 33 is the third check valve, 34 is the third check valve, 35 is the third check valve, 36 is the third check valve, 37 is the third check valve, 38 is the third check valve, 39 is the third check valve, 40 is the third check valve, 41 is the third check valve, 42 is the third check valve, 43 is the third check valve, 44 is the third check valve, 45 is the third check valve, 46 is the third check valve, 47 is the third check valve, 48 is the third check valve, 49 is the third check valve, 50 is the third check valve, 51 is the third check valve, 52 is the third check valve, 53 is the third check valve, 54 is the third check valve, 55 is the third check valve, 56 is the third check valve, 9 is the third main heat exchanger, 20 is the first electric heating coil, 21 is the second electric heating coil, 22 is the wellhead produced liquid outlet pipeline, 23 is a one-way valve, 24 is a delivery pump, 25 is a circulating water pump, 26 is a filter, 27 is a water collector, 28 is a water distributor, 29 is a liquid inlet pipeline, 30 is a first hot water pipeline, 31 is a second hot water pipeline, 32 is a third hot water pipeline, 33 is a first oil collection pipeline, 34 is a second oil collection pipeline, 35 is a first data acquisition module, 36 is a first 2. Data acquisition module, 37 is a control module, 38 is a host computer, 39 is a rotating shaft, 40 is an impeller, 41 is a support frame, 42 is a first straight pipe section, 43 is a conical pipe section, 44 is a second straight pipe section, 45 is a third straight pipe section, 46 is a solar collector, 47 is a circulation pump, 48 is a circulation pipe, 49 is a first heating pipe, 50 is a second heating pipe, 51 is a third heating pipe, 52 is a fourth heating pipe, 53 is a fifth heating pipe, 54 is a sixth heating pipe, 55 is a heating pipe Equipment, 56 is the first heat exchange tube, 57 is the second heat exchange tube, 58 is the third heat exchange tube, 59 is the fourth heat exchange tube, 60 is the fifth heat exchange tube, 61 is the sixth heat exchange tube, 62 is the seventh heat exchange tube, 63 is the expansion tank, 64 is the expansion tube, 65 is the isolation valve, 66 is the self-operated balancing valve, 67 is the flow meter, 68 is the isolation valve, 69 is the circulating heat pump, 70 is the first sub-heat exchanger, 71 is the second sub-heat exchanger, 72 is the third sub-heat exchanger, and 73 is the fourth hot water pipeline. DETAILED DESCRIPTION

[0041] The present invention is not limited by the following embodiments, and specific implementation methods can be determined based on the technical solution of the present invention and actual conditions.

[0042] In the present invention, for the convenience of description, the relative position relationship of each component is described according to the attached Figure 1The layout is described in detail, such as the positional relationship of front, back, top, bottom, left, right, etc., which is based on the attached manual. Figure 1 It is determined by the layout direction.

[0043] The present invention will be further described below in conjunction with embodiments and drawings: Embodiment 1: As shown in the attached Figure 1 As shown, the liquid storage and energy storage separation device comprises a main tank 1 and a first auxiliary tank 2 arranged at intervals, a first oil and gas outlet is arranged at the center of the upper end of the main tank 1, a first sand settling port is arranged at the center of the lower end of the main tank 1, a liquid inlet, a first oil inlet, a liquid outlet and a first water outlet are arranged at intervals from top to bottom on the outer side of the main tank 1 corresponding to the position between the first oil and gas outlet and the first sand settling port, a second oil and gas outlet is arranged at the center of the upper end of the first auxiliary tank 2, a second sand settling port is arranged at the center of the lower end of the first auxiliary tank 2, and a first inlet is arranged at intervals from top to bottom on the outer side of the first auxiliary tank 2 corresponding to the position between the second oil and gas outlet and the second sand settling port water outlet and the first drain outlet, the vertical distance between the first water inlet and the lower end of the main tank 1 is not greater than the vertical distance between the first water outlet and the lower end of the main tank 1, a first recovery pipe 3 is fixedly connected between the first water outlet and the first water inlet, a first gas collecting pipe 4 is fixedly connected between the first oil and gas outlet hole and the second oil and gas outlet hole, a vertically arranged external discharge pipe 5 is fixedly connected on the first gas collecting pipe 4, a first oil return pipe 6 is fixedly connected between the first gas collecting pipe 4 and the first oil inlet corresponding to the position between the external discharge pipe 5 and the first auxiliary tank 2, and a first check valve 7 is arranged on the first oil return pipe 6.

[0044] According to demand, the first oil return pipe 6 is a bendable and deformable pipe, such as a metal hose. The first oil return pipe 6 can be bent and deformed according to demand, so as to adjust the distance between the highest point of the first oil return pipe 6 and the second oil and gas outlet. The highest point of the first oil return pipe 6 is adjusted. The first check valve 7 is installed between the highest point of the first oil return pipe 6 and the first oil and gas outlet, which is equivalent to adjusting the height of the first check valve 7. The height of the first check valve 7 is adjusted to realize the adjustment of the liquid inlet height of the first oil inlet, so that the oil in the produced fluid with a higher water content can flow back to the main tank 1 through the first oil return pipe 6 and the first check valve 7, and the external discharge pipe 5 is vertically arranged.

[0045] The first check valve 7 is a prior art known in the art, such as the oil and gas recovery float check valve in the Chinese patent literature with the publication number CN206770966U and the name of the oil and gas recovery float check valve and oil and gas recovery device. The first check valve 7 may also include a valve body, a filter and a float. The valve body has a valve cavity, the upper end of the valve body has an outlet connected to the valve cavity, the lower end of the valve body has an inlet connected to the valve cavity, a filter screen with a shell-like structure opening upward is fixed to the inner side of the upper part of the valve cavity, and a float is provided on the inner side of the filter screen and the upper part of the valve cavity. As the oil level in the main tank 1 rises, the float moves upward. The float rises under the action of buoyancy, and the float closes the first oil return pipe 6 to prevent the oil from entering the first auxiliary tank 2. When the oil level in the upper layer of water separated in the first auxiliary tank 2 is high, it enters the outlet of the first check valve 7 through the first oil return pipe 6. After the float drops, the first oil return pipe 6 is opened, and the oil phase flows into the main tank 1 through the first oil return pipe 6. When the oil level in the main tank 1 drops, the float drops under the action of buoyancy, opens the first oil return pipe 6, and the oil in the first auxiliary tank 2 can be recovered into the main tank 1. Valves are installed on the first sand settling port and the second sand settling port.

[0046] When in use, at least one wellhead produced liquid pipeline is connected to the liquid inlet, so that the produced liquid with higher temperature (temperature greater than or equal to 60 degrees) from multiple wellhead produced liquid pipelines enters the main tank 1 to achieve oil-water separation, and the separated wastewater with heat enters the first auxiliary tank 2. The wastewater separated again by the first auxiliary tank 2 is injected into the heating pipeline again to heat the produced liquid again. The high-temperature wastewater separated again by the first auxiliary tank 2 can also be injected into the equipment that needs to be heated, such as the heating pipeline. In this way, the wastewater in the produced liquid can be separated and recycled, and it has the effect of storing the thermal energy of the produced liquid. Then the liquid outlet of the main tank 1 is connected to the processing station via the delivery pump 24, and the separated oil can flow into the processing station. The present application can store the heat in the produced liquid while separating the oil and water in the produced liquid, and can recycle the heat in the produced liquid.

[0047] After separation by the present invention, the water content of the first water outlet reaches more than 98%, and the separation rate is significantly improved compared with the prior art. When the water content of the first drain outlet reaches more than 95%, and the temperature is greater than or equal to 60°C, the first drain outlet can also be connected to the heating pipeline, and the outlet of the main tank 1 is connected to the treatment station through the delivery pump 24. The produced liquid first flows into the main tank 1 from the liquid inlet. When the temperature of the produced liquid pipeline is low (the temperature is less than 60 degrees), heating can be used to achieve oil-water separation and temperature compensation can be performed on the low-temperature sewage separated from the produced liquid to ensure the first The outlet water temperature of a drainage outlet meets the working condition requirements. If demulsification is more difficult, demulsifier and flocculant can be added. When the liquid level exceeds the first oil inlet (pump start level), the delivery pump 24 is turned on to pressurize the oil separated in the main tank 1 and deliver it to the processing station. When the liquid level is between the first oil inlet and the liquid outlet (pump stop level), the delivery pump 24 is turned off, and the separated gas is discharged through the first oil and gas outlet hole and the external discharge pipe 5 of the main tank 1. The separated sewage flows by gravity through the first recovery pipe 3 to the lower first auxiliary tank 2 for secondary oil, gas and water three-phase separation.

[0048] When the temperature of the first drainage outlet is greater than 80°C, it can be used as steam injection water and directly injected into the well for steam injection and production.

[0049] The sewage flows into the first auxiliary tank 2 by gravity, and the temperature of the produced liquid pipeline is relatively low (the temperature is less than 60 degrees). The temperature of the separated sewage is also relatively low, and the heating sedimentation method can be used to heat the sewage. At the same time, the secondary separation of oil, gas and water can be achieved. The separated oil and gas overflow from the second oil and gas outlet of the first auxiliary tank 2, and the gas is discharged from the second oil and gas outlet into the first gas collecting pipe 4. The separated oil flows into the main tank 1 through the first return oil pipe 6. The first check valve 7 on the first return oil pipe 6 can prevent the oil in the main tank 1 from flowing into the first auxiliary tank 2. The stored sewage enters the heating pipeline through the first drain port of the first auxiliary tank 2 to heat the fluid in the heating pipeline.

[0050] The present application can adopt an integrated skid-mounted design to separate oil, gas and water to achieve the recovery and utilization of sewage and sewage heat, avoiding the problem of double waste of materials and energy. The present application has a reasonable and compact structure, is easy to use, and is safe, labor-saving, simple and efficient.

[0051] The above-mentioned wellhead heating device based on the photothermal heating of oilfield produced fluid can be further optimized and / or improved according to actual needs: Embodiment 2: As an optimization of embodiment 1, as shown in the attached Figure 2 As shown, it also includes an aeration mixer 10, a first exhaust pipe 11 is fixedly connected between the upper end of the external exhaust pipe 5 and the first inlet of the aeration mixer 10, a first liquid outlet pipe 12 is fixedly connected between the liquid outlet and the second inlet of the aeration mixer 10, and a second check valve 13 is installed on the external exhaust pipe 5.

[0052] According to the requirements, the aeration mixer 10 is a known technology, such as a gas-liquid mixer. During use, the aeration mixer 10 can mix the separated gas and oil, or the oil containing a small amount of water, and then discharge it from the outlet of the aeration mixer 10 through the first oil collection pipeline 33, the delivery pump 24 and the second oil collection pipeline 34 to enter the processing station. The second check valve 13 adopts an oil and gas recovery float check valve with the same structure as the first check valve 7. The normal state is open, and the gas can overflow through the second check valve 13. As the oil level rises, the float rises under the action of buoyancy until it seals the external discharge pipe 5, so that the oil phase flows into the main tank 1 through the first gas collection pipe 4. After the liquid level drops, the float drops again and then opens the external discharge pipe 5 for exhaust.

[0053] Embodiment 3: As another optimization of Embodiment 1, as shown in the attached Figure 3 As shown, it also includes a second auxiliary tank 14, a second water outlet is provided on the outer side of the main tank 1 corresponding to the position of the first water outlet, a second oil inlet is provided on the outer side of the main tank 1 corresponding to the position of the first oil inlet, a third oil and gas outlet is provided at the center of the upper end of the second auxiliary tank 14, a third sand settling port is provided at the center of the lower end of the second auxiliary tank 14, a second water inlet and a second drain are provided at intervals above and below on the outer side of the second auxiliary tank 14 corresponding to the position between the third oil and gas outlet and the third sand settling port, a vertical distance between the second water inlet and the lower end of the main tank 1 is not greater than a vertical distance between the second water outlet and the lower end of the main tank 1, a second recovery pipe 15 is fixedly connected between the second water outlet and the second water inlet, a second air collecting pipe 16 is fixedly connected between the first air collecting pipe 4 corresponding to the position between the external discharge pipe 5 and the main tank 1 and the third oil and gas outlet, a second oil return pipe 17 is fixedly connected between the second air collecting pipe 16 corresponding to the position between the external discharge pipe 5 and the second auxiliary tank 14 and the second oil inlet, and a third check valve 18 is provided on the second oil return pipe 17.

[0054] According to the requirements, the third check valve 18 has the same structure as the first check valve 7. As the oil level in the main tank 1 rises, the float rises under the action of buoyancy, and the float closes the second oil return pipe 17. When the oil level in the second auxiliary tank 14 is high and enters the outlet of the third check valve 18 through the second oil return pipe 17, the float drops and then opens the second oil return pipe 17. The oil phase flows into the main tank 1 through the second oil return pipe 17. When the oil level in the main tank 1 drops, the float begins to drop under the action of buoyancy, opening the second oil return pipe 17. A valve is installed on the third sand settling port.

[0055] When in use, the outlet of the main tank 1 is connected to the treatment station through the delivery pump 24, and the first drain outlet and the second drain outlet are both connected to the heating pipeline. When the water content of the produced liquid is low, the produced liquid first flows into the main tank 1 from the liquid inlet. When the temperature of the produced liquid pipeline is low (the temperature is less than 60 degrees), heating can be used to achieve oil-water separation and temperature compensation can be performed on the low-temperature sewage separated from the produced liquid to ensure that the outlet water temperature of the first drain outlet and the second drain outlet meets the working condition requirements. If demulsification is difficult, demulsifiers and flocculants can be added. When the liquid level exceeds the first oil inlet, the delivery pump 24 is turned on to pressurize and deliver the separated oil in the main tank 1 to the processing station. When the liquid level is between the first oil inlet and the liquid outlet, the delivery pump 24 is turned off, and the separated gas is discharged through the first oil and gas outlet hole and the external discharge pipe 5 of the main tank 1. The separated sewage flows through the first recovery pipe 3 and the second recovery pipe 15 to the lower first auxiliary tank 2 and the second auxiliary tank 14 for secondary oil, gas and water three-phase separation. The water in the produced fluid can also be separated, heated and recycled.

[0056] The sewage flows into the first auxiliary tank 2 by gravity, and the temperature of the produced liquid pipeline is relatively low (the temperature is less than 60 degrees). The temperature of the separated sewage is also relatively low. The heating sedimentation method can be used to achieve secondary separation of oil, gas and water. The separated oil and gas overflow from the second oil and gas outlet of the first auxiliary tank 2, and the gas is discharged from the second oil and gas outlet into the first gas collecting pipe 4. The separated oil flows into the main tank 1 through the first return oil pipe 6. The first check valve 7 on the first return oil pipe 6 can prevent the oil in the main tank 1 from flowing into the auxiliary tank. The separated high-temperature sewage enters the heating pipeline through the first drain port of the first auxiliary tank 2.

[0057] At the same time, the sewage that flows into the second auxiliary tank 14 by gravity is subjected to secondary separation of oil, gas and water by heating sedimentation method. The separated oil and gas overflow from the third oil and gas outlet of the second auxiliary tank 14, and the gas is discharged from the third oil and gas outlet into the second gas collecting pipe 16. The separated oil flows into the main tank 1 through the second oil return pipe 17. The third check valve 18 on the second oil return pipe 17 can prevent the oil in the main tank 1 from flowing into the second auxiliary tank 14. The separated high-temperature sewage enters the heating pipeline through the second drain port of the second auxiliary tank 14.

[0058] As attached Figure 3 As shown, a first main heat exchanger 8 is provided in the main tank 1, a second main heat exchanger 9 is provided in the first auxiliary tank 2, and a third main heat exchanger 19 is provided in the second auxiliary tank 14. A first electric heating coil 20 is coiled between the lower end of the first main heat exchanger 8 and the inner side of the lower part of the main tank 1 and between the lower end of the second main heat exchanger 9 and the inner side of the lower part of the first auxiliary tank 2, and a second electric heating coil 21 is coiled between the lower end of the third main heat exchanger 19 and the inner side of the lower part of the second auxiliary tank 14.

[0059] According to the requirements, the first main heat exchanger 8 and the second main heat exchanger 9 can be connected to the existing known heating equipment, such as the solar collector. The solar collector of the well field can be used to heat the produced fluid to further increase the temperature of the separated sewage. The second electric heating coil 21 is an existing known technology, such as an electric heating stainless steel coil. When in use, if the solar thermal energy is insufficient, the second electric heating coil 21 can be powered on to supplement the heat, and the heating temperature in the second auxiliary tank 14 can be controlled at 80 to 85°C. The heating temperature in the second auxiliary tank 14 can also be controlled at 80 to 95°C according to the requirements, so that the water content of the first water outlet reaches more than 98%. Secondly, it can prevent the thick oil in the second auxiliary tank 14 from freezing after the temperature drops, and reduce the failure rate of the second auxiliary tank 14.

[0060] Embodiment 4: As an optimization of the above embodiment, as shown in the attached Figure 1 , 2 As shown in 3, the vertical distance between the upper end and the lower end of the first auxiliary tank 2 is h 1 , the vertical distance between the first drain outlet and the lower end of the first auxiliary tank 2 is h 2 , ; Where n 1 The value range of is [1 / 6,1 / 4]; The vertical distance between the liquid inlet and the first oil inlet is h 3 ,h 3 >50cm, The vertical distance between the first oil inlet and the first water outlet is h 4 ,h 4 >100cm, The vertical distance between the first water outlet and the lower end of the first auxiliary tank 2 is h 5, The vertical distance between the lower end of the main tank 1 and the lower end of the first auxiliary tank 2 is h 6 , ; Where n 2 The value range of is [1 / 3,1 / 2]; The vertical distance between the liquid outlet and the lower end of the main tank 1 is h 7 , ; Where n 3 The value of is 1 / 4.

[0061] During use, such an arrangement can achieve oil-water separation of the oil well produced fluid, so that the water content of the first water outlet and the second water outlet reaches more than 98%.

[0062] The application example is as follows: The temperature of an oil zone is 80°C and the water content is 85%. ρ 油 =930kg / m 3 The oilfield produced fluid flows into the liquid inlet.

[0063] The main tank 1 and the first auxiliary tank 2 are of the same size, with a diameter of 3.6m and a total height of 6.5m; the vertical distance between the upper and lower ends of the first auxiliary tank 2 is h 1 , that is, the tank height is 6.5m, and the vertical distance between the first drain outlet and the lower end of the first auxiliary tank 2 is h 2 ,h 2 is 1.2m, and the vertical distance between the liquid inlet and the first oil inlet is h 3 ,h 3 is 1.5m, and the vertical distance between the first oil inlet and the first water outlet is h 4 ,h 4 is 3.5m, and the vertical distance between the first water outlet and the lower end of the first auxiliary tank 2 is h 5 ,h 5 is 3.2m, and the vertical distance between the lower end of the main tank 1 and the lower end of the first auxiliary tank 2 is h 6 ,h 6 is 2m, and the vertical distance between the liquid outlet and the lower end of the main tank 1 is h 7 ,h 7 is 4m.

[0064] When the flow rate is 68.4 m 3 / h, the produced liquid with a water content of 85% enters the main tank 1 for heating, sedimentation and oil-water separation, and the oil droplets float to the top of the main tank 1. The separated oil reaches the pump start level (the liquid level exceeds the first oil inlet) and is pumped away to the treatment station by the delivery pump 24, while the lower sewage enters the first auxiliary tank 2 through the first outlet. The time it takes for the produced liquid to enter the main tank 1 through the inlet and rise from the bottom to the first outlet t 1 for: Where: V 3 The volume between the bottom of main tank 1 and the first water outlet, m 3 ; q The inlet flow rate of main tank 1, m 3 / s; After the liquid level of the main tank 1 exceeds the position of the first water outlet, the sewage starts to enter the first auxiliary tank 2 from the first water outlet, so the longest oil-water separation time of the sewage in the main tank 1 is 8 minutes.

[0065] According to the on-site water mixing demand, "when 45m3 of sewage is pumped from the first drainage outlet of the first auxiliary tank 2, 3 / h" and "When 20m3 of sewage is pumped out from the first drainage outlet of the first auxiliary tank 2 3 / h" as an example, as follows: Application Example 1: When 45m of sewage is pumped from the first drainage outlet of the first auxiliary tank 2 3 / h, the first oil return pipe 6 can be bent and deformed according to the demand, so as to adjust the distance between the highest point of the first oil return pipe 6 and the second oil outlet hole. The highest point of the first oil return pipe 6 is adjusted. The first check valve 7 is installed between the highest point of the first oil return pipe 6 and the first oil outlet hole, which is equivalent to adjusting the height of the first check valve 7. The height of the first check valve 7 is adjusted to adjust the liquid inlet height of the first oil inlet, and the sewage flow entering the first auxiliary tank 2 is kept at 50 m 3 / h, the sewage flows from the first outlet into the first auxiliary tank 2, and the time it takes for the liquid level of the first auxiliary tank 2 to rise from the bottom to the first drain outlet t 2 for: Where: V 4 is the volume between the bottom of the first auxiliary tank 2 and the first drain port, V 4 = V 3 ; q 1 is the liquid inlet flow rate of the first auxiliary tank 2, m 3 / s; After the liquid level of the first auxiliary tank 2 exceeds the position of the first drain port, the sewage starts to flow out of the first auxiliary tank 2, so the longest oil-water separation time of the sewage in the first auxiliary tank 2 is 11 minutes.

[0066] Application Example 2: When 20m2 of sewage is drawn from the first drainage outlet of the first auxiliary tank 2 3 / h, the first oil return pipe 6 can be bent and deformed according to the demand, so as to adjust the distance between the highest point of the first oil return pipe 6 and the second oil outlet hole. The highest point of the first oil return pipe 6 is adjusted. The first check valve 7 is installed between the highest point of the first oil return pipe 6 and the first oil outlet hole, which is equivalent to adjusting the height of the first check valve 7. The height of the first check valve 7 is adjusted to adjust the liquid inlet height of the first oil inlet, and the sewage flow entering the first auxiliary tank 2 is kept at 25.6 m 3 / h, the sewage flows from the first outlet into the first auxiliary tank 2, and the time it takes for the liquid level of the first auxiliary tank 2 to rise from the bottom to the first drain outlet t 2 for: Where: V 4 is the volume between the bottom of the first auxiliary tank 2 and the first drain port, V 4 = V 3 ;q 1 is the liquid inlet flow rate of the first auxiliary tank 2, m 3 / s; After the liquid level of the first auxiliary tank 2 exceeds the position of the first drain port, the sewage begins to enter the water mixing pipeline, so the longest oil-water separation time of the sewage in the first auxiliary tank 2 is 21 minutes.

[0067] The oil content of the water outlets of Application Example 1 and Application Example 2 were tested respectively, and the oil-water separation effects are shown in Table 1 below.

[0068] As can be seen from Table 2 below, the combination of two main tanks 1 and the first auxiliary tank 2 can greatly improve the separation efficiency, h 5 Maintaining a certain height is the function of the main tank 1 as a settling tank in the crude oil processing equipment. 6 The elevation and the combination of the main tank 1 and the first auxiliary tank 2 significantly prolong the oil-water separation time. The temperature of the main tank 1 and the first auxiliary tank 2 is maintained so that the oil-water separation reaches a better demulsification temperature. The oil removal effect reaches and exceeds the function of the sewage oil removal tank in the sewage treatment equipment without adding chemical agents.

[0069] In the prior art, the conventional separation efficiency is the highest in the corrugated tube plate oil-water separator, and the oil-water separation efficiency can reach more than 90%. It can be seen that the technical solution of the present application can ensure that the water content of the first drain outlet reaches more than 95%, meeting the working conditions of circulating water reuse. Otherwise, the oil contained in the sewage will adhere to the inner wall of the pipeline, which is easy to block and affect the operation of the pipeline.

[0070] The main experimental steps for the above oil-water separation effect are as follows: Step 1, draw a standard curve; in order to measure the oil content of sewage, make a standard curve, and make the standard curve with reference to the standard "SYT0530-2011 Determination of Oil Content in Oilfield Produced Water Spectrophotometry"; The principle of adopting this standard is that the oil in the produced water of the oil field is extracted with solvent gasoline or petroleum ether. The color depth of the extract has a certain linear relationship with the oil content. The extract is injected into a quartz colorimetric dish and its absorbance is measured with a spectrophotometer. The oil content in the produced water of the oil field is calculated, and the standard curve is drawn. The specific steps are as follows: (1) To prepare the reference oil reserve solution, first put the sewage into the electric dehydrator, remove the water and then extract the pure heavy oil as the reference oil sample. The density-temperature-viscosity-temperature curve of the heavy oil is shown in the attached figure. Figure 4 , 5 , accurately weigh 1000.0 mg of dehydrated thick oil, add a small amount of petroleum ether, dissolve and transfer to a 1000 ml volumetric flask, then dilute to 1000 ml mark with petroleum ether, the oil content at this time is 1 mg / ml; (2) Preheat the visible light spectrophotometer for 10 minutes and adjust the measurement wavelength to 430 nm; (3) Take 10 50ml stoppered conical bottles, use pipettes to add 0.00ml, 0.50ml, 1.00ml, 1.50ml, 2.00ml, 2.50ml, 3.00ml, 3.50ml, 4.00ml, 4.50ml and 5.00ml of the reference oil stock solution into the conical bottles, and then dilute to the scale with petroleum ether. The concentration series of this standard is 0mg / l, 10mg / l, 20mg / l, 30mg / l, 40mg / l, 50mg / l, 60mg / l, 70mg / l, 80mg / l, 90mg / l, 100mg / l. At this time, use a spectrophotometer to measure the absorbance, as shown in Table 2, and then draw a concentration-absorbance standard curve with concentration as the horizontal axis and absorbance as the vertical axis as shown in the attached figure. Figure 6 shown.

[0071] The measured absorbance value and oil concentration value were imported into the origin software, and the standard curve was obtained by plotting. The linearity of the regression curve was R 2 =0.99566, which meets the regression accuracy requirement, and the absorption coefficient K value is calculated to be 0.0018.

[0072] Step 2: extraction experiment; the water content of the oily wastewater entering the main tank 1 is 85%, the temperature is maintained at 80°C, the residence time is 8 minutes, 20 mL of wastewater is taken from the outlet of the main tank 1, and an extraction experiment is performed according to the following steps to calculate the oil content in the wastewater: (1) Divide the extracted water sample into two centrifuge tubes evenly and centrifuge at 4000r / min for 5 minutes. After the centrifugation, gently remove the centrifuge tube and fix it. Slowly insert the long needle into the bottom of the centrifuge tube from the middle of the centrifuge tube to extract the bottom water sample. After the extraction is completed, wash the centrifuge tube with clean petroleum ether and record the volume of petroleum ether used. Use a special beaker to hold the petroleum ether washings. Repeat the centrifugation operation several times until the extracted water is clear and transparent. (2) Pour the petroleum ether washings into a separatory funnel and take 1% ammonium persulfate (NH 4 ) 2 S 2 O 8) Add 20ml of solution into the separatory funnel, shake the sample thoroughly, open the piston to exhaust, and then place it on the iron stand for 5 minutes, drain the bottom water into a small beaker, and use a long needle to suck out the upper petroleum ether and place it in a dedicated conical bottle. If the oil in the lower layer of water sample has not been completely extracted, continue to pour the water sample in the small beaker into the separatory funnel, add petroleum ether again, and record the volume of petroleum ether. Repeat the above extraction steps until the lower layer of water is clear and transparent; (3) Add an appropriate amount of anhydrous sodium sulfate (Na 2 SO 4 ) Absorb moisture from petroleum ether; (4) After 24 hours, take 3 ml of the dried extract and measure its absorbance using a spectrophotometer and record it; if the absorbance is too high, dilute the sample before measuring; (5) The calculation formula for the oil content in sewage is as follows: Where: C 0 is the oil content of the tested water sample, mg / L; E is the absorbance of the water sample being tested; E 0 is the absorbance of the blank sample; a is the intercept of the standard curve; V 0 is the total volume of the extract, mL; b is the slope of the standard curve; V W is the volume of the water sample to be tested, mL; K is the absorption coefficient, L / mg; n is the dilution multiple; Through the above experiments and calculations, the oil content of the sewage at the outlet of the main tank 1 is 8442 mg / L. Similarly, the oil content of the sewage at the first outlet of the first auxiliary tank 2 is measured to be 1834 mg / L and 565 mg / L respectively.

[0073] Embodiment 5: As attached Figure 7 , 10As shown in , 11 and 12, the wellhead heating device includes a plurality of wellhead produced liquid outlet pipelines 22, each of which is provided with a one-way valve 23, and also includes a liquid storage and energy storage separation device, a delivery pump 24, a circulating water pump 25, a water collector 27, a water distributor 28 and a control module 37. The liquid outlet end of each wellhead produced liquid outlet pipeline 22 is fixedly connected to the water collector 27, a liquid inlet pipeline 29 is fixedly connected between the water collector 27 and the liquid inlet of the liquid storage and energy storage separation device, a first hot water pipeline 30 is fixedly connected between the first drain outlet of the liquid storage and energy storage separation device and the inlet of the circulating water pump 25, a second hot water pipeline 31 is fixedly connected between the outlet of the circulating water pump 25 and the water distributor 28, and each The wellhead produced liquid outlet pipeline 22 between the one-way valve 23 and the water collector 27 is fixedly connected to the third hot water pipeline 32, and the other end of each third hot water pipeline 32 is fixedly connected to the water distributor 28. The first oil collecting pipeline 33 is fixedly connected between the liquid outlet of the main tank 1 or the outlet of the aeration mixer 10 and the inlet of the delivery pump 24. The outlet of the delivery pump 24 is fixedly connected to the second oil collecting pipeline 34. The second hot water pipeline 31 is installed with a first data acquisition module 35. A second data acquisition module 36 is installed on each wellhead produced liquid outlet pipeline 22. The first data acquisition module 35 and all the second data acquisition modules 36 are connected to the control module 37, and the control module 37 is connected to the circulating water pump 25.

[0074] According to the requirements, the first data acquisition module 35 and the second data acquisition module 36 are both existing well-known technologies, and both include sensors for collecting single well oil pressure, produced liquid temperature, liquid volume, and water content data, such as DS18B20 digital data acquisition module, and the control module 37 is an existing well-known technology, such as PCS3000 wellhead controller, and the control module 37 is connected to the existing well-known host computer 38 to facilitate remote control. The water collector 27 and the water distributor 28 can also be existing well-known pipelines with both ends closed. The one-way valve 23 is located between the second data acquisition module and the water collector 27, and the first hot water pipeline 30 is provided with an existing well-known maintenance and adjustment valve along the medium flow direction.

[0075] During use, the wellhead produced liquid flows into the liquid storage and energy storage separation device through the wellhead produced liquid outlet pipeline 22, the water collector 27 and the liquid inlet pipeline 29. The liquid storage and energy storage separation device separates oil and water from the produced liquid, and heats the separated sewage and transports it to the wellhead produced liquid outlet pipeline 22 again through the first hot water pipeline 30, the circulating water pump 25, the second hot water pipeline 31, the water distributor 28 and the third hot water pipeline 32. The produced liquid with higher temperature (temperature greater than or equal to 60 degrees) from multiple wellhead produced liquid pipelines enters the main tank 1 to achieve oil-water separation, and the separated sewage with heat enters the first auxiliary tank 2. The high-temperature sewage in the first auxiliary tank 2 can be injected into the heating pipeline again to heat the produced liquid again. In this way, the high-temperature sewage in the produced liquid can be separated and recycled, which has the effect of storing the thermal energy of the produced liquid. At the same time, the separated oil can be transported through the first oil collecting pipeline 33, The delivery pump 24 and the second oil collection pipeline 34 are delivered to the heavy oil workstation for subsequent processing. The heat in the produced fluid can be stored while the oil and water are separated, and the heat in the produced fluid can be recycled. By setting the first data acquisition module 35 and the second data acquisition module 36, the temperature of the sewage in the second hot water pipeline 31 and the highest temperature of the produced fluid in all the wellhead produced fluid outlet pipelines 22 can be measured. The control module 37 compares the two temperatures and then adjusts the working frequency of the circulating water pump 25, thereby changing the flow of sewage flowing into the wellhead produced fluid outlet pipeline 22. The temperature of the sewage in the second hot water pipeline 31 can also be monitored by the first data acquisition module 35, and the heating temperature of the produced fluid in the liquid storage and energy storage separation device is adjusted, so that the produced fluid temperature in the wellhead produced fluid outlet pipeline 22 is constant and consistent with the set value, thereby improving the economy and operability of the produced fluid viscosity reduction transportation. The present invention has a reasonable and compact structure, is easy to use, and has the characteristics of safety, labor saving, simplicity and high efficiency.

[0076] During use, when the water content of the produced liquid is low, the produced liquid first flows into the main tank 1 from the liquid inlet through the liquid outlet end of the wellhead produced liquid outlet pipeline 22, and the heating sedimentation method can be used to achieve oil-water separation. If demulsification is more difficult, demulsifiers and flocculants can be added. A liquid level sensor for measuring the liquid level is provided on the main tank 1. When the liquid level sensor measures that the oil level in the main tank 1 exceeds the first oil inlet, the delivery pump 24 is turned on to pressurize the oil separated in the main tank 1 and deliver it to the processing station through the second oil collection pipeline 34 for subsequent treatment. When the liquid level sensor measures that the oil level in the main tank 1 is between the first oil inlet and the liquid outlet, the delivery pump 24 is turned off, and the separated gas is discharged through the first oil and gas outlet hole and the external discharge pipe 5 of the main tank 1. The separated sewage flows by gravity through the first recovery pipe 3 to the first auxiliary tank 2 at a lower position for secondary oil, gas and water three-phase separation. When the water content of the produced liquid collected by the second data acquisition module 36 exceeds the limit value, oil and water separation can be performed only in the main tank 1.

[0077] The sewage that flows into the first auxiliary tank 2 by gravity can be subjected to secondary separation of oil, gas and water by heating sedimentation method. The separated oil and gas overflow from the second oil and gas outlet of the first auxiliary tank 2, and the gas is discharged from the second oil and gas outlet into the first gas collecting pipe 4. The separated oil flows into the main tank 1 through the first return oil pipe 6. The first check valve 7 on the first return oil pipe 6 can prevent the oil in the main tank 1 from flowing into the first auxiliary tank 2. The separated high-temperature sewage enters the first hot water pipeline 30 through the first drain port of the first auxiliary tank 2, and finally enters the first straight pipe section 42 to heat and mix the wellhead produced fluid, thereby realizing the recycling of sewage in the wellhead produced fluid.

[0078] The above-mentioned wellhead heating device can be further optimized and / or improved according to actual needs: Embodiment 6: As an optimization of the above embodiment, as shown in the attached Figure 7 , 8 , 9, 10, and 11, it also includes a self-flowing agitator corresponding to the wellhead produced liquid outlet pipeline 22, the self-flowing agitator includes a shell, an impeller 40, a support frame 41 and a rotating shaft 39, the shell includes a first straight pipe section 42, a tapered pipe section 43 and a second straight pipe section 44 fixedly connected together from left to right, the tapered pipe section 43 is a cone with a larger left side and a smaller right side, a support frame 41 is fixedly installed on the inner side of the right part of the first straight pipe section 42, and a left-right rotating shaft 39 is rotatably installed at the center of the left side of the support frame 41, and the rotating shaft 39 is rotatably installed at the center of the left side of the rotating shaft 39. An impeller 40 is fixedly installed on the outer side of the left part, and a third straight pipe section 45 is fixedly connected to the outer side of the front part of the first straight pipe section 42 corresponding to the position of the impeller 40, and the upper inner wall of the third straight pipe section 45 is tangent to the upper inner wall of the first straight pipe section 42, the liquid outlet end of the wellhead produced liquid outlet pipeline 22 is fixedly connected to the corresponding left end of the first straight pipe section 42, the right end of the second straight pipe section 44 is fixedly connected to the corresponding position of the water collector 27, and the outlet end of the third hot water pipeline 32 is fixedly connected to the corresponding front end of the third straight pipe section 45.

[0079] During use, the gravity-flowing agitator can rely on the flow of fluid in the third straight pipe section 45 to achieve mutual mixing and stirring of the oil and water phases at different flow rates, so as to better form an O / W emulsion, which helps to reduce the back pressure of a single well. At the same time, the separated high-temperature sewage flows into the first straight pipe section 42 through the third hot water pipeline 32, which can better heat the produced fluid in the wellhead produced fluid outlet pipeline 22, thereby improving the economy of viscosity-reducing transportation of the produced fluid.

[0080] Embodiment 7: As an optimization of the above embodiment, as shown in the attached Figure 7 , 10As shown in , 11 and 12, it also includes a solar collector 46 and a circulation pump 47, a first heating pipe 49 that is sealed and passes through the main tank 1 is fixedly connected between the outlet of the solar collector 46 and the inlet of the first main heat exchanger 8, a second heating pipe 50 that is sealed and passes through the main tank 1 is fixedly connected between the outlet of the first main heat exchanger 8 and the inlet of the circulation pump 47, a circulation pipe 48 is fixedly connected between the outlet of the circulation pump 47 and the inlet of the solar collector 46, a third heating pipe 51 that is sealed and passes through the first auxiliary tank 2 is fixedly connected between the first heating pipe 49 and the inlet of the second main heat exchanger 9, a fourth heating pipe 52 that is sealed and passes through the first auxiliary tank 2 is fixedly connected between the second heating pipe 50 and the outlet of the second main heat exchanger 9, and the circulation pump 47 is connected to the control module 37.

[0081] The solar collector 46 is an existing well-known double-axis trough solar collector. The solar collector 46 is used for heating. The solar collector 46 continuously absorbs solar thermal energy and is powered by a circulating pump 47. The heat is stored in the first main heat exchanger 8 through the first heating tube 49 and the second heating tube 50. The temperature of the sewage in the second hot water pipeline 31 is monitored by the first data acquisition module 35, and the circulating pump 47 is controlled to adjust the temperature of the first main heat exchanger 8 in the main tank 1 and the temperature of the second main heat exchanger 9 in the first auxiliary tank 2, so that the heating temperature in the main tank 1 and the first auxiliary tank 2 is controlled at 80-85°C. The heating temperature in the main tank 1 and the first auxiliary tank 2 can also be controlled at 80-95°C as required, thereby increasing the temperature of the first drain outlet to meet the heat demand of the heating pipeline and realize the energy storage of sunlight.

[0082] Embodiment 8: As an optimization of the above embodiment, as shown in the attached Fig.11 As shown, a fourth hot water pipeline 73 is fixedly connected between the second drain port and the first hot water pipeline 30, a fifth heating pipe 53 is fixedly connected between the third heating pipe 51 and the inlet of the third main heat exchanger 19 and is sealed and passes through the second auxiliary tank 14, and a sixth heating pipe 54 is fixedly connected between the second heating pipe 50 corresponding to the position between the fourth heating pipe 52 and the first main heat exchanger 8 and the outlet of the third main heat exchanger 19 and is sealed and passes through the second auxiliary tank 14; A first heating pipe 49 that is sealed and passes through the main tank 1 is fixedly connected between the outlet of the solar collector 46 and the inlet of the first main heat exchanger 8, a second heating pipe 50 that is sealed and passes through the main tank 1 is fixedly connected between the outlet of the first main heat exchanger 8 and the inlet of the circulation pump 47, a circulation pipe 48 is fixedly connected between the outlet of the circulation pump 47 and the inlet of the solar collector 46, a third heating pipe 51 that is sealed and passes through the first auxiliary tank 2 is fixedly connected between the first heating pipe 49 and the inlet of the second main heat exchanger 9, a fourth heating pipe 52 that is sealed and passes through the first auxiliary tank 2 is fixedly connected between the second heating pipe 50 and the outlet of the second main heat exchanger 9, and the circulation pump 47 is connected to the control module 37.

[0083] According to the requirements, the third check valve 18 has the same structure as the first check valve 7. As the oil level in the main tank 1 rises, the float rises under the action of buoyancy, and the float closes the second oil return pipe 17. When the oil level in the second auxiliary tank 14 is high and enters the outlet of the third check valve 18 through the second oil return pipe 17, the float drops and then opens the second oil return pipe 17. The oil phase flows into the main tank 1 through the second oil return pipe 17. When the oil level in the main tank 1 drops, the float drops under the action of buoyancy, and the second oil return pipe 17 is opened. A valve is installed on the third sand settling port.

[0084] In this way, the second auxiliary tank 14 can be connected in parallel with the heater of the first auxiliary tank 2, which can increase the liquid storage capacity and oil-water separation efficiency, so that the water content of the first water outlet and the second water outlet reaches more than 98%, meeting the working conditions with large water consumption. When in use, when the water content of the produced liquid is low, the produced liquid first flows into the main tank 1 from the liquid inlet through the liquid outlet end of the wellhead produced liquid outlet pipeline 22, and the heating sedimentation method can be used to achieve oil-water separation. If demulsification is more difficult, demulsifiers and flocculants can be added. A liquid level sensor for measuring the liquid level is provided on the main tank 1. When the liquid level sensor measures the oil level in the main tank 1 When it exceeds the first oil inlet, the delivery pump 24 is turned on to pressurize the oil separated in the main tank 1 and deliver it to the processing station through the second oil collecting pipeline 34 for subsequent processing. When the liquid level sensor measures that the oil level in the main tank 1 is between the first oil inlet and the liquid outlet, the delivery pump 24 is turned off, and the separated gas is discharged through the first oil and gas outlet hole and the external discharge pipe 5 of the main tank 1. The separated sewage flows by gravity through the first recovery pipe 3 to the lower first auxiliary tank 2 for secondary oil, gas and water three-phase separation. When the water content of the produced fluid collected by the second data acquisition module 36 exceeds the limit value, oil and water separation can be performed only in the main tank 1.

[0085] The sewage that flows into the first auxiliary tank 2 by gravity can be subjected to secondary separation of oil, gas and water by heating sedimentation method. The separated oil and gas overflow from the second oil and gas outlet of the first auxiliary tank 2, and the gas is discharged from the second oil and gas outlet into the first gas collecting pipe 4. The separated oil flows into the main tank 1 through the first return oil pipe 6. The first check valve 7 on the first return oil pipe 6 can prevent the oil in the main tank 1 from flowing into the first auxiliary tank 2. The separated high-temperature sewage enters the first hot water pipeline 30 through the first drain port of the first auxiliary tank 2, and finally enters the first straight pipe section 42 to heat and mix the wellhead produced fluid, thereby realizing the recycling of sewage in the wellhead produced fluid.

[0086] At the same time, the sewage that flows into the second auxiliary tank 14 by gravity is subjected to secondary separation of oil, gas and water by heating sedimentation method. The separated oil and gas overflow from the third oil and gas outlet of the second auxiliary tank 14, and the gas is discharged from the third oil and gas outlet into the second gas collecting pipe 16. The separated oil flows into the main tank 1 through the second oil return pipe 17. The third check valve 18 on the second oil return pipe 17 can prevent the oil in the main tank 1 from flowing into the second auxiliary tank 14. The separated high-temperature sewage enters the first hot water pipeline 30 through the second drain port of the second auxiliary tank 14, and finally enters the first straight pipe section 42 to heat and mix the wellhead produced fluid, thereby realizing the recycling of water in the wellhead produced fluid and improving efficiency.

[0087] Embodiment 9: As an optimization of the above embodiment, as shown in the attached Figure 7 , 10 11, it also includes an expansion tank 63, an expansion tube 64 is fixedly connected between the expansion tank 63 and the second heating tube 50, a filter 26 is provided on the second hot water pipeline 31 corresponding to the position between the first data acquisition module 35 and the water distributor 28, and each third hot water pipeline 32 is provided with an isolation valve 65, a self-balancing valve 66 and a flow meter 67 at intervals along the medium flow direction.

[0088] According to the requirements, the filter 26 has a filtration mesh number of not less than 80 meshes, and mainly filters impurities with larger particle sizes. The cleaning cycle is determined according to the impurity content to reduce the damage of the water to be mixed to the subsequent pipelines, equipment and instruments; the flow meter 67 is an existing well-known technology, such as a Venturi flow meter, an orifice flow meter, a nozzle flow meter or an electromagnetic flow meter, and a shut-off valve 68 is installed on the third hot water pipeline 32 between the corresponding isolation valve 65 and the self-balancing valve 66.

[0089] The expansion tank 63 is provided with an existing well-known liquid level alarm system, which can monitor the heat transfer medium circulation operation and the operation of the main heat exchanger through the change of the heat transfer medium liquid level in the expansion tank 63, calculate the low limit liquid level and the high limit liquid level of the expansion tank 63 to maintain the normal operation of the heat transfer medium circulation, and adjust and determine during operation. The liquid level alarm system can collect the liquid level in the expansion tank 63, set the highest value and the lowest value of the low limit area of ​​the expansion tank 63 and the highest value and the lowest value of the high limit area. When the heat transfer medium is added, the liquid level of the expansion tank 63 is required to be between the low limit liquid level and the high limit liquid level. When the liquid level in the expansion tank 63 is at the highest position or below the low limit area, a low limit alarm occurs. When the liquid level in the expansion tank 63 is at the high limit area, a low limit alarm occurs. The high limit alarm occurs when the liquid level of the expansion tank 63 reaches the lowest position of the domain or above; in order to monitor the abnormal leakage of the heat transfer medium during operation, it can be achieved by monitoring the change value of the liquid level in the expansion tank 63 within a unit time. First, the reasonable change rate of the liquid level in the expansion tank 63 within a unit time is determined through trial operation. The unit time can be set according to the liquid level acquisition frequency. The reasonable change rate of the liquid level in the expansion tank 63 within 5 to 30 minutes is used as the basis. When the change of the liquid level within the set unit time exceeds the reasonable value, an alarm is generated. Extending the unit time setting can improve the accuracy of the alarm, and reducing the unit time setting can increase the timeliness of the alarm. It can be adjusted and determined according to needs during operation. The alarm response time can be set by adjusting the set unit time.

[0090] The self-operated balancing valve 66 is a known technology. The function of the self-operated balancing valve 66 is to automatically balance the flow of each water distribution pipeline at the required set value. It consists of two parts: an automatic regulating valve disc and a manual regulating valve disc. The working pressure of the system fluid is P1, and the front and rear pressures of the manual regulating valve are P2 and P3 respectively. When the manual regulating valve disc is adjusted to a certain position, it is considered that the "set flow" is determined. When the system flow increases, the actual value of P2-P3 exceeds the allowed given value. At this time, the automatic regulating valve disc automatically closes until the flow is maintained at the set value again, and vice versa. In addition, in order to save power costs, the valve can be set with a minimum flow. When the flow of the water mixing pipeline is greater than the minimum flow, the valve will automatically close until the flow reaches the minimum flow value. At the same time, a remote signal receiver can be installed through the remote signal receiving socket to transmit instructions to the automatic / manual dual-purpose regulating device to remotely adjust and control the water mixing amount, and a stop valve is installed at each end. When the regulating device fails, the stop valves at both ends can be shut off, which is convenient for replacing the regulating device.

[0091] The control module 37 determines the optimal amount of sewage to be added based on the pressure, temperature, flow rate and water content data fed back from the produced fluid at each wellhead, and refers to the sewage temperature, and sets the constant flow range of the self-operated balancing valve 66 of each well, controls the working frequency of the circulation pump 47, and automatically adjusts the hot water circulation pressure and flow rate, so that the water injection pressure is always greater than the maximum value of the single well back pressure in the system after the additional process loss, thereby meeting the wellhead water injection demand.

[0092] Embodiment 10: As an optimization of the above embodiment, as shown in the attached Figure 7 , 10 , 11, and 12, further comprising a heating device 55 and a circulating heat pump 69, a first auxiliary heat exchanger 70 is coiled between the lower end of the first main heat exchanger 8 and the inner side of the lower part of the main tank 1, a second auxiliary heat exchanger 71 is coiled between the lower end of the second main heat exchanger 9 and the inner side of the lower part of the first auxiliary tank 2, a third auxiliary heat exchanger 72 is coiled between the lower end of the third main heat exchanger 19 and the inner side of the lower part of the second auxiliary tank 14, a first heat exchange pipe 56 is fixedly connected between the outlet of the heating device 55 and the inlet of the circulating heat pump 69, a second heat exchange pipe 57 is fixedly connected between the outlet of the circulating heat pump 69 and the inlet of the first auxiliary heat exchanger 70, and a third heat exchange pipe 58 is fixedly connected between the outlet of the first auxiliary heat exchanger 70 and the inlet of the heating device 55. 8. A fourth heat exchange tube 59 is fixedly connected between the second heat exchange tube 57 and the inlet of the second auxiliary heat exchanger 71. A fifth heat exchange tube 60 is fixedly connected between the outlet of the second auxiliary heat exchanger 71 and the third heat exchange tube 58. A sixth heat exchange tube 61 is fixedly connected to the second heat exchange tube 57 corresponding to the position between the fourth heat exchange tube 59 and the first auxiliary heat exchanger 70. The other end of the sixth heat exchange tube 61 is fixedly connected to the inlet of the third auxiliary heat exchanger 72. A seventh heat exchange tube 62 is fixedly connected to the third heat exchange tube 58 corresponding to the position between the fifth heat exchange tube 60 and the first auxiliary heat exchanger 70. The other end of the seventh heat exchange tube 62 is fixedly connected to the outlet of the third auxiliary heat exchanger 72. The circulating heat pump 69 is connected to the control module 37.

[0093] According to the requirements, the heating equipment 55 is an existing well-known technology, such as a heat pump. The first main heat exchanger 8, the second main heat exchanger 9, the third main heat exchanger 19, the first auxiliary heat exchanger 70, the second auxiliary heat exchanger 71 and the third auxiliary heat exchanger 72 are all existing well-known spiral stainless steel tubes. The first auxiliary heat exchanger 70 is arranged between the first electric heating coil 20 and the inner side of the main tank 1, the second auxiliary heat exchanger 71 is arranged between the first electric heating coil 20 and the inner side of the first auxiliary tank 2 (the first electric heating coil is not shown in the figure), and the third auxiliary heat exchanger 72 is arranged between the second electric heating coil 21 and the inner side of the second auxiliary tank 14 (the second electric heating coil is not shown in the figure). During use, if the solar thermal energy is insufficient, heat can be supplemented by a heat pump, and the temperature of the sewage in the second hot water pipeline 31 is monitored by the first data acquisition module 35 to control the circulating heat pump 69 and adjust the heating temperature in the main tank 1, the first auxiliary tank 2 and the second auxiliary tank 14, so that the heating temperature in the main tank 1, the first auxiliary tank 2 and the second auxiliary tank 14 is controlled at 80-85°C. The heating temperature in the main tank 1, the first auxiliary tank 2 and the second auxiliary tank 14 can also be controlled at 80-95°C as required, so that the water content at the first water outlet and the second water outlet reaches more than 98%. Secondly, it can also realize the reuse of high-temperature sewage, and at the same time prevent the fluid in the tank from freezing after the temperature drops, thereby reducing the failure rate of the tank.

[0094] Embodiment 11: As shown in the attached Figure 7 , 10 As shown in Figure 13, the wellhead heating method includes the following steps: Step 1: The produced fluid in the well enters the main tank 1 through the wellhead produced fluid outlet pipeline 22, and the produced fluid in the well is separated into oil and water in the main tank 1, the first auxiliary tank 2 and / or the second auxiliary tank 14, and the separated oil is transported to the processing station through the delivery pump 24 and the second oil collection pipeline 34; Step 2: After the separated sewage is heated by the main tank, the first auxiliary tank and / or the second auxiliary tank, the outlet water temperature of the first drain outlet and / or the second drain outlet reaches 80-85°C; Step 3, each second data acquisition module 36 acquires data of the oil in the corresponding wellhead produced liquid outlet pipeline 22, the data including temperature, water content, liquid volume and single well back pressure; Step 4: determine whether the oil data in any wellhead produced liquid outlet pipeline 22 meets at least one of the first determination condition set. If not, return to step 3. If satisfied, start to implement water mixing and gathering. The first determination condition set includes: Judgment condition 1: the temperature in the wellhead produced liquid outlet pipeline 22 is greater than the first set temperature; Judgment condition 2: the water content in the wellhead produced liquid outlet pipeline 22 is greater than the first set water content; Judgment condition three: the liquid volume in the wellhead produced liquid outlet pipeline 22 is greater than the first set liquid volume; Judgment condition four: the single well back pressure is greater than the first set pressure value.

[0095] During use, the wellhead produced liquid flows into the liquid storage and energy storage separation device through the wellhead produced liquid outlet pipeline 22, the water collector 27 and the liquid inlet pipeline 29. The liquid storage and energy storage separation device separates oil and water from the produced liquid, and heats the separated sewage and transports it to the wellhead produced liquid outlet pipeline 22 again through the first hot water pipeline 30, the circulating water pump 25, the second hot water pipeline 31, the water distributor 28 and the third hot water pipeline 32. The produced liquids from multiple wellhead produced liquid pipelines enter the main tank 1 to achieve oil and water separation, and the separated sewage enters the first auxiliary tank 2. During the separation process, the liquid in the main tank 1, the first auxiliary tank 2 and / or the second auxiliary tank 14 is heated, and the sewage (greater than 80°C) discharged from the first auxiliary tank 2 and / or the second auxiliary tank 14 can be injected into the heating pipeline again to heat the produced liquid again, so that the sewage in the produced liquid can be separated and recycled. Function, at the same time, the separated oil can be transported to the heavy oil workstation through the first oil collecting pipeline 33, the delivery pump 24 and the second oil collecting pipeline 34, which is convenient for subsequent processing. By setting the first data acquisition module 35 and the second data acquisition module 36, the temperature of the sewage in the second hot water pipeline 31 and the highest temperature of the produced liquid in all the wellhead produced liquid outlet pipelines 22 can be measured. The control module 37 compares the two temperatures and then adjusts the working frequency of the circulating water pump 25, thereby changing the sewage flow rate flowing into the wellhead produced liquid outlet pipeline 22. The temperature of the sewage in the second hot water pipeline 31 can also be monitored by the first data acquisition module 35, and the heating temperature of the produced liquid in the liquid storage and energy storage separation device is adjusted, so that the produced liquid temperature in the wellhead produced liquid outlet pipeline 22 is constant and consistent with the set value, thereby improving the economy and operability of the produced liquid viscosity reduction transportation.

[0096] Embodiment 12: As an optimization of the above embodiment, as shown in the attached Figure 7 , 10 As shown in FIG13 , in step 5, each second data acquisition module 36 continuously acquires data of the oil in the corresponding wellhead produced liquid outlet pipeline 22, and determines whether the data of the oil in any wellhead produced liquid outlet pipeline 22 satisfies at least one judgment condition in the second judgment condition set. If so, step 6 is entered; if not, water mixing and gathering are continuously implemented. The second judgment condition set includes: Judgment condition 1: the temperature in the wellhead produced liquid outlet pipeline 22 is greater than the second set temperature; Judgment condition 2: the water content in the wellhead produced liquid outlet pipeline 22 is greater than the second set water content; Judgment condition three: the liquid volume in the wellhead produced liquid outlet pipeline 22 is greater than the second set liquid volume; Judgment condition four: the single well back pressure is less than the second set pressure value; Step six, adjusting the constant flow of the self-operated balancing valve 66 according to the change of the single well back pressure.

[0097] The water mixing and transportation in step 4 includes: In the first step, the heated sewage passes through the first hot water pipeline 30, the circulating water pump 25, the second hot water pipeline 31, the water distributor 28 and the third hot water pipeline 32 and then enters the gravity mixer; The difference between the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 is compared with the set wellhead back pressure, and the control module 37 adjusts the working frequency of the circulating water pump 25 according to the comparison result, so that the outlet pressure of the circulating water pump 25 is greater than the maximum wellhead back pressure; In the second step, the self-flowing agitator mixes the produced liquid with the heated sewage to form an O / W type emulsion. The evenly mixed emulsion enters the main tank 1 again under the action of the pressure in the wellhead produced liquid outlet pipeline 22.

[0098] Enter the next round of circulating hot water collection and transportation process. Among them, the start-up and operation conditions of single-well water collection and transportation: oil temperature less than 60℃, water content less than 60%, flow rate less than 5t / h, single-well back pressure greater than 0.5Mpa, are the basic conditions for starting. If any one of them is met, water collection and transportation can be implemented. The operation control is aimed at meeting the minimum single-well back pressure of single-well water collection and transportation, determining the optimal amount of sewage to be added, and controlling the water pressure according to the single-well back pressure chain. Single-well water collection and transportation flow maintenance conditions: oil temperature greater than 80℃, water content greater than 90%, flow rate greater than 10t / h, single-well back pressure less than 0.2Mpa, are the basic conditions for maintaining the minimum flow rate. If any one of them is met, the constant flow of the self-operated balancing valve 66 can be set to the minimum value. During operation, the constant flow of the self-operated balancing valve 66 can be adjusted step by step according to the change of the single-well back pressure to reduce the single-well back pressure, meet the requirements of heavy oil single-well collection and transportation, and implement dynamic control. Shutdown conditions for single-well water injection and gathering: When the back pressure of a single well is higher than the maximum outlet pressure of the circulating water pump 25, the water injection process must be stopped and reactivated after the line is swept and unblocked; when steam is injected at the wellhead, the water injection process must be stopped and the wellhead water injection pipeline must be removed; when steam crosstalk occurs during oil production, the single-well water injection process must be stopped.

[0099] Embodiment 13: As an optimization of the above embodiment, as shown in the attached Figure 7 , 10 As shown in FIG. 13 , the difference between the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 is compared with the set wellhead back pressure, and the control module 37 adjusts the working frequency of the circulating water pump 25 according to the comparison result so that the outlet pressure of the circulating water pump 25 is greater than the maximum wellhead back pressure, including: In the first step, the first data acquisition module 35 acquires the outlet pressure of the circulating water pump 25, and each second data acquisition module 36 acquires the pressure of the wellhead produced liquid outlet pipeline 22; The second step is to sort the pressures of the wellhead produced liquid outlet pipeline 22 collected by all the second data collection modules 36 to find the maximum pressure of the wellhead produced liquid outlet pipeline 22; Step 3: If the difference between the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 is the same as the set wellhead back pressure value, the control module 37 maintains the operating frequency of the circulating water pump 25; Step 4: If the difference between the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 is greater than the set wellhead back pressure value, the control module 37 reduces the operating frequency of the circulating water pump 25; The fifth step is that if the difference between the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 is less than the set wellhead back pressure, the control module 37 increases the operating frequency of the circulating water pump 25, and compares the increased operating frequency of the circulating water pump 25 with the maximum operating frequency of the circulating water pump 25. If it is greater than or equal to, the control module 37 issues an alarm and stops the circulating water pump 25. If it is less than, the circulating water pump 25 operates at the increased operating frequency.

[0100] The circulating water pump 25 adopts frequency conversion automatic control, collects the pressure of each wellhead wirelessly, connects the outlet pressure of the circulating water pump 25 and the inverter control to the intelligent control system by wire, takes the maximum wellhead pressure and compares it with the pump outlet pressure, wherein the set pressure difference is calculated according to the pipeline loss, and is specifically divided into four situations: if the difference between the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 is the same as the set wellhead back pressure value, the control module 37 maintains the operating frequency of the circulating water pump 25; if the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 are ... wellhead back pressure value, the control module 37 maintains the operating frequency of the circulating water pump 25; if the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 are the same as the wellhead back pressure value, the control module 37 maintains the operating frequency of the circulating water pump 25; if the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 are the same as the wellhead back pressure value, the control module 37 maintains the operating frequency of the circulating water pump 25; if the outlet pressure of the circulating water pump 2 If the difference between the outlet pressure of the circulating water pump 25 and the maximum pressure of the wellhead produced liquid outlet pipeline 22 is less than the set wellhead back pressure, the control module 37 increases the operating frequency of the circulating water pump 25, and compares the increased operating frequency of the circulating water pump 25 with the maximum operating frequency of the circulating water pump 25. If it is greater than or equal to, the control module 37 issues an alarm and stops the circulating water pump 25, disabling the water mixing technical process. If it is less than, the circulating water pump 25 operates at the increased operating frequency.

[0101] This application is managed by three levels: on-site station, centralized management station and remote monitoring station. Meteorological information (solar collector 46), temperature, flow and pressure are monitored in real time to achieve unmanned operation, remote operation and maintenance, fault warning and information push, and automatic energy adjustment.

[0102] Taking into account the heat loss caused by high-temperature sewage during the collection and transportation process, and the hot water mixed with heavy oil must meet certain temperature requirements, in order to promote green and low-carbon development and help achieve the carbon peak and carbon neutrality goals, this patent proposes a liquid storage and energy storage separation device, a wellhead heating device and a wellhead heating method, which provide a mature and reliable energy-saving and consumption-reducing technology for heavy oil collection and transportation, and has good prospects for promotion and application.

[0103] The above technical features respectively constitute various embodiments of the present invention, which have strong adaptability and implementation effect. Non-essential technical features can be added or reduced according to actual needs to meet the requirements of different situations.

Claims

1. A liquid storage and energy storage separation device, characterized in that The invention comprises a main tank and a first auxiliary tank which are arranged at intervals, a first oil and gas outlet is arranged at the center of the upper end of the main tank, a first sand settling port is arranged at the center of the lower end of the main tank, a liquid inlet, a first oil inlet, a liquid outlet and a first water outlet are arranged at intervals from top to bottom on the outer side of the main tank corresponding to the position between the first oil and gas outlet and the first sand settling port, a second oil and gas outlet is arranged at the center of the upper end of the first auxiliary tank, a second sand settling port is arranged at the center of the lower end of the first auxiliary tank, and a first water inlet and a first water outlet are arranged at intervals from top to bottom on the outer side of the first auxiliary tank corresponding to the position between the second oil and gas outlet and the second sand settling port A water outlet, a vertical distance between the first water inlet and the lower end of the main tank is not greater than a vertical distance between the first water outlet and the lower end of the main tank, a first recovery pipe is fixedly connected between the first water outlet and the first water inlet, a first gas collecting pipe is fixedly connected between the first oil and gas outlet hole and the second oil and gas outlet hole, a vertically arranged external pipe is fixedly connected on the first gas collecting pipe, a first oil return pipe is fixedly connected between the first gas collecting pipe corresponding to the position between the external pipe and the first auxiliary tank and the first oil inlet, and a first check valve is arranged on the first oil return pipe.

2. The liquid storage and energy storage separation device according to claim 1, characterized in that It also includes an aeration mixer, a first exhaust pipe is fixedly connected between the upper end of the external exhaust pipe and the first inlet of the aeration mixer, a first liquid outlet pipe is fixedly connected between the liquid outlet and the second inlet of the aeration mixer, and a second check valve is installed on the external exhaust pipe.

3. The liquid storage and energy storage separation device according to claim 1, characterized in that It also includes a second auxiliary tank, a second water outlet is provided on the outside of the main tank corresponding to the position of the first water outlet, a second oil inlet is provided on the outside of the main tank corresponding to the position of the first oil inlet, a third oil and gas outlet is provided in the center of the upper end of the second auxiliary tank, a third sand settling port is provided in the center of the lower end of the second auxiliary tank, a second water inlet and a second drain are provided at intervals above and below on the outside of the second auxiliary tank corresponding to the position between the third oil and gas outlet and the third sand settling port, a vertical distance between the second water inlet and the lower end of the main tank is not greater than a vertical distance between the second water outlet and the lower end of the main tank, a second recovery pipe is fixedly connected between the second water outlet and the second water inlet, a second air collecting pipe is fixedly connected between the first air collecting pipe corresponding to the position between the external discharge pipe and the main tank and the third oil and gas outlet, a second oil return pipe is fixedly connected between the second air collecting pipe corresponding to the position between the external discharge pipe and the second auxiliary tank and the second oil inlet, and a third check valve is provided on the second oil return pipe.

4. The liquid storage and energy storage separation device according to claim 3 is characterized in that A first main heat exchanger is provided in the main tank, a second main heat exchanger is provided in the first auxiliary tank, a third main heat exchanger is provided in the second auxiliary tank, a first electric heating coil is coiled between the lower end of the first main heat exchanger and the inner side of the lower part of the main tank and between the lower end of the second main heat exchanger and the inner side of the lower part of the first auxiliary tank, and a second electric heating coil is coiled between the lower end of the third main heat exchanger and the inner side of the lower part of the second auxiliary tank.

5. The liquid storage and energy storage separation device according to claim 1, 2, 3 or 4, characterized in that The vertical distance between the upper end and the lower end of the first auxiliary tank is h1, and the vertical distance between the first drain port and the lower end of the first auxiliary tank is h2. ; The value range of n1 is [1 / 6,1 / 4]; The vertical distance between the liquid inlet and the first oil inlet is h3, h3>50cm, The vertical distance between the first oil inlet and the first water outlet is h4, h4>100cm, The vertical distance between the first water outlet and the lower end of the first auxiliary tank is h 5, The vertical distance between the lower end of the main tank and the lower end of the first auxiliary tank is h6. ; The value range of n2 is [1 / 3,1 / 2]; The vertical distance between the liquid outlet and the lower end of the main tank is h7. ; The value of n3 is 1 / 4.

6. A wellhead heating device for a liquid storage and energy storage separation device according to any one of claims 3 to 5, comprising a plurality of wellhead produced liquid outlet pipelines, each of which is provided with a one-way valve, characterized in that It also includes a liquid storage and energy storage separation device, a delivery pump, a circulating water pump, a water collector, a water distributor and a control module. The liquid outlet end of each wellhead produced liquid outlet pipeline is fixedly connected to the water collector, and a liquid inlet pipeline is fixedly connected between the water collector and the liquid storage and energy storage separation device. A first hot water pipeline is fixedly connected between the first drain outlet of the liquid storage and energy storage separation device and the inlet of the circulating water pump, and a second hot water pipeline is fixedly connected between the outlet of the circulating water pump and the water distributor. The wellhead produced liquid outlet pipeline corresponding to the position between each one-way valve and the water collector is fixedly connected to the water distributor. A third hot water pipeline is fixedly connected, and the other end of each third hot water pipeline is fixedly connected to the water distributor. A first oil collecting pipeline is fixedly connected between the liquid outlet of the main tank or the outlet of the aeration mixer and the inlet of the delivery pump. The outlet of the delivery pump is fixedly connected to a second oil collecting pipeline. A first data acquisition module is installed on the second hot water pipeline, and a second data acquisition module is installed on each wellhead produced liquid outlet pipeline. The first data acquisition module and all the second data acquisition modules are connected to the control module, and the control module is connected to the circulating water pump.

7. The wellhead heating device according to claim 6, characterized in that It also includes a self-flowing agitator corresponding to the wellhead produced liquid outlet pipeline one by one, the self-flowing agitator includes a shell, an impeller, a support frame and a rotating shaft, the shell includes a first straight pipe section, a tapered pipe section and a second straight pipe section fixedly connected together from left to right, the tapered pipe section is a cone with a larger left and a smaller right side, a support frame is fixedly installed on the inner side of the right part of the first straight pipe section, a left-right rotating shaft is rotatably installed at the center of the left side of the support frame, an impeller is fixedly installed on the outer side of the left part of the rotating shaft, a front-to-back third straight pipe section is fixedly connected to the outer side of the front of the first straight pipe section corresponding to the impeller position, the upper inner wall of the third straight pipe section is tangent to the upper inner wall of the first straight pipe section, the outlet end of the wellhead produced liquid outlet pipeline is fixedly connected to the corresponding left end of the first straight pipe section, the right end of the second straight pipe section is fixedly connected to the corresponding position of the water collector, and the outlet end of the third hot water pipeline is fixedly connected to the corresponding front end of the third straight pipe section.

8. The wellhead heating device according to claim 6 or 7, characterized in that It also includes a solar collector and a circulation pump, a first heating pipe that is sealed and passes through the main tank and is fixedly connected between the outlet of the solar collector and the inlet of the first main heat exchanger, a second heating pipe that is sealed and passes through the main tank and is fixedly connected between the outlet of the first main heat exchanger and the inlet of the circulation pump, a circulation pipe that is fixedly connected between the outlet of the circulation pump and the inlet of the solar collector, a third heating pipe that is sealed and passes through the first auxiliary tank and is fixedly connected between the first heating pipe and the inlet of the second main heat exchanger, a fourth heating pipe that is sealed and passes through the first auxiliary tank and is fixedly connected between the second heating pipe and the outlet of the second main heat exchanger, and the circulation pump is connected to a control module.

9. The wellhead heating device according to claim 8, characterized in that A fourth hot water pipeline is fixedly connected between the second drain port and the first hot water pipeline, a fifth heating pipe that is sealed and passes through the second auxiliary tank is fixedly connected between the third heating pipe and the inlet of the third main heat exchanger, and a sixth heating pipe that is sealed and passes through the second auxiliary tank is fixedly connected between the second heating pipe corresponding to the position between the fourth heating pipe and the first main heat exchanger and the outlet of the third main heat exchanger; Or / and, it also includes an expansion tank, an expansion tube is fixedly connected between the expansion tank and the second heating tube, a filter is provided on the second hot water pipeline corresponding to the position between the first data acquisition module and the water distributor, and each third hot water pipeline is provided with an isolation valve, a self-balancing valve and a flow meter at intervals along the medium flow direction.

10. The wellhead heating device according to claim 6, 7 or 9, characterized in that It also includes a heating device and a circulating heat pump, a first auxiliary heat exchanger is coiled between the lower end of the first main heat exchanger and the inner side of the lower part of the main tank, a second auxiliary heat exchanger is coiled between the lower end of the second main heat exchanger and the inner side of the lower part of the first auxiliary tank, a third auxiliary heat exchanger is coiled between the lower end of the third main heat exchanger and the inner side of the lower part of the second auxiliary tank, a first heat exchange pipe is fixedly connected between the outlet of the heating device and the inlet of the circulating heat pump, a second heat exchange pipe is fixedly connected between the outlet of the circulating heat pump and the inlet of the first auxiliary heat exchanger, a third heat exchange pipe is fixedly connected between the outlet of the first auxiliary heat exchanger and the inlet of the heating device, and a A fourth heat exchange tube is fixedly connected between the second heat exchange tube and the inlet of the second auxiliary heat exchanger, a fifth heat exchange tube is fixedly connected between the outlet of the second auxiliary heat exchanger and the third heat exchange tube, a sixth heat exchange tube is fixedly connected to the second heat exchange tube corresponding to the position between the fourth heat exchange tube and the first auxiliary heat exchanger, the other end of the sixth heat exchange tube is fixedly connected to the inlet of the third auxiliary heat exchanger, a seventh heat exchange tube is fixedly connected to the third heat exchange tube corresponding to the position between the fifth heat exchange tube and the first auxiliary heat exchanger, the other end of the seventh heat exchange tube is fixedly connected to the outlet of the third auxiliary heat exchanger, and the circulating heat pump is connected to the control module.

11. The wellhead heating device according to claim 8, characterized in that It also includes a heating device and a circulating heat pump, a first auxiliary heat exchanger is coiled between the lower end of the first main heat exchanger and the inner side of the lower part of the main tank, a second auxiliary heat exchanger is coiled between the lower end of the second main heat exchanger and the inner side of the lower part of the first auxiliary tank, a third auxiliary heat exchanger is coiled between the lower end of the third main heat exchanger and the inner side of the lower part of the second auxiliary tank, a first heat exchange pipe is fixedly connected between the outlet of the heating device and the inlet of the circulating heat pump, a second heat exchange pipe is fixedly connected between the outlet of the circulating heat pump and the inlet of the first auxiliary heat exchanger, a third heat exchange pipe is fixedly connected between the outlet of the first auxiliary heat exchanger and the inlet of the heating device, and a A fourth heat exchange tube is fixedly connected between the second heat exchange tube and the inlet of the second auxiliary heat exchanger, a fifth heat exchange tube is fixedly connected between the outlet of the second auxiliary heat exchanger and the third heat exchange tube, a sixth heat exchange tube is fixedly connected to the second heat exchange tube corresponding to the position between the fourth heat exchange tube and the first auxiliary heat exchanger, the other end of the sixth heat exchange tube is fixedly connected to the inlet of the third auxiliary heat exchanger, a seventh heat exchange tube is fixedly connected to the third heat exchange tube corresponding to the position between the fifth heat exchange tube and the first auxiliary heat exchanger, the other end of the seventh heat exchange tube is fixedly connected to the outlet of the third auxiliary heat exchanger, and the circulating heat pump is connected to the control module.

12. A wellhead heating method using the wellhead heating device according to any one of claims 6 to 11, characterized in that The steps include: Step 1: The produced fluid in the well enters the main tank through the wellhead produced fluid outlet pipeline, and the produced fluid in the well is separated into oil and water in the main tank, the first auxiliary tank and / or the second auxiliary tank, and the separated oil is transported to the processing station through the delivery pump and the second oil gathering pipeline; Step 2: After the separated sewage is heated by the main tank, the first auxiliary tank and / or the second auxiliary tank, the outlet water temperature of the first drain outlet and / or the second drain outlet reaches 80-85°C; Step 3, each second data acquisition module acquires data of the oil in the corresponding wellhead produced liquid outlet pipeline, the data including temperature, water content, liquid volume and single well back pressure; Step 4: determine whether the oil data in any wellhead produced liquid outlet pipeline meets at least one of the first determination condition set. If not, return to step 3. If satisfied, start water blending and gathering. The first determination condition set includes: Judgment condition 1: the temperature in the outlet pipeline of the wellhead produced liquid is greater than the first set temperature; Judgment condition 2: the water content in the wellhead produced liquid outlet pipeline is greater than the first set water content; Judgment condition three: the liquid volume in the wellhead produced liquid outlet pipeline is greater than the first set liquid volume; Judgment condition four: the single well back pressure is greater than the first set pressure value; Step 5: Each second data acquisition module continuously collects data of the oil in the corresponding wellhead produced liquid outlet pipeline, and determines whether the data of the oil in any wellhead produced liquid outlet pipeline meets at least one judgment condition in the second judgment condition set. If so, proceed to step 6; if not, continue to implement water mixing and gathering. The second judgment condition set includes: Judgment condition 1: the temperature in the outlet pipeline of the wellhead produced liquid is greater than the second set temperature; Judgment condition 2: the water content in the wellhead produced liquid outlet pipeline is greater than the second set water content; Judgment condition three: the liquid volume in the wellhead produced liquid outlet pipeline is greater than the second set liquid volume; Judgment condition four: the single well back pressure is less than the second set pressure value; Step six, adjust the constant flow of the self-operated balancing valve according to the change of the back pressure of the single well.

13. The wellhead heating method according to claim 12, characterized in that The water mixing and transportation in step 3 includes: In the first step, the heated sewage passes through the first hot water pipeline, the circulating water pump, the second hot water pipeline, the water distributor and the third hot water pipeline and then enters the gravity mixer; The difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is compared with the set wellhead back pressure, and the control module adjusts the working frequency of the circulating water pump according to the comparison result so that the outlet pressure of the circulating water pump is greater than the maximum wellhead back pressure; In the second step, the gravity agitator mixes the produced fluid with the heated sewage to form an O / W emulsion. The evenly mixed emulsion enters the main tank again under the action of the pressure in the wellhead produced fluid outlet pipeline.

14. The wellhead heating method according to claim 13, characterized in that The difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is compared with the set wellhead back pressure, and the control module adjusts the working frequency of the circulating water pump according to the comparison result so that the outlet pressure of the circulating water pump is greater than the maximum wellhead back pressure, including: In the first step, the first data acquisition module acquires the outlet pressure of the circulating water pump, and each second data acquisition module acquires the pressure of the wellhead produced liquid outlet pipeline; The second step is to sort the wellhead produced liquid outlet pipeline pressures collected by all the second data collection modules to find the maximum value of the wellhead produced liquid outlet pipeline pressure; In the third step, if the difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is the same as the set wellhead back pressure value, the control module maintains the operating frequency of the circulating water pump; Step 4: If the difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is greater than the set wellhead back pressure value, the control module reduces the operating frequency of the circulating water pump; The fifth step is that if the difference between the outlet pressure of the circulating water pump and the maximum pressure of the wellhead produced liquid outlet pipeline is less than the set wellhead back pressure, the control module increases the operating frequency of the circulating water pump, and compares the increased operating frequency of the circulating water pump with the maximum operating frequency of the circulating water pump. If it is greater than or equal to, the control module issues an alarm and stops the circulating water pump at the same time. If it is less than, the circulating water pump operates at the increased operating frequency.

Citation Information

Patent Citations

  • Novel combined oil-gas-water three-phase separator based on solar thermal utilization technology

    CN107189810A

  • Auxiliary device for heavy oil recovery

    CN203547696U

  • Vapor recovery system floater check valve and vapor recovery system device

    CN206770966U