Intelligent control method and system for vacuum coating equipment

Through the collaborative work of the intelligent control system, the parameters of the vacuum coating equipment are analyzed and adjusted, which solves the problem of inconsistent coating thickness of composite materials and diversified products, improves the stability and production efficiency of the equipment, and reduces the defective rate.

CN118859862APending Publication Date: 2024-10-29SUZHOU HUILIANHANG TECH CO LTD

Patent Information

Application Number
CN202410878345.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

When vacuum coating equipment processes composite materials and diversified modeling products, coating with uniform specifications and parameters can easily lead to different thicknesses and changes in properties, increase the rate of defective products, and cause inconsistent aging of processing facilities, affecting production efficiency.

Method used

An intelligent control system is designed that uses multiple units to work together to collect and analyze data on items to be processed and the processing environment, calculate equipment adjustment reference values, determine and execute appropriate adjustment plans, and ensure that the equipment responds to changes in production conditions in real time.

Benefits of technology

It improves the stability and automation level of the equipment, reduces the defective rate, improves production efficiency and product quality, and makes the equipment more intelligent and adaptive.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118859862A_ABST
    Figure CN118859862A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of vacuum coating, and discloses an intelligent control method and system for vacuum coating equipment, and the system comprises a first collection unit, a second collection unit, a preprocessing unit, a data calculation unit, a data processing unit, a data analysis unit and an execution unit. Omnibearing monitoring and adjustment of the vacuum coating equipment are achieved, data processing and analysis technologies are adopted, the equipment can be intelligently adjusted according to real-time production data and performance states, the stability, performance and automation level of the equipment are improved, and compared with a traditional manual adjustment mode, the system has the advantages that the operation is simple, and the cost is low. The system can respond to the change of the equipment state more timely and accurately, and the production efficiency and the product quality are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of vacuum coating technology, and in particular to an intelligent control method and system for vacuum coating equipment. Background Art

[0002] Vacuum coating equipment is a special equipment used to form thin film coatings on the surface of objects. These films are usually composed of metals, ceramics or other materials and are deposited on the surface of substrates to change the appearance, performance or other characteristics of the substrate. Vacuum coating is usually used in the fields of electronics, optics, decoration, protective coating, etc.

[0003] There are still some problems in the operation of traditional vacuum coating equipment. When the objects to be processed are composite materials and have certain diversified shapes, they are subject to the different properties of different materials and the changes in product thickness and surface characteristics caused by the shapes. If the products are coated with uniform specifications and parameters during the coating process, it is easy to cause different coating thicknesses. The coating will also cause different changes in the properties of the products, resulting in an increase in the defective rate of the products. In order to save costs, some companies will acquire non-new processing facilities. The aging degree of various parts of such processing facilities is also inconsistent, which will cause certain interference to the processing. In addition, if the processing is stopped directly for maintenance due to minor problems during the processing, it will also interfere with production efficiency and affect the development of the company. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the deficiencies in the prior art, the present invention provides an intelligent control method and system for vacuum coating equipment, which solves the problem mentioned in the above background technology that the products are coated in a manner with uniform specification parameters during the coating process, which easily results in different coating thicknesses, different changes in the properties of the products caused by the coating, thereby increasing the defective rate of the products, and the aging degree of various parts of the processing facilities is also inconsistent, which causes certain interference to the processing.

[0006] (II) Technical solution

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: an intelligent control system for vacuum coating equipment, including a first acquisition unit, a second acquisition unit, a preprocessing unit, a data calculation unit, a data processing unit, a data analysis unit and an execution unit:

[0008] The first acquisition unit is used to acquire data on the object to be processed and the processing environment, thereby forming a regional material data group, a regional basic state data group and a processing environment data group. The second acquisition unit is used to acquire performance data of the processing equipment, thereby forming a processing equipment performance data group. The first acquisition unit and the second acquisition unit input the acquired regional material data group, regional basic state data group, processing environment data group and processing equipment performance data group into the preprocessing unit;

[0009] The preprocessing unit is used to preprocess the regional material data group, the regional basic state data group and the processing environment data group, and reorganize them into a first data group and a second data group, and input the reorganized first data group, the second data group and the processing equipment performance data group into the data calculation unit;

[0010] The data calculation unit is used to perform integration calculation on the first data group, the second data group and the processing equipment performance data group, so as to obtain the equipment adjustment reference value Stzk, and the data calculation unit inputs the calculated equipment adjustment reference value Stzk into the data processing unit;

[0011] The data processing unit is used to compare the equipment adjustment reference value Stzk with a preset first threshold value Y, thereby generating a first comparison result, and judging whether the coating equipment needs to be adjusted through the first comparison result. If the comparison result shows that no adjustment is needed, the equipment maintains the existing settings and continues processing. If the comparison result shows that adjustment is needed, the equipment adjustment reference value Stzk and the first threshold value Y are integrated and calculated to obtain the adjustment magnitude value Tljz and input it into the data analysis unit;

[0012] The data analysis unit compares the adjustment magnitude value Tljz with a preset second threshold value to generate a second comparison result, and divides the magnitude of the amplitude that needs to be adjusted for the device according to the second comparison result, and the data analysis unit inputs the second comparison result into the execution unit for data matching, adapts the magnitude of the second comparison result to the adjustment scheme pre-stored in the execution unit, and executes the corresponding adjustment scheme according to the adaptation result;

[0013] The execution unit also generates an adjustment log, marks the adjustment log, and sends a warning message to the user, so that the device can be maintained in time.

[0014] Preferably, the first acquisition unit includes a scanning module, a material recognition module and an image recognition module;

[0015] The scanning module is used to scan the surface of the product to be processed to generate a product surface image, and divide the image into a number of equal-area regions, respectively recorded as Q1, Q2, Q3, ..., Qn. The material recognition module recognizes each region of the product to be processed, thereby obtaining a regional material data group of the product to be processed. The regional material data group includes the material hardness value, material thermal sensitivity value, and material deformation value of the processed item in each region;

[0016] The material hardness values ​​are recorded as: Q1Cydz, Q2Cydz, Q3Cydz, ..., QnCydz, and the maximum value and minimum value from Q1Cydz to QnCydz are obtained and recorded as the maximum value Cymax and the minimum value Cymin of the material hardness, respectively;

[0017] The thermal sensitivity values ​​of the material are recorded as: Q1Crdz, Q2Crdz, Q3Crdz, ..., QnCrdz, and the maximum value and the minimum value from Q1Crdz to QnCrdz are obtained, which are recorded as the material thermal sensitivity maximum value Crmax and the material thermal sensitivity minimum value Crmin respectively;

[0018] The material deformation values ​​are recorded as: Q1Cxdz, Q2Cxdz, Q3Cxdz, ..., QnCxdz, and the maximum value and minimum value from Q1Cxdz to QnCxdz are obtained, which are recorded as the maximum material deformation value Cxmax and the minimum material deformation value CXmin respectively;

[0019] The image recognition module is used to recognize the image generated by the scanning module to obtain the basic thickness and basic flatness of each area of ​​the processed product;

[0020] The basic thicknesses are recorded as: Q1Hdz, Q2Hdz, Q3Hdz, ..., QnHdz, and the maximum value and minimum value from Q1Hdz to QnHdz are obtained and recorded as the maximum thickness Hdmax and the minimum thickness Hdmin, respectively;

[0021] The basic flatnesses are recorded as: Q1Pdz, Q2Pdz, Q3Pdz, ..., QnPdz, and the maximum and minimum values ​​from Q1pdz to Qnpdz are obtained and recorded as the maximum flatness value Pdmax and the minimum flatness value Pdmin, respectively.

[0022] Preferably, the second acquisition unit includes an environment identification module and a data identification module, wherein the environment identification module is used to acquire data on the working environment temperature and the working environment humidity of the coating equipment, and divide the data according to the timestamp;

[0023] The ambient temperatures are recorded as: S1Hwd, S2Hwd, S3Hwd, ..., SnHwd;

[0024] The ambient humidity is recorded as: S1Hsd, S2Hsd, S3Hsd, ..., SnHsd;

[0025] The data identification module is used to organize data on the performance of the coating equipment, including an original performance index YSxnz and an existing performance index XYxnz, wherein the original performance index YSxnz can be provided by the product manual and input into the data identification module by the user, and the existing performance index XYxnz is obtained after the performance detection of the coating equipment is performed by the performance detection module under the data identification module (202).

[0026] Preferably, the preprocessing unit preprocesses the data of the regional material data group, the regional basic state data group and the processing environment data group to form a first data group and a second data group, wherein the first data group includes: regional material mean PCydz, regional material peak FCydz, regional thermal sensitivity mean PCrdz, regional thermal sensitivity peak FCrdz, regional deformation mean PCxdz and regional deformation peak FCxdz, and the second data group includes: processing environment average temperature PHdz and processing environment average humidity PHsd, and the specific calculation formulas are:

[0027]

[0028]

[0029] Preferably, the data calculation unit calculates and obtains the adjustment reference value Stzk by the following formula:

[0030]

[0031] Wherein: PCydz is the regional material mean, FCydz is the regional material peak, PCrdz is the regional thermal sensitivity mean, FCrdz is the regional thermal sensitivity peak, PCxdz is the regional deformation mean, FCxdz is the regional deformation peak, PHdz is the average temperature of the processing environment, PHsd is the average humidity of the processing environment, YSxnz is the original performance index, XYxnz is the existing performance index, a1, a2, a3, a4, a5, a6, a7, a8, a9 and a10 are all weight values, and a1≠a2≠a3≠a4≠a5≠a6≠a7≠a8≠a9≠a10≠0, the specific values ​​of a1, a2, a3, a4, a5, a6, a7, a8, a9 and a10 are adjusted and set by the user, and log is a logarithmic function.

[0032] Preferably, the data processing unit includes a first comparison module and a second comparison module, the first comparison module is used to generate a first comparison result, and the second comparison module is used to generate a second comparison result;

[0033] The first comparison result is: when the adjustment reference value Stzk ≤ the first threshold value Y, it means that the device does not need to be adjusted; when the adjustment reference value Stzk > the first threshold value Y, it means that the device needs to be adjusted;

[0034] The second comparison result is: when the adjustment level value Tljz≤the second threshold R, it is the first intervention adjustment level;

[0035] When the second threshold R is less than the adjustment level value Tljz ≤ the second threshold R*105%, it is the second intervention adjustment level;

[0036] When the second threshold R*105%<adjustment level value Tljz≤the second threshold R*110%, it is the third intervention adjustment level;

[0037] When the adjustment level value Tljz> the second threshold value R*110%, it is the fourth intervention adjustment level;

[0038] The adjustment level value Tljz is calculated by the following formula:

[0039]

[0040] Wherein: Stzk is the adjustment reference value, and Y is the first threshold value.

[0041] Preferably, the data analysis unit includes a storage module and a matching module, the storage module is used to store the adjustment scheme, and the matching module is used to adapt the adjustment scheme stored in the storage module to the second comparison result;

[0042] The adjustment plan is as follows:

[0043] When the second comparison result is the first-level intervention adjustment level, the first-level intervention adjustment plan is implemented, the deposition rate of the process is increased by 5%, the coating process temperature is increased by 3°, the gas treatment system is checked, the gas purity is increased by 1%, and the vacuum degree of the equipment is increased by 2%;

[0044] When the second comparison result is the second level intervention adjustment level, execute the second level intervention adjustment plan, increase the deposition rate of the process by 5% to 10%, increase the coating process temperature by 5°, check the gas treatment system, increase the gas purity by 2%, and increase the vacuum degree of the equipment by 3%;

[0045] When the second comparison result is the third-level intervention adjustment level, the third-level intervention adjustment plan is implemented, the deposition rate of the process is increased by 10% to 18%, the coating process temperature is increased by 10°, the gas treatment system is checked, the gas purity is increased by 5%, the gas flow rate is increased by 7%, and the vacuum degree of the equipment is increased by 10%. After the processing is completed, the core components of the processing equipment are inspected, maintained or replaced;

[0046] When the second comparison result is the fourth-level intervention adjustment level, the fourth-level intervention adjustment plan is executed, the processing is immediately stopped, and the core components of the processing equipment are inspected, maintained or replaced, and then the processing machine is restarted.

[0047] Preferably, the execution unit includes an execution module and an alarm module, the execution module is used to execute the matching result of the matching module, and the alarm module is used to record the activation times of the execution module and generate an adjustment log for archiving.

[0048] Preferably, the alarm module also marks the adjustment log, and the specific marking method is as follows:

[0049] When the first-level intervention adjustment plan is implemented, the adjustment log is marked in blue;

[0050] When the secondary intervention adjustment plan is executed, the adjustment log is marked yellow;

[0051] When the Level 3 intervention adjustment plan is implemented, the adjustment log is marked in orange;

[0052] When the four-level intervention adjustment plan is executed, the adjustment log is marked in red

[0053] The present invention also provides an intelligent control method for vacuum coating equipment, the specific steps are as follows:

[0054] S1, data acquisition, the first acquisition unit acquires data of the object to be processed and the processing environment to form a regional material data group, a regional basic state data group and a processing environment data group, and the second acquisition unit acquires a processing equipment performance data group, and transmits the regional material data group, the regional basic state data group, the processing environment data group and the processing equipment performance data group to the preprocessing unit;

[0055] S2, data preprocessing, in the preprocessing unit, preprocessing the regional material data group, the regional basic state data group and the processing environment data group, sorting them into a first data group and a second data group, and transmitting the sorted first data group and the second data group together with the processing equipment performance data group to the data calculation unit;

[0056] S3, data operation, the data calculation unit integrates the first data group, the second data group and the processing equipment performance data group to obtain the equipment adjustment reference value Stzk, and transmits it to the data processing unit;

[0057] S4, equipment status judgment: the data processing unit compares the equipment adjustment reference value Stzk with the preset first threshold value Y to generate a first comparison result. If it is determined that no adjustment is required, the equipment maintains the current setting and continues processing; if adjustment is required, Stzk is integrated with the first threshold value Y to obtain the adjustment magnitude value Tljz and transmit it to the data analysis unit;

[0058] S5, adjusting the amplitude, the data analysis unit compares Tljz with a preset second threshold R, generates a second comparison result, and then divides the amplitude level that needs to be adjusted for the device and transmits the second comparison result to the execution unit;

[0059] S6. Execute adjustment. The execution unit adapts the magnitude of the second comparison result to the pre-stored adjustment plan and executes the corresponding adjustment plan. At the same time, the execution unit generates an adjustment log and marks it, and sends a warning message to the user to ensure timely maintenance of the equipment.

[0060] (III) Beneficial effects

[0061] The present invention provides an intelligent control method and system for vacuum coating equipment, which has the following beneficial effects:

[0062] 1. The intelligent control system of the vacuum coating equipment realizes all-round monitoring and adjustment of the vacuum coating equipment through the coordinated work of multiple units. The data processing and analysis technology enables the equipment to be intelligently adjusted according to real-time production data and performance status, thereby improving the stability, performance and automation level of the equipment. Compared with the traditional manual adjustment method, the system can respond to changes in equipment status more promptly and accurately, greatly improving production efficiency and product quality.

[0063] 2. The intelligent control system of the vacuum coating equipment, by introducing the first comparison module and the second comparison module, can make a more comprehensive judgment on the operating status and adjustment requirements of the equipment, thereby improving the real-time response capability of the system and enabling the system to quickly adjust the equipment to adapt to different production conditions, thereby improving production efficiency and product quality, making the vacuum coating equipment more intelligent and adaptive, and more superior for different production scenarios. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] Figure 1 It is a system flow chart of the present invention.

[0065] Figure 2 It is a diagram of the method steps of the present invention.

[0066] In the figure: 1. first acquisition unit; 2. second acquisition unit; 3. pre-processing unit; 4. data calculation unit; 5. data processing unit; 6. data analysis unit; 7. execution unit; 101. scanning module; 102. material recognition module; 103. image recognition module; 201. environment recognition module; 202. data recognition module; 501. first comparison module; 502. second comparison module; 601. storage module; 602. matching module; 701. execution module; 702. alarm module; 8. regional material data group; 9. regional basic status data group; 10. processing environment data group; 11. processing equipment performance data group; 12. first threshold value Y; 13. second threshold value R. DETAILED DESCRIPTION

[0067] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] Example 1

[0069] See also Figure 1 , an intelligent control system for vacuum coating equipment, comprising a first acquisition unit 1, a second acquisition unit 2, a preprocessing unit 3, a data calculation unit 4, a data processing unit 5, a data analysis unit 6 and an execution unit 7:

[0070] The first acquisition unit 1 is used to acquire data on the object to be processed and the processing environment, thereby forming a regional material data group 8, a regional basic state data group 9, and a processing environment data group 10. The second acquisition unit 2 is used to acquire performance data of the processing equipment, thereby forming a processing equipment performance data group 11. The first acquisition unit 1 and the second acquisition unit 2 input the acquired regional material data group 8, regional basic state data group 9, processing environment data group 10, and processing equipment performance data group 11 into the preprocessing unit 3;

[0071] The preprocessing unit 3 is used to preprocess the regional material data group 8, the regional basic state data group 9 and the processing environment data group 10, and reorganize them into a first data group and a second data group, and input the reorganized first data group, the second data group and the processing equipment performance data group 11 into the data calculation unit 4;

[0072] The data calculation unit 4 is used to perform integration calculation on the first data group, the second data group and the processing equipment performance data group 11, so as to obtain the equipment adjustment reference value Stzk. The data calculation unit 4 inputs the calculated equipment adjustment reference value Stzk into the data processing unit 5;

[0073] The data processing unit 5 is used to compare the equipment adjustment reference value Stzk with the preset first threshold value Y12, so as to generate a first comparison result, and judge whether the coating equipment needs to be adjusted through the first comparison result. If the comparison result shows that no adjustment is needed, the equipment maintains the existing settings and continues processing. If the comparison result shows that adjustment is needed, the equipment adjustment reference value Stzk and the first threshold value Y12 are integrated and calculated to obtain the adjustment magnitude value Tljz and input it into the data analysis unit 6;

[0074] The data analysis unit 6 compares the adjustment magnitude value Tljz with a preset second threshold value, thereby generating a second comparison result, and divides the magnitude of the amplitude that needs to be adjusted for the device according to the second comparison result. The data analysis unit 6 inputs the second comparison result into the execution unit 7 for data matching, adapts the magnitude of the second comparison result to the adjustment scheme pre-stored in the execution unit 7, and executes the corresponding adjustment scheme according to the adaptation result;

[0075] The execution unit 7 also generates an adjustment log, marks the adjustment log, and sends a warning message to the user, so that the device can be maintained in time.

[0076] In this embodiment: the first acquisition unit 1 is used to obtain data on the processed items and the processing environment to form a regional material data group, a regional basic status data group and a processing environment data group; the second acquisition unit 2 is responsible for obtaining the processing equipment performance data to form a processing equipment performance data group 11. Through the collaborative work of the first acquisition unit 1 and the second acquisition unit 2, comprehensive and accurate original data is provided to the system, laying a data foundation for subsequent intelligent control.

[0077] The preprocessing unit 3 preprocesses the collected data and reorganizes it into a first data group and a second data group, providing high-quality input for further calculation and analysis. Through the preprocessing unit 3, the system can better adapt to different data types and formats, and improve the consistency and availability of the data.

[0078] The data calculation unit 4 integrates and calculates the first data group, the second data group and the processing equipment performance data group 11 to obtain the equipment adjustment reference value Stzk. The data calculation unit 4 performs in-depth analysis on the data to provide the system with an adjustment reference value based on comprehensive data, making the adjustment more targeted and intelligent.

[0079] The data processing unit 5 compares the equipment adjustment reference value Stzk with the preset first threshold value Y12 to generate a first comparison result, and then determines whether the equipment needs to be adjusted. The data processing unit 5 realizes real-time monitoring and judgment of the equipment status by the system, so that the equipment can be automatically adjusted when necessary, thereby improving the level of production automation.

[0080] The data analysis unit 6 compares the adjustment magnitude value Tljz with the second threshold value R13 to generate a second comparison result, and divides the magnitude of the adjustment required for the equipment. By deeply analyzing the data through the data analysis unit 6, the system more accurately determines the degree of adjustment, providing a basis for subsequent specific adjustment plans.

[0081] The execution unit 7 is responsible for matching the pre-stored adjustment plan according to the second comparison result and performing the corresponding adjustment. In addition, the execution unit 7 generates an adjustment log and sends warning information to the user in a timely manner to ensure that the user can understand the device status at the first time, thereby improving the maintainability and response speed of the device.

[0082] Through the coordinated work of multiple units, the system realizes all-round monitoring and adjustment of vacuum coating equipment. The use of data processing and analysis technology enables the equipment to make intelligent adjustments based on real-time production data and performance status, thereby improving the stability, performance and automation level of the equipment. Compared with traditional manual adjustment methods, the system can respond to changes in equipment status more promptly and accurately, greatly improving production efficiency and product quality.

[0083] Example 2

[0084] See also Figure 1 , the first acquisition unit 1 includes a scanning module 101, a material recognition module 102 and an image recognition module 103;

[0085] The scanning module 101 is used to scan the surface of the product to be processed to generate a product surface image, and divide the image into a number of equal-area regions, respectively recorded as Q1, Q2, Q3, ..., Qn. The material recognition module 102 recognizes each region of the product to be processed, thereby obtaining a regional material data group 8 of the product to be processed. The regional material data group 8 includes the material hardness value, material thermal sensitivity value, and material deformation value of the processed item in each region.

[0086] The material hardness values ​​are recorded as: Q1Cydz, Q2Cydz, Q3Cydz, ..., QnCydz, and the maximum value and minimum value from Q1Cydz to QnCydz are obtained and recorded as the maximum value Cymax and the minimum value Cymin of the material hardness, respectively;

[0087] The thermal sensitivity values ​​of the material are recorded as: Q1Crdz, Q2Crdz, Q3Crdz, ..., QnCrdz, and the maximum value and the minimum value from Q1Crdz to QnCrdz are obtained, which are recorded as the material thermal sensitivity maximum value Crmax and the material thermal sensitivity minimum value Crmin respectively;

[0088] The material deformation values ​​are recorded as: Q1Cxdz, Q2Cxdz, Q3Cxdz, ..., QnCxdz, and the maximum value and minimum value from Q1Cxdz to QnCxdz are obtained, which are recorded as the maximum material deformation value Cxmax and the minimum material deformation value CXmin respectively;

[0089] The image recognition module 103 is used to recognize the image generated by the scanning module 101 so as to obtain the basic thickness and basic flatness of each area of ​​the processed product;

[0090] The basic thicknesses are recorded as: Q1Hdz, Q2Hdz, Q3Hdz, ..., QnHdz, and the maximum value and minimum value from Q1Hdz to QnHdz are obtained and recorded as the maximum thickness Hdmax and the minimum thickness Hdmin, respectively;

[0091] The basic flatnesses are recorded as: Q1Pdz, Q2Pdz, Q3Pdz, ..., QnPdz, and the maximum and minimum values ​​from Q1pdz to Qnpdz are obtained and recorded as the maximum flatness value Pdmax and the minimum flatness value Pdmin, respectively.

[0092] In this embodiment: a scanning module 101, a material recognition module 102 and an image recognition module 103 are introduced into the first acquisition unit 1 to achieve more refined data acquisition and processing.

[0093] Through the scanning module 101, the system can scan the surface of the product to be processed and generate a surface image of the product, dividing the image into several equal-area areas, so that the system can understand the characteristics of different areas in more detail and provide a richer data basis for subsequent processing adjustments.

[0094] Through the material identification module 102, the system can identify each area and obtain the regional material data group 8 of the processed product, including multiple key parameters such as material hardness value, material thermal sensitivity value and material deformation value. By obtaining the maximum and minimum values ​​respectively, the system obtains the extreme values ​​of the material in each area, providing a more comprehensive reference basis for intelligent adjustment.

[0095] The image recognition module 103 is used to obtain the basic thickness and basic flatness of each area, which further enriches the system's understanding of the processed products, enables the system to more comprehensively analyze the processing environment, and improves the ability to control basic parameters in the thin film deposition process.

[0096] Through the scanning module 101, the material recognition module 102 and the image recognition module 103, the system's data collection is more accurate and detailed, and the system has a more comprehensive understanding of the materials and basic parameters of different areas, thereby improving the accuracy and pertinence of intelligent adjustment, thereby improving the production efficiency of the coating equipment, reducing the scrap rate, and achieving the purpose of more intelligent control of the production of the coating equipment.

[0097] Example 3

[0098] See also Figure 1 The second acquisition unit 2 includes an environment identification module 201 and a data identification module 202. The environment identification module 201 is used to acquire data on the working environment temperature and the working environment humidity of the coating equipment, and divide the data according to the timestamp;

[0099] The ambient temperatures are recorded as: S1Hwd, S2Hwd, S3Hwd, ..., SnHwd;

[0100] The ambient humidity is recorded as: S1Hsd, S2Hsd, S3Hsd, ..., SnHsd;

[0101] The data identification module 202 is used to organize data on the performance of the coating equipment, including the original performance index YSxnz and the current performance index XYxnz, wherein the original performance index YSxnz can be provided by the product manual and input into the data identification module 202 by the user, and the current performance index XYxnz is obtained after the performance detection module under the data identification module 202 performs performance detection on the coating equipment.

[0102] In this embodiment, an environment identification module 201 and a data identification module 202 are introduced into the second acquisition unit 2 to achieve more accurate data acquisition of the temperature and humidity of the working environment.

[0103] Through the environment identification module 201, the system can acquire real-time data on the temperature and humidity of the working environment of the coating equipment, and divide the data according to timestamps. This time-segmented data collection method enables the system to understand the changing trends of the working environment more carefully, providing a more powerful basis for subsequent data analysis and intelligent control.

[0104] The environment identification module 201 introduces multi-dimensional data of ambient temperature and humidity, wherein the temperature data are recorded as S1Hwd, S2Hwd, S3Hwd, ..., SnHwd, and the humidity data are recorded as S1Hsd, S2Hsd, S3Hsd, ..., SnHsd. The introduction of the above data enriches the system's understanding of the operating environment, helps to more accurately grasp the impact of environmental changes on the thin film deposition process, and improves the system's intelligent adjustment capability.

[0105] By introducing the environment identification module 201 and the data identification module 202, the system's real-time monitoring of the working environment is more comprehensive and detailed, and can respond more flexibly to environmental changes in different time periods. Through more accurate environmental data, the system can implement more precise adjustment strategies, thereby improving the adaptability and stability of the equipment in different working environments, thereby helping to reduce the impact of temperature and humidity fluctuations in production on film quality, and ultimately improving the production efficiency and product quality of the coating equipment.

[0106] Example 4

[0107] See also Figure 1 , the preprocessing unit 3 preprocesses the data of the regional material data group 8, the regional basic state data group 9 and the processing environment data group 10, thereby forming a first data group and a second data group, wherein the first data group includes: regional material mean PCydz, regional material peak FCydz, regional thermal sensitivity mean PCrdz, regional thermal sensitivity peak FCrdz, regional deformation mean PCxdz and regional deformation peak FCxdz, and the second data group includes: processing environment average temperature PHdz and processing environment average humidity PHsd, and the specific calculation formulas are:

[0108]

[0109] In this embodiment: the pre-processing unit 3 performs comprehensive processing on the regional material data set 8, the regional basic state data set 9 and the processing environment data set 10 to form a first data set and a second data set.

[0110] By processing the regional material data group 8, the system generates the first data group, including the regional material mean PCydz, the regional material peak FCydz, the regional thermal sensitivity mean PCrdz, the regional thermal sensitivity peak FCrdz, the regional deformation mean PCxdz and the regional deformation peak FCxdz. This enables the system to understand the material characteristics and deformation of different regions more comprehensively and meticulously, providing more accurate reference indicators for subsequent intelligent adjustments.

[0111] By processing the processing environment data, the system realizes comprehensive monitoring of the working environment and provides more accurate basic data for intelligent control. This helps the system better adapt to different production environment changes, improves the stability and production efficiency of the equipment, and enables the system to understand the material, deformation, environment and other aspects of information in more detail, which provides richer reference data for intelligent adjustment, enabling the system to respond to different production scenarios more flexibly and intelligently, and improves the adaptability and production quality of the equipment. This optimization helps to further improve the intelligent control level of vacuum coating equipment and improve the overall level of production efficiency and product quality.

[0112] Example 5

[0113] See also Figure 1 , the data calculation unit 4 calculates and obtains the adjustment reference value Stzk through the following formula;

[0114]

[0115] Wherein: PCydz is the regional material mean, FCydz is the regional material peak, PCrdz is the regional thermal sensitivity mean, FCrdz is the regional thermal sensitivity peak, PCxdz is the regional deformation mean, FCxdz is the regional deformation peak, PHdz is the average temperature of the processing environment, PHsd is the average humidity of the processing environment, YSxnz is the original performance index, XYxnz is the existing performance index, a1, a2, a3, a4, a5, a6, a7, a8, a9 and a10 are all weight values, and a1≠a2≠a3≠a4≠a5≠a6≠a7≠a8≠a9≠a10≠0, the specific values ​​of a1, a2, a3, a4, a5, a6, a7, a8, a9 and a10 are adjusted and set by the user, and log is a logarithmic function.

[0116] In this embodiment: by introducing the regional material mean PCydz, the regional material peak FCydz, the regional thermal sensitivity mean PCrdz, the regional thermal sensitivity peak FCrdz, the regional deformation mean PCxdz, the regional deformation peak FCxdz, the processing environment average temperature PHdz, the processing environment average humidity PHsd, the original performance index YSxnz and the existing performance index XYxnz, and using user-adjustable weight values, the system realizes flexible integration of different parameters, which enables the calculation formula to more accurately reflect the impact of various factors on equipment performance, thereby improving the accuracy of the adjustment reference value.

[0117] The calculation model of the data calculation unit 4 system is more in line with the actual situation, which improves the comprehensive control ability of different factors, thereby helping to enhance the system's intelligent adjustment level of equipment performance and improve the production efficiency and product quality of vacuum coating equipment.

[0118] Example 6

[0119] See also Figure 1 , the data processing unit 5 includes a first comparison module 501 and a second comparison module 502, the first comparison module 501 is used to generate a first comparison result, and the second comparison module 502 is used to generate a second comparison result;

[0120] The first comparison result is: when the adjustment reference value Stzk ≤ the first threshold value Y12, it means that the device does not need to be adjusted; when the adjustment reference value Stzk > the first threshold value Y12, it means that the device needs to be adjusted;

[0121] The second comparison result is: when the adjustment level value Tljz≤the second threshold value R13, it is the first intervention adjustment level;

[0122] When the second threshold R13<adjustment level value Tljz≤second threshold R13*105%, it is the second intervention adjustment level;

[0123] When the second threshold R13105%<adjustment level value Tljz≤second threshold R13*110%, it is the third intervention adjustment level;

[0124] When the adjustment level value Tljz> the second threshold R13*110%, it is the fourth intervention adjustment level;

[0125] The adjustment level value Tljz is calculated by the following formula:

[0126]

[0127] Wherein: Stzk is the adjustment reference value, and Y is the first threshold value.

[0128] In this embodiment: a first comparison module 501 and a second comparison module 502 are introduced into the data processing unit 5 to generate a first comparison result and a second comparison result, respectively to determine whether equipment adjustment is required.

[0129] Through the first comparison module 501, the system can compare the adjustment reference value Stzk with the preset first threshold value Y12 to generate a first comparison result. This enables the system to monitor in real time whether the performance of the device is within the normal range. When the adjustment reference value is lower than the first threshold value, the system determines that it is operating normally and no adjustment is required; when the adjustment reference value exceeds the first threshold value, the system determines that adjustment is required and triggers the intelligent adjustment mechanism.

[0130] Through the second comparison module 502, the system can generate a second comparison result based on the comparison between the adjustment level value Tljz and the second threshold R13, and determine the corresponding adjustment level according to different level divisions. Such an intelligent adjustment mechanism enables the system to adopt flexible adjustment strategies according to different adjustment levels, thereby improving the intelligence and adaptability of the device.

[0131] By introducing the first comparison module 501 and the second comparison module 502, the system can make a more comprehensive judgment on the operating status and adjustment needs of the equipment, improve the real-time response capability of the system, and enable the system to quickly adjust the equipment to adapt to different production conditions, thereby improving production efficiency and product quality, making the vacuum coating equipment more intelligent and adaptive, and more superior for different production scenarios.

[0132] Example 7

[0133] See also Figure 1 The data analysis unit 6 includes a storage module 601 and a matching module 602, wherein the storage module 601 is used to store the adjustment scheme, and the matching module 602 is used to adapt the adjustment scheme stored in the storage module 601 to the second comparison result;

[0134] The adjustment plan is as follows:

[0135] When the second comparison result is the first-level intervention adjustment level, the first-level intervention adjustment plan is implemented, the deposition rate of the process is increased by 5%, the coating process temperature is increased by 3°, the gas treatment system is checked, the gas purity is increased by 1%, and the vacuum degree of the equipment is increased by 2%;

[0136] When the second comparison result is the second level intervention adjustment level, execute the second level intervention adjustment plan, increase the deposition rate of the process by 5% to 10%, increase the coating process temperature by 5°, check the gas treatment system, increase the gas purity by 2%, and increase the vacuum degree of the equipment by 3%;

[0137] When the second comparison result is the third-level intervention adjustment level, the third-level intervention adjustment plan is implemented, the deposition rate of the process is increased by 10% to 18%, the coating process temperature is increased by 10°, the gas treatment system is checked, the gas purity is increased by 5%, the gas flow rate is increased by 7%, and the vacuum degree of the equipment is increased by 10%. After the processing is completed, the core components of the processing equipment are inspected, maintained or replaced;

[0138] When the second comparison result is the fourth-level intervention adjustment level, the fourth-level intervention adjustment plan is executed, the processing is immediately stopped, and the core components of the processing equipment are inspected, maintained or replaced, and then the processing machine is restarted.

[0139] In this embodiment: the data analysis unit 6 includes a storage module 601 and a matching module 602 to more flexibly and intelligently respond to different equipment adjustment requirements.

[0140] Through the storage module 601, the system implements the storage of various adjustment schemes, including specific adjustment schemes for intervention adjustment levels 1 to 4. This enables the system to flexibly select the corresponding adjustment scheme based on the second comparison result, rather than simply making a qualitative judgment, thereby improving the scalability and adaptability of the system.

[0141] Through the matching module 602, the system can adapt the stored adjustment plan to the second comparison result, and flexibly select and execute the corresponding adjustment strategy according to the actual situation. This intelligent matching mechanism makes the system more flexible and can take different measures according to different adjustment levels, thereby improving the intelligent adjustment level of the system.

[0142] By introducing the storage module 601 and the matching module 602, the system can respond to different equipment adjustment requirements in a more specific and targeted manner, thereby improving the reliability and stability of the equipment. This optimization helps the system to respond to different production scenarios more flexibly and improves the adaptability and intelligence of the vacuum coating equipment.

[0143] Example 8

[0144] See also Figure 1 The execution unit 7 includes an execution module 701 and an alarm module 702. The execution module 701 is used to execute the matching result of the matching module 602. The alarm module 702 is used to record the activation times of the execution module 701 and generate an adjustment log for archiving.

[0145] The alarm module 702 also marks the adjustment log, and the specific marking method is as follows:

[0146] When the first-level intervention adjustment plan is implemented, the adjustment log is marked in blue;

[0147] When the secondary intervention adjustment plan is executed, the adjustment log is marked yellow;

[0148] When the Level 3 intervention adjustment plan is implemented, the adjustment log is marked in orange;

[0149] When the four-level intervention adjustment plan is executed, the adjustment log is marked in red.

[0150] In this embodiment: an execution module 701 and an alarm module 702 are introduced into the execution unit 7 to further enhance the intelligence and management efficiency of the system.

[0151] By introducing the execution module 701, the system can effectively execute the matching results obtained by the matching module 602, that is, execute the corresponding adjustment plan according to the magnitude division of the second comparison result. The matching module 602 enhances the automatic adjustment capability of the system, ensuring that the device can quickly and accurately make corresponding adjustment responses at different adjustment levels.

[0152] By introducing the alarm module 702, the system can record the activation times of the execution module 701, generate an adjustment log, and archive it, thereby realizing detailed recording and management of the equipment adjustment history, providing strong support for subsequent performance analysis, troubleshooting, etc.

[0153] The alarm module 702 also marks the adjustment log to intuitively display the execution status of different adjustment levels. By marking different levels of adjustment plans with different colors, operators can quickly understand the operating status of the equipment and achieve more intuitive and convenient equipment management.

[0154] By introducing the execution module 701 and the alarm module 702, the system realizes comprehensive tracking of the equipment adjustment history, which is helpful for analyzing the long-term trend of equipment performance and optimizing the adjustment plan. At the same time, the adjustment log is marked with different colors to facilitate operators to quickly understand the equipment status, thereby improving the convenience and intuitiveness of equipment management. This improvement makes the intelligent control system of vacuum coating equipment more comprehensive and practical.

[0155] The present invention also provides an intelligent control method for vacuum coating equipment, see Figure 2 , the specific steps are as follows:

[0156] S1, data acquisition, the first acquisition unit 1 acquires data of the object to be processed and the processing environment to form a regional material data group 8, a regional basic state data group 9 and a processing environment data group 10, and the second acquisition unit 2 acquires a processing equipment performance data group 11, and transmits the regional material data group 8, the regional basic state data group 9, the processing environment data group 10 and the processing equipment performance data group 11 to the preprocessing unit 3;

[0157] S2, data preprocessing, in the preprocessing unit 3, the regional material data group 8, the regional basic state data group 9 and the processing environment data group 10 are preprocessed and sorted into a first data group and a second data group, and the sorted first data group and the second data group are transmitted to the data calculation unit 4 together with the processing equipment performance data group 11;

[0158] S3, data operation, the data calculation unit 4 performs integration operation on the first data group, the second data group and the processing equipment performance data group 11, obtains the equipment adjustment reference value Stzk, and transmits it to the data processing unit 5;

[0159] S4, equipment status judgment, the data processing unit 5 compares the equipment adjustment reference value Stzk with the preset first threshold value Y12 to generate a first comparison result. If it is determined that no adjustment is required, the equipment maintains the current setting and continues processing; if adjustment is required, Stzk is integrated with the first threshold value Y12 to calculate and obtain the adjustment magnitude value Tljz, and transmit it to the data analysis unit 6;

[0160] S5, adjustment amplitude determination, the data analysis unit 6 compares Tljz with a preset second threshold R13, generates a second comparison result, and further divides the amplitude level that the device needs to adjust and transmits the second comparison result to the execution unit 7;

[0161] S6. Execute adjustment. The execution unit 7 adapts the magnitude of the second comparison result to the pre-stored adjustment plan and executes the corresponding adjustment plan. At the same time, the execution unit generates an adjustment log and marks it, and sends a warning message to the user to ensure timely maintenance of the equipment.

[0162] The following is a set of data examples, taking the vacuum coating equipment of a certain factory as an example:

[0163] The area division of the product to be processed is three (Qn=3), and the time stamp is four (Sn=4);

[0164] The regional hardness values ​​are: Q1Cydz=70, Q2Cydz=80, Q3Cydz=75;

[0165] The regional thermal sensitivity values ​​are: Q1Crdz=40, Q2Crdz=50, Q3Crdz=45;

[0166] The regional deformation values ​​are: Q1Crdz=12, Q2Crdz=15, Q3Crdz=10;

[0167] The ambient temperature values ​​are: S1Hwd=25, S2Hwd=30, S3Hwd=28, S4Hwd=32;

[0168] The environmental humidity values ​​are: S1Hsd=40, S2Hsd=50, S3Hsd=45, S4Hsd=55;

[0169] Regional material mean (PCydz) = 75;

[0170] Regional material peak (FCydz) = 5;

[0171] Regional thermal sensitivity mean (PCrdz) = 45;

[0172] Regional thermal sensitivity peak (FCrdz) = 5;

[0173] The mean regional deformation (PCxdz) = 12.3;

[0174] Regional deformation peak (FCxdz) = 2.5;

[0175] Average processing environment temperature (PWdz) = 28.75;

[0176] The average humidity value of the processing environment is PHsd = 47.5;

[0177] a1=0.2, a2=0.15, a3=0.1, a4=0.05, a5=0.12, a6=0.18, a7=0.08, a8=0.14, a9=0.03, a10=0.05,

[0178] Adjust the reference value Stzk to:

[0179]

[0180] The first threshold value Y=1.36, the second threshold value R=0.36;

[0181] Adjust the reference value Stzk>Y, and the first comparison result is that the coating equipment needs to be adjusted;

[0182] Adjust the magnitude value Tljz to:

[0183] The second comparison result is that when the second threshold R*105% (0.378) < the adjustment level value Tljz (0.38) ≤ the second threshold R*110% (0.396), it is the third intervention adjustment level;

[0184] When the second comparison result is the third-level intervention adjustment level, execute the third-level intervention adjustment plan, increase the deposition rate of the processing by 10% to 18%, increase the coating processing temperature by 10°, check the gas treatment system, increase the gas purity by 5%, increase the gas flow by 7%, increase the vacuum degree of the equipment by 10%, and after the processing is completed, inspect and repair the core components of the processing equipment, perform maintenance or replace them, and mark the adjustment log in orange.

[0185] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An intelligent control system for vacuum coating equipment, comprising a first acquisition unit (1), a second acquisition unit (2), a preprocessing unit (3), a data calculation unit (4), a data processing unit (5), a data analysis unit (6) and an execution unit (7), characterized in that: The first acquisition unit (1) is used to acquire data on the object to be processed and the processing environment, thereby forming a regional material data group (8), a regional basic state data group (9) and a processing environment data group (10); the second acquisition unit (2) is used to acquire performance data of the processing equipment, thereby forming a processing equipment performance data group (11); the first acquisition unit (1) and the second acquisition unit (2) input the acquired regional material data group (8), regional basic state data group (9), processing environment data group (10) and processing equipment performance data group (11) into the preprocessing unit (3); The preprocessing unit (3) is used to preprocess the regional material data group (8), the regional basic state data group (9) and the processing environment data group (10), and reorganize them into a first data group and a second data group, and input the reorganized first data group, the second data group and the processing equipment performance data group (11) into the data calculation unit (4); The data calculation unit (4) is used to perform integration calculation on the first data group, the second data group and the processing equipment performance data group (11), so as to obtain the equipment adjustment reference value Stzk, and the data calculation unit (4) inputs the calculated equipment adjustment reference value Stzk into the data processing unit (5); The data processing unit (5) is used to compare the equipment adjustment reference value Stzk with a preset first threshold value Y (12), thereby generating a first comparison result, and judging whether the coating equipment needs to be adjusted based on the first comparison result. If the comparison result shows that no adjustment is needed, the equipment maintains the existing settings and continues processing. If the comparison result shows that adjustment is needed, the equipment adjustment reference value Stzk and the first threshold value Y (12) are integrated and calculated to obtain an adjustment magnitude value Tljz and input it into the data analysis unit (6); The data analysis unit (6) compares the adjustment magnitude value Tljz with a preset second threshold value, thereby generating a second comparison result, and divides the magnitude of the amplitude that needs to be adjusted for the device according to the second comparison result; the data analysis unit (6) inputs the second comparison result into the execution unit (7) for data matching, adapts the magnitude of the second comparison result to the adjustment scheme pre-stored in the execution unit (7), and executes the corresponding adjustment scheme according to the adaptation result; The execution unit (7) also generates an adjustment log, marks the adjustment log, and sends a warning message to the user, so that the device can be maintained in time.

2. The intelligent control system of the vacuum coating equipment according to claim 1, characterized in that: The first acquisition unit (1) comprises a scanning module (101), a material recognition module (102) and an image recognition module (103); The scanning module (101) is used to scan the surface of the product to be processed to generate a product surface image, and divide the image into a plurality of equal-area regions, respectively recorded as Q1, Q2, Q3, ..., Qn; the material identification module (102) identifies each region of the product to be processed, thereby obtaining a regional material data group (8) of the product to be processed, the regional material data group (8) including a material hardness value, a material thermal sensitivity value, and a material deformation value of the product to be processed in each region; The material hardness values ​​are recorded as: Q1Cydz, Q2Cydz, Q3Cydz, ..., QnCydz, and the maximum value and minimum value from Q1Cydz to QnCydz are obtained and recorded as the maximum value Cymax and the minimum value Cymin of the material hardness, respectively; The thermal sensitivity values ​​of the material are recorded as: Q1Crdz, Q2Crdz, Q3Crdz, ..., QnCrdz, and the maximum value and the minimum value from Q1Crdz to QnCrdz are obtained, which are recorded as the material thermal sensitivity maximum value Crmax and the material thermal sensitivity minimum value Crmin respectively; The material deformation values ​​are recorded as: Q1Cxdz, Q2Cxdz, Q3Cxdz, ..., QnCxdz, and the maximum value and minimum value from Q1Cxdz to QnCxdz are obtained, which are recorded as the maximum material deformation value Cxmax and the minimum material deformation value CXmin respectively; The image recognition module (103) is used to recognize the image generated by the scanning module (101) so as to obtain the basic thickness and basic flatness of each area of ​​the processed product; The basic thicknesses are recorded as: Q1Hdz, Q2Hdz, Q3Hdz, ..., QnHdz, and the maximum value and minimum value from Q1Hdz to QnHdz are obtained and recorded as the maximum thickness Hdmax and the minimum thickness Hdmin, respectively; The basic flatnesses are recorded as: Q1Pdz, Q2Pdz, Q3Pdz, ..., QnPdz, and the maximum and minimum values ​​from Q1pdz to Qnpdz are obtained and recorded as the maximum flatness value Pdmax and the minimum flatness value Pdmin, respectively.

3. The intelligent control system of the vacuum coating equipment according to claim 2, characterized in that: The second acquisition unit (2) comprises an environment recognition module (201) and a data recognition module (202), wherein the environment recognition module (201) is used to acquire data on the operating environment temperature and the operating environment humidity of the coating equipment, and divide the data according to timestamps; The ambient temperatures are recorded as: S1Hwd, S2Hwd, S3Hwd, ..., SnHwd; The ambient humidity is recorded as: S1Hsd, S2Hsd, S3Hsd, ..., SnHsd; The data identification module (202) is used to organize data on the performance of the coating equipment, including an original performance index YSxnz and an existing performance index XYxnz, wherein the original performance index YSxnz can be provided by the product manual and input into the data identification module (202) by the user, and the existing performance index XYxnz is obtained after the performance detection module under the data identification module (202) performs performance detection on the coating equipment.

4. The intelligent control system of the vacuum coating equipment according to claim 3, characterized in that: The preprocessing unit (3) preprocesses the data of the regional material data group (8), the regional basic state data group (9) and the processing environment data group (10), thereby forming a first data group and a second data group, wherein the first data group includes: the regional material mean PCydz, the regional material peak FCydz, the regional thermal sensitivity mean PCrdz, the regional thermal sensitivity peak FCrdz, the regional deformation mean PCxdz and the regional deformation peak FCxdz, and the second data group includes: the processing environment average temperature PHdz and the processing environment average humidity PHsd, and the specific calculation formulas are:

5. The intelligent control system of the vacuum coating equipment according to claim 4, characterized in that: The data calculation unit (4) calculates and obtains the adjustment reference value Stzk through the following formula; Wherein: PCydz is the regional material mean, FCydz is the regional material peak, PCrdz is the regional thermal sensitivity mean, FCrdz is the regional thermal sensitivity peak, PCxdz is the regional deformation mean, FCxdz is the regional deformation peak, PHdz is the average temperature of the processing environment, PHsd is the average humidity of the processing environment, YSxnz is the original performance index, XYxnz is the existing performance index, a1, a2, a3, a4, a5, a6, a7, a8, a9 and a10 are all weight values, and a1≠a2≠a3≠a4≠a5≠a6≠a7≠a8≠a9≠a10≠0, the specific values ​​of a1, a2, a3, a4, a5, a6, a7, a8, a9 and a10 are adjusted and set by the user, and log is a logarithmic function.

6. The intelligent control system of the vacuum coating equipment according to claim 5, characterized in that: The data processing unit (5) comprises a first comparison module (501) and a second comparison module (502), wherein the first comparison module (501) is used to generate a first comparison result, and the second comparison module (502) is used to generate a second comparison result; The first comparison result is: when the adjustment reference value Stzk is less than or equal to the first threshold value Y(12), it means that the device does not need to be adjusted; when the adjustment reference value Stzk is greater than the first threshold value Y(12), it means that the device needs to be adjusted; The second comparison result is: when the adjustment level value Tljz≤the second threshold value R(13), it is the first intervention adjustment level; When the second threshold R(13)<adjustment level value Tljz≤second threshold R(13)*105%, it is the second intervention adjustment level; When the second threshold R(13)105%<adjustment level value Tljz≤second threshold R(13)*110%, it is the third intervention adjustment level; When the adjustment level value Tljz> the second threshold value R(13)*110%, it is the fourth intervention adjustment level; The adjustment level value Tljz is calculated by the following formula: Wherein: Stzk is the adjustment reference value, and Y is the first threshold value.

7. The intelligent control system of the vacuum coating equipment according to claim 6, characterized in that: The data analysis unit (6) comprises a storage module (601) and a matching module (602), wherein the storage module (601) is used to store the adjustment scheme, and the matching module (602) is used to match the adjustment scheme stored in the storage module (601) with the second comparison result; The adjustment plan is as follows: When the second comparison result is the first-level intervention adjustment level, the first-level intervention adjustment plan is implemented, the deposition rate of the process is increased by 5%, the coating process temperature is increased by 3°, the gas treatment system is checked, the gas purity is increased by 1%, and the vacuum degree of the equipment is increased by 2%; When the second comparison result is the second level intervention adjustment level, execute the second level intervention adjustment plan, increase the deposition rate of the process by 5% to 10%, increase the coating process temperature by 5°, check the gas treatment system, increase the gas purity by 2%, and increase the vacuum degree of the equipment by 3%; When the second comparison result is the third-level intervention adjustment level, the third-level intervention adjustment plan is implemented, the deposition rate of the process is increased by 10% to 18%, the coating process temperature is increased by 10°, the gas treatment system is checked, the gas purity is increased by 5%, the gas flow rate is increased by 7%, and the vacuum degree of the equipment is increased by 10%. After the processing is completed, the core components of the processing equipment are inspected, maintained or replaced; When the second comparison result is the fourth-level intervention adjustment level, the fourth-level intervention adjustment plan is executed, the processing is immediately stopped, and the core components of the processing equipment are inspected, maintained or replaced, and then the processing machine is restarted.

8. The intelligent control system of the vacuum coating equipment according to claim 7, characterized in that: The execution unit (7) comprises an execution module (701) and an alarm module (702), wherein the execution module (701) is used to execute the matching result of the matching module (602), and the alarm module (702) is used to record the number of activations of the execution module (701), and to generate an adjustment log for archiving.

9. The intelligent control system of the vacuum coating equipment according to claim 8, characterized in that: The alarm module (702) also marks the adjustment log, and the specific marking method is as follows: When the first-level intervention adjustment plan is implemented, the adjustment log is marked in blue; When the secondary intervention adjustment plan is executed, the adjustment log is marked yellow; When the Level 3 intervention adjustment plan is implemented, the adjustment log is marked in orange; When the four-level intervention adjustment plan is executed, the adjustment log is marked in red.

10. An intelligent control method for vacuum coating equipment, characterized in that: An intelligent control system comprising the vacuum coating equipment according to any one of claims 1 to 9, wherein the specific steps are as follows; S1, data acquisition, the first acquisition unit (1) acquires data on the object to be processed and the processing environment to form a regional material data group (8), a regional basic state data group (9) and a processing environment data group (10), while the second acquisition unit (2) acquires a processing equipment performance data group (11), and transmits the regional material data group (8), the regional basic state data group (9), the processing environment data group (10) and the processing equipment performance data group (11) to the pre-processing unit (3); S2, data preprocessing, in the preprocessing unit (3), the regional material data group (8), the regional basic state data group (9) and the processing environment data group (10) are preprocessed and sorted into a first data group and a second data group, and the sorted first data group and the second data group are transmitted to the data calculation unit (4) together with the processing equipment performance data group (11); S3, data operation, the data calculation unit (4) performs integration operation on the first data group, the second data group and the processing equipment performance data group (11), obtains the equipment adjustment reference value Stzk, and transmits it to the data processing unit (5); S4, judging the state of the equipment, the data processing unit (5) compares the equipment adjustment reference value Stzk with the preset first threshold value Y (12) to generate a first comparison result. If it is judged that no adjustment is required, the equipment maintains the current setting and continues processing; if adjustment is required, Stzk and the first threshold value Y (12) are integrated and calculated to obtain the adjustment magnitude value Tljz, and transmit it to the data analysis unit (6); S5, adjusting the amplitude, the data analysis unit (6) compares Tljz with a preset second threshold R (13), generates a second comparison result, and then divides the amplitude level that needs to be adjusted for the device and transmits the second comparison result to the execution unit (7); S6. Execute adjustment. The execution unit (7) matches the magnitude of the second comparison result with the pre-stored adjustment plan and executes the corresponding adjustment plan. At the same time, the execution unit generates an adjustment log and marks it, and sends a warning message to the user to ensure timely maintenance of the equipment.

Citation Information

Patent Citations

  • Glass online coating process intelligent management system based on big data

    CN117105536A

  • Access control equipment based on digital cloud intercom system and control method thereof

    CN117812057A

  • Video Internet of Things detection equipment

    CN117893951A

  • Electric energy quality analysis system based on digital transformer substation

    CN117973948A

  • Solar photovoltaic power generation maximum power tracking system and application

    CN118192752A

Cited By

  • Automatic vacuum coating method and system based on image recognition

    CN119047931A

  • An automated vacuum coating method and system based on image recognition

    CN119047931B

  • Intelligent control system and method for electrogalvanizing pre-plating impurity removal

    CN120700568A