Advertisement bidding method, device, equipment and computer program product
By dividing the advertising bidding cycle into multiple stages and allocating budgets, automatic advertising bidding is realized, which solves the problem that PID controller hyperparameter adjustment requires human intervention, and improves the effectiveness and value of advertising.
Patent Information
- Application Number
- CN202410796354.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-29
AI Technical Summary
In the advertising auction, the hyperparameter adjustment of the PID controller requires human intervention, which leads to interference in the automatic advertising bidding process and cannot effectively meet the advertising effect of advertisers.
By dividing the advertising bidding cycle into multiple stages, allocating total budget data, and performing advertising bidding operations at each stage, human intervention is reduced and automatic bidding is achieved.
It reduces the interference of human factors on the advertising bidding process, improves the effectiveness and value of advertising, and meets the advertising goals of advertisers.
Smart Images

Figure CN118864017A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of advertising technology, and in particular to an advertising bidding method, device, equipment and computer program product. Background Art
[0002] Ad auction means that for each advertising opportunity in the online advertising system, the advertising platform will conduct an ad auction based on the bids and ad quality of all advertisers to decide which advertisers will be allocated the ad display opportunities, and the winning advertisers will be charged according to the preset deduction rules.
[0003] In order to facilitate advertisers to conduct advertising auction operations, automatic bidding strategies for advertising auction scenarios have emerged. At present, common automatic bidding operations are often implemented based on proportional-integral-derivative (PID) controllers. The above PID controller can dynamically adjust the advertising bid so that the advertising budget can be consumed smoothly and evenly within the specified time.
[0004] However, when using a PID controller for automatic bidding, it is necessary to manually adjust or configure the PID hyperparameters of the PID controller, and the configured PID hyperparameters have a great impact on the performance of the PID controller, thereby increasing the degree of interference of human factors in the automatic bidding process of advertisements, which in turn easily leads to the auctioned advertisement display opportunities failing to meet the advertising delivery effects expected by advertisers. Summary of the invention
[0005] The embodiments of the present invention provide an advertisement bidding method, apparatus, device and computer program product, which can reduce the interference degree of human factors on the advertisement bidding process, so that the auctioned advertisement opportunities can easily meet the advertisement delivery effect desired by the advertiser.
[0006] In a first aspect, an embodiment of the present invention provides an advertisement bidding method, comprising:
[0007] Acquire an advertisement bidding cycle and total advertisement budget data corresponding to the advertisement bidding cycle;
[0008] Dividing the advertisement bidding cycle into a plurality of advertisement bidding stages;
[0009] Allocating the total advertising budget data to the multiple advertising bidding stages to obtain the stage cumulative budget data corresponding to each advertising bidding stage;
[0010] Based on the stage accumulated budget data corresponding to each advertising bidding stage, an advertising bidding operation is performed in each advertising bidding stage.
[0011] In a second aspect, an embodiment of the present invention provides an advertisement bidding device, including:
[0012] A first acquisition module, used to acquire an advertisement bidding cycle and total advertisement budget data corresponding to the advertisement bidding cycle;
[0013] A first division module, used to divide the advertisement bidding cycle into a plurality of advertisement bidding stages;
[0014] A first determination module is used to allocate the total advertising budget data to the multiple advertising bidding stages to obtain the stage cumulative budget data corresponding to each advertising bidding stage;
[0015] The first processing module is used to perform an advertisement bidding operation in each advertisement bidding stage based on the stage accumulated budget data corresponding to each advertisement bidding stage.
[0016] In a third aspect, an embodiment of the present invention provides an electronic device, comprising: a memory, and a processor; wherein the memory is used to store one or more computer instructions, wherein the one or more computer instructions, when executed by the processor, implement the advertising bidding method in the above-mentioned first aspect.
[0017] In a fourth aspect, an embodiment of the present invention provides a computer storage medium for storing a computer program, wherein the computer program enables a computer to implement the advertisement bidding method in the first aspect when executed.
[0018] In a fifth aspect, an embodiment of the present invention provides a computer program product, comprising: a computer-readable storage medium storing computer instructions, which, when executed by one or more processors, causes the one or more processors to execute the steps in the advertising bidding method shown in the first aspect above.
[0019] The advertising bidding method, device, equipment and computer program product provided in this embodiment obtain an advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle, divide the advertising bidding cycle into multiple advertising bidding stages, and allocate the total advertising budget data to the multiple advertising bidding stages to obtain the stage cumulative budget data corresponding to each advertising bidding stage, and then perform advertising bidding operations in each advertising bidding stage based on the stage cumulative budget data corresponding to each advertising bidding stage, thereby effectively realizing advertising bidding operations without human intervention and reducing the degree of interference of human factors on the advertising bidding process; and, by dividing an advertising bidding cycle into multiple advertising bidding stages and then performing automatic bidding operations for each advertising bidding stage, it is realized that the long sequence decision problem of performing automatic bidding operations in an advertising bidding cycle is switched to multiple short sequence decision problems of performing automatic bidding operations in each advertising bidding stage, so that under the premise of limited total advertising budget data, the quality and effect of the advertising bidding operation can be guaranteed, which is conducive to bringing greater advertising delivery value to advertisers and satisfying the advertising delivery effect desired by users, further improving the practicality of the method. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 A schematic diagram of a scenario of an advertisement bidding method provided by an embodiment of the present invention;
[0022] Figure 2 A schematic diagram of a flow chart of an advertisement bidding method provided by an embodiment of the present invention;
[0023] Figure 3 A schematic diagram of a process for obtaining budget allocation information corresponding to the total advertising budget data provided by an embodiment of the present invention;
[0024] Figure 4 A schematic diagram of the principle of an automatic bidding method for e-commerce advertisements provided by an application embodiment of the present invention;
[0025] Figure 5 A schematic diagram of the structure of an advertisement bidding device provided by an embodiment of the present invention;
[0026] Figure 6 For Figure 5The figure shows a schematic diagram of the structure of an electronic device corresponding to the advertisement bidding device provided in the embodiment. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "an", and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings, and "multiple" generally includes at least two, but does not exclude the situation of including at least one.
[0029] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0030] As used herein, the words "if" and "if" may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0031] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a product or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such a product or system. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the product or system including the elements.
[0032] In addition, the step sequence in the following method embodiments is only an example and not a strict limitation.
[0033] In order to facilitate understanding of the specific implementation process and implementation effect of the advertising bidding method, device, equipment and computer program product in this embodiment, the following briefly describes the relevant technology:
[0034] Ad auction means that for each advertising opportunity in the online advertising system, the advertising platform will conduct an ad auction based on the bids and ad quality of all advertisers to decide which advertisers will be allocated the ad display opportunities, and the winning advertisers will be charged according to the preset deduction rules.
[0035] In order to facilitate advertisers to conduct advertising auction operations, automatic bidding strategies for advertising auction scenarios have emerged. At present, the automatic bidding algorithm in the online advertising system usually takes days as the advertising bidding cycle. In each advertising bidding cycle, automatic bidding operations can be performed according to the advertiser's total budget and constraints to maximize the advertiser's delivery target, where the advertiser's delivery target can include at least one of the following: total number of clicks, total number of purchases, total purchase amount, etc.
[0036] When performing automatic bidding, for each ad display opportunity within each ad bidding cycle, the automatic bidding algorithm will be informed of the estimated value of the display opportunity and the advertiser, and then the automatic bidding algorithm will determine the specific bid based on the estimated value and the advertiser's total budget and constraints. Only when the advertiser's bid exceeds the market price of the display opportunity can the advertiser win the ad auction and receive feedback from the advertising system. In addition, the market price of the ad display opportunity can only be known after the advertiser submits a bid to participate in the auction.
[0037] Specifically, a common automatic bidding strategy is an automatic bidding algorithm implemented based on a proportional-integral-derivative (PID) controller. The PID controller is a classic control algorithm that can dynamically adjust advertising bids. During the adjustment process, all historical bids and historical feedback information will be used to consume the total budget so that the total budget can be consumed smoothly and evenly within the specified time.
[0038] Through analysis, it can be seen that the advantages of the automatic bidding algorithm implemented by the PID controller are: simple principle and easy to implement. However, its disadvantages are: when using the PID controller for automatic bidding, it is necessary to manually adjust or configure the PID hyperparameters of the PID controller, and the configured PID hyperparameters have a great impact on the performance of the PID controller, thereby increasing the degree of interference of human factors in the advertising bidding process; in addition, the goal of the PID controller is to consume the total budget steadily and evenly, and it does not optimize the advertising goals of the advertisers, which easily leads to the auctioned advertising display opportunities failing to meet the advertising delivery effects that the advertisers hope to achieve.
[0039] In order to solve the above technical problems, this embodiment provides an advertisement bidding method, device, equipment and computer program product. Figure 1 As shown, the execution subject of the advertising bidding method can be an advertising bidding device 200. It should be noted that the advertising bidding device 200 can be implemented as a local server, a server in the cloud, or a preset device. In the case where the advertising bidding device 200 is implemented as a server in the cloud, the advertising bidding method can be executed in the cloud, and several computing nodes (cloud servers) can be deployed in the cloud, and each computing node has computing, storage and other processing resources. In the cloud, multiple computing nodes can be organized to provide a certain service. Of course, a computing node can also provide one or more services. The way to provide the service in the cloud can be to provide a service interface to the outside, and the user calls the service interface to use the corresponding service. The service interface includes a software development kit (Software Development Kit, referred to as SDK), an application programming interface (Application Programming Interface, referred to as API), and the like.
[0040] The advertising bidding device 200 is connected to the client 100 in communication, wherein the client 100 is used for the advertiser (or the advertising bidding user) to obtain the advertising bidding demand, and to start the advertising bidding device 200 to automatically bid for the advertisement based on the advertising bidding demand. The above-mentioned client 100 can be any computing device with a certain data transmission capability. In specific implementation, the client 100 can be a mobile phone, a personal computer PC, a tablet computer, a setting application, etc. In addition, the basic structure of the client 100 may include: at least one processor. The number of processors depends on the configuration and type of the client. The client 100 may also include a memory, which may be volatile, such as a random access memory (RAM), or non-volatile, such as a read-only memory (ROM), flash memory, etc., or may include both types. The memory usually stores an operating system (OS), one or more application programs, and may also store program data, etc. In addition to the processing unit and the memory, the client 100 also includes some basic configurations, such as: a network card chip, an IO bus, a display component, and some peripheral devices, etc. Optionally, some peripheral devices may include, for example: a keyboard, a mouse, an input pen, a printer, etc. Other peripheral devices are well known in the art and will not be described in detail here.
[0041] The advertising bidding device 200 refers to a device that can provide advertising bidding operations in a network virtual environment, and generally refers to a device that uses the network to perform information planning and advertising bidding operations. In terms of physical implementation, the advertising bidding device 200 can be any device that can provide computing services and can perform corresponding advertising bidding operations, for example: it can be a cluster server, a conventional server, a cloud server, a cloud host, a virtual center, etc. The composition of the advertising bidding device 200 mainly includes a processor, a hard disk, a memory, a system bus, etc., which is similar to a general computer architecture.
[0042] In the above embodiment, the client 100 is connected to the advertising bidding device 200 through a network, and the network connection can be a wireless or wired network connection. If the client 100 can be connected to the advertising bidding device 200 through communication, the network standard of the mobile network can be any one of 2G (GSM), 2.5G (GPRS), 3G (WCDMA, TD-SCDMA, CDMA2000, UTMS), 4G (LTE), 4G+ (LTE+), WiMax, 5G, 6G, etc.
[0043] In the embodiment of the present application, the client 100 is used by users (advertisers, advertising auction users, etc.). In order to stably implement the advertising bidding operation, the user generates an advertising bidding request through the client 100, wherein the advertising bidding request can be generated through human-computer interaction operation or voice interaction operation. After obtaining the advertising bidding request, the advertising bidding request can be sent to the advertising bidding device 200, so that the advertising bidding device 200 can perform the corresponding advertising bidding operation based on the advertising bidding request.
[0044] The advertising bidding device 200 is used to obtain the advertising bidding request sent by the client 100, and then analyze and process the advertising bidding request to obtain the advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle, wherein the advertising bidding cycle can be 1 day, 2 days, 3 days, 5 days, etc. After obtaining the total advertising budget data and the advertising bidding cycle, in order to ensure the user's advertising delivery goals as much as possible, the advertising bidding cycle can be divided into multiple advertising bidding stages, and the duration of any two advertising bidding stages obtained can be the same or different.
[0045] After obtaining multiple advertising bidding stages, the total advertising budget data can be allocated to the multiple advertising bidding stages obtained above, so as to obtain the stage cumulative budget data corresponding to each advertising bidding stage, wherein the stage cumulative budget data corresponding to any two advertising bidding stages can be the same or different. Then, based on the stage cumulative budget data corresponding to each advertising bidding stage, advertising bidding operations can be performed in each advertising bidding stage. Specifically, since any advertising bidding stage includes at least one advertising bidding opportunity (or advertising display opportunity), multiple advertising bidding operations can be performed in one advertising bidding stage, and the advertising bidding information corresponding to multiple advertising bidding operations can be the same or different. It is necessary to ensure that in one advertising bidding stage, the total advertising bidding information corresponding to all advertising bidding operations is less than or equal to the stage cumulative budget data corresponding to the advertising bidding stage.
[0046] In this embodiment, automatic bidding operation of advertisements without human intervention is effectively realized, and the interference degree of human factors on the advertising bidding process is reduced; and, by dividing an advertising bidding cycle into multiple advertising bidding stages, and then performing automatic bidding operation for each advertising bidding stage, it is possible to switch the long sequence decision problem of performing automatic bidding operation in an advertising bidding cycle to multiple short sequence decision problems of performing automatic bidding operation in each advertising bidding stage. In this way, under the premise of limited total advertising budget data, the quality and effect of automatic bidding operation of advertisements can be guaranteed, which is conducive to bringing greater advertising value to advertisers and satisfying the advertising effect desired by users.
[0047] Some embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the case where there is no conflict between the embodiments, the following embodiments and the features in the embodiments can be combined with each other. In addition, the step sequence in the following method embodiments is only an example and not a strict limitation.
[0048] Figure 2 A flowchart of an advertisement bidding method provided by an embodiment of the present invention; Figure 2 As shown, this embodiment provides an advertisement bidding method, the execution subject of the method is an advertisement bidding device, specifically, the advertisement bidding device can be implemented as software, or a combination of software and hardware. When the advertisement bidding device is implemented as hardware, it can be various electronic devices that can implement advertisement bidding operations, including but not limited to personal computers, servers, databases, etc. When the advertisement bidding device is implemented as software, it can be installed in the electronic devices listed above. In some examples, the advertisement bidding device can be implemented as a network platform for implementing advertisement bidding, and the network platform can communicate and connect with multiple clients and supplier platforms corresponding to advertisement bidding opportunities to provide advertisement bidding services to advertisers as a third party in the advertisement bidding process.
[0049] Based on the above-mentioned advertisement bidding device, the advertisement bidding method in this embodiment may include:
[0050] Step S201: Acquire an advertisement bidding cycle and advertisement total budget data corresponding to the advertisement bidding cycle.
[0051] Step S202: Divide the advertisement bidding cycle into multiple advertisement bidding stages.
[0052] Step S203: Allocate the total advertisement budget data to multiple advertisement bidding stages, and obtain the stage cumulative budget data corresponding to each advertisement bidding stage.
[0053] Step S204: performing an advertisement bidding operation in each advertisement bidding stage based on the stage accumulated budget data corresponding to each advertisement bidding stage.
[0054] The specific implementation process and effects of each of the above steps are described in detail below:
[0055] Step S201: Acquire an advertisement bidding cycle and advertisement total budget data corresponding to the advertisement bidding cycle.
[0056] When advertisers or other types of advertising bidding users (hereinafter collectively referred to as "users") have advertising bidding needs, the advertising bidding device can obtain the advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle, wherein the advertising bidding cycle refers to the time period in which bidding can be made for advertising bidding opportunities (or advertising display opportunities), for example: the advertising bidding cycle can be 1 day, 3 days, 5 days or 1 week, etc., and the total advertising budget data can refer to the total cost that the advertiser can invest in a certain advertising bidding cycle.
[0057] In addition, this embodiment does not limit the specific method for obtaining the advertising bidding cycle and the total advertising budget data. In some instances, the advertising bidding cycle and the total advertising budget data can be obtained through human-computer interaction operations or voice interaction operations. Specifically, implementation method 1: obtaining the advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle may include: displaying a human-computer interaction interface; obtaining an execution operation (for example: information editing operation, information selection operation, etc.) input by a user in the human-computer interaction interface; obtaining the advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle based on the execution operation. Implementation method 2: obtaining the advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle may include: in response to a voice wake-up word for the advertising bidding device, starting a voice collection module set in the advertising bidding device; obtaining the voice information input by the user through the voice collection module; obtaining the advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle through the voice information.
[0058] In other instances, the advertising bidding cycle and the total advertising budget data can also be obtained through a preset device (for example, a client). Specifically, the advertising bidding cycle and the total advertising budget data can be obtained through an advertising bidding task to be executed sent by the preset device. At this time, obtaining the advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle may include: determining a preset device that is communicatively connected to the advertising bidding device; actively or passively obtaining the advertising bidding task through the preset device; analyzing and processing the advertising bidding task to obtain the advertising bidding cycle and the total advertising budget data corresponding to the advertising bidding cycle.
[0059] Step S202: Divide the advertisement bidding cycle into multiple advertisement bidding stages.
[0060] After obtaining the advertising bidding cycle, the user can directly bid for each advertising bidding opportunity in the advertising bidding cycle. At this time, the advertising bidding cycle requires multiple advertising bidding operations, thus forming a long sequence decision process for one advertising bidding cycle. The long sequence decision process is prone to occur when the total advertising budget data is limited, and it is impossible to grasp the advertising opportunities with high cost performance, resulting in suboptimal bidding plans, which can easily lead to the advertising opportunities being unable to meet the advertising delivery effects that advertisers hope to achieve.
[0061] In order to solve the problems existing in the long sequence decision-making process, after obtaining the advertising bidding cycle, the advertising bidding cycle can be divided into multiple advertising bidding stages, that is, a longer advertising bidding cycle is split into multiple advertising bidding stages. Compared with the advertising bidding cycle, the duration corresponding to each advertising bidding stage used to constitute the advertising bidding cycle is relatively short, and then only decisions need to be made in each advertising bidding stage. This effectively alleviates the problems existing in the long sequence decision-making process.
[0062] Among them, this embodiment does not limit the specific division method of the advertising bidding cycle. In some instances, the advertising bidding cycle can be evenly divided to obtain multiple advertising bidding stages with the same time period. At this time, dividing the advertising bidding cycle into multiple advertising bidding stages may include: obtaining a duration parameter for limiting the advertising bidding stage, the duration parameter is greater than or equal to a preset duration; and dividing the advertising bidding cycle evenly into multiple advertising bidding stages based on the duration parameter.
[0063] Specifically, in order to realize the operation of dividing the advertising bidding cycle, you can first obtain the duration parameter used to limit the advertising bidding period. The specific method of obtaining the duration parameter is similar to the specific method of obtaining the above-mentioned total advertising budget data. Please refer to the above statements for details, which will not be repeated here.
[0064] For the duration parameter, the size of the duration parameter is directly related to the number of advertising bidding stages obtained. For example, when the duration parameter is large, the number of advertising bidding stages obtained is small; when the duration parameter is small, the number of advertising bidding stages obtained is large. In order to avoid too many advertising bidding stages being divided, the obtained duration parameter needs to be greater than or equal to the preset duration. For example, the preset duration can be 30 minutes, 1 hour, 2 hours, 3 hours, 2.5 hours, 3.5 hours, etc., and those skilled in the art can flexibly configure it according to specific application scenarios or application requirements.
[0065] After obtaining the duration parameter, the advertising bidding cycle can be evenly divided into multiple advertising bidding stages based on the duration parameter. At this time, the duration of any advertising bidding stage satisfies the duration specified by the above-mentioned duration parameter, that is, the durations corresponding to any two advertising bidding stages are the same, thereby realizing the average division operation of the advertising bidding cycle.
[0066] In other instances, the advertising bidding cycle can be divided not only evenly to obtain multiple advertising bidding stages, but also unevenly to obtain multiple advertising bidding stages of different durations. In this case, dividing the advertising bidding cycle into multiple advertising bidding stages may include: obtaining a duration parameter for dividing the advertising bidding cycle, the duration parameter being greater than or equal to a preset duration; dividing the advertising bidding cycle into multiple intermediate stages on an even basis based on the duration parameter; determining the importance of each intermediate stage; merging at least part of the multiple intermediate stages based on the importance of each intermediate stage to obtain a merged bidding stage, and determining the merged bidding stage and the unmerged intermediate stages as the multiple advertising bidding stages obtained after the advertising bidding cycle is divided.
[0067] Specifically, since the advertising bidding cycle includes multiple time periods, the importance of advertising bidding opportunities in different time periods is different. For example, for advertising bidding opportunities, the importance of the daytime time period is higher than that of the nighttime time period; the importance of the non-meal time period is higher than that of the meal time period; the importance of the last time period in the advertising bidding cycle is higher than the importance of the starting time period after the advertising bidding, and so on. Therefore, in order to be able to flexibly divide the advertising bidding cycle, the advertising bidding cycle can be divided according to the importance of each time period. At this time, the advertising bidding cycle can be evenly divided into multiple intermediate stages based on the obtained duration parameters. This process is similar to the implementation method in the above-mentioned embodiment and will not be repeated here.
[0068] After obtaining multiple intermediate stages, each intermediate stage can be analyzed and processed to determine the importance of each intermediate stage. In some examples, the importance of the intermediate stage can be determined based on the start time and end time of the stage, or the importance of the intermediate stage can be determined according to a preset rule or preset experience. In addition, the importance of each intermediate stage obtained can be implemented as a value or a level. For ease of understanding, the importance of each intermediate stage is implemented as a level for explanation below. For example, the importance can include the first level, the second level, the third level, the fourth level, etc. The higher the level, the more important the intermediate stage is, and the lower the level, the less important the intermediate stage is.
[0069] After obtaining the importance of each intermediate stage, at least some of the intermediate stages in the multiple intermediate stages can be merged based on the importance of each intermediate stage, so as to obtain a merged bidding stage. Specifically, merging at least some of the intermediate stages in the multiple intermediate stages based on the importance of each intermediate stage to obtain the merged bidding stage may include: based on the importance of each intermediate stage, determining multiple adjacent intermediate stages belonging to the same importance in the multiple intermediate stages; if the importance of multiple adjacent intermediate stages is greater than or equal to a preset threshold, then keeping the multiple intermediate stages unchanged; if the importance of multiple adjacent intermediate stages is less than the preset threshold, then merging multiple adjacent process bidding nodes to obtain a merged bidding stage, at which time, the duration of the merged bidding stage is greater than the duration of the intermediate stage.
[0070] Through the above operation, multiple merged bidding stages and multiple intermediate stages that have not undergone the merge operation can be obtained, and then the multiple merged bidding stages and multiple intermediate stages obtained can be determined as multiple advertising bidding stages obtained after the advertising bidding cycle is divided. In this way, an uneven division operation of the advertising bidding cycle is realized.
[0071] Step S203: Allocate the total advertisement budget data to multiple advertisement bidding stages, and obtain the stage cumulative budget data corresponding to each advertisement bidding stage.
[0072] After obtaining multiple advertising bidding stages, in order to be able to perform automatic bidding operations on advertisements in stages, the total advertising budget data can be first allocated to multiple advertising bidding stages, and the stage cumulative budget data corresponding to each advertising bidding stage can be obtained, wherein the cumulative budget data of each stage is part of the total advertising budget data, and the sum of all stage cumulative budget data can be less than or equal to the total advertising budget data.
[0073] Among them, this embodiment does not limit the implementation method of allocating the total advertising budget data. In some instances, the allocation operation of the total advertising budget data can be implemented through a pre-trained machine learning model. At this time, allocating the total advertising budget data to multiple advertising bidding stages, and obtaining the stage cumulative budget data corresponding to each advertising bidding stage may include: obtaining a pre-trained machine learning model; inputting the total advertising budget data and multiple advertising bidding stages into the machine learning model to perform the allocation operation of the total advertising budget data, and obtaining the stage cumulative budget data corresponding to each advertising bidding stage output by the machine learning model.
[0074] In other instances, the allocation operation of the total advertising budget data can be achieved not only through a pre-trained machine learning model, but also through the obtained budget allocation information. At this time, allocating the total advertising budget data to multiple advertising bidding stages, and obtaining the stage cumulative budget data corresponding to each advertising bidding stage may include: obtaining the budget allocation information corresponding to the total advertising budget data; allocating the total advertising budget data to multiple advertising bidding stages based on the budget allocation information, and obtaining the stage cumulative budget data corresponding to each advertising bidding stage.
[0075] Specifically, in order to accurately allocate the total advertising budget data to multiple advertising bidding stages, the budget allocation information corresponding to the total advertising budget data can be first obtained, wherein the method for obtaining the budget allocation information is similar to the method for obtaining the total advertising budget data in the above-mentioned embodiment, and the details can be referred to the description content, which will not be repeated here. Since the budget allocation information is used to identify the stage cumulative budget data that needs to be allocated to each advertising bidding stage, after obtaining the budget allocation information, the total advertising budget data can be allocated to multiple advertising bidding stages based on the budget allocation information, so that the stage cumulative budget data corresponding to each advertising bidding stage can be obtained, thereby effectively realizing the allocation operation of the total advertising budget data.
[0076] Step S204: performing an advertisement bidding operation in each advertisement bidding stage based on the stage accumulated budget data corresponding to each advertisement bidding stage.
[0077] After obtaining the stage cumulative budget data corresponding to each advertising bidding stage, advertising bidding operations can be performed in each advertising bidding stage based on the stage cumulative budget data corresponding to each advertising bidding stage. Specifically, automatic advertising bidding operations can be performed in each advertising bidding stage based on the stage cumulative budget data corresponding to each advertising bidding stage. In some instances, the advertising bidding operation can be implemented by a pre-trained machine learning model. In this case, based on the stage cumulative budget data corresponding to each advertising bidding stage, performing advertising bidding operations in each advertising bidding stage can include: obtaining a machine learning model for implementing the advertising bidding operation, inputting each advertising bidding stage and the stage cumulative budget data corresponding to each advertising bidding stage into the machine learning model, and obtaining the advertising bidding information in each advertising bidding stage output by the machine learning model.
[0078] In some other instances, the advertising bidding operation can be implemented not only through a pre-trained machine learning model, but also through a preset algorithm. In this case, based on the stage cumulative budget data corresponding to each advertising bidding stage, the advertising bidding operation in each advertising bidding stage may include: obtaining the number of advertising bidding opportunities included in each advertising bidding stage; based on the number of advertising bidding opportunities, evenly dividing the stage cumulative budget data of each advertising bidding stage to obtain advertising bidding information corresponding to each advertising bidding opportunity, the sum of the advertising bidding information of all advertising bidding opportunities is less than or equal to the stage cumulative budget data of the advertising bidding stage; and then, based on the advertising bidding information, the advertising bidding operation can be performed for each advertising bidding opportunity, thereby effectively ensuring the stability and reliability of the advertising bidding operation.
[0079] In other instances, in order to improve the practicality of the method, based on the stage cumulative budget data corresponding to each advertising bidding stage, after performing advertising bidding operations in each advertising bidding stage, the relevant information corresponding to the advertising bidding operation can be stored as reference information for the next advertising bidding cycle. At this time, the method in this embodiment may also include: obtaining the actual cumulative value and actual cumulative expenditure corresponding to each advertising bidding stage; and associating and storing the stage cumulative budget data, actual cumulative value and actual cumulative expenditure corresponding to each advertising bidding stage as historical bidding data for the next advertising bidding cycle.
[0080] Specifically, based on the cumulative budget data corresponding to each advertising bidding stage, after performing advertising bidding operations in each advertising bidding stage, the actual cumulative value and actual cumulative expenditure corresponding to each advertising bidding stage can be obtained or collected, wherein the actual cumulative value can be determined by the advertisement click-through rate and / or the advertisement conversion rate. In some instances, the actual cumulative value can be positively correlated with the advertisement click-through rate and / or the advertisement conversion rate, or the actual cumulative value can be positively correlated with the product of the advertisement click-through rate and the advertisement conversion rate; the actual cumulative expenditure can be obtained by statistically analyzing the actual expenditure of the advertising bidding operation.
[0081] For the actual cumulative value and the actual cumulative expenditure, the actual cumulative value may be the sum of the actual values corresponding to the multiple advertising bidding opportunities in the advertising bidding stage; the actual cumulative value may refer to the sum of the actual advertising bidding information corresponding to all advertising bidding opportunities in each advertising bidding stage. For example: one advertising bidding stage may include: advertising bidding opportunity a, advertising bidding opportunity b, advertising bidding opportunity c, advertising bidding opportunity d and advertising bidding opportunity e. The above-mentioned advertising bidding opportunity a corresponds to actual value 1 and actual expenditure 1, advertising bidding opportunity b corresponds to actual value 2 and actual expenditure 2, advertising bidding opportunity c corresponds to actual value 3 and actual expenditure 3, advertising bidding opportunity d corresponds to actual value 4 and actual expenditure 4, and advertising bidding information e corresponds to actual value 5 and actual expenditure 5. The actual cumulative value of the advertising bidding stage may be the actual value. 1. The sum of actual value 2, actual value 3, actual value 4 and actual value 5, that is, actual cumulative value = actual value 1 + actual value 2 + actual value 3 + actual value 4 + actual value 5; the actual cumulative expenditure corresponding to the advertising bidding stage can be the sum of actual expenditure 1, actual expenditure 2, actual expenditure 3, actual expenditure 4 and actual expenditure 5, that is, actual cumulative expenditure = actual expenditure 1 + actual expenditure 2 + actual expenditure 3 + actual expenditure 4 + actual expenditure 5, which effectively ensures the accuracy and reliability of obtaining the actual cumulative value and actual cumulative expenditure.
[0082] After obtaining the actual cumulative value and actual cumulative expenditure corresponding to each advertising bidding stage, the stage cumulative budget data, actual cumulative value and actual cumulative expenditure corresponding to each advertising bidding stage can be associated and stored as historical bidding data for the next advertising bidding cycle. This is conducive to accurate advertising bidding operations in the next advertising bidding cycle and ensures the quality and effectiveness of advertising bidding.
[0083] The advertising bidding method provided in this embodiment obtains an advertising bidding cycle and advertising total budget data corresponding to the advertising bidding cycle, divides the advertising bidding cycle into multiple advertising bidding stages, allocates the advertising total budget data to the multiple advertising bidding stages, obtains the stage cumulative budget data corresponding to each advertising bidding stage, and then performs advertising bidding operations in each advertising bidding stage based on the stage cumulative budget data corresponding to each advertising bidding stage, thereby effectively realizing advertising bidding operations without human intervention, and even realizing automatic bidding operations for advertisements, reducing the degree of interference of human factors on the advertising bidding process; and, by dividing an advertising bidding cycle into multiple advertising bidding stages, and then performing automatic bidding operations for each advertising bidding stage, it is realized that the long sequence decision problem of performing automatic bidding operations in an advertising bidding cycle is switched to multiple short sequence decision problems of performing automatic bidding operations in each advertising bidding stage, so that under the premise of limited advertising total budget data, the quality and effect of the advertising bidding operation can be guaranteed, which is conducive to bringing greater advertising delivery value to advertisers and satisfying the advertising delivery effect desired by users, further improving the practicality of the method.
[0084] Figure 3 A schematic diagram of a flow chart of obtaining budget allocation information corresponding to total advertising budget data provided by an embodiment of the present invention; based on the above embodiment, refer to the attached Figure 3 As shown, when the total advertising budget data is allocated to multiple advertising bidding stages based on the budget allocation information, the budget allocation information corresponding to the allocation operation can be obtained not only based on the human-computer interaction operation or the preset device, but also through the historical bidding data. At this time, obtaining the budget allocation information corresponding to the total advertising budget data may include:
[0085] Step S301: Obtain historical bidding data of the same advertiser's advertising bidding operations in the historical bidding cycle, the historical bidding data at least including: historical stage cumulative budget data corresponding to each historical bidding stage in the historical bidding cycle, historical actual cumulative value and historical actual cumulative expenditure.
[0086] In order to be able to stably determine the budget allocation information corresponding to the total advertising budget data based on the historical bidding data, the historical bidding data of the advertising bidding operations performed by the same advertiser in the historical bidding cycle can be first obtained. In some instances, the historical bidding data can be stored in a preset area or a preset device. At this time, the historical bidding data of the advertising bidding operations performed by the same advertiser in the historical bidding cycle can be obtained by accessing the preset area or the preset device. This effectively ensures the accuracy and reliability of the acquisition of the historical bidding data. The historical bidding data can at least include: the historical stage cumulative budget data corresponding to each historical bidding stage in the historical bidding cycle, the historical actual cumulative value and the historical actual cumulative expenditure.
[0087] Step S302: Based on the historical bidding data, determine the budget allocation information corresponding to the total advertisement budget data.
[0088] After the historical bid data is obtained, the historical bid data may be analyzed and processed to determine budget allocation information corresponding to the total advertising budget data. In some instances, the budget allocation information may be obtained through a pre-trained machine learning model. In this case, based on the historical bid data, determining the budget allocation information corresponding to the total advertising budget data may include: obtaining a machine learning model for determining budget allocation information; inputting the historical bid data and the total advertising budget data into the machine learning model to obtain the budget allocation information output by the machine learning model.
[0089] Among them, a machine learning model for determining budget allocation information is pre-trained, and the machine learning model can be stored in a preset area or a preset device. At this time, the machine learning model for determining budget allocation information can be obtained by accessing the preset area or the preset device. After obtaining the machine learning model for determining budget allocation information, historical bidding data and total advertising budget data can be input into the machine learning model. The historical bidding data input into the machine learning model can be data corresponding to any number of historical bidding cycles, and the budget allocation information output by the machine learning model is obtained, which effectively ensures the stability and reliability of determining the budget allocation information.
[0090] It should be noted that for machine learning models, in order to ensure the reasoning quality and effect of machine learning models, after performing advertising bidding operations in each advertising bidding stage based on the cumulative budget data corresponding to each advertising bidding stage, users can use the advertising bidding-related data corresponding to the advertising bidding cycle to optimize and adjust the machine learning model according to application requirements or design requirements. Specifically, the cumulative budget data, actual cumulative value and actual cumulative expenditure corresponding to each advertising bidding stage corresponding to the advertising bidding cycle can be used to optimize and adjust the machine learning model, so as to obtain an optimized machine learning model. The optimized machine learning model can be used to perform advertising bidding operations in the next advertising bidding cycle, further ensuring the quality and effect of the advertising bidding operation.
[0091] In some other instances, budget allocation information can not only be obtained through a pre-trained machine learning model, but also can be determined through the correlation relationship corresponding to the historical bidding data. At this time, based on the historical bidding data, determining the budget allocation information corresponding to the total advertising budget data may include: based on the historical bidding data, determining the correlation relationship between the historical stage cumulative budget data, the historical actual cumulative value, and the historical actual cumulative expenditure corresponding to each historical bidding stage; based on the correlation relationship, determining the budget allocation information.
[0092] Specifically, after obtaining the historical bidding data, the historical bidding data can be analyzed and processed to determine the correlation between the historical stage cumulative budget data, the historical actual cumulative value, and the historical actual cumulative expenditure corresponding to each historical bidding stage. In some instances, the correlation can be determined by analyzing and processing the historical stage cumulative budget data, the historical actual cumulative value, and the historical actual cumulative expenditure corresponding to each historical bidding stage using a pre-trained machine learning model.
[0093] In other instances, the association relationship can be obtained by analyzing and processing the historical stage cumulative budget data, historical actual cumulative value and historical actual cumulative expenditure corresponding to each historical bidding stage through a preset algorithm. At this time, based on the historical bidding data, determining the association relationship between the historical stage cumulative budget data, historical actual cumulative value and historical actual cumulative expenditure corresponding to each historical bidding stage can include: determining the advertising cost-effectiveness of each historical bidding stage based on the historical actual cumulative value and actual cumulative expenditure of each historical bidding stage in the historical bidding data; determining the association information between the advertising cost-effectiveness of each historical bidding stage and the historical stage cumulative budget data.
[0094] Since an advertising bidding cycle includes multiple advertising bidding stages, when advertising bidding operations are performed in each advertising bidding stage, the advertising bidding opportunities or advertising display opportunities in different advertising bidding stages may correspond to different advertising cost-effectiveness, and the level of advertising cost-effectiveness has a greater impact on the budget allocation operation of the total advertising budget data. Therefore, after obtaining the historical bidding data, the historical actual cumulative value and actual cumulative expenditure of each historical bidding stage in the historical bidding data can be analyzed and processed to determine the advertising cost-effectiveness of each historical bidding stage. In some instances, advertising cost-effectiveness = historical actual cumulative value / actual cumulative expenditure, or advertising cost-effectiveness = preset coefficient * historical actual cumulative value / actual cumulative expenditure. This effectively ensures the accuracy and reliability of determining the advertising cost-effectiveness.
[0095] After obtaining the advertising cost-effectiveness of each historical bidding stage, the advertising cost-effectiveness of each historical bidding stage and the cumulative budget data of the historical stage can be analyzed and processed to determine the correlation information between the advertising cost-effectiveness of each historical bidding stage and the cumulative budget data of the historical stage, that is, the correlation between the changing trend of the advertising cost-effectiveness of each historical bidding stage and the changing trend of the cumulative budget data of the historical stage can be obtained. In some instances, the obtained correlation is used to identify that the cumulative budget data of the historical stage is positively correlated with the advertising cost-effectiveness, that is, for the historical bidding stage with higher advertising cost-effectiveness, higher historical stage cumulative budget data will be allocated; for the historical bidding stage with lower advertising cost-effectiveness, lower historical stage cumulative budget data will be allocated. This effectively ensures the accuracy and reliability of determining the correlation.
[0096] When the association relationship is used to identify that the cumulative budget data of the historical stage is positively correlated with the advertising cost-effectiveness, in order to facilitate understanding of the allocation operation of the total advertising budget data, the following takes the advertising bidding cycle including the first bidding stage and the second bidding stage as an example for explanation. At this time, the total advertising budget data is allocated to multiple advertising bidding stages based on the budget allocation information, and obtaining the stage cumulative budget data corresponding to each advertising bidding stage may include: allocating a budget to the first bidding stage based on the budget allocation information and the total advertising budget data, and obtaining the first stage cumulative budget data corresponding to the first bidding stage; allocating a budget to the second bidding stage based on the budget allocation information and the total advertising budget data, and obtaining the second stage cumulative budget data corresponding to the second bidding stage. budget data; wherein, when the advertising cost performance ratio of the first bidding stage is higher than that of the second bidding stage, the accumulative budget data of the first stage is greater than the accumulative budget data of the second stage; when the advertising cost performance ratio of the first bidding stage is lower than that of the second bidding stage, the accumulative budget data of the first stage is less than the accumulative budget data of the second stage, thus effectively achieving that for the advertising bidding stage with higher cost performance of the advertising display opportunity, the stage accumulative budget data allocated to the advertising bidding stage is increased, and for the advertising bidding stage with lower cost performance of the advertising display opportunity, the stage accumulative budget data allocated to the advertising bidding stage is reduced, thereby improving the flexibility and reliability of allocating the total advertising budget data.
[0097] It should be noted that an advertising bidding cycle not only includes the above-mentioned two advertising bidding stages (i.e., the first bidding stage and the second bidding stage), but may also include three or more advertising bidding stages. When the advertising bidding cycle includes multiple advertising bidding stages, when the budget allocation operation of the total advertising budget data is performed on any two advertising bidding stages in the advertising bidding cycle, the advertising cost-effectiveness corresponding to any two advertising bidding stages and the cumulative budget data of the stages to be allocated all satisfy the above-mentioned obtained association relationship, thereby effectively realizing the stable reliability of the budget allocation operation on the total advertising budget data based on the association relationship.
[0098] In this embodiment, by obtaining historical bidding data of the same advertiser performing advertising bidding operations in historical bidding cycles, and then determining the budget allocation information corresponding to the total advertising budget data based on the historical bidding data, the accuracy and reliability of the determination of the budget allocation information is effectively guaranteed. Then, the total advertising budget data can be allocated to multiple advertising bidding stages based on the budget allocation information, and the stage cumulative budget data corresponding to each advertising bidding stage can be stably obtained. Then, the advertising bidding operation can be performed based on the stage cumulative budget data, which effectively improves the practicality of the advertising bidding method.
[0099] For specific applications, refer to the attached Figure 4As shown, this application embodiment provides an automatic advertising bidding method, which can alleviate the suboptimal bidding caused by the long sequence decision problem of the current automatic advertising bidding algorithm, thereby helping to improve the cumulative value of the advertisements placed by the advertiser. Specifically, the execution subject of the automatic bidding method can be an automatic bidding platform, which includes a budget planner at the top layer and an automatic bidder at the bottom layer, wherein the budget planner is communicatively connected with the automatic bidder, and both the budget planner at the top layer and the automatic bidder at the bottom layer aim to maximize the cumulative value of the advertiser.
[0100] Based on the above automatic bidding platform, the automatic bidding method may include:
[0101] Step 1: Obtain an advertising bidding cycle, and divide the advertising bidding cycle into multiple advertising bidding stages.
[0102] Specifically, after obtaining the advertising bidding cycle, one advertising bidding cycle can be divided into m stages. For example, when an advertising bidding cycle is 1 day, one day can be divided into 24 advertising bidding stages in units of one hour; or, one day can be divided into 48 advertising bidding cycles in units of half an hour, or one day can be divided into 12 advertising bidding stages in units of two hours, and so on. Technical personnel in this field can adjust the division granularity of the advertising bidding cycle according to specific application requirements or scenario requirements, which will not be repeated here.
[0103] Step 2: Obtain the total advertising budget data corresponding to the advertising bidding cycle, use the top-level budget planner to allocate the total advertising budget data to multiple advertising bidding stages, and obtain the stage cumulative budget data corresponding to each advertising bidding stage.
[0104] The budget planner can allocate the total advertising budget data based on the historical bidding data of the same advertiser in the historical bidding cycle (the number is at least one). Specifically, the top-level budget planner is used to allocate the total advertising budget data to multiple advertising bidding stages, and the stage cumulative budget data corresponding to each advertising bidding stage is obtained, including: obtaining the historical bidding data of the same advertiser in the historical bidding cycle for advertising bidding operations, the historical bidding data at least including: the historical stage cumulative budget data corresponding to each historical bidding stage in the historical bidding cycle, the historical actual cumulative value and the historical actual cumulative expenditure; based on each historical bidding data The advertising cost-effectiveness of each historical bidding stage is determined by combining the historical actual cumulative value and the historical actual cumulative expenditure of each historical bidding stage, wherein the advertising cost-effectiveness can be equal to the historical actual cumulative value / actual cumulative expenditure; the correlation information between the advertising cost-effectiveness of each historical bidding stage and the cumulative budget data of the historical stage is determined, and the correlation relationship is used to identify that the cumulative budget data of the historical stage is positively correlated with the advertising cost-effectiveness; based on the correlation relationship, the total advertising budget data is allocated to multiple advertising bidding stages, and the stage cumulative budget data corresponding to each advertising bidding stage is obtained. The stage cumulative budget data corresponding to each advertising bidding stage obtained can be provided to the underlying automatic bidder as a budget consumption plan.
[0105] It should be noted that the above-mentioned principle of allocating the total advertising budget data can be implemented not only through a preset algorithm, but also through a pre-trained machine learning model. At this time, the budget planner may include a machine learning model for dividing the total advertising budget data based on the above-mentioned budget allocation principle. After obtaining the historical bidding data, multiple advertising bidding stages and the total advertising budget data, the historical bidding data, multiple advertising bidding stages and the total advertising budget data can be input into the machine learning model for processing, so as to obtain the stage cumulative budget data corresponding to each advertising bidding stage output by the machine learning model.
[0106] Step 3: The bottom-level automatic bidder can perform automatic bidding operations at each advertising bidding stage based on the budget consumption plan obtained by the top-level budget planner.
[0107] Among them, after the top-level budget planner formulates a budget consumption plan for all advertising bidding stages within an advertising bidding cycle, the bottom-level automatic bidder can bid using a corresponding bidding algorithm in each advertising bidding stage based on the budget consumption plan. For the automatic bidder, the bidding algorithm may include at least one of the following: a proportional-integral-derivative (PID) bidding algorithm, a linear programming (LP) bidding algorithm, and a reinforcement learning (RL) bidding algorithm. This realizes the combination of the top-level budget planner and the various automatic bidding algorithms at the bottom level, thereby enhancing the effect of automatic bidding. Specifically:
[0108] (1) The implementation principle of the PID algorithm can refer to the description in the above embodiments. When the bottom-level automatic bidder performs automatic bidding based on the PID algorithm, the top-level budget planner formulates a budget consumption plan, and then the automatic bidding can be performed based on the budget consumption plan. In this way, the accumulated budget data can be increased during the advertising bidding stage with high cost performance of the advertising display opportunity, and the accumulated budget data can be reduced during the advertising bidding stage with low cost performance of the advertising display opportunity. This effectively solves the problem of not optimizing the advertiser's accumulated value when the existing automatic bidding operation based on the PID algorithm is performed alone, thereby optimizing the advertiser's accumulated value.
[0109] (2) The implementation principle of the LP algorithm is as follows: a bid coefficient is pre-configured for the advertising bidding operation, the bid coefficient of the advertiser is updated at regular intervals, and when an advertising bidding opportunity (or advertising display opportunity) arrives, the product of the bid coefficient and the estimated value of the advertising bidding opportunity is used as the specific advertising bid. The bid coefficient can be updated by a linear programming method. Specifically, based on the current remaining budget and the historical bid log of the previous bidding cycle (including bids, market prices, estimated values, etc.), a linear programming method is used to solve the ex post optimal bid coefficient for historical data.
[0110] When the bottom-level automatic bidder performs automatic bidding based on the LP algorithm, the top-level budget planner can formulate or generate a budget consumption plan based on historical bidding data from multiple historical bidding cycles, thereby effectively reducing the reliance on historical bidding data from the previous advertising bidding cycle.
[0111] (3) The implementation principle of the RL algorithm is as follows: the automatic bidding problem is modeled as a Markov Decision Process (MDP). In this decision-making process, the advertising bidding operation updates the advertiser's bid coefficient at regular intervals. When an advertising bidding opportunity comes, the specific advertising bid is calculated based on the bid coefficient and the estimated value of the advertising bidding opportunity. The bidding strategy is then learned through online or offline reinforcement learning.
[0112] When the bottom-level automatic bidder performs automatic bidding based on the RL algorithm, the top-level budget planner can split an advertising bidding cycle into multiple shorter advertising bidding stages. This effectively reduces the high learning difficulty of the RL bidding algorithm due to the long sequence decision-making problem.
[0113] From the above, it can be seen that since the scheme does not limit the bidding algorithm or bidding principle of the automatic bidder at the bottom layer, in the specific implementation, the automatic bidder can choose any automatic bidding algorithm that spends the specified budget within the specified time (including the PID-based, LP-based and RL-based bidding algorithms included in the above description); therefore, the layered automatic bidding architecture has strong compatibility and does not require users to make too many modifications to the implementation principle or implementation algorithm of the automatic bidder, so that the automatic bidding platform has high integration and adaptability.
[0114] It should be noted that one advertising bidding stage may include multiple advertising bidding opportunities, and the automatic bidder can perform automatic bidding operations for each advertising bidding opportunity. Regardless of the bidding strategy adopted, the following conditions must be met: the total advertising bid corresponding to all advertising bidding opportunities must be less than or equal to the cumulative budget data of the stage corresponding to the advertising bidding stage.
[0115] In addition, for the budget planner in the automatic bidding platform, since there are a large number of cold-start advertisers with insufficient historical bidding data in the advertising system or the automatic bidding platform, the budget planner can be configured as a budget planner with a small sample adaptability. Specifically, the budget planning problem can be modeled as a Markov decision process (MDP for short). The decision process takes one advertising bidding cycle (for example, one day) as a decision step. In each decision step, the information that the budget planner can observe includes: the advertiser's total advertising budget data, and the advertiser's historical budget consumption plan at all stages of each historical advertising bidding cycle, the cumulative value of the historical stage, and the cumulative expenditure of the historical stage.
[0116] For example, Figure 4 In Indicates the historical stage cumulative budget data for the first advertising bidding stage in the 0th advertising bidding cycle. Indicates the historical cumulative budget data for the second advertising bidding stage in the 0th advertising bidding cycle. Represents the historical stage cumulative budget data in the mth advertising bidding stage in the 0th advertising bidding cycle. It indicates the historical cumulative value (actual value) of the first advertising bidding stage in the 0th advertising bidding cycle. Indicates the historical cumulative value of the second advertising bidding stage in the 0th advertising bidding cycle. Represents the historical cumulative value of the mth advertising bidding stage in the 0th advertising bidding cycle. Indicates the historical cumulative expenditure (actual expenditure) in the first advertising bidding stage of the 0th advertising bidding cycle. Indicates the historical cumulative expenditure in the second advertising bidding stage of the 0th advertising bidding cycle. It represents the accumulated expenditure in the historical stage of the mth advertising bidding stage in the 0th advertising bidding cycle, and so on.
[0117] After the budget planner obtains the above observation data, the top-level planner can formulate or generate a new budget consumption plan before the new advertising bidding cycle arrives, and then the bottom-level automatic bidder performs automatic bidding operations according to the budget consumption plan. Finally, after the end of the advertising bidding cycle, the feedback information of the budget planner can be calculated based on the actual accumulated value of the advertising bidding cycle, and the budget planner can be optimized and adjusted based on the feedback information.
[0118] In addition, after the end of the advertising bidding cycle, the budget consumption plan corresponding to the advertising bidding cycle, the cumulative value of each advertising bidding stage, the cumulative expenditure of each advertising bidding stage and other information can be collected, and the above information can be associated and stored as historical bidding reference data for the next advertising bidding cycle. This effectively realizes that only historical bidding data of at least one historical bidding cycle is needed to realize automatic advertising bidding operations, and in the process of automatic advertising bidding operations, the collection operation of historical bidding reference data is simultaneously realized, thereby enabling the budget planner to have the ability to adapt to a small number of samples.
[0119] The technical solution provided by the present application embodiment realizes a layered automatic bidding architecture. Specifically, the top-level budget planner can split an advertising bidding cycle into multiple advertising bidding stages of relatively short time, which can effectively alleviate the long sequence decision-making problem existing in the automatic bidding operation of the bottom-level automatic bidder, and the bottom-level automatic bidder can adapt to various bidding algorithms, including PID, LP and RL, etc., which effectively realizes the use of the upper-level budget planner to enhance the lower-level automatic bidding algorithm; in addition, the budget planner at the top level can adjust the budget allocation of each advertising bidding stage according to the historical bidding data of different advertising bidding stages. Specifically, the budget planner can automatically calculate the budget consumption plan before the next advertising bidding cycle according to the information or data of the advertiser's historical bidding cycle, so as to adapt to the advertising bidding environment, which is conducive to optimizing or improving the cumulative value of the advertiser, further improving the quality and effect of the advertising bidding operation, and ensuring the practicality of the technical solution.
[0120] Figure 5 A schematic diagram of the structure of an advertisement bidding device provided by an embodiment of the present invention; Figure 5 As shown, this embodiment provides an advertisement bidding device, which is used to perform the above Figure 2 The advertising bidding method shown, the advertising bidding device may include:
[0121] The first acquisition module 11 is used to acquire the advertisement bidding cycle and the advertisement total budget data corresponding to the advertisement bidding cycle;
[0122] A first division module 12, used to divide the advertisement bidding cycle into multiple advertisement bidding stages;
[0123] The first determination module 13 is used to allocate the total advertising budget data to multiple advertising bidding stages, and obtain the stage cumulative budget data corresponding to each advertising bidding stage;
[0124] The first processing module 14 is used to perform an advertisement bidding operation in each advertisement bidding stage based on the stage accumulated budget data corresponding to each advertisement bidding stage.
[0125] In some instances, when the first division module 12 divides the advertising bidding cycle into multiple advertising bidding stages, the first division module 12 is used to execute: obtaining a duration parameter for limiting the advertising bidding stage, the duration parameter being greater than or equal to a preset duration; and dividing the advertising bidding cycle evenly into multiple advertising bidding stages based on the duration parameter.
[0126] In some instances, when the first determination module 13 allocates the total advertising budget data to multiple advertising bidding stages and obtains the stage cumulative budget data corresponding to each advertising bidding stage, the first determination module 13 is used to execute: obtaining budget allocation information corresponding to the total advertising budget data; allocating the total advertising budget data to multiple advertising bidding stages based on the budget allocation information, and obtaining the stage cumulative budget data corresponding to each advertising bidding stage.
[0127] In some instances, when the first determination module 13 obtains budget allocation information corresponding to the total advertising budget data, the first determination module 13 is used to execute: obtaining historical bidding data of the same advertiser performing advertising bidding operations in a historical bidding cycle, the historical bidding data at least including: historical stage cumulative budget data, historical actual cumulative value, and historical actual cumulative expenditure corresponding to each historical bidding stage in the historical bidding cycle; based on the historical bidding data, determining the budget allocation information corresponding to the total advertising budget data.
[0128] In some instances, when the first determination module 13 determines the budget allocation information corresponding to the total advertising budget data based on the historical bidding data, the first determination module 13 is used to execute: obtaining a machine learning model for determining the budget allocation information; inputting the historical bidding data and the total advertising budget data into the machine learning model to obtain the budget allocation information output by the machine learning model.
[0129] In some instances, when the first determination module 13 determines the budget allocation information corresponding to the total advertising budget data based on the historical bidding data, the first determination module 13 is used to execute: determining the correlation between the historical stage cumulative budget data, the historical actual cumulative value and the historical actual cumulative expenditure corresponding to each historical bidding stage based on the historical bidding data; and determining the budget allocation information based on the correlation.
[0130] In some instances, when the first determination module 13 determines the correlation between the historical stage cumulative budget data, the historical actual cumulative value and the historical actual cumulative expenditure corresponding to each historical bidding stage based on the historical bidding data, the first determination module 13 is used to execute: determining the advertising cost-effectiveness of each historical bidding stage based on the historical actual cumulative value and the historical actual cumulative expenditure of each historical bidding stage in the historical bidding data; determining the correlation information between the advertising cost-effectiveness of each historical bidding stage and the historical stage cumulative budget data, the correlation relationship is used to identify that the historical stage cumulative budget data is positively correlated with the advertising cost-effectiveness.
[0131] In some instances, the advertising bidding cycle includes a first bidding stage and a second bidding stage; when the first determination module 13 allocates the total advertising budget data to multiple advertising bidding stages based on the budget allocation information and obtains the stage cumulative budget data corresponding to each advertising bidding stage, the first determination module 13 is used to execute: allocating a budget to the first bidding stage based on the budget allocation information and the total advertising budget data, and obtaining the first stage cumulative budget data corresponding to the first bidding stage; allocating a budget to the second bidding stage based on the budget allocation information and the total advertising budget data, and obtaining the second stage cumulative budget data corresponding to the second bidding stage; wherein, when the advertising cost-effectiveness of the first bidding stage is higher than that of the second bidding stage, the first stage cumulative budget data is greater than the second stage cumulative budget data; when the advertising cost-effectiveness of the first bidding stage is lower than that of the second bidding stage, the first stage cumulative budget data is less than the second stage cumulative budget data.
[0132] In some examples, after performing an advertisement bidding operation in each advertisement bidding stage based on the stage accumulated budget data corresponding to each advertisement bidding stage, the first acquisition module 11 and the first processing module 14 in this embodiment are used to perform the following steps:
[0133] The first acquisition module 11 is used to acquire the actual accumulated value and actual accumulated expenditure corresponding to each advertising bidding stage;
[0134] The first processing module 14 is used to associate and store the stage cumulative budget data, actual cumulative value and actual cumulative expenditure corresponding to each advertisement bidding stage, so as to serve as the historical bidding data for the next advertisement bidding cycle.
[0135] Figure 5 The device shown can perform Figure 1-Figure 4 For the method of the embodiment shown in the figure, the part not described in detail in this embodiment can be referred to Figure 1-Figure 4 The implementation process and technical effects of this technical solution refer to Figure 1-Figure 4 The description in the illustrated embodiment will not be repeated here.
[0136] In one possible design, Figure 5 The structure of the advertising bidding device shown can be implemented as an electronic device, which can be a controller, a personal computer, a server, or other devices. Figure 6 As shown, the electronic device may include: a first processor 21 and a first memory 22. The first memory 22 is used to store the corresponding electronic device to execute the above Figure 1-Figure 4 The program of the advertisement bidding method provided in the illustrated embodiment, the first processor 21 is configured to execute the program stored in the first memory 22 .
[0137] The program includes one or more computer instructions, wherein the one or more computer instructions, when executed by the first processor 21, can implement the following steps: obtaining an advertising bidding cycle and total advertising budget data corresponding to the advertising bidding cycle; dividing the advertising bidding cycle into multiple advertising bidding stages; allocating the total advertising budget data to multiple advertising bidding stages, and obtaining the stage cumulative budget data corresponding to each advertising bidding stage; and performing advertising bidding operations in each advertising bidding stage based on the stage cumulative budget data corresponding to each advertising bidding stage.
[0138] Furthermore, the first processor 21 is also used to execute the aforementioned Figure 1-Figure 4 All or part of the steps in the illustrated embodiments.
[0139] The structure of the electronic device may further include a first communication interface 23 for the electronic device to communicate with other devices or a communication network.
[0140] In addition, an embodiment of the present invention provides a computer storage medium for storing computer software instructions used by electronic devices, which includes instructions for executing the above Figure 1-Figure 4 The procedures involved in the advertisement bidding method in the illustrated embodiment.
[0141] In addition, an embodiment of the present invention provides a computer program product, including: a computer-readable storage medium storing computer instructions, when the computer instructions are executed by one or more processors, causing the one or more processors to execute the above Figure 1-Figure 4 The steps in the advertisement bidding method in the method embodiment are shown.
[0142] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with the relevant laws, regulations and standards of the relevant countries and regions, and provide corresponding operation entrances for users to choose to authorize or refuse.
[0143] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, i.e., they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative effort.
[0144] Through the description of the above embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by adding a necessary general hardware platform, and of course can also be implemented by combining hardware and software. Based on such an understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a computer product, and the present invention can be in the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0145] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable device to produce a machine, so that the instructions executed by the processor of the computer or other programmable device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0146] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable device to work in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be loaded onto a computer or other programmable device so that a series of operation steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide the functions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps of the functions specified in the blocks or multiple blocks. In a typical configuration, the computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory. The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0147] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include transitory media such as modulated data signals and carrier waves.
[0148] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An advertisement bidding method, characterized in that: include: Acquire an advertisement bidding cycle and total advertisement budget data corresponding to the advertisement bidding cycle; Dividing the advertisement bidding cycle into a plurality of advertisement bidding stages; Allocating the total advertising budget data to the multiple advertising bidding stages to obtain the stage cumulative budget data corresponding to each advertising bidding stage; Based on the stage accumulated budget data corresponding to each advertising bidding stage, an advertising bidding operation is performed in each advertising bidding stage.
2. The method according to claim 1, characterized in that The advertisement bidding cycle is divided into multiple advertisement bidding stages, including: Acquire a duration parameter for limiting an advertisement bidding phase, where the duration parameter is greater than or equal to a preset duration; The advertisement bidding cycle is evenly divided into a plurality of advertisement bidding stages based on the duration parameter.
3. The method according to claim 1 or 2, characterized in that: Allocating the total advertising budget data to the multiple advertising bidding stages to obtain the stage cumulative budget data corresponding to each advertising bidding stage includes: Acquire budget allocation information corresponding to the total advertising budget data; The total advertisement budget data is allocated to the multiple advertisement bidding stages based on the budget allocation information, and the stage cumulative budget data corresponding to each advertisement bidding stage is obtained.
4. The method according to claim 3, characterized in that Acquiring budget allocation information corresponding to the total advertising budget data includes: Obtaining historical bidding data of the same advertiser's advertising bidding operations in the historical bidding cycle, the historical bidding data at least including: historical stage cumulative budget data, historical actual cumulative value, and historical actual cumulative expenditure corresponding to each historical bidding stage in the historical bidding cycle; Budget allocation information corresponding to the total advertisement budget data is determined based on the historical bidding data.
5. The method according to claim 4, characterized in that Determining budget allocation information corresponding to the total advertising budget data based on the historical bidding data includes: Obtaining machine learning models for determining budget allocation information; The historical bidding data and the total advertising budget data are input into the machine learning model to obtain the budget allocation information output by the machine learning model.
6. The method according to claim 4, characterized in that Determining budget allocation information corresponding to the total advertising budget data based on the historical bidding data includes: Based on the historical bidding data, determining the correlation between the historical stage cumulative budget data, the historical actual cumulative value and the historical actual cumulative expenditure corresponding to each historical bidding stage; Based on the association relationship, the budget allocation information is determined.
7. The method according to claim 6, characterized in that Based on the historical bidding data, the correlation between the historical stage cumulative budget data, the historical actual cumulative value and the historical actual cumulative expenditure corresponding to each historical bidding stage is determined, including: Determine the advertising cost performance of each historical bidding stage based on the historical actual accumulated value and the historical actual accumulated expenditure of each historical bidding stage in the historical bidding data; The correlation information between the advertising cost performance ratio of each of the historical bidding stages and the accumulated budget data of the historical stages is determined, wherein the correlation relationship is used to identify that the accumulated budget data of the historical stages is positively correlated with the advertising cost performance ratio.
8. The method according to claim 7, characterized in that The advertisement bidding cycle includes a first bidding stage and a second bidding stage; allocating the total advertisement budget data to the multiple advertisement bidding stages based on the budget allocation information, and obtaining the stage cumulative budget data corresponding to each advertisement bidding stage, including: Allocate a budget for the first bidding stage based on the budget allocation information and the total advertising budget data, and obtain first-stage cumulative budget data corresponding to the first bidding stage; Allocate a budget for the second bidding stage based on the budget allocation information and the total advertising budget data, and obtain second-stage cumulative budget data corresponding to the second bidding stage; Among them, when the advertising cost-effectiveness of the first bidding stage is higher than that of the second bidding stage, the cumulative budget data of the first stage is greater than the cumulative budget data of the second stage; when the advertising cost-effectiveness of the first bidding stage is lower than that of the second bidding stage, the cumulative budget data of the first stage is less than the cumulative budget data of the second stage.
9. The method according to claim 1 or 2, characterized in that: After performing an advertisement bidding operation in each advertisement bidding stage based on the stage accumulated budget data corresponding to each advertisement bidding stage, the method further includes: Obtain the actual cumulative value and actual cumulative expenditure corresponding to each advertising bidding stage; The stage accumulated budget data, the actual accumulated value and the actual accumulated expenditure corresponding to each advertisement bidding stage are associated and stored to serve as historical bidding data for the next advertisement bidding cycle.
10. An advertising bidding device, characterized in that: include: A first acquisition module, used to acquire an advertisement bidding cycle and advertisement total budget data corresponding to the advertisement bidding cycle; A first division module, used to divide the advertisement bidding cycle into a plurality of advertisement bidding stages; A first determination module is used to allocate the total advertising budget data to the multiple advertising bidding stages to obtain the stage cumulative budget data corresponding to each advertising bidding stage; The first processing module is used to perform an advertisement bidding operation in each advertisement bidding stage based on the stage accumulated budget data corresponding to each advertisement bidding stage.
11. An electronic device, characterized in that: include: A memory, a processor; wherein the memory is used to store one or more computer instructions, wherein the one or more computer instructions, when executed by the processor, implement the method as described in any one of claims 1-9.
12. A computer storage medium, characterized in that: Used to store a computer program, which enables a computer to implement the method of any one of claims 1 to 9 when executed.
13. A computer program product, characterized in that include: A computer program, when executed by a processor of an electronic device, causes the processor to execute the steps of any one of the methods of claims 1 to 9.
Citation Information
Cited By
Advertisement automatic bidding method and system based on predictive delivery planning
CN120746653A
