Storage early warning system based on electrical equipment test and analysis method thereof

By designing a power equipment test storage early warning system, using real-time monitoring and data analysis modules, a multi-level early warning threshold area is established, which solves the error problem caused by human dependence in the existing technology, realizes automated data analysis and early warning of power equipment, and improves efficiency. Equipment maintenance accuracy and efficiency.

CN118865641APending Publication Date: 2024-10-29HAIXI POWER SUPPLY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411070868.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

The data entry and early warning process in existing power equipment testing relies on a large amount of manpower, has errors and is not automated enough, and cannot achieve accurate storage and early warning.

Method used

A test storage early warning system based on electric power equipment is designed, including a storage unit, an early warning unit and a management platform. It uses a real-time monitoring module, a data acquisition module, a data analysis module and a remote data transmission module to regulate and regulate safety thresholds and safety assessments. Establish multi-level early warning threshold areas and early warning level triggering mechanisms to achieve automated data analysis and early warning.

Benefits of technology

It reduces human participation, reduces errors, achieves more accurate equipment maintenance and inspection cycle management, and improves the automation level of data storage and early warning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118865641A_ABST
    Figure CN118865641A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power equipment, and discloses a power equipment test-based storage early warning system, which comprises a storage unit, an early warning unit and a management platform, and is characterized in that the storage unit and the early warning unit form a storage early warning system, and the storage early warning system is connected with the management platform. The storage unit and the early warning unit are connected through network signals. The remote data transmission and control module is arranged, the real-time data acquisition modules send acquired data to the remote data transmission and control module through a network, and the local computer module / remote management monitoring computer module is matched with the data analysis module to judge and analyze the acquired data. Therefore, manpower is saved, manpower participation is reduced, errors caused by personnel negligence are reduced, and equipment maintenance and overhaul can be more accurately carried out according to a corresponding period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power equipment, and in particular to an early warning system based on electric power equipment test storage and an analysis method thereof. Background Art

[0002] Power equipment is a general term for some facilities, such as generators, power lines, mutual inductors, grounding devices, etc. In addition, electrical equipment is very important in daily life. In power plants, it is through electrical equipment that the normal transmission of electricity is achieved, thereby meeting people's normal needs. Nowadays, in the process of testing power equipment, with the help of relevant test equipment, various inspections and tests are carried out on the newly shipped, installed and in-service power equipment in accordance with certain methods and standards to find insulation defects in the equipment.

[0003] However, the existing power equipment manually enters and stores the data after the test, and manually predicts the cycle and makes plans, but it requires too much manpower, and the manual data entry and storage have large errors, and cannot achieve corresponding storage and early warning. To this end, we provide an early warning system based on power equipment test storage and its analysis method, which saves manpower, reduces human participation, reduces errors caused by human negligence, and more accurately performs equipment maintenance and inspection according to the corresponding cycle. Summary of the invention

[0004] The purpose of the present invention is to provide an early warning system based on power equipment test storage and an analysis method thereof to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a storage warning system based on power equipment test, comprising a storage unit, a warning unit and a management platform, wherein the storage unit and the warning unit constitute a storage warning system, the storage warning system is connected to the management platform, and the storage unit and the warning unit are connected via a network signal; the management platform has built-in safety threshold control and safety assessment control; The storage unit includes multiple real-time monitoring modules, multiple real-time data acquisition modules, a data micro storage module, a data management module, a report entry module and a data analysis module; The storage unit also includes a remote data transmission and control module; The early warning unit includes an alarm module B and a processing control module, wherein the alarm module B is connected to the processing control module by signal, and the alarm module B is connected to the alarm module A by signal; The safety threshold control obtains data information in the data analysis module and compares it with the data information to establish a test storage strain warning level division model. The model obtains the storage data packet sent by the power equipment. The storage data packet includes power data and characteristic information of the power data. The characteristic information of the power data includes the data volume, transmission time, regional information, transmission bytes, transmission protocol and other information of the power data. Combined with the actual safety threshold, the corresponding information image including the data volume, transmission time, regional information, transmission bytes, transmission protocol and other information of the power data is drawn, and divided into a first-level warning threshold area, a second-level warning threshold area, a third-level warning threshold area, a fourth-level warning threshold area and other multi-level warning threshold areas. The corresponding colors in the information image are green, blue, yellow, red and other different colors. According to the corresponding colors, the warning level trigger mechanism is obtained; The safety assessment and control evaluates the information of the multi-level warning threshold area. If abnormal information is found, the corresponding warning level trigger mechanism is activated. The safety assessment and control then feeds back the information to the site maintenance personnel for reverse feedback control or manual maintenance, providing real-time warning for decision-making on response measures.

[0006] Preferably, multiple real-time monitoring modules are connected to multiple real-time data acquisition modules via network signals, multiple real-time data acquisition modules are connected to data micro storage modules via network signals, the data micro storage modules are connected to data management modules via network signals, the data management modules are connected to report entry modules via network signals, and the report entry modules are connected to data analysis modules via network signals.

[0007] Preferably, the plurality of real-time data acquisition modules send the acquired data to the remote data transmission and control module through the network.

[0008] Preferably, the remote data transmission and control module includes a local computer module, a remote management and monitoring computer module and an alarm module A.

[0009] Preferably, multiple real-time monitoring modules are used to detect data generated by various power equipment tests; multiple real-time data acquisition modules are used to collect test data of various power equipment after detection; the data micro storage module is used to abstract different types of collected data using virtualization technology, so that all abstract data are integrated in the storage resource library, realizing the mapping from physical devices to logical views, and at the same time realizing centralized management, status monitoring and dynamic expansion of storage data; the data management module is used to coordinate multiple storage data by allocating data storage and data upload based on the operating status of different storage disks; the report entry module is used to enter multiple storage data in the form of reports to facilitate centralized analysis of the storage data; the data analysis module is used to analyze each entered storage data one by one to determine whether it is normal.

[0010] Preferably, the local computer module and the remote management and monitoring computer module both collect data through a network connection, the local computer module saves the collected data in a local database, the remote management and monitoring computer module saves the collected data in a remote database, and the alarm module A is signal-connected to the data analysis module, the local computer module, and the remote management and monitoring computer module, respectively.

[0011] Preferably, the processing control module is divided into a normal processing module and an abnormal processing module. The normal processing module transmits the data to the report entry module after processing, and the abnormal processing module transmits the data to the report entry module after processing.

[0012] Preferably, the normal processing module also includes a data control module, a data classification module, a data cycle recording module, a countdown year prompt module, a plan making module, a submission scheduling module, and a countdown month prompt module. The signal end of the data control module is connected to the signal end of the data classification module, the signal end of the data classification module is connected to the signal end of the data cycle recording module, the signal end of the data cycle recording module is connected to the signal end of the countdown year prompt module, the signal end of the countdown year prompt module is connected to the signal end of the plan making module, the signal end of the plan making module is connected to the signal end of the submission scheduling module, and the signal end of the submission scheduling module is connected to the signal end of the countdown month prompt module.

[0013] Preferably, the exception handling module also includes an alarm module, a personnel setting cycle module, and a tracking module. The signal end of the alarm module is connected to the signal end of the personnel setting cycle module, and the signal end of the personnel setting cycle module is connected to the signal end of the tracking module.

[0014] Another technical problem to be solved by the present invention is to provide a method for early warning analysis based on power equipment test storage, comprising the following steps: Step 1: First, test the data generated by various power equipment tests; Step 2: Collect the test data of various power equipment after detection; Step 3: Use virtualization technology to abstract different types of collected data, so that all abstract data are integrated in the storage resource library, realize the mapping from physical devices to logical views, and realize centralized management of storage data, status monitoring and dynamic expansion of capacity; Step 4: Coordinate data storage and data upload based on the operating status of different storage disks to achieve coordination between multiple storage data; Step 5: Enter multiple storage data in the form of reports to facilitate centralized analysis of the storage data; Step 6: Analyze each of the entered storage data one by one to determine whether it is normal. The specific determination is as follows: Multiple real-time data acquisition modules send the collected data to the remote data transmission and control module through the network. When the local computer module / remote management monitoring computer module does not find any abnormalities in the collected data, it is normal. The data analysis module data is transmitted to the normal processing module in the early warning unit through the management platform. The data control module is used to monitor the data in real time, and transmit the monitored data to the data classification module for data classification. The monitoring data of the same item is processed separately, and then the data cycle recording module is used for data cycle recording. The project is recorded in detail during the period, and a reminder is given one year in advance through the countdown year reminder module according to the project cycle, and then a plan is made one year in advance through the plan making module, and then the submission and scheduling module is used to submit the scheduling, and finally a reminder is given one month in advance through the countdown month reminder module, and the cycle data after the reminder is fed back and regulated to the report entry module again; when the local computer module / remote management and monitoring computer module finds that the collected data is abnormal, the alarm module A is started to alarm, and the abnormal collected data is transmitted to the alarm module B in the early warning unit through the management platform, and the alarm module B alarms, so that the abnormal data is alarmed through the alarm module, and the staff manually sets the cycle and tracks it, and the set cycle data is fed back and regulated to the report entry module again.

[0015] The present invention provides an early warning system based on power equipment test storage and an analysis method thereof. It has the following beneficial effects: (1) The present invention sets up a remote data transmission and control module, and sends the collected data to the remote data transmission and control module through the network by multiple real-time data acquisition modules. The local computer module / remote management and monitoring computer module cooperates with the data analysis module to realize the judgment and analysis of the collected data to determine whether it is abnormal. In this way, manpower is saved, human participation is reduced, errors caused by human negligence are reduced, and equipment maintenance and inspection are performed more accurately according to the corresponding cycle.

[0016] (2) The present invention sets a normal processing module, which is sent to the report entry module after processing. When the local computer module / remote management and monitoring computer module does not find any abnormality in the collected data, it is normal. The data of the data analysis module is sent to the normal processing module in the early warning unit through the management platform, and the data is monitored in real time. The monitored data is sent to the data classification module for data classification, and the monitoring data of the same item is processed separately. Then, the data cycle is recorded in detail through the data cycle recording module, and a one-year advance reminder is given through the countdown year reminder module according to the project cycle. Then, a plan is made one year in advance through the plan making module, and then a submission and scheduling module is used to submit and schedule. Finally, a one-month advance reminder is given through the countdown month reminder module, and the periodic data after the reminder is reversely fed back and regulated to the report entry module. The system is used to judge and store, saving manpower, reducing errors, and realizing corresponding storage and early warning.

[0017] (3) The present invention sets an exception handling module, which is sent to the report entry module after processing. When the local computer module / remote management and monitoring computer module finds that the collected data is abnormal, the alarm module A is activated to alarm, and the abnormal collected data is sent to the alarm module B in the early warning unit through the management platform. The alarm module B alarms, so that the abnormal data is sent to the alarm module to alarm the staff to manually set the cycle and track it, and the set cycle data is reversely fed back to the report entry module. The system is used to judge and store, saving manpower, reducing errors, and realizing corresponding storage and early warning.

[0018] (4) The present invention has built-in safety threshold and safety assessment control in the management platform. Safety threshold control establishes a strain warning level model through information comparison of the data analysis module, obtains the power equipment storage data packet, including power data and characteristic information (such as data volume, transmission time, etc.), divides the multi-level warning threshold area into multiple levels according to the actual safety threshold, and distinguishes them by color. Safety assessment control evaluates abnormal information, activates the warning level trigger mechanism, and feeds back to the maintenance personnel to provide real-time warning. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the power equipment test storage early warning system of the present invention; Figure 2 It is a schematic diagram of the storage unit and the early warning unit / module of the present invention; Figure 3 This is a schematic diagram of a normal processing module of the present invention; Figure 4 This is a schematic diagram of an exception handling module of the present invention. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention. Example

[0022] A preferred embodiment of the power equipment test storage early warning system provided by the present invention is as follows: Figure 1-4 As shown: a storage warning system based on power equipment test, including a storage unit, a warning unit and a management platform, the storage unit and the warning unit form a storage warning system, the storage warning system is connected to the management platform, the storage unit and the warning unit are connected through network signals, the storage unit includes multiple real-time monitoring modules, multiple real-time data acquisition modules, data micro storage modules, data management modules, report entry modules and data analysis modules; the storage unit also includes a remote data transmission and control module; the management platform has built-in safety threshold control and safety assessment control, the safety threshold control obtains data information in the data analysis module and compares it with it to establish a test storage strain warning level classification model, the model The method obtains a storage data packet sent by the power equipment, wherein the storage data packet includes power data and characteristic information of the power data, wherein the characteristic information of the power data includes information such as data volume, transmission time, regional information, transmission bytes, and transmission protocol of the power data, and draws information images including data volume, transmission time, regional information, transmission bytes, and transmission protocol of the power data in accordance with the actual safety threshold, and divides the information images into a first-level warning threshold area, a second-level warning threshold area, a third-level warning threshold area, a fourth-level warning threshold area, and other multi-level warning threshold areas. The corresponding colors in the information images are green, blue, yellow, red, and other different colors, and a warning level trigger mechanism is obtained according to the corresponding colors; The safety assessment and control evaluates the information of the multi-level warning threshold area. If abnormal information is found, the corresponding warning level trigger mechanism is activated. The safety assessment and control then feeds back the information to the site maintenance personnel for reverse feedback control or manual maintenance, providing real-time warning for decision-making on response measures.

[0023] A plurality of real-time monitoring modules are connected to a plurality of real-time data acquisition modules through network signals, a plurality of real-time data acquisition modules are connected to a data micro storage module through network signals, a data micro storage module is connected to a data management module through network signals, a data management module is connected to a report entry module through network signals, and a report entry module is connected to a data analysis module through network signals, wherein the plurality of real-time data acquisition modules send the collected data to a remote data transmission and control module through a network, wherein the remote data transmission and control module includes a local computer module, a remote management and monitoring computer module, and an alarm module A; Multiple real-time monitoring modules are used to detect the data generated by various power equipment tests; multiple real-time data acquisition modules are used to collect various power equipment test data after detection; the data micro storage module is used to abstract different types of collected data using virtualization technology, so that all abstract data are integrated in the storage resource library, realizing the mapping from physical equipment to logical view, and realizing centralized management, status monitoring and dynamic expansion of storage data; the data management module is used to coordinate data storage and data upload based on the operating status of different storage disks, so as to achieve coordination between multiple storage data; the report entry module is used to enter multiple storage data in the form of reports for centralized analysis of storage data; the data analysis module is used to analyze each entered storage data one by one to determine whether it is normal; The local computer module and the remote management and monitoring computer module collect data through a network connection. The local computer module saves the collected data in a local database, and the remote management and monitoring computer module saves the collected data in a remote database. The alarm module A is respectively connected to the data analysis module, the local computer module, and the remote management and monitoring computer module by signal; In this specific embodiment, by carefully designing and embedding the remote data transmission and control module, it is possible to effectively control multiple real-time data acquisition modules. These real-time data acquisition modules are responsible for collecting the required data and transmitting the collected data to the remote data transmission and control module through network technology. In this process, the local computer module and the remote management and monitoring computer module work closely with the data analysis module. They work together to make in-depth judgments and analyses on the collected data to determine whether the data is abnormal. In this way, we have greatly reduced the investment in human resources, reduced the degree of human participation, and also reduced the errors that may be caused by negligent operation of personnel. More importantly, this method can ensure that equipment maintenance and overhaul can be carried out more accurately and effectively according to the established cycle, thereby improving work efficiency and ensuring the stability of equipment operation. Example

[0024] See also Figure 1-Figure 4 , and on the basis of Example 1, it is further obtained that: the early warning unit includes an alarm module B and a processing control module, the alarm module B is connected to the processing control module by signal, the alarm module B is connected to the alarm module A by signal, the processing control module is divided into a normal processing module and an abnormal processing module, the normal processing module is transmitted to the report entry module after processing, and the abnormal processing module is transmitted to the report entry module after processing; The normal processing module also includes a data control module, a data classification module, a data cycle recording module, a countdown year prompting module, a plan making module, a report scheduling module, and a countdown month prompting module. The signal end of the data control module is connected to the signal end of the data classification module, the signal end of the data classification module is connected to the signal end of the data cycle recording module, the signal end of the data cycle recording module is connected to the signal end of the countdown year prompting module, the signal end of the countdown year prompting module is connected to the signal end of the plan making module, the signal end of the plan making module is connected to the signal end of the report scheduling module, and the signal end of the report scheduling module is connected to the signal end of the countdown month prompting module; The abnormality handling module also includes an alarm module, a personnel setting cycle module, and a tracking module. The signal end of the alarm module is connected to the signal end of the personnel setting cycle module, and the signal end of the personnel setting cycle module is connected to the signal end of the tracking module.

[0025] In this embodiment, a processing control module is set up, which is mainly divided into two parts: a normal processing module and an exception processing module. In the normal processing module, the data will be sent to the report entry module after a series of processing. In the exception processing module, the data will also be processed accordingly and finally sent to the report entry module. When the local computer module or the remote management and monitoring computer module does not find any abnormality in the collected data, we think this situation is normal. At this time, the data in the data analysis module will be sent to the normal processing module in the early warning unit through the management platform for real-time data monitoring, and the monitored data will be sent to the data classification module for classification processing. For the same monitoring data, it will be processed separately, and then the data will be recorded in detail through the data cycle recording module. In addition, according to the project cycle, the countdown year prompt module will be used to prompt one year in advance so that there is enough time to make corresponding preparations. Next, the plan is made one year in advance through the plan making module, and then the submission scheduling is carried out through the submission scheduling module. Finally, the countdown month prompt module is used to prompt one month in advance, and the cycle data after the prompt is reversely fed back and regulated to the report entry module.

[0026] When the local computer module or the remote management and monitoring computer module finds that the collected data is abnormal, we will immediately start the alarm module A to alarm, and transmit the abnormal collected data to the alarm module B in the early warning unit through the management platform. Module B will also start the alarm, so that the abnormal data can be alarmed through the alarm module, and the staff can set the cycle manually and track it. The set cycle data will be fed back and regulated to the report entry module. Using such a system to judge and store data can greatly save labor costs, reduce errors, and achieve effective data storage and early warning. Example

[0027] See also Figure 1-Figure 4 , and based on Examples 1 and 2, it is further obtained that another technical problem to be solved by the present invention is to provide a method for early warning analysis based on power equipment test storage, comprising the following steps: Step 1: First, test the data generated by various power equipment tests; Step 2: Collect the test data of various power equipment after detection; Step 3: Use virtualization technology to abstract different types of collected data, so that all abstract data are integrated in the storage resource library, realize the mapping from physical devices to logical views, and realize centralized management of storage data, status monitoring and dynamic expansion of capacity; Step 4: Coordinate data storage and data upload based on the operating status of different storage disks to achieve coordination between multiple storage data; Step 5: Enter multiple storage data in the form of reports to facilitate centralized analysis of the storage data; Step 6: Analyze each of the entered storage data one by one to determine whether it is normal. The specific determination is as follows: Multiple real-time data acquisition modules send the collected data to the remote data transmission and control module through the network. When the local computer module / remote management monitoring computer module does not find any abnormalities in the collected data, it is normal. The data analysis module data is transmitted to the normal processing module in the early warning unit through the management platform. The data control module is used to monitor the data in real time, and transmit the monitored data to the data classification module for data classification. The monitoring data of the same item is processed separately, and then the data cycle recording module is used for data cycle recording. The project is recorded in detail during the period, and a reminder is given one year in advance through the countdown year reminder module according to the project cycle, and then a plan is made one year in advance through the plan making module, and then the submission and scheduling module is used to submit the scheduling, and finally a reminder is given one month in advance through the countdown month reminder module, and the cycle data after the reminder is fed back and regulated to the report entry module again; when the local computer module / remote management and monitoring computer module finds that the collected data is abnormal, the alarm module A is started to alarm, and the abnormal collected data is transmitted to the alarm module B in the early warning unit through the management platform, and the alarm module B alarms, so that the abnormal data is alarmed through the alarm module, and the staff manually sets the cycle and tracks it, and the set cycle data is fed back and regulated to the report entry module again.

[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0029] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A storage warning system based on power equipment test, comprising a storage unit, a warning unit and a management platform, characterized in that: The storage unit and the early warning unit form a storage early warning system, which is connected to the management platform. The storage unit and the early warning unit are connected via network signals. The management platform has built-in security threshold control and security assessment control. The storage unit includes multiple real-time monitoring modules, multiple real-time data acquisition modules, a data micro storage module, a data management module, a report entry module and a data analysis module; The storage unit also includes a remote data transmission and control module; The early warning unit includes an alarm module B and a processing control module, wherein the alarm module B is connected to the processing control module by signal, and the alarm module B is connected to the alarm module A by signal; The safety threshold control obtains data information in the data analysis module and compares it with the data information to establish a test storage strain warning level division model. The model obtains the storage data packet sent by the power equipment. The storage data packet includes power data and characteristic information of the power data. The characteristic information of the power data includes the data volume, transmission time, regional information, transmission bytes, transmission protocol and other information of the power data. Combined with the actual safety threshold, the corresponding information image including the data volume, transmission time, regional information, transmission bytes, transmission protocol and other information of the power data is drawn, and divided into a first-level warning threshold area, a second-level warning threshold area, a third-level warning threshold area, a fourth-level warning threshold area and other multi-level warning threshold areas. The corresponding colors in the information image are green, blue, yellow, red and other different colors. According to the corresponding colors, the warning level trigger mechanism is obtained; The safety assessment and control evaluates the information of the multi-level warning threshold area. If abnormal information is found, the corresponding warning level trigger mechanism is activated. The safety assessment and control then feeds back the information to the site maintenance personnel for reverse feedback control or manual maintenance, providing real-time warning for decision-making on response measures.

2. The early warning system based on power equipment test storage according to claim 1 is characterized in that: Multiple real-time monitoring modules are connected to multiple real-time data acquisition modules via network signals, multiple real-time data acquisition modules are connected to data micro storage modules via network signals, the data micro storage module is connected to a data management module via network signals, the data management module is connected to a report entry module via network signals, and the report entry module is connected to a data analysis module via network signals.

3. The early warning system based on power equipment test storage according to claim 1 is characterized by: The multiple real-time data acquisition modules send the acquired data to the remote data transmission and control module through the network.

4. The early warning system based on power equipment test storage according to claim 1 is characterized in that: The remote data transmission and control module includes a local computer module, a remote management and monitoring computer module and an alarm module A.

5. The early warning system based on power equipment test storage according to claim 1 is characterized in that: The multiple real-time monitoring modules are used to detect the data generated by various power equipment tests; the multiple real-time data acquisition modules are used to collect the test data of various power equipment after detection; The data micro storage module is used to abstract different types of collected data using virtualization technology, so that all abstract data are integrated in the storage resource library, realizing the mapping from physical devices to logical views, and realizing centralized management, status monitoring and dynamic expansion of storage data; the data management module is used to coordinate data storage and data upload based on the operating status of different storage disks, so as to realize the coordination between multiple storage data; The report entry module is used to enter a plurality of stored data in the form of a report, so as to facilitate centralized analysis of the stored data; The data analysis module is used to analyze each entered storage data one by one to determine whether it is normal.

6. The early warning system based on power equipment test storage according to claim 4 is characterized in that: The local computer module and the remote management and monitoring computer module both collect data through a network connection. The local computer module saves the collected data in a local database, and the remote management and monitoring computer module saves the collected data in a remote database. The alarm module A is signal-connected to the data analysis module, the local computer module, and the remote management and monitoring computer module respectively.

7. The early warning system based on power equipment test storage according to claim 1 is characterized by: The processing control module is divided into a normal processing module and an abnormal processing module. The normal processing module is transmitted to the report entry module after processing, and the abnormal processing module is transmitted to the report entry module after processing.

8. The early warning system based on power equipment test storage according to claim 7 is characterized by: The normal processing module also includes a data control module, a data classification module, a data cycle recording module, a countdown year prompt module, a plan making module, a submission scheduling module, and a countdown month prompt module. The signal end of the data control module is connected to the signal end of the data classification module, the signal end of the data classification module is connected to the signal end of the data cycle recording module, the signal end of the data cycle recording module is connected to the signal end of the countdown year prompt module, the signal end of the countdown year prompt module is connected to the signal end of the plan making module, the signal end of the plan making module is connected to the signal end of the submission scheduling module, and the signal end of the submission scheduling module is connected to the signal end of the countdown month prompt module.

9. The early warning system based on power equipment test storage according to claim 7 is characterized in that: The abnormality handling module also includes an alarm module, a personnel setting cycle module, and a tracking module. The signal end of the alarm module is connected to the signal end of the personnel setting cycle module, and the signal end of the personnel setting cycle module is connected to the signal end of the tracking module.

10. A method for early warning analysis based on power equipment test storage, characterized in that: A power equipment test storage early warning system according to any one of claims 1 to 9, comprising the following steps: Step 1: First, test the data generated by various power equipment tests; Step 2: Collect the test data of various power equipment after detection; Step 3: Use virtualization technology to abstract different types of collected data, so that all abstract data are integrated in the storage resource library, realize the mapping from physical devices to logical views, and realize centralized management of storage data, status monitoring and dynamic expansion of capacity; Step 4: Coordinate data storage and data upload based on the operating status of different storage disks to achieve coordination between multiple storage data; Step 5: Enter multiple storage data in the form of reports to facilitate centralized analysis of the storage data; Step 6: Analyze each of the entered storage data one by one to determine whether it is normal. The specific determination is as follows: Multiple real-time data acquisition modules send the collected data to the remote data transmission and control module through the network. When the local computer module / remote management monitoring computer module does not find any abnormalities in the collected data, it is normal. The data analysis module data is transmitted to the normal processing module in the early warning unit through the management platform. The data control module is used to monitor the data in real time, and transmit the monitored data to the data classification module for data classification. The monitoring data of the same item is processed separately, and then the data cycle recording module is used for data cycle recording. The project is recorded in detail during the period, and a reminder is given one year in advance through the countdown year reminder module according to the project cycle, and then a plan is made one year in advance through the plan making module, and then the submission and scheduling module is used to submit the scheduling, and finally a reminder is given one month in advance through the countdown month reminder module, and the cycle data after the reminder is fed back and regulated to the report entry module again; when the local computer module / remote management and monitoring computer module finds that the collected data is abnormal, the alarm module A is started to alarm, and the abnormal collected data is transmitted to the alarm module B in the early warning unit through the management platform, and the alarm module B alarms, so that the abnormal data is alarmed through the alarm module, and the staff manually sets the cycle and tracks it, and the set cycle data is fed back and regulated to the report entry module again.