Combined hole-forming construction method for Binjiang sandy gravel geological pile foundation

By employing a combined construction method of rotary drilling rig and mud wall protection combined with impact drilling under the sandy and gravelly geological conditions of Binjiang, the problems of low drilling efficiency and high noise were solved, and high-efficiency, low-noise pile foundation drilling quality control was achieved.

CN118895752AInactive Publication Date: 2024-11-05THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410794188.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies have low drilling efficiency and high noise levels under riverside sandy and gravelly geological conditions, and the drilling quality is difficult to guarantee.

Method used

The construction method adopts a combination of rotary drilling and mud wall protection and percussion drilling. The depth of rotary drilling is determined by advanced geological drilling, and mud wall protection or C20 concrete is used to deal with hole collapse when necessary. The percussion drill passes through the sand and gravel reinforced strata.

Benefits of technology

It improved drilling efficiency, reduced construction noise, ensured the quality of pile foundation drilling, and facilitated the lowering of the reinforcing cage and the removal of sediment through mud wall protection, thus enabling quality control during the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895752A_ABST
    Figure CN118895752A_ABST
Patent Text Reader

Abstract

The invention discloses a combined hole forming construction method for a Binjiang sandy gravel geological pile foundation. The combined hole forming construction method comprises the following steps that S1, construction investigation is conducted; s2, field leveling and construction lofting are carried out; s3, a pile casing is installed; s4, rotary excavating drilling is carried out; s5, drilling through the percussion drill. The rotary drilling method is high in hole forming efficiency, especially for a reinforced belt sandy gravel stratum; a three-dimensional perpendicularity controller of the rotary excavating pile is utilized, so that the problem of drilling deflection caused by uneven stratums can be effectively reduced; the lower portion adopts the slurry retaining wall and the impact hole forming technology, noise is reduced, the influence of slurry pollution on the environment is reduced, meanwhile, secondary hole cleaning can be conducted through slurry after the reinforcement cage is put down, and control over sediment of a rotary excavating pile is better facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a riverside sand and pebble geological pile foundation combined hole-forming construction method. Background Art

[0002] Common pile foundations can be divided into spiral drilling method, impact drilling method, rotary drilling method and manual digging method according to different hole-forming processes. Spiral drilling is mainly suitable for the construction of fill, clay, silt, sandy soil and gravel layers above the groundwater level. It has high requirements for geological conditions and fast hole-forming efficiency. Impact drilling has a wide range of applications, but there are problems of high noise and severe environmental pollution. Rotary drilling rigs are generally suitable for clay, silt, sand, silty soil, artificial backfill and strata containing some pebbles and gravel, and are widely used in construction. Manual digging is generally suitable for clay with good soil quality and low groundwater level, and clay layers containing a small amount of sand and pebbles. It has a higher safety risk, but the hole-forming quality is good, and it is widely used in places where hole-forming machinery cannot reach. Summary of the invention

[0003] The present invention aims to provide a riverside sand and pebble geological pile foundation combined hole construction method in view of the deficiencies of the prior art, comprising the following steps: S1. Construction survey: Combined with the detailed geological survey and drilling point location, advance geological drilling is carried out in the manner of one hole per pile. The depth of rotary drilling is determined through geological survey and the consistency with the survey design is checked; S2. Site leveling and construction layout: During construction, the total station is used to measure the pile position, and then the pile position is led to the outside of the casing position using the cross line to drive four wooden piles, and the casing is buried according to the intersection of the four wooden piles. After the casing is buried, it is re-inspected with the total station; S3. Install casing: When burying the casing, the vertical line of the casing center coincides with the center of the pile. After the casing is in place, backfill the clay symmetrically and evenly on all sides, and ensure that the fill is dense; S4, rotary drilling: after the pile position is verified, a rotary drilling rig is used for drilling. The drilling rig is gently pressed and slowly rotated to gradually enter the hole. During the drilling process, various parameters of the hole-making process are recorded. When the drilling speed increases, the footage slows down, and the amount of excavated material increases, the drilling is stopped and the hole collapse is handled by using mud wall protection or C20 concrete; S5. Impact drilling: After the rotary drilling pile is excavated to the designed depth of the pile foundation, it is changed to impact drilling. The impact drill is used at the section between the rotary drilling hole and the impact drill. Short-stroke drilling is used. After the drilling depth exceeds the full height of the drill bit plus the normal stroke, drilling is carried out at a normal speed according to the soil quality.

[0004] Preferably, in step S1, the actual hole spacing between the drilling points is 2.4-10 m, the exploration point is located at the center of the pile, and the exploration hole should enter the medium-weathered rock layer.

[0005] Preferably, in step S3, the elevation of the top of the casing is not less than 300 mm above the ground. When the casing is buried, the allowable deviation between the vertical line of the center of the casing and the center plane of the pile is 50 mm, and the inclination of the vertical line is not more than 1%.

[0006] Preferably, in step S4, the deviation between the drill rod center of the drilling rig and the casing center is no more than 5 cm, and the parameters include drilling depth, geological characteristics, mechanical equipment damage, and obstacle conditions.

[0007] Preferably, in step S5, the depth of the impact hole is controlled to be 2 m above the measured river water level, and the impact drill uses a flat-bottom drill bit.

[0008] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention firstly adopts a rotary drilling machine to drill holes, which also serves as a guide hole function. The depth is controlled at 2m above the measured river water level to ensure that the sand and gravel reinforced belt stratum is penetrated, and then mud wall protection + impact drilling is used to drill holes until the designed pile bottom elevation. The rotary drilling construction helps to solve the problem of slow impact drilling efficiency in sand and gravel reinforced strata, and the construction noise is relatively small. If the hole collapse problem occurs during the process, it can be solved by using the technical measures of mud wall protection or C20 concrete re-injection and secondary drilling. Then the impact drilling is adopted, which not only weakens the impact of noise on the environment, but also the mud wall protection can ensure the quality of the pile foundation hole, which is convenient for secondary hole cleaning after the steel cage is lowered. The strongly weathered layer is rotary drilled to isolate the sand and gravel layer. The pile foundation is drilled in advance before construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 This is a large-scale diagram of the node of the present invention. DETAILED DESCRIPTION

[0010] The technical solution of the present invention is described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the embodiments.

[0011] Reference Figure 1 The present invention provides a riverside sand and pebble geological pile foundation combined hole forming construction method, comprising the following steps: S1. Construction survey: Combined with the detailed geological survey and drilling point location, advance geological drilling is carried out in the manner of one hole per pile. The actual hole spacing is 2.4~10m, the survey point is located at the center of the pile, and the exploration hole should enter the medium weathered rock layer. The rotary drilling depth is determined through geological survey to check the consistency with the survey design.

[0012] S2. Site leveling and construction layout: remove debris, replace soft soil, level and compact, and determine the equipment route and material storage site, processing area, slag storage site, mud pool, etc. according to the overall construction process. During construction, use a total station to measure the pile position, and then use the cross line to lead the pile position to the outside of the casing position to drive four wooden piles. The casing is buried at the intersection of the four wooden piles. After the casing is buried, it is re-checked with a total station to ensure that the drilling rig is in place and centered. The allowable deviation of the pile position layout is as follows: 20mm for pile groups; 10mm for single-row piles.

[0013] S3. Install casing: The top elevation of casing should be no less than 300mm above the ground. When burying casing, the vertical line of the center of casing should coincide with the center of pile. The general allowable deviation of plane is 50mm, and the vertical line inclination is no more than 1%. After the casing is in place, clay should be backfilled symmetrically and evenly around, and the filling should be dense to prevent the casing from tilting. After the casing is buried, measure its top elevation, make a record, and have it reviewed by the supervising engineer.

[0014] S4. Rotary drilling: After the top surface of the casing and the original ground elevation have been determined and the performance of the drilling rig has been checked, the drilling rig is in place and the deviation between the center of the drill rod and the center of the casing shall not exceed 5cm. After the pile position is verified, a rotary drilling rig is used for drilling. The drilling rig is pressed lightly and rotated slowly to gradually enter. In water-rich sand and gravel geology, the drilling rig should be lifted and placed gently, and do not force pressure. During the drilling process, various parameters of the hole-making process are recorded, such as drilling depth, geological characteristics, damage to mechanical equipment, obstacles, etc. When the drilling speed increases, the footage slows down, and the amount of excavated increases, it is judged that there is a slight hole collapse, and drilling is stopped. The hole collapse is handled by mud wall protection or C20 concrete.

[0015] S5. Impact drilling: After the rotary excavation pile is excavated to the design depth of the pile foundation, it is changed to impact drilling. The depth is controlled at 2m above the measured river water level to ensure that it passes through the sand and gravel reinforced belt stratum. The impact drill uses a flat-bottomed drill cone, low stroke, and thick mud. The penetration should be properly controlled. At the section of the rotary drilling hole and the impact drill, short stroke drilling should be used to prevent the retaining wall from collapsing. After the drilling depth exceeds the full height of the drill bit plus the normal stroke, drilling can be carried out at a normal speed according to the soil quality.

[0016] Impact drilling can effectively deal with large pile diameters and different geological pile foundation drilling, and mud wall protection can effectively reduce the occurrence of hole collapse in water-rich sand and gravel geology and floating bedrock under the influence of construction dynamic loads and underground dynamic water. In addition, mud is not only beneficial to the situation after the completion of the first drilling, but also ensures the secondary sediment cleaning after the steel cage is lowered.

[0017] In the present invention (1) If the ratio of the height difference of the top of the weathered rock layer between adjacent survey points to the horizontal distance between adjacent survey points is greater than 0.5 during the exploration process, the survey points should be deepened or increased in number to identify the free surface that may affect the slippage of the foundation (pile end). At the same time, the economically effective depth of the rotary sinking hole should be determined through reasonable deepening.

[0018] (2) Drilling in reinforced sand and gravel formations is very likely to cause the drill rod to tilt due to uneven geology. Therefore, it is necessary to strengthen the observation of the three-dimensional verticality controller of the rotary drilling rig and adjust the verticality of the drill rod in time to ensure that the verticality deviation of the hole is controlled within no more than 1%H.

[0019] (3) When the center distance between piles is less than 2.5d (d is the pile diameter), the pile hole should be constructed by skipping piles. The adjacent pile hole can be drilled after the concrete pouring of the pile is completed and reaches 50% strength.

[0020] (4) The composite drilling process maximizes the advantages of different mechanical drilling methods, but the drilling operation should be kept continuous and the interruption time should not exceed 6 hours.

[0021] (5) When the geology changes during the drilling process, timely collect slag samples, check and record the changes in the soil layer, and compare them with the geological profile to analyze the geological consistency in order to control the drilling speed. Closely observe whether there are any abnormal conditions. If there are any abnormal conditions, stop drilling immediately, analyze the causes, and deal with them in a timely manner.

[0022] (6) When drilling in clay, if the slag capacity can meet the construction requirements, the original soil in the hole can be used to make slurry to protect the wall. When drilling in sand, the slurry raw material should be high-quality clay or bentonite. Every 2m of drilling or when the formation changes, the drilling slag sample should be collected from the mud tank, the soil type should be identified and recorded, and the drilling slag should be removed and the mud replaced in time.

[0023] The present invention has high hole-forming efficiency and is convenient for quality control, which is mainly reflected in: 1. The rotary drilling efficiency is high, especially for reinforced sand and gravel strata; 2. The use of the three-dimensional verticality controller provided by the rotary pile can effectively reduce the problem of skewness of the drilling hole caused by uneven strata; 3. The use of mud wall protection + impact hole-forming process in the lower part is conducive to reducing noise and reducing the impact of mud pollution on the environment. At the same time, after the steel cage is lowered, the mud can be used for secondary hole cleaning, which is more advantageous than the sediment control of the rotary pile.

[0024] As above, although the present invention has been shown and described with reference to specific preferred embodiments, it should not be construed as limiting the present invention itself. Various changes may be made to it in form and detail without departing from the spirit and scope of the present invention as defined in the appended claims.

Claims

1. A riverside sand and pebble geological pile foundation combined hole construction method, characterized in that: The steps include: S1. Construction survey: Combined with the detailed geological survey and drilling point location, advance geological drilling is carried out in the manner of one hole for every other pile. The depth of rotary drilling is determined through geological survey and the consistency with the survey design is checked; S2. Site leveling and construction layout: During construction, the total station is used to measure the pile position, and then the pile position is led to the outside of the casing position using the cross line to drive four wooden piles, and the casing is buried according to the intersection of the four wooden piles. After the casing is buried, it is re-inspected with the total station; S3. Install casing: When burying the casing, the vertical line of the casing center coincides with the center of the pile. After the casing is in place, backfill the clay symmetrically and evenly on all sides, and ensure that the fill is dense; S4, rotary drilling: after the pile position is verified, a rotary drilling rig is used for drilling. The drilling rig is gently pressed and slowly rotated to gradually enter the hole. During the drilling process, various parameters of the hole-making process are recorded. When the drilling speed increases, the footage slows down, and the amount of excavated material increases, the drilling is stopped and the hole collapse is handled by using mud wall protection or C20 concrete; S5. Impact drilling: After the rotary drilling pile is excavated to the designed depth of the pile foundation, it is changed to impact drilling. The impact drill is used at the section between the rotary drilling hole and the impact drill. Short-stroke drilling is used. After the drilling depth exceeds the full height of the drill bit plus the normal stroke, drilling is carried out at a normal speed according to the soil quality.

2. A riverside sand and pebble geological pile foundation combined hole construction method according to claim 1, characterized in that: In step S1, the actual hole spacing between the drilling points is 2.4-10 m, the exploration point is located at the center of the pile, and the exploration hole should enter the medium-weathered rock layer.

3. The method for combined drilling of riverside sand and pebble geological pile foundation according to claim 1 is characterized by: In step S3, the elevation of the top of the casing is not less than 300 mm above the ground. When the casing is buried, the allowable deviation between the vertical line of the center of the casing and the center plane of the pile is 50 mm, and the inclination of the vertical line is not more than 1%.

4. The method for combined drilling of riverside sand and pebble geological pile foundation according to claim 1 is characterized by: In step S4, the deviation between the drill pipe center and the casing center of the drilling rig is no more than 5 cm, and the parameters include drilling depth, geological characteristics, mechanical equipment damage, and obstacle conditions.

5. The method for combined drilling of riverside sand and pebble geological pile foundation according to claim 1 is characterized by: In step S5, the depth of the impact hole is controlled to be 2 m above the measured river water level, and the impact drill uses a flat-bottom drill bit.

Citation Information

Patent Citations

  • Hole forming construction method for three-section type pedestal pile

    CN105064336A

  • Water-rich sandy gravel geological pile group hole forming construction method

    CN114753354A