Method for rapidly filling cofferdam with soil

Through satellite positioning and steel sheet pile skeleton structure, combined with steel-plastic grille and waterproof geotextile, the cofferdam construction is achieved efficient, environmentally friendly and sustainable, solving the problems of low efficiency and pollution in the existing technology, and significantly improving the construction efficiency and the durability of the cofferdam.

CN118895778AInactive Publication Date: 2024-11-05CCCC TIANJIN HARBOR ENG DESIGN INST CO LTD

Patent Information

Application Number
CN202411378692.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing cofferdam construction methods are inefficient and complex, which affect the environment and may pollute water bodies.

Method used

Satellite positioning and fine measurement are used to determine the position of the cofferdam, use steel sheet piles and steel pipe skeleton structures, lay steel and plastic gratings and waterproof geotextiles, fill the weir core with dredgers and transport ships, and pump water after construction is completed. silt.

Benefits of technology

It improves construction efficiency, ensures that the inside of the cofferdam is clean and dry, reduces environmental impact and pollution risks, extends the service life of the cofferdam, and realizes resource conservation and reuse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895778A_ABST
    Figure CN118895778A_ABST
Patent Text Reader

Abstract

The invention relates to a method for rapidly filling a cofferdam with soil, and belongs to the field of cofferdams. The method for rapidly filling the cofferdam with the soil comprises the following steps: S100, measuring and S200, steel sheet piles are driven; s300, a framework is formed; s400, a steel-plastic grid and geotechnical cloth are laid; s500, filling the weir core with soil; s600, water pumping and desilting are conducted in the cofferdam; wherein S100 comprises the following steps: S110, positioning each first set distance according to a cofferdam plane design drawing and satellite positioning to determine the position of a guide control pile; s120, a control pile is driven at the position of the guide control pile; s130, marking a cofferdam contour line along the control pile by using an iron wire stay wire; s140, determining pile positions along the contour line of the cofferdam according to a design interval; s150, the distance between the positioning positions is verified; s200 comprises the following steps: S210, selecting a steel sheet pile; s220, steel sheet piles are inserted; s230, the top of the steel channel is beaten through a tamping machine; the step S300 comprises the substeps that S310, the channel steel in the same row is connected through steel pipes; and S320, the two pieces of corresponding channel steel in the first row and the second row are connected through reinforcing steel bars.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of cofferdams, and in particular relates to a rapid earth-filling cofferdam method. Background Art

[0002] Cofferdam is an important temporary retaining structure in water conservancy project construction. Its main purpose is to prevent water and soil from entering the construction site of the building when building permanent water conservancy facilities, thereby facilitating drainage, excavation of foundation pits and construction of buildings within the cofferdam.

[0003] In the prior art, excavation is usually carried out directly, and then backfilling of dam body stones and clay is started, and filling is carried out according to design requirements. Geotextile is used as an anti-filter layer inside and outside the clay core wall to prevent soil and stone from damaging the core wall. This method is inefficient and has complicated procedures. Summary of the invention

[0004] In view of the shortcomings existing in the related technologies, the present invention provides a method for rapid earth-filling cofferdam, which not only improves the construction efficiency through an efficient operation process, but also ensures the cleanliness and dryness of the inside of the cofferdam. In the entire construction process, attention is paid to environmental protection and sustainability. Through precise measurement and positioning, unnecessary earth excavation and backfilling are reduced, and the impact on the surrounding environment is reduced. At the same time, environmentally friendly materials such as waterproof geotextiles are used to ensure that the cofferdam will not pollute the water body during use. In addition, through reasonable construction arrangements and efficient operation processes, resource conservation and reuse are achieved. In order to solve the technical problems of low efficiency and complex procedures existing in the prior art.

[0005] The present invention provides a rapid earth-filling cofferdam method, comprising: S100, measurement and positioning; S200, steel sheet pile installation; S300, frame forming; S400, laying of steel-plastic grid and geotextile; S500, core filling; S600, pumping and dredging of cofferdam; Among them, S100 includes: S110, according to the cofferdam plane design drawing, the position of the guide control pile is determined according to each first set distance of the satellite positioning; S120, the control pile is set at the position of the guide control pile; S130, the cofferdam contour line is marked along the control pile with a wire; S140, the pile position is determined according to the designed spacing along the cofferdam contour line; S150, the spacing between the positioning positions is checked; Among them, S200 includes: S210, selecting steel sheet piles; S220, inserting steel sheet piles; S230, using a tamping machine to pound the top of the channel steel; Wherein, S300 includes: S310, connecting each channel steel in the same row by steel pipe; step S320, connecting two corresponding channel steels in the first row and the second row by steel bars; Among them, S400 includes: S410, splicing the steel-plastic gratings to form unit sections; S420, installing the unit sections in sequence along the length direction of the first row to the side of the first row of channel steels facing the second row of channel steels; S430, installing the unit sections in sequence along the length direction of the second row to the side of the second row of channel steels facing the first row of channel steels; S440, hanging waterproof geotextile on the inner wall of the unit section.

[0006] In the technical solution, the efficient operation process not only improves the construction efficiency, but also ensures the cleanliness and dryness of the inside of the cofferdam. Throughout the construction process, attention is paid to environmental protection and sustainability. Through precise measurement and positioning, unnecessary earth excavation and backfilling are reduced, reducing the impact on the surrounding environment. At the same time, the use of environmentally friendly materials such as waterproof geotextiles ensures that the cofferdam will not pollute the water body during use. In addition, through reasonable construction arrangements and efficient operation processes, resource conservation and reuse are achieved.

[0007] In some of the embodiments, step S110 specifically includes marking the coordinates of the guide control piles on a map or GPS; and reaching the coordinates by a construction vessel according to the position indicated by the GPS.

[0008] In some embodiments, in step S140, the construction vessel is measured along the contour line, and the water surface is marked at each designed interval. When marking, the marking point on the water surface is set at 1.5 meters away from the contour line; specifically, the initial pile position of the first row is marked at the shortest distance X meters from the contour line, and the initial pile position of the second row is symmetrically marked at the position X meters away from the contour line on the other side of the contour line; step S001, in the second row, along the contour line, the water surface is marked at the shortest distance X meters from the contour line and Y meters from the previous marking point of the second row; in the first row, along the contour line, the water surface is marked at the shortest distance X meters from the contour line and Y meters from the previous marking point of the first row; repeat the above step S001 until all pile positions are marked.

[0009] In some of the embodiments, step S140 is specifically, marking the initial pile positions of the first row on the contour line, and symmetrically marking the initial pile positions of the second row at a position A meters away from the contour line on the other side of the contour line; step S003, measuring along the contour line in the second row, marking the water surface at a distance of A meters from the contour line and Y meters from the previous marking point of the second row; measuring along the contour line in the first row, marking the water surface on the contour line at a distance of Y meters from the previous marking point of the first row; repeating the above step S003 until all the pile positions are marked.

[0010] In some of these embodiments, the specific steps of step S150 include step S151 and / or step S152; In step S151: the distance between two adjacent piles distributed along the cofferdam contour line is measured by pulling a line or a ruler to see whether it meets the designed distance; In step S152: the construction vessel moves to one pile position and records the current GPS coordinates as the first parameter, moves to the next pile position along the cofferdam contour line, and records the current GPS coordinates as the second parameter; calculates whether the numerical difference between the first parameter and the second parameter meets the design spacing.

[0011] In some embodiments, step S220 includes: S221. The channel steel is loaded into a transport ship and transported to the construction site by the transport ship; S222, the piling vessel moves to the construction site and approaches the transport vessel; S223, insert the first row of channel steels; use a pile-driving boat to clamp one of the channel steels, align it with one of the marked pile positions and insert it; take out the next channel steel, align it with the next pile position in the first row of pile positions and insert it; S224, insert the second row of channel steels; use a pile-driving boat to clamp one of the channel steels, align it with one of the marked pile positions and insert it; take out the next channel steel, align it with the next pile position in the second row of pile positions and insert it.

[0012] In some embodiments, step S300 includes: S310, connecting the channel steels in the same row through steel pipes; S320, use steel bars to connect the two corresponding channels in the first and second rows.

[0013] In some embodiments, step S400 includes: S410, splicing the steel-plastic grilles to form unit segments; S420, installing the unit segments in sequence along the length direction of the first row to the side of the first row of channel steels facing the second row of channel steels; S430, installing the unit segments in sequence along the length direction of the second row to the side of the second row of channel steels facing the first row of channel steels; S440. Hang waterproof geotextile on the inner wall of the unit section.

[0014] In some embodiments, step S500 includes: S510, taking soil from the bottom of the cofferdam using a dredger; S520, the transport vessel moves the dredger to the cofferdam structure; S530, the first filling, using the excavator on the transport ship to fill the soil into the weir core; S540, the second filling, using the excavator on the transport ship to fill the soil into the weir core; S550, the third filling, using the excavator on the transport ship to fill the soil into the weir core.

[0015] In the technical solution, In some embodiments, step S600 includes: S610, waiting for the weir core fill to settle stably; S620, use a pump to remove the lake water in the cofferdam; S630, remove the silt inside the cofferdam; S640. Build and level the inner slope of the cofferdam in a width-to-height ratio of 1:2.

[0016] Based on the above technical scheme, in the embodiment of the present invention, the precise determination of the cofferdam position and the accurate arrangement of the pile position are achieved through satellite positioning and fine measurement and verification, laying a solid foundation for subsequent construction. At the same time, the various steps are closely connected, from measurement and positioning to pumping and desilting in the cofferdam, forming a set of efficient and orderly construction processes, which significantly shortens the construction period. Steel sheet piles are used as the main supporting structure of the cofferdam, and the verticality and density of the steel sheet piles are ensured by careful selection and hammering. In addition, a stable skeleton structure is formed by the connection of steel pipes and steel bars, which enhances the overall strength and stability of the cofferdam. This structure can effectively resist water flow impact and soil pressure, and ensure the safety and reliability of the cofferdam under complex environmental conditions. The laying of steel-plastic grid and waterproof geotextile provides an additional reinforcement and protective layer for the cofferdam. The steel-plastic grid has high tensile strength and can effectively disperse the stress inside the cofferdam; the geotextile has good waterproof performance, which can prevent water flow penetration and keep the inside of the cofferdam dry and stable. This combination not only improves the durability of the cofferdam, but also extends its service life. The core filling of the weir is carried out by dredgers and transport ships, which realizes fast and large-scale earthwork operations. The earth is taken from the inside of the cofferdam, which reduces the workload of subsequent silt removal. At the same time, after the filling is completed, the lake water in the cofferdam is pumped out by a pump and the internal silt is removed, providing a good working environment for subsequent construction. This efficient operation process not only improves the construction efficiency, but also ensures the cleanliness and dryness of the inside of the cofferdam. Throughout the construction process, attention is paid to environmental protection and sustainability. Through precise measurement and positioning, unnecessary earth excavation and backfilling are reduced, reducing the impact on the surrounding environment. At the same time, environmentally friendly materials such as waterproof geotextiles are used to ensure that the cofferdam will not pollute the water body during use. In addition, through reasonable construction arrangements and efficient operation processes, resource conservation and reuse are achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings: Figure 1 This is a schematic diagram of the overall structure of an embodiment of the rapid earth filling cofferdam method of the present invention after step S200; Figure 2A top view of an embodiment of the rapid earth filling cofferdam method of the present invention after step S200; Figure 3 This is a schematic diagram of the overall structure of an embodiment of the rapid earth filling cofferdam method of the present invention after step S400; Figure 4 A top view of an embodiment of the rapid earth filling cofferdam method of the present invention after S400; Figure 5 One of the working flow charts of an embodiment of the rapid earth filling cofferdam method of the present invention; Figure 6 This is the second working flow chart of an embodiment of the rapid earth filling cofferdam method of the present invention; Figure 7 The third working flow chart of an embodiment of the rapid earth filling cofferdam method of the present invention; Figure 8 This is a fourth working flow chart of an embodiment of the rapid earth filling cofferdam method of the present invention; Fig. 9 The fifth work flow chart of an embodiment of the rapid earth filling cofferdam method of the present invention; Fig.10 This is a sixth working flow chart of an embodiment of the rapid earth filling cofferdam method of the present invention; Fig.11 This is the seventh working flow chart of an embodiment of the rapid earth filling cofferdam method of the present invention.

[0018] In the figure: 100, control piles; 200, cofferdam outline; 300, channel steel; 400, steel pipe; 500, steel bars; 600, unit segment; 700, waterproof geotextile; 800, weir core; 900, inside of the cofferdam. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0020] In the description of the present invention, it should be understood that the terms "center", "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0021] The terms "first", "second", and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the technical features indicated. Thus, a feature defined as "first", "second", and "third" may explicitly or implicitly include one or more of the features.

[0022] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0023] Referring to all the accompanying drawings, in an illustrative embodiment of the rapid earth filling cofferdam method of the present invention, the rapid earth filling cofferdam method comprises: S100, measurement and positioning; S200, driving steel sheet piles; S300, skeleton forming; S400, laying of steel-plastic grid and geotextile; S500, weir core 800 fill; S600, pumping water and clearing silt from the cofferdam.

[0024] In the above scheme, the S100, measurement and positioning, accurate measurement and positioning ensured the accurate location of the cofferdam construction. This is the basis for building a stable cofferdam and provides a reliable reference for subsequent construction. The accuracy of measurement and positioning directly affects the overall layout and stability of the cofferdam and is an important link in ensuring the quality and safety of the project.

[0025] Through S200 and the installation of steel sheet piles, a solid support structure is provided for the cofferdam, which can effectively resist the impact of water flow and soil pressure. The verticality and density of the steel sheet piles are guaranteed through careful construction, thereby enhancing the stability and durability of the cofferdam. This step is the key to constructing the cofferdam skeleton and provides a stable support platform for subsequent construction.

[0026] Through S300, skeleton forming, and the connection of steel pipe 400 and steel bar 500, the skeleton structure of the cofferdam is formed. This skeleton structure not only enhances the overall strength and stability of the cofferdam, but also improves its anti-deformation ability. The completion of skeleton forming provides a good supporting foundation for the subsequent laying of steel-plastic grid and geotextile, ensuring the integrity and reliability of the entire cofferdam structure.

[0027] Through S400, laying steel-plastic grid and geotextile, laying steel-plastic grid and geotextile provides an additional reinforcement and protection layer for the cofferdam. The steel-plastic grid has high tensile strength and can effectively disperse the stress of 900 inside the cofferdam and improve the overall stability of the cofferdam. The geotextile has good waterproof performance and can effectively prevent water penetration and keep the inside of the cofferdam dry and stable. The completion of this step further enhances the protection ability and durability of the cofferdam.

[0028] The main structure of the cofferdam was quickly formed by filling with S500 and core 800. During the filling process, layered compaction was carried out according to the design requirements to ensure the density and stability of the cofferdam. The completion of the core 800 filling marked the formation of the main structure of the cofferdam, providing solid support for subsequent construction.

[0029] Through S600, pumping and dredging inside the cofferdam, after the main structure of the cofferdam is completed, pumping and dredging work inside the cofferdam is carried out. This step is to remove 900 of accumulated water and silt inside the cofferdam to ensure that the inside of the cofferdam is dry and clean. The completion of pumping and dredging provides a good working environment for subsequent construction, and also improves the use effect and safety of the cofferdam.

[0030] In some embodiments, S100, measurement and positioning, specifically involves measuring and positioning in water areas to demarcate the construction area.

[0031] Wherein, step S100 includes the following steps S110 to S150.

[0032] S110, determining the position of the guide control pile 100 at each first set distance according to the cofferdam plan design drawing and satellite positioning.

[0033] Furthermore, the first set distance may be 30 meters, which is a reasonable size range and is convenient for calibration, observation and construction.

[0034] Specifically, step S110 is to mark the coordinates of the guide control pile 100 on a map or GPS (satellite positioning system, which can also be replaced by Beidou system), and reach the coordinates by the construction ship according to the position indicated by GPS.

[0035] S120 , driving a control pile 100 at the position of the guide control pile 100 .

[0036] In some embodiments, step S120 may specifically include inserting the control pile 100 on the construction vessel into the water bottom.

[0037] It is worth noting that step S110 and step S120 can be performed alternately, that is, after calibrating the position of a guide control pile 100, the control pile 100 is directly inserted until all the control piles 100 are inserted. The operation is simple, and the construction vessel only needs one procession to complete all the work of step S110 and step S120, thereby improving work efficiency.

[0038] In addition, in some other embodiments, in step S110, after the construction ship reaches the coordinate according to the position indicated by the GPS, a mark is set on the water surface. The mark can be a buoy balloon, etc. In this method, step S120 can be performed after step S110 is completely completed, that is, after the positions of all the guide control piles 100 are completely calibrated, S120 is performed again, and the control piles 100 are inserted according to the calibrated positions. It can be manually verified after step S110 is completely calibrated to ensure that the positions of all calibrated guide control piles 100 are accurate before inserting the control piles 100, so as to avoid the situation of reworking due to errors and improve the accuracy of construction.

[0039] In some embodiments, step S100 further includes step S125, observing the construction area through satellite photography, and detecting whether the position of the guide control pile 100 and the position of the actually inserted control pile 100 are accurate. Step S125 may be after step S110 or after step S120.

[0040] S130, using wires to mark the cofferdam contour line 200 along the control piles 100. The wires after setting are the contour line of the cofferdam.

[0041] In some embodiments, the specific steps of step S130 are: a wire is installed on the construction ship, the construction ship is moved to one of the control piles 100, and the wire is connected to the corresponding control pile 100. Move to the next control pile 100 along the construction path, connect the wire to the corresponding control pile 100, and repeat the above steps until all the control piles 100 are connected by the wire.

[0042] In some embodiments, in step S130, the specific step of moving the construction vessel to one of the control piles 100 is to move the construction vessel to the control pile 100 at the end.

[0043] In some other embodiments, in step S130, the specific step of moving the construction vessel to one of the control piles 100 is to move the construction vessel to the control pile 100 closest to the shore.

[0044] In some other embodiments, in step S130, the specific step of moving the construction vessel to one of the control piles 100 is to move the construction vessel to the control pile 100 farthest from the shore.

[0045] The connection between the iron wire and the control pile 100 may be in various ways such as bundling, winding, and penetration.

[0046] In addition, in step S130, the construction path may be a path planned with reference to the construction drawings, or may be a path designated by the construction personnel according to the construction plan.

[0047] Furthermore, the construction path is not limited to a straight line, and can be curved or bent, that is, the cofferdam contour line 200 can be curved or bent.

[0048] S140, determining pile positions along the cofferdam contour line 200 according to the designed spacing.

[0049] In some embodiments, the specific steps of step S140 include step S141. In step S141, the construction vessel measures along the contour line and marks the water surface at every designed interval. The marks on the water surface are pile positions.

[0050] Among them, marking methods include but are not limited to setting buoys, balloons, etc.

[0051] In some other embodiments, the specific steps of step S140 include step S142. In step S142, according to the coordinates displayed by the GPS, the coordinates of the GPS are calculated along the design spacing of the cofferdam contour line 200, and the water surface is marked after moving to the corresponding position. The mark on the water surface is the pile position.

[0052] Furthermore, the GPS may be fixedly mounted on the bow of the construction vessel.

[0053] Among them, marking methods include but are not limited to setting buoys, balloons, etc.

[0054] It is worth noting that the above step S141 can be performed first or simultaneously with step S142. Furthermore, in step S140, one of S141 and S142 can be selected according to actual conditions.

[0055] S150, check the distance between the positioning positions.

[0056] In some embodiments, the specific steps of step S150 include step S151. In step S151: measuring the distance between two adjacent piles distributed along the cofferdam contour line 200 by pulling a line or a ruler to see whether the distance meets the design.

[0057] In some other embodiments, the specific steps of step S150 include S152. In step S152: the construction ship moves to one of the pile positions, and records the current GPS coordinates as the first parameter, moves to the next pile position along the cofferdam contour line 200, and records the current GPS coordinates as the second parameter. Calculate whether the numerical difference between the first parameter and the second parameter meets the design spacing. The operation process is simple and efficient.

[0058] Furthermore, when the construction vessel moves to the corresponding pile position, method 1 can be used to place the GPS above the pile position and record the coordinates. The coordinates recorded by this method are more accurate.

[0059] In addition, method 2 can also be used, where the GPS can be set at a fixed position on the construction vessel, and each time the GPS approaches the pile position, the distance and angle between the pile position and the GPS are the same, thereby ensuring that the GPS can be quickly calibrated without moving it.

[0060] It is worth noting that method 1 and method 2 can be used at the same time, that is, two GPSs are used for measurement.

[0061] It should also be noted that the above step S151 can be performed first or simultaneously with step S152. Also, in step S150, one of S151 and S152 can be selected according to actual conditions.

[0062] In some embodiments, in step S140, two rows of piles need to be set along the contour line. It can be that two rows of piles are set on both sides of the contour line respectively; please refer to the following for specific steps: Step S140 specifically includes marking the initial pile position of the first row at the shortest distance X meters from the contour line, and symmetrically marking the initial pile position of the second row at the position X meters away from the contour line on the other side of the contour line. Step S001, in the second row, measure along the contour line, and mark the water surface at the shortest distance X meters from the contour line and Y meters away from the previous marking point of the second row. In the first row, measure along the contour line, and mark the water surface at the shortest distance X meters from the contour line and Y meters away from the previous marking point of the first row. Repeat the above step S001 until all pile positions are marked.

[0063] In some other embodiments, step S140 is specifically to mark the initial pile position of the first row at the shortest distance X meters from the contour line, and symmetrically mark the initial pile position of the second row at the position X meters away from the contour line on the other side of the contour line. Step S002, in the second row, according to the coordinates displayed by the GPS, mark the water surface at the shortest distance X meters from the contour line and Y meters away from the previous marking point of the second row. In the first row, according to the coordinates displayed by the GPS, mark the water surface at the shortest distance X meters from the contour line and Y meters away from the previous marking point of the first row. Repeat the above step S002 until all pile positions are marked.

[0064] Among them, X is 1.5 meters and Y is 0.8 meters.

[0065] In some embodiments, in step S140, two rows of piles need to be set along the contour line. It can be a row of piles set on the contour line and another row of piles set on one side of the contour line; the specific steps are as follows: Step S140 specifically includes marking the initial pile positions of the first row on the contour line, and symmetrically marking the initial pile positions of the second row at a position A meters away from the contour line on the other side of the contour line. Step S003, in the second row, measure along the contour line, and mark the water surface at a position A meters away from the contour line and Y meters away from the last marked point of the second row. In the first row, measure along the contour line, and mark the water surface at a position Y meters away from the last marked point of the first row on the contour line. Repeat the above step S003 until all pile positions are marked.

[0066] Step S140 specifically includes marking the initial pile position of the first row on the contour line, and symmetrically marking the initial pile position of the second row at a position A meters away from the contour line on the other side of the contour line. Step S004, in the second row, mark the water surface at the shortest distance A meters from the contour line and Y meters away from the last marked point in the second row according to the coordinates displayed by the GPS. In the first row, mark the water surface at the distance Y meters from the last marked point in the first row on the contour line according to the coordinates displayed by the GPS. Repeat the above step S004 until all pile positions are marked.

[0067] Among them, A is 3 meters and Y is 0.8 meters.

[0068] In step S140 , the line connecting the channel steels 300 in the first row and the corresponding channel steels 300 in the second row is controlled to be perpendicular to the contour line.

[0069] In some embodiments, S200, driving steel sheet piles specifically includes driving steel sheet piles in the water area to preliminarily form a cofferdam. The steel sheet piles are formed by two rows of multiple channel steels 300 arranged at intervals.

[0070] Among them, step S200 of driving steel sheet piles includes the following steps S200 to S230.

[0071] S210, select steel sheet piles; Furthermore, in step S210, the specific step of selecting the steel sheet piles is to use No. 20 channel steel 300 with a length of 7 meters.

[0072] S220, inserting steel sheet piles: 300 channel steels are transported to the construction site by transport ship and driven by pile-driving ship.

[0073] Step S220 includes the following steps S223 to S224.

[0074] S221, 300 channel steels are loaded into a transport ship and transported to the construction site by the transport ship; S222, the piling vessel moves to the construction site and approaches the transport vessel; S223, insert the first row of channel steels 300; use a pile-driving ship to clamp one of the channel steels 300, align it with one of the marked pile positions and insert it; take out the next channel steel 300, align it with the next pile position in the first row of pile positions and insert it.

[0075] In some embodiments, in step S223, the specific step of inserting one of the pile positions is inserting the pile position at the end, that is, the first inserted channel steel 300 is inserted into the pile position at the end of the pile positions in the first row.

[0076] In some other embodiments, in step S223, the specific step of inserting one of the pile positions is to insert the pile position closest to the shore, that is, the first inserted channel steel 300 is inserted into the pile position closest to the shore in the first row of pile positions.

[0077] In some other embodiments, in step S223, the specific step of inserting one of the pile positions is to insert the pile position farthest from the shore, that is, the first inserted channel steel 300 is inserted into the pile position farthest from the shore in the first row of pile positions.

[0078] S224, insert the second row of channel steels 300; use a pile-driving ship to clamp one of the channel steels 300, align it with one of the marked pile positions and insert it; take out the next channel steel 300, align it with the next pile position in the second row of pile positions and insert it.

[0079] In some embodiments, in step S224, the specific step of inserting one of the pile positions is inserting the pile position at the end, that is, the first inserted channel steel 300 is inserted into the pile position at the end of the pile positions in the second row.

[0080] In some other embodiments, in step S224, the specific step of inserting one of the pile positions is to insert the pile position closest to the shore, that is, the first inserted channel steel 300 is inserted into the pile position closest to the shore in the second row of pile positions.

[0081] In some other embodiments, in step S224, the specific step of inserting one of the pile positions is to insert the pile position farthest from the shore, that is, the first inserted channel steel 300 is inserted into the pile position farthest from the shore in the second row of pile positions.

[0082] It is worth noting that step S224 may be performed after step S223, or step S223 and step S224 may be performed simultaneously, or step S223 and step S224 may be performed alternately.

[0083] In some embodiments, in some embodiments, step S225 may be further included after step S220; step S225 is to remove the guide control pile 100 and the corresponding wire.

[0084] S230. Use a tamping machine to pound the top of channel steel 300.

[0085] In some embodiments, the specific steps of step S230 are: using a diesel rammer with a hammer weight of 1.5 tons. The rammer is fixed to the bow of the construction ship. The rammer hammer of the rammer hits the top of the channel steel 300 to insert the channel steel 300 into the water until the designed depth is reached. The rammer is controlled to move to the next channel steel 300 and the above steps are repeated.

[0086] It is worth noting that step S230 may be performed after step S223. It may also be performed after step S223 and step S224 are all completed. It may also be performed alternately with step S223. It may also be performed alternately with step S224. It may also be performed alternately with step S223 and step S224.

[0087] S300, skeleton forming, which forms the skeleton of the cofferdam to make it a whole, improve the strength and facilitate the subsequent laying of steel-plastic grid and geotextile.

[0088] The step S300 of skeleton forming includes the following steps S310 and S320.

[0089] S310, connecting the channel steels 300 in the same row through the steel pipe 400.

[0090] Wherein, step S310 includes step S311 and step S312.

[0091] In some embodiments, step S311 is to connect the first row of channel steels 300 using a steel pipe 400. Specifically, the steel pipe 400 is moved to the side of the first row of channel steels 300 away from the second row of channel steels 300 by a construction ship, and the steel pipe 400 is connected to one of the channel steels 300. The construction ship is moved to the next channel steel 300 in the first row of channel steels 300, and the steel pipe 400 is connected to the corresponding channel steel 300. The above steps are repeated until the steel pipe 400 is connected to the first row of channel steels 300. It is worth noting that the steel pipe 400 is located above the water surface.

[0092] Further, in step S311, the steel pipe 400 is connected to one of the channel steels 300, which may be the channel steel 300 at the end of the first row, or the channel steel 300 closest to the shore, or the channel steel 300 farthest from the shore.

[0093] In some embodiments, step S312 is to connect each channel steel 300 of the second row with a steel pipe 400. Specifically, the steel pipe 400 is moved to the side of the second row of channel steels 300 away from the second row of channel steels 300 by a construction ship, and the steel pipe 400 is connected to one of the channel steels 300. The construction ship is moved to the next channel steel 300 in the second row of channel steels 300, and the steel pipe 400 is connected to the corresponding channel steel 300, and the above steps are repeated until the steel pipe 400 is connected to the second row of channel steels 300. It is worth noting that the steel pipe 400 is located above the water surface.

[0094] Further, in step S312, the steel pipe 400 is connected to one of the channel steels 300, which may be the channel steel 300 at the end of the second row, or the channel steel 300 closest to the shore, or the channel steel 300 farthest from the shore.

[0095] It is worth noting that step S311 and step S312 can be performed simultaneously, step S311 can be completed first and then step S312, or step S312 can be completed first and then step S311.

[0096] In some embodiments, in step S320, two corresponding channel steels 300 in the first row and the second row are connected with steel bars 500.

[0097] Further, step S320 is specifically to use a steel bar 500 with a diameter of 8 mm, connect one end of the steel bar 500 to one of the channel steels 300 in the first row, and connect the other end of the steel bar 500 to the corresponding channel steel 300 in the second row. Move to the channel steel 300 that has not been connected to the steel bar 500 and repeat the above steps. The corresponding channel steel 300 in the second row is the channel steel 300 in the second row that is closest to the steel bar 500.

[0098] In addition, one end of the steel bar 500 may be connected to one of the channel steels 300 in the second row, and the other end of the steel bar 500 may be connected to the corresponding channel steel 300 in the first row. Move to the channel steel 300 that has not been connected to the steel bar 500 and repeat the above steps. The corresponding channel steel 300 in the first row is the channel steel 300 in the first row that is closest to the steel bar 500.

[0099] Furthermore, in step S320, preferably, when connecting the steel bars 500, the connection is performed sequentially along the length direction of the first row and the second row.

[0100] The two channel steels 300 are pulled against each other by the steel bars 500 .

[0101] Furthermore, the steel bars 500 and the channel steels 300 may be connected by bundling, winding, tying, or the like.

[0102] In some embodiments, after step S320, the method further includes: if the two channel steels 300 connected to the steel bars 500 are inclined from bottom to top in a direction away from each other, tightening the steel bars 500 to bring the two ends of the steel bars 500 closer to each other, and pulling the two channel steels 300 to achieve verticality of the channel steels 300.

[0103] It is worth noting that the order of step S310 and step S320 can be swapped; step S310 and step S320 can also be performed simultaneously; step S310 and step S320 can also be performed alternately; step S310 and step S320 can also be performed simultaneously.

[0104] S400, laying steel-plastic grid and geotextile; laying steel-plastic grid and geotextile on the frame to make it waterproof.

[0105] Among them, step S400 of laying steel-plastic grid and geotextile includes the following steps S410 to S440.

[0106] S410, splicing the steel-plastic gratings to each other to form a unit segment 600.

[0107] In some embodiments, the specific steps of step S410 are: using three 2m×2.4m steel-plastic grids to splice into a unit segment 600. A plurality of unit segments 600 are manufactured to ensure that the length and number of the unit segments 600 are sufficient for cofferdam construction.

[0108] Furthermore, step S410 also includes connecting the three steel-plastic grilles in sequence along a single direction, and the connection methods include but are not limited to welding, bundling, etc.

[0109] Furthermore, the three steel-plastic grilles are connected in sequence along the width direction. Or, the three steel-plastic grilles are connected in sequence along the length direction.

[0110] S420 , sequentially installing the unit segments 600 along the length direction of the first row to the side of the first row of channel steels 300 facing the second row of channel steels 300 .

[0111] In some embodiments, step S420 further includes placing any two adjacent unit segments 600 in close contact with each other, that is, when installing a unit segment 600, placing it in close contact with the previous unit segment 600.

[0112] Furthermore, in step S420, the specific step of installing the unit segment 600 to the first row of channel steels 300 is to use No. 8 iron wire to fix the unit segment 600 to the inner wall of the first row of channel steels 300. The iron wire can bundle the unit segment 600 with the corresponding channel steel 300.

[0113] S430 , sequentially installing the unit segments 600 along the length direction of the second row to the side of the second row of channel steels 300 facing the first row of channel steels 300 .

[0114] In some embodiments, step S430 further includes placing any two adjacent unit segments 600 in close contact with each other, that is, when installing a unit segment 600, placing it in close contact with the previous unit segment 600.

[0115] Furthermore, in step S430, the specific step of installing the unit segment 600 to the second row of channel steels 300 is to fix the unit segment 600 to the inner wall of the second row of channel steels 300 with No. 8 iron wire. The iron wire can bundle the unit segment 600 with the corresponding channel steel 300.

[0116] It is worth noting that the order of step S420 and step S430 can be swapped; step S420 and step S430 can also be performed simultaneously; step S420 and step S430 can also be performed alternately.

[0117] S440 , hanging a waterproof geotextile 700 on the inner wall of the unit segment 600 .

[0118] In some embodiments, step S440 includes step S441 and step S442.

[0119] In some embodiments, step S441 is to install the waterproof geotextile 700 on the side of the unit section 600 of the first row of channel steels 300 facing the second row of channel steels 300 .

[0120] Further, step S441 is to install multiple waterproof geotextiles 700 along the extension direction of the first row of channel steels 300 on the side of the unit section 600 of the first row of channel steels 300 facing the second row of channel steels 300. When the waterproof geotextile 700 is installed, it is closely attached to the last installed waterproof geotextile 700.

[0121] Furthermore, in step S441, the connection methods of the waterproof geotextile 700 and the unit segment 600 include but are not limited to bonding, hanging, and bundling.

[0122] Step S442 is to install the waterproof geotextile 700 on the side of the unit section 600 of the second row of channel steels 300 facing the first row of channel steels 300 .

[0123] Further, step S442 is to install multiple waterproof geotextiles 700 on the side of the unit section 600 of the second row of channel steels 300 facing the first row of channel steels 300 along the extension direction of the second row of channel steels 300. When the waterproof geotextile 700 is installed, it is closely attached to the last installed waterproof geotextile 700.

[0124] Furthermore, in step S442, the connection methods of the waterproof geotextile 700 and the unit segment 600 include but are not limited to bonding, hanging, and bundling.

[0125] It is worth noting that the order of step S441 and step S442 can be swapped; step S441 and step S442 can also be performed simultaneously; step S441 and step S442 can also be performed alternately.

[0126] S500, filling the weir core 800 with soil. The area formed between the waterproof geotextile 700 on the first row of channel steels 300 and the waterproof geotextile 700 on the second row of channel steels 300 is the weir core 800. Soil is filled into the weir core 800 to realize the construction of the cofferdam structure.

[0127] It is worth noting that the structural part formed by the first row of channel steels 300, the second row of channel steels 300, the unit segments 600, the geotextile and the weir core 800 after filling is called the cofferdam structure part. The independent area enclosed by the cofferdam structure can be the interior of the cofferdam.

[0128] Among them, step S500 of filling the weir core 800 includes the following steps S510 to S560.

[0129] Step S510: using a dredger to take soil from the bottom of the cofferdam.

[0130] Step S520: The transport ship moves the dredger to the side of the cofferdam structure; Step S530 , first filling of soil, using an excavator on the transport ship to fill soil into the weir core 800 .

[0131] In some embodiments, the specific steps of step S530 are to fill the interior of the weir core 800 with soil so that the height of the soil inside the weir core 800 reaches a first height.

[0132] Step S540: Second soil filling: using the excavator on the transport ship to fill the soil into the weir core 800.

[0133] In some embodiments, the specific steps of step S540 are to fill the interior of the weir core 800 with soil so that the height of the soil inside the weir core 800 reaches a second height.

[0134] It is conceivable that the second height is higher than the first height.

[0135] Step S550 , the third soil filling, using the excavator on the transport ship to fill the soil into the weir core 800 .

[0136] In some embodiments, the specific step of step S550 is to fill the interior of the weir core 800 with soil so that the soil height inside the weir core 800 reaches a third height. It is conceivable that the third height is higher than the second height.

[0137] Furthermore, the third height is above the water surface.

[0138] Step S560: Fill the soil in the weir core 800 to a level higher than the water level, and compact the soil in the weir core 800 using the bucket of an excavator.

[0139] The row structure formed by the channel steel 300 , the unit segment 600 and the waterproof geotextile 700 may be referred to as a steel sheet pile, and the area between two rows of steel sheet piles is a weir core 800 .

[0140] In step S530 to step S550, filling the soil in three times can avoid excessive pressure inside the weir core 800 due to filling the soil in one construction, which causes the steel sheet piles on both sides to tilt outward and deform. In the present application, filling the soil in three times can well share the pressure inside the weir core 800 and avoid the situation where the steel sheet piles tilt outward and deform.

[0141] S600, pumping water and clearing silt inside the cofferdam.

[0142] Among them, step S600 of pumping water and clearing silt in the cofferdam includes the following steps S610 to S660.

[0143] S610, wait for the filling of the weir core 800 to settle and stabilize.

[0144] In some embodiments, the specific steps of step S610 are to detect the filling soil in the weir core 800 by using a detection device, or to wait for a preset time.

[0145] S620. Use a pump to remove the lake water from the cofferdam.

[0146] In some embodiments, the specific steps of step S620 are: using four pumps, the input end of which extends into the cofferdam 900, and the output section of the pump extends outside the cofferdam, and starting the pumps until the water in the cofferdam is pumped away.

[0147] S630, remove 900 ml of silt from inside the cofferdam.

[0148] In some embodiments, the specific steps of step S630 are: using an excavator or a bulldozer to drive to the inside of the cofferdam 900, digging the silt into a transport vehicle or a transport ship, and using the transport ship to transport the silt to a designated location.

[0149] S640. Build and level the inner slope of the cofferdam in a width-to-height ratio of 1:2.

[0150] In some embodiments, the specific steps of step S640 are to construct the inner slope of the cofferdam by using the bucket of the excavator.

[0151] S650. Build a construction access road 900 meters inside the cofferdam.

[0152] S660: Replace the inner base of the cofferdam with 5% lime soil until the pile top and bottom elevation. It is worth noting that the inner base of the cofferdam is the land after the silt is cleared.

[0153] Through the description of multiple embodiments of the rapid earth filling cofferdam method of the present invention, it can be seen that the rapid earth filling cofferdam method of the present invention has at least one or more of the following advantages: Through satellite positioning and fine measurement and verification, the cofferdam position was accurately determined and the pile position was accurately arranged, laying a solid foundation for subsequent construction. At the same time, the various steps were closely connected, from measurement and positioning to pumping and desilting in the cofferdam, forming an efficient and orderly construction process, which significantly shortened the construction period. Steel sheet piles were used as the main supporting structure of the cofferdam. Through careful selection and hammering fixation, the verticality and density of the steel sheet piles were ensured. In addition, through the connection of steel pipe 400 and steel bar 500, a stable skeleton structure was formed, which enhanced the overall strength and stability of the cofferdam. This structure can effectively resist the impact of water flow and soil pressure, and ensure the safety and reliability of the cofferdam under complex environmental conditions. The laying of steel-plastic grid and waterproof geotextile 700 provides an additional reinforcement and protective layer for the cofferdam. The steel-plastic grid has high tensile strength and can effectively disperse the stress of 900 inside the cofferdam; the geotextile has good waterproof performance, which can prevent water flow penetration and keep 900 inside the cofferdam dry and stable. This combination not only improves the durability of the cofferdam, but also extends its service life. The 800-meter filling of the core of the weir was carried out by dredgers and transport ships, which achieved fast and large-scale earthwork operations, and the soil was taken from 900 meters inside the cofferdam, reducing the workload of subsequent silt removal. At the same time, after the filling was completed, the lake water in the cofferdam was pumped out by a pump and the internal silt was removed, providing a good working environment for subsequent construction. This efficient operation process not only improves the construction efficiency, but also ensures the cleanliness and dryness of 900 meters inside the cofferdam. Throughout the construction process, attention was paid to environmental protection and sustainability. Through precise measurement and positioning, unnecessary earth excavation and backfilling were reduced, reducing the impact on the surrounding environment. At the same time, environmentally friendly materials such as waterproof geotextile 700 were used to ensure that the cofferdam would not pollute the water body during use. In addition, through reasonable construction arrangements and efficient operation processes, resource conservation and reuse were achieved.

[0154] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0155] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A rapid earth filling cofferdam method, It is characterized in that include: S100, measurement and positioning; S200, steel sheet pile installation; S300, frame forming; S400, laying of steel-plastic grid and geotextile; S500, core filling; S600, pumping and dredging of cofferdam; Among them, S100 includes: S110, according to the cofferdam plane design drawing, the position of the guide control pile is determined according to each first set distance of the satellite positioning; S120, the control pile is set at the position of the guide control pile; S130, the cofferdam contour line is marked along the control pile with a wire; S140, the pile position is determined according to the designed spacing along the cofferdam contour line; S150, the spacing between the positioning positions is checked; Among them, S200 includes: S210, selecting steel sheet piles; S220, inserting steel sheet piles; S230, using a tamping machine to pound the top of the channel steel; Wherein, S300 includes: S310, connecting each channel steel in the same row by steel pipe; step S320, connecting two corresponding channel steels in the first row and the second row by steel bars; Among them, S400 includes: S410, splicing the steel-plastic gratings to form unit sections; S420, installing the unit sections in sequence along the length direction of the first row to the side of the first row of channel steels facing the second row of channel steels; S430, installing the unit sections in sequence along the length direction of the second row to the side of the second row of channel steels facing the first row of channel steels; S440, hanging waterproof geotextile on the inner wall of the unit section.

2. The rapid earth filling cofferdam method according to claim 1, It is characterized in that In step S110, the steps specifically include marking the coordinates of the guide control piles on a map or GPS; and reaching the coordinates by a construction vessel according to the position indicated by the GPS.

3. The rapid earth filling cofferdam method according to claim 1, It is characterized in that In step S140, the construction vessel is measured along the contour line, and the water surface is marked at each designed interval; when marking, the marking point on the water surface is set at 1.5 meters away from the contour line; specifically, the initial pile position of the first row is marked at the shortest distance X meters from the contour line, and the initial pile position of the second row is symmetrically marked at a position X meters away from the contour line on the other side of the contour line; in step S001, in the second row, along the contour line, the water surface is marked at the shortest distance X meters from the contour line and Y meters away from the previous marking point of the second row; in the first row, along the contour line, the water surface is marked at the shortest distance X meters from the contour line and Y meters away from the previous marking point of the first row; repeat the above step S001 until all pile positions are marked.

4. The rapid earth filling cofferdam method according to claim 1, It is characterized in that Step S140 specifically includes marking the initial pile positions of the first row on the contour line, and symmetrically marking the initial pile positions of the second row at a position A meters away from the contour line on the other side of the contour line; Step S003, measuring along the contour line in the second row, marking the water surface at a position A meters away from the contour line and Y meters away from the last marked point of the second row; measuring along the contour line in the first row, marking the water surface at a position Y meters away from the last marked point of the first row on the contour line; Repeat the above step S003 until all pile positions are marked.

5. The rapid earth filling cofferdam method according to claim 1, It is characterized in that The specific steps of step S150 include step S151 and / or step S152; In step S151: the distance between two adjacent piles distributed along the cofferdam contour line is measured by pulling a line or a ruler to see whether it meets the designed distance; In step S152: the construction vessel moves to one pile position and records the current GPS coordinates as the first parameter, moves to the next pile position along the cofferdam contour line, and records the current GPS coordinates as the second parameter; calculates whether the numerical difference between the first parameter and the second parameter meets the design spacing.

6. The rapid earth filling cofferdam method according to claim 1, It is characterized in that Step S220 includes: S221. The channel steel is loaded into a transport ship and transported to the construction site by the transport ship; S222, the piling vessel moves to the construction site and approaches the transport vessel; S223, insert the first row of channel steels; use a pile-driving boat to clamp one of the channel steels, align it with one of the marked pile positions and insert it; take out the next channel steel, align it with the next pile position in the first row of pile positions and insert it; S224, insert the second row of channel steels; use a pile-driving boat to clamp one of the channel steels, align it with one of the marked pile positions and insert it; take out the next channel steel, align it with the next pile position in the second row of pile positions and insert it.

7. The rapid earth filling cofferdam method according to claim 1, It is characterized in that Step S300 includes: S310, connecting the channel steels in the same row through steel pipes; S320, use steel bars to connect the two corresponding channels in the first and second rows.

8. The rapid earth filling cofferdam method according to claim 1, It is characterized in that Step S400 includes: S410, splicing the steel-plastic grilles to form unit segments; S420, installing the unit segments in sequence along the length direction of the first row to the side of the first row of channel steels facing the second row of channel steels; S430, installing the unit segments in sequence along the length direction of the second row to the side of the second row of channel steels facing the first row of channel steels; S440. Hang waterproof geotextile on the inner wall of the unit section.

9. The rapid earth filling cofferdam method according to claim 1, It is characterized in that Step S500 includes: S510, taking soil from the bottom of the cofferdam using a dredger; S520, the transport vessel moves the dredger to the cofferdam structure; S530, the first filling, using the excavator on the transport ship to fill the soil into the weir core; S540, the second filling, using the excavator on the transport ship to fill the soil into the weir core; S550, the third filling, using the excavator on the transport ship to fill the soil into the weir core.

10. The rapid earth filling cofferdam method according to claim 1, It is characterized in that Step S600 includes: S610, waiting for the weir core fill to settle stably; S620, use a pump to remove the lake water in the cofferdam; S630, remove the silt inside the cofferdam; S640. Build and level the inner slope of the cofferdam in a width-to-height ratio of 1:2.

Citation Information

Patent Citations

  • Cofferdam damming method under shallow water silt conditions

    CN108570996A

  • Shallow water territory steel pipe pile holder fortifield village weir structure

    CN205975646U

  • Tidal river reach steel pipe pile pull anchor combined cofferdam

    CN215105430U

  • Cofferdam structure and construction method of temporary facility using the same

    KR102181917B1

Cited By

  • Method and system for improving construction efficiency of pile driving barge based on artificial intelligence

    CN120087197A

  • Method and system for improving construction efficiency of pile-driving boat based on artificial intelligence

    CN120087197B