The invention relates to a method for rapidly filling a
cofferdam with soil, and belongs to the field of cofferdams. The method for rapidly filling the
cofferdam with the soil comprises the following steps: S100, measuring and S200, steel sheet piles are driven; s300, a framework is formed; s400, a steel-plastic grid and geotechnical cloth are laid; s500, filling the weir core with soil; s600,
water pumping and desilting are conducted in the
cofferdam; wherein S100 comprises the following steps: S110, positioning each first
set distance according to a cofferdam plane design drawing and
satellite positioning to determine the position of a guide control
pile; s120, a control
pile is driven at the position of the guide control
pile; s130, marking a cofferdam
contour line along the control pile by using an iron wire stay wire; s140, determining pile positions along the
contour line of the cofferdam according to a design interval; s150, the distance between the positioning positions is verified; s200 comprises the following steps: S210, selecting a steel
sheet pile; s220, steel sheet piles are inserted; s230, the top of the steel channel is beaten through a tamping
machine; the step S300 comprises the substeps that S310, the channel steel in the same row is connected through steel pipes; and S320, the two pieces of corresponding channel steel in the first row and the second row are connected through reinforcing steel bars.