The utility model discloses an improved garbage
incineration power
plant, including the garbage transport passage that sets gradually, garbage loading and unloading area, boiler area and new
flue gas area, be equipped with the unloading door between garbage loading and unloading area and garbage transport passage, when unloading door opens, garbage transport car is transported to garbage loading and unloading area in garbage transport passage with garbage, be equipped with
remote control loader and feeding mechanism in garbage loading and unloading area, feeding mechanism is connected with boiler area,
remote control loader is used to load garbage to feeding mechanism, feeding mechanism is used to transport garbage to boiler area and carries out
incineration, the
incineration flue gas of boiler area generation is discharged through new
flue gas area. The utility model has the characteristics such as
function optimization, small floor space, low building cost, fully considers the small
tonnage of garbage of
small town and underdeveloped area, realizes the maximum limit that
small town, underdeveloped area can build garbage incineration power
plant.