Dry-type connecting method for upper-layer prefabricated wall and lower-layer prefabricated wall
By opening hand holes and bolt holes at the connection end of the prefabricated wall and using bolts for dry connection, the problem of slow installation speed of prefabricated walls in prefabricated buildings in the prior art is solved, and faster and more accurate walls are achieved Installation improves construction efficiency.
Patent Information
- Application Number
- CN202411175906.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prefabricated walls of existing prefabricated buildings have complex processes and slow assembly speed during on-site installation, which affects construction efficiency.
Hand holes and bolt holes are opened at the connection end of the prefabricated wall, and dry connections are made with bolts to simplify the installation process.
It greatly improves the speed and accuracy of wall installation and improves construction efficiency.
Smart Images

Figure CN118895870A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to building construction, in particular to a dry-type connection method for upper and lower prefabricated walls. Background Art
[0002] With the global green and low-carbon transformation and the requirements of sustainable development, prefabricated buildings, as an emerging force in the construction industry, have shown great development potential and broad market prospects. In recent years, the Chinese government has attached great importance to the development of prefabricated buildings and has promoted its rapid development by continuously issuing a number of policies.
[0003] The prefabricated walls of existing prefabricated buildings have complicated procedures and slow assembly speed during on-site installation, which affects construction efficiency. Summary of the invention
[0004] The present invention aims to solve the above technical problems, thereby providing a dry-type connection method for upper and lower prefabricated walls, which greatly speeds up the installation of the walls.
[0005] The technical solution adopted by the present invention to solve the technical problem is: A method for dry-connecting upper and lower prefabricated walls, comprising the following steps: S1. During the production of prefabricated walls, hand holes are opened on the side walls of the connecting ends of two adjacent prefabricated walls, and bolt holes are opened on the top and bottom surfaces of the hand holes of the two prefabricated walls; S2. Transport the prefabricated walls to the construction site; S3, installation of lower prefabricated walls; S4, the upper prefabricated wall is placed on the lower prefabricated wall; S5. Install bolts in the bolt holes of the lower prefabricated wall and the upper prefabricated wall; S6. Repeat steps S4-S5 to install the upper prefabricated walls in sequence.
[0006] Compared with the prior art, the present invention using the above technical solution has the following beneficial effects: Bolt holes are reserved in advance on the side walls of two adjacent prefabricated walls. During on-site installation, the two prefabricated walls are fixed and installed using bolts. This not only greatly improves the wall installation speed, but also improves the installation accuracy, thereby improving construction efficiency.
[0007] Further, the optimization scheme of the present invention is: The hand hole is a blind hole structure.
[0008] The bolt hole passes through the end surface of the prefabricated wall.
[0009] The bottom surface and top surface of the hand holes at the upper and lower ends of the same prefabricated wall are arranged inclined. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a front view of an embodiment of the present invention; Figure 2 for Figure 1 A top view of Figure 3 for Figure 1 Left view of; Figure 4 The figure is a schematic diagram of the connection of two layers of prefabricated walls according to an embodiment of the present invention.
[0011] In the figure: prefabricated wall 1; hand hole 101; bolt hole 102; bolt 2; lower prefabricated wall 3; upper prefabricated wall 4. DETAILED DESCRIPTION
[0012] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0013] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0014] See also Figure 1-Figure 3 This embodiment provides a method for dry-connecting upper and lower prefabricated walls, which is performed in the following steps: S1. During the production of the prefabricated wall 1, a plurality of hand holes 101 are opened on the side wall surface of the connecting end of two adjacent prefabricated walls 1. The hand holes 101 are blind hole structures, and the size of the hand holes 101 is 100×90×80 mm. The cross section of the hand holes 101 is square or rectangular. The bottom and top surfaces of the hand holes 101 at the upper and lower ends of the same prefabricated wall 1 are inclined. Bolt holes 102 are opened on the top and bottom surfaces of the hand holes 101 of the two adjacent prefabricated walls 1, and the bolt holes 102 penetrate the end surface of the prefabricated wall 1.
[0015] S2, transporting the prefabricated wall 1 to the construction site; S3, the lower prefabricated wall 3 is fixedly installed to the foundation.
[0016] S4, the upper prefabricated wall 4 is placed on the lower prefabricated wall 3 ( Figure 4 shown); S5 , bolts 2 are installed in the bolt holes 102 of the lower prefabricated wall 3 and the upper prefabricated wall 4 , and the lower prefabricated wall 3 and the upper prefabricated wall 4 are fixed by the bolts 2 .
[0017] S6. Repeat steps S4-S5 to install the upper prefabricated wall 4 in sequence.
[0018] The present invention simplifies the wall installation method, greatly improves the wall installation speed, and also improves the installation accuracy and construction efficiency.
[0019] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A method for dry-connecting upper and lower prefabricated walls, comprising the following steps: S1. During the production of prefabricated walls, hand holes are opened on the side walls of the connecting ends of two adjacent prefabricated walls, and bolt holes are opened on the top and bottom surfaces of the hand holes of the two prefabricated walls; S2. Transport the prefabricated walls to the construction site; S3, installation of lower prefabricated walls; S4, the upper prefabricated wall is placed on the lower prefabricated wall; S5. Install bolts in the bolt holes of the lower prefabricated wall and the upper prefabricated wall; S6. Repeat steps S4-S5 to install the upper prefabricated walls in sequence.
2. The dry connection method of upper and lower prefabricated walls according to claim 1 is characterized in that: The hand hole is a blind hole structure.
3. The dry connection method of upper and lower prefabricated walls according to claim 1 is characterized in that: The bolt hole passes through the end surface of the prefabricated wall.
4. The dry connection method of upper and lower prefabricated walls according to claim 1 is characterized in that: The bottom surface and top surface of the hand holes at the upper and lower ends of the same prefabricated wall are inclined.