Booster station building structure and booster station design method

By utilizing multi-story building structures and underground space, combining fire-fighting water tanks and emergency oil tanks, and optimizing the layout of photovoltaic modules, the problems of large land area and large amount of earthwork for the substation were solved, achieving a cost-effective and compact building layout and reducing construction costs.

CN118895887AInactive Publication Date: 2024-11-05徐闻县粤水电能源有限公司 +2
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411010603.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When planning and constructing photovoltaic substations in towns and surrounding areas, problems such as complicated approval procedures for land use, high land prices, difficulty in land acquisition and demolition, and difficulty in site leveling and soil extraction or disposal are encountered, resulting in large land area, large amount of earthwork, and high costs for substations.

Method used

The building adopts a multi-story structure, including a comprehensive building and a production building. It combines underground space utilization and photovoltaic module layout, connects the above-ground buildings with the outdoor ground through steps, and combines fire water tanks and emergency oil tanks. It optimizes the building layout and functional area division, utilizes underground and above-ground space, and reduces the land area and earthwork volume.

Benefits of technology

It enables the functional layout to be completed within a smaller building area, saving the number of buildings, improving space utilization, reducing earthwork, and lowering construction costs. It is suitable for the construction of photovoltaic project booster stations in urban and surrounding areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895887A_ABST
    Figure CN118895887A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of booster station construction, and particularly relates to a booster station building structure and a booster station design method. The booster station building structure comprises an enclosing wall, an overground building is arranged in the enclosing wall, the overground building comprises a composite building of a multi-layer structure and a production building of a multi-layer structure, an outdoor terrace of a booster station is 0.3-0.5 m higher than the surrounding terrain, the + / -0 elevation of the overground building is 0.3 m higher than the flood level, and a foundation of the overground building is in an elevated form. Transition between the overground building and the outdoor terrace is achieved through steps. The design method of the booster station comprises the following steps: arranging a multi-storey building; and utilizing the underground space of the building or the structure. Through the arrangement technology of the multi-storey complex building and the production building, arrangement of all functional rooms can be completed by using a small building area, compact, reasonable and economical building layout is achieved, and the building area is saved while the building function is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of booster station construction, and in particular relates to a booster station building structure and a design method for the booster station. Background Art

[0002] The photovoltaic project booster station should be arranged according to the production, construction and living needs of the project, combined with the natural conditions and construction plan of the station site and its surrounding areas, and the water supply and drainage, transportation, and line location within the station should be planned. The booster station generally includes living quarters, production rooms, auxiliary rooms, main transformer foundations and accident oil pools, various production equipment foundations, cable trenches, sewage treatment facilities, walls, roads, parking areas and other buildings (structures). When the booster station is located in towns and surrounding areas, it usually faces complicated procedures for approval of construction land use, high land prices, difficult land acquisition and demolition work, and difficulties in site leveling and soil excavation or disposal during the construction period. Therefore, during the planning and layout stage of the booster station, in addition to meeting the local government's planning conditions for the project construction land, it should also reasonably reduce the area occupied by the booster station and reduce the amount of earthwork for site leveling.

[0003] When planning the construction of photovoltaic project booster stations in towns and surrounding areas, innovative land-saving methods were proposed to improve land utilization, reduce the floor space of booster stations, save land acquisition fees, and reduce the difficulty of land acquisition and demolition work. Summary of the Invention

[0004] In order to solve the above technical problems, that is, how to reduce the floor space of the booster station, reduce the earthwork volume of the site leveling project, and save costs.

[0005] The present invention provides the following technical solutions:

[0006] In the first aspect, the present invention provides a booster station building structure, including a wall, with ground buildings arranged inside the wall, the ground buildings including a multi-story comprehensive building and a multi-story production building, the outdoor floor of the booster station is 0.3 to 0.5 meters higher than the surrounding terrain, the ±0 elevation of the ground buildings is set to 0.3 meters higher than the flood level, the foundation of the ground buildings is in an elevated form, and the transition between the ground buildings and the outdoor floor is connected by steps.

[0007] Furthermore, toilets are provided under the stairwells on the first floor of the comprehensive building and the production building.

[0008] Furthermore, a fire water tank is set up under the comprehensive building. The fire water tank is composed of a bottom plate, walls and a top plate. The bottom plate in the fire water tank is connected to the foundation of the comprehensive building, the walls in the fire water tank are connected to the beams and columns below ±0 of the comprehensive building, and the top plate in the fire water tank is connected to the ground of the ±0 floor of the comprehensive building.

[0009] Furthermore, a circular road is set between the wall and the production building, and an emergency oil pool is set in the open space formed by the corner of the circular road and the corner of the wall, and the emergency oil pool is set underground.

[0010] Furthermore, a central control room is provided in the production building, and a remote video monitoring system and an automatic access control identification system for the gate of the booster station wall are installed in the central control room.

[0011] In a second aspect, the present invention provides a design method for a booster station, comprising:

[0012] The layout of multi-story buildings includes setting up a comprehensive building integrating living, production, and auxiliary functions, and setting up a production building that concentrates all equipment that needs to be installed indoors in the booster station; based on the building function and building height of the multi-story building, each floor of the multi-story building should be arranged according to the independence and relevance of the room use function;

[0013] Utilization of underground space of buildings or structures, combining underground structures with building structures, and combining underground structures with above-ground structures.

[0014] Furthermore, the layout of the comprehensive building specifically includes the following steps:

[0015] 1) Determine the building functions of the comprehensive building: According to the actual situation of the booster station, determine the building functions that need to be set up in the comprehensive building, and set up several functional rooms, including duty rooms, toilets, stairwells, guard rooms, storage rooms and reception rooms;

[0016] 2) Determine the building height of the complex building: Based on the determined building function, project scale, and the number of operation and maintenance personnel after the project is put into production, the number or area of ​​each functional room and the building floors and height of the complex building shall be determined;

[0017] 3) Arrange the floor plan of the complex building according to the independence and correlation of the room usage functions: Arrange the floor plan of each floor of the complex building according to the determined building function and building height of the complex building.

[0018] Furthermore, the floor plan of the comprehensive building includes: the space under the stairwell is used for the public toilet, that is, a public toilet is set up under the stairwell; the remaining space after the dedicated toilet is set up in the living room is used as a storage room; a drainage pipe outlet is reserved next to the balcony of the rest room for the placement of a washing machine, and an independent toilet with toilet, washing and bathing functions is equipped.

[0019] Furthermore, the production building layout specifically includes the following steps:

[0020] 1) Determine the function of the production building: Based on the actual operation of the booster station, determine the names and specifications of all equipment that need to be installed indoors, and classify and divide the functional rooms according to industry standards, including the central control room;

[0021] 2) Determine the height of the production building: Determine the building area and floor height of each functional room based on the installation and operation and maintenance environment requirements of each equipment;

[0022] 3) Layout of the floor plan of the production building: Layout of each floor of the production building shall be carried out according to the determined building functions and building floors of the production building. When arranging, reasonable locations and floors shall be selected according to the operations between various functions.

[0023] Furthermore, the spatial design method of the booster station also includes the arrangement of photovoltaic modules added to the booster station: integrating areas within the booster station that do not affect the operation of production equipment, are not blocked by shadows, and whose existing functions are not affected by the addition of photovoltaic modules to build a photovoltaic power station.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] 1. The present invention uses multi-story comprehensive building and production building layout technology to complete the layout of various functional rooms with less building area, realizing a compact, rational and economical building layout, meeting the building functions while saving building area.

[0026] 2. The present invention integrates the functions of various buildings in the booster station through the layout technology of multi-story comprehensive buildings and production buildings, reduces the number of buildings, and reduces the floor space of buildings.

[0027] 3. The present invention reduces the floor space occupied by the booster station structure through underground space utilization technology.

[0028] 4. The present invention improves the utilization rate of the above-ground space through the layout technology of multi-story comprehensive buildings and production buildings, and the technology of adding photovoltaic modules to the booster station, and improves the utilization rate of the underground space through the technology of combining the underground fire water tank with the building and the technology of combining the accident oil tank with the wall.

[0029] 5. The present invention reduces earthwork volume by differentiating the ground elevation between outdoor and building surfaces, fully utilizes on-site raw soil resources, promotes the balance of excavation and filling, reduces the amount of earthwork purchased or transported, reduces the energy consumption of mechanical equipment, and is more friendly to the natural environment.

[0030] 6. The present invention reduces the building area, reduces the floor space, improves space utilization, and reduces the amount of earthwork, thereby reducing the construction cost of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is the general layout diagram of the booster station of the present invention;

[0032] Figure 2 This is a schematic diagram of the difference between the outdoor and building ground elevations of the present invention;

[0033] Figure 3 This is a schematic diagram of the layout of the first floor of the comprehensive building of the present invention;

[0034] Figure 4 This is a schematic diagram of the layout of the second floor of the comprehensive building of the present invention;

[0035] Figure 5 This is a schematic diagram of the layout of the three floors of the comprehensive building of the present invention;

[0036] Figure 6 This is a schematic diagram of the layout of the first floor of the production building of the present invention;

[0037] Figure 7 This is a schematic diagram of the layout of the second floor of the production building of the present invention.

[0038] 1- Wall; 2- General Building; 211- General Building Stairwell; 212- Corridor; 213- General Building Public Restroom; 214- Reception Room; 215- Reception Room; 216- Entrance Hall; 217- General Department Office; 218- Pump Room; 219- Reception Room Private Restroom; 220- Storage Room; 221- Kitchen; 222- Dining Room; 223- Exhibition Hall; 224- Activity Room;

[0039] 225-Conference Room; 226-Men's Restroom; 227-Women's Restroom; 228-Safety Production Department; 229-Reference Room; 230-Office; 231-Rest Room;

[0040] 3-Stairs; 4-Fire water tank; 5-Production building; 511-Production building stairwell; 512-Production building public restroom; 513-Battery room; 514-Central control room; 515-Communication battery room; 516-Spare parts room; 517-35kV power distribution equipment room;

[0041] 518-Relay protection room; 519-GIS room; 520-Transportation platform; 6-Steel structure stairs; 7-Emergency oil tank; 8-SVG power distribution device; 9-Main transformer; 10-Cable shaft;

[0042] 11-grounding transformer foundation; 12-station transformer foundation; 13-sewage treatment plant; 14-parking space; 15-standby transformer foundation; 16-water collection well;

[0043] 17-Land acquisition red line; 18-Main entrance; 20-Railing; 21-Road. DETAILED DESCRIPTION

[0044] The technical solution of the present invention will be clearly described below in conjunction with the accompanying drawings. Obviously, the described embodiments are not all embodiments of the present invention. All other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0045] It should be noted that the terms "center", "up", "down", "horizontal", "left", "right", "front", "back", "lateral", "longitudinal", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0046] Example 1

[0047] like Figure 1 As shown, the present invention provides a booster station building structure, including a wall 1, within which are located above-ground and underground structures. Wall 1 is a masonry wall serving as a flood control facility. The perimeter of wall 1 is defined by a land acquisition redline 17, and a main entrance 18 is provided on wall 1.

[0048] like Figure 1 As shown, the above-ground buildings include a comprehensive building 2, which is a three-story building.

[0049] Combine Figure 3-5 As shown, the comprehensive building 2 is provided with a living area, such as a rest room 231, a kitchen 221, a dining room 222, a toilet, an activity room 224, etc.; it is also provided with a production area, such as an office 230, a document room 229, a conference room 225, a reception room 215, etc.; and it is provided with auxiliary areas, such as a guard room, a maintenance room, etc.

[0050] Specifically, a stairwell 211 is provided on both sides of the building 2, and stairs are provided in the stairwell 211. Each floor of the building 2 is connected by stairs. The middle area of ​​each floor of the building 2 is provided as a corridor 212.

[0051] The effective clear space under the stairwell on the first floor of the comprehensive building 2 is ≥2.0m, and the elevation of the second floor of the comprehensive building 2 relative to the first floor of the comprehensive building 2 is 4m. A public toilet 213 of the comprehensive building is set under each stairwell on this first floor.

[0052] like Figure 3As shown, the first floor of the comprehensive building 2 is divided into multiple functional rooms by inner walls. The front side of the first floor corridor 212 of the comprehensive building 2 is provided with a reception room 214, a reception room 215, a foyer 216, a general department office 217, and a pump room 218 from left to right. A special toilet 219 for the reception room is provided in the corner of the reception room 214, and the space extending from the special toilet 219 for the reception room is provided as a storage room 220.

[0053] On the back side of the first-floor corridor 212 of the complex building 2, there are arranged a kitchen 221, a restaurant 222, an exhibition hall 223, and an activity room 224 from left to right.

[0054] like Figure 4 As shown, on the front side of the corridor on the second floor of the comprehensive building 2, there are arranged in sequence a conference room 225, a men's toilet 226, a women's toilet 227, a production safety department 228, and a document room 229; on the back side of the corridor, there are arranged in sequence three offices 230 and four rest rooms 231. The rest room 231 has a balcony with drainage pipes reserved on the balcony, and an independent toilet is set in the rest room 231.

[0055] like Figure 5 As shown, the third floor of the comprehensive building 2 is provided with several rest rooms 231 with the same structure as that of the second floor.

[0056] like Figure 2 As shown, the elevation a inside the substation is 0.3m to 0.5m higher than the elevation b outside the substation, indicating a 0.3-0.5m backfill. The ±0m elevations of the foundations of Complex Building 2, Production Building 5, and all equipment are set 0.3m above the flood level. The foundation of Complex Building 2 is elevated, and the transition between Complex Building 2 and the outdoor floor is connected by steps 3, which are made of brick treads.

[0057] The elevation of the second floor of Comprehensive Building 2 is 4m, the elevation of the third floor of Comprehensive Building 2 is 7.5m, and the elevation of the top of the third floor of Comprehensive Building 2 is 10.8m

[0058] like Figure 1 As shown, a fire water tank 4 is provided underground where the comprehensive building 2 is located. The fire water tank 4 is composed of a bottom plate, a wall and a top plate. The bottom plate of the fire water tank 4 is connected to the foundation of the comprehensive building, the wall of the fire water tank 4 is connected to the beams and columns below ±0 of the comprehensive building, and the top plate of the fire water tank 4 is connected to the ground of the ±0 floor of the comprehensive building.

[0059] like Figure 1 As shown, the above-ground buildings also include a production building 5, which is a two-story building. Figure 6 、 7As shown, a production building stairwell 511 is set on the left side of the production building 5. A staircase is set in the production building stairwell 511. Each floor of the production building 5 is connected by a staircase, which serves as an indoor fire escape route of the production building 5. One or two steel structure staircases 6 are set outdoors as supplementary fire escape routes.

[0060] A road 21 is provided between the enclosure wall 1 and the production building 2 .

[0061] like Figure 6 As shown, the effective clear space under the stairwell 511 on the first floor of the production building 5 is ≥2.0m, and the elevation of the second floor of the production building 5 relative to the first floor of the production building 5 is 5m. A public toilet 512 for the production building is set under the stairwell on the first floor.

[0062] like Figure 6 As shown, the first floor of the production building 5 is also provided with a battery room 513, a central control room 514, a communication battery room 515, a spare parts room 516, and a 35kV power distribution device room 517.

[0063] like Figure 7 As shown, the second floor of the production building 5 is provided with a relay protection room 518, a GIS room 519, and a transport platform 520.

[0064] The ±0 elevation of the production building 5 and all equipment foundations is set to 0.3m above the flood level. The foundation of the production building 5 is elevated, and the transition between the production building 5 and the outdoor floor is connected by steps 3.

[0065] The central control room 514 is equipped with a video surveillance system and an automatic access control system for the substation wall gate.

[0066] like Figure 1 As shown, an emergency oil pool 7 is provided in the booster station. The emergency oil pool 7 is provided in the open space formed by the corner of the road 21 and the second corner of the wall 1, and the emergency oil pool 7 is provided underground. The wall of the emergency oil pool 7 serves as the foundation of the wall.

[0067] A parking space 14 is also provided in the booster station, a railing 20 is provided on one side of the parking space, and a photovoltaic carport is designed on the parking space 14.

[0068] A plurality of photovoltaic installation equipment are reserved on the roof of the above-ground building, the outdoor open space of the booster station and the parking space 14 for the subsequent addition of photovoltaic modules.

[0069] An SVG power distribution device 8, a main transformer 9, a cable well 10, a grounding transformer foundation 11, a station transformer foundation 12, and a water collection well 16 are arranged around the production building 5.

[0070] A sewage treatment device 13 is provided at the first corner of the enclosure wall 1, and a spare foundation 15 is provided at the third corner.

[0071] Example 2

[0072] like Figure 1 As shown, the present invention provides a design method for a booster station, including a design method for multi-story buildings, a design method for underground spaces, a design method for adding photovoltaic modules to a booster station, and a design method for distinguishing between outdoor and building ground elevations. The details are as follows:

[0073] 1. Design methods for multi-story buildings, including layout of complex buildings and production buildings.

[0074] Comprehensive building layout: Set up a comprehensive building that integrates living, production, and auxiliary functions. The comprehensive building adopts a multi-story structure. The layout of the comprehensive building specifically includes the following steps:

[0075] 1) Determine the building function:

[0076] Determine the building functions required within the complex based on the project's specific circumstances. This design primarily facilitates post-project operation and maintenance, facilitating the complex's construction design and construction. Avoid rooms affected by equipment selection, such as the relay protection room 518 and the central control room 514. Living areas typically include rest rooms 231, kitchens 221, dining rooms 222, restrooms, and activity rooms 224. Production areas include offices 230, data rooms 229, conference rooms 225, and reception rooms. Support areas include security guard rooms and maintenance rooms.

[0077] 2) Determine the building height:

[0078] Based on the building's intended function, project scale, and the number of post-project maintenance personnel, determine the number or area of ​​each functional room and the number of floors and heights of the comprehensive building. In addition to meeting planning requirements, the height of the comprehensive building should be determined within the overall project construction schedule. The construction of the comprehensive building should not become a critical component of the project's grid connection and commissioning construction plan.

[0079] 3) Floor plan:

[0080] The floor plan of each floor of the complex building is designed based on the building's functions and number of floors. Functional areas are divided by floors, corridors, and partitions, making full use of the floor area of ​​each floor for a compact, rational, and economical layout, thus achieving both functional and floor area savings.

[0081] Methods for designing floor plans include:

[0082] The stairwell and public toilet are built together.

[0083] Combine Figure 1-Figure 5As shown, a lobby 216 is provided on the first floor of the comprehensive building with a relatively high floor height. When the effective clearance under the stairwell is ≥2.0m, the conditions for setting up a public toilet under the stairwell are met. A public toilet is set up under each of the two stairwells, realizing space sharing between the stairwell and the public toilet, and providing the building space originally belonging to the toilet for use by other functional rooms.

[0084] The storage room 220 is built together with the reception room 214 and the bathroom.

[0085] like Figure 3 As shown, when an independent reception room is set up in the comprehensive building, the dedicated bathroom of the reception room 214 is set up against the corner according to the required area, and the remaining space is separated by a partition wall as a storage room 220, so that the building space originally belonging to the storage room 220 is provided for use by other functional rooms.

[0086] Rest room layout.

[0087] like Figure 4 As shown, in addition to being equipped with a wardrobe, a desk, and a single bed, the duty room 231 in the comprehensive building has a drainage pipe outlet reserved next to the balcony of the duty room 231 for arranging a washing machine, and is equipped with an independent small bathroom with toilet, washing, and bathing functions. This not only improves the comfort of employees' lives, but also allows the building area originally belonging to the public toilet and laundry room to be used to arrange the duty room 231.

[0088] Production building layout:

[0089] All equipment that needs to be installed indoors for the project is concentrated in a production building 5. The production building 5 adopts a multi-story structure, which can save construction area and building land area while meeting the functions of equipment installation, operation and maintenance.

[0090] 1) Determine building functions: Based on the project's specific needs, determine the names and specifications of all production equipment to be installed indoors, and categorize and divide the functional rooms according to industry standards. Typically, the production building's five functional rooms include: 35kV power distribution room 517, battery room 513, relay protection room 518, GIS room 519, and central control room 514.

[0091] 2) Determine the building height:

[0092] Determine the installation and operation and maintenance environment requirements for each equipment based on national and industry standards and the technical requirements of the equipment manufacturer, determine the building area and building height of each functional room, and set the number of floors of Production Building 5 based on the design, construction, equipment installation and commissioning schedule without affecting the construction node targets of the entire project.

[0093] 3) Floor plan:

[0094] The floor plan layout of each floor of the production building 5 is carried out according to the determined building functions and building floors. When arranging, reasonable locations and floors are selected according to the operations between the functions. The layout location should be convenient for the installation, operation and maintenance of various production equipment. The floor plan layout includes:

[0095] Layout of internal and external fire escape passages:

[0096] Only one indoor fire escape is set up in the production building 5, and 1 to 2 steel structure stairs 6 are set up outdoors as supplementary fire escapes. While meeting the fire evacuation requirements, the building space originally belonging to another indoor fire escape is provided for use in other functional rooms, which is beneficial to the layout of indoor functional rooms.

[0097] Stairwell and public toilet are built together:

[0098] In order to meet the requirements of the installation and operation and maintenance environment of production equipment, the first floor of Production Building 5 is relatively high, and the effective clearance under the stairwell meets the conditions for setting up a public toilet. Therefore, the stairwell of the indoor fire escape is built together with the public toilet. On the one hand, it meets the needs of the operation and maintenance personnel in the central control room, and on the other hand, the building space originally belonging to the toilet is provided for use in other functional rooms.

[0099] Utilize the remaining building space to arrange auxiliary rooms:

[0100] When using production building technology, there may be some remaining building space after the planned functional rooms are arranged. The remaining building space can be reasonably set up as auxiliary rooms, such as spare parts rooms, tool rooms, etc. The auxiliary rooms set up should not cause safety hazards to the operation of production equipment rooms.

[0101] The central control room covers the management functions of the guard room:

[0102] Through the video surveillance system and automatic access control identification system of the booster station wall gate, the daily management authority of the gate is set in the central control room. The operation and maintenance personnel take on the duties of the gate guard in their daily work, and the construction of the gate guard room is eliminated, further saving building area and building land area.

[0103] 2. Underground space utilization technology, including

[0104] Underground structures are built together with buildings.

[0105] In addition to complying with national or industry regulations, the site selection and construction of fire water tank 4 should also be planned and designed based on the topography, landform, and geology of the substation, and in accordance with the principles of facilitating construction, operation and maintenance, and balancing excavation and fill at the substation. The advantages of placing fire water tank 4 underground and building it alongside a building are: excavated material is used for backfilling the substation, promoting a balanced excavation and fill volume at the substation and reducing the amount of earthwork purchased; the bottom plate of fire water tank 4 is integrated with the building foundation, the walls of the water tank are integrated with the beams and columns below ±0 of the building, and the top plate of the water tank is integrated with the ground at ±0 floors of the building, further saving construction costs; combined construction can reduce the floor space occupied by the substation structure and improve the utilization rate of the substation land; and combined construction with the building utilizes the underground space of the building, reducing the impact on the functional layout of the above-ground building.

[0106] Underground structures and above-ground structures are built together.

[0107] In combination with the actual situation of the project's booster station production area, the accident oil pool 7 is located in the open space formed by the corner of the station road and the corner of the wall 1, and the accident oil pool 7 is set underground to improve the land utilization rate and underground space utilization rate of the booster station; the accident oil pool 7 is set underground, and the excavated materials are used for the leveling and backfilling of the booster station, which promotes the balance of excavation and filling volume of the booster station and reduces the amount of earthwork purchased; the wall of the accident oil pool 7 is used as the foundation of the wall, saving construction costs and saving the area occupied by the structure.

[0108] 3. Technology for adding photovoltaic modules to booster stations:

[0109] Through rational planning, areas within the substation that do not impact production equipment operation, are not obstructed by shadows, and whose existing functions are not affected by the addition of photovoltaic panels can be integrated into the construction of a photovoltaic power station. For example, areas such as building roofs and parking spaces 14 can be used for photovoltaic installation. The load of rooftop photovoltaic panels is considered during the building structural design phase to ensure that the roof structure's bearing capacity meets the requirements of rooftop photovoltaic installation. If necessary, embedded components can be installed on the roof to facilitate rooftop photovoltaic installation. A photovoltaic carport can be designed over parking space 14 of the substation, integrating photovoltaic power generation with the carport, comprehensively utilizing spatial resources and improving land efficiency.

[0110] 4. Differentiating the ground elevation between outdoor and building

[0111] When the substation site is below the local flood control level, a large volume of earth and rock is typically transported from outside to backfill the substation, ensuring that the station's outdoor floor elevation is above the flood control level. This method, taking into account the surrounding topography, involves backfilling the substation site in small amounts, raising the station's outdoor floor elevation to 0.3 to 0.5 meters above the surrounding terrain. Then, based on the flood level data for the substation site, the ±0 elevations of the substation's buildings and all equipment foundations are set 0.3 meters above the flood level. Building foundations are elevated, and steps create a transition between the buildings and the outdoor floor. Finally, the surrounding walls of the substation are designed as masonry walls, which can serve as part of the flood control system. This method significantly reduces the amount of earthwork purchased or transported from outside, fully utilizes on-site soil resources, and promotes a balanced excavation and fill volume.

[0112] By using the present invention, the construction area of ​​the substation can be saved; the floor area of ​​the building can be reduced; the floor area of ​​the structure can be reduced; the land space utilization rate is high; it is more friendly to the natural environment; costs can be reduced and efficiency can be increased; reducing the construction area, reducing the floor area, improving the land space utilization rate, and reducing the earthwork volume can all reduce the construction cost of the project and further improve the project investment income; it has strong applicability.

[0113] The present invention is not only applicable to projects for constructing photovoltaic booster stations in urban areas, but also to the construction of booster stations for all centralized photovoltaic projects, and even for the construction of booster stations for wind power and energy storage projects. It has strong promotional potential and is suitable for promotion in all projects that require the construction of booster stations.

[0114] The above technical features constitute the best embodiment of the present invention, which has strong adaptability and best implementation effect. Non-essential technical features can be added or removed according to actual needs to meet the needs of different situations.

[0115] Finally, it should be noted that the above content is only used to illustrate the technical solution of the present invention, rather than to limit the scope of protection of the present invention. Simple modifications or equivalent substitutions of the technical solution of the present invention by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the present invention.

Claims

1. A booster station building structure, comprising a wall, characterized in that: There are above-ground buildings within the wall, including a multi-story comprehensive building and a multi-story production building. The outdoor floor of the booster station is 0.3 to 0.5m higher than the surrounding terrain. The ±0 elevation of the above-ground buildings is set to 0.3m higher than the flood level. The foundation of the above-ground buildings is elevated, and the transition between the above-ground buildings and the outdoor floor is connected by steps.

2. The booster station building structure according to claim 1, characterized in that: There are toilets under the stairwells on the first floor of the comprehensive building and the production building.

3. The booster station building structure according to claim 1, characterized in that: A fire water tank is set up under the comprehensive building. The fire water tank is composed of a bottom plate, walls and a top plate. The bottom plate of the fire water tank is connected to the foundation of the comprehensive building, the walls of the fire water tank are connected to the beams and columns below ±0 of the comprehensive building, and the top plate of the fire water tank is connected to the ground of the ±0 floor of the comprehensive building.

4. The booster station building structure according to claim 1, characterized in that: A circular road is set between the wall and the production building, and an accident oil pool is set in the open space formed by the corner of the circular road and the corner of the wall, and the accident oil pool is set underground.

5. The booster station building structure according to claim 1, characterized in that: A central control room is set up in the production building, which is equipped with a remote video monitoring system and an automatic access control recognition system for the gate of the booster station wall.

6. A design method for a booster station, characterized in that: include: The layout of multi-storey buildings includes setting up a comprehensive building integrating living, production and auxiliary functions, and setting up a production building that concentrates all the equipment that needs to be installed indoors in the booster station; according to the building functions and building heights of multi-storey buildings, each floor of the multi-storey building is arranged according to the independence and relevance of the room use functions; Utilization of underground space of buildings or structures, combining underground structures with building structures, and combining underground structures with above-ground structures.

7. The design method according to claim 6, characterized in that: The layout of the complex building specifically includes the following steps: 1) Determine the building functions of the comprehensive building: According to the actual situation of the booster station, determine the building functions that need to be set up in the comprehensive building, and set up several functional rooms, including duty rooms, toilets, stairwells, guard rooms, storage rooms and reception rooms; 2) Determine the building height of the comprehensive building: According to the determined building function, project scale, and the number of operation and maintenance personnel after the project is put into production, the number or area of ​​each functional room is planned, and the building floors and floor heights of the comprehensive building are determined; 3) Arrange the floor plan of the complex building according to the independence and correlation of the room usage functions: Arrange the floor plan of each floor of the complex building according to the determined building function and building height of the complex building.

8. The design method according to claim 7, characterized in that: The floor plan of the comprehensive building includes: the space under the stairwell is used for the public toilet, that is, a public toilet is set up under the stairwell; the remaining space after the private toilet is set up in the living room is used as a storage room; a drainage pipe outlet is reserved next to the balcony of the rest room for the placement of a washing machine, and an independent toilet with toilet, washing and bathing functions is configured.

9. The design method according to claim 6, characterized in that: The production building layout specifically includes the following steps: 1) Determine the function of the production building: According to the actual operation of the booster station, determine the names and specifications of all equipment that need to be installed indoors, and classify and divide the functional rooms according to industry standards, including the central control room; 2) Determine the height of the production building: Determine the building area and floor height of each functional room based on the installation and operation and maintenance environment requirements of each equipment; 3) Layout of the floor plan of the production building: Layout of each floor of the production building shall be carried out according to the determined building functions and building floors of the production building. When arranging, reasonable locations and floors shall be selected according to the operations between the functions.

10. The design method according to any one of claims 6 to 9, characterized in that: The spatial design method of the substation also includes the layout of additional photovoltaic modules in the substation: integrating areas in the substation that do not affect the operation of production equipment, are not blocked by shadows, and whose existing functions are not affected by the addition of photovoltaic modules to build a photovoltaic power station.

Citation Information

Patent Citations

  • Wind -powered electricity generation field planar arrangement of transformer substation structure

    CN205840426U

  • 20MW photovoltaic power plant switching station arrangement structure

    CN207368546U

  • Building for novel grid service station and transformer substation

    CN211622783U

  • Protective barrier for industrial equipment

    FR3121608A1

  • Compact LNG production train and method

    US20200309450A1