Construction method for full water test of pool structure of sewage treatment plant
By using technologies such as temporary fire protection pipeline network and float level switch, the problems of temporary pipeline laying and water source consumption in the water tank full test of sewage treatment plant were solved, and the effects of cost saving and shortening of the test cycle were achieved.
Patent Information
- Application Number
- CN202411008419.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-05
AI Technical Summary
In the full water test of the sewage treatment plant, temporary pipeline laying costs are high and time-consuming, and the test water consumption is large, resulting in high water source cost and long full water test cycle.
The temporary fire protection pipeline that has been built in the yard is connected to the drainage pipeline of the original industrial water plant, and the water injection is automatically stopped through float level switches and electric butterfly valves. The water seepage and evaporation are measured in combination with the level gauge and steel plate water tank to reduce temporary pipeline installation and water consumption.
Save construction costs and time, shorten the full water test cycle, reduce water source costs, and improve water injection accuracy and test efficiency.
Smart Images

Figure CN118896891A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of full water testing, and in particular relates to a full water testing construction method for a water tank structure in a sewage treatment plant. Background Art
[0002] A sewage treatment plant is a complex water treatment system consisting of multiple pool structures. The pool structures are close to each other, with different pool depths and large volumes. After the main structure construction is completed, the pool structure needs to be fully water tested to inspect the quality of concrete construction. Only after the full water test can the subsequent work such as the pool waterproofing construction and equipment installation be carried out. Usually, when conducting a full water test, a large number of temporary pipes need to be laid, and the temporary pipes are connected to tap water. The tap water is injected into the pool through the temporary pipes. The construction cost of laying temporary pipes is high and the time is long, resulting in a long full water test cycle. At the same time, due to the large volume of the pool, the test water consumption is huge, and the cost of tap water source is also high. Summary of the invention
[0003] The main purpose of the present invention is to propose a full water test construction method for a water tank structure in a sewage treatment plant, which can effectively solve the problems in the background technology.
[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0005] A construction method for a full water test of a water tank structure in a sewage treatment plant comprises the following steps:
[0006] S1: Use the temporary fire-fighting pipe network already built on site to connect the temporary fire-fighting pipe network to the drainage pipe of the original industrial water plant;
[0007] S2: Connect a test water branch pipe to the temporary fire-fighting pipe network near the pool, and install an electric butterfly valve on the test water branch pipe;
[0008] S3: Use blocking plates to block the reserved holes of the pool. The smaller reserved holes of the pool can be directly installed with pipes and valves according to the design and connected to the drainage network;
[0009] S4: A liquid level gauge with a scale plate is installed on the side wall of the pool through a bracket, and a conduit is installed on the blocking plate. One end of the conduit extends into the pool, and the other end is connected to the liquid level gauge through a ball valve;
[0010] S5: Divide the test depth of water injection into three equal parts, install float level switches at corresponding depths in the water pool, and electrically connect the three float level switches to the electric butterfly valve;
[0011] S6: Fill the pool with water through the test water branch pipe. When the water depth reaches the first float level switch, that is, it reaches 1 / 3 of the test depth, the electric butterfly valve automatically closes and stops filling water. The 24-hour water level drop value is recorded by the level meter to calculate the water seepage;
[0012] S7: Continue to pour water into the pool. When the water depth reaches the second float level switch, that is, reaches 2 / 3 of the test depth, the electric butterfly valve automatically closes and stops pouring water. The 24-hour water level drop value is recorded by the level meter to calculate the water seepage.
[0013] S8: Continue to pour water into the pool. When the water depth reaches the third float level switch, that is, reaches the test depth, the electric butterfly valve automatically closes, stops water injection, and records the 24-hour water level drop value through the level meter to calculate the water seepage;
[0014] S9: Install a first water level gauge needle in the water pool, install a steel plate water tank for testing evaporation on the walkway at the top of the water pool, and install a second water level gauge needle in the steel plate water tank;
[0015] S10: After filling water to the test depth for 24 hours, read the initial reading of the first water level gauge needle, and then read the final reading of the first water level gauge needle after another 24 hours or more. Each time the water level in the pool is measured, the evaporation water level in the steel plate water tank is measured by the second water level gauge needle.
[0016] S11: Determine whether the pool full water test is qualified through data analysis;
[0017] S12: After the pool is full of water and the test is passed, the water is discharged into the drainage network through the pipes and valves installed at the lower position of the pool, and then injected into the next test pool through the drainage network.
[0018] Preferably, in step S6, when water is first injected, water may be injected to above the construction joint at the bottom of the pool wall to check whether there is leakage in the construction joint and the bottom plate. If there is no abnormality, water may be injected to 1 / 3 of the test depth.
[0019] It is better to conduct an appearance inspection of the pool body during and after the water filling process. When it is found that the water seepage is too large, the water filling should be stopped and can only be continued after proper treatment.
[0020] Preferably, in step S9, in order to prevent the wind from affecting the water surface fluctuation and affecting the reading, the first water level gauge needle is installed in a pipe section which is open at the top and bottom of the pool and closed on all sides.
[0021] Preferably, in step S9, the steel plate water tank is an open steel plate water tank with a diameter of 50 cm and a height of 30 cm, and the water depth in the steel plate water tank is 20 cm.
[0022] The present invention provides a construction method for full water test of a water tank structure in a sewage treatment plant, which has the following beneficial effects:
[0023] 1. The present invention utilizes the temporary fire-fighting pipe network that has been built on site, connects the temporary fire-fighting pipe network to the drainage pipe of the original industrial water plant, and uses the temporary fire-fighting pipe network as the water injection main. This eliminates the need to lay a large number of temporary pipes, can save construction costs, save construction time, shorten the full water test cycle, and use the original industrial water plant as a water source, which can also greatly reduce the water source cost.
[0024] 2. The present invention installs float liquid level switches at corresponding depths in the water pool. Three float liquid level switches are electrically connected to the electric butterfly valve, which can realize automatic stopping of water injection. Compared with the traditional manual water stop method of manual observation, the accuracy of water injection can be guaranteed.
[0025] 3. The present invention installs a liquid level gauge with a scale plate on the side wall of the pool through a bracket, which is convenient for personnel to observe the liquid level outside the pool. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 A cross-sectional view of the construction of the present invention;
[0027] Figure 2 A plan view of the construction of the present invention;
[0028] Figure 3 It is a schematic diagram of the installation of the sealing plate and the liquid level meter of the present invention.
[0029] In the figure: 1. Water tank; 2. Sealing plate; 3. Liquid level meter; 4. First water level gauge needle; 5. Float liquid level switch; 6. Test water branch pipe; 7. Electric butterfly valve; 8. Steel plate water tank; 9. Second water level gauge needle; 10. Drainage network; 11. Conduit; 12. Ball valve. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solutions and advantages of the present invention more clear, the technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the present invention.
[0031] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0033] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] Example
[0035] Reference Figure 1-3 As shown, a construction method for full water test of a water tank structure in a sewage treatment plant comprises the following steps:
[0036] S1: Use the temporary fire-fighting pipe network already built on site to connect the temporary fire-fighting pipe network to the drainage pipe of the original industrial water plant. The temporary fire-fighting pipe network serves as the water injection pipe and the original industrial water plant serves as the water source.
[0037] S2: Connect a test water branch pipe 6 to the temporary fire-fighting pipe network near the pool 1, and install an electric butterfly valve 7 on the test water branch pipe 6;
[0038] S3: Use the blocking plate 2 to block the reserved holes of the pool 1. The smaller reserved holes of the pool 1 can be directly installed with pipes and valves according to the design, and used as discharge pipes to connect to the drainage network 10. Blocking with the blocking plate 2 is more effective and easier to operate than traditional brick blocking.
[0039] S4: A liquid level gauge 3 with a scale plate is installed on the side wall of the pool 1 through a bracket, and a conduit 11 is installed on the blocking plate 2. One end of the conduit 11 extends into the pool 1, and the other end is connected to the liquid level gauge 3 through a ball valve 12;
[0040] S5: Divide the test depth of water injection into three equal parts, install float liquid level switches 5 at corresponding depths in the pool 1, and the three float liquid level switches 5 are electrically connected to the electric butterfly valve 7;
[0041] S6: Fill water into the pool 1 through the test water branch pipe 6. When the water depth reaches the first float liquid level switch 5, that is, reaches 1 / 3 of the test depth, the electric butterfly valve 7 automatically closes and stops filling water. The 24-hour water level drop value is recorded by the liquid level meter 3 to calculate the water seepage amount;
[0042] When filling water for the first time, fill water to above the construction joint at the bottom of the pool wall, check whether there is leakage in the construction joint and the bottom plate, and then fill water to 1 / 3 of the test depth if there is no abnormality;
[0043] S7: Continue to inject water into the pool 1. When the water depth reaches the second float liquid level switch 5, that is, reaches the 2 / 3 test depth, the electric butterfly valve 7 automatically closes, stops injecting water, and records the 24-hour water level drop value through the liquid level meter 3 to calculate the water seepage amount;
[0044] S8: Continue to inject water into the pool 1. When the water depth reaches the third float liquid level switch 5, that is, reaches the test depth, the electric butterfly valve 7 automatically closes, stops injecting water, and records the 24-hour water level drop value through the liquid level meter 3 to calculate the water seepage amount;
[0045] During and after the water filling process, the pool body should be visually inspected. If excessive water seepage is found, water filling should be stopped and can only be continued after proper treatment.
[0046] Among them, if there is a requirement to observe the settlement of the pool body, observation points should be selected to measure and record the initial elevations of each observation point on the pool body.
[0047] S9: Install a first water level gauge needle 4 in the water pool 1, install a steel plate water tank 8 for testing evaporation on the top walkway of the water pool 1, and a second water level gauge needle 9 is arranged in the steel plate water tank 8;
[0048] In order to prevent the wind from affecting the water surface fluctuation and affecting the reading, the first water level gauge needle 4 is installed in a pipe section which is open at the top and bottom of the pool 1 and is closed on all sides.
[0049] The steel plate water tank 8 is an open steel plate water tank 8 with a diameter of 50 cm and a height of 30 cm, and the water filling depth in the steel plate water tank 8 is 20 cm.
[0050] S10: After filling water to the test depth, read the initial reading of the first water level gauge needle 4 after 24 hours, and then read the final reading of the first water level gauge needle 4 after 24 hours or more. Each time the water level in the pool 1 is measured, the evaporation water level in the steel plate water tank 8 is measured by the second water level gauge needle 9 at the same time.
[0051] S11: Determine whether the full water test of pool 1 is qualified through data analysis;
[0052] S12: After the full water test of the water pool 1 is passed, the water is discharged into the drainage network 10 through the pipes and valves arranged at the lower position of the water pool 1, and then injected into the next test water pool 1 through the drainage network 10.
[0053] The present invention utilizes the temporary fire-fighting pipe network that has been built on site, connects the temporary fire-fighting pipe network to the drainage pipe of the original industrial water plant, and uses the temporary fire-fighting pipe network as the water injection main. In this way, there is no need to lay a large number of temporary pipes, which can save construction costs, save construction time, and shorten the full water test cycle. At the same time, using the original industrial water plant as a water source can also greatly reduce the water source cost.
[0054] The present invention installs float level switches 5 at corresponding depths in the water pool 1. The three float level switches 5 are electrically connected to the electric butterfly valve 7 to automatically stop water injection. Compared with the traditional manual water stop method of manual observation, the accuracy of water injection can be guaranteed.
[0055] In the present invention, a liquid level meter 3 with a scale plate is installed on the side wall of the pool 1 through a bracket, so that personnel can observe the liquid level outside the pool.
[0056] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A construction method for full water test of a water tank structure in a sewage treatment plant, characterized in that: The following steps are involved: S1: Use the temporary fire-fighting pipe network already built on site to connect the temporary fire-fighting pipe network to the drainage pipe of the original industrial water plant; S2: Connect a test water branch pipe to the temporary fire-fighting pipe network near the pool, and install an electric butterfly valve on the test water branch pipe; S3: Use blocking plates to block the reserved holes of the pool. The smaller reserved holes of the pool can be directly installed with pipes and valves according to the design and connected to the drainage network; S4: A liquid level gauge with a scale plate is installed on the side wall of the pool through a bracket, and a conduit is installed on the blocking plate. One end of the conduit extends into the pool, and the other end is connected to the liquid level gauge through a ball valve; S5: Divide the test depth of water injection into three equal parts, install float level switches at corresponding depths in the water pool, and electrically connect the three float level switches to the electric butterfly valve; S6: Fill the pool with water through the test water branch pipe. When the water depth reaches the first float level switch, that is, it reaches 1 / 3 of the test depth, the electric butterfly valve automatically closes and stops filling water. The 24-hour water level drop value is recorded by the level meter to calculate the water seepage; S7: Continue to pour water into the pool. When the water depth reaches the second float level switch, that is, reaches 2 / 3 of the test depth, the electric butterfly valve automatically closes and stops pouring water. The 24-hour water level drop value is recorded by the level meter to calculate the water seepage. S8: Continue to pour water into the pool. When the water depth reaches the third float level switch, that is, reaches the test depth, the electric butterfly valve automatically closes, stops water injection, and records the 24-hour water level drop value through the level meter to calculate the water seepage; S9: Install a first water level gauge needle in the water pool, install a steel plate water tank for testing evaporation on the walkway at the top of the water pool, and install a second water level gauge needle in the steel plate water tank; S10: After filling water to the test depth for 24 hours, read the initial reading of the first water level gauge needle, and then read the final reading of the first water level gauge needle after another 24 hours or more. Each time the water level in the pool is measured, the evaporation water level in the steel plate water tank is measured by the second water level gauge needle. S11: Determine whether the pool full water test is qualified through data analysis; S12: After the pool is full of water and the test is passed, the water is discharged into the drainage network through the pipes and valves installed at the lower position of the pool, and then injected into the next test pool through the drainage network.
2. A construction method for full water test of a sewage treatment plant pool structure according to claim 1, characterized in that: In step S6, when water is first injected, water may be injected to above the construction joint at the bottom of the pool wall to check whether there is leakage in the construction joint and the bottom plate. If there is no abnormality, water may be injected to 1 / 3 of the test depth.
3. A construction method for full water test of a sewage treatment plant pool structure according to claim 1, characterized in that: During and after the water filling process, the pool body should be visually inspected. If excessive water seepage is found, water filling should be stopped and can only be continued after proper treatment.
4. A construction method for full water test of a sewage treatment plant pool structure according to claim 1, characterized in that: In step S9, in order to prevent the wind from affecting the water surface fluctuation and affecting the reading, the first water level gauge needle is installed in a pipe section which is open at the top and bottom of the pool and closed on all sides.
5. A construction method for full water test of a sewage treatment plant pool structure according to claim 1, characterized in that: In step S9, the steel plate water tank adopts an open steel plate water tank with a diameter of 50 cm and a height of 30 cm, and the water depth in the steel plate water tank is 20 cm.