Transformer area load decentralized control method and device, electronic equipment and storage medium

By monitoring the transformer load rate and load line level within the distribution area, candidate load lines are selected and their power consumption or cut-off is controlled. Combined with the power supply of the energy storage system, the problem of insufficient transformer capacity in the distribution area is solved, load distributed control is realized, and the power supply security for users is improved.

CN118899857APending Publication Date: 2024-11-05YUNNAN POWER GRID CO LTD KUNMING POWER SUPPLY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310492281.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-04
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The transformers in the distribution area are aging and have insufficient capacity, which cannot meet the surge in electricity demand and affects the user experience.

Method used

By monitoring the transformer load rate in the distribution area in real time, under overload conditions, candidate load lines are selected according to the load line level and power consumption information, and the target load lines are controlled to reduce power consumption or cut off power. Combined with the power supply of the energy storage system, the load distribution is optimized.

Benefits of technology

This effectively avoids the contradiction between insufficient transformer capacity and surging electricity demand, ensures power supply for high-level load lines, and improves user experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899857A_ABST
    Figure CN118899857A_ABST
Patent Text Reader

Abstract

The embodiment of the invention relates to a transformer area load decentralized control method and device, electronic equipment and a storage medium. The method comprises the steps that whether a transformer in a transformer area is in overload operation or not is determined; determining the grade of each load line which is being used in the transformer area under the condition that the overload operation of the transformer is determined; according to the grade of each load line, determining a plurality of candidate load lines from a plurality of load lines which are being used in the transformer area; according to the electricity utilization information of each candidate load line, determining at least one target load line from the plurality of candidate load lines; and according to a preset power supply control strategy, controlling the at least one target load line to reduce the charge or cut off the power. Therefore, the contradictory problem of insufficient capacity of the transformer and sharp increase of power demand can be avoided, so that power guarantee is provided for users, and the user experience is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present invention relate to the technical field of power systems, and in particular to a method, device, electronic equipment and storage medium for load distribution control in an area. Background Art

[0002] With the development of science and technology, people's demand for electricity is gradually increasing. For example, in addition to daily electricity consumption, with the development of electric vehicles, the number of charging piles is also gradually increasing.

[0003] As the transformer in the substation is used over time, its capacity will gradually decrease due to aging. This creates a contradiction between insufficient transformer capacity and the surge in electricity demand, which makes it impossible to provide electricity security for users and affects user experience. Summary of the invention

[0004] In view of this, in order to solve the contradiction between insufficient transformer capacity and the surge in electricity demand in the above-mentioned prior art, which makes it impossible to provide electricity security for users and affects the user experience, the embodiment of the present invention provides a load distribution control method, device, electronic device and storage medium for a substation.

[0005] In a first aspect, an embodiment of the present invention provides a method for controlling load distribution in a substation, the method comprising:

[0006] Determine whether the transformer in the substation is overloaded;

[0007] In the case where it is determined that the transformer is overloaded, determining the level of each load line in use in the substation;

[0008] According to the level of each of the load lines, determining a plurality of candidate load lines from a plurality of load lines currently being used in the substation;

[0009] Determine at least one target load line from the plurality of candidate load lines according to the power consumption information of each candidate load line;

[0010] According to a preset power supply control strategy, at least one of the target load lines is controlled to reduce power consumption or cut off power.

[0011] As a possible implementation, the step of determining whether the transformer in the substation is overloaded includes:

[0012] determining a load factor of the transformer;

[0013] comparing the load rate with a preset first load rate threshold;

[0014] If the load rate is greater than the first load rate threshold, it is determined that the transformer in the substation is overloaded;

[0015] If it is compared that the load rate is less than or equal to the first load rate threshold, it is determined that the transformer in the substation is not overloaded.

[0016] As a possible implementation, each load line corresponds to a grade identifier, and according to the grade of the load line, multiple candidate load lines are determined from the multiple load lines in the substation, including:

[0017] Obtaining the level identifier corresponding to each load line;

[0018] For each of the grade identifiers, determining whether the grade identifier is a preset identifier, the preset identifier being used to indicate that the grade of the corresponding load line is lower than the grades of the load lines corresponding to other grade identifiers;

[0019] If the level identifier is the preset identifier, the load line corresponding to the level identifier is determined as a candidate load line, and a plurality of candidate load lines are obtained.

[0020] As a possible implementation, before determining at least one target load line from a plurality of candidate load lines according to the power consumption information of each candidate load line, the method further includes:

[0021] Determine the overload power consumption of the transformer and the basic power consumption of each of the candidate load lines;

[0022] Determine a target number of target load lines to be controlled according to the overload power consumption and each of the basic power consumptions, wherein the total power consumption of the target number of target load lines is greater than the overload power consumption, and the total power consumption is the sum of the basic power consumptions of the target number of target load lines;

[0023] The step of determining at least one target load line from a plurality of candidate load lines according to the power consumption information of each candidate load line comprises:

[0024] Determining the target number of target load lines from the plurality of candidate load lines according to the power consumption information of each candidate load line;

[0025] According to the preset power supply control strategy, controlling at least one target load line to reduce power consumption or cut off power supply includes:

[0026] According to a preset power supply control strategy, the target number of target load lines are controlled to reduce power consumption or cut off power.

[0027] As a possible implementation, the power usage information includes power usage duration, and determining the target number of target load lines from the plurality of candidate load lines according to the power usage information of each candidate load line includes:

[0028] Determining the power consumption duration of each of the candidate load lines;

[0029] Sorting the plurality of candidate load lines in descending order of the power consumption time to obtain a candidate load line sequence;

[0030] The candidate load lines in the candidate load line sequence that are located at the aforementioned target number are determined as target load lines.

[0031] As a possible implementation, the power usage information includes a power usage time period, and determining the target number of target load lines from a plurality of candidate load lines according to the power usage information of each candidate load line includes:

[0032] Determine the power consumption time period of each candidate load line and the current time point;

[0033] For each candidate load line, determining whether the current time point belongs to the power consumption time period corresponding to the candidate load line;

[0034] If the current time point belongs to the power consumption time period, determining that the candidate load line is not a target load line;

[0035] If the current time point does not belong to the power consumption time period, determining the candidate load line as the target load line;

[0036] determining whether the number of the target load lines is the target number;

[0037] If the number is greater than the target number, selecting the target number of target load lines from the target number of load lines;

[0038] If the quantity is less than the target quantity, the difference between the target quantity and the quantity is determined, and a non-target load line having the difference is determined from among the non-target load lines as the target load line.

[0039] As a possible implementation, controlling at least one target load line to reduce power consumption or cut off power according to a preset power supply control strategy includes:

[0040] For each of the target load lines, determining whether the target load line can reduce power consumption;

[0041] When the target load line can reduce power consumption, reducing power consumption of the target load line according to a first load reduction amount;

[0042] When the target load line cannot reduce its load, the target load line is powered off;

[0043] Determine whether the transformer is currently overloaded, and if it is determined that the transformer is overloaded, for each target load line that can reduce power consumption, execute the step of reducing power consumption of the target load line according to the first load reduction amount, and return to execute the step of determining whether the transformer is currently overloaded until all the target load lines are powered off.

[0044] As a possible implementation, in the case where it is determined that the transformer is overloaded, before determining the level of each load line in use in the substation, the method further includes:

[0045] Obtaining the storage capacity of a preset energy storage system;

[0046] Determining whether the stored power is greater than a preset first power threshold;

[0047] When the stored power is greater than the first power threshold, the energy storage system is controlled to supply power to the load lines in the substation, and the step of determining whether the transformer in the substation is overloaded is returned to the execution, and when it is determined that the transformer is overloaded, the step of determining the level of each load line in use in the substation is returned to the execution.

[0048] As a possible implementation manner, when it is determined that the transformer is not overloaded, the method further includes:

[0049] Determining the amount of electricity stored in the energy storage system and the load rate of the transformer;

[0050] Determining whether the stored power is less than a preset second power threshold, and whether the load rate is less than a preset second load rate threshold;

[0051] When the stored power is less than the second power threshold and the load rate is less than the second load rate threshold, the transformer is controlled to charge the energy storage system, and the second power threshold is less than the first power threshold.

[0052] In a second aspect, an embodiment of the present invention provides a load distribution control device for a substation, the device comprising:

[0053] The first determination module is used to determine whether the transformer in the transformer area is overloaded;

[0054] A second determination module is used to determine the level of each load line in use in the transformer area when it is determined that the transformer is overloaded;

[0055] A third determination module is used to determine a plurality of candidate load lines from a plurality of load lines currently being used in the substation according to the level of each of the load lines;

[0056] A fourth determination module, configured to determine at least one target load line from a plurality of the candidate load lines according to the power consumption information of each of the candidate load lines;

[0057] The control module is used to control at least one of the target load lines to reduce power consumption or cut off power according to a preset power supply control strategy.

[0058] In a third aspect, an embodiment of the present invention provides an electronic device, comprising: a processor and a memory, wherein the processor is used to execute a substation load distribution control program stored in the memory to implement the substation load distribution control method described in any one of the first aspects.

[0059] In a fourth aspect, an embodiment of the present invention provides a storage medium, wherein the storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the substation load distribution control method described in any one of the first aspects.

[0060] The technical solution provided by the embodiment of the present invention determines whether the transformer in the substation is overloaded. When the transformer is overloaded, the level of each load line in use in the substation is determined. According to the level of each load line, multiple candidate load lines are determined from the multiple load lines in use in the substation. According to the power consumption information of each candidate load line, at least one target load line is determined from the multiple candidate load lines. According to the preset power supply control strategy, at least one target load line is controlled to reduce the power consumption or cut off the power. This technical solution monitors whether the transformer in the substation is overloaded in real time, and when the transformer is overloaded, determines the target load line according to the level and power consumption information of each load line in the substation, and controls the target load line to reduce the power consumption or cut off the power, thereby ensuring the power consumption of the load lines with higher levels in the substation, avoiding the contradiction between insufficient transformer capacity and the surge in power demand, thereby providing power supply guarantee for users and improving user experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 A flow chart of an embodiment of a method for controlling load distribution in a substation provided by an embodiment of the present invention;

[0062] Figure 2A flow chart of another embodiment of a load distribution control method for a substation provided by an embodiment of the present invention;

[0063] Figure 3 A flow chart of another embodiment of a load distribution control method for an area provided by an embodiment of the present invention;

[0064] Figure 4 A schematic diagram of the structure of a load distribution control system for a substation provided by an embodiment of the present invention;

[0065] Figure 5 A schematic diagram of a logical relationship of a substation equipment provided by an embodiment of the present invention;

[0066] Figure 6 A schematic diagram of the structure of an intelligent monitoring system for loads in a substation area provided by an embodiment of the present invention;

[0067] Figure 7 A block diagram of an embodiment of a load distribution control device for a substation provided by an embodiment of the present invention;

[0068] Figure 8 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0069] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0070] The following is a further explanation of the load distribution control method for the substation area provided by the present invention with reference to specific embodiments in conjunction with the accompanying drawings. The embodiments do not constitute a limitation on the embodiments of the present invention.

[0071] See also Figure 1 , is a flow chart of an embodiment of a load distribution control method for a substation provided by an embodiment of the present invention. Figure 1 As shown, the process may include the following steps:

[0072] Step 101: Determine whether the transformer in the substation is overloaded.

[0073] The above-mentioned substation refers to the power supply range or area of ​​the transformer, wherein each substation corresponds to a transformer.

[0074] The above-mentioned transformer refers to the transformer corresponding to the above-mentioned substation, which supplies power to the substation.

[0075] In an embodiment of the present invention, in order to avoid insufficient transformer capacity in the substation and the inability to provide electricity guarantee for users, the execution subject of the embodiment of the present invention can monitor in real time whether the transformer is overloaded. If it is determined that the transformer is overloaded, it means that the capacity of the transformer is insufficient to provide electricity guarantee for users. At this time, the load line of the transformer can be controlled.

[0076] Specifically, when determining whether a transformer in a substation is overloaded, the load rate of the transformer can be determined and compared with a preset load rate threshold (eg, 100% or 120%, hereinafter referred to as the first load rate threshold for ease of description).

[0077] Optionally, if it is compared that the load rate is greater than the above-mentioned first load rate threshold, it means that the load on the transformer is too much at this time. Therefore, it can be determined that the transformer in the substation is overloaded.

[0078] On the contrary, if it is compared that the load rate is less than or equal to the first load rate threshold, it means that the load of the transformer is relatively small at this time. Therefore, it can be determined that the transformer in the substation is not overloaded.

[0079] Step 102: When it is determined that the transformer is overloaded, determine the level of each load line in use in the transformer area.

[0080] The above-mentioned load lines refer to power consumption lines that are currently in use and powered by transformers within the substation area, wherein each load line may include multiple loads, for example, a basic power line may include multiple loads such as refrigerators, washing machines, light bulbs, air conditioners, etc.

[0081] The above-mentioned levels refer to the priority of each load line, which can characterize the importance of each load line. For example, the above-mentioned levels can be divided into level 1 and level 2, wherein level 1 can be used to characterize that the corresponding load line is a basic power line, which is very important and has the highest priority, and level 2 can be used to characterize that the corresponding load line is a non-basic line (such as the power supply line corresponding to the charging pile), which is generally important and has a lower priority. Further, the above-mentioned level 2 can be divided into level 21, level 22, level 23..., wherein the importance of the above-mentioned level 21, level 22, level 23... decreases in sequence, that is, level 21 has the highest priority, and the following levels decrease in sequence. For example, level 21 is the most important line in the level 2 load line, which can be the power supply line corresponding to a special user.

[0082] For another example, each line can be divided into level 1, level 2, level 3, etc. The earlier the level number, the higher the corresponding level. For example, level 1 corresponds to the basic power line, which is the most important. Level 2 is the more important line among non-basic power lines, and so on. The load lines with later level numbers have the lowest level.

[0083] In an embodiment of the present invention, a grade identifier (for example, 1, 2, 3..., or a, b, c...) can be set in advance for each load line, that is, each load line corresponds to a grade identifier. Based on this, when it is determined that the above-mentioned transformer is overloaded, the grade identifier corresponding to each load line can be obtained to determine the grade of each load line.

[0084] It should be noted that each load line may correspond to a grade identifier, and a grade identifier may correspond to one load line or multiple load lines, which is not limited in the embodiment of the present invention.

[0085] Step 103: According to the level of each load line, multiple candidate load lines are determined from multiple load lines currently in use in the substation.

[0086] The candidate load lines mentioned above refer to load lines that can be controlled when it is determined that the transformer is overloaded. Preferably, they can be load lines with lower priorities.

[0087] In one embodiment, the execution subject of the embodiment of the present invention may determine a plurality of candidate load lines to be decentralized controlled from a plurality of load lines currently in use in the substation according to the level of each load line.

[0088] Specifically, it can be known from the above description that each load line can correspond to a grade identifier. Based on this, the execution subject of the embodiment of the present invention can obtain the grade identifier corresponding to each load line, and for each grade identifier, determine whether the grade identifier is a preset identifier, wherein the preset identifier is used to indicate that the grade of the corresponding load line is lower than the grades of the load lines corresponding to other grade identifiers. For example, if the preset identifier is 5, then the load line with the grade identifier of 5 is the lowest grade. Optionally, the above preset identifier can be one or more, and the execution subject of the embodiment of the present invention does not limit this.

[0089] Step 104: Determine at least one target load line from multiple candidate load lines based on the power consumption information of each candidate load line.

[0090] Step 105: According to a preset power supply control strategy, at least one target load line is controlled to reduce power consumption or cut off power.

[0091] The following is a unified description of step 104 and step 105:

[0092] The above-mentioned electricity consumption information refers to the electricity consumption information of each load line, which may include but is not limited to: electricity consumption, electricity consumption duration, electricity consumption time period, etc.

[0093] The target load line is a load line that can be decentralized controlled and is determined from candidate load lines. There may be one or more target load lines, and the embodiment of the present invention does not impose any limitation on this.

[0094] In one embodiment, the execution entity of the embodiment of the present invention can determine at least one target load line from multiple candidate load lines based on the power consumption information of each candidate load line, and control at least one target load line to reduce power consumption or cut off power according to a preset power supply control strategy, thereby reducing the load rate of the transformer so that the transformer no longer operates in overload.

[0095] Specifically, when at least one target load line is controlled to reduce power consumption or cut off power according to a preset power supply control strategy, it can be determined for each target load line whether the target load line can reduce power consumption.

[0096] Optionally, if the target load line can reduce power consumption, the target load line is reduced in power consumption according to the first load reduction amount.

[0097] On the contrary, if the target load line cannot reduce its power consumption, the power supply to the target load line will be cut off.

[0098] Afterwards, it can be determined whether the transformer is currently operating overloaded. If it is determined that the transformer is overloaded, for each target load line that can reduce power consumption as determined above, the step of reducing power consumption on the target load line according to the first load reduction amount is performed, and the step of determining whether the transformer is currently operating overloaded is returned to execute until all target load lines are de-energized.

[0099] As for how the execution subject of the embodiment of the present invention specifically determines at least one target load line from multiple candidate load lines according to the power consumption information of each candidate load line, it can be described in the following. Figure 2 The process shown is explained and will not be described in detail here.

[0100] In addition, since transformer overload operation may be caused by two aspects, the first aspect is that there are a large number of load lines currently in use, resulting in transformer overload operation, and the second aspect is that there are overloaded load lines among the load lines currently in use. Therefore, the executive body of the embodiment of the present invention may first determine which aspect causes the transformer overload operation before determining the level of each load line in use in the substation.

[0101] Specifically, the number of load lines currently in use can be obtained first, and it can be determined whether the number exceeds a preset threshold value (for example, 20). If it is determined that the number exceeds the above threshold value, it is determined that the transformer is currently overloaded due to the excessive number of load lines in use. At this time, the step of determining the level of each load line being used in the substation in the above step 102 can be executed, and then according to steps 103 to 105, the load rate of the transformer can be reduced so that the transformer is no longer overloaded.

[0102] Optionally, if it is determined that the number does not exceed the above-mentioned number threshold, it is determined that the transformer is not overloaded due to the excessive number of load lines currently in use. Therefore, it is further possible to determine the load rate of each load line currently in use (hereinafter referred to as the line load rate for ease of distinction), and determine whether the line load rate of each load line is greater than a preset line load rate threshold (for example, 100%). If it is determined that the line load rate is greater than the line load rate threshold, it is determined that the load line is overloaded, thereby causing the transformer to be overloaded; if it is determined that the line load rate is less than or equal to the line load rate threshold, it is determined that the load line is not overloaded.

[0103] Based on this, after determining that N overloaded load lines are running, the grade identification of each load line in the N load lines can be obtained, and it can be determined whether the grade identification of each load line is a preset identification (for the sake of ease of description, hereinafter referred to as a high preset identification). The high preset identification can be used to characterize that the grade of the corresponding load line is higher than the grades of the load lines corresponding to other grade identifications, that is, the grade corresponding to the high preset identification is the highest. For example, the high preset identification is used to characterize that the corresponding load line is a basic power line, and the above N is a positive integer.

[0104] Optionally, if a load line with a level identifier of a high preset identifier is determined from the above-mentioned N overloaded load lines, then this load line cannot be controlled. Therefore, the step of determining the level of each load line being used in the substation in the above-mentioned step 102 can be performed from the remaining load lines (including overloaded load lines whose level identifier is not a high preset identifier, and load lines that are not overloaded), and then according to steps 103 to 105, the load rate of the transformer can be reduced so that the transformer is no longer overloaded.

[0105] The technical solution provided by the embodiment of the present invention determines whether the transformer in the substation is overloaded. When the transformer is overloaded, the level of each load line in use in the substation is determined. According to the level of each load line, multiple candidate load lines are determined from the multiple load lines in use in the substation. According to the power consumption information of each candidate load line, at least one target load line is determined from the multiple candidate load lines. According to the preset power supply control strategy, at least one target load line is controlled to reduce the power consumption or cut off the power. This technical solution monitors whether the transformer in the substation is overloaded in real time, and when the transformer is overloaded, determines the target load line according to the level and power consumption information of each load line in the substation, and controls the target load line to reduce the power consumption or cut off the power, thereby ensuring the power consumption of the load lines with higher levels in the substation, avoiding the contradiction between insufficient transformer capacity and the surge in power demand, thereby providing power supply guarantee for users and improving user experience.

[0106] See also Figure 2 , which is a flow chart of an embodiment of another substation load distribution control method provided in an embodiment of the present invention. Figure 2 The process shown in Figure 1 Based on the process shown in FIG. 1 , it is described how to determine at least one target load line from multiple candidate load lines according to the power consumption information of each candidate load line. Figure 2 As shown, the process may include the following steps:

[0107] Step 201: Determine whether the transformer in the substation is overloaded.

[0108] Step 202: When it is determined that the transformer is overloaded, determine the level of each load line in use in the transformer area.

[0109] Step 203: According to the level of each load line, multiple candidate load lines are determined from multiple load lines currently in use in the substation.

[0110] The detailed description of steps 201 to 203 can be found in the description of steps 101 to 103, which will not be repeated here.

[0111] Step 204: Determine the overload power consumption of the transformer and the basic power consumption of each candidate load line.

[0112] The above-mentioned overload power consumption refers to the difference in power consumption between the power consumption when the transformer is overloaded and the power consumption when it is operated at the load threshold. The above-mentioned load threshold is the threshold when the transformer is not overloaded, that is, when the load of the transformer is greater than the load threshold, the transformer is overloaded.

[0113] The above basic electricity consumption refers to the current electricity consumption of each load line in use.

[0114] In one embodiment, the execution subject of the embodiment of the present invention may be a distributed dispatching control system for the load in the substation, which may obtain the overload power consumption of the substation transformer and the basic power consumption of each load line from the intelligent monitoring system for the load in the substation. The intelligent monitoring system for the load in the substation may intelligently monitor the load of the transformer, determine the overload power consumption, and the real-time power consumption (basic power consumption) of each load line and other data.

[0115] Step 205: Determine the target number of target load lines to be controlled based on the overload power consumption and each of the basic power consumptions, wherein the total power consumption of the target number of target load lines is greater than the overload power consumption, and the total power consumption is the sum of the basic power consumptions of the target number of target load lines.

[0116] The above total electricity consumption is the sum of the basic electricity consumption of the target number of target load lines.

[0117] In one embodiment, in order to avoid the problem that the transformer is still overloaded after all target load lines are controlled to be de-energized, the execution body of the embodiment of the present invention can determine the target number of target load lines to be controlled based on the overload power consumption of the above-mentioned transformer and the basic power consumption of each candidate load line, so that the total power consumption of the target load lines of the target number is greater than the overload power consumption, thereby ensuring that after the target load lines are controlled, the transformer will no longer be overloaded.

[0118] As a possible implementation, the candidate load lines can be sorted from low to high according to their levels to obtain a candidate load line sequence. Afterwards, each candidate load line in the candidate load line sequence is summed up from front to back, and each sum can be determined to determine whether the total power consumption obtained by the sum is greater than the overload power consumption.

[0119] Optionally, if the total power consumption is greater than the overload power consumption, the number of candidate load lines participating in this summation is determined as the target number, and the corresponding candidate load lines are determined as target load lines.

[0120] On the contrary, if the total power consumption is less than or equal to the overload power consumption, the basic power consumption of the next candidate load line will continue to be added to the total power consumption of this summation until the new total power consumption is greater than the overload power consumption.

[0121] For example, assume that the candidate load line sequence includes 5 candidate load lines: 1, 2, 3, 4, and 5, and the basic power consumption of each candidate load line is 100, 110, 120, 123, and 140 respectively, and continue to assume that the overload power consumption is 350. According to the above description, the total power consumption of the first two is 210, and 210 is less than 350, so the third basic power consumption is added to the total power consumption 210 of this summation to obtain a new total power consumption of 330, and 330 is still less than 350. After that, the fourth basic power consumption is added to the total power consumption 330 of this summation to obtain 453, and 453 is greater than 350, so the target number of target load lines can be determined to be 4.

[0122] As another possible implementation, the basic power consumption of all candidate load lines may be added together to obtain the total basic power consumption. Afterwards, the total basic power consumption may be divided by the total number of candidate load lines to obtain the average basic power consumption of each candidate load line. Finally, the overload power consumption may be divided by the average basic power consumption to obtain the first number of target load lines. At the same time, in order to avoid the total power consumption of the target load line being less than the overload power consumption due to an error, the first number may be added to a preset value to obtain the target number. The preset value may be 1, 2, or 3, and the embodiment of the present invention does not limit this.

[0123] For example, according to the 5 candidate load lines in the above example: 1, 2, 3, 4, 5, the basic power consumption of each candidate load line is: 100, 110, 120, 123, 140, and the overload power consumption is 350. According to the above description, the total basic power consumption after adding up the 5 basic power consumptions is 593. The total basic power consumption is divided by the total number of candidate load lines 5, and the average basic power consumption is 118.6.

[0124] Afterwards, the overload power consumption is divided by the above-mentioned average basic power consumption, that is, 350 divided by 118.6, and the first number is obtained as 3 (rounded up). At the same time, the first number is added with the preset value 1, and the target number is obtained as 4.

[0125] Step 206: Determine a target number of target load lines from the plurality of candidate load lines based on the power consumption information of each candidate load line.

[0126] Step 207: According to a preset power supply control strategy, the target number of target load lines are controlled to reduce power consumption or cut off power.

[0127] The following is a unified description of step 206 and step 207:

[0128] The above-mentioned electricity consumption information refers to the electricity consumption information of each load line, which may include but is not limited to: electricity consumption, electricity consumption duration, electricity consumption time period, etc.

[0129] The target load line is a load line that can be decentralized controlled and is determined from candidate load lines. There may be one or more target load lines, and the embodiment of the present invention does not impose any limitation on this.

[0130] In one embodiment, when determining the target number corresponding to the target load lines, the target number of target load lines may be determined from a plurality of candidate load lines based on the power usage information of each candidate load line.

[0131] It should be noted that in the description of step 205, after the candidate load line sequence is determined according to the levels of the candidate load lines, and the target number of target load lines is determined according to the candidate load line sequence, the first target number of candidate load lines in the above candidate load line sequence can be directly determined as target load lines, and there is no need to determine the target load line based on the power consumption information of the candidate load lines.

[0132] As a possible implementation, the above-mentioned power consumption information may include power consumption duration, that is, the power consumption duration of each target load line from the beginning of power consumption to the current power consumption. Based on this, when determining the target number of load lines from multiple candidate load lines according to the power consumption information of each candidate load line, the power consumption duration of each candidate load line can be determined.

[0133] Afterwards, multiple candidate load lines can be sorted in descending order of the power consumption time to obtain a candidate load line sequence, and from the candidate load line sequence, the candidate load line located in the front target number position is determined as the target load line.

[0134] As another possible implementation, the power consumption information may include a power consumption time period, wherein the corresponding power consumption time period may be marked in advance for each candidate load line. Based on this, when determining a target number of target load lines from multiple candidate load lines according to the power consumption information of each candidate load line, the power consumption time period of each candidate load line and the current time point may be determined.

[0135] Afterwards, for each candidate load line, it can be determined whether the current time point belongs to the above-mentioned power consumption time period corresponding to the candidate load line.

[0136] Optionally, if the current time point belongs to the above-mentioned power consumption time period, it means that the current time point belongs to the power consumption time of the candidate load line corresponding to the power consumption time period. Therefore, it can be determined that the candidate load line is not the target load line.

[0137] On the contrary, if the current time point does not belong to the above power consumption time period, it means that the current time point does not belong to the power consumption time period of the candidate load line corresponding to the power consumption time period. Therefore, the candidate load line can be determined as the target load line.

[0138] Furthermore, since the number of target load lines determined according to the power consumption time period may be the target number, or may be greater than or less than the target number, after determining the target load line from the above-mentioned candidate load lines, it can be determined whether the number of the target load lines is the above-mentioned target number.

[0139] Optionally, if the number of the target load lines is the above target number, the step of determining the target number of target load lines is completed.

[0140] Optionally, if the number of the target load lines is greater than the above target number, the target number of target load lines can be selected from the above number of target load lines.

[0141] It should be noted that when selecting a target number of target load lines from the above-mentioned number of target load lines, the target number of target load lines can be selected arbitrarily from the above-mentioned number, or the target number of target load lines can be selected from the above-mentioned number based on the usage time of each target load line (the one with a longer usage time is determined as the target load line), or the target number of target load lines can be selected from the above-mentioned number based on the grade of each target load line (the one with a lower grade is determined as the target load line), and the embodiment of the present invention does not impose any restrictions on this.

[0142] Optionally, if the number of the above-mentioned target loads is less than the above-mentioned target number, the difference between the target number and the number is determined, and the non-target load line of the above-mentioned difference is determined from the non-target load lines determined above as the target load line.

[0143] It should be noted that, when determining the non-target load lines of the difference from the non-target load lines determined above, the non-target load lines of the difference can be arbitrarily selected from the non-target load lines as the target load lines, or the non-target load lines of the difference can be selected from the non-target load lines as the target load lines according to the usage time of each non-target load line (the one with a longer usage time is determined as the target load line), or the non-target load lines of the difference can be selected from the non-target load lines as the target load lines according to the grade of each non-target load line (the one with a lower grade is determined as the target load line), and the embodiments of the present invention do not impose any restrictions on this.

[0144] In one embodiment, the execution subject of the embodiment of the present invention can control the target number of target load lines to reduce power consumption or cut off power according to a preset power supply control strategy. As for how to control the target number of target load lines to reduce power consumption or cut off power, please refer to the detailed description of the above step 105, which will not be repeated here.

[0145] The technical solution provided by the embodiment of the present invention determines whether the transformer in the substation is overloaded. When it is determined that the transformer is overloaded, the grade of each load line in use in the substation is determined. According to the grade of each load line, multiple candidate load lines are determined from the multiple load lines in use in the substation, the overload power consumption of the transformer and the basic power consumption of each candidate load line are determined, and the target number of target load lines to be controlled is determined according to the overload power consumption and each of the basic power consumptions, wherein the total power consumption of the target number of target load lines is greater than the overload power consumption, and the total power consumption is the sum of the basic power consumption of the target number of target load lines. According to the power consumption information of each candidate load line, the target number of target load lines is determined from the multiple candidate load lines, and according to the preset power supply control strategy, the target number of target load lines is controlled to reduce load or cut off power. This technical solution, when it is determined that the transformer is overloaded, determines the target number of target load lines to be controlled according to the overload power consumption of the transformer and the basic power consumption of each candidate load line, thereby controlling the target number of target load lines to reduce power or cut off power. By more accurately determining the target number of target load lines to be controlled based on the overload power consumption, the transformer can be accurately controlled to no longer be overloaded, and power can be accurately provided to load lines with higher levels, avoiding the contradiction between insufficient transformer capacity and a surge in power demand, thereby providing power supply security for users and improving user experience.

[0146] See also Figure 3 , which is a flow chart of an embodiment of another substation load distribution control method provided in an embodiment of the present invention. Figure 3 The process shown in Figure 1 or Figure 2 Based on the process shown in FIG, it is further described that when the transformer is determined to be overloaded, the load line in the substation area can be powered by the preset energy storage system to reduce the load of the transformer. Figure 3 As shown, the process may include the following steps:

[0147] Step 301, determine whether the transformer in the substation is overloaded, if so, execute step 302; if not, execute step 310.

[0148] The detailed description of step 301 can refer to the description of step 101, which will not be repeated here. It should be noted that the difference between this and step 101 is that, when it is determined that the transformer is not overloaded, step 310 can be executed, and the specific content can be referred to step 310.

[0149] Step 302: When it is determined that the transformer is overloaded, obtain the stored power of the preset energy storage system.

[0150] Step 303 , determine whether the above-mentioned stored power is greater than a preset first power threshold, if so, execute step 304 ; if not, execute step 306 .

[0151] Step 304: Control the energy storage system to supply power to the load lines in the substation.

[0152] Step 305, determine whether the transformer is overloaded, if so, execute step 306; if not, end the process.

[0153] The following is a unified description of steps 302 to 305:

[0154] The above energy storage system is a preset system for storing electricity, which can supply power to the load lines within the substation area.

[0155] In one embodiment, when the execution subject of the embodiment of the present invention determines that the transformer in the substation is overloaded, in order to avoid stopping the power supply to the load line, the energy storage system can be controlled to supply power to the load line in the substation.

[0156] Specifically, first, the stored power of the above-mentioned energy storage system can be obtained, and it can be determined whether the stored power is greater than a preset power threshold (for the convenience of description, hereinafter referred to as the first power threshold). If the stored power is greater than the above-mentioned first circuit threshold, it means that the energy storage system here has sufficient power to supply power to the load lines in the substation. Therefore, the energy storage system can be controlled to supply power to the load lines in the substation.

[0157] As a possible implementation method, when controlling the energy storage system to supply power to the load line of the substation, the energy storage system can be controlled to supply power to any load line.

[0158] As another possible implementation, when controlling the energy storage system to supply power to the load line in the substation, step 103 may be used to determine a plurality of candidate load lines, and the energy storage system may be controlled to supply power to the plurality of candidate load lines.

[0159] As another possible implementation method, when controlling the energy storage system to supply power to the load line in the substation area, the Figure 2 The process shown determines a target number of target load lines and controls the energy storage system to supply power to the target number of target load lines.

[0160] Afterwards, after controlling the energy storage system to supply power to the load line of the substation, it can be determined again whether the transformer is overloaded. If the transformer is still overloaded at this time, step 306 can be continued to reduce the load of the transformer; if the transformer is no longer overloaded at this time, the process can be ended.

[0161] On the contrary, if the above-mentioned stored electricity is less than or equal to the above-mentioned first electricity threshold, it means that the energy storage system at this time cannot supply power to the load line of the substation, and at this time, step 306 can be executed.

[0162] Step 306: Determine the level of each load line currently in use within the substation.

[0163] Step 307: According to the level of each load line, determine multiple candidate load lines from multiple load lines currently in use in the substation.

[0164] Step 308: Determine at least one target load line from multiple candidate load lines based on the power consumption information of each candidate load line.

[0165] Step 309: According to a preset power supply control strategy, at least one target load line is controlled to reduce power consumption or cut off power.

[0166] The detailed description of steps 306 to 309 can be found in the description of steps 102 to 105, which will not be repeated here.

[0167] Step 310: Determine the amount of electricity stored in the energy storage system and the load rate of the transformer.

[0168] Step 311, determine whether the above-mentioned stored power is less than the preset second power threshold, and whether the load rate is less than the preset second load rate threshold, the above-mentioned second power threshold is less than the first power threshold, if the stored power is less than the second power threshold, and the load rate is less than the second load rate threshold, execute step 312; otherwise, end the process.

[0169] Step 312: Control the transformer to charge the energy storage system.

[0170] The following is a unified description of steps 310 to 312:

[0171] In an embodiment of the present invention, when it is first determined that the transformer is not overloaded, in order to prevent the above-mentioned energy storage system from being unable to charge the transformer due to insufficient stored electricity when the transformer is overloaded, the execution subject of the embodiment of the present invention may charge the energy storage system when it is determined that the transformer is not overloaded.

[0172] Specifically, in order to prevent the transformer from being overloaded due to charging the energy storage system, the executor of the embodiment of the present invention may first determine the storage capacity of the energy storage system and the load rate of the transformer (specifically, it can be obtained from the substation load intelligent monitoring system connected to the embodiment of the present invention, and the substation load intelligent monitoring system can be used to monitor the storage capacity of the energy storage system and the load rate of the transformer and other parameters).

[0173] Afterwards, it may be determined whether the stored power is less than a preset second power threshold and whether the load rate is less than a preset second load rate threshold.

[0174] Optionally, if it is determined that the stored power is less than a preset second power threshold, and the load rate of the transformer is less than the second load rate threshold, it means that the stored power of the energy storage system is insufficient and needs to be charged urgently, and the transformer charging the energy storage system at this time will not cause the transformer to overload, so the transformer can be controlled to charge the energy storage system. The second power threshold is less than the first power threshold.

[0175] Optionally, if the above-mentioned stored electricity is greater than or equal to the above-mentioned second electricity threshold, and / or the load rate of the above-mentioned transformer is greater than or equal to the above-mentioned second load rate threshold, it means that the energy storage system does not need to be charged at this time, or the transformer charging the energy storage system will cause the transformer to be overloaded, and therefore, the process can be terminated.

[0176] The technical solution provided by the embodiment of the present invention determines whether the transformer in the substation is overloaded. When it is determined that the transformer is overloaded, the stored power of the preset energy storage system is obtained, and it is determined whether the above-mentioned stored power is greater than the preset first power threshold. If it is greater, the energy storage system is controlled to supply power to the load line in the substation, and it is determined whether the transformer is overloaded. If so, the level of each load line in use in the substation is determined, and according to the level of each load line, multiple candidate load lines are determined from the multiple load lines in use in the substation according to the power consumption information of each candidate load line. From the multiple candidate load lines, at least one target load line is determined, and according to the preset power supply control strategy, at least one target load line is controlled to reduce power consumption or cut off power; when the transformer is not overloaded, the stored power of the energy storage system and the load rate of the transformer are determined, and it is determined whether the above-mentioned stored power is less than the preset second power threshold, and whether the load rate is less than the preset second load rate threshold, and the above-mentioned second power threshold is less than the first power threshold. If the stored power is less than the second power threshold and the load rate is less than the second load rate threshold, the transformer is controlled to supply power to the energy storage system. This technical solution reduces the load rate of the transformer by supplying power to the load lines of the substation through the energy storage system when the transformer is overloaded. When the transformer is not overloaded, the energy storage system can be charged to ensure that the energy storage system can supply power to the load lines of the substation when the transformer is overloaded. This enables the energy storage system to assist the transformer in supplying power to the load lines of the substation when it is determined that the transformer is overloaded, thereby avoiding the contradiction between insufficient transformer capacity and a surge in electricity demand, thereby providing electricity security for users and improving user experience.

[0177] See also Figure 4, is a schematic diagram of a load distribution control system for a substation provided by an embodiment of the present invention. Figure 4 As shown, the substation load distribution control system (also referred to as the substation load orderly distribution dispatching control system) can be used as the execution subject of the embodiment of the present invention, which may include a device configuration management subsystem and a load strategy management subsystem.

[0178] Among them, the above-mentioned equipment configuration management subsystem: a subsystem deployed in the local area load orderly distributed dispatching control equipment, is mainly responsible for managing and configuring local equipment so that local equipment and software can work together.

[0179] The above-mentioned load strategy management subsystem: a subsystem deployed in the local area load orderly decentralized dispatching control equipment, responsible for configuring and managing the control strategy of the area load orderly decentralized dispatching.

[0180] Optionally, the above-mentioned equipment configuration management subsystem may include: an area management module, a transformer management module, a gateway management module, a distribution box management module, a micro-break management module, and a configuration data synchronization module.

[0181] The above-mentioned load strategy management subsystem may include: an action threshold configuration module, a distribution system strategy configuration module, and an energy storage system strategy configuration module.

[0182] Specifically, the above-mentioned area management module can be used to define areas, including area number, name, location (province, city, district), address, coordinates (latitude and longitude), management personnel and contact number, etc. Areas can be added, deleted, and modified.

[0183] The above transformer management module can be used to define transformers for controlled areas and configure various parameters of transformers, including: name, distribution transformer terminal ID number, model, number of phases, rated capacity, rated incoming line voltage, rated outgoing line voltage, rated incoming line current, rated outgoing line current, no-load loss, no-load current, load loss, impedance voltage, CT ratio, etc. Among them, one area has only one transformer.

[0184] The above-mentioned gateway management module can be used to configure an intelligent gateway for access to the distribution box for the controlled area. Each gateway is only allowed to be used in one area (connected to one transformer). The parameters set for the gateway include: gateway ID (unique factory number), login account / password, gateway 4G card number (optional), transformer (area) to which it belongs, IP address (optional), etc. It should be noted that one area allows access to multiple gateways at the same time, one gateway allows access (control) to multiple distribution boxes, and one distribution box can only access one gateway. To implement XC gateway access, the interface implements the sending of the micro-break switch serial number field.

[0185] The above distribution box management module can be used for one gateway to connect one or more distribution boxes, each of which is configured with a three-phase line. The distribution box configuration parameters include: distribution box factory ID, name, installation address, access gateway ID, molded case switch number, molded case switch model, rated current (molded case switch rated current), A / B / C three-phase line number.

[0186] The above-mentioned micro-break management module can be used to install one or more single-phase / three-phase intelligent micro-breaks in a distribution box. The micro-break is connected to the gateway device through wireless communication and exchanges data with the gateway device. Each micro-break needs to be registered in the system before it can be connected to the system. The parameters of the micro-break configuration include: micro-break factory ID, micro-break name, micro-break model, micro-break type, access gateway ID, distribution box, distribution box line number, activation status, distribution box line phase, micro-break pole number, leakage protection, frame grade rated current, adjustable rated current, instantaneous trip type, rated short-circuit breaking capacity, etc.

[0187] The above configuration data synchronization module can be used. Since the load distribution dispatching control system of the substation area can work independently from the cloud system, there may be changes in system equipment and network architecture, and the local system configuration of the substation area needs to be synchronized to the cloud platform in time. The synchronization data includes all the above configuration data.

[0188] In the load strategy management subsystem, the above action threshold configuration module can be used to cause the power supply system (including transformers and energy storage) and line control equipment to perform related actions when the load and power consumption of the substation area change, such as charging or discharging of the energy storage system, opening or closing of the line circuit breaker, etc. When the system detects that the monitoring value of the equipment action in the line reaches the critical point, the relevant equipment will perform the action.

[0189] This function only includes the configuration of the control threshold for action execution. It does not include automatic equipment actions caused by physical factors, such as switch protection tripping actions.

[0190] The configurable control thresholds are listed in Table 1 below:

[0191] Table 1

[0192]

[0193] The above distribution system strategy configuration module can be used for the orderly distributed dispatching control system of the load in the substation. The core of the dispatching control strategy is the dispatching control strategy. The system supports a variety of power control strategies:

[0194] Time-sharing control strategy: control power consumption according to peak and valley time periods.

[0195] Priority control strategy: Implement power priority control on each branch line to ensure that key equipment has priority in power use.

[0196] Indifferent control strategy: When the transformer in the substation is overloaded, the energy storage system intervenes to discharge; when the transformer load is redundant, the energy storage system charges. When the remaining power of the energy storage system battery is insufficient and the transformer is still overloaded, the power supply to the last power-consuming equipment is cut off.

[0197] Hybrid control strategy: Multiple control strategies are used to control power consumption.

[0198] The above energy storage system strategy configuration module can be used to set the control strategy of the substation energy storage system independently. The energy storage system can be set to: peak and valley mode strategy, power limit mode strategy, power bank mode strategy, power quality management strategy, remote dispatch mode strategy, and debugging state strategy.

[0199] Peak-valley mode strategy: Set the charging and discharging power in each time period according to the peak-valley strategy.

[0200] Power-limiting mode strategy: Set the energy storage system discharge strategy during the power-limiting period.

[0201] Power bank mode strategy: strategy for grid-connected charging and off-grid discharging of energy storage systems.

[0202] Power quality management strategy: The energy storage system supplies power to the three-phase circuits separately when the power quality of the power grid is insufficient, the three-phase is unbalanced, or the substation is overloaded.

[0203] Remote dispatch mode strategy: A control strategy in which the host computer system controls the action of the energy storage system.

[0204] Debugging state strategy: A strategy in which the operation of the energy storage system is completely controlled manually.

[0205] In the embodiment of the present invention, the logical relationship between the devices included in the above system can be obtained from the above description as follows: Figure 5 As shown, see Figure 5 , is a schematic diagram of a logical relationship of a substation equipment provided by an embodiment of the present invention. Figure 5 As shown, a substation may include the following equipment: a transformer, an energy storage system, each transformer may correspond to N gateways and 1 distribution transformer monitoring terminal, wherein each gateway may correspond to N distribution boxes and N micro-break switches, and each distribution box may correspond to a molded case switch.

[0206] Among them, molded case circuit breakers: referred to as molded cases, are suitable for distribution networks with AC 50Hz, rated voltage 400V and below, and rated current up to 630A. They are used to distribute electrical energy and protect lines and power equipment.

[0207] Smart miniature circuit breaker: referred to as smart micro-breaker, it is suitable for AC 50Hz, rated working voltage up to 400V lines, and can remotely control the line to disconnect or close. At the same time, it can detect voltage, current, power, electricity statistics, power quality analysis, overload protection, overvoltage protection, undervoltage protection, over-temperature protection, over-temperature protection, leakage protection and leakage reclosing, providing isolation protection for low-voltage terminals.

[0208] Smart Gateway: Smart Gateway is used together with Smart MCB to provide two-way Internet communication. It has functions such as data collection, uploading, analysis, and storage. Smart MCB communicates with Smart Gateway via CAN / 485 bus, and Smart Gateway exchanges data with cloud platform via Ethernet / 4G.

[0209] Distribution transformer monitoring terminal: intelligent monitoring equipment for substation loads, which can collect real-time operating data such as transformer voltage, current, power, temperature, power quality, etc., and transmit the data to the cloud platform through communication methods such as Wifi / 4G / LAN.

[0210] Smart distribution box / cabinet: A distribution box / cabinet encapsulated with plastic shell, smart gateway, smart micro-breaker and other smart modules and supporting communication transmission devices. It can remotely control the power supply of terminal power equipment to ensure that the load in the substation is not overloaded.

[0211] Cloud service platform: A software service platform deployed in the cloud. It is a cloud service management software system based on smart micro-breaks. With the help of analog quantity, signal quantity, fault handling information and other data provided by distribution transformer monitoring terminals and smart micro-breaks, Wi-Fi communication based on the Internet standard communication protocol, a wirelessly interconnected Internet of Things system is formed through the cloud service platform and the electric energy management and control system. The system uses cloud technology to coordinate the operation of multiple systems on the Internet of Things, dynamically respond to changes in user needs, and provide users with self-defined standardized services and forward-looking customized services. The cloud service platform includes: intelligent monitoring system for load in the substation area, orderly and decentralized dispatching and control system for load in the substation area, and big data analysis system for power consumption in the substation area.

[0212] See also Figure 6 , which is a structural diagram of an intelligent monitoring system for load in an area provided in an embodiment of the present invention. Figure 6 The intelligent monitoring system for load in the substation shown can be used to monitor the operating parameters of each device in the substation. Figure 6 As shown, the intelligent load monitoring system for the substation may include a substation load monitoring large screen module, a branch line power consumption monitoring module, an energy storage system operation monitoring module, a substation alarm information monitoring module, and a substation event information monitoring module.

[0213] Among them, the above-mentioned substation load monitoring large-screen module can be used on the monitoring large screen to display the panoramic data of power consumption monitoring of the entire cloud platform in real time, including: controlled substation distribution map, substation overview, equipment overview, today's data statistics, branch line power consumption data, number of online devices, alarm event statistics, etc.

[0214] Optionally, the controlled areas are distributed as geographical coordinates registered in the system, and the number of controlled areas in each city can be displayed on the map. Clicking on a city can enlarge the map to display the number of controlled areas in each district.

[0215] The station overview column displays the number of cities and stations where all stations controlled by the entire platform are distributed, the number of stations controlled by each city, and other data.

[0216] The device overview displays the total number of devices managed by the entire platform, including: the number of energy storage system devices, the number of distribution boxes, the number of smart gateways, the number of smart micro-breaks, the number of distribution transformer monitoring terminals, etc.

[0217] The Today's Data Statistics column displays today's platform statistics, including the amount of data, alarm information data, event information data, and fault information data.

[0218] The current electricity consumption data column displays the number of idle lines, the number of lines in use, the number of disconnected (power-limited) lines, and the number of faulty (offline) lines among the branch lines currently under control.

[0219] Optionally, the above-mentioned branch line power consumption monitoring module may include a branch line power consumption monitoring page, which displays the power consumption and equipment usage of a substation. The page includes a substation equipment and power consumption overview module, a transformer operation status module, and a branch line operation status module.

[0220] Among them, the overall power consumption module of the substation equipment is used to display the substation name, address, number of smart gateways, number of distribution boxes, number of branch lines (loops) and the number of branch lines in various states (reuse, idle, controlled, faulty), basic power consumption ratio and 24-hour peak ratio, controlled power consumption ratio and 24-hour peak ratio, today's substation power consumption, maximum load power, and peak power occurrence time.

[0221] The above transformer operation status module is used to display data such as transformer model, main parameters, current load, load rate, controlled load, three-phase voltage, current, load, and three-phase load rate.

[0222] The above-mentioned branch line operation dynamic state module is used to graphically display the switch status of each branch line controlled by each distribution box (closed in use, closed idle, open, faulty) and the real-time voltage, current, power of each line, the three-phase voltage, current, power and proportion of the distribution box, etc.

[0223] Optionally, the energy storage system operation monitoring module can be an energy storage system operation monitoring page, which displays the charging and discharging operation status data of the energy storage system in the substation, and can include: an operation status monitoring module and an electricity load monitoring module.

[0224] The above-mentioned operation status monitoring module is used to display the real-time operation status of each device and battery pack of the energy storage system, the working mode of the energy storage system, etc.

[0225] The above-mentioned power load monitoring module is used to display the charging and discharging status data of the energy storage system and real-time load data such as power, power, voltage, and current.

[0226] Optionally, the above-mentioned substation alarm information monitoring module can display the substation alarm flow data in a tabular form, and can be queried and retrieved by keywords such as time and substation name.

[0227] Optionally, the above-mentioned substation event information monitoring module can be used to display the substation equipment event flow data in a tabular form, and can be queried and retrieved by keywords such as time and substation name.

[0228] See also Figure 7 , is a block diagram of an embodiment of a load distribution control device for a substation provided by an embodiment of the present invention. Figure 7 As shown, the device comprises:

[0229] The first determination module 71 is used to determine whether the transformer in the transformer area is overloaded;

[0230] A second determination module 72 is used to determine the level of each load line in use in the transformer area when it is determined that the transformer is overloaded;

[0231] A third determination module 73 is used to determine a plurality of candidate load lines from the plurality of load lines being used in the substation according to the level of each load line;

[0232] A fourth determination module 74 is used to determine at least one target load line from the plurality of candidate load lines according to the power consumption information of each candidate load line;

[0233] The control module 75 is used to control at least one of the target load lines to reduce power consumption or cut off power according to a preset power supply control strategy.

[0234] Figure 8 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, Figure 8The electronic device 800 shown includes: at least one processor 801, a memory 802, at least one network interface 804 and a user interface 803. The various components in the electronic device 800 are coupled together via a bus system 805. It is understood that the bus system 805 is used to achieve connection and communication between these components. In addition to the data bus, the bus system 805 also includes a power bus, a control bus and a status signal bus. However, for the sake of clarity, the bus system 805 is not shown in FIG. Figure 8 Various buses are labeled as bus system 805 .

[0235] The user interface 803 may include a display, a keyboard, or a pointing device (eg, a mouse, a trackball, a touch pad, or a touch screen).

[0236] It can be understood that the memory 802 in the embodiment of the present invention can be a volatile memory or a non-volatile memory, or can include both volatile and non-volatile memories. Among them, the non-volatile memory can be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory can be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static random access memory (SRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDRSDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), and direct RAM bus random access memory (DRRAM). The memory 802 described herein is intended to include, but is not limited to, these and any other suitable types of memory.

[0237] In some implementations, the memory 802 stores the following elements, executable units or data structures, or a subset thereof, or an extended set thereof: an operating system 8021 and an application program 8022 .

[0238] The operating system 8021 includes various system programs, such as a framework layer, a core library layer, a driver layer, etc., which are used to implement various basic services and process hardware-based tasks. The application program 8022 includes various application programs, such as a media player (Media Player), a browser (Browser), etc., which are used to implement various application services. The program for implementing the method of the embodiment of the present invention can be included in the application program 8022.

[0239] In the embodiment of the present invention, by calling the program or instruction stored in the memory 802, specifically, the program or instruction stored in the application 8022, the processor 801 is used to execute the method steps provided by each method embodiment, for example, including:

[0240] Determine whether the transformer in the substation is overloaded;

[0241] In the case where it is determined that the transformer is overloaded, determining the level of each load line in use in the substation;

[0242] According to the level of each of the load lines, determining a plurality of candidate load lines from a plurality of load lines currently being used in the substation;

[0243] Determine at least one target load line from the plurality of candidate load lines according to the power consumption information of each candidate load line;

[0244] According to a preset power supply control strategy, at least one of the target load lines is controlled to reduce power consumption or cut off power.

[0245] The method disclosed in the above embodiment of the present invention can be applied to the processor 801, or implemented by the processor 801. The processor 801 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit in the processor 801 or the instruction in the form of software. The above processor 801 can be a general processor, a digital signal processor (Digital Signal Processor, DSP), an application specific integrated circuit (Application Specific Integrated Circuit, ASIC), a field programmable gate array (Field Programmable Gate Array, FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present invention can be implemented or executed. The general processor can be a microprocessor or the processor can also be any conventional processor. The steps of the method disclosed in the embodiment of the present invention can be directly embodied as a hardware decoding processor to execute, or the hardware and software units in the decoding processor can be executed. The software unit can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 802, and the processor 801 reads the information in the memory 802 and completes the steps of the above method in combination with its hardware.

[0246] It is understood that the embodiments described herein may be implemented in hardware, software, firmware, middleware, microcode, or a combination thereof. For hardware implementation, the processing unit may be implemented in one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), general purpose processors, controllers, microcontrollers, microprocessors, other electronic units for performing the functions described in the present application, or a combination thereof.

[0247] For software implementation, the technology described herein can be implemented by a unit that performs the functions described herein. The software code can be stored in a memory and executed by a processor. The memory can be implemented in the processor or outside the processor.

[0248] The electronic device provided in this embodiment may be Figure 8 The electronic device shown in FIG. 1 may perform the following steps: Figures 1 to 3 All steps of the load distribution control method in the middle station area are realized Figures 1 to 3 For details, please refer to the technical effect of the load distribution control method in the middle station area. Figures 1 to 3 For the sake of brevity, the relevant description is not repeated here.

[0249] The embodiment of the present invention also provides a storage medium (computer-readable storage medium). The storage medium here stores one or more programs. The storage medium may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a read-only memory, a flash memory, a hard disk or a solid-state drive; the memory may also include a combination of the above-mentioned types of memory.

[0250] When one or more programs in the storage medium can be executed by one or more processors, the above-mentioned station load distribution control method executed on the electronic device side can be implemented.

[0251] The processor is used to execute the station area load distribution control program stored in the memory to implement the following steps of the station area load distribution control method executed on the electronic device side:

[0252] Determine whether the transformer in the substation is overloaded;

[0253] In the case where it is determined that the transformer is overloaded, determining the level of each load line in use in the substation;

[0254] According to the level of each of the load lines, determining a plurality of candidate load lines from a plurality of load lines currently being used in the substation;

[0255] Determine at least one target load line from the plurality of candidate load lines according to the power consumption information of each candidate load line;

[0256] According to a preset power supply control strategy, at least one of the target load lines is controlled to reduce power consumption or cut off power.

[0257] The professionals should further realize that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented by electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to the function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0258] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented using hardware, a software module executed by a processor, or a combination of the two. The software module may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.

[0259] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for controlling load distribution in a substation, characterized in that: The method comprises: Determine whether the transformer in the substation is overloaded; In the case where it is determined that the transformer is overloaded, determining the level of each load line in use in the substation; According to the level of each of the load lines, determining a plurality of candidate load lines from a plurality of load lines currently being used in the substation; Determine at least one target load line from the plurality of candidate load lines according to the power consumption information of each candidate load line; According to a preset power supply control strategy, at least one of the target load lines is controlled to reduce power consumption or cut off power.

2. The method according to claim 1, characterized in that The step of determining whether the transformer in the transformer area is overloaded includes: determining a load factor of the transformer; comparing the load rate with a preset first load rate threshold; If the load rate is greater than the first load rate threshold, it is determined that the transformer in the substation is overloaded; If it is compared that the load rate is less than or equal to the first load rate threshold, it is determined that the transformer in the substation is not overloaded.

3. The method according to claim 1, characterized in that Each of the load lines corresponds to a grade identifier, and according to the grade of the load line, a plurality of candidate load lines are determined from the plurality of load lines in the substation, including: Obtaining the level identifier corresponding to each load line; For each of the grade identifiers, determining whether the grade identifier is a preset identifier, the preset identifier being used to indicate that the grade of the corresponding load line is lower than the grades of the load lines corresponding to other grade identifiers; If the level identifier is the preset identifier, the load line corresponding to the level identifier is determined as a candidate load line, and a plurality of candidate load lines are obtained.

4. The method according to claim 1, characterized in that: Before determining at least one target load line from the plurality of candidate load lines according to the power consumption information of each candidate load line, the method further includes: Determine the overload power consumption of the transformer and the basic power consumption of each of the candidate load lines; Determine a target number of target load lines to be controlled according to the overload power consumption and each of the basic power consumptions, wherein the total power consumption of the target number of target load lines is greater than the overload power consumption, and the total power consumption is the sum of the basic power consumptions of the target number of target load lines; The step of determining at least one target load line from a plurality of candidate load lines according to the power consumption information of each candidate load line comprises: Determining the target number of target load lines from the plurality of candidate load lines according to the power consumption information of each candidate load line; According to the preset power supply control strategy, controlling at least one target load line to reduce power consumption or cut off power supply includes: According to a preset power supply control strategy, the target number of target load lines are controlled to reduce power consumption or cut off power.

5. The method according to claim 4, characterized in that The power consumption information includes power consumption duration, and determining the target number of target load lines from the plurality of candidate load lines according to the power consumption information of each candidate load line includes: Determining the power consumption duration of each of the candidate load lines; Sorting the plurality of candidate load lines in descending order of the power consumption time to obtain a candidate load line sequence; The candidate load lines in the candidate load line sequence that are located at the aforementioned target number are determined as target load lines.

6. The method according to claim 4, characterized in that The power consumption information includes a power consumption time period, and determining the target number of target load lines from a plurality of the candidate load lines according to the power consumption information of each of the candidate load lines comprises: Determine the power consumption time period of each candidate load line and the current time point; For each candidate load line, determining whether the current time point belongs to the power consumption time period corresponding to the candidate load line; If the current time point belongs to the power consumption time period, determining that the candidate load line is not a target load line; If the current time point does not belong to the power consumption time period, determining the candidate load line as the target load line; determining whether the number of the target load lines is the target number; If the number is greater than the target number, selecting the target number of target load lines from the target number of load lines; If the quantity is less than the target quantity, the difference between the target quantity and the quantity is determined, and a non-target load line having the difference is determined from among the non-target load lines as the target load line.

7. The method according to claim 1, characterized in that According to the preset power supply control strategy, controlling at least one target load line to reduce power consumption or cut off power supply includes: For each of the target load lines, determining whether the target load line can reduce power consumption; When the target load line can reduce power consumption, reducing power consumption of the target load line according to a first load reduction amount; When the target load line cannot reduce its load, the target load line is powered off; Determine whether the transformer is currently overloaded, and if it is determined that the transformer is overloaded, for each target load line that can reduce power consumption, execute the step of reducing power consumption of the target load line according to the first load reduction amount, and return to execute the step of determining whether the transformer is currently overloaded until all the target load lines are powered off.

8. The method according to claim 1, characterized in that In the case where it is determined that the transformer is overloaded, before determining the level of each load line in use in the substation, the method further includes: Obtaining the storage capacity of a preset energy storage system; Determining whether the stored power is greater than a preset first power threshold; When the stored power is greater than the first power threshold, the energy storage system is controlled to supply power to the load lines in the substation, and the step of determining whether the transformer in the substation is overloaded is returned to the execution, and when it is determined that the transformer is overloaded, the step of determining the level of each load line in use in the substation is returned to the execution.

9. The method according to claim 8, characterized in that When it is determined that the transformer is not overloaded, the method further includes: Determining the amount of electricity stored in the energy storage system and the load rate of the transformer; Determining whether the stored power is less than a preset second power threshold, and whether the load rate is less than a preset second load rate threshold; When the stored power is less than the second power threshold and the load rate is less than the second load rate threshold, the transformer is controlled to charge the energy storage system, and the second power threshold is less than the first power threshold.

10. A load distribution control device for a substation, characterized in that: The device comprises: The first determination module is used to determine whether the transformer in the transformer area is overloaded; A second determination module is used to determine the level of each load line in use in the transformer area when it is determined that the transformer is overloaded; A third determination module is used to determine a plurality of candidate load lines from a plurality of load lines currently being used in the substation according to the level of each of the load lines; A fourth determination module, configured to determine at least one target load line from a plurality of the candidate load lines according to the power consumption information of each of the candidate load lines; The control module is used to control at least one of the target load lines to reduce power consumption or cut off power according to a preset power supply control strategy.

11. An electronic device, characterized in that: include: A processor and a memory, wherein the processor is used to execute a substation load distribution control program stored in the memory to implement the substation load distribution control method according to any one of claims 1 to 9.

12. A storage medium, characterized in that: The storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the substation load distribution control method according to any one of claims 1 to 9.