Construction area monitoring method and device and storage medium

By identifying the distance and coverage area between the high-voltage transmission line and the construction area, and calculating and installing cameras, the problem of blind spots in the construction site monitoring is solved, and construction safety and monitoring efficiency are improved.

CN118900316APending Publication Date: 2024-11-05ELLIPSPACE (BEIJING) TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411247814.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The existing construction site monitoring system is prone to monitoring blind spots near high-voltage transmission lines, making it difficult to check safety hazards and low manual identification efficiency.

Method used

By determining the current distance between the high-voltage transmission line and the construction area, identifying the areas that are not covered by the camera and the fixed object area, calculating the number and location of the image acquisition devices to be installed, performing precise installation, and ensuring full coverage monitoring.

Benefits of technology

It reduces the chance of monitoring blind spots in the construction area, improves construction safety, promptly checks safety hazards between the construction area and the transmission line, and reduces the chance of safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118900316A_ABST
    Figure CN118900316A_ABST
Patent Text Reader

Abstract

The invention discloses a construction area monitoring method, device and equipment and a storage medium, and the method comprises the steps: determining a current distance between a high-voltage power transmission line and a construction area under the condition that the high-voltage power transmission line exists in a set area including the construction area; under the condition that the current distance is smaller than a set distance threshold value, in a first area between the high-voltage transmission line and the construction area, an unshot area which is not shot and covered by the image acquisition device is determined, and an object area where a fixed object is located in a set area around the construction area is determined; and according to the unshot area and the object area, determining the number of to-be-installed image acquisition devices for monitoring the construction area and corresponding first installation positions, and performing corresponding installation. Therefore, potential safety hazards between the construction area and the power transmission line are checked in time, the construction safety is improved, and the probability of safety accidents is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction, and in particular to a method, a device and a storage medium for monitoring a construction area. Background Art

[0002] Civil engineering, construction, electric power and other engineering constructions are characterized by outdoor operations, multiple locations and wide areas, long time spans and multiple process flows. This places high demands on construction site safety management, production scheduling and information statistics. Effective monitoring of important targets such as machinery and equipment and operators can help reduce safety accidents and organize production more effectively.

[0003] At present, the monitoring of construction sites is mainly carried out by installing multiple cameras, collecting real-time image information and transmitting it to the background monitoring center through the Internet, and manually identifying safety hazards and statistical engineering information. However, there are buildings, electric poles, etc. around the construction area, and there may also be high-voltage lines. If the number of cameras installed is insufficient or the installation position is incorrect, it may cause monitoring blind spots in the construction area and the surrounding area, posing certain safety hazards. Summary of the invention

[0004] In order to solve the above problems existing in the prior art, the present invention provides a method, device and storage medium for monitoring a construction area. The technical problem to be solved by the present invention is achieved through the following technical solutions:

[0005] A first aspect of an embodiment of the present invention provides a method for monitoring a construction area, comprising:

[0006] In the case where a high voltage transmission line exists in a set area including a construction area, determining a current distance between the high voltage transmission line and the construction area;

[0007] When the current distance is less than the set distance threshold, in the first area between the high-voltage transmission line and the construction area, determine the uncaptured area not captured by the image acquisition device, and determine the object area where the fixed objects are located in the set area around the construction area;

[0008] According to the unphotographed area and the object area, the number of image acquisition devices to be installed for monitoring the construction area and the corresponding first installation positions are determined, and corresponding installations are performed.

[0009] A second aspect of an embodiment of the present invention provides a device for monitoring a construction area, the device comprising a processor and a memory storing program instructions, the processor being configured to execute the above-mentioned method for monitoring a construction area when executing the program instructions.

[0010] A third aspect of an embodiment of the present invention provides a storage medium storing program instructions, which, when run, execute the above-mentioned method for monitoring a construction area.

[0011] Beneficial effects of the present invention:

[0012] When there is a high-voltage transmission line in a set area including a construction area, and the current distance between the high-voltage transmission line and the construction area is less than a set distance threshold, the unphotographed area in the first area between the high-voltage transmission line and the construction area, as well as the surrounding environment of the construction area are determined, and then the number of image acquisition devices to be installed for monitoring the construction area and the corresponding first installation position are determined, and the corresponding installation is performed, thereby increasing the monitoring of the high-voltage transmission line and reducing the probability of blind spots in the construction area. It is convenient to monitor the construction area including the high-voltage transmission line, and can timely check for safety hazards between the construction area and the transmission line, thereby improving the safety of construction and reducing the probability of safety accidents.

[0013] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0014] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0016] Figure 1 A schematic diagram of a flow chart of a method for monitoring a construction area provided by an embodiment of the present invention;

[0017] Figure 2 A schematic diagram of a flow chart of a method for monitoring a construction area provided by an embodiment of the present invention;

[0018] Figure 3 A schematic diagram of a flow chart of a method for monitoring a construction area provided by an embodiment of the present invention;

[0019] Figure 4 A schematic diagram of the structure of a construction area monitoring device provided by an embodiment of the present invention;

[0020] Figure 5 A schematic diagram of the structure of a construction area monitoring device provided by an embodiment of the present invention;

[0021] Figure 6 A schematic structural diagram of a construction area monitoring device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0022] The present invention is further described in detail below with reference to specific embodiments, but the embodiments of the present invention are not limited thereto.

[0023] With the development of society, civil engineering, construction, power and other engineering construction are in full swing, and the safety management of the construction site is a very important task. Especially when there are high-voltage transmission lines in the construction area or surrounding areas, it is necessary to strengthen monitoring to avoid blind spots. Figure 1 As shown, a first aspect of an embodiment of the present invention provides a method for monitoring a construction area, comprising the following steps:

[0024] Step 101: When a high-voltage transmission line exists in a set area including a construction area, determine a current distance between the high-voltage transmission line and the construction area.

[0025] Equipment located in a ground station, a ground data center, or a satellite with computing capabilities, etc. can perform safety monitoring of the construction area. Therefore, it is necessary to first determine the construction area, and then monitor it based on the images collected by the existing image acquisition device in the construction area. The image acquisition device may include: a camera, construction equipment equipped with a camera, etc.

[0026] The construction area may be preset, that is, a ground station, a ground data center, or a satellite with computing capabilities, etc. may obtain the preset construction area and obtain the corresponding first geographic location information. Alternatively, the ground station, the ground data center, or a satellite with computing capabilities, etc. may identify the construction area through satellite remote sensing images. Therefore, in some embodiments, determining the construction area includes: obtaining the preset construction area and obtaining the corresponding first geographic location information; or obtaining a satellite remote sensing image of the geographic area where the construction area is located, and identifying the construction area from the satellite remote sensing image to obtain the corresponding first geographic location information.

[0027] The transmission line is achieved by using a transformer to step up the voltage of the electric energy generated by the generator, and then connecting it to the transmission line through control equipment such as circuit breakers. It is an infrastructure to ensure the normal operation of factories and life. Among them, the transmission line includes: high-voltage transmission lines and civil transmission lines. The electricity generated by the power plant is not only used by people nearby, but also transmitted to far away places to meet more needs. This electricity cannot be transmitted directly through ordinary wires, but must be transmitted by high-voltage transmission lines. Therefore, high-voltage transmission lines usually refer to transmission lines that transmit voltages above 10kV. When the electricity is transmitted to the place where it is used, the voltage must be lowered before it can be used. At this time, it is transmitted through civil transmission lines.

[0028] In order to ensure construction safety and the safe operation of power lines, the distance between the high-voltage transmission line and the construction area must be far, so it is necessary to determine the current distance between the high-voltage transmission line and the construction area. In this way, after determining the first geographical location information of the construction area, it is also necessary to determine the second geographical location information of the high-voltage transmission line, so that the current distance between the high-voltage transmission line and the nighttime construction area can be obtained based on the first geographical location information and the second geographical location information.

[0029] Among them, the equipment located in the ground station, ground data center, or a satellite with computing power can obtain the information of each transmission line tower in the set area including the construction area, so as to determine whether there is a tower of a high-voltage transmission line. If so, it can be determined that the set area includes a high-voltage transmission line, and the second geographical location information of the high-voltage transmission line can be determined according to the coordinate information of the high-voltage transmission line tower. Therefore, according to the first geographical location information and the second geographical location information, the current distance between the high-voltage transmission line and the construction area is obtained.

[0030] Among them, the geographical area of ​​the transmission line can be preset, or it can be obtained by identifying the towers through satellite remote sensing images. In some embodiments, determining the second geographical location information of the high-voltage transmission line also includes: identifying each transmission line tower in the area to be photographed through satellite remote sensing images, and obtaining corresponding coordinate information, thereby determining the second geographical location information of the high-voltage transmission line according to the coordinate information. That is, in some embodiments, determining the current distance between the high-voltage transmission line and the construction area includes: determining the construction area and its corresponding first geographical location information through satellite remote sensing images, and identifying each transmission line tower of the high-voltage transmission line in the set area, and determining the second geographical location information of the high-voltage transmission line according to the coordinate information of the transmission line tower; according to the first geographical location information and the second geographical location information, obtaining the current distance between the high-voltage transmission line and the nighttime construction area.

[0031] Of course, the set area including the construction area can be determined based on the streets and traffic conditions in the construction area, or based on the distance from the construction area. For example, a set point in the construction area is used as the center of the circle, and the radius is set to determine the set area of ​​the construction area. The specific details will not be listed one by one.

[0032] Step 102, when the current distance is less than a set distance threshold, in the first area between the high-voltage transmission line and the construction area, determine the uncaptured area not covered by the image acquisition device, and determine the object area where fixed objects are located in the set area around the construction area.

[0033] The "Detailed Rules for the Implementation of the Electric Power Facility Protection Ordinance" have determined the horizontal safe distance between the edge of each voltage conductor and the building when calculating the maximum wind deviation of the conductor. Therefore, the corresponding set distance threshold can be determined according to the current voltage of the high-voltage transmission line. In this way, when the current distance is less than the set distance threshold, it is necessary to focus on monitoring the first area between the high-voltage transmission line and the construction area.

[0034] In some scenarios, there are already some image acquisition devices in the construction area. Therefore, monitoring is performed based on the images captured by the existing image acquisition devices. However, the shooting areas of the existing image acquisition devices do not cover all construction areas. In particular, in the first area, there may be unshot areas that are not covered by the image acquisition devices. Therefore, it is necessary to determine the unshot areas in the first area that are not covered by the image acquisition devices, which may include: determining the construction area, and obtaining the second installation position of the existing image acquisition devices in the construction area and the corresponding shooting area; determining the first area between the high-voltage transmission line and the construction area, and comparing the first area with the shooting area to obtain the unshot areas in the first area that are not covered by the image acquisition devices.

[0035] In the above process of determining the current distance between the high-voltage transmission line and the construction area, the first geographical location information of the construction area has been determined, including: obtaining a preset construction area; or, obtaining a satellite remote sensing image of the geographical area where the construction area is located, and identifying the construction area from the satellite remote sensing image. Similarly, the existing image acquisition device in the construction area can be preset, that is, the second installation position of the existing image acquisition device in the construction area and the corresponding shooting area can be obtained according to the preset construction area. Alternatively, the existing image acquisition device in the construction area can be identified from the satellite remote sensing image through the satellite remote sensing image, and the corresponding second installation position and the corresponding shooting area can be obtained.

[0036] In the above process of determining the current distance between the high-voltage transmission line and the construction area, the first geographical location information of the construction area and the second geographical location information of the high-voltage transmission line have been determined. Therefore, based on the first geographical location information and the second geographical location information, the first area between the high-voltage transmission line and the construction area can be determined.

[0037] Therefore, the first area can be compared with the photographing area to obtain the unphotographed area in the first area that is not covered by the image acquisition device.

[0038] There may be buildings, electric towers and other fixed objects in the set area around the construction area. These fixed objects may be affected during on-site construction. Alternatively, image acquisition devices may be installed on these fixed objects to further monitor the construction area more comprehensively. Therefore, a ground station, a ground data center, or a satellite with computing capabilities, etc., needs to determine the object area where the fixed objects are located in the set area around the construction area.

[0039] In some embodiments, determining the object area where the fixed objects in the surrounding set area of ​​the construction area are located includes: dispatching a satellite to photograph the surrounding set area of ​​the construction area to obtain an image of the surrounding set area, wherein the satellite includes: a twilight orbit satellite or an optical multispectral satellite; recognizing the image of the surrounding set area to determine the fixed objects in the surrounding set area and the object area where they are located. Of course, in some embodiments, the fixed object machines in the surrounding set area and the object area where they are located can also be obtained by preset or personnel reporting.

[0040] The surrounding set area of ​​the construction area and the set area including the construction area may be determined in the same manner, and the sizes of the two areas may be the same or different. Alternatively, the surrounding set area of ​​the construction area may be greater than or equal to the set area including the construction area, which can be determined based on the specific construction scenario.

[0041] Step 103, determining the number of image acquisition devices to be installed for monitoring the construction area and the corresponding first installation positions according to the unphotographed area and the object area, and performing corresponding installation.

[0042] Determining the number and installation positions of image acquisition devices is essentially a site selection problem, which is mathematically similar to a set coverage type site selection problem, that is, selecting the minimum set of image acquisition devices while satisfying all shooting requirements. According to the shooting requirements analysis, it is necessary to select as few image acquisition device points as possible from the image acquisition device candidate point group that can meet the monitoring coverage range. Therefore, in some embodiments, determining the number of image acquisition devices to be installed for construction area monitoring and the corresponding first installation position includes: determining the minimum number of candidate image acquisition devices and the corresponding positions to be installed based on the unphotographed area and the object area through the set coverage type site selection model, and determining the current monitoring coverage rate corresponding to the candidate image acquisition devices; when the current monitoring coverage rate is greater than or equal to the set monitoring coverage rate, the candidate image acquisition device is determined as the image acquisition device to be installed for construction area monitoring.

[0043] Thus, a set coverage type site selection model needs to be configured in a ground station, a ground data center, or a satellite with computing capabilities. In some embodiments, a set coverage type site selection model as shown in formula (1) is configured;

[0044]

[0045] Where Z is the total number of image acquisition devices; x i ,y i , …, k i etc. are 0 or 1 respectively. When x i ,y i , ..., or k i = 0, it means that point i is not selected to install the first, second, ..., or Nth image acquisition device. i ,y i , ..., or k i =1, it means that point i is selected to install the first, second, ..., or Nth image acquisition device; a ij 、b ij 、c ij The coefficients respectively represent the area of ​​the jth (j=1,2,…,M) geographical scene covered by the field of view when the corresponding image acquisition device is installed at point i; S j Represents the minimum total coverage area of ​​the jth geographical scenario.

[0046] In this way, the point distribution of the candidate image acquisition devices can be estimated based on the unphotographed areas and the object areas. Then, the estimated point distribution of the candidate image acquisition devices can be input into the above-mentioned set coverage type site selection model in a certain logical order to obtain the minimum number of image acquisition devices that meet the model, and determine them as candidate image acquisition devices to obtain the corresponding locations to be installed.

[0047] Then, according to the candidate image acquisition device and its corresponding position to be installed, the current monitoring coverage of the candidate image acquisition device can be obtained. In some embodiments, obtaining the current monitoring coverage may include: obtaining a corresponding view layer according to the position to be installed of the candidate image acquisition device, and obtaining a corresponding scene spot according to the unphotographed area and the object area; and performing an overlay analysis on the view layer and the scene spot to obtain the current monitoring coverage corresponding to the candidate image acquisition device.

[0048] In this way, if the current monitoring coverage is greater than or equal to the set monitoring coverage, the candidate image acquisition device can be determined as the image acquisition device to be installed for monitoring the construction area. Thus, the installation position corresponding to the candidate image acquisition device can be the corresponding first installation position. In this way, after the corresponding installation, comprehensive monitoring of the construction area can be achieved, reducing the probability of monitoring blind spots in the construction area and improving the safety of construction.

[0049] Of course, in some embodiments, when the current monitoring coverage is less than the set monitoring coverage, the candidate image acquisition devices are supplemented until the corresponding monitoring coverage is greater than or equal to the set monitoring coverage. That is, if the current monitoring coverage is less than the set monitoring coverage, the image acquisition devices need to be supplemented to obtain a larger number of candidate image acquisition devices than the last time, and then the minimum number of candidate image acquisition devices and the corresponding positions to be installed are determined through the set coverage type site selection model, and the current monitoring coverage corresponding to the candidate image acquisition devices is determined. Similarly, if the current monitoring coverage is greater than or equal to the set monitoring coverage, the candidate image acquisition device is determined as the image acquisition device to be installed for monitoring the construction area. Otherwise, it is still necessary to continue to supplement the image acquisition devices until the corresponding current monitoring coverage is greater than or equal to the set monitoring coverage, and the corresponding image acquisition device to be installed and its corresponding position to be installed are obtained.

[0050] It can be seen that in the embodiment of the present invention, there is a high-voltage transmission line in the set area including the construction area, and the unphotographed area in the first area between the high-voltage transmission line and the construction area, as well as the surrounding environment of the construction area, are determined, and then the number of image acquisition devices to be installed for monitoring the construction area, as well as the corresponding first installation position, are determined, and the corresponding installation is performed, which reduces the probability of monitoring blind spots in the construction area, facilitates monitoring of the construction area including the high-voltage transmission line, can timely check for safety hazards between the construction area and the transmission line, improves the safety of construction, and reduces the probability of safety accidents. Among them, objects or areas can also be identified through satellite remote sensing images, which further improves the accuracy of regional division, and also further improves the accuracy of monitoring the construction area, as well as the safety of construction.

[0051] The operation flow is collected into a specific embodiment below to illustrate the construction area monitoring process provided by the embodiment of the present invention.

[0052] In one embodiment of the present invention, the ground station stores the collective coverage type site selection model shown in formula (1) and also stores the set monitoring coverage rate. The image acquisition device can be various types of cameras, such as Figure 2 As shown, the method for monitoring a construction area comprises the following steps:

[0053] In step 201, the ground station obtains a preset construction area, obtains corresponding first geographical location information, and obtains geographical location information of the power transmission line in the set area including the construction area.

[0054] Step 202, determine whether the set area includes a high-voltage transmission line? If so, execute step 203, otherwise, the process ends.

[0055] Step 203, the ground station determines the second geographical location information of the high-voltage transmission line based on the geographical location information of the transmission line, and obtains the current distance between the high-voltage transmission line and the nighttime construction area, and the first area between the high-voltage transmission line and the construction area.

[0056] Step 204, determine whether the current distance is less than a set distance threshold matching the high-voltage transmission line. If so, execute step 205, otherwise, the process ends.

[0057] Step 205: The ground station determines, based on the preset construction area, the existing cameras in the construction area and the corresponding second installation positions, and determines the corresponding shooting area.

[0058] In step 206, the ground station compares the first area with the photographing area to obtain an unphotographed area in the first area that is not covered by the camera.

[0059] In step 207, the ground station obtains the surrounding set area of ​​the construction area, and determines the fixed objects in the surrounding set area and the object area where they are located.

[0060] Step 208: The ground station estimates the point distribution of the candidate image acquisition devices based on the unphotographed area and the object area.

[0061] Step 209: The point distribution of the candidate image acquisition devices estimated by the ground station is input into the model corresponding to formula (1) to obtain the minimum number of candidate cameras and the corresponding locations to be installed.

[0062] In step 210, the ground station obtains the corresponding field of view layer according to the location where the candidate camera is to be installed, and obtains the corresponding scene patch according to the unphotographed area and the object area, and performs overlay analysis on the field of view layer and the scene patch to obtain the current monitoring coverage corresponding to the candidate camera.

[0063] Step 211, determine whether the current monitoring coverage is greater than or equal to the set monitoring coverage. If so, execute step 212; otherwise, execute step 213.

[0064] In step 212, the ground station determines the candidate camera as a camera to be installed for monitoring the construction area, and determines the installation position corresponding to the candidate camera as the corresponding first installation position, and performs corresponding installation.

[0065] Step 213 , the ground station adds the location of the candidate image acquisition device and returns to step 209 .

[0066] It can be seen that in this embodiment, when there is a high-voltage transmission line in the set area including the construction area, and the current distance between the high-voltage transmission line and the construction area is less than the set distance threshold, the first area between the high-voltage transmission line and the construction area, the unphotographed area, and the surrounding environment of the construction area are determined, and then the number of cameras to be installed for monitoring the construction area and the corresponding first installation position are determined, and the corresponding installation is performed, which reduces the probability of monitoring blind spots in the construction area, facilitates the monitoring of the construction area including the high-voltage transmission line, and can timely check for safety hazards between the construction area and the transmission line, thereby improving the safety of construction and reducing the probability of safety accidents.

[0067] In one embodiment of the present invention, the ground data center stores the set coverage type site selection model as shown in formula (1) and also stores the set monitoring coverage rate. The image acquisition device can be various types of cameras, such as Figure 3 As shown, the method for monitoring a construction area comprises the following steps:

[0068] Step 301: The ground data center obtains a satellite remote sensing image of the geographical area where the construction area is located, and identifies the construction area and the transmission lines in a set area including the construction area from the satellite remote sensing image, and obtains first geographical location information of the construction area and location information of the transmission lines, respectively.

[0069] Step 302, determine whether the set area includes a high-voltage transmission line? If so, execute step 303, otherwise, the process ends.

[0070] Step 303, the ground data center determines the second geographic location information of the high-voltage transmission line based on the coordinate information of each transmission tower of the high-voltage transmission line in the identified set area, and obtains the current distance between the high-voltage transmission line and the night construction area, as well as the first area between the high-voltage transmission line and the construction area.

[0071] Step 304, determine whether the current distance is less than a set distance threshold matching the high-voltage transmission line. If so, execute step 305, otherwise, the process ends.

[0072] Step 305: The ground data center identifies existing cameras in the construction area from the satellite remote sensing image, and determines the corresponding second installation position and the corresponding shooting area.

[0073] Step 306: The ground data center compares the first area with the shooting area to obtain an unshot area in the first area that is not covered by the camera.

[0074] Step 307: The ground data center dispatches an optical multispectral satellite to take photos of a surrounding set area of ​​the construction area to obtain an image of the surrounding set area, and identifies the image of the surrounding set area to determine fixed objects in the surrounding set area and the object area where they are located.

[0075] Step 308: The ground data center estimates the point distribution of candidate image acquisition devices based on the unphotographed areas and object areas.

[0076] Step 309: The point distribution of candidate image acquisition devices estimated by the ground data center is input into the model corresponding to formula (1) to obtain the minimum number of candidate cameras and the corresponding locations to be installed.

[0077] In step 310, the ground data center obtains the corresponding field of view layer according to the location where the candidate camera is to be installed, and obtains the corresponding scene patch according to the unphotographed area and the object area, and performs overlay analysis on the field of view layer and the scene patch to obtain the current monitoring coverage corresponding to the candidate camera.

[0078] Step 311, determine whether the current monitoring coverage is greater than or equal to the set monitoring coverage. If so, execute step 312; otherwise, execute step 313.

[0079] In step 312, the ground data center determines the candidate camera as a camera to be installed for monitoring the construction area, and determines the installation position corresponding to the candidate camera as the corresponding first installation position, and performs corresponding installation.

[0080] Step 313 , the ground data center adds the locations of the candidate image acquisition devices and returns to step 309 .

[0081] It can be seen that in this embodiment, by calling the satellite to take pictures, and identifying the construction area, high-voltage lines, cameras, etc. and their corresponding geographical location information, there is a high-voltage transmission line in the set area including the construction area, and the current distance between the high-voltage transmission line and the construction area is less than the set distance threshold, the first area between the high-voltage transmission line and the construction area, the unphotographed area, and the surrounding environment of the construction area are determined, and then the number of cameras to be installed for monitoring the construction area and the corresponding first installation position are determined, and the corresponding installation is performed, which reduces the probability of monitoring blind spots in the construction area, facilitates the monitoring of the construction area including the high-voltage transmission line, and can timely check the safety hazards between the construction area and the transmission line, improve the safety of construction, and reduce the probability of safety accidents. In addition, the identification of objects or areas through satellite remote sensing images further improves the accuracy of regional division, and also further improves the accuracy of monitoring the construction area and the safety of construction.

[0082] According to the above construction area monitoring process, a device for monitoring a construction area can be constructed. Figure 4 The device for monitoring a construction area provided by the embodiment of the present invention can be applied to a ground station, a ground data center, or a device in a satellite with computing capabilities, such as Figure 4 As shown, the device 400 includes: a first determination module 410, a second determination module 420 and a determination monitoring module 430.

[0083] The first determination module 410 is configured to determine a current distance between the high-voltage transmission line and the construction area when there is a high-voltage transmission line in a set area including the construction area.

[0084] The second determination module 420 is configured to determine, when the current distance is less than a set distance threshold, an uncaptured area not captured by the image acquisition device in the first area between the high-voltage transmission line and the construction area, and an object area where fixed objects are located within a set area around the construction area.

[0085] The monitoring module 430 is configured to determine the number of image acquisition devices to be installed for monitoring the construction area and the corresponding first installation positions according to the unphotographed area and the object area, and perform corresponding installations.

[0086] In some embodiments, the first determination module 410 includes:

[0087] The first determination unit is configured to determine the construction area and its corresponding first geographical location information through satellite remote sensing images, and to identify each transmission line tower of the high-voltage transmission line in the set area, and determine the second geographical location information of the high-voltage transmission line according to the coordinate information of the transmission line tower;

[0088] The distance unit is configured to obtain the current distance between the high-voltage transmission line and the night construction area according to the first geographical location information and the second geographical location information.

[0089] In some embodiments, the second determination module 420 includes:

[0090] The second determining unit is configured to determine the construction area and obtain a second installation position of an existing image acquisition device in the construction area and a corresponding shooting area.

[0091] The comparison unit is configured to determine a first area between the high-voltage transmission line and the construction area, and compare the first area with the shooting area to obtain an unshot area in the first area that is not covered by the image acquisition device.

[0092] In some embodiments, the second determination module 420 further includes:

[0093] The dispatching and identifying unit is configured to dispatch satellites to photograph a set area around the construction area to obtain an image of the set area, wherein the satellite includes: a twilight orbit satellite or an optical multispectral satellite; and identify the image of the set area to determine fixed objects in the set area and the object area where they are located.

[0094] In some embodiments, determining monitoring module 430 includes:

[0095] A site selection unit is configured to determine the minimum number of candidate image acquisition devices and corresponding locations to be installed according to the unphotographed area and the object area by using a set coverage type site selection model, and determine the current monitoring coverage rate corresponding to the candidate image acquisition devices;

[0096] The candidate determination unit is configured to determine the candidate image acquisition device as the image acquisition device to be installed for monitoring the construction area when the current monitoring coverage rate is greater than or equal to the set monitoring coverage rate.

[0097] In some embodiments, it also includes:

[0098] A configuration module is configured to configure a set covering type location selection model as shown in formula (1);

[0099]

[0100] Where Z is the total number of image acquisition devices; x i ,y i , …, k i etc. are 0 or 1 respectively. When x i ,y i , ..., or k i = 0, it means that point i is not selected to install the first, second, ..., or Nth image acquisition device. i ,y i , ..., or k i =1, it means that point i is selected to install the first, second, ..., or Nth image acquisition device; a ij 、b ij 、c ij The coefficients respectively represent the area of ​​the jth (j=1,2,…,M) geographical scene covered by the field of view when the corresponding image acquisition device is installed at point i; S j Represents the minimum total coverage area of ​​the jth geographical scenario.

[0101] In some embodiments, the site selection unit is specifically configured to obtain a corresponding field of view layer according to the location where the candidate image acquisition device is to be installed, and to obtain a corresponding scene patch according to the unphotographed area and the object area; the field of view layer and the scene patch are overlaid and analyzed to obtain the current monitoring coverage corresponding to the candidate image acquisition device.

[0102] In some embodiments, the monitoring module 430 further includes:

[0103] The point supplement unit is configured to supplement the points of the candidate image acquisition devices when the current monitoring coverage rate is less than the set monitoring coverage rate until the corresponding monitoring coverage rate is greater than or equal to the set monitoring coverage rate.

[0104] The following is an example of a construction area monitoring process for a construction area monitoring device provided by an embodiment of the present invention.

[0105] The construction area monitoring device can be applied to ground stations, ground data centers, and equipment in a satellite with computing capabilities, such as Figure 5 As shown, the device 400 includes: a first determination module 410, a second determination module 420, a determination monitoring module 430 and a configuration module 440. The first determination module 410 includes: a first determination unit 411 and a distance unit 412, the second determination module 420 includes: a second determination unit 421, a determination comparison unit 422 and a scheduling identification unit 423, and the determination monitoring module 430 includes: a selection unit 431, a candidate determination unit 432 and a point supplement unit 433.

[0106] Thus, the set coverage type location selection model as shown in formula (1) has been configured in the configuration module 440;

[0107]

[0108] Where Z is the total number of image acquisition devices; x i ,y i , …, k i etc. are 0 or 1 respectively. When x i ,y i , ..., or k i = 0, it means that point i is not selected to install the first, second, ..., or Nth image acquisition device. i ,y i , ..., or k i =1, it means that point i is selected to install the first, second, ..., or Nth image acquisition device; a ij 、b ij 、c ij The coefficients respectively represent the area of ​​the jth (j=1,2,…,M) geographical scene covered by the field of view when the corresponding image acquisition device is installed at point i; S j Represents the minimum total coverage area of ​​the jth geographical scenario.

[0109] In this way, a satellite remote sensing image of the geographical area where the construction area is located is obtained, and the first determination unit 411 in the first determination module 410 can identify the construction area from the satellite remote sensing image, obtain the first geographical location information of the construction area, and can identify the transmission lines in the set area including the construction area, and obtain the location information of the corresponding transmission lines.

[0110] When there is a high-voltage transmission line in the set area including the construction area, the first determination unit 411 can also identify the various transmission towers of the high-voltage transmission line in the set area through satellite remote sensing images, and determine the second geographic location information of the high-voltage transmission line based on the coordinate information of the transmission towers. Thus, the distance unit 412 can obtain the current distance between the high-voltage transmission line and the night construction area based on the first geographic location information and the second geographic location information.

[0111] When the current distance is less than the set distance threshold, the second determination unit 421 in the second determination module 420 can identify the existing image acquisition device in the construction area from the satellite remote sensing image, and determine the corresponding second installation position and the corresponding shooting area. After the determination comparison unit 422 determines the first area between the high-voltage transmission line and the night construction area based on the first geographic location information and the second geographic location information, the first area is compared with the shooting area to obtain the unphotographed area in the first area that is not covered by the image acquisition device. In addition, the scheduling identification unit 423 dispatches the optical multispectral satellite to shoot the surrounding set area of ​​the construction area, obtain the surrounding set area image, and identify the surrounding set area image to determine the fixed objects in the surrounding set area and the object area where they are located.

[0112] Thus, the selection unit 431 in the determination recognition module 430 can estimate the point distribution of the candidate image acquisition devices according to the unphotographed area and the object area, and input the estimated point distribution of the candidate image acquisition devices into the model corresponding to formula (1) to obtain the minimum number of candidate image acquisition devices and the corresponding positions to be installed. Then, according to the positions to be installed of the candidate image acquisition devices, the corresponding field of view layer is obtained, and after obtaining the corresponding scene spots according to the unphotographed area and the object area, the field of view layer and the scene spots are overlaid and analyzed to obtain the current monitoring coverage corresponding to the candidate image acquisition devices.

[0113] When the current monitoring coverage is greater than or equal to the set monitoring coverage, the candidate determination unit 432 determines the candidate image acquisition device as the image acquisition device to be installed for monitoring the construction area, and determines the installation position corresponding to the candidate image acquisition device as the corresponding first installation position, and performs corresponding installation.

[0114] Of course, when the current monitoring coverage rate is less than the set monitoring coverage rate, the point supplement unit 433 can supplement the candidate image acquisition devices until the corresponding monitoring coverage rate is greater than or equal to the set monitoring coverage rate.

[0115] It can be seen that in the embodiment of the present invention, by calling the satellite to take pictures, and identifying the construction area, high-voltage lines, cameras, etc. and their corresponding geographical location information, there is a high-voltage transmission line in the set area including the construction area, and the current distance between the high-voltage transmission line and the construction area is less than the set distance threshold. The device for monitoring the construction area can identify the unphotographed area in the first area and the surrounding environment of the construction area, and then determine the number of image acquisition devices to be installed for monitoring the construction area, and the corresponding first installation position, and perform corresponding installation, which reduces the probability of monitoring blind spots in the construction area, facilitates the monitoring of the construction area including the high-voltage transmission line, and can timely check the safety hazards between the construction area and the transmission line, improve the safety of construction, and reduce the probability of safety accidents. In addition, the identification of objects or areas through satellite remote sensing images further improves the accuracy of regional division, and also further improves the accuracy of monitoring the construction area and the safety of construction.

[0116] Combination Figure 6 , an embodiment of the present invention provides a device 1100 for monitoring a construction area, comprising:

[0117] The processor 1000 and the memory 1001 may also include a communication interface 1002 and a bus 1003. The processor 1000, the communication interface 1002, and the memory 1001 may communicate with each other through the bus 1003. The communication interface 1002 may be used for information transmission. The processor 1000 may call the logic instructions in the memory 1001 to execute the method for monitoring the construction area of ​​the above embodiment.

[0118] In addition, the logic instructions in the above-mentioned memory 1001 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product.

[0119] The memory 1001 is a computer-readable storage medium that can be used to store software programs and computer executable programs, such as program instructions / modules corresponding to the method in the embodiment of the present invention. The processor 1000 executes functional applications and data processing by running the program instructions / modules stored in the memory 1001, that is, the method for monitoring the construction area in the above method embodiment is implemented.

[0120] The memory 1001 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required for at least one function; the data storage area may store data created according to the use of the terminal device, etc. In addition, the memory 1001 may include a high-speed random access memory and may also include a non-volatile memory.

[0121] An embodiment of the present invention provides a device for monitoring a construction area, comprising: a processor and a memory storing program instructions, wherein the processor is configured to execute a method for monitoring a construction area when executing the program instructions.

[0122] An embodiment of the present invention provides a storage medium storing program instructions, which, when run, execute the above-mentioned method for monitoring a construction area.

[0123] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0124] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0125] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0126] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for monitoring a construction area, characterized in that: include: In the case where a high-voltage transmission line exists in a set area including a construction area, determining a current distance between the high-voltage transmission line and the construction area; When the current distance is less than the set distance threshold, in the first area between the high-voltage transmission line and the construction area, determine the uncaptured area not captured by the image acquisition device, and determine the object area where the fixed objects are located in the set area around the construction area; According to the unphotographed area and the object area, the number of image acquisition devices to be installed for monitoring the construction area and the corresponding first installation positions are determined, and corresponding installations are performed.

2. The method according to claim 1, characterized in that Determining the current distance between the high-voltage transmission line and the construction area includes: Determine the construction area and its corresponding first geographical location information through satellite remote sensing images, identify each transmission line tower of the high-voltage transmission line in the set area, and determine the second geographical location information of the high-voltage transmission line based on the coordinate information of the transmission line tower; According to the first geographical location information and the second geographical location information, the current distance between the high-voltage transmission line and the night construction area is obtained.

3. The method according to claim 1, characterized in that The determining of the uncaptured area not captured by the image acquisition device comprises: Determine the construction area, and obtain the second installation position of the existing image acquisition device in the construction area and the corresponding shooting area; A first area between the high-voltage transmission line and the construction area is determined, and the first area is compared with the shooting area to obtain an unshot area in the first area that is not captured by the image acquisition device.

4. The method according to claim 1, characterized in that The object area where the fixed objects are located in the surrounding setting area of ​​the construction area includes: The dispatching satellite photographs a set area around the construction area to obtain an image of the set area around the construction area, wherein the satellite includes: a dawn-dusk orbit satellite or an optical multi-spectral satellite; The image of the surrounding set area is recognized to determine the fixed objects in the surrounding set area and the object area where they are located.

5. The method according to claim 1, characterized in that The step of determining the number of image acquisition devices to be installed for monitoring the construction area and the corresponding first installation positions includes: According to the unphotographed area and the object area, the minimum number of candidate image acquisition devices and the corresponding locations to be installed are determined by using a collection coverage type site selection model, and the current monitoring coverage rate corresponding to the candidate image acquisition devices is determined; When the current monitoring coverage is greater than or equal to the set monitoring coverage, the candidate image acquisition device is determined as the image acquisition device to be installed for monitoring the construction area.

6. The method according to claim 5, characterized in that Also includes: Configure the set covering type location selection model as shown in formula (1); Where Z is the total number of image acquisition devices; x i ,y i , …, k i etc. are 0 or 1 respectively. When x i ,y i , ..., or k i = 0, it means that point i is not selected to install the first, second, ..., or Nth image acquisition device. i ,y i , ..., or k i =1, it means that point i is selected to install the first, second, ..., or Nth image acquisition device; a ij 、b ij 、c ij The coefficients respectively represent the area of ​​the jth (j=1,2,…,M) geographical scene covered by the field of view when the corresponding image acquisition device is installed at point i; S j Represents the minimum total coverage area of ​​the jth geographical scenario.

7. The method according to claim 5, characterized in that Determining the current monitoring coverage rate corresponding to the candidate image acquisition device includes: According to the position where the candidate image acquisition device is to be installed, a corresponding view layer is obtained, and according to the unphotographed area and the object area, a corresponding scene patch is obtained; The viewshed layer and the scene patch are overlaid and analyzed to obtain the current monitoring coverage corresponding to the candidate image acquisition device.

8. The method according to any one of claims 5 to 7, characterized in that Also includes: When the current monitoring coverage rate is less than the set monitoring coverage rate, the candidate image acquisition devices are supplemented until the corresponding monitoring coverage rate is greater than or equal to the set monitoring coverage rate.

9. A device for monitoring a construction area, the device comprising a processor and a memory storing program instructions, characterized in that: The processor is configured to perform the method for monitoring a construction area according to any one of claims 1 to 8 when executing the program instructions.

10. A storage medium storing program instructions, characterized in that: When the program instructions are executed, the method for monitoring a construction area as described in any one of claims 1 to 8 is executed.