Method and system for dynamically adjusting guaranteed braking rate based on vehicle braking loss degree
By dynamically adjusting the emergency braking rate and traction braking curve, the problem of lack of flexibility in the prior art emergency braking rate value is solved, the safety and efficiency of train operation are improved, and safety hazards and operating costs are reduced. .
Patent Information
- Application Number
- CN202411126116.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-08
AI Technical Summary
The lack of flexibility in the value of emergency braking rates in the prior art, resulting in safety hazards and low operational efficiency, and is unable to effectively match the safety vehicle control needs of vehicles and signal systems.
Using a dynamic adjustment method based on the degree of vehicle braking loss, the braking rate is set in a multi-speed emergency, and the traction braking curve and vehicle control strategy are adjusted in real time according to the line conditions and vehicle status, matching safe speed limits, ensuring that the train is different Can operate safely in case of failure.
It improves the flexibility and safety of the system, reduces the risks of crashes, squeezing, derailment, etc., optimizes the efficiency of train operation, ensures compatibility of emergency braking distance and time parameters, and reduces the operating burden of dispatchers.
Smart Images

Figure CN118907177A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to, in particular to, a control method and system for dynamically adjusting a guaranteed braking rate according to a degree of vehicle braking loss. Background Art
[0002] During the operation of urban rail transit trains, the onboard controller controls the traction and braking of the train based on the mobile authorization and train operation tasks to complete the normal parking process of the train. If various fault scenarios occur, emergency braking is the most critical measure to ensure the safe operation of the train. The CBTC system adopts the safety braking model defined by the IEEE1474.1 standard, which involves a total of five different braking stages. The key parameter that determines whether the train can stop safely is the emergency guarantee braking rate (GEBR). The value of the emergency guarantee braking rate is a key parameter in the design of the signal system. If the GEBR value is too large, when the system fails, the actual braking rate applied is less than the design value of the emergency guarantee braking rate, and there will be safety risks such as collision, squeezing, and derailment; if the GEBR value is too small, the actual braking rate applied is much greater than the emergency guarantee braking rate value, then the train tracking interval, average travel time, system safety response time, system safety distance parameters, etc. will increase, and the operating efficiency will be greatly reduced.
[0003] At present, there is no clear standard defining how to determine the emergency braking rate at home and abroad. According to project experience, the vehicle braking system manufacturer usually provides a table corresponding to different amounts of bogies cut off under different adhesion coefficients, and refers to the experience of existing project implementation. The minutes of the joint meeting of the vehicle, signal, and owner confirm a fixed emergency braking rate value. Since they are all based on project experience, the value standards and final values of various places vary greatly, and the emergency braking rate ranges from 0.7m / s2 to 1.0m / s2. However, the actual practice of determining the value based on experience is not scientific. Fixed emergency braking rate lacks flexibility, and some lines sacrifice safety in pursuit of operating efficiency, which poses serious safety hazards.
[0004] With more and more urban rail transit lines in operation, the safety of train operation faces more severe challenges. As a key system for train operation safety, whether the signal system can match the vehicle braking system to achieve safe train control becomes more prominent. In the train safety protection model, for safety reasons, the train emergency braking rate is often set to a small value, while the actual train can have better braking performance in most cases. As a result, the theoretically calculated braking distance is too large, which increases the train tracking interval and reduces driving efficiency. Summary of the invention
[0005] The purpose of the present invention is to overcome the defects of the above-mentioned prior art that the value setting of the emergency braking rate lacks flexibility and has certain safety hazards, and to provide a control method and system for dynamically adjusting the emergency braking rate according to the degree of vehicle braking loss.
[0006] The purpose of the present invention can be achieved by the following technical solutions:
[0007] As a first aspect of the present invention, a method for dynamically adjusting a guaranteed braking rate based on a degree of vehicle braking loss is provided, the steps comprising:
[0008] Set multiple gear emergency braking rates according to the degree of vehicle braking loss and line conditions, and set a safe speed limit for the gear matching where the emergency braking rate is lower than the threshold;
[0009] During train operation, the onboard control system obtains the vehicle braking loss status in real time;
[0010] After receiving the corresponding vehicle braking loss information, the on-board ATP system dynamically adjusts the guarantee braking rate and the matching safety speed limit according to the preset multi-gear emergency guarantee braking rate. The on-board ATO updates the traction braking curve parameters and matches the corresponding vehicle control strategy.
[0011] As a preferred technical solution, the method sets different guaranteed braking rates for the non-open section and the open section separately.
[0012] As a preferred technical solution, the multi-gear emergency braking rate is set according to the degree of vehicle braking loss and line conditions as follows:
[0013] Selecting an adhesion coefficient based on line factors, including weather conditions, environmental characteristics, whether it is fully underground, track conditions, and whether it is wet;
[0014] Under the selected adhesion coefficient, the vehicle braking system gives the emergency guarantee braking rate under normal operating conditions, one bogie removed, two bogies removed, three bogies removed, n bogies removed or the same braking fault conditions, and the corresponding operating conditions are defined as different fault levels.
[0015] As an optimal technical solution, the method, based on the emergency guarantee braking rate corresponding to the actual number of working bogies, additionally considers the corresponding guarantee braking rate of at least one or more bogies being removed in the event of fault degradation.
[0016] As an optimal technical solution, if a large number of bogie cuts causes the emergency braking distance at the highest speed under the corresponding emergency braking rate to exceed the safety threshold, a corresponding safety speed limit is set to match the corresponding emergency braking rate value.
[0017] As an optimal technical solution, the method is based on the preset offline input of VOBC braking model parameters and matching speed limits under various gear emergency braking rates, and is used for actual vehicle control to adjust relevant parameters in real time according to vehicle input; offline input of ground and underground section data to the line electronic map, generating vehicle control parameter configuration and line electronic map.
[0018] As an optimal technical solution, the method refers to the preset guarantee braking rate parameters and the matching safety speed limit, calculates the trackside safety distance and time-related parameter configuration and inputs them offline into the trackside subsystem database. The trackside safety distance and time-related parameter configuration include the trackside emergency braking distance, the length of the approach locking section, the approach delay unlocking time, the protection section unlocking time and the personnel protection activation time.
[0019] As a preferred technical solution, the method uses a hard-wired interface to safely collect different vehicle braking states, and the collection circuit is designed to default to the safe side, that is, the bogie is cut off by default.
[0020] As a preferred technical solution, after receiving the corresponding vehicle braking fault information, the on-board ATP system determines whether to activate the guaranteed braking rate of the underground section or the ground section based on the current position, and determines the corresponding guaranteed braking rate and the matching safety speed limit according to the degree of braking loss; the on-board ATO immediately updates the traction braking curve and matches the corresponding vehicle control strategy.
[0021] As a preferred technical solution, if the current vehicle braking state is a serious braking failure, the train will stop with emergency braking, and an alarm will be issued to prompt the operator to switch to manual driving. The train will then exit the mainline operation after it reaches the next platform and clears the passengers.
[0022] If the current vehicle braking state is a non-serious braking fault, the new guaranteed braking rate and the corresponding safety speed limit of the guaranteed braking rate are adjusted based on the current train operating conditions.
[0023] As an optimal technical solution, when the train is far away from the restriction point, or the train is close to the restriction point but the current speed has not reached the trigger curve for emergency braking, and the current train speed has not exceeded the newly added safety speed limit, the on-board VOBC is immediately adjusted to the new emergency braking rate and matching speed limit, and then the on-board controller continues to control the train normally to continue running.
[0024] As a preferred technical solution, when the train is close to the restriction point or the current speed is high, or the current train speed has exceeded or is about to exceed the new safety speed limit, the train adjusts to the new emergency braking rate and the corresponding level of safety speed limit. The train immediately triggers the emergency braking curve. A normal train will stop before the stopping point after triggering the emergency brake.
[0025] As a preferred technical solution, if the onboard controller calculates that the train is over-powered during travel, emergency braking is immediately applied to stop the train before the safe parking point, and then the train control curve is adjusted to control the train to continue running;
[0026] If the on-board controller calculates that the capacity is not exceeded, the on-board ATO will immediately update the traction braking curve and match the corresponding train control strategy. After the train updates the train control curve, it will continue to control the train operation normally.
[0027] As a second aspect of the present invention, a system for dynamically adjusting a guaranteed braking rate based on a degree of vehicle braking loss is provided, the system comprising:
[0028] The emergency braking rate gear configuration unit sets multiple gear emergency braking rates according to the degree of vehicle braking loss and line conditions, and sets a safe speed limit for the gear matching with an emergency braking rate lower than a threshold;
[0029] The vehicle control system offline generation unit offline inputs the VOBC braking model parameters and matching speed limit under various gear emergency protection braking rates according to preset input, and offline inputs the surface and underground section data to the route electronic map;
[0030] Trackside offline generation module calculates the trackside safety-related parameters of the train according to different guaranteed braking rate parameters and matching safety speed limits, and inputs them into the trackside subsystem database offline;
[0031] On-board control system real-time sampling unit: During train operation, the on-board control system obtains the vehicle braking loss status in real time;
[0032] On-board control system control unit: After receiving the corresponding vehicle brake fault information, the on-board ATP system dynamically adjusts the braking rate and the matching safety speed limit, and the on-board ATO updates the traction brake curve parameters and matches the corresponding vehicle control strategy;
[0033] On-board control system execution unit: updates the traction braking command and level information of the vehicle interface, outputs emergency braking command when necessary, and sends corresponding alarm to the trackside system.
[0034] As a preferred technical solution, the emergency braking rate gear configuration unit sets different emergency braking rates for the non-opening section and the opening section.
[0035] The multi-level emergency braking rate is set according to the degree of vehicle braking loss and line conditions as follows:
[0036] Selecting an adhesion coefficient based on line factors, including weather conditions, environmental characteristics, whether it is fully underground, track conditions, and whether it is wet;
[0037] Under the selected adhesion coefficient, the vehicle braking system gives the emergency guarantee braking rate under normal working conditions, one bogie removed, two bogies removed, three bogies removed, n bogies removed or the same braking fault conditions, and the corresponding working conditions are defined as different fault levels;
[0038] On the basis of the emergency guarantee braking rate corresponding to the actual number of working bogies, additional guarantee braking rate corresponding to the removal of at least one or more bogies is considered in the case of fault degradation.
[0039] As an optimal technical solution, the trackside offline generation module calculates the trackside safety distance and time-related parameter configuration with reference to the preset guaranteed braking rate parameters and the matching safety speed limit, including the calculation of the train emergency braking distance, emergency braking time, approach locking section length, route delay unlocking time and protection section unlocking time.
[0040] As a preferred technical solution, the real-time sampling unit of the vehicle control system uses a hard-wired interface to safely collect different vehicle braking states, and the collection circuit is designed to default to the safe side, that is, the bogie is cut off by default.
[0041] As a preferred technical solution, after receiving the corresponding vehicle brake fault information, the vehicle control system control unit:
[0042] If the current vehicle braking status is a serious brake failure, the train will stop with emergency braking, and an alarm will be given to the operator to switch to manual driving. The train will then exit the mainline operation after it reaches the next platform and clears the passengers.
[0043] If the current vehicle braking state is non-critical braking fault, the new guaranteed braking rate and the corresponding safety speed limit of the guaranteed braking rate are adjusted based on the current train working condition;
[0044] When the train is far away from the restriction point, or the train is close to the restriction point but the current speed has not reached the trigger curve for emergency braking, and the current train speed has not exceeded the newly added safety speed limit, the onboard VOBC is immediately adjusted to the new emergency braking rate and matching speed limit, and then the onboard controller continues to control the train to continue running normally;
[0045] When the train is close to the restriction point or the current speed is high, or the current train speed has exceeded or is about to exceed the new safety speed limit, the train adjusts to the new emergency braking rate and the corresponding level of safety speed limit. The train immediately triggers the emergency braking curve. A normal train will stop before the stop point after triggering the emergency brake.
[0046] As a preferred technical solution, the vehicle control system control unit
[0047] If the onboard controller calculates that the train is over-capacity during its operation, it will immediately apply emergency braking to stop the train before the safe parking point, and then adjust the train control curve to control the train to continue running;
[0048] If the on-board controller calculates that the capacity is not exceeded, the on-board ATO will immediately update the traction braking curve and match the corresponding train control strategy. After the train updates the train control curve, it will continue to control the train operation normally.
[0049] Compared with the prior art, the present invention has the following beneficial effects:
[0050] 1) The present invention classifies the guaranteed braking rates corresponding to different vehicle braking faults into guaranteed braking rates under different levels, such as normal braking, minor braking fault, medium braking fault, major braking fault, and severe braking fault. Taking into account the different adhesion systems, the guaranteed braking rates are divided into two different categories according to the elevated section and the ground section. According to the different vehicles, tracks, and operation organizations of different projects, the emergency guaranteed braking rates under different vehicle braking faults are flexibly set. The invention greatly improves the system availability.
[0051] 2) In the present invention, when the emergency braking rate is set at multiple gears, the emergency braking rate actually used during the operation of the train is considered to be safe. It is necessary to consider the emergency braking rate corresponding to the actual number of working bogies, and to additionally consider the corresponding braking rate of at least one additional bogie removed in the case of fault degradation, so as to avoid the risk of collision, squeezing, derailment, etc. caused by not considering the removal of additional bogies during driving, so as to ensure driving safety.
[0052] 3) The present invention, while ensuring the multi-gear setting of the braking rate, avoids the GEBR value being too low, which may affect the overall parameter performance of the line emergency braking distance, emergency braking time, approach locking section length, route delay unlocking time, protection section unlocking time, and personnel protection zone activation effective time. Therefore, when the number of bogie cuts is large and leads to a relatively low GEBR value, the present invention proposes to match and set a suitable safety speed limit under the condition of a lower GEBR value, thereby greatly improving the system availability.
[0053] 4) Under the condition of multi-gear setting of guarantee braking rate, the present invention matches all emergency guarantee braking rates and corresponding safety speed limits, and completes offline configuration of trackside safety distance and time-related parameter in the database of trackside subsystems such as ZC, DSU, CI, ATS, etc., ensuring the compatibility of trackside related safety parameters with the adjusted on-board guarantee braking rate. This complete solution can further ensure the safety of the system.
[0054] 5) The present invention refers to the preset safety braking rate parameters and the matching safety speed limit, calculates the trackside safety distance and time-related parameter configuration to ensure the compatibility of the trackside related safety parameters with the adjusted on-board safety braking rate, and inputs them offline into the trackside subsystem database. The trackside safety distance and time-related parameter configuration include the trackside emergency braking distance, the length of the approach locking section, the approach delay unlocking time, the protection section unlocking time and the personnel protection activation time. This complete parameter setting scheme can ensure the safety of the system.
[0055] 6) In the present invention, while ensuring the multi-gear setting of the braking rate, the hard-wired interface of the input and output module safely collects the braking status of different vehicles, and the collection circuit is designed to default to the safe side to ensure driving safety.
[0056] 7) The vehicle-mounted control system of the present invention dynamically adjusts the train braking rate and the matching safety speed limit according to the vehicle braking loss and whether it is currently in an elevated or underground section, and automatically adjusts and updates the matching traction braking curve and vehicle control strategy. The automatic adjustment method reduces the operating burden of the dispatcher and improves the automation level of the system; the real-time dynamic adjustment method greatly shortens the emergency response time under system failure and improves the safety of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 This is a flow chart of a method for dynamically adjusting a guaranteed braking rate based on a degree of vehicle braking loss according to the present invention;
[0058] Figure 2 To ensure the vehicle control curve diagram in case of safety accidents caused by incorrect braking rate selection;
[0059] Figure 3 It is a schematic diagram of the vehicle control curve under emergency braking without over-capacity braking;
[0060] Figure 4 It is a schematic diagram of the vehicle control curve under super emergency braking;
[0061] Figure 5 The figure is a flow chart of VOBC vehicle control under vehicle brake failure of the present invention. DETAILED DESCRIPTION
[0062] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.
[0063] Example 1
[0064] The present invention proposes a method and system for dynamically adjusting the guarantee braking rate according to the degree of vehicle braking loss. According to the degree of vehicle braking loss and whether it is on the ground or underground section, the emergency guarantee braking rate under vehicle braking failure is defined in advance as multiple levels, and the on-board vehicle control parameter configuration, trackside safety time / distance parameter data and line electronic map data are generated offline. During the operation of the train, the vehicle feeds back the degree of vehicle braking loss to the on-board VOBC (Vehicle On-Board Controller) in real time through the safety interface. The VOBC dynamically adjusts the emergency guarantee braking rate, the safety speed limit and the corresponding vehicle control curve according to the degree of vehicle braking loss and the current position of the train. The present invention reasonably sets the multi-gear emergency guarantee braking rate through the VOBC and vehicle safety interface, realizes the dynamic adjustment of the emergency guarantee braking rate and the matching safety speed limit during the movement, and greatly improves the system operation efficiency without reducing the safety of the system.
[0065] The system mainly includes the following units:
[0066] The emergency braking rate gear configuration unit selects multiple gear emergency braking rates and emergency braking rate values under different gears according to the actual situation of the line, and sets a safe speed limit for the gear matching with an emergency braking rate lower than a threshold.
[0067] The vehicle control system offline generation unit inputs the VOBC braking model parameters and matching speed limits under various gear emergency braking rates offline according to preset inputs, which is used for actual vehicle control to adjust relevant parameters in real time according to vehicle input; and offline inputs ground and underground section data to the line electronic map, which is used to match different emergency braking rates under the same vehicle braking state.
[0068] The trackside offline generation module calculates trackside safety-related parameters such as the train emergency braking distance, emergency braking time, approach locking section length, approach delay unlocking time, and protection section unlocking time based on different guaranteed braking rate parameters and matching safety speed limits, and inputs them offline into the databases of trackside subsystems such as ZC, DSU, CI, and ATS.
[0069] On-board control system real-time sampling unit: During train operation, the on-board control system obtains the vehicle braking loss status in real time.
[0070] On-board control system control unit: After receiving the corresponding vehicle brake fault information, the on-board automatic train protection ATP system (Automatic Train Protection System) dynamically adjusts the braking rate and the matching safety speed limit, and immediately applies emergency braking when the over-energy is calculated. The on-board automatic train operation ATO (Automatic Train Operation) updates the traction brake curve parameters and matches the corresponding vehicle control strategy.
[0071] On-board control system execution unit: updates the traction braking command and level information of the vehicle interface, outputs emergency braking command when necessary, and sends corresponding alarm to the trackside system.
[0072] In the above-mentioned emergency guarantee braking rate gear configuration unit, multiple gear emergency guarantee braking rates and emergency guarantee braking rate values under different gears are selected. The appropriate adhesion coefficient can be selected in combination with factors such as line weather conditions, environmental characteristics, whether it is completely underground, track conditions, whether it is humid, etc. Under the selected adhesion system, the vehicle braking system gives the emergency guarantee braking rate under normal working conditions, cutting off one bogie, cutting off two bogies, cutting off three bogies, cutting off n bogies, or under the same braking fault conditions. The corresponding working condition name can be defined as normal braking, minor braking faults, medium braking faults, severe braking faults, and serious braking faults. In addition, considering the factors such as rain and snow on the ground and the corresponding open sections of the elevated road that cause the wheel-rail adhesion system to deteriorate, different guarantee braking rates are set separately for the non-open sections and the open sections. Considering the low probability of emergency brake failure, in theory, the non-open section or open section can consider 2 to 4 emergency guarantee braking rates that can control the vehicle normally. The specific settings can be adjusted according to the vehicle braking failure rate, the theoretical value of the emergency guarantee braking rate, the line automation level, the system availability requirements, the operation management process, etc. The typical settings can be defined as shown in Table 1:
[0073] Table 1: Definition of emergency braking rate corresponding to different degrees of braking loss
[0074]
[0075] In the above-mentioned emergency braking rate gear configuration unit, driving safety is taken into consideration. During the operation of the train, it is necessary to consider at least one or more bogies to cut off the corresponding braking rate in the event of fault degradation on the basis of the actual number of bogies working and the emergency braking rate, so as to ensure driving safety. If one or more bogie failures are not considered additionally, then when the vehicle is normally controlled and is relatively close to the restriction point, and the vehicle control speed code is close to the emergency braking rate curve, a bogie failure is suddenly added. The on-board controller calculates that the current speed has exceeded the emergency braking trigger curve and immediately applies emergency braking. However, the braking rate under the current braking condition of the vehicle is not enough to ensure that the train can stop before the safety restriction point. Therefore, there is a risk of collision, squeezing, derailment, etc. Figure 2 As shown in the vehicle control curve_guaranteed braking rate selection, a new bogie fault is added to the vehicle, and the corresponding vehicle guaranteed braking rate is reduced. The ATP calculation exceeds the emergency braking trigger curve and triggers the emergency braking. However, after the emergency braking is triggered, the braking command application delay, the braking system response delay, and the superimposed downhill are required. In the most unfavorable case, the new emergency braking rate is not enough to stop the train completely before the safety limit point, and eventually a safety accident occurs.
[0076] In the above-mentioned vehicle control system offline generation unit, according to the preset guaranteed braking rate parameters, the safety distance, time, vehicle control model and other parameters are generated offline, and the ground area and underground area are input offline, and finally the vehicle control parameter configuration and route electronic map are generated.
[0077] In addition, according to the simulation calculation model, for low GEBR values caused by a large number of bogie cuts, a safe speed limit matching the GEBR value will be recommended to avoid the overall line parameter performance being affected by too low a GEBR value. For example, global parameters such as the length of the interlock used to determine whether it constitutes a near lock, the approach delay unlocking time, etc. will consider the worst GEBR value to generate the parameters of the entire line. Setting a safe speed limit corresponding to the GEBR value can optimize the calculation of these distance and time parameters and improve system availability.
[0078] In the above-mentioned trackside offline generation module, with reference to the preset guarantee braking rate parameters and the matching safety speed limit, the trackside emergency braking distance, emergency braking time, approach locking section length, route delay unlocking time, protection section unlocking time, personnel protection zone activation effective time and other trackside system safety distance and time related parameter configurations are calculated and input offline to the ZC, DSU, CI, ATS and other trackside subsystem databases to ensure the compatibility of trackside related safety parameters with the adjusted on-board guarantee braking rate. This complete parameter setting solution can ensure the safety of the system.
[0079] In the above-mentioned trackside offline generation module, the real-time sampling unit of the on-board control system safely collects the braking status of different vehicles through the hard-wired interface of the input and output module. The collection circuit needs to be designed to guide the safe side by default, that is, the bogie is cut off by default to ensure driving safety.
[0080] In the above-mentioned vehicle control system control unit, the vehicle control system control unit: after receiving the corresponding vehicle brake fault information, the vehicle ATP system determines whether to enable the underground section or the ground section's guaranteed braking rate in combination with the current position, and determines the corresponding guaranteed braking rate and the matching safe speed limit according to the degree of braking loss; the vehicle ATO immediately updates the traction braking curve and matches the corresponding vehicle control strategy. At this time, there are three situations:
[0081] a) If a serious vehicle brake failure is triggered, the vehicle control system control unit immediately outputs emergency brake stop and alerts the operator to switch to manual driving. The driver and dispatcher jointly ensure safety and drive the train to the next platform to clear passengers, and then withdraw the train from the main line service. If a non-vehicle brake failure scenario is triggered, switch to b) or c).
[0082] b) The principle of the vehicle control curve corresponding to the braking stage is as follows Figure 3 As shown, the train is far away from the restriction point, or the train is close to the restriction point but the current speed has not reached the trigger curve for the emergency brake, and the current train speed has not exceeded the newly added safety speed limit. At this time, the on-board VOBC is immediately adjusted to the new emergency braking rate and matching speed limit, and then the on-board controller continues to control the train to continue running normally.
[0083] c) The principle of the vehicle control curve corresponding to the braking stage is as follows Figure 4 As shown, the train is close to the restriction point or the current speed is high, or the current train speed has exceeded or is about to exceed the new safety speed limit. After the train is adjusted to the new emergency guarantee braking rate and the corresponding level of safety speed limit, the train immediately triggers the emergency braking curve. A normal train will stop before the stopping point after triggering the emergency braking. Considering extreme situations, based on the large slope ahead, the longest delay in issuing the braking command, and the longest response time of the braking system, the train will stop beyond the normal stopping point ahead. However, because the guarantee braking rate used by the train before the braking failure has taken into account the loss of this braking failure, the train can stop safely before the dangerous point ahead, so there are no safety risks such as collision, squeezing, and derailment.
[0084] In the above-mentioned on-board control system execution unit, the on-board control system execution unit adjusts the traction brake command and level information of the vehicle interface according to the on-board control unit instruction, and outputs the emergency brake command safely through hard wire when necessary. After the train is over-capable of applying emergency brakes, the on-board VOBC will inform the driver and trackside dispatcher and maintenance personnel of the emergency brake alarm and the alarm triggering reason, and remind them to handle it in time.
[0085] In existing projects, only one guaranteed braking rate is set for vehicle braking failures. For safety reasons, the train emergency braking rate is usually set to a small value. In actual cases, trains can have better braking performance in most cases. As a result, the theoretically calculated braking distance is too large, which increases the train tracking interval and reduces driving efficiency. The present invention classifies the guaranteed braking rates corresponding to different vehicle braking failures into guaranteed braking rates at different levels, such as normal braking, minor braking failures, medium braking failures, severe braking failures, and serious braking failures. Considering the different adhesion systems, two different guaranteed braking rates are set separately for elevated sections and ground sections. According to different project vehicles, tracks, and operating organizations, the emergency guaranteed braking rates under different vehicle braking failures are flexibly set. This invention greatly improves the system availability.
[0086] Example 2
[0087] As another embodiment of the present invention, a method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss is also provided. In this embodiment, the basic line conditions are: the line operation level is 100km / h, 6-car B-type trains, and half of the main line is elevated and half is underground. Figure 1 As shown, the specific steps of the method for dynamically adjusting the braking rate are as follows:
[0088] Step 1: Define different emergency braking rates for elevated and underground lines. The vehicle braking system gives the emergency braking rate under normal operating conditions with a certain adhesion coefficient, when one bogie is removed, two bogies are removed, three bogies are removed, four bogies are removed, more bogies are removed, or the same braking fault occurs. Considering driving safety, during train operation, the actual system braking rate used is based on the normal working number of the corresponding bogies, and additionally considers the corresponding braking rate when one bogie is removed in the case of fault degradation to ensure driving safety. The emergency braking rate determined for this line is shown in Table 2 below:
[0089] Table 2: Emergency braking rate values
[0090]
[0091] Step 2: Evaluate the impact of the guaranteed braking rate under different braking losses on system performance and availability, and set a safe speed limit when the guaranteed braking rate is relatively low. For example, under the above guaranteed braking rate, by comparing the braking distance and braking time required to stop the vehicle from emergency braking at the highest speed, the safe speed limit setting with a relatively low guaranteed braking rate is given as shown in Table 3 below:
[0092] Table 3: Braking distance and time calculation under different emergency braking rates and the corresponding safety speed limit values
[0093]
[0094] Step 3: Based on the preset guaranteed braking rate parameters, generate parameters such as safety distance, time, and vehicle control model offline, and input the ground area and underground area offline. Finally, generate the on-board vehicle control parameter configuration and route electronic map offline.
[0095] Step 4: Calculate the trackside safety distance and time-related parameter configurations such as the trackside emergency braking distance, approach locking section length, route delay unlocking time, protection section unlocking time, and personnel protection activation time, with reference to the preset guaranteed braking rate parameters and the matching safety speed limit, and input them offline into the ZC, DSU, CI, ATS and other trackside subsystem databases.
[0096] Step 5: Combine Figure 5 , the VOBC vehicle control process for vehicle brake failure is as follows:
[0097] The real-time sampling unit of the vehicle control system safely collects different vehicle braking states through the hard-wired interface of the input and output module. The collection circuit is designed to default to the safe side to ensure driving safety. For the five types of vehicle braking states, at least three safety collection code positions are used. The collection examples are shown in Table 4 below:
[0098] Table 4: Correspondence between IO acquisition points and vehicle brake fault conditions
[0099] IO Collection 1 IO Collection 2 IO Collection 3 Condition Name 0 0 / 1 0 / 1 Serious brake failure 1 0 0 Heavy brake failure 1 0 1 Braking medium fault 1 1 0 Braking light fault 1 1 1 Braking is normal
[0100] After receiving the vehicle's braking loss status, the on-board control system control unit determines the matching guaranteed braking rate and the corresponding safe speed limit of the guaranteed braking rate based on whether the train is currently located in an underground section or a ground section.
[0101] a) If the current vehicle braking status is a serious brake failure, the train will stop with emergency braking, and an alarm will be sounded to prompt the operator to switch to manual driving. The driver and the dispatcher will jointly ensure safety and drive the train to the next platform to clear passengers, after which the train will exit the mainline operation.
[0102] b) If the current vehicle braking state is non-critical braking fault, after the vehicle is adjusted to the new guaranteed braking rate and the safety speed limit corresponding to the guaranteed braking rate, if the vehicle controller calculates that it has exceeded the capacity, the emergency brake is immediately applied. The train stops before the safe parking point, and then automatically adjusts the vehicle control curve to control the train to continue running; if the vehicle controller calculates that it has not exceeded the capacity, the vehicle ATO immediately updates the traction braking curve and matches the corresponding vehicle control strategy. After the train updates the vehicle control curve, it continues to control the train to run normally.
[0103] Step 6: The onboard control system execution unit adjusts the traction, braking commands and level information of the vehicle interface according to the onboard control unit instructions. If the calculation exceeds the capacity, the emergency braking command is output safely through the hard line output. After the train exceeds the capacity to apply emergency braking, the onboard VOBC will inform the driver and trackside dispatcher and maintenance personnel of the emergency braking alarm and the alarm triggering reason, and remind them to handle it in time.
[0104] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss, characterized in that the steps include: Set multiple gear emergency braking rates according to the degree of vehicle braking loss and line conditions, and set a safe speed limit for the gear matching where the emergency braking rate is lower than the threshold; During train operation, the onboard control system obtains the vehicle braking loss status in real time; After receiving the corresponding vehicle braking loss information, the on-board ATP system dynamically adjusts the guarantee braking rate and the matching safety speed limit according to the preset multi-gear emergency guarantee braking rate. The on-board ATO updates the traction braking curve parameters and matches the corresponding vehicle control strategy.
2. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 1, characterized in that: The method sets different guaranteed braking rates for the non-open section and the open section respectively.
3. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 1, characterized in that: The multi-gear emergency braking rate is set according to the degree of vehicle braking loss and line conditions as follows: Selecting an adhesion coefficient based on line factors, including weather conditions, environmental characteristics, whether it is fully underground, track conditions, and whether it is wet; Under the selected adhesion coefficient, the vehicle braking system gives the emergency guarantee braking rate under normal operating conditions, one bogie removed, two bogies removed, three bogies removed, n bogies removed or the same braking fault conditions, and the corresponding operating conditions are defined as different fault levels.
4. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 3, characterized in that: The method, based on the emergency guarantee braking rate corresponding to the actual number of working bogies, additionally considers the guarantee braking rate corresponding to the removal of at least one or more bogies in the case of fault degradation.
5. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 3, characterized in that: If a large number of bogie cuts causes the emergency braking distance at the highest speed under the corresponding emergency braking rate to exceed the safety threshold, the corresponding safety speed limit is set to match the corresponding emergency braking rate value.
6. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 1, characterized in that: The method is based on the preset offline input of VOBC braking model parameters under emergency braking rates of various gears and matching speed limits, and is used for actual vehicle control to adjust relevant parameters in real time according to vehicle input; offline input of ground and underground section data to the line electronic map, and generation of vehicle control parameter configuration and line electronic map.
7. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 1, characterized in that: The method refers to the preset guarantee braking rate parameters and the matching safety speed limit, calculates the trackside safety distance and time-related parameter configuration to ensure the compatibility of the trackside related safety parameters with the adjusted vehicle-mounted guarantee braking rate, and inputs them into the trackside subsystem database offline. The trackside safety distance and time-related parameter configuration include the trackside emergency braking distance, the approach locking section length, the approach delay unlocking time, the protection section unlocking time and the personnel protection activation time.
8. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 1, characterized in that: The method adopts a hard-wire interface to safely collect different vehicle braking states, and the collection circuit is designed to guide the safe side by default, that is, the bogie is cut off by default.
9. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 1, characterized in that: After receiving the corresponding vehicle brake fault information, the on-board ATP system determines whether to use the underground section or the ground section's guaranteed braking rate based on the current position, and determines the corresponding guaranteed braking rate and the corresponding safety speed limit according to the degree of brake loss; The on-board ATO immediately updates the traction braking curve and matches the corresponding vehicle control strategy.
10. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 9, characterized in that: If the current vehicle braking status is a serious brake failure, the train will stop with emergency braking, and an alarm will be given to the operator to switch to manual driving. The train will then exit the mainline operation after it reaches the next platform and clears the passengers. If the current vehicle braking state is a non-serious braking fault, the new guaranteed braking rate and the corresponding safety speed limit of the guaranteed braking rate are adjusted based on the current train operating conditions.
11. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 10, characterized in that: When the train is far away from the restriction point, or the train is close to the restriction point but the current speed has not reached the trigger curve for emergency braking, and the current train speed has not exceeded the newly added safety speed limit, the on-board VOBC is immediately adjusted to the new emergency braking rate and matching speed limit, after which the on-board controller continues to control the train to continue running normally.
12. The method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 10, characterized in that: When the train is close to the restriction point or the current speed is high, or the current train speed has exceeded or is about to exceed the new safety speed limit, the train adjusts to the new emergency braking rate and the corresponding level of safety speed limit. The train immediately triggers the emergency braking curve. A normal train will stop before the stop point after triggering the emergency brake.
13. A method for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to any one of claims 9 to 12, characterized in that: If the onboard controller calculates that the train is over-capacity during its operation, it will immediately apply emergency braking to stop the train before the safe parking point, and then adjust the train control curve to control the train to continue running; If the on-board controller calculates that the capacity is not exceeded, the on-board ATO will immediately update the traction braking curve and match the corresponding train control strategy. After the train updates the train control curve, it will continue to control the train operation normally.
14. A dynamic adjustment system for guaranteeing braking rate based on the degree of vehicle braking loss, characterized in that: The system comprises: The emergency braking rate gear configuration unit sets multiple gear emergency braking rates according to the degree of vehicle braking loss and line conditions, and sets a safe speed limit for the gear matching with an emergency braking rate lower than a threshold; The vehicle control system offline generation unit offline inputs the VOBC braking model parameters and matching speed limit under various gear emergency protection braking rates according to preset input, and offline inputs the surface and underground section data to the route electronic map; Trackside offline generation module calculates the trackside safety-related parameters of the train according to different guaranteed braking rate parameters and matching safety speed limits, and inputs them into the trackside subsystem database offline; On-board control system real-time sampling unit: During train operation, the on-board control system obtains the vehicle braking loss status in real time; On-board control system control unit: After receiving the corresponding vehicle brake fault information, the on-board ATP system dynamically adjusts the braking rate and the matching safety speed limit, and the on-board ATO updates the traction brake curve parameters and matches the corresponding vehicle control strategy; On-board control system execution unit: updates the traction braking command and level information of the vehicle interface, outputs emergency braking command when necessary, and sends corresponding alarm to the trackside system.
15. The system for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 14, characterized in that: The emergency braking rate gear configuration unit sets different emergency braking rates for the non-opening section and the opening section. The multi-level emergency braking rate is set according to the degree of vehicle braking loss and line conditions as follows: Selecting an adhesion coefficient based on line factors, including weather conditions, environmental characteristics, whether it is fully underground, track conditions, and whether it is wet; Under the selected adhesion coefficient, the vehicle braking system gives the emergency guarantee braking rate under normal working conditions, one bogie removed, two bogies removed, three bogies removed, n bogies removed or the same braking fault conditions, and the corresponding working conditions are defined as different fault levels; On the basis of the emergency guarantee braking rate corresponding to the actual number of working bogies, additional guarantee braking rate corresponding to the removal of at least one or more bogies is considered in the case of fault degradation.
16. The system for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 14, characterized in that: The trackside offline generation module calculates the trackside safety distance and time-related parameter configuration with reference to the preset guaranteed braking rate parameters and the matching safety speed limit, including the calculation of the train emergency braking distance, emergency braking time, approach locking section length, route delay unlocking time and protection section unlocking time.
17. The system for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 14, characterized in that: The on-board control system real-time sampling unit adopts a hard-wired interface to safely collect different vehicle braking states, and the collection circuit is designed to default to the safe side, that is, the bogie is cut off by default.
18. The system for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 14, characterized in that: After receiving the corresponding vehicle brake fault information, the vehicle control system control unit: If the current vehicle braking status is a serious brake failure, the train will stop with emergency braking, and an alarm will be given to the operator to switch to manual driving. The train will then exit the mainline operation after it reaches the next platform and clears the passengers. If the current vehicle braking state is non-critical braking fault, the new guaranteed braking rate and the corresponding safety speed limit of the guaranteed braking rate are adjusted based on the current train working condition; When the train is far away from the restriction point, or the train is close to the restriction point but the current speed has not reached the trigger curve for emergency braking, and the current train speed has not exceeded the newly added safety speed limit, the onboard VOBC is immediately adjusted to the new emergency braking rate and matching speed limit, and then the onboard controller continues to control the train to continue running normally; When the train is close to the restriction point or the current speed is high, or the current train speed has exceeded or is about to exceed the new safety speed limit, the train adjusts to the new emergency braking rate and the corresponding level of safety speed limit. The train immediately triggers the emergency braking curve. A normal train will stop before the stop point after triggering the emergency brake.
19. The system for dynamically adjusting the guaranteed braking rate based on the degree of vehicle braking loss according to claim 14, characterized in that: The vehicle control system control unit If the onboard controller calculates that the train is over-capacity during its operation, it will immediately apply emergency braking to stop the train before the safe parking point, and then adjust the train control curve to control the train to continue running; If the on-board controller calculates that the capacity is not exceeded, the on-board ATO will immediately update the traction braking curve and match the corresponding train control strategy. After the train updates the train control curve, it will continue to control the train operation normally.
Citation Information
Cited By
Virtual marshalling train operation control method and device, electronic equipment and storage medium
CN119928943A
Vehicle-mounted train automatic protection system and brake control method thereof
CN120552816A