Coal bunker blockage monitoring system based on coal bunker coal level real-time prediction

Through a monitoring system based on real-time prediction of coal bin coal level, the accuracy and safety problems of coal bin blockage monitoring in the existing technology are solved, and safe continuous production of thermal power plants is achieved, reducing consumption and risks.

CN118907670AActive Publication Date: 2024-11-08XIAMEN HUAXIA INT POWER DEV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411143170.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-08
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

The existing coal silo clogging monitoring technology has problems such as low measurement accuracy, signal interference, structural complexity and safety risks. It is impossible to effectively prevent and deal with coal silo clogging of different degrees, affecting the production efficiency and safety of thermal power plants.

Method used

Adopt a monitoring system based on real-time prediction of coal level in coal silo, and through the coal silo coal replenishment monitoring module, coal storage volume monitoring module, coal drop volume monitoring module, balance compensation module and blockage early warning module, the coal silo coal level is monitored and predicted in real time, and the coal silo coal level is positioned in real time. clog the position and perform different degrees of intervention through anti-blocking inhibition module.

Benefits of technology

It realizes accurate monitoring of the entire operation of the boiler coal silo, timely discovers blockages, reduces manpower and material consumption, ensures the continuity and stability of power production, avoids safety risks, and provides data reference for the optimization of the coal silo structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118907670A_ABST
    Figure CN118907670A_ABST
Patent Text Reader

Abstract

The invention discloses a coal bunker blockage monitoring system based on coal bunker coal level real-time prediction, which comprises a coal bunker coal supplement monitoring module constructed by adopting a coal level meter signal and a volume calculation module with a double-action switching function, and the volume calculation module is switched by a coal supplement signal to activate coal bunker coal storage volume monitoring update; the updated coal bunker coal storage volume monitoring module and the updated coal bunker coal drop volume monitoring module generate a coal bunker coal level prediction signal through switching the reset volume calculation module and then through loop iteration of the balance compensation module; a coal bunker coal level prediction signal and a coal level meter signal form a coal bunker blockage early warning module, and the coal bunker blockage early warning module outputs a coal bunker blockage alarm signal and blockage positioning prediction, activates a coal bunker blockage prevention inhibition module and controls bunker wall rapping devices or air cannons at different parts of a coal bunker. According to the invention, the whole operation process of the coal bunker of the boiler can be monitored, the blockage of the coal bunker can be found in time, the blockage position can be positioned, and different intervention measures can be carried out for blockage of different degrees.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of coal bunker blockage monitoring, and in particular to a coal bunker blockage monitoring system based on real-time prediction of coal levels in the coal bunker. Background Art

[0002] Raw coal bunkers and raw coal hoppers are used in thermal power plants to store raw coal, coal slime and other granular materials. The problem of coal blockage in raw coal hoppers or raw coal bunkers is a common challenge, posing a serious threat to the stable operation and safety of power plants. The blockage of raw coal bunkers or coal hoppers will cause the effective volume in the coal bunker to decrease, forming "rat holes", causing the coal feeder to be cut off, resulting in a shortened coal feeding time interval, frequent operation of the coal transportation system, large fluctuations in boiler operating conditions, and difficulty in controlling environmental protection indicators. In addition, if not handled properly, it may even cause boiler fire extinguishing, coal hoppers to spontaneously combust or explode, seriously affecting normal production. In particularly serious cases, severely blocked coal bunkers have also caused major accidents such as bunker collapse during the bunkering process, causing personal injury and direct economic losses of millions of yuan.

[0003] There are many main reasons for blockage. The design structures of raw coal hoppers or raw coal bunkers include rectangular section oblique cone type, cone type, rectangular section hyperbolic type and circular section hyperbolic type. Although these structural types have their own characteristics, they all have coal blocking problems to varying degrees. For example, the conical raw coal bunker is prone to increase the friction between coal particles and the bunker wall due to the gradual decrease in the flow cross-sectional area and the increase in the extrusion pressure, which causes arch blockage. The raw coal near the four corners of the hopper wall of the rectangular section raw coal bunker is subject to "double-sided friction" and extrusion, which makes it easy to stick to the corners of the hopper wall, causing coal blocking. However, the main reasons for blockage include coal quality characteristics (such as moisture content and particle size distribution). At present, many thermal power plants in my country cannot ensure the use of a single coal source and need to mix and blend coal for combustion, which makes the coal blocking problem caused by coal quality characteristics inevitable.

[0004] Coal blockages take a long time to develop from the initial stage to the serious stage. If there is a slight blockage in the coal bunker, such as coal adhesion or deposition, it may only need to be solved by using vibrators, water spraying or simple bin clearing operations. If a slight blockage is not handled in time, it will cause moderate or even severe blockage. For moderate blockages, such as agglomeration or slight arch blockage, air cannons, hydraulic loosening machines and other equipment are usually used. If it develops into hard agglomeration or large arch blockage, the processing time may take several days or even longer, requiring complex operations and equipment, such as large bin clearing equipment, blasting operations, etc.

[0005] In order to prevent and control coal blockages as early as possible and avoid major losses, thermal power plants have adopted various technical methods to detect and control coal blockages. The current new monitoring and early warning technologies for coal bunker blockage, such as using a new level meter as the main sensor to collect multi-point real-time coal height data on the inner surface of the coal bunker, and then computer processing the collected coal height data to simulate the actual coal distribution on site. Or install a coal seam pressure sensor to monitor the changes in coal pile pressure in real time. Use abnormal pressure changes to trigger an alarm to prevent the occurrence of coal bunker blockage. However, existing technologies have limitations in many aspects. Radar level meters, as the mainstream and more advanced level sensors, may be affected by signal attenuation when measuring in materials with high conductivity (such as coal with high moisture content). In an environment with high dust concentration, radar signals may be scattered or absorbed. In a conical coal bunker, radar waves may generate multiple reflections on the cone wall, resulting in false echoes. Brackets, pipes or other structures in the bunker may interfere with the propagation of radar signals. The above problems will significantly affect the measurement precision and accuracy. In terms of the monitoring system, the coal bunker needs to be restructured and a large number of monitoring points installed, which not only increases the structural complexity of the inner wall of the coal bunker and creates new causes of blockage, but also creates heterogeneous industrial control network security risks due to the newly added monitoring and early warning computer processing units; in terms of blockage management, most of the heterogeneous monitoring and early warning computer processing units are black box systems based on the original design, which not only have execution time lags, but also often become inaccurate after changes in production processes. This causes the anti-blocking measures to be mismatched with the specific conditions of the coal bunker or coal hopper, and the problem of coal blockage cannot be effectively solved, resulting in poor coal flow and affecting production efficiency. Incorrect triggering of anti-blocking equipment can also cause safety risks. For example, inappropriate vibrator frequency may damage the coal bunker structure, and excessively strong airflow devices may cause the risk of coal dust explosion. Summary of the invention

[0006] The main purpose of the present invention is to overcome the above-mentioned defects in the prior art and to propose a coal bunker blockage monitoring system based on real-time prediction of coal level in the coal bunker, which can realize the whole process monitoring of the boiler coal bunker operation, timely detect coal bunker blockage, locate the location of blockage, and implement different intervention measures for different degrees of blockage.

[0007] The present invention adopts the following technical solution:

[0008] A coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker, comprising:

[0009] The coal bunker coal replenishment monitoring module obtains the collected coal level meter signal of the coal bunker, determines the start of coal loading based on the coal level meter signal, triggers the coal bunker coal replenishment signal, and initializes the coal bunker coal storage volume monitoring module, coal bunker coal falling volume monitoring module and coal bunker blockage warning module; after determining the end of coal loading based on the coal level meter signal, activates the coal bunker coal storage volume monitoring module, coal bunker coal falling volume monitoring module and coal bunker blockage warning module;

[0010] Coal storage volume monitoring module in coal bunker: after the coal storage volume monitoring module in coal bunker is activated, the input of switching volume calculation module is the real-time signal of coal level meter, the output of switching volume calculation module is the coal storage volume signal after coal loading, and the initial coal storage volume of coal bunker is updated to the coal storage volume signal after coal loading; after the update is completed, the updated initial coal storage volume of coal bunker is output to the balance compensation module as the given value, the input of switching volume calculation module is the front-stage signal of balance compensation module storage output, the output of switching volume calculation module is the first input signal of balance compensation module, and the coal position of coal bunker is predicted in real time cycle;

[0011] The coal bunker coal volume monitoring module starts to calculate the real-time coal volume of the coal bunker after the coal bunker coal volume monitoring module is activated, and outputs the real-time cyclic output to the second input signal of the balance compensation module;

[0012] The balance compensation module cyclically calculates the real-time predicted coal storage volume of the coal bunker. When the sum of the first input signal and the second input signal reaches a balance with the given value deviation, the register output of the rear stage of the balance compensation module is activated to output the coal bunker coal position prediction signal;

[0013] The coal bunker blockage warning module calculates the coal drop detection height difference between the coal level prediction signal of the coal bunker and the coal level meter signal collected in real time by the coal level meter. When the coal drop detection height difference reaches the blockage warning condition, an alarm signal is issued.

[0014] Preferably, the coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker is characterized by further comprising:

[0015] The coal bunker anti-blocking suppression module and the coal bunker blockage warning module activate the coal bunker anti-blocking suppression module after issuing an alarm signal; the coal bunker anti-blocking suppression module starts the vibrating device or air cannon to clear the blockage based on the coal falling detection height difference and the real-time coal feeding rate signal; the vibrating device and air cannon are distributed around the bunker wall at different heights on the coal bunker side.

[0016] Preferably, the coal bunker is divided into two or more branches, each branch is equipped with a coal level meter; the coal bunker coal replenishment monitoring module is based on the coal level meter signals of all branches; the coal bunker coal storage volume monitoring module, coal bunker coal falling volume monitoring module, balance compensation module, coal bunker blockage warning module and coal bunker anti-blockage suppression module all perform independent processing for each branch.

[0017] Preferably, in the coal bunker replenishment monitoring module, judging the start of coal loading based on the coal level meter signal specifically includes:

[0018] When there is only one coal level meter, a preset periodic variation is calculated for the coal level meter signal cycle. When the preset periodic variation of the coal level meter signal is greater than a first threshold value, and the triggering time interval of the coal level meter signal exceeding the first threshold value is less than a second threshold value, it is determined that coal loading has started.

[0019] The coal loading is judged to be finished based on the coal level meter signal, specifically including:

[0020] After the coal bunker starts to replenish coal signal, the preset periodic change of the coal level meter signal is detected until both are less than the third threshold value, and it is judged that the coal loading is finished;

[0021] When there are two or more coal level meters, the preset periodic variation is calculated for all coal level meter signal cycles. When the preset periodic variation of at least two coal level meter signals is greater than a first threshold, and the triggering time interval exceeding the first threshold is less than a second threshold, it is determined that coal loading has started.

[0022] The coal loading is judged to be finished based on the coal level meter signal, specifically including:

[0023] After the coal bunker starts to replenish coal signal is activated, the preset periodic change of at least two coal level meter signals is detected until both are less than the third threshold value, and it is determined that the coal loading is completed.

[0024] Preferably, in the coal bunker volume calculation module, the initial coal storage volume and the real-time predicted coal storage volume of the coal bunker are calculated based on the coal bunker design structural parameters.

[0025] Preferably, in the coal bunker coal falling volume monitoring module, the calculation method of the real-time coal falling volume of the coal bunker is as follows:

[0026]

[0027] Among them, V At represents the real-time coal volume in the coal bunker; ρ represents the coal particle size density coefficient; ∈ represents the time interval from the last initialization to the re-issuance of the activation signal, and t represents the time interval from the last activation to the re-issuance of the initialization signal; M A The integrated time coal feeding rate signal of the preset time width dt is represented, and the coal feeding rate signal is the coal feeding rate signal multiplied by the preset time width coefficient.

[0028] Preferably, in the balance compensation module, when the difference between the real-time predicted coal storage volume of the coal bunker and the initial coal storage volume and the real-time coal falling volume of the coal bunker reaches a balance, it is expressed as follows:

[0029]

[0030] Among them, V(h tn ) is the coal position prediction signal h based on real-time coal bunker tn and specific coal bunker design structural parameters, refer to the updated initial coal storage volume V A0n The calculated real-time predicted coal storage volume of the coal bunker, V(h tn ) The calculation process is repeated through balance compensation until the difference between the two sides of the formula is less than the fourth threshold value, and the final coal bunker coal level prediction signal is output; V At Indicates the real-time volume of coal falling into the coal bunker.

[0031] Preferably, in the coal bunker blockage warning module, the coal drop detection height difference between the coal level prediction signal of the coal bunker and the coal level meter signal collected in real time by the coal level meter is calculated, and when the coal drop detection height difference reaches the blockage warning condition, an alarm signal is issued, specifically including:

[0032] When the height difference of coal falling detection is greater than or equal to the fifth threshold, a coal bunker blockage alarm signal is output, and based on the coal bunker design structure parameters and the coal falling detection height difference, empirical constants are superimposed to output blockage location prediction parameters. The empirical constants are generated by multiple iterative fitting of the normal coal falling process of the calculation loop. The blockage location prediction parameters include the average blockage elevation, the arched blockage vector height and the circumferential position of the blockage.

[0033] Preferably, the coal bunker blockage warning module is also used to activate the anti-blockage suppression module, and when the height difference of the falling coal detection is less than a sixth threshold value, reset the alarm signal and stop the anti-blockage suppression module.

[0034] Preferably, the coal bunker anti-blocking and suppression module is specifically used to: control the bunker wall vibration device at the corresponding circumferential position of the coal bunker and close to and slightly higher than the arch blockage arrow height according to the blockage positioning prediction parameters output by the coal bunker blockage warning module, and perform initial blockage clearing at a preset frequency; at the same time, perform real-time calculation and monitoring of the coal falling detection height difference and the real-time coal feeding rate signal, and when the decrease in the real-time coal feeding rate signal is greater than the seventh threshold or the coal falling detection height difference is greater than the eighth threshold, control the air cannon at the corresponding circumferential position of the coal bunker and close to and slightly higher than the arch blockage arrow height to start, and perform moderate blockage clearing at a preset frequency.

[0035] Compared with the prior art, the present invention has the following beneficial effects:

[0036] (1) The present invention monitors the loading of coal into the coal bunker through a coal bunker replenishment monitoring module; after the coal bunker coal storage volume monitoring module is activated, the volume calculation module is switched to calculate the initial coal storage volume and the real-time predicted coal storage volume; the real-time coal dropping volume of the coal bunker is calculated based on the coal bunker coal dropping volume monitoring module; the balance compensation module is used to control the real-time predicted coal storage volume of the coal bunker to reach a balance with the difference between the initial coal storage volume and the real-time coal dropping volume of the coal bunker, and obtain a coal bunker coal position prediction signal; the coal bunker blockage warning module calculates the coal dropping detection height difference, issues an alarm signal based on the coal dropping detection height difference, and realizes blockage positioning prediction; the coal bunker anti-blockage suppression module performs different interventions for different degrees of blockage to ensure safe and continuous production of thermal power plants;

[0037] (2) The present invention can bypass the static deviation of the existing coal level measurement points in the coal bunker, and combine the coal feeding metering system to perform data mining on the changing characteristics of the coal dropping process in the coal bunker without generating any network security risks;

[0038] (3) The present invention can be used to optimize and expand the measurement points based on the physical position in various complex coal bunker structures, obtain more accurate blockage positioning, more effectively judge the coal blockage situation, and obtain the key parts of the blockage treatment in the first time, effectively reducing the manpower and material consumption in the coal distribution operation process of the thermal power plant, ensuring the continuity and stability of power production, and providing data reference for the subsequent optimization and transformation of the coal bunker structure;

[0039] (3) The coal bunker coal level prediction signal generated by the system of the present invention can also be used as a calibration signal for coal bunker replacement and modification of coal level meters to test the performance and sensitivity of the device. Even if the structural dimensions and volume of the coal bunker change in the future, the system can flexibly adjust the coal bunker design structural parameters in the module (different coal bunker structures can adjust the module calculation function through the components according to the parameters) to ensure continuous and stable operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a structural block diagram of a coal bunker blockage monitoring system based on real-time prediction of coal position in a coal bunker according to an embodiment of the present invention;

[0041] Figure 2 This is a schematic diagram of the coal bunker structure and parameters of an embodiment of the present invention. DETAILED DESCRIPTION

[0042] The present invention will be further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms fall within the scope limited by the appended claims of the application equally.

[0043] See also Figure 1As shown, the present invention is a coal bunker blockage monitoring system based on real-time prediction of coal position in a coal bunker, comprising a coal bunker replenishment monitoring module 11, a volume calculation module 12, a coal bunker storage volume monitoring module 13, a coal bunker falling coal volume monitoring module 14, a balance compensation module 15 and a coal bunker blockage early warning module 16, specifically:

[0044] The coal bunker coal replenishment monitoring module 11 obtains the collected coal level meter signal of the coal bunker, determines the start of coal loading based on the coal level meter signal, triggers the coal bunker coal replenishment start signal, and initializes the coal bunker coal storage volume monitoring module 13, the coal bunker coal drop volume monitoring module 14 and the coal bunker blockage warning module 16; after determining the end of coal loading based on the coal level meter signal, activates the coal bunker coal storage volume monitoring module 13, the coal bunker coal drop volume monitoring module 14 and the coal bunker blockage warning module 16;

[0045] The coal storage volume monitoring module 13 of the coal bunker, after the coal storage volume monitoring module 13 is activated, the input of the switching volume calculation module 12 is the real-time signal of the coal level meter, the output of the switching volume calculation module 12 is the coal storage volume signal after coal loading, and the initial coal storage volume of the coal bunker is updated to the coal storage volume signal after coal loading; after the update is completed, the updated initial coal storage volume of the coal bunker is output to the balance compensation module 15 as a given value, the input of the switching volume calculation module 12 is the front-stage signal of the balance compensation module storage output, and the back end of the switching volume calculation module 12 is the first input signal of the balance compensation module 15, so as to perform real-time cyclic prediction of the coal level in the coal bunker;

[0046] The coal bunker coal volume monitoring module 14 starts to calculate the coal volume after the coal bunker coal volume monitoring module 14 is activated, and outputs the second input signal to the balance compensation module 15 in real time and cyclically;

[0047] The balance compensation module 15 controls the coal bunker coal level prediction calculation loop to cyclically calculate the real-time predicted coal storage volume of the coal bunker. When the sum of the first input signal and the second input signal reaches a balance with the given value deviation, the register output of the rear stage of the balance compensation module 15 is activated to output the coal bunker coal level prediction signal.

[0048] The coal bunker blockage warning module 16 calculates the coal drop detection height difference between the coal level prediction signal of the coal bunker and the coal level meter signal collected in real time by the coal level meter, and sends out an alarm signal when the coal drop detection height difference reaches the blockage warning condition;

[0049] The coal bunker anti-blocking suppression module 17 and the coal bunker blockage warning module 16 activate the coal bunker anti-blocking suppression module 1 after issuing an alarm signal; the coal bunker anti-blocking suppression module 1 starts the vibrating device or air cannon to clear the blockage based on the coal falling detection height difference and the real-time coal feeding rate signal; the vibrating device and the air cannon are distributed around the bunker wall at different heights on the coal bunker side.

[0050] In this embodiment, the coal level meter signal is collected by two or more sets of radar coal level meters installed on the top of the coal bunker. The number of radar coal level meters is consistent with the number of coal bunker divisions. In addition, at least one surrounding bunker wall vibration device is distributed at different heights on the side wall of the coal bunker, and air cannons are arranged in the same way. A coal feeder control device is connected to the coal port under the coal bunker, as well as a DCS distributed control system or a PLC control system that connects the control signals of the above modules together.

[0051] The following is an example in which two coal bunker sections, two corresponding radar coal level meters, and a DCS distributed control system are used for explanation.

[0052] A coal bunker blockage monitoring system based on real-time prediction of coal position in a coal bunker is based on a DCS system software computing engine, and is constructed using a coal bunker coal replenishment monitoring module 11 and a volume calculation module 12 with dual-action switching using coal level meter signals. The volume calculation module 12 is switched by the coal replenishment signal to activate the coal bunker coal storage volume monitoring update. The updated coal bunker coal storage volume monitoring module 13 and the coal bunker coal falling volume monitoring module 14 are generated by switching the reset volume calculation module 12 and then iterating through a balance compensation module 15 to generate a coal bunker coal position prediction signal. The coal bunker coal position prediction signal and two sets of radar coal level meter signals respectively constitute a coal bunker blockage early warning module 16. The coal bunker blockage early warning module 16 outputs a coal bunker blockage alarm signal and a blockage location prediction, and activates a coal bunker anti-blockage suppression module 17 to control the bunker wall vibration device and / or air cannon at different parts of the coal bunker, thereby realizing full-process monitoring of the boiler coal bunker operation, based on the static coal quantity reset at the moment of coal loading completion, and the coal position cycle correction prediction and blockage location control that are adaptive to the irregular coal replenishment cycle.

[0053] The specific implementation of the coal bunker coal replenishment monitoring module 11 is as follows. Based on two sets (or more sets, two are taken as an example here) of radar coal level meter signals, the preset time period change amount is calculated cyclically respectively. When the preset period change amount of the two sets of radar coal level meter signals is greater than the first threshold, and the trigger time interval of exceeding the first threshold is less than the second threshold, the coal bunker starts to replenish coal signal, which initializes the coal bunker coal storage volume monitoring module 13, the coal bunker coal falling volume monitoring module 14 and the coal bunker blockage warning module 16. After the coal bunker starts to replenish coal signal is activated, the preset period change amount of the two sets of radar coal level meter signals is detected until they are both less than the third threshold, and the coal bunker coal storage volume monitoring module 13 and the coal bunker coal falling volume monitoring module 14 are activated.

[0054] The specific implementation of the coal storage volume monitoring module 13 is as follows. Based on two sets (or more sets, two are used as an example here) of radar coal level meter signals, independent monitoring loops are constructed respectively. The monitoring loops are based on the specific coal bunker design structure parameters and the coal level meter signal value h at the moment of module activation. 0n(i.e. the signal values ​​of the two coal level meters after the coal loading is completed), calculate and output the corresponding coal storage volume signals V of the two coal bunkers A0n , where n represents the radar coal level meter number. This volume is calculated and generated and stored as the coal storage value after this coal loading, and is cleared after the next initialization. Figure 2 As shown in the figure, a formula for calculating the coal storage volume is output according to structural parameters based on a typical conical coal hopper structure in an embodiment.

[0055]

[0056] It should be particularly pointed out that, in the embodiment, the volume calculation module 12 has a dual-action switch, which is used for both the coal storage volume calculation circuit and the coal bunker coal position prediction calculation circuit, which does not mean that the module cannot be copied and replaced and used in parallel.

[0057] The specific implementation of the coal bunker coal volume monitoring module 14 is as follows: Based on the coal feeder control device connected to the coal bunker lower coal port, its standard process real-time coal feeding rate signal is converted into an integral time coal feeding rate signal M with a preset time width dt. A When the coal bunker coal volume monitoring module 14 is initialized, the coal volume V output by the module is At Clear to zero, and start to calculate and output the coal volume V when the coal bunker coal volume monitoring module 14 is activated At ρ represents the coal particle size density coefficient, which can be corrected in the DCS system human-machine interface; ∈ represents the time interval from the last initialization to the reactivation of the module, and t represents the time interval from the last initialization to the reinitialization, both of which are sent out and displayed by the coal bunker coal volume monitoring module 14 as auxiliary signals.

[0058]

[0059] Among them, V At represents the real-time coal volume in the coal bunker; ρ represents the coal particle size density coefficient; ∈ represents the time interval from the last initialization to the re-issuance of the activation signal, and t represents the time interval from the last activation to the re-issuance of the initialization signal; M A The integral time coal feeding rate signal of the preset time width dt is represented. The coal feeding rate signal is the coal feeding rate signal multiplied by the preset time width coefficient. The unit of the original coal feeding rate signal is cubic meter / hour.

[0060] Specifically, the balance compensation module 15 generates a coal bunker coal position prediction signal by cyclic iteration based on the following balance formula:

[0061]

[0062] The V(h tn) is based on the real-time prediction signal of coal position in coal bunker and specific coal bunker design structural parameters, referring to the coal volume signal V of different coal bunkers A0n The real-time predicted coal bunker volume is calculated and generated. The calculation process is repeated through balance compensation until the difference between the two sides of the formula is less than the fourth threshold, and the coal position prediction signal h of different coal bunkers is output. tn In the embodiment, the pseudo code format of the balance compensation is as follows:

[0063]

[0064] As mentioned above, the volume calculation module 12 has a dual-action switch, V(h tn ) Based on a typical conical coal hopper structure embodiment, fx(h tn ) The calculation formula is as follows. The meanings of the symbols in the formula are as follows: Figure 2 shown.

[0065]

[0066] The coal bunker blockage warning module 16 is specifically implemented as follows. tn Together with the two sets of radar coal level meter signals, they respectively constitute the coal drop detection height difference based on the coal bunker division where the radar coal level meter is located. When the coal drop detection height difference of the division is greater than the fifth threshold, a coal bunker blockage alarm signal is output, and based on the coal bunker design structure parameters and the coal drop detection height difference, empirical constants are superimposed to output blockage location prediction parameters. The empirical constants are generated by multiple iterations of fitting during the normal coal drop process of the calculation loop. The blockage location prediction parameters include the average blockage elevation, the arch blockage vector height, and the circumferential location of the blockage. Furthermore, the division blockage warning module activates the anti-blockage suppression module after issuing an alarm signal. When the coal drop detection height difference of the division is less than the sixth threshold (the difference between the fifth threshold and the preset return value), the alarm signal is reset and the anti-blockage suppression module is stopped.

[0067] The specific implementation of the coal bunker anti-blocking suppression module 17 is as follows: according to the blockage positioning prediction parameters, the corresponding circumferential parts of the coal bunker and the bunker wall vibration devices close to and slightly higher than the arch blockage arrow height are controlled to perform initial blockage removal at a preset frequency. In parallel, the module starts the suppression evaluation module to perform real-time calculation and monitoring of the branch coal drop detection height difference and the real-time coal feeding rate signal. When the real-time coal feeding rate signal decreases by more than the seventh threshold, or the branch coal drop detection height difference is greater than the eighth threshold, the coal bunker moderate blockage alarm signal is activated, and the air cannons close to and slightly higher than the arch blockage arrow height are controlled to start at the corresponding circumferential parts of the coal bunker, and the air cannons close to and slightly higher than the arch blockage arrow height are controlled to perform moderate blockage removal at a preset frequency.

[0068] The above is only a specific implementation of the present invention, but the design concept of the present invention is not limited thereto. Any non-substantial changes to the present invention using this concept shall be deemed as an infringement of the protection scope of the present invention.

Claims

1. A coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker, characterized in that: include: The coal bunker coal replenishment monitoring module obtains the collected coal level meter signal of the coal bunker, determines the start of coal loading based on the coal level meter signal, triggers the coal bunker coal replenishment signal, and initializes the coal bunker coal storage volume monitoring module, coal bunker coal falling volume monitoring module and coal bunker blockage warning module; after determining the end of coal loading based on the coal level meter signal, activates the coal bunker coal storage volume monitoring module, coal bunker coal falling volume monitoring module and coal bunker blockage warning module; Coal storage volume monitoring module in coal bunker: after the coal storage volume monitoring module in coal bunker is activated, the input of switching volume calculation module is the real-time signal of coal level meter, the output of switching volume calculation module is the coal storage volume signal after coal loading, and the initial coal storage volume of coal bunker is updated to the coal storage volume signal after coal loading; after the update is completed, the updated initial coal storage volume of coal bunker is output to the balance compensation module as the given value, the input of switching volume calculation module is the front-stage signal of balance compensation module storage output, the output of switching volume calculation module is the first input signal of balance compensation module, and the coal position of coal bunker is predicted in real time cycle; The coal bunker coal volume monitoring module starts to calculate the real-time coal volume of the coal bunker after the coal bunker coal volume monitoring module is activated, and outputs the real-time cyclic output to the second input signal of the balance compensation module; The balance compensation module cyclically calculates the real-time predicted coal storage volume of the coal bunker. When the sum of the first input signal and the second input signal reaches a balance with the given value deviation, the register output of the rear stage of the balance compensation module is activated to output the coal bunker coal position prediction signal; The coal bunker blockage warning module calculates the coal drop detection height difference between the coal level prediction signal of the coal bunker and the coal level meter signal collected in real time by the coal level meter. When the coal drop detection height difference reaches the blockage warning condition, an alarm signal is issued.

2. The coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker according to claim 1 is characterized in that: Also includes: Coal bunker anti-blocking suppression module, the coal bunker blockage warning module activates the coal bunker anti-blocking suppression module after sending out an alarm signal; The coal bunker anti-blocking and suppression module starts the rapping device or air cannon to clear the blockage based on the coal falling detection height difference and the real-time coal feeding rate signal; the rapping device and air cannon are distributed at different heights on the coal bunker side around the bunker wall.

3. The coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker according to claim 1 is characterized in that: The coal bunker is divided into two or more branches, each branch is equipped with a coal level meter; the coal bunker coal replenishment monitoring module is based on the coal level meter signals of all branches; the coal bunker coal storage volume monitoring module, coal bunker coal falling volume monitoring module, balance compensation module, coal bunker blockage warning module and coal bunker anti-blockage suppression module all perform independent processing for each branch.

4. The coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker according to claim 1 is characterized in that: In the coal bunker replenishment monitoring module, the coal loading start is judged based on the coal level meter signal, specifically including: When there is only one coal level meter, a preset periodic variation is calculated for the coal level meter signal cycle. When the preset periodic variation of the coal level meter signal is greater than a first threshold value, and the triggering time interval of the coal level meter signal exceeding the first threshold value is less than a second threshold value, it is determined that coal loading has started. The coal loading is judged to be finished based on the coal level meter signal, specifically including: After the coal bunker starts to replenish coal signal, the preset periodic change of the coal level meter signal is detected until both are less than the third threshold value, and it is judged that the coal loading is completed; When there are two or more coal level meters, the preset periodic variation is calculated for all coal level meter signal cycles. When the preset periodic variation of at least two coal level meter signals is greater than a first threshold, and the triggering time interval exceeding the first threshold is less than a second threshold, it is determined that coal loading has started. The coal loading is judged to be finished based on the coal level meter signal, specifically including: After the coal bunker starts to replenish coal signal is activated, the preset periodic change of at least two coal level meter signals is detected until both are less than the third threshold value, and it is determined that the coal loading is completed.

5. The coal bunker blockage monitoring system based on real-time prediction of coal position in coal bunker according to claim 1 is characterized in that: In the coal bunker volume calculation module, the initial coal storage volume and the real-time predicted coal storage volume of the coal bunker are calculated based on the coal bunker design structural parameters.

6. The coal bunker blockage monitoring system based on real-time prediction of coal position in coal bunker according to claim 1 is characterized in that: In the coal bunker coal volume monitoring module, the real-time coal volume of the coal bunker is calculated as follows: Among them, V At represents the real-time coal volume in the coal bunker; ρ represents the coal particle size density coefficient; ∈ represents the time interval from the last initialization to the re-issuance of the activation signal, and t represents the time interval from the last activation to the re-issuance of the initialization signal; M A The integrated time coal feeding rate signal of the preset time width dt is represented, and the coal feeding rate signal is the coal feeding rate signal multiplied by the preset time width coefficient.

7. The coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker according to claim 1 is characterized in that: In the balance compensation module, when the difference between the real-time predicted coal storage volume of the coal bunker and the initial coal storage volume and the real-time coal falling volume of the coal bunker reaches a balance, it is expressed as follows: Among them, V(h tn ) is the coal position prediction signal h based on real-time coal bunker tn and specific coal bunker design structural parameters, refer to the updated initial coal storage volume V A0n The calculated real-time predicted coal storage volume of the coal bunker, V(h tn ) The calculation process is repeated through balance compensation until the difference between the two sides of the formula is less than the fourth threshold value, and the final coal bunker coal level prediction signal is output; V At Indicates the real-time volume of coal falling into the coal bunker.

8. The coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker according to claim 1 is characterized in that: In the coal bunker blockage warning module, the coal drop detection height difference between the coal level prediction signal of the coal bunker and the coal level meter signal collected in real time by the coal level meter is calculated. When the coal drop detection height difference reaches the blockage warning condition, an alarm signal is issued, specifically including: When the height difference of coal falling detection is greater than or equal to the fifth threshold, a coal bunker blockage alarm signal is output, and based on the coal bunker design structure parameters and the coal falling detection height difference, empirical constants are superimposed to output blockage location prediction parameters. The empirical constants are generated by multiple iterative fitting of the normal coal falling process of the calculation loop. The blockage location prediction parameters include the average blockage elevation, the arched blockage vector height and the circumferential position of the blockage.

9. The coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker according to claim 8 is characterized in that: The coal bunker blockage warning module is also used to activate the anti-blockage suppression module, and when the height difference of the coal drop detection is less than the sixth threshold value, reset the alarm signal and stop the anti-blockage suppression module.

10. The coal bunker blockage monitoring system based on real-time prediction of coal level in coal bunker according to claim 2, characterized in that: The coal bunker anti-blocking and suppression module is specifically used to: control the bunker wall vibration device at the corresponding circumferential position of the coal bunker and close to and slightly higher than the arch blockage arrow height according to the blockage positioning prediction parameters output by the coal bunker blockage warning module, and perform initial blockage clearing at a preset frequency; at the same time, perform real-time calculation and monitoring of the coal falling detection height difference and the real-time coal feeding rate signal. When the decrease in the real-time coal feeding rate signal is greater than the seventh threshold or the coal falling detection height difference is greater than the eighth threshold, control the air cannon at the corresponding circumferential position of the coal bunker and close to and slightly higher than the arch blockage arrow height to start, and perform moderate blockage clearing at a preset frequency.

Citation Information

Patent Citations

  • Raw coal bunker dynamic compensation processing system and method

    CN110286608A

  • Coal bunker monitoring system

    CN116553119A

  • Real-time online monitoring system for quality of coal as fired

    CN211292885U

  • Tamping coal tower structure with unblocking function

    CN216837815U