Shore crane loading and unloading system

By introducing a transit platform and lifting mechanism into the shore bridge loading and unloading system, two sets of slings are divided into labour for lifting operations, which solves the problem of long operating time of shore bridge lifting boxes and box matching, and improves the container loading and unloading efficiency.

CN118908080AActive Publication Date: 2024-11-08HUADIAN LANCO TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411031720.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-08
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

The shore bridge consumes more time in the hanging box and box-to-box operation, resulting in low container loading and unloading efficiency.

Method used

A shore bridge loading and unloading system is designed, including a transit platform and a lifting mechanism, and a first spreader is used to lift the container between the sea side and the transit platform, and a second spreader is used to lift the container between the transit platform and the land side to reduce the The operating time of the hanging box reduces the shaking of the second spreader and improves the operating efficiency of the box.

Benefits of technology

Through two sets of spreaders and transit platforms that are divided into work, the time consumption of hanging boxes and box operations is reduced, the efficiency of loading and unloading containers of the shore bridge is improved, and the operation difficulty between the second spreader and the transport vehicle is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118908080A_ABST
    Figure CN118908080A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of loading and unloading equipment, and discloses a quay crane loading and unloading system which comprises a container quay crane, a quay crane loading and unloading device, a quay crane loading and unloading device, a quay crane loading and unloading device, a quay crane loading and unloading device and a quay crane loading and unloading device, and the quay crane loading and unloading device is provided with a crossbeam and a quay crane trolley suitable for moving along the crossbeam; the transfer platform is located below the girder and suitable for transferring containers; and the lifting mechanism is arranged on at least one side of the transfer platform, the lifting mechanism comprises a second lifting appliance capable of ascending or descending, and the second lifting appliance is suitable for lifting the container. The two groups of lifting appliances can work respectively, so that the time consumption of box lifting operation is reduced; the distance that the second lifting appliance is lowered to the land-side transport vehicle is far smaller than the distance that the first lifting appliance is directly lowered to the land-side transport vehicle, so that the shaking of the second lifting appliance can be effectively reduced, and the time consumption of container operation between the second lifting appliance and the land-side transport vehicle is reduced; container lifting operation and container aligning operation are simultaneously reduced in time consumption, so that the container loading and unloading efficiency of the quay crane is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of loading and unloading equipment, and in particular to a quay crane loading and unloading system. Background Art

[0002] As the most important container loading and unloading equipment at port terminals, quay cranes are responsible for the vast majority of container ship loading and unloading work at port terminals. Therefore, the working efficiency of quay cranes directly affects the container ship loading and unloading efficiency at port terminals.

[0003] In the operation process of the quay crane, the quay crane trolley moves along the beam, and the spreader is pulled on the quay crane trolley by the wire rope. The spreader is controlled by the lengthening or retracting of the wire rope to lift or drop the container, and the container is transported between the container truck and the container ship in coordination with the movement of the quay crane trolley. Since the stacking height of the containers on the container ship on the sea side is often much higher than that of the container truck on the road side, the wire rope needs to be lowered or retracted for a long distance during the container transportation operation, which consumes a lot of time for the container lifting operation; and the spreader is often prone to shaking, and the loading platform on the container truck is comparable to the width of the container, which makes it difficult for the spreader to quickly align the container with the loading platform on the container truck, which consumes a lot of time for the container operation, and ultimately leads to low efficiency in loading and unloading containers by the quay crane. Summary of the invention

[0004] In view of this, the present invention provides a quay crane loading and unloading system to solve the problem that the current container quay crane operation consumes a lot of time, resulting in low efficiency in loading and unloading containers by the quay crane.

[0005] The present invention provides a quay crane loading and unloading system, comprising: a container quay crane, which has a beam and a quay crane trolley suitable for moving along the beam, the quay crane trolley is provided with a first sling that can be raised or lowered, and the first sling is suitable for lifting containers; a transfer platform, located below the beam, and the transfer platform is suitable for transshipping containers; a lifting mechanism, arranged on at least one side of the transfer platform, the lifting mechanism comprises a second sling that can be raised or lowered, and the second sling is suitable for lifting containers; wherein, the first sling is suitable for lifting containers on a transport ship on the sea side and dropping them to the transfer platform for transshipment, and the second sling is used to lift the containers and drop them to a transport vehicle on the land side; and the second sling is suitable for lifting containers on a transport vehicle on the land side and lifting them to the transfer platform for transshipment, and the first sling is used to lift the containers to the transport ship on the sea side.

[0006] Beneficial effects: The present invention provides a quay crane loading and unloading system, which, by setting a transfer platform and a lifting mechanism, uses a first hoist of the container quay crane to lift containers between a transport ship on the sea side and the transfer platform located below the beam, uses the transfer platform to transfer containers, and uses a second hoist of the lifting mechanism to lift containers between the transfer platform and a transport vehicle on the land side; the two groups of hoists can operate separately, reducing the time consumption of lifting container operations; the distance that the second hoist is lowered to the transport vehicle on the land side is much shorter than the distance that the first hoist is directly lowered to the transport vehicle on the land side, which can effectively reduce the shaking of the second hoist, and reduce the time consumption of the box operation between the second hoist and the transport vehicle on the land side; the time consumption in both the box lifting operation and the box operation is reduced, thereby improving the efficiency of quay crane loading and unloading containers.

[0007] In an optional embodiment, the transfer platform includes a main platform and a flip platform rotatably connected to the main platform, and the flip platform is arranged on at least one side of the main platform; the second sling is suitable for rising or falling in the vertical direction, and the second sling and the flip platform are arranged collinearly in the vertical direction.

[0008] Beneficial effects: The second spreader is set to rise or fall in the vertical direction, which reduces the difficulty of container operations between the second spreader and the transport vehicle, or between the second spreader and the container on the transport vehicle, thereby further reducing the time consumption of container operations and further improving the efficiency of loading and unloading containers by the quay crane; the rotating and connected flip platform on the main platform facilitates avoiding the second spreader.

[0009] In an optional embodiment, the two flipping platforms are rotatably connected to the two sides of the main platform respectively; the lifting mechanism is provided in two and is respectively provided on the two sides of the main platform; the two second hoists are respectively provided corresponding to the two flipping platforms.

[0010] Beneficial effects: Two flip platform screens are equipped with two lifting mechanisms, and container transfer and lifting operations can be carried out on both sides of the main platform, improving the loading and unloading efficiency of the quay crane loading and unloading system.

[0011] In an optional embodiment, conveyor belts are respectively provided on the main platform and the turnover platform, and the conveyor belts are suitable for transshipping containers.

[0012] Beneficial effect: Conveyor belts are respectively arranged on the main platform and the turning platform, so as to realize the transfer operation of the container by using the conveyor belts, which has a simple structure and is fast and efficient.

[0013] In an optional embodiment, the lifting mechanism also includes: a driving device having a power output end; a traction rope, one end of which is transmission-connected to the power output end, and the other end of which is directly or indirectly connected to the second sling, and the driving device is suitable for driving the traction rope so that the traction rope drives the second sling to rise or fall.

[0014] Beneficial effect: The driving device outputs power to drive the traction rope to move up and down, thereby driving the second spreader to move up and down, thereby realizing the lifting operation of the second spreader for the container.

[0015] In an optional embodiment, the lifting mechanism also includes: a guide rail, arranged in a vertical direction; an installation bracket, which is guided and connected to the guide rail and connected to the traction rope, and is provided with the second sling, and the installation bracket is suitable for being driven by the traction rope to move along the guide rail to drive the second sling to rise or fall in the vertical direction.

[0016] Beneficial effects: The traction rope is connected to the second spreader through the mounting bracket, and the mounting bracket is guided in the vertical direction by the guide rail, thereby ensuring the stability of the second spreader in the vertical direction; since the guide rail guides the mounting bracket and also guides the second spreader, the shaking of the traction rope driving the second spreader is restricted, thereby effectively preventing the second spreader from shaking. At this time, the second spreader and the transport vehicle are fixed structure to fixed structure, and the difficulty of box operation between the two is greatly reduced, which can reduce the time consumption of box operation between the second spreader and the transport vehicle, and further improve the efficiency of loading and unloading containers by the quay crane.

[0017] In an optional embodiment, the mounting bracket includes: a main frame, which is connected to the guide rail; an extension frame, which is fixedly connected to the main frame and extends in a horizontal direction; a movable frame, which extends in a horizontal direction and is movably connected to the extension frame, and the movable frame is provided with the second sling; a driving member, which is arranged between the extension frame and the movable frame, and the driving member is suitable for driving the movable frame to telescopically move relative to the extension frame.

[0018] Beneficial effect: The driving member is used to drive the movable frame to telescopically move relative to the extension frame, driving the second sling to move laterally, thereby fine-tuning the position of the second sling, so that the second sling can accurately lift the container to the transport vehicle, or the second sling can accurately lift the container on the transport vehicle.

[0019] In an optional embodiment, the lifting mechanism further includes a roller, and the roller is connected to a side of the main frame close to the guide rail and abuts against the guide rail.

[0020] Beneficial effect: By arranging the rollers, the lifting and lowering movement of the mounting bracket on the guide rail is smoother, thereby improving the running smoothness of the lifting mechanism.

[0021] In an optional embodiment, the lifting mechanism further includes a brake device, wherein the brake device is spaced apart from the roller in a height direction, and the brake device is suitable for clamping the side surface of the guide rail to limit the movement of the second sling.

[0022] Beneficial effect: By providing a brake device, the side of the guide rail can be clamped in an emergency, thereby limiting the movement of the second hanger and improving the safety of the lifting mechanism operation.

[0023] In an optional embodiment, the container quay crane has a main structure suitable for being supported on the ground, and the transfer platform and the lifting mechanism are arranged on the main structure.

[0024] Beneficial effect: The main structure of the container quay crane is used as the installation basis for the transfer platform and the lifting mechanism, thereby improving the integrity of the quay crane loading and unloading system. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0026] Figure 1 A schematic structural diagram of a quay crane loading and unloading system provided by the present invention;

[0027] Figure 2 A structural schematic diagram of the position of the second hanger in the lifting mechanism provided by the present invention;

[0028] Figure 3 This is a structural schematic diagram of the matching positions of the mounting bracket and the guide rail in the lifting mechanism provided by the present invention.

[0029] Description of reference numerals:

[0030] 1. Container quay crane; 101. Main beam; 102. Quay crane trolley; 103. First spreader; 104. Main structure;

[0031] 2. Transfer platform; 201. Main platform; 202. Turning platform; 203. Rotation axis;

[0032] 3. Lifting mechanism; 301. Second lifting device; 302. Driving device; 303. Traction rope; 304. Guide rail; 305. Mounting bracket; 3051. Main frame; 3052. Extension frame; 3053. Movable frame; 3054. Driving member; 3055. Pull rod; 306. Roller; 307. Braking device;

[0033] 4. Transport vehicle;

[0034] 100. Container. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0036] Combine the following Figure 1-Figure 3 , describing an embodiment of the present invention.

[0037] According to an embodiment of the present invention, a quay crane loading and unloading system is provided, such as Figure 1 As shown, it includes: a container quay crane 1, a transfer platform 2 and a lifting mechanism 3.

[0038] The container quay crane 1 has a beam 101 and a quay crane trolley 102 suitable for moving along the beam 101, and the quay crane trolley 102 is provided with a first lifting device 103 that can be raised or lowered, and the first lifting device 103 is suitable for lifting the container 100; the transfer platform 2 is located below the beam 101, and the transfer platform 2 is suitable for transshipping the container 100; the lifting mechanism 3 is arranged on at least one side of the transfer platform 2, and the lifting mechanism 3 includes a second lifting device 301 that can be raised or lowered, and the second lifting device 301 is suitable for lifting the container 100; wherein, the first lifting device 103 is suitable for lifting the container 100 on the transport ship on the sea side and dropping it to the transfer platform 2 for transshipment, and the second lifting device 301 is used to lift the container 100 and drop it to the transport vehicle 4 on the land side; and the second lifting device 301 is suitable for lifting the container 100 on the transport vehicle 4 on the land side and lifting it to the transfer platform 2 for transshipment, and the first lifting device 103 is used to lift the container 100 to the transport ship on the sea side.

[0039] In the above embodiment, by setting up a transfer platform 2 and a lifting mechanism 3, the first lifting device 103 of the container quay crane 1 is used to lift the container 100 between the transport ship on the sea side and the transfer platform 2 located under the beam 101, the transfer platform 2 is used to transfer the container 100, and the second lifting device 301 of the lifting mechanism 3 is used to lift the container 100 between the transfer platform 2 and the transport vehicle 4 on the land side; the two groups of lifting devices can operate separately, reducing the time consumption of lifting the container; the distance from the second lifting device 301 to the transport vehicle 4 on the land side is much smaller than the distance from the first lifting device 103 directly lowered to the transport vehicle 4 on the land side, which can effectively reduce the shaking of the second lifting device 301 and reduce the time consumption of the box operation between the second lifting device 301 and the transport vehicle 4 on the land side; the time consumption in both the box lifting operation and the box operation is reduced, thereby improving the efficiency of the quay crane in loading and unloading containers.

[0040] Specifically, the container quay crane 1 and the lifting mechanism 3 can each operate independently. With the cooperation of the transfer platform 2 in the transfer of containers, the first lifting device 103 can leave for the next operation after lifting the container 100 to the transfer platform 2. Similarly, the second lifting device 301 can leave for the next operation after lifting the container 100 to the transfer platform 2. The two lifting and transfer modes do not affect each other's reasonable division of labor, which helps to improve the efficiency of the quay crane in loading and unloading containers.

[0041] Furthermore, if Figure 1 As shown, this embodiment does not limit the specific method of transferring the container 100 on the transfer platform 2. As an implementation method, a transfer trolley with a cargo basket is provided on the transfer platform 2, and the container 100 is hoisted into the cargo basket by the first sling 103 or the second sling 301, and the transfer operation of the container 100 on the transfer platform 2 is realized by the movement of the transfer trolley; as another implementation method, a conveyor belt is provided on the transfer platform 2, and the container 100 is hoisted onto the conveyor belt by the first sling 103 or the second sling 301, and the transfer operation of the container 100 on the transfer platform 2 is realized by the movement of the conveyor belt.

[0042] Furthermore, if Figure 1 As shown, the specific manner in which the second sling 301 in the lifting mechanism 3 performs lifting operation is not limited. As an implementation method, the second sling 301 operates in a similar manner to the first sling 103, and a horizontal moving structure similar to the beam 101 is set to facilitate the horizontal movement of the container 100, and the first sling 103 is driven to move by lowering or retracting the steel wire rope on the lifting mechanism 3; as another implementation method, the horizontal movement of the container 100 is only performed on the transfer platform 2, and a guide rail is set to guide the second sling 301, and the first sling 103 is driven to move by lowering or retracting the steel wire rope on the lifting mechanism 3. The driving element of the steel wire rope is set as a driving motor, a winch, etc.

[0043] In some embodiments, Figure 1 As shown, the transfer platform 2 includes a main platform 201 and a flip platform 202 rotatably connected to the main platform 201, and the flip platform 202 is arranged on at least one side of the main platform 201; the second sling 301 is suitable for rising or falling in the vertical direction, and the second sling 301 and the flip platform 202 are arranged in the same line in the vertical direction.

[0044] In the above embodiment, the second sling 301 is set to rise or fall in the vertical direction, reducing the difficulty of container operations between the second sling 301 and the transport vehicle 4, or between the second sling 301 and the container 100 on the transport vehicle 4, thereby further reducing the time consumption of container operations and further improving the efficiency of container loading and unloading by the quay crane; the turning platform 202 rotatably connected to the main platform 201 facilitates avoiding the second sling 301.

[0045] Specifically, Figure 1 As shown, on the one hand, after the container 100 is transferred to the flipping platform 202 on one side of the main platform 201, the second sling 301 lifts the container 100, and the flipping platform 202 flips to a position perpendicular to the main platform 201 to avoid the second sling 301 and the container 100 lifted by it, and the second sling 301 can continue to fall to the transport vehicle 4 on the land side; on the other hand, the second sling 301 lifts the container 100 on the transport vehicle 4 on the land side, and the flipping platform 202 flips to a position perpendicular to the main platform 201 to avoid the second sling 301 and the container 100 lifted by it. When the second sling 301 and the container 100 lifted by it are lifted to a relative height above the main platform 201, the flipping platform 202 is reset, and the second sling 301 drops the container 100 to the flipping platform 202 and transfers it to the main platform 201 by the flipping platform 202.

[0046] In some embodiments, Figure 1 As shown, the two flip platforms 202 are rotatably connected to the two sides of the main platform 201 by two rotating shafts 203; the lifting mechanism 3 is provided in two, and is respectively provided on both sides of the main platform 201, and the two second hoists 301 are respectively provided corresponding to the two flip platforms 202.

[0047] In the above embodiment, two turnover platforms 202 are provided with two lifting mechanisms 3, so that the container 100 can be transferred and hoisted on both sides of the main platform 201, thereby improving the loading and unloading efficiency of the quay crane loading and unloading system.

[0048] Specifically, Figure 1 As shown, the two flip platforms 202 are rotatably connected to the two sides of the main platform 201 by two rotating shafts 203 respectively, and can be rotationally controlled by a controller.

[0049] In some embodiments, Figure 1 As shown, as a preferred embodiment, conveyor belts are respectively provided on the main platform 201 and the turning platform 202 , and the conveyor belts are suitable for transshipping the container 100 .

[0050] In the above embodiment, conveyor belts are respectively arranged on the main platform 201 and the turning platform 202, so as to realize the transfer operation of the container 100 by using the conveyor belts, which has a simple structure and is fast and efficient.

[0051] Specifically, Figure 1 As shown, the width of the main platform 201 and the width of the turning platform 202 are both equivalent to the length of the container 100. Independently operated conveyor belts are respectively set on the two turning platforms 202 of the main platform 201. The three groups of conveyor belt terminals operate according to the instructions of the dispatching system to transfer the containers 100 on the main platform 201 to the appropriate turning platform 202 on one side, and cooperate with the first sling 103 or the second sling 301 to carry out the next lifting operation.

[0052] In some embodiments, Figure 1 As shown, the lifting mechanism 3 further includes: a driving device 302 and a traction rope 303 .

[0053] The driving device 302 has a power output end; one end of the traction rope 303 is transmission-connected to the power output end, and the other end is directly or indirectly connected to the second sling 301. The driving device 302 is suitable for driving the traction rope 303 so that the traction rope 303 drives the second sling 301 to rise or fall.

[0054] In the above embodiment, the driving device 302 outputs power to drive the traction rope 303 to move up and down, thereby driving the second lifting device 301 to move up and down, thereby realizing the lifting operation of the second lifting device 301 for the container 100.

[0055] Specifically, Figure 1 As shown, the driving device 302 is configured as a winch, and the traction rope 303 is configured as a steel wire rope or a steel cable.

[0056] Furthermore, if Figure 1 As shown, this embodiment does not limit the connection method between the traction rope 303 and the second sling 301. As an implementation method, the traction rope 303 is directly connected to the second sling 301; as another implementation method, the traction rope 303 is connected to the second sling 301 through an intermediate connection structure.

[0057] In some embodiments, Figure 1 As shown, as a preferred embodiment, the lifting mechanism 3 further includes: a guide rail 304 and a mounting bracket 305 .

[0058] The guide rail 304 is arranged in the vertical direction; the mounting bracket 305 is connected to the guide rail 304 and is connected to the traction rope 303, and a second sling 301 is provided. The mounting bracket 305 is suitable for being driven by the traction rope 303 to move along the guide rail 304 to drive the second sling 301 to rise or fall in the vertical direction.

[0059] In the above embodiment, the traction rope 303 is connected to the second sling 301 through the mounting bracket 305, and the guide rail 304 is used to guide the mounting bracket 305 in the vertical direction to ensure the stability of the second sling 301 in the vertical direction; because the guide rail 304 guides the mounting bracket 305 and also guides the second sling 301, the shaking of the traction rope 303 driving the second sling 301 is restricted, and the shaking of the second sling 301 is effectively avoided. At this time, the second sling 301 and the transport vehicle 4 are fixed structures against fixed structures, and the difficulty of box operation between the two is greatly reduced, which can reduce the time consumption of box operation between the second sling 301 and the transport vehicle 4, and further improve the efficiency of loading and unloading containers by the quay crane.

[0060] Specifically, Figure 1 As shown, the guide rails 304 are arranged on both sides of the transfer platform 2, and are respectively connected and matched with the mounting brackets 305 on the lifting mechanisms 3 on both sides of the transfer platform 2 for guiding connection.

[0061] In some embodiments, Figure 2 , Figure 3 As shown, the mounting bracket 305 includes: a main frame 3051 , an extension frame 3052 , a movable frame 3053 and a driving member 3054 .

[0062] The main frame 3051 is guided and connected to the guide rail 304; the extension frame 3052 is fixedly connected to the main frame 3051 and extends in the horizontal direction; the movable frame 3053 extends in the horizontal direction and is movably connected to the extension frame 3052, and the movable frame 3053 is provided with a second sling 301; the driving member 3054 is arranged between the extension frame 3052 and the movable frame 3053, and the driving member 3054 is suitable for driving the movable frame 3053 to telescopically move relative to the extension frame 3052.

[0063] In the above embodiment, the driving member 3054 is used to drive the movable frame 3053 to telescopically move relative to the extension frame 3052, thereby driving the second sling 301 to move laterally, thereby fine-tuning the position of the second sling 301, so that the second sling 301 can accurately lift the container 100 to the transport vehicle 4, or the second sling 301 can accurately lift the container 100 on the transport vehicle 4.

[0064] Specifically, Figure 2 , Figure 3As shown, the driving member 3054 is configured as a cylinder or a hydraulic cylinder, the fixed end of which is fixedly connected to the extension frame 3052, and the movable end is fixedly connected to the movable frame 3053. The extension frame 3052 has two groups, and the movable frame 3053 is rectangular, and its two short sides are respectively movably connected to the two groups of extension frames 3052, and three groups of driving members 3054 are arranged between the extension frame 3052 and the movable frame 3053.

[0065] Furthermore, if Figure 2 As shown, a pull rod 3055 is obliquely arranged between the main frame 3051 and the extension frame 3052 . The main frame 3051 , the extension frame 3052 and the pull rod 3055 form a triangular structure, thereby improving the structural stability of the mounting bracket 305 .

[0066] In some embodiments, Figure 3 As shown, the lifting mechanism 3 further includes a roller 306 , which is connected to a side of the main frame 3051 close to the guide rail 304 and abuts against the guide rail 304 .

[0067] In the above embodiment, the roller 306 is provided to make the lifting movement of the mounting bracket 305 on the guide rail 304 smoother, thereby improving the running smoothness of the lifting mechanism 3 .

[0068] Specifically, Figure 3 As shown, a group of guide rails 304 are arranged on one side of the transfer platform 2, and a group of guide rails 304 includes two guide rails 304. Each guide rail 304 is correspondingly provided with a group of rollers 306. A group of rollers 306 includes four rollers 306, two of which are arranged on the main frame 3051, and the other two rollers 306 are respectively arranged on two extension structures of the main frame 3051.

[0069] In some embodiments, Figure 3 As shown, the lifting mechanism 3 further includes a brake device 307 , which is spaced apart from the roller 306 in the height direction. The brake device 307 is suitable for clamping the side of the guide rail 304 to limit the movement of the second hanger 301 .

[0070] In the above embodiment, the brake device 307 is provided to clamp the side of the guide rail 304 in an emergency, thereby limiting the movement of the second lifting device 301 and improving the safety of the operation of the lifting mechanism 3.

[0071] Specifically, Figure 3 As shown, a group of guide rails 304 is set on one side of the transfer platform 2, and a group of guide rails 304 includes two guide rails 304. Each guide rail 304 is correspondingly provided with a group of brake devices 307. A group of brake devices 307 includes two brake devices 307. The two brake devices 307 are respectively arranged on two extension structures of the main frame 3051.

[0072] In some embodiments, Figure 1 As shown, the container quay crane 1 has a main structure 104 suitable for being supported on the ground, and the transfer platform 2 and the lifting mechanism 3 are arranged on the main structure 104 .

[0073] In the above embodiment, the main structure 104 of the container quay crane 1 is used as the installation base of the transfer platform 2 and the lifting mechanism 3 to improve the integrity of the quay crane loading and unloading system.

[0074] Specifically, Figure 1 As shown, the main structure 104 of the container quay crane 1 provides an installation position for the transfer platform 2 and the lifting mechanism 3, so that the main platform 201 on the transfer platform 2 and the guide rail 304 in the lifting mechanism 3 can be directly fixedly connected to the main structure 104 of the container quay crane 1.

[0075] Furthermore, if Figure 1 As shown, the second spreader 301 can be vertically slidably arranged on the guide rail 304 through several frames of the lifting mechanism 3. Since the guide rail 304 is relatively fixed relative to the door legs of the main structure 104 in the container quay crane 1, the sliding of the second spreader 301 in the vertical direction is relatively fixed, which can prevent the container 100 from shaking during the container loading process.

[0076] Furthermore, if Figure 1 As shown, the driving device 302 in the lifting mechanism 3 is directly fixedly connected to the beam 101 of the container quay crane 1.

[0077] The present embodiment provides a quay crane loading and unloading system operation mode as follows:

[0078] When loading the container 100 from the container ship on the sea side onto the transport vehicle 4 on the road side, the first hoist 103 of the container quay crane 1 lifts the container 100 on the container ship on the sea side, and lifts the container 100 to the main platform 201 of the transfer platform 2 and places it by means of the steel wire rope expansion and contraction and the movement of the quay crane trolley. After the conveyor belt transfers the container 100 to the tipping platform 202 on one side of the main platform 201, the second hoist 301 of the lifting mechanism 3 lifts the container 100, and the tipping platform 202 is flipped to a vertical position with the main platform 201 to avoid the second hoist 301 and the container 100 lifted by it, so that the second hoist 301 can continue to fall along the guide rail 304 to the transport vehicle 4 close to the land side, and the movable frame 3053 of the mounting bracket 305 in the lifting mechanism 3 is used to fine-tune the position of the second hoist 301 and the container 100 lifted by it. After the adjustment is in place, the second hoist 301 puts down the container 100, so that the container 100 is loaded on the transport vehicle 4 on the road side.

[0079] When loading the container 100 from the transport vehicle 4 on the road side into the container ship on the sea side, the transport vehicle 4 transports the container 100 and drives to one side of the guide rail 304 of the lifting mechanism 3, that is, below the second spreader 301, and uses the movable frame 3053 of the mounting bracket 305 in the lifting mechanism 3 to fine-tune the position of the second spreader 301. After the adjustment is in place, the second spreader 301 lifts the container 100, and the flip platform 202 flips to a vertical position with the main platform 201 to avoid the second spreader 301 and the container 100 lifted by it. When the second spreader 301 and the container 100 lifted by it are lifted to a relative height above the main platform 201 of the transfer platform 2, the flip platform 202 is reset, and the second spreader 301 drops the container 100 to the flip platform 202 and transfers it to the main platform 201 by the flip platform 202. The first spreader 103 of the container quay crane 1 lifts the container 100, and the container 100 is loaded into the container ship on the sea side by retracting the wire rope and moving the quay crane trolley.

[0080] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A quay crane loading and unloading system, characterized in that: include: A container quay crane (1) comprises a beam (101) and a quay crane trolley (102) adapted to move along the beam (101), wherein the quay crane trolley (102) is provided with a first lifting device (103) that can be raised or lowered, and the first lifting device (103) is adapted to lift a container (100); A transfer platform (2), located below the beam (101), the transfer platform (2) being suitable for transshipping containers (100); A lifting mechanism (3) is arranged on at least one side of the transfer platform (2), the lifting mechanism (3) comprising a second lifting device (301) that can be raised or lowered, and the second lifting device (301) is suitable for lifting a container (100); The first sling (103) is suitable for lifting a container (100) on a transport ship on the sea side and dropping it to the transfer platform (2) for transshipment, and the second sling (301) is used to lift the container (100) and drop it to a transport vehicle (4) on the land side; and the second sling (301) is suitable for lifting a container (100) on a transport vehicle (4) on the land side and lifting it to the transfer platform (2) for transshipment, and the first sling (103) is used to lift the container (100) and lift it to the transport ship on the sea side.

2. The quay crane loading and unloading system according to claim 1, characterized in that: The transfer platform (2) comprises a main platform (201) and a flip platform (202) rotatably connected to the main platform (201), wherein the flip platform (202) is arranged on at least one side of the main platform (201); The second sling (301) is suitable for rising or falling in a vertical direction, and the second sling (301) and the turning platform (202) are arranged in the same line in the vertical direction.

3. The quay crane loading and unloading system according to claim 2, characterized in that: The two flip platforms (202) are rotatably connected to two sides of the main platform (201); The lifting mechanisms (3) are provided in two numbers and are respectively provided on both sides of the main platform (201); the two second hangers (301) are respectively provided corresponding to the two turning platforms (202).

4. The quay crane loading and unloading system according to claim 3, characterized in that: Conveyor belts are respectively arranged on the main platform (201) and the overturning platform (202), and the conveyor belts are suitable for transshipping containers (100).

5. The quay crane loading and unloading system according to any one of claims 1 to 4, characterized in that: The lifting mechanism (3) further comprises: A driving device (302) having a power output end; A traction rope (303) has one end drivingly connected to the power output end and the other end directly or indirectly connected to the second sling (301); the driving device (302) is suitable for driving the traction rope (303) so that the traction rope (303) drives the second sling (301) to rise or fall.

6. The quay crane loading and unloading system according to claim 5, characterized in that: The lifting mechanism (3) further comprises: A guide rail (304) is arranged in a vertical direction; The mounting bracket (305) is connected to the guide rail (304) and the traction rope (303), and is provided with the second sling (301). The mounting bracket (305) is suitable for being driven by the traction rope (303) to move along the guide rail (304) to drive the second sling (301) to rise or fall in the vertical direction.

7. The quay crane loading and unloading system according to claim 6, characterized in that: The mounting bracket (305) comprises: A main frame (3051) is connected to the guide rail (304) for guiding; An extension frame (3052) is fixedly connected to the main frame (3051) and extends in a horizontal direction; A movable frame (3053) is extended in a horizontal direction and movably connected to the extension frame (3052), and the movable frame (3053) is provided with the second sling (301); The driving member (3054) is arranged between the extension frame (3052) and the movable frame (3053), and the driving member (3054) is suitable for driving the movable frame (3053) to perform telescopic movement relative to the extension frame (3052).

8. The quay crane loading and unloading system according to claim 7, characterized in that: The lifting mechanism (3) further comprises a roller (306), wherein the roller (306) is connected to a side of the main frame (3051) close to the guide rail (304) and abuts against the guide rail (304).

9. The quay crane loading and unloading system according to claim 8, characterized in that: The lifting mechanism (3) further comprises a brake device (307), wherein the brake device (307) and the roller (306) are arranged at intervals in the height direction, and the brake device (307) is suitable for clamping the side of the guide rail (304) to limit the movement of the second sling (301).

10. The quay crane loading and unloading system according to claim 1, characterized in that: The container quay crane (1) has a main structure (104) suitable for being supported on the ground, and the transfer platform (2) and the lifting mechanism (3) are arranged on the main structure (104).

Citation Information

Patent Citations

  • Container inspection system, port facility and container inspection method

    CN108373108A

  • Apparatus for transferring containers between ship an shore, and vice versa

    EP0303884A1

  • device FOER ATT OMLASTA EN TRANSPORTCONTAINER FRAON ETT FARTYG TILL LAND OCH TVAERTOM.

    FI883774A0