Construction method for mixed type test pavement of test site

CN118910984AActive Publication Date: 2024-11-08CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
-1 Cites -1 Cited by

Patent Information

Application Number
CN202310510451.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-08
Publication Date
2024-11-08
Estimated Expiration
2043-05-08

Smart Images

  • Figure CN118910984A_ABST
    Figure CN118910984A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for a mixed type test pavement in a test site. The construction method comprises the following steps: (1) surveying and setting out; (2) arranging a reinforcing mesh; (3) reserving a manhole position; (4) distribution of dowel bars; (5) pouring concrete; (6) concrete surface finishing; (7) curing the concrete pavement; (8) mounting a well lid and building a manhole; and (9) rechecking the elevation. The three-dimensional control technology is applied, the problems that a mixed type test pavement composed of a cast iron component, a high-strength concrete pavement and a manhole stone block is complex in construction process and high in connection difficulty of pavements made of different materials are solved, the problem that the pavements made of different materials cannot be connected due to different elevations is solved, the construction process is optimized, and the construction efficiency is improved. The difficulty of construction operation is reduced, the construction precision is greatly improved, and the construction quality is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction of special roads such as special test roads, manhole cover roads, mixed test roads and the like in automobile test sites, and in particular to a construction method of mixed test road surfaces in test sites. Background Art

[0002] The existing special test roads in the test field are mostly regular concrete construction technology. There are no special test roads in the domestic test field with irregular road spectrum constraints, such as stone + concrete roads. This type of special test road is composed of irregular stones + concrete pavement + cast iron manhole cover, and is mainly used for vehicle comfort testing. At present, the most effective and closest existing construction technology is mainly the construction technology of rural roads.

[0003] There is no mature construction technology for this type of special test road in the prior art, and there is no record of accurate three-dimensional elevation layout, control and detection technology or solutions for irregular road spectra with the same comprehensive technical characteristics. In the construction of this type of special test road, the elevation accuracy control requirements are high, repeated measurement and control are required, the construction efficiency is low, and the elevation control is difficult, making it difficult to ensure the quality of the project. Summary of the invention

[0004] In order to solve the defects in the prior art, the present invention provides a method for constructing a mixed test pavement in a test field. The present invention proposes a mixed test pavement construction technology, which involves manhole stone masonry + manhole cover installation, and applies three-dimensional control technology, which solves the problems of complex construction technology of mixed test pavement composed of cast iron components, high-strength concrete pavement and manhole stones, high difficulty in connecting pavements of different materials, and the difficulty that pavements of different materials cannot be connected due to different elevations, optimizes the construction technology, reduces the difficulty of construction operations, greatly improves construction accuracy, and ensures construction quality; the quality control measures are highly standardized, technical and innovative, the control measures are clear in order, and the key points are clearly grasped, which can effectively improve the construction quality.

[0005] To achieve the above object, the present invention provides a method for constructing a mixed test pavement in a test field, comprising the following steps:

[0006] (1) Measurement and staking out: Before staking out, the base surface of the mixed test pavement is completely cleaned and moistened with water, and then three-dimensional control data is constructed on the base surface;

[0007] (2) Steel mesh layout;

[0008] (3) Manhole position reservation: The manhole position is reserved along the longitudinal edges of both sides of the mixed test pavement. The reserved manhole position is rectangular and is divided into Class A manhole position and Class B manhole position according to size;

[0009] (4) Dowel rod layout: Dowel rods are laid out at the designed locations of pre-cut contraction joints, construction joints, and expansion joints in the transverse direction of the mixed test pavement. Multiple dowel rods are evenly spaced along the transverse direction of the pavement, and the layout distance between adjacent dowel rods is 33-36 cm.

[0010] (5) Concrete pouring: During the pouring process, the concrete is vibrated and the height of the concrete pouring is strictly controlled. The height is adjusted at any time during the pouring process;

[0011] (6) Concrete finishing: according to the three-dimensional control data of the pavement design, a smoothing device is used to smooth the surface;

[0012] (7) Concrete pavement curing: After the concrete surface is finished, the mixed test pavement in the test field is covered with water-retaining geotextile and plastic film for curing;

[0013] (8) Installation of manhole covers and construction of manholes, where a manhole cover is installed in the center of the A-type manhole position, and a protrusion is built in the center of the B-type manhole position to replace the manhole cover; after the manhole cover is installed at the A-type manhole position, a bottom layer of high-performance concrete is poured around it, and after it solidifies, the upper structure is built, and then the upper structure is grouted with mortar; the overall mixed test pavement construction is completed;

[0014] (9) Elevation review: Use elevation monitoring equipment to review the completed mixed test road surface according to the road spectrum data.

[0015] Preferably, in the step (1), firstly, a three-dimensional model of the road surface is drawn using three-dimensional drawing software according to the design drawings of the mixed test road surface, and then the road surface is plane-grid-divided according to the road spectrum by the software; the format of the road surface file after grid division is edited, and the node numbers and connection relationships in the grid road surface are defined, so as to generate a digital road surface, and the line is accurately laid out on the base layer based on this; then, an elevation monitoring device is installed to monitor and control the elevation of the mixed test road surface in real time, so as to construct three-dimensional control data.

[0016] In any of the above schemes, it is preferred that in step (2), a layer of 180mm×180mm Ø8mm cold-rolled ribbed steel mesh is laid at a height of 1 / 3 from the surface of the mixed test road surface, and 4 Ø14mm ribbed reinforcement steel bars are arranged on both side edges of the mixed test road surface; no steel mesh is arranged at the manhole position.

[0017] In any of the above schemes, preferably, in step (3), the size of the reserved type A manhole position is 1.33*0.87m, the size of the reserved type B manhole position is 1.22*0.82m; and the spacing between adjacent manhole positions is 0.5-0.62m.

[0018] In any of the above schemes, it is preferred that in step (3), the manhole positions on each side are set as a unit of 3 along the longitudinal direction of the mixed test road surface, each unit has 2 Class A manhole positions and the other is a Class B manhole position, and one Class A manhole position is closer to the center line of the road surface; the manhole positions on both sides of the mixed test road surface are staggered.

[0019] In any of the above schemes, it is preferred that in step (4), the force transmission rod is arranged below the steel mesh and its height is located at 1 / 2 of the distance between the steel mesh and the base layer.

[0020] In any of the above schemes, it is preferred that in step (5), when pouring concrete, a concrete compartment pouring device is used, which includes a liftable support frame arranged at the front and rear, a pouring groove is arranged on the liftable support frame, and a plurality of compartment guide nozzles with different opening sizes can be detachably arranged in the pouring groove.

[0021] In any of the above schemes, it is preferred that in step (5), when vibrating the concrete, the angle of the vibrating rod inserted into the concrete is controlled to be 35-40°, and the vibration is maintained at a uniform speed and a small amplitude until the road surface does not sink and no bubbles are generated, so as to avoid collision with the formwork and affecting the road surface construction quality; the construction at the edge of the concrete pavement is strengthened to ensure its overall stability; and the transverse pre-cut contraction joints, construction joints, and expansion joints are designed in accordance with the requirements of the specifications.

[0022] In any of the above schemes, it is preferred that in step (6), a roller is used to slurry the concrete pavement before finishing the concrete surface.

[0023] In any of the above schemes, it is preferred that in step (8), the upper structure is built with granite blocks, and the other areas of the Class A manhole position except the manhole cover are flatly paved; the protrusion is also built with granite blocks, and the other areas of the Class B manhole position except the protrusion are also flatly paved with granite blocks; the slope of the protrusion along the driving direction of the mixed test road surface is 2°-3°.

[0024] The beneficial effects of the present invention are:

[0025] 1. The present invention proposes a mixed test pavement construction technology, which involves manhole stone masonry + manhole cover installation, and applies three-dimensional control technology to solve the problems of complex construction technology of a mixed test pavement composed of cast iron components, high-strength concrete pavement and manhole stones, high difficulty in connecting pavements of different materials, and the difficulty that pavements of different materials cannot be connected due to different elevations. The construction technology is optimized, the difficulty of construction operations is reduced, the construction accuracy is greatly improved, and the construction quality is ensured; the quality control measures are highly standardized, technical and innovative, the control measures are well-organized, the key points are clearly grasped, and the construction quality can be effectively improved.

[0026] 2. The present invention reduces construction costs, improves project quality and construction efficiency, and ensures project progress through reasonably optimized construction and standardized processes that integrate machinery and materials.

[0027] 3. The present invention uses new equipment such as an elevation monitoring device and a concrete compartment pouring device, and adopts a new process to achieve a one-time forming rate of the mixed test pavement, thereby ensuring the pavement forming quality, avoiding rework losses caused by unqualified quality, saving resources, reducing cost investment, and achieving the goal of sustainable development.

[0028] 4. The present invention adopts the three-dimensional control technology of the stone elevation of the hybrid test road and the manhole cover installation control technology. After the stone masonry and the manhole cover installation are completed, the elevation error is within ±2mm, so that all indicators of the hybrid test road meet the design and test standards, and the quality of the hybrid test road surface is improved; the special design of the manhole position combined with the concrete pavement can meet various vehicle testing needs, including comfort, tire wear resistance, dryness reduction, etc.; the present invention has advanced technology, mature process, strong practicality, good reliability, significant economic and social benefits, and broad application prospects.

[0029] BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 A schematic diagram of the construction process of the test field mixed test pavement construction method according to the present invention;

[0031] Figure 2 It is a schematic structural diagram of a concrete compartment pouring device used in the test field mixed test pavement construction method according to the present invention. DETAILED DESCRIPTION

[0032] The technical solution of the present application will be described in detail below in conjunction with the drawings and specific implementation methods of the present application. However, the following embodiments are only for understanding the present invention. The embodiments in the present application and the features in the embodiments can be combined with each other. The present application can be implemented in a variety of different ways as defined and covered by the claims.

[0033] Example 1

[0034] See also Figure 1 , a test field mixed test pavement construction method, comprising the following steps:

[0035] (1) Measurement and staking out: Before staking out, the base surface of the mixed test pavement is completely cleaned and moistened with water, and then three-dimensional control data is constructed on the base surface;

[0036] (2) Steel mesh layout;

[0037] (3) Manhole position reservation: The manhole position is reserved along the longitudinal edges of both sides of the mixed test pavement. The reserved manhole position is rectangular and is divided into Class A manhole position and Class B manhole position according to size;

[0038] (4) Dowel bar layout: Dowel bars are laid out at the designed locations of pre-cut contraction joints, construction joints, and expansion joints in the transverse direction of the mixed test pavement. Multiple dowel bars are evenly spaced in the transverse direction of the pavement, and the layout distance between adjacent dowel bars is 33 cm.

[0039] (5) Concrete pouring: During the pouring process, the concrete is vibrated and the height of the concrete pouring is strictly controlled. The height is adjusted at any time during the pouring process;

[0040] (6) Concrete finishing: according to the three-dimensional control data of the pavement design, a smoothing device is used to smooth the surface;

[0041] (7) Concrete pavement curing: After the concrete surface is finished, the mixed test pavement in the test field is covered with water-retaining geotextile and plastic film for curing;

[0042] (8) Installation of manhole covers and construction of manholes, where a manhole cover is installed in the center of the A-type manhole position, and a protrusion is built in the center of the B-type manhole position to replace the manhole cover; after the manhole cover is installed at the A-type manhole position, a bottom layer of high-performance concrete is poured around it, and after it solidifies, the upper structure is built, and then the upper structure is grouted with mortar; the overall mixed test pavement construction is completed;

[0043] (9) Elevation review: Use elevation monitoring equipment to review the completed mixed test road surface according to the road spectrum data.

[0044] In the step (1), firstly, a three-dimensional model of the road surface is drawn using three-dimensional drawing software according to the design drawings of the mixed test road surface, and then the road surface is plane-grid-divided according to the road spectrum by the software; the format of the road surface file after grid division is edited, and the node numbers and connection relationships in the grid road surface are defined, so as to generate a digital road surface, and then the line is accurately laid out on the base layer; then an elevation monitoring device is installed to monitor and control the elevation of the mixed test road surface in real time, so as to construct three-dimensional control data.

[0045] In the step (2), a layer of 180mm×180mm Ø8mm cold-rolled ribbed steel mesh is laid at a height of 1 / 3 from the surface of the mixed test pavement, and 4 Ø14mm ribbed reinforcement steel bars are arranged on both side edges of the mixed test pavement; no steel mesh is arranged at the manhole position.

[0046] In the step (3), the size of the reserved A-type manhole position is 1.33*0.87m, and the size of the reserved B-type manhole position is 1.22*0.82m; the spacing between adjacent manhole positions is 0.62m.

[0047] In the step (3), the manhole positions on each side are set as a unit of three along the longitudinal direction of the mixed test road surface, each unit has two Class A manhole positions and the other is a Class B manhole position, and one Class A manhole position is closer to the center line of the road surface; the manhole positions on both sides of the mixed test road surface are staggered.

[0048] In the step (4), the force transmission rod is arranged below the steel mesh, and the height is located at 1 / 2 of the distance between the steel mesh and the base layer.

[0049] In the step (5), when pouring concrete, a concrete compartment pouring device is used, which includes a liftable support frame arranged at the front and rear, a pouring slot is arranged on the liftable support frame, and a plurality of compartment guide nozzles with different opening sizes can be detachably arranged in the pouring slot.

[0050] In the step (5), when the concrete is vibrated, the angle of the vibrating rod inserted into the concrete is controlled to be 35-40°, and the vibration is maintained at a uniform speed and a small amplitude until the road surface does not sink and no bubbles are generated, so as to avoid collision with the formwork and affecting the road surface construction quality; the construction at the edge of the concrete road surface is strengthened to ensure its overall stability; and the transverse pre-cut contraction joints, construction joints, and expansion joints are designed in accordance with the requirements of the specifications.

[0051] In the step (6), a roller is used to raise the concrete pavement before the concrete surface is finished.

[0052] In step (8), the upper structure is built with granite blocks, and the other areas of the Class A manhole position except the manhole cover are flattened and fully paved; the protrusion is also built with granite blocks, and the other areas of the Class B manhole position except the protrusion are also flattened and fully paved with granite blocks; the slope of the protrusion along the driving direction of the mixed test road surface is 2°.

[0053] In this embodiment, the mixed test pavement is 200m long and the effective construction period is completed within 20 days, while the traditional construction process has an effective construction period of 35 days, thereby saving construction time.

[0054] Example 2

[0055] See also Figure 1 , a test field mixed test pavement construction method, comprising the following steps:

[0056] (1) Measurement and staking out: Before staking out, the base surface of the mixed test pavement is completely cleaned and moistened with water, and then three-dimensional control data is constructed on the base surface;

[0057] (2) Steel mesh layout;

[0058] (3) Manhole position reservation: The manhole position is reserved along the longitudinal edges of both sides of the mixed test pavement. The reserved manhole position is rectangular and is divided into Class A manhole position and Class B manhole position according to size;

[0059] (4) Dowel bar layout: Dowel bars are laid out at the designed locations of pre-cut contraction joints, construction joints, and expansion joints in the transverse direction of the mixed test pavement. Multiple dowel bars are evenly spaced in the transverse direction of the pavement, and the layout distance between adjacent dowel bars is 36 cm.

[0060] (5) Concrete pouring: During the pouring process, the concrete is vibrated and the height of the concrete pouring is strictly controlled. The height is adjusted at any time during the pouring process;

[0061] (6) Concrete finishing: according to the three-dimensional control data of the pavement design, a smoothing device is used to smooth the surface;

[0062] (7) Concrete pavement curing: After the concrete surface is finished, the mixed test pavement in the test field is covered with water-retaining geotextile and plastic film for curing;

[0063] (8) Installation of manhole covers and construction of manholes, where a manhole cover is installed in the center of the A-type manhole position, and a protrusion is built in the center of the B-type manhole position to replace the manhole cover; after the manhole cover is installed at the A-type manhole position, a bottom layer of high-performance concrete is poured around it, and after it solidifies, the upper structure is built, and then the upper structure is grouted with mortar; the overall mixed test pavement construction is completed;

[0064] (9) Elevation review: Use elevation monitoring equipment to review the completed mixed test road surface according to the road spectrum data.

[0065] In the step (1), firstly, a three-dimensional model of the road surface is drawn using three-dimensional drawing software according to the design drawings of the mixed test road surface, and then the road surface is plane-grid-divided according to the road spectrum by the software; the format of the road surface file after grid division is edited, and the node numbers and connection relationships in the grid road surface are defined, so as to generate a digital road surface, and then the line is accurately laid out on the base layer; then an elevation monitoring device is installed to monitor and control the elevation of the mixed test road surface in real time, so as to construct three-dimensional control data.

[0066] In the step (2), a layer of 180mm×180mm Ø8mm cold-rolled ribbed steel mesh is laid at a height of 1 / 3 from the surface of the mixed test pavement, and 4 Ø14mm ribbed reinforcement steel bars are arranged on both side edges of the mixed test pavement; no steel mesh is arranged at the manhole position.

[0067] In the step (3), the size of the reserved A-type manhole position is 1.33*0.87m, and the size of the reserved B-type manhole position is 1.22*0.82m; the spacing between adjacent manhole positions is 0.5m.

[0068] In the step (3), the manhole positions on each side are set as a unit of three along the longitudinal direction of the mixed test road surface, each unit has two Class A manhole positions and the other is a Class B manhole position, and one Class A manhole position is closer to the center line of the road surface; the manhole positions on both sides of the mixed test road surface are staggered.

[0069] In the step (4), the force transmission rod is arranged below the steel mesh, and the height is located at 1 / 2 of the distance between the steel mesh and the base layer.

[0070] In step (5), when pouring concrete, a concrete compartment pouring device is used, see Figure 2 , from the front view of the concrete compartment casting device, it includes a liftable support frame 1 arranged at the front and rear, a casting trough 2 is arranged on the liftable support frame 1, and a plurality of compartment guide nozzles 3 with different opening sizes can be detachably arranged in the casting trough 2. From the top view of the concrete compartment casting device, the casting trough 2 is a U-shaped trough structure, and the compartment guide nozzle 3 includes a bottom plate 4, and two vertical plates 5 are arranged on the bottom plate. The two vertical plates 5 are arranged perpendicular to the bottom plate 4 and are inclined at an angle on the bottom plate 4. The size of the bottom plate 4 is adapted to the size of the casting trough 2, so that it can be detachably inserted into the casting trough 2. When the bottom plate 4 is inserted into the casting trough 2, it can ensure that the rear ends of the two vertical plates 5 (i.e., the notch direction of the casting trough 2 receiving concrete) are in contact with the side wall of the casting trough 2, and the front ends of the two vertical plates 5 (i.e., the notch direction of the casting trough 2 outflowing concrete) form openings, and the sizes of the openings are different. By setting the liftable support frame 1 to rise and fall, the front and rear liftable support frames 1 are set to different heights, so that the casting trough 2 is tilted. When concrete is poured into the casting trough 2 from the rear end by a cement tank truck, the concrete moves to the front end under the action of gravity, and is detachably inserted into a plurality of compartment guide nozzles 3. By setting a suitable opening size, the concrete flow rate at different openings is different, so that the concrete discharge speed is different, so that the concrete discharge amount is adjusted according to actual application needs, thereby facilitating uniform laying of concrete.

[0071] In the step (5), when the concrete is vibrated, the angle of the vibrating rod inserted into the concrete is controlled to be 35-40°, and the vibration is maintained at a uniform speed and a small amplitude until the road surface does not sink and no bubbles are generated, so as to avoid collision with the formwork and affecting the road surface construction quality; the construction at the edge of the concrete road surface is strengthened to ensure its overall stability; and the transverse pre-cut contraction joints, construction joints, and expansion joints are designed in accordance with the requirements of the specifications.

[0072] In the step (6), a roller is used to raise the concrete pavement before the concrete surface is finished.

[0073] In step (8), the upper structure is built with granite blocks, and the other areas of the Class A manhole position except the manhole cover are flattened and fully paved; the protrusion is also built with granite blocks, and the other areas of the Class B manhole position except the protrusion are also flattened and fully paved with granite blocks; the slope of the protrusion along the driving direction of the mixed test road surface is 3°.

[0074] In addition, in order to further improve the technical effect of the present invention, in this embodiment, the force transfer rod is composed of two layers of basic volcanic rock fiber coated on the outside of steel bars. The diameter of the steel bar is 30mm, and the thickness of the two layers of basic volcanic rock fiber is 2mm. The length of each force transfer rod is 550mm, and smooth steel bars of φ15mm are used as force transfer rod supports when laying out the force transfer rods. The force transfer rod avoids the poor deformation coordination due to the high modulus of the steel bar and reduces the occurrence of stress concentration; the two layers of basic volcanic rock fiber coated on the outside of the steel bar increase the corrosion resistance of the force transfer rod. Under the same load, the force transfer rod can quickly diffuse the stress to the bottom of the concrete slab, reduce stress concentration, and achieve the effect of stress diffusion. The stress diffusion range at the bottom of the concrete slab is larger than that of the concrete slab with ordinary steel bar force transfer rods.

[0075] In step (8), when laying granite blocks, lay a mortar cushion layer under the granite blocks on the solidified high-performance concrete at a height of 30 to 40 mm higher than the designed elevation of the built granite blocks. Lay the granite blocks on the cement mortar cushion layer, and use a rubber hammer to knock on the top surface of the granite blocks to ensure that the bottom mortar cushion layer is dense until the designed elevation position. Use a plastic bag to make a funnel to pour M20 mortar between the joints, and use a steel bar head that is consistent with the joint width to grout the joints. The grouting should be dense and full. Sprinkle water on the masonry granite blocks after grouting for curing for 3 to 4 days. During the curing period, keep the joints moist or have a small amount of water.

[0076] The granite blocks built by this method are dense and have strong impact resistance. They can improve the structural stability of the manhole and the manhole cover, and improve the overall performance of the mixed test pavement.

[0077] Example 3

[0078] See also Figure 1, a test field mixed test pavement construction method, comprising the following steps:

[0079] (1) Measurement and staking out: Before staking out, the base surface of the mixed test pavement is completely cleaned and moistened with water, and then three-dimensional control data is constructed on the base surface;

[0080] (2) Steel mesh layout;

[0081] (3) Manhole position reservation: The manhole position is reserved along the longitudinal edges of both sides of the mixed test pavement. The reserved manhole position is rectangular and is divided into Class A manhole position and Class B manhole position according to size;

[0082] (4) Dowel bar layout: Dowel bars are laid out at the designed locations of pre-cut contraction joints, construction joints, and expansion joints in the transverse direction of the mixed test pavement. Multiple dowel bars are evenly spaced in the transverse direction of the pavement, and the layout distance between adjacent dowel bars is 35 cm.

[0083] (5) Concrete pouring: During the pouring process, the concrete is vibrated and the height of the concrete pouring is strictly controlled. The height is adjusted at any time during the pouring process;

[0084] (6) Concrete finishing: according to the three-dimensional control data of the pavement design, a smoothing device is used to smooth the surface;

[0085] (7) Concrete pavement curing: After the concrete surface is finished, the mixed test pavement in the test field is covered with water-retaining geotextile and plastic film for curing;

[0086] (8) Installation of manhole covers and construction of manholes, where a manhole cover is installed in the center of the A-type manhole position, and a protrusion is built in the center of the B-type manhole position to replace the manhole cover; after the manhole cover is installed at the A-type manhole position, a bottom layer of high-performance concrete is poured around it, and after it solidifies, the upper structure is built, and then the upper structure is grouted with mortar; the overall mixed test pavement construction is completed;

[0087] (9) Elevation review: Use elevation monitoring equipment to review the completed mixed test road surface according to the road spectrum data.

[0088] In the step (1), firstly, a three-dimensional model of the road surface is drawn using three-dimensional drawing software according to the design drawings of the mixed test road surface, and then the road surface is plane-grid-divided according to the road spectrum by the software; the format of the road surface file after grid division is edited, and the node numbers and connection relationships in the grid road surface are defined, so as to generate a digital road surface, and then the line is accurately laid out on the base layer; then an elevation monitoring device is installed to monitor and control the elevation of the mixed test road surface in real time, so as to construct three-dimensional control data.

[0089] In the step (2), a layer of 180mm×180mm Ø8mm cold-rolled ribbed steel mesh is laid at a height of 1 / 3 from the surface of the mixed test pavement, and 4 Ø14mm ribbed reinforcement steel bars are arranged on both side edges of the mixed test pavement; no steel mesh is arranged at the manhole position.

[0090] In step (3), the size of the reserved A-type manhole position is 1.33*0.87m, and the size of the reserved B-type manhole position is 1.22*0.82m; the spacing between adjacent manhole positions is 0.56m.

[0091] In the step (3), the manhole positions on each side are set as a unit of three along the longitudinal direction of the mixed test road surface, each unit has two Class A manhole positions and the other is a Class B manhole position, and one Class A manhole position is closer to the center line of the road surface; the manhole positions on both sides of the mixed test road surface are staggered.

[0092] In the step (4), the force transmission rod is arranged below the steel mesh, and the height is located at 1 / 2 of the distance between the steel mesh and the base layer.

[0093] In the step (5), when pouring concrete, a concrete compartment pouring device is used, which includes a liftable support frame arranged at the front and rear, a pouring slot is arranged on the liftable support frame, and a plurality of compartment guide nozzles with different opening sizes can be detachably arranged in the pouring slot.

[0094] In the step (5), when the concrete is vibrated, the angle of the vibrating rod inserted into the concrete is controlled to be 35-40°, and the vibration is maintained at a uniform speed and a small amplitude until the road surface does not sink and no bubbles are generated, so as to avoid collision with the formwork and affecting the road surface construction quality; the construction at the edge of the concrete road surface is strengthened to ensure its overall stability; and the transverse pre-cut contraction joints, construction joints, and expansion joints are designed in accordance with the requirements of the specifications.

[0095] In the step (6), a roller is used to raise the concrete pavement before the concrete surface is finished.

[0096] In step (8), the upper structure is built with granite blocks, and the other areas of the Class A manhole position except the manhole cover are flat and fully paved; the protrusion is also built with granite blocks, and the other areas of the Class B manhole position except the protrusion are also flat and fully paved with granite blocks; the slope of the protrusion along the driving direction of the mixed test road surface is 2.58°.

[0097] In addition, in order to further improve the technical effect of the present invention, in this embodiment, in step (1), drawing the three-dimensional model includes establishing a coordinate system, with the horizontal direction of the road surface as the X coordinate, the vertical direction of the road surface as the Y coordinate, and the vertical elevation direction as the Z coordinate, and dividing the plane into m*n grids according to the measurement data interval, then the elevation is represented by Zmn (X m Y n ). Use a high-definition digital camera to collect the characteristic marking line image of the hybrid test road surface, realize the cross-section scanning of the road surface, and obtain the cross-section digital database. Then, low-frequency signal filtering is performed to obtain a continuous deformation three-dimensional digital data array database, reconstruct the three-dimensional road surface, and obtain any longitudinal section elevation curve and the flatness index required by the regulations.

[0098] The elevation monitoring device includes: a laser emitting unit, which is arranged on a fixed base point on the outside of the mixed test road surface; a plurality of light sensing units, which are arranged at corresponding designed elevation positions above the mixed test road surface at longitudinal intervals along the mixed test road surface and can receive the laser sent by the first laser; a processor unit, which is connected to the light sensing unit and can collect the elevation of the corresponding position thereof; a signal acquisition unit, which is wirelessly connected to the laser emitting unit and the light sensing unit; a micro control unit, which is wirelessly connected to the signal acquisition unit to control it and can collect the collected elevation information, monitor the collected elevation information, and send it to a terminal device for display.

[0099] The elevation monitoring device can intelligently monitor the elevation information of the mixed test pavement in real time during the construction process, ensuring the rigor and accuracy of the three-dimensional control data, greatly improving the construction quality and efficiency, and is more intelligent, convenient and easy to operate than the elevation controller used in the prior art.

[0100] The present invention can comprehensively describe and monitor various technical conditions of mixed test pavement through related designs such as three-dimensional control data, setting of force transmission rods, setting of manhole types, location selection and formation methods, ensure that various test requirements of automobile test sites are met, and thus quickly evaluate the impact of various characteristic parameters on vehicles. It greatly improves the load transfer and load transfer coefficient between concrete pavement slabs, and greatly improves the quality and efficiency of pavement construction.

[0101] It can be seen from the above embodiments that the present invention proposes a hybrid test pavement construction technology, which involves manhole stone masonry + manhole cover installation, and applies three-dimensional control technology to solve the problems of complex construction technology of a hybrid test pavement composed of cast iron components, high-strength concrete pavement and manhole stones, high difficulty in connecting pavements of different materials, and the difficulty that pavements of different materials cannot be connected due to different elevations. The construction process is optimized, the difficulty of construction operations is reduced, the construction accuracy is greatly improved, and the construction quality is ensured; the quality control measures are highly standardized, technical and innovative, the control measures are well-organized, the key points are clearly grasped, and the construction quality can be effectively improved.

[0102] The present invention reduces construction costs, improves project quality and construction efficiency, and ensures project progress through reasonably optimized construction and standardized processes that integrate machinery and materials.

[0103] The present invention applies new equipment such as an elevation monitoring device and a concrete compartment pouring device, and adopts a new process to achieve a one-time forming rate of a mixed test pavement, thereby ensuring the pavement forming quality, avoiding rework losses caused by unqualified quality, saving resources, reducing cost investment, and achieving the goal of sustainable development.

[0104] The present invention adopts the three-dimensional control technology of the stone elevation of the hybrid test road and the manhole cover installation control technology. After the stone masonry and the manhole cover installation are completed, the elevation errors are within ±2mm, so that all indicators of the hybrid test road meet the design and test standards, and the quality of the hybrid test road pavement is improved; the special design of the manhole position is combined with the concrete pavement to meet various vehicle testing needs, including comfort, tire wear resistance, dryness reduction, etc.; the present invention has advanced technology, mature process, strong practicality, good reliability, remarkable economic and social benefits, and broad application prospects.

[0105] The above is only a preferred embodiment of the present invention, and does not limit the present invention in other forms. Any technician familiar with the profession may use the above disclosed technical content to change or modify it into an equivalent embodiment with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the technical solution of the present invention still belongs to the protection scope of the technical solution of the present invention.

Claims

1. A method for constructing a mixed test pavement in a test field, characterized in that: The following steps are involved: (1) Measurement and staking out: Before staking out, the base surface of the mixed test pavement is completely cleaned and wetted with water, and then three-dimensional control data is constructed on the base surface; (2) Steel mesh layout; (3) Manhole position reservation: The manhole position is reserved along the longitudinal edges of both sides of the mixed test pavement. The reserved manhole position is rectangular and is divided into Class A manhole position and Class B manhole position according to size; (4) Dowel rod layout: Dowel rods are laid out at the designed locations of pre-cut contraction joints, construction joints, and expansion joints in the transverse direction of the mixed test pavement. Multiple dowel rods are evenly spaced along the transverse direction of the pavement, and the layout distance between adjacent dowel rods is 33-36 cm. (5) Concrete pouring: During the pouring process, the concrete is vibrated and the height of the concrete pouring is strictly controlled. The height is adjusted at any time during the pouring process; (6) Concrete finishing: according to the three-dimensional control data of the pavement design, a smoothing device is used to smooth the surface; (7) Concrete pavement curing: After the concrete surface is finished, the mixed test pavement in the test field is covered with water-retaining geotextile and plastic film for curing; (8) Installation of manhole covers and construction of manholes, where a manhole cover is installed in the center of the A-type manhole position, and a protrusion is built in the center of the B-type manhole position to replace the manhole cover; after the manhole cover is installed at the A-type manhole position, a bottom layer of high-performance concrete is poured around it, and after it solidifies, the upper structure is built, and then the upper structure is grouted with mortar; the overall mixed test pavement construction is completed; (9) Elevation review: Use an elevation monitoring device to review the completed mixed test road surface according to the road spectrum data.

2. The method for constructing a mixed test pavement in a test field according to claim 1, characterized in that: In the step (1), firstly, a three-dimensional model of the road surface is drawn using three-dimensional drawing software according to the design drawings of the mixed test road surface, and then the road surface is plane-grid-divided according to the road spectrum by the software; the format of the road surface file after grid division is edited, and the node numbers and connection relationships in the grid road surface are defined, so as to generate a digital road surface, and then the line is accurately laid out on the base layer; then an elevation monitoring device is installed to monitor and control the elevation of the mixed test road surface in real time, so as to construct three-dimensional control data.

3. The method for constructing a mixed test pavement in a test field according to claim 2, characterized in that: In the step (2), a layer of 180mm×180mm Ø8mm cold-rolled ribbed steel mesh is laid at a height of 1 / 3 from the surface of the mixed test pavement, and 4 Ø14mm ribbed reinforcement steel bars are arranged on both side edges of the mixed test pavement; no steel mesh is arranged at the manhole position.

4. The method for constructing a mixed test pavement in a test field according to claim 3, characterized in that: In the step (3), the size of the reserved A-type manhole position is 1.33*0.87m, and the size of the reserved B-type manhole position is 1.22*0.82m; the spacing between adjacent manhole positions is 0.5-0.62m.

5. The method for constructing a mixed test pavement in a test field according to claim 4, characterized in that: In the step (3), the manhole positions on each side are set as a unit of three along the longitudinal direction of the mixed test road surface, each unit has two Class A manhole positions and the other is a Class B manhole position, and one Class A manhole position is closer to the center line of the road surface; the manhole positions on both sides of the mixed test road surface are staggered.

6. The method for constructing a mixed test pavement in a test field according to claim 4 or 5, characterized in that: In the step (4), the force transmission rod is arranged below the steel mesh, and the height is located at 1 / 2 of the distance between the steel mesh and the base layer.

7. The method for constructing a mixed test pavement in a test field according to claim 6, characterized in that: In the step (5), when pouring concrete, a concrete compartment pouring device is used, which includes a liftable support frame arranged at the front and rear, a pouring slot is arranged on the liftable support frame, and a plurality of compartment guide nozzles with different opening sizes can be detachably arranged in the pouring slot.

8. The method for constructing a mixed test pavement in a test field according to claim 7, characterized in that: In the step (5), when vibrating the concrete, the angle of the vibrating rod inserted into the concrete is controlled to be 35-40°, and the vibration is maintained at a uniform speed and a small amplitude until the road surface does not sink and no bubbles are generated; the construction at the edge of the concrete road surface is strengthened; and the transverse pre-cut contraction joints, construction joints, and expansion joints are designed in accordance with the specifications.

9. The method for constructing a mixed test pavement in a test field according to claim 7 or 8, characterized in that: In the step (6), a roller is used to raise the concrete pavement before the concrete surface is finished.

10. The method for constructing a mixed test pavement in a test field according to claim 9, characterized in that: In step (8), the upper structure is built with granite blocks, and the other areas of the Class A manhole position except the manhole cover are flattened and fully paved; the protrusion is also built with granite blocks, and the other areas of the Class B manhole position except the protrusion are also flattened and fully paved with granite blocks; the slope of the protrusion along the driving direction of the mixed test road surface is 2°-3°.