Bailey truss integral beam falling device and method
Through the intelligent controller, the entire Bere frame fall beam device monitored by the intelligent controller uses suspended beams, guide limits and buffer components to achieve continuous, smooth and safe whereabouts of the Bere frame, and solves the removal process of the Bere frame in the existing technology. Safety hazards and low construction efficiency reduce the load on the penetrating jack and improve construction safety and efficiency.
Patent Information
- Application Number
- CN202411300906.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-08
AI Technical Summary
The existing Beire frame removal method poses safety hazards in high altitude operations, and the construction speed is slow, making it difficult to meet on-site demand. Especially when the crane is inconvenient to park, the operator has a high dependence on the penetrating jack and the fall There is a lack of buffer mechanism during the process, and stability and synchronization are difficult to control.
The integrated beam falling device of the Bere frame monitored by intelligent controller includes four top corner beam units, equipped with suspended beam components, guide limiting components and buffering components. The Bere frame drops through the heart-piercing jack, and the buffering components are Provides slowing during the fall process, ensuring continuous, slow drops, and real-time monitoring and adjustments through smart controllers.
It improves the safety and construction efficiency of Beire frame removal, reduces the load on the heart-piercing jack, reduces the risk of accidents, and achieves a continuous and stable fall process, avoids high-altitude operations to the greatest extent and shortens the construction period.
Smart Images

Figure CN118911034A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of municipal bridge engineering, and in particular to a Bailey frame integral beam dropping device and method. Background Art
[0002] During the construction of cast-in-place box girders in viaducts and other projects, in order to ensure the stability of the structure, some temporary support structures (such as Bailey frames or other truss systems) will be used between the piers at both ends of the box girder, and then they will be gradually removed after the structure is stable. At present, when removing the Bailey frame, the general method is to move it outward in sections and groups, and then use two cranes to lift it to the ground at the same time. In most construction environments, due to the limitations of construction conditions, this construction method generally requires both cranes to be located on one side of the bridge during construction. In this case, if it occurs on the other side of the bridge where it is not convenient to park cranes and other equipment, this will make the removal of the Bailey frame difficult and fail to meet the on-site construction requirements. It will not only reduce the construction speed, but also cause greater safety hazards to construction workers due to the operation at high altitude.
[0003] To solve the above problems, the Chinese patent document "A Bailey frame integral lowering device and construction process for cast-in-place box girder" with application number 202010945283.2 records a technical solution: that is, multiple through-hole jacks are arranged on the box girder, and the through-hole jacks are used to hang the entire Bailey frame system on the box girder through the second threaded steel hanger. The through-hole jacks are then retracted synchronously to drive the Bailey frame to fall. When the Bailey frame is lowered to a lower position, it is manually disassembled. This not only improves the safety of workers at work, but also increases the construction speed.
[0004] However, the defect of the above scheme is that, although the Bailey frame can be supported and protected by the first threaded steel hanger to prevent the Bailey frame from falling, there is almost no buffer mechanism during the falling process. In this way, when an accident occurs during the falling process (such as sudden falling), it is difficult to control the stability and synchronization of the Bailey frame in the process of the through-hole jack driving the Bailey frame to fall. Therefore, it can only rely on the through-hole jack to drive the Bailey frame to fall for a shorter distance (generally not more than 20 cm) each time. Such frequent alternating falls in sections are not continuous. In the process of alternating falls, workers are required to constantly adjust the nuts formed by the control, which is very dangerous, that is, it puts forward high requirements on operators and through-hole jacks, and has a strong dependence on equipment. Therefore, it is necessary to provide a high-altitude large-span suspended bracket dismantling method with continuous and convenient dismantling construction, active control, and higher safety. Summary of the invention
[0005] In order to overcome the defects of the prior art, the technical problem to be solved by the present invention is to propose a Bailey frame integral beam dropping device and method, which does not require frequent operations when dismantling the Bailey frame and can be monitored in real time during the construction process to ensure higher safety and construction efficiency.
[0006] To achieve this object, the present invention adopts the following technical solutions:
[0007] The present invention provides a Bailey frame integral beam-dropping device, comprising an intelligent controller and a beam-dropping unit arranged near the four top corners of the box beam, a plurality of steel pipe columns are arranged near the two ends at the bottom of the box beam, a truss system supporting the box beam is arranged on the top of the plurality of steel pipe columns, and the beam-dropping unit is provided with a suspension beam assembly, a guide limit assembly and a buffer assembly cooperating with the truss system on the flange of the box beam from the inside to the outside in sequence, and when the truss system is dropped down under the monitoring of the intelligent controller, the suspension beam assembly drives the truss system along the guide limit assembly under the action of the buffer assembly to complete the beam-dropping operation. In this way, the entire beam-dropping process is monitored by the intelligent controller, and then the truss system is driven to drop to the ground by the suspension assembly, and then the guide limit assembly plays the role of guidance and safety guarantee during the falling process (temporary support in case of accidents), and the buffer assembly performs the whole-process deceleration, so that the falling process can be continuous and slow, which also greatly reduces the requirements for the suspension assembly.
[0008] In the corresponding truss system to be adapted to dismantling, the truss system includes several groups of Bailey frames, several of the steel pipe columns are provided with unloading blocks on the top, several of the unloading blocks are provided with load-bearing beams supporting the Bailey frames, and several groups of the Bailey frames are fixedly provided with distribution beams supporting the box beams on the top; the bottom of the Bailey frame is fixedly connected to the load-bearing beam, and several groups of the Bailey frames are also fixedly provided with a through cross connection close to the side of the load-bearing beam to make the truss system more stable.
[0009] During the hoisting process, the hoisting assembly actively drives the truss system to descend. The preferred technical solution is that the lifting beam assembly includes a through-hole jack and a suspension rod, and the suspension rod is vertically arranged. The box beam, the distribution beam and the load-bearing beam are provided with lifting holes that cooperate with the suspension rod. The suspension rod is inserted into the lifting holes, and the box beam is provided with an upper suspension piece that cooperates with the suspension rod. The through-hole jack is arranged on the upper suspension point to drive the suspension rod to rise and fall; a middle suspension piece that cooperates with the suspension rod is arranged between the through-cross connection and the load-bearing beam, and a lower suspension piece that cooperates with the suspension rod is arranged at the bottom of the load-bearing beam to facilitate the separate dismantling operations. Specifically, the upper suspension piece is a beam dropping pedestal composed of a steel plate rolled into a cylindrical shape with ribbed plates and upper and lower round steel plates, the middle suspension piece is square steel, and the lower suspension piece is a locking nut.
[0010] During the descent, good directionality must be ensured to ensure stability and safety during the descent. The preferred technical solution is that the guide limit assembly includes a guide rod, which is arranged vertically. The box beam, the distribution beam and the load-bearing beam are provided with guide holes that match the guide rod. The guide rod is inserted into the guide holes. The box beam is fixed with an upper limit piece that matches the guide rod. The upper limit piece is a set of double-jointed channel steels. The guide rod is also provided with two safety nuts. In this way, the guide rod can be used for guidance, and the two safety nuts can also serve as temporary suspension when an accident occurs.
[0011] Considering that in order to make the entire construction and demolition safer, two purposes are mainly achieved, one is that the falling speed cannot be too fast, and the other is to try to reduce the high load of the through-hole jack. The preferred technical solution is that the buffer assembly includes a buffer, and the box beam is provided with a buffer hole that matches the buffer, and the buffer hole is also fixed with a friction-increasing layer, so that the friction between the buffer hole and the buffer can be increased. Rubber, high-performance engineering plastics or other materials can be selected according to the construction situation. The buffer is fixed with a number of annular buffer rings that match the buffer hole. The buffer is divided into a fast-drop section, a deceleration section and a slow-drop section. The diameter of the annular buffer ring is larger than that of the fast-drop section in the slow-drop section, and the diameter of the deceleration section gradually changes from the diameter of the fast-drop section to the diameter of the slow-drop section. One end of the fast-drop section is fixedly connected to the distribution beam. In this way, during the entire descent process, the buffer actually plays a role in increasing the descent resistance of the truss system, but it can be descended at a relatively fast speed at the beginning, and then decelerated. Finally, when landing on the ground, it can be slowly and slowly descended, while ensuring construction efficiency, it can also fully ensure the safety of workers.
[0012] While using the buffer assembly to ensure safety and continuous falling, personnel are also required to understand the falling information in real time in order to make adjustments and controls. The preferred technical solution is that the intelligent controller includes a processor and an interactive display screen, and the through-the-core jack is equipped with a displacement sensor, a speed sensor and a pressure sensor, and the displacement sensor, the speed sensor and the pressure sensor are wirelessly connected to the processor. The interactive display screen displays the collected data in real time and sends control instructions to the through-the-core jack through the processor.
[0013] A Bailey frame integral beam-dropping construction method adopts the beam-dropping device as described above, comprising the following steps: S00: installing the integral beam-dropping device, firstly opening a lifting hole, a guide hole and a buffer hole, and then sequentially setting the lifting beam assembly, the guide limit assembly and the buffer assembly, that is, using a crane to hang the through-hole jack, the upper hanging piece and the upper limit piece on the box beam, and then respectively matching the hanging rod and the guide rod and installing them in place, then setting the middle hanging piece, and adjusting the position of the lower hanging piece and the safety nut, and at the same time fixing one end of the fast-dropping section in the buffer piece to the distribution beam, and finally connecting the intelligent controller, debugging and then performing subsequent operations; S10: removing the unloading block, and tightening the truss system by the box beam, firstly fixing the entire Bailey frame together with the load-bearing beam on the box beam, and then removing the unloading block, releasing the longitudinal and transverse positions of the steel pipe column. Connect, and then use a crane to remove the remaining steel pipe columns. When removing, proceed in the order from the middle to both sides; S20: lowering the truss system. When falling, the truss system is slowly lowered through the buffer parts through three stages of fast descent, deceleration and slow descent. During the descent, the beam-dropping devices at the four corners of the box beam work simultaneously, and the intelligent controller monitors the descent status of the through-hole jack and the truss system in real time, so that the entire truss system is in a horizontal state, making the descent process continuous, stable and safe; S30: dismantling and transferring the truss system. After the truss system falls to the ground, finally release the Bailey frame and the load-bearing beam, the through-cross-connection and the distribution beam in sequence. When releasing, they must not be released all at once. If one Bailey piece needs to be released, use a forklift to move to the next hole, and then release the next Bailey piece until it is completed.
[0014] Depending on the different construction conditions, in different construction environments, different lengths of hangers and guide rods may be required. Therefore, in step S00, the hangers and guide rods are made of high-quality rolled threaded steel. During the beam lowering process, the hangers and guide rods are lengthened using threaded connectors when they are insufficient in length. The guide limit assembly not only plays a guiding role during the descent of the truss system, but also serves as a temporary support when an unexpected risk occurs. Therefore, in step S00, one of the safety nuts on the guide rod is set on the side of the load-bearing beam away from the Bailey frame, and the other is set close to one end of the box beam. When an accident occurs to the beam suspension assembly, the two safety nuts are tightened to temporarily limit the truss system and lift it up. After the accident is eliminated, the beam lowering operation can be continued.
[0015] The beneficial effects of the present invention are:
[0016] The present invention utilizes a through-hole jack to hoist the entire truss system, and then under the monitoring of the intelligent controller, the entire truss system is slowly lowered along the guide rod, and the buffer assembly is used to decelerate the truss lowering system, which greatly reduces the load on the through-hole jack, reduces the risk of accidents, and makes the construction safer. Moreover, the entire beam dropping process is divided into three stages: fast dropping, deceleration, and slow dropping. The entire dropping process is continuous and does not require workers to perform frequent operations. That is, while avoiding high-altitude operations to the greatest extent and ensuring safety and reliability, it can also shorten the construction period and improve construction efficiency, so that the entire truss system can quickly fall back to the ground and then be safely and stably disassembled. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the principle of a Bailey frame integral beam dropping device provided in a specific embodiment of the present invention;
[0018] Figure 2 yes Figure 1 A is an enlarged schematic diagram;
[0019] Figure 3 It is a structural schematic diagram of a box girder provided in a specific embodiment of the present invention;
[0020] Figure 4 yes Figure 3 A magnified schematic diagram of B;
[0021] Figure 5 is a schematic structural diagram of a buffer provided in a specific embodiment of the present invention;
[0022] Figure 6 yes Figure 5 A magnified schematic diagram of middle C;
[0023] Figure 7 is a schematic diagram of the control principle of the intelligent controller provided in a specific embodiment of the present invention;
[0024] In the figure:
[0025] 1. Intelligent controller; 2. Box beam; 3. Beam drop unit; 4. Steel pipe column; 5. Truss system; 31. Hanging beam assembly; 32. Guide limit assembly; 33. Buffer assembly; 51. Bailey frame; 41. Unloading block; 511. Load-bearing beam; 512. Distribution beam; 513. Through-link; 311. Through-core jack; 312. Hanging rod; 313. Hanging hole; 314. Upper hanging piece; 315. Middle hanging piece; 316. Lower hanging piece; 321. Guide rod; 322. Guide hole; 323. Upper limit piece; 3211. Safety nut; 331. Buffer piece; 332. Buffer hole; 3321. Wear-increasing layer; 3311. Annular buffer ring; 3312. Fast lowering section; 3313. Speed reduction section; 3314. Slow lowering section. DETAILED DESCRIPTION
[0026] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.
[0027] like Figure 1 As shown, the present invention provides a Bailey frame integral beam dropping device, comprising an intelligent controller 1 and a beam dropping unit 3 arranged near the four top corners of a box beam 2, a plurality of steel pipe columns 4 are arranged near the two ends at the bottom of the box beam 2, and a truss system 5 supporting the box beam 2 is arranged on the top of the plurality of steel pipe columns 4. Specifically, the truss system 5 comprises a plurality of groups of Bailey frames 51, a plurality of steel pipe columns 4 are arranged on the top of the plurality of steel pipe columns 4, a plurality of load-bearing beams 511 supporting the Bailey frames 51 are arranged on the plurality of load-bearing blocks 41, and a plurality of distribution beams 512 supporting the box beam 2 are fixedly arranged on the top of the plurality of groups of Bailey frames 51; the bottom of the Bailey frame 51 is fixedly connected to the load-bearing beam 511, and a plurality of groups of Bailey frames 51 are also fixedly provided with a through cross connection 513 near one side of the load-bearing beam 511 to make the truss system 5 more stable; the beam dropping unit 3 is sequentially provided with a suspension beam assembly 31, a guide limit assembly 31 cooperating with the truss system 5 on the flange of the box beam 2 from the inside to the outside. The positioning component 32 and the buffer component 33, when the truss system 5 is lowered under the monitoring of the intelligent controller 1, the hanging beam component 31 drives the truss system 5 along the guide limit component 32 to complete the beam dropping operation under the action of the buffer component 33; the overall principle of this case is to use the overall beam dropping device to pre-lift the truss system 5 on the box beam 2, and then first remove the part supporting the truss system 5 on the ground, that is, the steel pipe column 4 in this case (in some scenarios, a cushion beam will be set at the bottom of the steel pipe column 4 to ensure good support), and then place the truss system 5 on the ground through the overall beam dropping device, and then the workers will remove it. This can avoid the workers' high-altitude work and improve the safety of the workers at work. It is also suitable for use in some scenarios where it is inconvenient to use a crane for construction. In order to further improve the safety when adopting the above scheme, the present case further provides a buffer component 33 and an intelligent controller 1. Figure 5 and Figure 6As shown, the buffer assembly 33 includes a buffer member 331. The buffer member 31 can use flexible materials and rigid materials according to the scene. For example, when the distance from the ground is long, flexible materials can be used for convenient lifting and use. Otherwise, rigid materials can be used. A buffer hole 332 cooperating with the buffer member 331 is provided on the box beam 2. The buffer hole 332 is also fixed with a friction-increasing layer 3321. The buffer member 331 is fixed with a plurality of annular buffer rings 3311 cooperating with the buffer hole 332. The buffer member 331 is divided into a fast-drop section 3312, a deceleration section 3313 and a slow-drop section 3314. The diameter of the annular buffer ring 3311 is larger than that of the fast-drop section 3312 in the slow-drop section 3314. The diameter of the deceleration section 3313 gradually changes from the diameter of the fast-drop section 3312 to the diameter of the slow-drop section 3314. One end of the fast-drop section 3312 is fixedly connected to the distribution beam 512 (this can be adjusted according to actual conditions, and can also be fixed on the load-bearing beam 511). In this way, during the falling process, The annular buffer ring 3311 on the buffer member 331 continuously rubs and squeezes the buffer hole 332 to deform, thereby increasing the resistance of the truss system 5 when it falls. This can reduce the speed of the truss system 5 when it falls, and also reduce the load of the through-hole jack 311 when it is in use, thereby reducing the working requirements for the through-hole jack 311 and improving the safety of the through-hole jack 311 when it is working. In addition, during the working process, in order to ensure the construction efficiency, the buffer member 331 is divided into a fast-drop section 3312, a deceleration section 3313 and a slow-drop section 3314, that is, the initial resistance is small, the truss system 5 can be dropped at a relatively fast speed in the fast-drop section 3312, and then decelerated in the deceleration section 3133, and finally slowly dropped to the ground in the slow-drop section 3314, which can ensure faster construction efficiency and allow the staff to have enough reaction time when close to the ground, thereby maximizing the convenience and safety of the on-site construction personnel when operating; Figure 7As shown, the further intelligent controller 1 includes a processor and an interactive display screen, and a displacement sensor, a speed sensor and a pressure sensor are installed in the through-hole jack 311. The displacement sensor, speed sensor and pressure sensor are wirelessly connected to the processor (an external or built-in power supply can be set as needed when power is needed), and the interactive display screen displays the collected data in real time, and sends control instructions to the through-hole jack 311 through the processor. In this way, during the entire beam dropping operation, the displacement sensor, speed sensor and pressure sensor in the through-hole jack 311 can be used to sense and collect the displacement, speed and pressure information of the descent process in real time, and then the corresponding displacement, speed and pressure prediction fitting curve can be further generated on the interactive display screen through the processor, and then the subsequently collected information is compared with the data of the predicted fitting curve. If the value of the predicted curve differs from the value of the information perception curve by more than the set range, Then the intelligent controller 1 can directly control the hydraulic system of the through-hole jack 311 through the processor for adjustment (the connection method is a conventional means and will not be repeated here). At the same time, if remote control is required, a communication module can also be set in the intelligent controller 1. The processor can push data to the remote terminal through the communication module, so that the operator can remotely monitor and adjust the instructions to ensure the safety and convenience of the operator. In the event of an accident, the intelligent controller 1 can also control the safety protection valve on the oil pipeline of the through-hole jack 311 to ensure that when an unexpected failure occurs in the system or load, the high-pressure oil can be safely released to prevent the through-hole jack 311 from losing pressure and sliding down, thereby ensuring the safety and reliability of the system. In this way, the intelligent controller 1 can effectively control the through-hole jack 311 and adapt to the periodic changes in force, and can also improve the safety and efficiency of the fast descent section 3312, the deceleration section 3313 and the slow descent section 3314 during construction.
[0028] The hanging beam assembly 31 needs to play a major role in the hanging process of the beam dropping operation. Preferably, the hanging beam assembly 31 includes a through-hole jack 311 and a hanging rod 312. The hanging rod 312 is vertically arranged. The box beam 2, the distribution beam 512 and the load-bearing beam 511 are provided with hanging holes 313 that match the hanging rod 312. The hanging rod 312 is inserted into the hanging holes 313. The box beam 2 is provided with an upper hanging piece 314 that matches the hanging rod 312. The through-hole jack 311 is arranged on the upper hanging point to drive the hanging rod 312 to rise and fall. A middle hanger 315 cooperating with the hanger 312 is arranged between the cross connection 513 and the load-bearing beam 511, and a lower hanger 316 cooperating with the hanger 312 is arranged at the bottom of the load-bearing beam 511 to facilitate the separate dismantling operations; at the same time, the upper hanger 314 is a beam-dropping pedestal composed of a steel plate rolled into a cylindrical shape with ribs and upper and lower round steel plates, the middle hanger 315 is square steel, and the lower hanger 316 is a locking nut; this can not only provide good support, but also provide better protection for the surface of the box beam 2.
[0029] The guide limiter assembly 32 further ensures the stability and safety of the hanging during the process of hanging and dropping the beam, that is, it must ensure a steady vertical descent during the hanging and dropping, so that the horizontal stability of the truss system 5 can be ensured, and in the event of an accident, it must also have the function of ensuring safe handling; specifically, the guide limiter assembly 32 includes a guide rod 321, the guide rod 321 is vertically arranged, and guide holes 322 that cooperate with the guide rod 321 are opened on the box beam 2, the distribution beam 512 and the load-bearing beam 511, and the guide rod 321 is inserted into the guide hole 322, and the box beam 2, the distribution beam 512 and the load-bearing beam 511 are provided. An upper limit piece 323 cooperating with the guide rod 321 is fixedly provided on the beam 2. The upper limit piece 323 is a set of double-piece channel steels. Two safety nuts 3211 are also provided on the guide rod 321. In this way, during operation, one of the safety nuts 3211 fixes the guide rod 321 to the load-bearing beam 511, so that the guide rod 321 will not fall naturally through the guide hole 322 during the guiding process. The other safety nut 3211 can be used to tighten the upper limit piece 323 in case of an accident, so as to temporarily limit the lifting of the truss system 5.
[0030] A Bailey frame integral beam dropping construction method, using the beam dropping device as described above, includes the following steps: S00: installing the integral beam dropping device, firstly opening the lifting hole 313, the guide hole 322 and the buffer hole 332, and then sequentially setting the lifting beam assembly 31, the guide limit assembly 32 and the buffer assembly 33, that is, using a crane to hang the through jack 311, the upper hanging piece 314 and the upper limit piece 323 on the box beam 2, and then respectively matching the hanging rod 312 and the guide rod 321 and installing them in place, then setting the middle hanging piece 315, and adjusting the position of the lower hanging piece 316 and the safety nut 3211, and at the same time fixing one end of the fast-dropping section 3312 in the buffer 331 to the distribution beam 512, and finally connecting the intelligent controller 1, debugging and then performing subsequent operations; S10: removing the unloading block 41, and tightening the truss system 5 by the box beam 2, firstly fixing the entire Bailey frame 51 together with the load-bearing beam 511 on the box beam 2, Then remove the unloading block 41, release the longitudinal and transverse connections of the steel pipe column 4, and then use a crane to remove the remaining steel pipe columns 4, and remove them in order from the middle to the two sides; S20: lower the truss system 5. When falling, the buffer member 331 is used to make the truss system 5 slowly descend through three stages of fast descent, deceleration and slow descent. During the descent, the beam-dropping devices at the four corners of the box beam 2 work simultaneously, and the intelligent controller 1 monitors the descent status of the through-core jack 311 and the truss system 5 in real time, so that the entire truss system 5 is in a horizontal state, making the descent process continuous, stable and safe; S30: dismantle and transfer the truss system 5. After the truss system 5 falls to the ground, finally untie the Bailey frame 51 and the load-bearing beam 511, the through-cross-connection and the distribution beam 512 in order. When releasing, all of them must not be released at once. It is necessary to release a Bailey piece, use a forklift to move to the next hole, and then release the next Bailey piece until it is completed.
[0031] In the above construction method, in different environments and situations, there may be couples who are faced with the problem that the length of the suspension rod 312 and the guide rod 321 is insufficient. In step S00, the suspension rod 312 and the guide rod 321 are made of finely rolled threaded steel. During the beam dropping process, the suspension rod 312 and the guide rod 321 are lengthened by using threaded connectors when the length is insufficient; this enhances the adaptability during construction at different heights;
[0032] The guide and limit assembly 32 mainly plays a guiding and limiting role, that is, it plays a guiding role in the normal beam lowering process, but in the event of an accident, it can also have a temporary limiting role to ensure the elimination of accidents and safety during construction. In step S00, one of the safety nuts 3211 on the guide rod 321 is set on the side of the load-bearing beam 511 away from the Bailey frame 51, and the other is set close to one end of the box beam 2. When an accident occurs to the suspension beam assembly 31, the two safety nuts 3211 are tightened to temporarily limit the truss system 5 and lift it up, and the beam lowering operation can be continued after the accident is eliminated.
[0033] The present invention is described by preferred embodiments, and those skilled in the art will appreciate that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. The present invention is not limited to the specific embodiments disclosed herein, and other embodiments falling within the claims of this application are within the scope of protection of the present invention.
Claims
1. A Bailey frame integral beam dropping device, characterized in that: The invention comprises an intelligent controller (1) and a beam-dropping unit (3) arranged near the four top corners of a box beam (2); a plurality of steel pipe columns (4) are arranged near the two ends at the bottom of the box beam (2); a truss system (5) supporting the box beam (2) is arranged on the top of the plurality of steel pipe columns (4); the beam-dropping unit (3) is provided with a suspension beam assembly (31), a guide limit assembly (32) and a buffer assembly (33) cooperating with the truss system (5) on the flange of the box beam (2) in sequence from the inside to the outside; when the truss system (5) is dropped under the monitoring of the intelligent controller (1), the suspension beam assembly (31) drives the truss system (5) along the guide limit assembly (32) under the action of the buffer assembly (33) to complete the beam-dropping operation.
2. A Bailey frame integral beam dropping device according to claim 1, characterized in that: The truss system (5) comprises a plurality of groups of Bailey frames (51), the tops of a plurality of the steel pipe columns (4) are provided with unloading blocks (41), a plurality of the unloading blocks (41) are provided with load-bearing beams (511) supporting the Bailey frames (51), and a distribution beam (512) supporting the box beam (2) is fixedly provided on the tops of a plurality of groups of the Bailey frames (51); the bottoms of the Bailey frames (51) are fixedly connected to the load-bearing beams (511), and a through-cross connection (513) is also fixedly provided on a side of a plurality of groups of the Bailey frames (51) close to the load-bearing beams (511) to make the truss system (5) more stable.
3. A Bailey frame integral beam dropping device according to claim 2, characterized in that: The suspension beam assembly (31) comprises a through-hole jack (311) and a suspension rod (312); the suspension rod (312) is arranged vertically; the box beam (2), the distribution beam (512) and the load-bearing beam (511) are provided with a suspension hole (313) which matches with the suspension rod (312); the suspension rod (312) is inserted into the suspension hole (313); the box beam (2) is provided with a suspension hole (313) which matches with the suspension rod (312); The through-hole jack (311) is arranged on the upper hanging point to drive the lifting of the suspension rod (312); a middle hanging piece (315) cooperating with the suspension rod (312) is arranged between the through-cross connection (513) and the load-bearing beam (511), and a lower hanging piece (316) cooperating with the suspension rod (312) is arranged at the bottom of the load-bearing beam (511) to facilitate the separate dismantling operations.
4. A Bailey frame integral beam dropping device according to claim 3, characterized in that: The upper hanging member (314) is a beam drop pedestal composed of a steel plate rolled into a ribbed cylindrical shape and upper and lower round steel plates, the middle hanging member (315) is a square steel, and the lower hanging member (316) is a locking nut.
5. The Bailey frame integral beam dropping device according to claim 3, characterized in that: The guide limit assembly (32) comprises a guide rod (321), the guide rod (321) is arranged vertically, the box beam (2), the distribution beam (512) and the load-bearing beam (511) are provided with guide holes (322) which cooperate with the guide rod (321), the guide rod (321) is passed through the guide holes (322), an upper limit member (323) which cooperates with the guide rod (321) is fixedly provided on the box beam (2), the upper limit member (323) is a set of double-jointed channel steels, and two safety nuts (3211) are also provided on the guide rod (321).
6. The Bailey frame integral beam dropping device according to claim 5, characterized in that: The buffer assembly (33) comprises a buffer part (331); a buffer hole (332) matched with the buffer part (331) is arranged on the box beam (2); a friction-enhancing layer (3321) is fixedly provided on the buffer part (331); a plurality of annular buffer rings (3311) matched with the buffer hole (332) are fixedly provided on the buffer part (331); the buffer part (331) is divided into a fast-drop section (3312), a deceleration section (3313) and a slow-drop section (3314); the diameter of the annular buffer ring (3311) in the slow-drop section (3314) is larger than that of the fast-drop section (3312); the diameter of the deceleration section (3313) gradually changes from the diameter of the fast-drop section (3312) to the diameter of the slow-drop section (3314); and one end of the fast-drop section (3312) is fixedly connected to the distribution beam (512).
7. A Bailey frame integral beam dropping device according to claim 6, characterized in that: The intelligent controller (1) comprises a processor and an interactive display screen. A displacement sensor, a speed sensor and a pressure sensor are installed in the through-hole jack (311). The displacement sensor, the speed sensor and the pressure sensor are wirelessly connected to the processor. The interactive display screen displays collected data in real time and sends control instructions to the through-hole jack (311) through the processor.
8. A Bailey frame integral beam drop construction method, characterized in that: The beam dropping device according to any one of claims 1 to 7 is used, comprising the following steps: S00: Install the integral beam-dropping device. First, open the lifting hole (313), the guide hole (322) and the buffer hole (332), and then sequentially set the lifting beam assembly (31), the guide limit assembly (32) and the buffer assembly (33). That is, use a crane to hang the through-hole jack (311), the upper hanging member (314) and the upper limit member (323) on the box beam (2). Then, respectively match the hanging rod (312) and the guide rod (321) and install them in place. Then, set the middle hanging member (315), and adjust the position of the lower hanging member (316) and the safety nut (3211). At the same time, fix one end of the fast-drop section (3312) in the buffer member (331) to the distribution beam (512). Finally, connect the intelligent controller (1), debug it, and then carry out subsequent operations. S10: removing the unloading block (41), and tightening the truss system (5) by the box beam (2), first fixing the entire Bailey frame (51) together with the load-bearing beam (511) on the box beam (2), then removing the unloading block (41), releasing the longitudinal and transverse connections of the steel pipe columns (4), and then using a crane to remove the remaining steel pipe columns (4), and removing them in the order from the middle to the two sides; S20: lowering the truss system (5). During the lowering, the truss system (5) is slowly lowered through the buffer (331) through three stages of rapid lowering, deceleration and slow lowering. During the lowering process, the beam lowering devices at the four corners of the box beam (2) work simultaneously. The intelligent controller (1) monitors the lowering state of the through-hole jack (311) and the truss system (5) in real time, so that the entire truss system (5) is in a horizontal state, and the lowering process is continuous, stable and safe. S30: The truss system (5) is dismantled and transferred. After the truss system (5) falls to the ground, the Bailey frame (51) and the load-bearing beam (511), the through cross-connection and the distribution beam (512) are finally released in sequence. When releasing, all of them cannot be released at once. When a piece of Bailey needs to be released, a forklift is used to move to the next hole, and then the next piece of Bailey is released until it is completed.
9. The Bailey frame integral beam drop construction method according to claim 8, characterized in that: In step S00, the suspension rod (312) and the guide rod (321) are made of precision-rolled threaded steel. During the beam lowering process, when the suspension rod (312) and the guide rod (321) are insufficient in length, they are lengthened using threaded steel connectors.
10. The Bailey frame integral beam drop construction method according to claim 8, characterized in that: In step S00, one of the safety nuts (3211) on the guide rod (321) is arranged on the side of the load-bearing beam (511) away from the Bailey frame (51), and the other is arranged on the end close to the box beam (2). When an accident occurs to the suspension beam assembly (31), the two safety nuts (3211) are tightened to temporarily limit the position of the truss system (5) and continue the beam lowering operation after the accident is eliminated.