Fabricated wharf revetment structure adopting buried sand piles and implementation method of fabricated wharf revetment structure
The prefabricated wharf revetment structure using buried sand piles solves the problems of slow construction, high cost, and poor stability of traditional wharf revetment structures, enabling rapid and low-cost wharf construction, adapting to complex geological conditions, and meeting the needs of large cargo ships.
Patent Information
- Application Number
- CN202411035688.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-08
AI Technical Summary
Traditional wharf revetment structures have long construction cycles, high costs, and inconvenient maintenance. They are also prone to corrosion in harsh environments, making it difficult to meet the needs of modern large cargo ships. Especially in the geological conditions of deep soft soil layers on silty coastlines, existing prefabricated structures have high requirements for installation precision and complex geological conditions, making it difficult to ensure the stability and adaptability of the structure.
The prefabricated wharf revetment structure using buried sand piles includes buried sand piles, a lower barrel foundation, an upper box structure, an unloading breast wall, berthing components, horizontal bracing, mooring bollards, rubber fenders, and joint-sealing steel structures. Through the assembly of prefabricated components and negative pressure sinking construction, a composite foundation with high bearing capacity is formed, which can adapt to different geological conditions.
It achieves a wharf structure that is quick to construct, low in cost, and highly stable, adaptable to different geological conditions, reduces the requirements for installation accuracy, lowers project costs, and improves the stability and adaptability of the structure.
Smart Images

Figure CN118911066A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of soft foundation wharf construction, and in particular to an assembled wharf revetment structure using buried sand piles and an implementation method thereof. Background Art
[0002] With the rapid development of port logistics, traditional dock revetment structures can no longer meet the carrying needs of modern large cargo ships. Traditional dock revetment structures mostly use reinforced concrete pile foundations, which have the disadvantages of long construction period, high cost, and inconvenient maintenance. This new type of dock revetment structure came into being.
[0003] Traditional dock revetment structures usually use reinforced concrete pile foundations, which have the advantages of high strength and good durability, but also have obvious disadvantages, such as long construction period, high cost, and inconvenient maintenance. In addition, the pile foundation of the traditional structure requires a lot of manual operation, and the construction efficiency is low, which cannot meet the needs of modern large cargo ships.
[0004] Chinese patent CN109555077A (publication date: December 14, 2018) discloses an assembled ecological revetment structure suitable for soft soil foundation, including a prefabricated box, a prefabricated pile foundation, a prefabricated cap plate and planting soil; the prefabricated pile foundation is arranged on the river bank of the soft soil foundation, and a prefabricated cap plate is arranged on the prefabricated pile foundation, and a plurality of prefabricated boxes are arranged on the prefabricated cap plate, and the front and rear of the plurality of prefabricated boxes are arranged in steps, and the interior of each prefabricated box is provided with planting soil; the assembled ecological revetment structure suitable for soft soil foundation of the present invention is assembled by prefabricated piles, prefabricated cap plates and prefabricated boxes to form a revetment structure with a low pile cap, and the horizontal force and other loads behind the wall are borne by the revetment structure to achieve the role of structural safety, stability and reliability, and can achieve the purpose of high efficiency, energy saving, green and environmental protection, with the characteristics of factory production, fast construction, less waste of resources, ecological and environmental protection, etc., suitable for soft soil foundation, high environmental requirements, tight construction period and other places, and has broad application prospects. However, prefabricated structures have high requirements for installation accuracy. Improper installation will affect the stability and overall performance of the structure. The geological conditions of soft soil foundations may be very complex. Prefabricated pile foundations and cap plates are difficult to design and adjust according to different geological conditions, and the adaptability and safety of the structure cannot be ensured.
[0005] Chinese patent CN203096686U (publication date: June 17, 2024) discloses a new type of combined structure of high-pile dock and shore connection structure, which belongs to the field of port engineering technology. Its structure includes drainage piles, dock foundation piles, high-pile docks, and guide beams, wherein the drainage piles are arranged at the rear edge of the high-pile dock structure, and the drainage piles and the high-pile dock structure are integrally connected by the guide beam to form a force-bearing structure. During construction, the drainage piles can be constructed simultaneously with the dock frame foundation piles, and the drainage piles are densely driven along the rear edge of the dock; after the piles are sunk, the height of the revetment part is completed by symmetrically throwing stones on both sides of the drainage piles; the high-pile dock crossbeam structure and guide beam are cast to connect the drainage piles and the dock crossbeam into a whole; the revetment throwing stone construction is completed; and finally the construction of the high-pile dock is completed. The utility model adopts a combination of drainage piles and high-pile docks, does not require foundation treatment, and the structure is evenly stressed, has high reliability, has obvious effect on controlling the overall stability of the revetment, and has fast construction speed, simplicity, and obvious effect. For the above technical solution, the driving of drainage piles will be affected by geological conditions, groundwater level, surrounding buildings and other factors. It is not applicable to certain special environments. The connection between the high-pile wharf and the drainage piles needs to be precisely aligned, and there are high requirements for construction accuracy. Any deviation during the construction process may affect the stability and stress performance of the overall structure.
[0006] The existing prefabricated dock-quay integrated structure mainly uses prefabricated concrete components, which are installed by hoisting, splicing, etc. The advantages of this structure are short construction period, low cost, environmental protection and energy saving, but its disadvantages are high requirements for the foundation and easy corrosion in harsh environments.
[0007] Therefore, for muddy coasts, the seabed surface is basically a thick soft soil layer, the physical and mechanical properties of the soil are poor and highly sensitive. When developing and constructing ports under such complex geological conditions, the construction of docks and revetment structures should be given great attention. Summary of the invention
[0008] In view of the above problems, the present invention provides an assembled wharf revetment structure using buried sand piles and an implementation method thereof.
[0009] An assembled dock revetment structure using buried sand piles, the structure comprising: buried sand piles, a lower barrel foundation, an upper box structure, a load-relief breast wall, a mooring member, a horizontal support, a mooring post, a rubber fender, a caulking steel structure and an inverted filter;
[0010] A lower bucket foundation is arranged on the upper part of the buried sand pile;
[0011] The adjacent lower barrel foundations are connected by an inverted filter body, and caulking steel structures are arranged on both sides of the inverted filter body;
[0012] The upper box-type structure is arranged on the upper part of the lower barrel-type foundation;
[0013] The unloading breast wall is arranged at the top of the upper box structure, a mooring post is arranged on the top of the unloading breast wall, and a rubber fender is arranged on the side of the unloading breast wall;
[0014] The bottom of the rubber fender is provided with a ship-supporting member and a horizontal support;
[0015] The horizontal support is located at the upper part of the mooring member.
[0016] Preferably, a plurality of lower bucket foundations are arranged on the upper part of the buried sand piles, and the lower bucket foundations penetrate 1m-2m into the buried sand piles.
[0017] Preferably, the lower barrel-type foundation and the upper box-type structure are constructed by prefabrication, and the mortise and tenon grooves of the caulking steel structure are pre-embedded during the prefabrication of the lower barrel-type foundation and the upper box-type structure.
[0018] Preferably, the tongue and groove of the embedded caulking steel structure are arranged at the front and rear ends of the lower barrel-type foundation and the upper box-type structure.
[0019] Preferably, combined steel sheet piles are inserted between the tongue and groove of the pre-buried caulking steel structure, and filter bodies are backfilled between the steel sheet piles.
[0020] Preferably, the unloading breast wall, mooring components and horizontal braces on the upper part of the upper box-type structure are prefabricated and connected to the upper box-type structure as a whole through cast-in-place nodes.
[0021] Preferably, the interior of the lower barrel-type foundation and the upper box-type structure are filled with backfill.
[0022] Preferably, the installation method of the assembled wharf revetment structure using buried sand piles comprises the following steps:
[0023] Step S1: Conducting buried sand pile construction;
[0024] Step S2: prefabricate box-barrel assembly components, mooring components, horizontal bracing and unloading breast walls at the prefabrication yard;
[0025] Step S3: After the box-barrel structure reaches the designed strength, it is transported as a whole to the site for negative pressure sinking, and the bottom of the barrel is inserted into the sand pile composite foundation;
[0026] Step S4: Install the caulking steel structure and steel sheet piles, and carry out the inverted filter body construction; install the upper mooring components, horizontal braces and unloading breast walls, and cast-in-place nodes; install the mooring posts and fenders.
[0027] Preferably, after the backfilling of the filter body between the steel sheet piles in step S4 is completed, a continuous structure is formed, and the rear of the wharf is directly filled with land to realize the functions of the wharf and retaining revetment.
[0028] Compared with the prior art, the technical solution of the present application has the following advantages and effects:
[0029] 1. The structure of the present invention adopts the concept of prefabricated design. It can meet the function of the wharf once built, and can also be directly used as a revetment structure at the boundary of the land reclamation area. It has fast construction speed, high stability, little impact from wind and waves, and low project cost.
[0030] 2. The present invention adopts a new type of buried sand piles to treat the wharf foundation to form a composite foundation with high bearing capacity. While meeting the requirements of the stability of the assembled structure and the bearing capacity of the foundation, the unreinforced soft soil foundation on the upper part does not affect the negative pressure sinking construction of the box barrel structure.
[0031] 3. The arrangement of the buried sand piles of the present invention, the barrel-type structure and the box-type structure prefabricated as an integral component can scientifically determine the replacement rate of the buried sand piles, the elevation of the top of the sand piles and the elevation of the bottom of the sand piles according to the water depth at the front of the wharf, the elevation of the wharf surface, the height of the lower barrel and the geological conditions, thereby ensuring the stable burial of the pile body and adapting to different geological conditions.
[0032] 4. The prefabricated structure of the lower barrel foundation and the upper box structure of the present invention, as well as the pre-embedded mortise and tenon grooves of the caulking steel structure during the prefabrication of the lower barrel foundation and the upper box structure, make the construction and assembly of the entire structure more convenient and also improve the stability of the structure.
[0033] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application so that it can be implemented in accordance with the contents of the specification, and to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the following is a detailed description of the preferred embodiments of the present application in conjunction with the accompanying drawings as follows.
[0034] Based on the detailed description of the specific embodiments of the present application in combination with the accompanying drawings below, those skilled in the art will become more aware of the above and other objects, advantages and features of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can also be obtained based on these drawings without creative work. In all drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0036] Figure 1 It is a side structural schematic diagram of the present invention;
[0037] Figure 2 It is a schematic diagram of the planar structure of the present invention;
[0038] Explanation of the reference numerals: 1. buried sand pile; 2. lower barrel foundation; 3. upper box structure; 4. unloading breast wall; 5. mooring member; 6. horizontal support; 7. mooring post; 8. rubber fender; 9. caulking steel structure; 10. inverted filter body. Specific embodiments
[0039] To make the purpose, technical scheme and advantages of the embodiment of the present application clearer, the technical scheme in the embodiment of the present application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiment of the present application. Obviously, the described embodiment is a part of the embodiment of the present application, rather than all of the embodiments. In the following description, specific details such as specific configuration and components are provided only to help fully understand the embodiments of the present application. Therefore, it should be clear to those skilled in the art that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the present application. In addition, for clarity and brevity, the description of known functions and structures is omitted in the embodiment.
[0040] It should be understood that the references to "one embodiment" or "this embodiment" throughout the specification mean that the specific features, structures, or characteristics associated with the embodiment are included in at least one embodiment of the present application. Therefore, the references to "one embodiment" or "this embodiment" appearing throughout the specification do not necessarily refer to the same embodiment. In addition, these specific features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
[0041] In addition, the present application may repeat reference numerals and / or letters in different examples. This repetition is for the purpose of simplicity and clarity, and does not in itself indicate the relationship between the various embodiments and / or settings discussed.
[0042] The term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, B exists alone, and A and B exist at the same time. The term " / and" in this article describes another type of association object relationship, indicating that there can be two relationships. For example, A / and B can mean: A exists alone, and A and B exist alone. In addition, the character " / " in this article generally indicates that the previous and next associated objects are in an "or" relationship.
[0043] The term "at least one" in this article is merely a description of the association relationship of associated objects, indicating that there may be three relationships. For example, at least one of A and B can mean: A exists alone, A and B exist at the same time, and B exists alone.
[0044] It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusions.
[0045] Example 1
[0046] This embodiment mainly introduces an assembled dock revetment structure using buried sand piles, such as Figure 1 As shown, the structure includes: buried sand piles 1, lower barrel foundation 2, upper box structure 3, unloading breast wall 4, mooring member 5, horizontal support 6, mooring column 7, rubber fender 8, caulking steel structure 9 and inverted filter 10;
[0047] A lower bucket foundation 2 is arranged on the upper part of the buried sand pile 1;
[0048] The adjacent lower barrel foundations 2 are connected by an inverted filter body 10, and a caulking steel structure 9 is provided on both sides of the inverted filter body 10;
[0049] The upper box structure 3 is arranged on the upper part of the lower barrel foundation 2;
[0050] The unloading breast wall 4 is arranged at the top of the upper box structure 3, a mooring post 7 is arranged on the top of the unloading breast wall 4, and a rubber fender 8 is arranged on the side of the unloading breast wall 4;
[0051] The bottom of the rubber fender 8 is provided with a mooring member 5 and a horizontal support 6;
[0052] The horizontal support 6 is located on the upper part of the mooring member 5 .
[0053] A plurality of lower bucket-type foundations 2 are arranged on the upper part of the buried sand pile 1, and the lower bucket-type foundations 2 are 1m-2m deep into the buried sand pile.
[0054] The lower barrel-type foundation 2 and the upper box-type structure 3 are prefabricated, and the tongue and groove of the caulking steel structure 9 are pre-embedded during the prefabrication of the lower barrel-type foundation 2 and the upper box-type structure 3 .
[0055] The tongue and groove of the embedded caulking steel structure 9 are arranged at the front and rear ends of the lower barrel foundation 2 and the upper box structure 3 .
[0056] Combined steel sheet piles are inserted between the tongue and groove of the pre-buried caulking steel structure 9, and filter bodies 10 are backfilled between the steel sheet piles.
[0057] The unloading breast wall 4, the mooring member 5 and the horizontal brace 6 on the upper part of the upper box-type structure 3 are prefabricated and connected to the upper box-type structure 3 as a whole through cast-in-place nodes.
[0058] The interior of the lower barrel foundation 2 and the upper box structure 3 are filled with backfill.
[0059] This embodiment adopts the concept of prefabricated design. It can meet the function of the wharf in one construction and can also be directly used as a revetment structure at the boundary of the land reclamation area. It has fast construction speed, high stability, little impact from wind and waves, and low project cost.
[0060] Example 2
[0061] This embodiment is mainly based on Embodiment 1, and mainly introduces a lower barrel foundation and an upper box structure of an assembled dock-reveal integrated structure using buried sand piles, such as Figure 2 As shown;
[0062] The lower barrel foundation 2 and the upper box structure 3 are circular or rectangular box structures, and the lower barrel foundation 2 and the upper box structure 3 adopt multiple groups of structures to form the overall structure of the dock. The lower part of each multiple group of structures is a barrel-shaped multi-compartment structure that is inverted and inserted into the underwater soft soil foundation. Prefabricated unloading breast walls, berthing components and horizontal braces are installed on the upper box structure 3, and mooring posts and rubber fenders are installed by pre-embedded bolts.
[0063] A caulking steel structure and an inverted filter are arranged between the adjacent lower barrel-type foundations 2, and a caulking steel structure and an inverted filter are arranged between the adjacent upper box-type structures 3; the lower barrel-type foundation 2 and the upper box-type structure 3 are formed into a plurality of groups of structures to form the overall structure of the wharf, and then the land area can be directly filled to form an assembled wharf-reveal integrated structure;
[0064] The lower bucket foundation 2 and the upper box structure 3 are constructed in a deep soft soil area, and the soft soil foundation can reach 30 to 40 meters. The height of the lower bucket foundation 2 structure is limited by the cost and construction technology, and is generally controlled to be less than 15 meters. A new type of buried sand pile is used for foundation treatment to form a composite foundation with high bearing capacity. While meeting the requirements of prefabricated structure stability and foundation bearing capacity, the upper unreinforced soft soil foundation does not affect the negative pressure sinking construction of the lower bucket foundation 2 and the upper box structure 3.
[0065] The prefabricated structure of the lower barrel foundation and the upper box structure of this embodiment, as well as the mortise and tenon of the pre-embedded caulking steel structure during the prefabrication of the lower barrel foundation and the upper box structure, make the construction and assembly of the entire structure more convenient and also improve the stability of the structure.
[0066] Example 3
[0067] This embodiment is mainly based on Embodiment 1 or Embodiment 2, and mainly introduces an implementation method of an assembled wharf revetment structure using buried sand piles, including the following steps:
[0068] Step S1: Calculate the structural stability and foundation bearing capacity according to the geological conditions, water depth, backfill soil index, process load and ship load, determine the main structural dimensions, determine the top elevation, bottom elevation and replacement rate of the sand pile, calculate the structural strength of the box barrel concrete structure, upper unloading breast wall and other structures according to the current specifications, and determine the detailed dimensions and reinforcement of the components;
[0069] Step S2: constructing buried sand pile 1;
[0070] Step S3: prefabricate the box-barrel assembly components, the berthing components 5, the horizontal bracing 6 and the unloading breast wall 4 in the prefabrication yard;
[0071] Step S4: After the box-barrel structure reaches the designed strength, it is transported as a whole to the site for negative pressure sinking, and the bottom of the barrel is inserted into the sand pile composite foundation;
[0072] Step S5: Install the caulking steel structure 9 and the steel sheet piles, and construct the inverted filter body 10; install the upper mooring member 5, the horizontal support 6 and the unloading breast wall 4, and cast-in-place nodes; install the mooring bollard 7 and the fender.
[0073] After the backfilling of the filter bodies 10 between the steel sheet piles in step S4 is completed, a continuous structure is formed, and the rear of the wharf is directly filled with land to realize the functions of the wharf and the retaining revetment.
[0074] This embodiment uses a new type of buried sand piles to treat the wharf foundation to form a composite foundation with high bearing capacity. While meeting the requirements of the stability of the prefabricated structure and the qualified bearing capacity of the foundation, the unreinforced soft soil foundation on the upper part does not affect the negative pressure sinking construction of the box barrel structure.
[0075] The above description is only the preferred embodiment of the present invention, which does not limit the protection scope of the present invention. For those skilled in the art, the present invention can be modified and varied in various ways. Within the spirit and principle of the present invention, any change, modification, replacement, integration and parameter change of these embodiments by conventional substitution or capable of achieving the same function without departing from the principle and spirit of the present invention shall fall within the protection scope of the present invention.
Claims
1. An assembled dock revetment structure using buried sand piles, characterized in that: include: Submerged sand piles (1), lower bucket foundation (2), upper box structure (3), unloading breast wall (4), mooring member (5), horizontal support (6), mooring column (7), rubber fender (8), caulking steel structure (9) and inverted filter (10); A lower bucket foundation (2) is arranged on the upper part of the buried sand pile (1); The adjacent lower barrel foundations (2) are connected via an inverted filter body (10), and caulking steel structures (9) are provided on both sides of the inverted filter body (10); The upper box-type structure (3) is arranged on the upper part of the lower barrel-type foundation (2); The unloading breast wall (4) is arranged at the top of the upper box structure (3), a mooring post (7) is arranged on the top of the unloading breast wall (4), and a rubber fender (8) is arranged on the side of the unloading breast wall (4); A mooring member (5) and a horizontal support (6) are arranged at the bottom of the rubber fender (8); The horizontal support (6) is located on the upper part of the mooring member (5).
2. The assembled dock revetment structure using buried sand piles according to claim 1 is characterized in that: A plurality of lower bucket-type foundations (2) are arranged on the upper part of the buried sand pile (1), and the lower bucket-type foundations (2) are 1 m to 2 m deep into the buried sand pile (1).
3. The assembled dock revetment structure using buried sand piles according to claim 2 is characterized in that: The lower barrel-type foundation (2) and the upper box-type structure (3) are prefabricated, and the tongue and groove of the caulking steel structure (9) are pre-embedded during the prefabrication of the lower barrel-type foundation (2) and the upper box-type structure (3).
4. The assembled dock revetment structure using buried sand piles according to claim 3 is characterized in that: The tongue and groove of the pre-buried caulking steel structure (9) are arranged at the front and rear ends of the lower barrel-type foundation (2) and the upper box-type structure (3).
5. The assembled dock revetment structure using buried sand piles according to claim 4 is characterized in that: Combined steel sheet piles are inserted between the tongue and groove of the pre-buried caulking steel structure (9), and filter bodies (10) are backfilled between the steel sheet piles.
6. The assembled dock revetment structure using buried sand piles according to claim 4 is characterized in that: The unloading breast wall (4), the mooring member (5) and the horizontal brace (6) on the upper part of the upper box-type structure (3) are prefabricated and connected to the upper box-type structure (3) through cast-in-place nodes to form a whole.
7. The assembled dock revetment structure using buried sand piles according to claim 1 is characterized in that: The interior of the lower barrel-type foundation (2) and the upper box-type structure (3) are filled with backfill.
8. A method for installing an assembled dock revetment structure using buried sand piles according to any one of claims 1 to 7, characterized in that: The following steps are involved: Step S1: constructing buried sand piles (1); Step S2: prefabricate the box-barrel assembly components, the berthing components (5), the horizontal bracing (6) and the unloading breast wall (4) at the prefabrication yard; Step S3: After the box-barrel structure reaches the designed strength, it is transported as a whole to the site for negative pressure sinking, and the bottom of the barrel is inserted into the sand pile composite foundation; Step S4: Install the caulking steel structure (9) and steel sheet piles, and construct the inverted filter body (10); install the upper mooring components (5), horizontal braces (6) and unloading breast walls (4), and cast-in-place nodes; install the mooring posts (7) and fenders.
9. The method for installing a prefabricated dock revetment structure using buried sand piles according to claim 8, characterized in that: After the backfilling of the filter body (10) between the steel sheet piles in step S4 is completed, a continuous structure is formed, and the rear of the wharf is directly filled with land to realize the functions of the wharf and the retaining revetment.
Citation Information
Cited By
Inland river anchorage berthing pier structure and construction method thereof
CN122039586A
Inland river anchorage docking structure and construction method thereof
CN122039586B
Permeable dock revetment structure and construction method thereof
CN122128990A