Preparation and use method of uplift pile buckle type connecting device

Through the snap-on connection device, the design of steel tenons, springs and steel wedges is used to solve the stability and construction efficiency of the traditional pile-removing connection method, and achieve high strength, convenient construction and low maintenance costs.

CN118911122APending Publication Date: 2024-11-08THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411050916.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The traditional anti-pile-pull-connecting method has problems such as unstable welding quality and complicated bolt connections, which are difficult to meet the strict requirements of high-rise buildings and important infrastructure to resist pile load bearing capacity and stability.

Method used

The snap-on connection device is adopted, including the upper and lower connections. Through the design of steel tenons, springs and steel wedges, the perforated plug welding connection method is used to simplify the construction steps and improve the connection strength.

Benefits of technology

It significantly improves the connection strength and construction efficiency, is suitable for various specifications of anti-pile pulling, reduces maintenance costs and extends the service life of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911122A_ABST
    Figure CN118911122A_ABST
Patent Text Reader

Abstract

The invention provides a preparation and use method of an uplift pile buckle type connecting device, and relates to the technical field of pile foundation engineering, and the preparation and use method comprises the steps of preparation of an upper connecting piece, preparation of a lower connecting piece, connection operation, inspection of connection quality and the like. The construction steps are simplified, the construction time is shortened, and the construction efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation engineering, and in particular to a preparation and use method of a pull-out pile clip-on connection device. Background Art

[0002] As an important part of building foundation engineering, the main function of anti-pullout piles is to ensure that buildings can remain stable under the tensile force caused by natural disasters such as earthquakes and storms or human factors, and to prevent buildings from shifting or tilting. With the continuous development of modern construction technology, the performance requirements for anti-pullout piles are becoming higher and higher, especially in the fields of high-rise buildings, large bridges, important infrastructure, etc., where the bearing capacity and stability requirements of anti-pullout piles are more stringent.

[0003] In the construction process of pull-out piles, pile connection is one of the key links. The quality of pile connection is directly related to the overall performance and safety of the pull-out piles. Traditional pile connection methods include welding connection, bolt connection, flange connection, etc. Although these connection methods can meet the engineering needs to a certain extent, there are also some problems. For example, welding connection is easily affected by factors such as welding quality and material properties, resulting in unstable connection strength; bolt connection has problems such as cumbersome installation and easy loosening.

[0004] In order to solve these problems and improve the reliability and stability of the connection between pull-out piles, researchers have been exploring new ways and technologies for pile connection in recent years. For example, pull-out piles made of high-strength steel and special anti-corrosion coatings are used to optimize the connection structure and improve the strength and sealing of the connection interface; at the same time, more advanced and reliable pile connection methods have been developed by combining new materials, new processes and new technologies, such as the use of intelligent monitoring and control systems to monitor the working status and performance of the pile connection in real time, providing strong guarantees for the safety and stability of the project.

[0005] In order to meet higher performance requirements and higher construction efficiency, researchers need to continuously explore new pile connection technologies and methods to improve the bearing capacity and stability of pull-out piles and the construction speed, while ensuring the safety and stability of the project. Summary of the invention

[0006] In view of the above-mentioned prior art, the present invention proposes a preparation and use method of a pull-out pile snap-on connection device.

[0007] The present invention provides a method for preparing and using a pull-out pile clip-on connection device, comprising the following steps: S1. Prepare the upper connecting piece: the upper connecting piece includes an upper anchor bar and an upper steel plate. A plurality of upper anchor bars are processed along the circumference of the upper end of the upper steel plate, a plurality of steel tenons are processed along the circumference of the lower end of the upper steel plate, a groove is reserved at the bottom of the upper steel plate at the side end of the steel tenon, a spring is installed in the groove, and a steel wedge is installed at the bottom of the spring; S2. Prepare the lower connecting piece: the lower connecting piece includes a lower anchor bar and a lower steel plate, a plurality of lower anchor bars are processed along the periphery of the lower end of the lower steel plate, and a plurality of reserved grooves are processed along the periphery of the lower steel plate, the cross section of the reserved groove is L-shaped, and the reserved groove matches the steel tenon and the steel wedge; S3, connection operation: fix the upper connection piece to the upper part of the pull-out pile, align the steel tenon with the reserved groove, and slowly insert it. When the steel tenon is completely inserted into the reserved groove, rotate the upper and lower pull-out piles in opposite directions to squeeze the spring. When the spring is under sufficient pressure, the steel wedge pops out into the reserved groove, so that the steel wedge tightly clamps the steel tenon to prevent it from slipping out. S4. Check the connection quality: After the connection is completed, check the connection quality between the connectors to ensure that the connection is firm and not loose.

[0008] Preferably, the upper anchor bar and the upper steel plate, as well as the lower anchor bar and the lower steel plate are connected by perforated plug welding.

[0009] Preferably, both the upper connecting piece and the lower connecting piece are subjected to rust-proof treatment.

[0010] Preferably, the upper steel plate and the lower steel plate are both configured as an annular structure.

[0011] Compared with the prior art, the beneficial effects of the present invention are: 1. Significantly improve the connection strength: Through the snap-on design, combined with the use of high-performance rust-proof springs and steel wedges, the pull-out piles can form a strong locking force when connected, effectively preventing the connection parts from slipping or breaking when subjected to tension, thereby greatly improving the connection strength and providing a solid guarantee for the stability and safety of the project.

[0012] 2. Easy operation and improved construction efficiency: Compared with the traditional connection method, this snap-on connection method does not require complicated tools or equipment. You only need to simply insert the steel tenon of the upper connection piece into the reserved groove of the lower connection piece and complete the connection by rotating it. This not only simplifies the construction steps, but also shortens the construction time and greatly improves the construction efficiency.

[0013] 3. Good adaptability: This connection method is suitable for pull-out piles of various specifications and shapes, whether it is a pipe pile or a square pile, it can be easily connected. At the same time, due to the flexible design of the connector, it can be customized according to specific engineering requirements, thus ensuring the stability and reliability of the connection.

[0014] 4. Reduce maintenance costs: Since the connection parts use high-performance rust-proof springs and steel wedges, these materials have good corrosion resistance and wear resistance, and can maintain stable performance for a long time in harsh environments. Therefore, this connection method not only reduces maintenance costs, but also extends the service life of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a construction schematic diagram of the anti-pullout pile clip-on connection device in an embodiment of the present invention.

[0016] Figure 2 Schematic diagram of the structure of the upper connecting member in an embodiment of the present invention.

[0017] Figure 3 Schematic diagram of the structure of the lower connecting member in an embodiment of the present invention.

[0018] In the figure: 100, upper connecting piece; 101, upper anchor bar; 102, upper steel plate; 103, steel wedge; 104, spring; 105, steel tenon; 200, lower connecting piece; 201, lower anchor bar; 202, lower steel plate; 203, reserved groove. DETAILED DESCRIPTION

[0019] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below with reference to specific diagrams.

[0020] Example: Figure 1-3 As shown, a method for preparing and using a pull-out pile clip-on connection device comprises the following steps: S1. Prepare the upper connecting part: The upper connecting part 100 includes an upper anchor rib 101 and an upper steel plate 102. Several upper anchor ribs 101 are processed along the circumference of the upper end of the upper steel plate 102, and several steel tenons 105 are processed along the circumference of the lower end of the upper steel plate 102. A groove is reserved at the side end of the steel tenon 105 at the bottom of the upper steel plate 102, and a high-performance and rust-proof spring 104 is installed in the groove, and a steel wedge 103 is installed at the bottom of the spring 104; ensure that the spring 104 has sufficient elastic force so that the steel wedge 103 can be ejected and inserted into the reserved groove 203 at the bottom during connection.

[0021] S2. Prepare the lower connecting part: The lower connecting part 200 includes a lower anchor rib 201 and a lower steel plate 202. Several lower anchor ribs 201 are processed along the circumference of the lower end of the lower steel plate 202, and several reserved grooves 203 are processed along the circumference of the lower steel plate 202. The cross-section of the reserved groove 203 is L-shaped, and the reserved groove 203 matches the steel tenon 105 and the steel wedge 103.

[0022] Among them, during the design and processing of the upper anchor bar 101 and the lower anchor bar 201, it is necessary to avoid the reserved groove 203 and the steel tenon 105 to avoid interference or damage to the connecting parts during the connection process; the upper anchor bar 101 and the upper steel plate 102, and the lower anchor bar 201 and the lower steel plate 202 are connected by perforated plug welding to ensure high connection strength and good sealing; the upper connecting part 100 and the lower connecting part 200 are both treated with rust prevention; the upper steel plate 102 and the lower steel plate 202 are both arranged as an annular structure.

[0023] S3, connection operation: fix the upper connecting piece 100 to the upper part of the pull-out pile, align the steel tenon 105 with the reserved groove 203, and slowly insert it. When the steel tenon 105 is completely inserted into the reserved groove 203, the spring 104 is squeezed by rotating the upper and lower sections of the pull-out pile in opposite directions. After the spring 104 is subjected to sufficient pressure, the steel wedge 103 is ejected into the reserved groove 203, so that the steel wedge 103 tightly clamps the steel tenon 105 to prevent the steel tenon 105 from slipping out.

[0024] S4. Check the connection quality: After the connection is completed, check the connection quality between the connectors to ensure that the connection is firm and not loose. If necessary, use appropriate tools and methods to make necessary adjustments and reinforcements.

[0025] This embodiment adopts a snap-on design, combined with the use of high-performance rust-proof springs and steel wedges, so that the pull-out piles can form a strong locking force when connected, effectively preventing the connection parts from slipping or breaking when subjected to tension, thereby greatly improving the connection strength and providing a solid guarantee for the stability and safety of the project.

[0026] The above are only implementation modes of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure made using the contents of the present invention's specification and drawings, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present invention.

Claims

1. A method for preparing and using a pull-out pile clip-on connection device, characterized in that: The steps include: S1. Prepare the upper connecting member: the upper connecting member (100) comprises an upper anchor bar (101) and an upper steel plate (102), a plurality of upper anchor bars (101) are processed along the circumference of the upper end of the upper steel plate (102), a plurality of steel tenons (105) are processed along the circumference of the lower end of the upper steel plate (102), a groove is reserved at the bottom of the upper steel plate (102) at the side end of the steel tenon (105), a spring (104) is installed in the groove, and a steel wedge (103) is installed at the bottom of the spring (104); S2. preparing a lower connecting member: the lower connecting member (200) comprises a lower anchor bar (201) and a lower steel plate (202); a plurality of lower anchor bars (201) are processed along the circumference of the lower end of the lower steel plate (202); a plurality of reserved grooves (203) are processed along the circumference of the lower steel plate (202); the cross section of the reserved groove (203) is L-shaped, and the reserved groove (203) matches the steel tenon (105) and the steel wedge (103); S3, connection operation: fix the upper connection piece (100) to the upper part of the pull-out pile, align the steel tenon (105) with the reserved groove (203), and slowly insert it. When the steel tenon (105) is completely inserted into the reserved groove (203), the spring (104) is squeezed by rotating the upper and lower pull-out piles in opposite directions. After the spring (104) is subjected to sufficient pressure, the steel wedge (103) is ejected into the reserved groove (203), so that the steel wedge (103) is tightly clamped on the steel tenon (105) to prevent the steel tenon (105) from sliding out; S4. Check the connection quality: After the connection is completed, check the connection quality between the connectors to ensure that the connection is firm and not loose.

2. The method for preparing and using the pull-out pile snap-on connection device according to claim 1, characterized in that: The upper anchor bar (101) and the upper steel plate (102), as well as the lower anchor bar (201) and the lower steel plate (202) are connected by perforation plug welding.

3. The method for preparing and using the pull-out pile snap-on connection device according to claim 1 or 2, characterized in that: The upper connecting piece (100) and the lower connecting piece (200) are both subjected to rust prevention treatment.

4. The method for preparing and using the pull-out pile snap-on connection device according to claim 1 or 2, characterized in that: The upper steel plate (102) and the lower steel plate (202) are both configured as an annular structure.

Citation Information

Patent Citations

  • Fabricated bridge pile foundation mechanical connection structure and construction method

    CN116497804A

  • Uplift pile capable of being quickly spliced

    CN218346161U