Deep foundation pit uplift pile anchoring structure and construction method thereof

By adopting a pile-removing anchor structure in deep foundation pits, the buoyancy is transmitted to the pile-removing resistance by using mounting parts and clasping, and through the anchoring of the concrete layer and the ground wall, the poor anti-floating and uplifting properties of the underwater bottom cover concrete are solved. The problem of this has achieved stronger pit bottom load-bearing capacity and convenient installation process.

CN118911123APending Publication Date: 2024-11-08SHANGHAI TUNNEL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410949888.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the existing deep foundation pit excavation technology, underwater bottom cover concrete has poor anti-floating and bump resistance under high pressure water pressure, and cannot effectively bear the water head pressure at the bottom of the pit.

Method used

Deep foundation pit anti-pile pile anchor structure, including mounting parts, clasp and concrete layer, transmit buoyancy to anti-pile pile through sleeves and stress diffusers, and anchor them with the ground wall through concrete layers to form an integral anti-pile floating Anti-protrusion system.

Benefits of technology

The anti-floating and uplifting properties of the concrete layer are significantly improved, forming an overall anti-floating and uplifting system, enhancing the load-bearing capacity of the pit bottom, and it is convenient to install later, and the underwater workload is small.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911123A_ABST
    Figure CN118911123A_ABST
Patent Text Reader

Abstract

The invention relates to a deep foundation pit uplift pile anchoring structure and a construction method thereof. The anchoring structure comprises a mounting piece, a hoop and a concrete layer. The mounting piece comprises a sleeve fixedly arranged at the lower end of the uplift pile in a sleeving manner and a stress diffusion piece, and the stress diffusion piece is fixedly mounted at the upper end of the sleeve; the hoop is tightly hooped outside the sleeve and abuts against the bottom of the stress diffusion piece. And the concrete layer is formed by pouring concrete at the bottom of the foundation pit. The uplift pile and the concrete layer are anchored through the sleeve structure and the hoop structure to form anchoring bond, part of upward buoyancy borne by the concrete layer can be transmitted to the uplift pile, then the uplift pile and the ground wall are mutually anchored through the concrete layer, and the ground wall can bear the other part of upward buoyancy borne by the concrete layer; compared with the prior art, the anti-floating and anti-upheaval system has the advantage that the anti-floating and anti-upheaval performance of the concrete layer can be greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underwater excavation of deep foundation pits, and in particular relates to a deep foundation pit anti-pulling pile anchoring structure and a construction method thereof. Background Art

[0002] Underwater excavation of deep foundation pits refers to a kind of foundation pit excavation technology that uses backwater in deep foundation pits to balance the high pressure water pressure at the bottom of the pit by using the water pressure in the pit to achieve anti-surge of deep foundation pit excavation or to achieve stable seepage inside and outside the pit. After the underwater excavation is completed, it is necessary to pour underwater concrete bottom seal. After the bottom seal concrete reaches the design strength, the water in the foundation pit is drained and the pouring of the bottom plate of the main structure of the foundation pit is completed under dry working conditions.

[0003] Among them, underwater bottom concrete is the most important part of the whole process. The reason is that the bottom concrete is an important temporary structure to bear the water pressure at the bottom of the pit during the subsequent dry operation to complete the construction of the main structure bottom plate; currently, under the conditions of deep excavation of the foundation pit and high water pressure, the water head pressure at the bottom of the pit cannot be borne by the deadweight of the bottom concrete alone, resulting in poor overall anti-floating and anti-uplift performance formed by the bottom concrete; therefore, we propose a deep foundation pit anti-pullout pile anchoring structure and its construction method to solve the above problems. Summary of the invention

[0004] In order to solve the above problems, the present invention provides a deep foundation pit anti-pullout pile anchoring structure and a construction method thereof, which solves the problem of poor anti-floating and anti-uplift performance of bottom sealing concrete.

[0005] The present invention is implemented by the following scheme: a deep foundation pit anti-pulling pile anchoring structure, wherein a circle of ground walls abutting against the inner wall of the foundation pit is arranged around the foundation pit, and the anchoring structure comprises a mounting part, a hoop and a concrete layer;

[0006] The mounting member comprises a sleeve fixedly mounted on the lower end of the pull-out pile and a stress diffusion member, wherein the stress diffusion member is fixedly mounted on the upper end of the sleeve and is used to transfer the buoyancy borne by the stress diffusion member to the pull-out pile through the sleeve;

[0007] The clamp is tightly clamped to the outside of the sleeve and abuts against the bottom of the stress diffusion member, so as to transfer the buoyancy borne by the clamp to the sleeve through the stress diffusion member;

[0008] The concrete layer is formed by pouring concrete at the bottom of the foundation pit, and the concrete wraps around the mounting member and the hoop, and a part of the buoyancy borne by the concrete layer is transferred to the anti-pullout pile through the hoop and the mounting member;

[0009] The concrete layer and the ground wall are anchored to each other, so as to transfer another part of the buoyancy borne by the concrete layer to the ground wall.

[0010] A further improvement of the deep foundation pit anti-pullout pile anchoring structure of the present invention is that the stress diffusion member includes a stress disk sleeved and welded to the outside of the sleeve.

[0011] A further improvement of the deep foundation pit anti-pullout pile anchoring structure of the present invention is that it also includes a rib plate, which is arranged in a circle on the top of the stress plate, and the rib plate and the stress plate form an inverted corbel structure.

[0012] A further improvement of the deep foundation pit pull-out pile anchoring structure of the present invention is that the hoop includes a first arc-shaped plate and a second arc-shaped plate respectively having two connecting ends, the two connecting ends of the first arc-shaped plate and the second arc-shaped plate are respectively the first end and the second end, the first end of the first arc-shaped plate and the first end of the second arc-shaped plate are hinged to each other for adjusting the opening and closing of the hoop, and the second end of the first arc-shaped plate and the second end of the second arc-shaped plate are locked to each other for controlling the locking or opening of the hoop.

[0013] A further improvement of the deep foundation pit anti-pulling pile anchoring structure of the present invention is that a plurality of end bearing plates arranged at intervals are fixedly connected to the outer circumferences of the first arc plate and the second arc plate, and through holes for pouring concrete are opened on the end bearing plates.

[0014] A further improvement of the deep foundation pit pull-out pile anchoring structure of the present invention is that a shear plate is welded between each two adjacent end bearing plates to connect and fix the multiple end bearing plates into a whole.

[0015] A further improvement of the deep foundation pit pull-out pile anchoring structure of the present invention is that the second ends of the first arc plate and the second arc plate are fixedly connected to a fixing plate, and the fixing plates of the first arc plate and the second arc plate are penetrated by corresponding mounting holes, and bolts are passed through the mounting holes and fastened by nuts to achieve mutual locking of the second ends of the first arc plate and the second ends of the second arc plate.

[0016] A construction method for a deep foundation pit anti-pullout pile anchor structure, comprising the following steps:

[0017] Step 1: When constructing the pull-out pile, provide a sleeve and a stress diffuser, place the sleeve at the lower end of the pull-out pile reinforcement cage and fix it to the main reinforcement, and install the stress diffuser at the upper end of the sleeve to form a mounting part that can transmit force to each other;

[0018] Step 2: Lower the anti-pullout pile reinforcement cage together with the mounting parts into the pile hole of the anti-pullout pile and pour concrete to form the anti-pullout pile;

[0019] Step 3: Carry out ground and wall construction;

[0020] Step 4: excavating the foundation pit until the upper end of the sleeve is exposed, and cleaning the outer surface of the upper end of the sleeve;

[0021] Step 5: Provide a hoop, tighten the hoop to the outside of the upper end of the sleeve and abut against the bottom of the stress diffusion member, so that the buoyancy of the hoop can be transmitted to the sleeve through the stress diffusion member;

[0022] Step 6: Underwater concrete bottom casting is performed at the bottom of the foundation pit, and the cast concrete completely wraps the mounting parts and the clamps while being anchored to the ground wall, so that part of the buoyancy borne by the formed concrete layer is transferred to the ground wall for bearing.

[0023] A further improvement of the construction method of the deep foundation pit anti-pullout pile anchor structure of the present invention is that: before implementing step 2, an oil layer is applied to the position on the upper end of the sleeve where the clamp is tightened, or a detachable sheath is installed; when cleaning the outer surface of the upper end of the sleeve, obstacles at the position where the oil layer is applied are directly removed, or the sheath is removed.

[0024] A further improvement of the construction method of the deep foundation pit anti-pulling pile anchoring structure of the present invention is that the stress diffusion member includes a sleeve stress plate and a plurality of ribs;

[0025] When installing the stress diffusion component, the stress disk is first sleeved and welded to the outer surface of the upper end of the sleeve, and then a plurality of ribs are arranged in a circle along the circumference of the stress disk and welded to the top of the stress disk, so that the ribs and the stress disk form an inverted corbel structure.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] The present invention forms an anchoring grip by means of anchoring the anti-pullout piles and the concrete layer through the sleeve structure and the hoop structure, so that a part of the buoyancy borne by the concrete layer can be transferred to the anti-pullout piles, and then the concrete layer and the ground wall are anchored to each other. The ground wall can bear another part of the buoyancy borne by the concrete layer, thereby forming an integral anti-floating and anti-uplift system in the deep foundation pit. Compared with the prior art, the anti-floating and anti-uplift performance of the concrete layer can be greatly improved; and the later installation is convenient, and the workload of underwater operations is small. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A schematic top view of the mounting member of the present invention is shown.

[0029] Figure 2 A schematic diagram of the cross-sectional structure of the mounting member of the present invention is shown.

[0030] Figure 3 A schematic top view of the clamp structure of the present invention is shown.

[0031] Figure 4 The cross-sectional structure diagram of the clamp of the present invention is shown.

[0032] Figure 5 A schematic diagram of the installation position of the mounting piece and the clamp of the present invention is shown.

[0033] Figure 6 A schematic diagram of the pre-embedded position of the ground wall and the anti-pulling piles of the present invention is shown.

[0034] Figure 7 The schematic diagram of the present invention showing the excavation in the foundation pit to the critical elevation position of the foundation pit against sudden surge is shown.

[0035] Figure 8 The schematic diagram of underwater excavation in a foundation pit of the present invention is shown.

[0036] Fig. 9 A schematic diagram of installing a clamp according to the present invention is shown.

[0037] Fig.10 The schematic diagram of pouring concrete at the bottom of the foundation pit of the present invention is shown.

[0038] Fig.11 The schematic diagram of draining foundation pit water and continuing construction according to the present invention is shown.

[0039] In the figure: 1, ground wall; 2, pull-out pile; 3, mounting part; 301, sleeve; 302, stress plate; 303, rib plate; 4, foundation pit; 5, hoop; 501, first arc plate; 502, connecting plate; 503, hinge structure; 504, end bearing plate; 505, through hole; 506, shear plate; 507, fixing plate; 508, bolt; 509, nut; 510, second arc plate; 6, concrete layer. DETAILED DESCRIPTION

[0040] In order to solve the problem of poor anti-floating and anti-uplift performance of bottom sealing concrete, the present invention provides a deep foundation pit anti-pullout pile anchoring structure and a construction method thereof. The following is a further description of the deep foundation pit anti-pullout pile anchoring structure and a construction method thereof with specific embodiments combined with the accompanying drawings.

[0041] See also Figures 1 to 11 As shown, a deep foundation pit anti-pulling pile anchoring structure, a circle of ground wall 1 is arranged around the foundation pit 4 and abuts against the inner wall of the foundation pit 4, and the anchoring structure includes a mounting part 3, a hoop 5 and a concrete layer 6;

[0042] The mounting member 3 includes a sleeve 301 fixedly mounted on the lower end of the anti-pulling pile 2, the lower end of the sleeve 301 being buried in the soil at the bottom of the foundation pit 4; and also includes a stress diffusion member, which is fixedly mounted on the upper end of the sleeve 301 and is used to transfer the buoyancy borne by the stress diffusion member to the anti-pulling pile 2 through the sleeve 301;

[0043] The clamp 5 is clamped tightly on the outside of the sleeve 301 and abuts against the bottom of the stress diffusion member, so as to transfer the buoyancy force borne by the clamp 5 to the sleeve 301 through the stress diffusion member;

[0044] The concrete layer 6 is formed by pouring concrete at the bottom of the foundation pit 4 and wrapping the mounting member 3 and the hoop 5 with the concrete. A part of the buoyancy borne by the concrete layer 6 is transferred to the anti-pullout pile 2 through the hoop 5 and the mounting member 3.

[0045] The concrete layer 6 and the ground wall 1 are anchored to each other, so as to transfer another part of the buoyancy borne by the concrete layer 6 to the ground wall 1 for bearing.

[0046] By means of anchoring measures of the anti-pullout pile 2 and the concrete layer 6 through the sleeve 301 structure and the hoop 5 structure, an anchor grip is formed, so that a part of the buoyancy borne by the concrete layer 6 can be transferred to the anti-pullout pile 2, and then the concrete layer 6 and the ground wall 1 are anchored to each other. The ground wall 1 can bear another part of the buoyancy borne by the concrete layer 6, thereby forming an integral anti-floating and anti-uplift system in the deep foundation pit 4. Compared with the prior art, the anti-floating and anti-uplift performance of the concrete layer 6 can be greatly improved.

[0047] The stress diffusion member includes a stress disk 302 sleeved and welded on the outside of the sleeve 301; and also includes a rib plate 303, which is arranged around the top of the stress disk 302, and the rib plate 303 and the stress disk 302 form an inverted corbel structure.

[0048] When high water pressure acts on the bottom of the concrete layer 6, the concrete layer 6 tends to move upward relative to the pull-out pile 2. The hoop 5 is cast and anchored in the concrete layer 6 as a whole. The force is transmitted to the annular stress disk 302 and the rib 303 at the upper end of the sleeve 301 (made of steel) through the hoop 5. The inverted corbel structure in this solution can better concentrate the force and then transmit it to the main reinforcement of the pull-out pile 2 through the sleeve 301 to achieve anti-floating and anti-uplift of the concrete layer 6.

[0049] The hoop 5 includes a first curved plate 501 and a second curved plate 510 respectively having two connecting ends, the two connecting ends of the first curved plate 501 and the second curved plate 510 are respectively the first end and the second end, the first end of the first curved plate 501 and the first end of the second curved plate 510 are hinged to each other, and are used to adjust the opening and closing of the hoop 5, and the second end of the first curved plate 501 and the second end of the second curved plate 510 are locked to each other, and are used to control the hoop 5 to be locked or opened;

[0050] The first end of the first curved plate 501 and the first end of the second curved plate 510 are both fixedly connected with a connecting plate 502 . The connecting plate 502 on the first curved plate 501 and the connecting plate 502 on the second curved plate 510 are hinged to each other via a hinge structure.

[0051] By controlling the opening and closing of the clamp 5, the clamp 5 can be conveniently installed to be clamped outside the sleeve 301; the clamp 5 can be conveniently controlled to be locked or opened through the lock structure.

[0052] A plurality of end support plates 504 arranged at intervals are fixedly connected to the outer circumferences of the first arc plate 501 and the second arc plate 510 , and through holes 505 for pouring concrete are opened on the end support plates 504 .

[0053] By pouring concrete into the through hole 505 on the end bearing plate 504 , the hoop 5 and the concrete layer 6 can be anchored more firmly, and the buoyancy can be better transmitted to the stress disk 302 through the provided end bearing plate 504 .

[0054] Wherein, a shear plate is welded between every two adjacent end bearing plates 504 to connect and fix the multiple end bearing plates 504 into a whole.

[0055] By disposing the anti-shear plates 506 between adjacent end bearing plates 504 , the plurality of end bearing plates 504 can be integrated into one, so that the end bearing plates 504 can better bear force and transmit force.

[0056] The second ends of the first curved plate 501 and the second curved plate 510 are both fixedly connected with a fixing plate 507, and the fixing plates 507 of the first curved plate 501 and the second curved plate 510 are penetrated with corresponding mounting holes, and bolts 508 are passed through the mounting holes and fastened by nuts 509, so that the second end of the first curved plate 501 and the second end of the second curved plate 510 are locked with each other;

[0057] The fixing plate 507 on the first arc plate 501 is locked with the fixing plate 507 on the second arc plate 510 by means of the bolts 508 and the nuts 509. The locking method is simple and firm, and is convenient for divers to operate underwater.

[0058] A construction method for a deep foundation pit anti-pullout pile anchor structure, comprising the following steps:

[0059] Step 1: When constructing the pull-out pile 2, provide a sleeve 301 and a stress diffusion member, place the sleeve 301 at the lower end of the steel cage of the pull-out pile 2 and fix it to the main reinforcement, and install the stress diffusion member at the upper end of the sleeve 301 to form a mounting member 3 that can transmit force to each other;

[0060] Step 2: lower the steel cage of the pull-out pile 2 together with the mounting member 3 into the pile hole of the excavated pull-out pile 2 and pour concrete to form the pull-out pile 2 (in the process of pouring bored piles, an information-based concrete elevation control system is set to strictly prohibit over-pouring of concrete);

[0061] Step 3: Carry out the construction of ground wall 1;

[0062] Step 4: excavate the foundation pit 4, perform conventional dry excavation, construct the frame beam and the structural side wall by reverse construction, and excavate to the critical elevation of the foundation pit 4 to resist sudden surge;

[0063] Step 5: water is returned to the foundation pit 4, and underwater excavation is performed in the foundation pit 4 until the upper end of the sleeve 301 is exposed;

[0064] Step 6: The diver levels the bottom of the foundation pit 4 underwater, spreads a gravel cushion layer on the bottom of the foundation pit 4, and cleans the outer surface of the upper end of the sleeve 301;

[0065] Step 7: Provide a clamp 5 and hoist the clamp 5 underwater, and the diver cooperates to hold the clamp 5 around the upper end of the sleeve 301 and tighten it;

[0066] Step 8: Underwater concrete bottom casting is performed at the bottom of the foundation pit 4, and the cast concrete completely wraps the mounting parts 3 and the clamps 5, and is anchored to the ground wall 1, so that part of the buoyancy borne by the formed concrete layer 6 is transferred to the ground wall 1 for bearing.

[0067] Step 9: Drain the water in foundation pit 4 and construct the main structure and remaining side walls.

[0068] By utilizing the pull-out pile 2 structure, the concrete of the pull-out pile 2 does not need to be poured to the anchor body range of the semi-enclosed hoop 5 of the present invention, and the elevation can be controlled; the later installation is convenient, and the workload of underwater operation is small;

[0069] By adopting the form of anti-pullout piles 2 plus concrete bottom anchoring, the arrangement of the anti-pullout piles 2 inside the foundation pit 4 can be optimized according to the stress conditions of the concrete bottom, so as to minimize the bending moment acting on the concrete layer 6; the pile head of the anti-pullout pile 2 is anchored into the concrete layer 6, and the rigid sleeve 301 is pre-embedded in advance, and is lowered as a whole with the steel cage of the pile; by controlling the concrete elevation of the pile, the concrete will not invade the rigid sleeve 301, eliminating the need for divers to chisel out the concrete underwater at a later stage, and only the clamp 5 needs to be installed outside the rigid sleeve 301.

[0070] Before implementing step 2, an oil layer is applied to the position of the upper end of the sleeve 301 where the clamp 5 is tightened, or a detachable sheath is installed; when cleaning the outer surface of the upper end of the sleeve 301, obstacles at the position where the oil layer is applied are directly removed, or the sheath is removed;

[0071] Specifically, industrial butter is preferably used for the oil layer, and foam strips are preferably used for the sheath (when cleaning, divers will first chisel off the foam strips underwater).

[0072] By adopting the above design, when the sleeve 301 is pre-buried with the steel cage of the pull-out pile 2 and when the foundation pit is excavated, the surface of the sleeve 301 will be protected by the oil layer or the sheath, so that the installation area of ​​the clamp 5 will not be adhered to obstacles. Even if there are objects adhered, it is convenient for divers to chisel and clean them underwater, which is conducive to the installation of the clamp 5.

[0073] The stress diffusion member includes a stress disk 302 (the diameter of the annular stress disk 302 is smaller than the diameter of the bored pile) and a plurality of ribs 303;

[0074] When installing the stress diffusion part, the stress disk 302 is first sleeved and welded to the outer surface of the upper end of the sleeve 301, and then a plurality of ribs 303 are arranged around the circumference of the stress disk 302 and welded to the top of the stress disk 302, so that the ribs 303 and the stress disk 302 form an inverted corbel structure.

[0075] The force is transmitted to the annular stress disk 302 and the rib 303 at the upper end of the sleeve 301 through the hoop 5. The inverted bracket structure in this solution can better concentrate the force and then transmit it to the main reinforcement of the pull-out pile 2 through the sleeve 301 to achieve anti-floating and anti-uplift of the concrete layer 6.

[0076] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0077] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.

Claims

1. A deep foundation pit anti-pulling pile anchoring structure, wherein a circle of ground walls is arranged around the inner wall of the foundation pit and abuts against the inner wall of the foundation pit, characterized in that: The anchoring structure includes a mounting piece, a hoop and a concrete layer; The mounting member comprises a sleeve fixedly mounted on the lower end of the pull-out pile and a stress diffusion member, wherein the stress diffusion member is fixedly mounted on the upper end of the sleeve and is used to transfer the buoyancy borne by the stress diffusion member to the pull-out pile through the sleeve; The clamp is tightly clamped to the outside of the sleeve and abuts against the bottom of the stress diffusion member, so as to transfer the buoyancy borne by the clamp to the sleeve through the stress diffusion member; The concrete layer is formed by pouring concrete at the bottom of the foundation pit, and the concrete wraps around the mounting member and the hoop, and a part of the buoyancy borne by the concrete layer is transferred to the anti-pullout pile through the hoop and the mounting member; The concrete layer and the ground wall are anchored to each other, so as to transfer another part of the buoyancy borne by the concrete layer to the ground wall.

2. The deep foundation pit anti-pulling pile anchoring structure according to claim 1, characterized in that: The stress diffusion member comprises a stress disk which is sleeved and welded on the outside of the sleeve.

3. The deep foundation pit anti-pulling pile anchoring structure according to claim 2, characterized in that: It also includes a rib plate, which is arranged in a circle on the top of the stress disk, and the rib plate and the stress disk form an inverted corbel structure.

4. The deep foundation pit anti-pulling pile anchoring structure according to claim 1, characterized in that: The clamp includes a first arc plate and a second arc plate respectively having two connecting ends, the two connecting ends of the first arc plate and the second arc plate are respectively the first end and the second end, the first end of the first arc plate and the first end of the second arc plate are hinged to each other for adjusting the opening and closing of the clamp, and the second end of the first arc plate and the second end of the second arc plate are locked to each other for controlling the clamp to be locked or opened.

5. The deep foundation pit anti-pulling pile anchoring structure according to claim 4, characterized in that: A plurality of end support plates arranged at intervals are fixedly connected to the outer circumferential surfaces of the first arc-shaped plate and the second arc-shaped plate, and through holes for pouring concrete are opened on the end support plates.

6. The deep foundation pit anti-pulling pile anchoring structure according to claim 5, characterized in that: A shear plate is welded between every two adjacent end bearing plates to connect and fix the multiple end bearing plates into a whole.

7. The deep foundation pit anti-pulling pile anchoring structure according to claim 4, characterized in that: The second ends of the first arc plate and the second arc plate are fixedly connected to a fixing plate, and corresponding mounting holes are penetrated through the fixing plates of the first arc plate and the second arc plate. Bolts are passed through the mounting holes and fastened with nuts to achieve mutual locking of the second ends of the first arc plate and the second arc plate.

8. A construction method for a deep foundation pit anti-pulling pile anchor structure, characterized in that the steps include: Step 1: When constructing the pull-out pile, provide a sleeve and a stress diffuser, place the sleeve at the lower end of the pull-out pile reinforcement cage and fix it to the main reinforcement, and install the stress diffuser at the upper end of the sleeve to form a mounting part that can transmit force to each other; Step 2: Lower the anti-pullout pile reinforcement cage together with the mounting parts into the pile hole of the anti-pullout pile, and pour concrete to form the anti-pullout pile; Step 3: Carry out ground and wall construction; Step 4: excavating the foundation pit until the upper end of the sleeve is exposed, and cleaning the outer surface of the upper end of the sleeve; Step 5: providing a clamp, and tightening the clamp to the outside of the upper end of the sleeve and abutting against the bottom of the stress diffusion member, so that the buoyancy force borne by the clamp can be transmitted to the sleeve through the stress diffusion member; Step 6: Underwater concrete bottom casting is performed at the bottom of the foundation pit, and the cast concrete completely wraps the mounting parts and the clamps while being anchored to the ground wall, so that part of the buoyancy borne by the formed concrete layer is transferred to the ground wall for bearing.

9. The construction method of the deep foundation pit anti-pulling pile anchor structure according to claim 8, characterized in that: Before implementing step 2, apply an oil layer or install a detachable sheath at the position on the upper end of the sleeve where the clamp is tightened; when cleaning the outer surface of the upper end of the sleeve, directly remove the obstruction at the position where the oil layer is applied, or remove the sheath.

10. The construction method of the deep foundation pit anti-pulling pile anchor structure according to claim 8, characterized in that: The stress diffusion member includes a stress disk and a plurality of ribs; When installing the stress diffusion component, the stress disk is first sleeved and welded to the outer surface of the upper end of the sleeve, and then a plurality of ribs are arranged in a circle along the circumference of the stress disk and welded to the top of the stress disk, so that the ribs and the stress disk form an inverted corbel structure.