Construction trolley and construction technology for prefabricated block arched slope protection of expressway
By designing a highway prefabricated block arch slope protection construction trolley, using mechanized groove opening and uphill lifting units, the problem of time-consuming and labor-intensive manual groove opening and uphill transportation is solved, and efficient and precise construction is achieved, suitable for large-scale applications. .
Patent Information
- Application Number
- CN202411268132.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-08
AI Technical Summary
In the construction of prefabricated block arch slope protection on highways, manual groove opening and uphill transportation and placement processes are time-consuming and labor-intensive, with low accuracy, and difficult to achieve efficient construction.
Design a construction trolley including a bottom-slope walking system, a top-slope walking system and an uphill lifting unit. The height and position of the main body truss are adjusted through a hydraulic jack and a synchronous drive motor, and combined with a hoist and a rotary groove blade to achieve mechanized groove and grooved blade. Transport uphill, reduce labor intensity and improve accuracy.
It greatly reduces the labor intensity of prefabricated block arch slope protection construction, improves work efficiency and groove accuracy, ensures construction quality, and is suitable for large-scale promotion.
Smart Images

Figure CN118911166A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge engineering construction, in particular to a highway prefabricated block arch slope protection construction trolley. Background Art
[0002] The application of prefabricated arched slope protection in highways is becoming more and more common. This type of slope protection adopts the construction method of centralized production of prefabricated blocks in the factory and manual installation after transportation to the site. The process flow of conventional manual installation is mainly setting out → skeleton slotting → uphill transportation and placement, masonry → grouting → acceptance. Among them, the skeleton slotting process adopts manual excavation, which is time-consuming and labor-intensive, and the precision is not high because the slope soil is generally dense. The uphill transportation and placement of prefabricated blocks is difficult and laborious because the slope is high and steep.
[0003] It is planned to invent a construction trolley, adopt mechanical optimization to the skeleton grooving, uphill transportation and placement construction processes, and form a corresponding construction process. Summary of the invention
[0004] The object of the present invention is to provide a highway prefabricated block arch slope protection construction trolley and construction process to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a highway prefabricated block arch slope protection construction trolley, comprising a slope bottom walking system, a slope bottom height adjustment system is arranged on the slope bottom walking system, a main truss is erected on the top of the slope bottom height adjustment system, a slope top height adjustment system is arranged at the top of the highway slope below the top of the main truss, a slope top walking system is arranged below the slope top height adjustment system, an uphill lifting unit is arranged at the top of the main truss, and a slotted trolley is placed at the bottom of the main truss;
[0006] The uphill lifting unit and the slotting trolley form a slotting unit, and the uphill lifting unit includes a hoist, a lifting wire rope and a connecting device; the hoist is fixed on the top of the main truss, the hoist is connected to the lifting wire rope, the lifting wire rope is fixed at the object placement end with a connecting device, and the connecting device is connected to the slotting trolley;
[0007] The slotting trolley includes a trolley main body, a trolley handrail, a trolley engine, a trolley running wheel and a rotating slotting blade; the trolley main body is connected to the connecting device, the trolley engine and the rotating slotting blade are arranged in the trolley main body, the driving end of the trolley engine is connected to the rotating slotting blade, the rotating slotting blade passes through the bottom of the trolley main body and is tightly connected to the slope, the bottom of the trolley main body is provided with a trolley running wheel, the trolley running wheel is mounted on a track in the main body truss, and a trolley handrail is fixed to the side of the trolley main body away from the connecting device.
[0008] As a further improvement of the present invention, a winch switch, a trolley engine switch and an engine throttle are provided on the trolley handrail, the winch switch is electrically connected to the winch, the trolley engine switch is connected to the trolley engine, and the engine throttle controls the output power of the trolley engine.
[0009] As a further improvement of the present invention, the slope bottom height adjustment system includes a slope bottom hydraulic jack, a slope bottom hydraulic jack fixing seat, a main truss bottom mounting platform and a slope bottom angle measuring device; the slope bottom hydraulic jack is fixed on the slope bottom hydraulic jack fixing seat, the main truss bottom mounting platform is fixed on the top of the slope bottom hydraulic jack, and the slope bottom angle measuring device is fixed on the main truss bottom mounting platform.
[0010] As a further improvement of the present invention, the slope top height adjustment system includes a slope top hydraulic jack, a slope top hydraulic jack fixing seat, a main truss top mounting platform and a slope top angle measuring device; the slope top hydraulic jack is fixed on the slope top hydraulic jack fixing seat, the main truss top mounting platform is fixed on the top of the slope top hydraulic jack, and the slope top angle measuring device is fixed on the main truss top mounting platform.
[0011] As a further improvement of the present invention, the slope bottom walking system includes a slope bottom walking track, a slope bottom transverse walking wheel and a slope bottom synchronous drive motor; the slope bottom walking track is erected at the bottom of the highway slope, and a slope bottom transverse walking wheel is arranged in the slope bottom walking track, and the slope bottom transverse walking wheel is rotatably connected to the bottom of the slope bottom hydraulic jack fixing seat, the slope bottom synchronous drive motor is fixed on the slope bottom hydraulic jack fixing seat, and the driving end of the slope bottom synchronous drive motor is connected to the rotating shaft of the slope bottom transverse walking wheel through a connecting device.
[0012] As a further improvement of the present invention, the slope top walking system includes a slope top walking track, a slope top transverse walking wheel and a slope top synchronous drive motor; the slope top walking track is erected on the top of the highway slope, the slope top walking track is parallel to the slope bottom walking track, a slope top transverse walking wheel is arranged in the slope top walking track, the slope top transverse walking wheel is rotatably connected to the bottom of the slope top hydraulic jack fixing seat, the slope top synchronous drive motor is fixed on the slope top hydraulic jack fixing seat, and the driving end of the slope top synchronous drive motor is connected to the rotating shaft of the slope top transverse walking wheel through a connecting device.
[0013] As a further improvement of the present invention, the driving time and driving power of the synchronous driving motor at the bottom of the slope are synchronized with those of the synchronous driving motor at the top of the slope.
[0014] As a further improvement of the present invention, after the slotting, the connecting device is connected with an arched skeleton prefabricated block, and the arched skeleton prefabricated block is placed at the bottom of the slot opened in the slope.
[0015] To achieve the above object, the present invention also provides the following technical solution: a highway prefabricated block arch slope protection construction trolley and a construction process, wherein the highway prefabricated block arch slope protection construction trolley is used for construction, and the construction comprises the following steps:
[0016] S1. Measure and lay out the arch frame positions at the top and bottom of the slope, and mark them;
[0017] S2. Lay channel steel walking tracks at the top and bottom of the slope. The track length should be sufficient for the slotting unit and the uphill lifting unit to travel.
[0018] S3, move the slotting unit into place, move the main truss to the layout mark and align it, start the slope top and slope bottom height adjustment system according to the designed slope rate and slotting depth, make the main truss reach the same slope rate and appropriate distance, and fix it; at this time, the distance between the rotating blade of the slotting trolley and the slope is adjusted accordingly, and the slotting is now the designed slotting thickness;
[0019] S4. Prepare the slotting trolley at the bottom of the main truss slope; start the winch switch and the trolley engine switch through the trolley handrail, control the trolley to move upward along the main truss under the lifting of the winch, and at the same time, the engine drives the rotating blade to perform slotting operations; according to the softness and hardness of the slope soil, appropriately increase or decrease the slotting power through the throttle switch; until the trolley moves to the top of the slope, the skeleton slotting is completed;
[0020] S5, moving the slotting unit to the next frame operation;
[0021] S6. Move the lifting unit to the slotted part, align the winch lifting system with the slotted part, and adjust the height of the top and bottom of the slope to make the main truss as close to the slope as possible; release the wire rope, tie the arched slope protection prefabricated blocks from the bottom of the slope, start the winch, and lift the prefabricated blocks one by one along the slot. After transporting them to the designed position at the top of the slope, they are manually laid, and then the next block is lifted and laid from top to bottom;
[0022] S7, grouting and acceptance.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] The present invention forms a slotting unit by arranging an uphill lifting unit and a slotting trolley. The winch is fixed in the main truss of the slope top. The slotting trolley and the arch skeleton prefabricated block are pulled up and down along the slope direction by retracting and releasing the lifting wire rope. The trolley engine is started to drive the rotating slotting blade to rotate and slot. As the slotting trolley 7 moves upward, an arch skeleton placement groove is opened along the slope direction. The slotting power is appropriately increased or decreased by the engine throttle according to the hardness of the slope soil. After slotting, another uphill lifting unit is replaced to the slotting position. The arch skeleton prefabricated block is connected by the lifting wire rope. After being transported to the designed position on the slope top, it is manually laid, and then the next block is lifted and laid from top to bottom. The labor intensity of the prefabricated block arch slope protection can be well reduced, the work efficiency is greatly improved, the slotting accuracy is guaranteed, and the slope protection construction quality is further ensured, which is worthy of large-scale promotion and application.
[0025] The present invention installs a slope bottom height adjustment system and a slope top height adjustment system at the top and bottom of the slope at the same time, starts the hydraulic jack at the bottom of the slope and the hydraulic jack at the top of the slope according to the designed slope rate and slotting depth, raises or lowers the bottom mounting platform of the main truss and the top mounting platform of the main truss, and adjusts the main truss to the same slope rate and appropriate distance. At this time, the distance between the rotating blade of the slotting trolley and the slope is adjusted accordingly. At this time, the slotting is the designed slotting thickness, thereby improving the slotting accuracy.
[0026] The present invention sets a slope bottom walking system and a slope top walking system, and both upper and lower sides of the main truss are fixed with slope bottom lateral walking wheels and slope top lateral walking wheels, so that the main truss can move laterally along the slope bottom walking track and the slope top walking track, which is convenient for subsequent masonry of arch skeleton prefabricated blocks. The slope bottom lateral walking wheels and slope top lateral walking wheels are driven by the slope bottom synchronous driving motor and the slope top synchronous driving motor, and the driving time and driving power of the slope bottom synchronous driving motor are synchronized with the slope top synchronous driving motor, so that the main truss can maintain the vertical position without changing when it moves horizontally, thereby reducing the adjustment time before re-grooving and ensuring the accuracy of re-grooving. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall planar structure of the present invention;
[0028] Figure 2 This is a schematic diagram of the planar structure of the slotting unit of the present invention;
[0029] Figure 3 This is a schematic diagram of the planar structure of the uphill lifting unit of the present invention;
[0030] Figure 4 It is a schematic diagram of the side plan structure of the slotting trolley of the present invention;
[0031] Figure 5 It is a schematic diagram of the top plan structure of the slotting trolley of the present invention.
[0032] In the figure: 1. Slope bottom walking system; 101. Slope bottom walking track; 102. Slope bottom lateral walking wheel; 103. Slope bottom synchronous drive motor; 2. Slope bottom height adjustment system; 201. Slope bottom hydraulic jack; 202. Slope bottom hydraulic jack fixing seat; 203. Main truss bottom mounting platform; 204. Slope bottom angle measuring device; 3. Main truss; 4. Slope top height adjustment system; 401. Slope top hydraulic jack; 402. Slope top hydraulic jack fixing seat; 403. Main truss top mounting platform; 404. Slope top angle measuring device ; 5. Slope top walking system; 501. Slope top walking track; 502. Slope top lateral walking wheel; 503. Slope top synchronous drive motor; 6. Uphill lifting unit; 601. Winch; 602. Lifting wire rope; 603. Connecting device; 7. Slotting trolley; 701. Trolley body; 702. Trolley handrail; 7021. Winch switch; 7022. Trolley engine switch; 7023. Engine throttle; 703. Trolley engine; 704. Trolley walking wheel; 705. Rotating slotting blade; 8. Arched skeleton prefabricated block. DETAILED DESCRIPTION
[0033] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0034] It should be noted that when an element is referred to as being "fixed", "mounted", "connected" or "disposed" with another element, it may be directly on the other element or indirectly on the other element. It should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation in the specification, and therefore cannot be understood as limiting the present invention.
[0035] As a further improvement of the present invention, the terms "first", "second", "third", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include one or more of the features.
[0036] Example 1
[0037] See also Figure 1-5The present invention provides a technical solution: a highway prefabricated block arch slope protection construction trolley, comprising a slope bottom walking system 1, a slope bottom height adjustment system 2 is arranged on the slope bottom walking system 1, a main truss 3 is erected on the top of the slope bottom height adjustment system 2, a slope top height adjustment system 4 is arranged at the top of the highway slope below the top of the main truss 3, a slope top walking system 5 is arranged below the slope top height adjustment system 4, an uphill lifting unit 6 is arranged at the top of the main truss 3, and a slotted trolley 7 is placed at the bottom of the main truss 3;
[0038] The uphill lifting unit 6 and the slotting trolley 7 form a slotting unit, and the uphill lifting unit 6 includes a hoist 601, a lifting wire rope 602 and a connecting device 603; the hoist 601 is fixed on the top of the main truss 3, the hoist 601 is connected to the lifting wire rope 602, the lifting wire rope 602 is fixed at the object placement end with the connecting device 603, and the connecting device 603 is connected to the slotting trolley 7;
[0039] The slotting trolley 7 includes a trolley body 701, a trolley handrail 702, a trolley engine 703, a trolley running wheel 704 and a rotating slotting blade 705; the trolley body 701 is connected to the connecting device 603, the trolley engine 703 and the rotating slotting blade 705 are arranged in the trolley body 701, the driving end of the trolley engine 703 is connected to the rotating slotting blade 705, the rotating slotting blade 705 passes through the bottom of the trolley body 701 and is closely connected to the slope, and the trolley body 701 is arranged at the bottom Traveling wheels 704, the trolley traveling wheels 704 are mounted on the track inside the main truss 3, a trolley handrail 702 is fixed to the side of the trolley body 701 away from the connecting device 603, a winch switch 7021, a trolley engine switch 7022 and an engine throttle 7023 are provided on the trolley handrail 702, the winch switch 7021 is electrically connected to the winch 601, the trolley engine switch 7022 is connected to the trolley engine 703, and the engine throttle 7023 controls the output power of the trolley engine 703.
[0040] The uphill lifting unit 6 and the slotting trolley 7 are combined into a slotting unit, and the winch 601 is fixed in the main truss 3 at the top of the slope. The slotting trolley 7 and the arch skeleton prefabricated block 8 are pulled up and down along the slope direction by retracting and releasing the lifting wire rope 602. The trolley engine 703 is started to drive the rotating slotting blade 705 to rotate and slot. As the slotting trolley 7 moves upward, an arch skeleton placement slot is opened along the slope direction. The engine throttle 7023 is appropriately used to increase or decrease the slotting power according to the hardness of the slope soil. After slotting, another uphill lifting unit 6 is replaced to the slotting position, and the arch skeleton prefabricated block 8 is connected by the lifting wire rope 602. After being transported to the designed position at the top of the slope, it is manually laid, and then the next block is lifted and laid from top to bottom. This can better reduce the labor intensity of the prefabricated block arch slope protection, greatly improve work efficiency, ensure the slotting accuracy and further ensure the quality of slope protection construction, and is worthy of large-scale promotion and application.
[0041] Example 2
[0042] See also Figure 1-5 The present invention also provides a highway prefabricated block arch slope protection construction trolley, including a slope bottom walking system 1, a slope bottom height adjustment system 2 is arranged on the slope bottom walking system 1, a main truss 3 is erected on the top of the slope bottom height adjustment system 2, a slope top height adjustment system 4 is arranged at the top of the highway slope below the top of the main truss 3, a slope top walking system 5 is arranged below the slope top height adjustment system 4, an uphill lifting unit 6 is arranged at the top of the main truss 3, and a slotted trolley 7 is placed at the bottom of the main truss 3;
[0043] The slope bottom height adjustment system 2 includes a slope bottom hydraulic jack 201, a slope bottom hydraulic jack fixing seat 202, a main truss bottom mounting platform 203 and a slope bottom angle measuring device 204; the slope bottom hydraulic jack 201 is fixed on the slope bottom hydraulic jack fixing seat 202, a main truss bottom mounting platform 203 is fixed on the top of the slope bottom hydraulic jack 201, and a slope bottom angle measuring device 204 is fixed on the main truss bottom mounting platform 203;
[0044] The slope top height adjustment system 4 includes a slope top hydraulic jack 401, a slope top hydraulic jack fixing seat 402, a main truss top mounting platform 403 and a slope top angle measuring device 404; the slope top hydraulic jack 401 is fixed on the slope top hydraulic jack fixing seat 402, a main truss top mounting platform 403 is fixed on the top of the slope top hydraulic jack 401, and a slope top angle measuring device 404 is fixed on the main truss top mounting platform 403.
[0045] By installing the bottom height adjustment system 2 and the top height adjustment system 4 at the top and the bottom of the slope at the same time, according to the designed slope gradient and slotting depth, the hydraulic jack 201 at the bottom of the slope and the hydraulic jack 401 at the top of the slope are started to raise or lower the bottom mounting platform 203 of the main truss and the top mounting platform 403 of the main truss, and the main truss 3 is adjusted to achieve the same slope gradient and appropriate distance. At this time, the distance between the rotating blade of the slotting trolley and the slope is adjusted accordingly. At this time, the slotting is the designed slotting thickness, thereby improving the slotting accuracy.
[0046] Example 3
[0047] See also Figure 1-5 The present invention also provides a highway prefabricated block arch slope protection construction trolley, including a slope bottom walking system 1, a slope bottom height adjustment system 2 is arranged on the slope bottom walking system 1, a main truss 3 is erected on the top of the slope bottom height adjustment system 2, a slope top height adjustment system 4 is arranged at the top of the highway slope below the top of the main truss 3, a slope top walking system 5 is arranged below the slope top height adjustment system 4, an uphill lifting unit 6 is arranged at the top of the main truss 3, and a slotted trolley 7 is placed at the bottom of the main truss 3;
[0048] The slope bottom walking system 1 comprises a slope bottom walking track 101, a slope bottom transverse walking wheel 102 and a slope bottom synchronous driving motor 103; the slope bottom walking track 101 is set at the bottom of the highway slope, and the slope bottom transverse walking wheel 102 is arranged in the slope bottom walking track 101, and the slope bottom transverse walking wheel 102 is rotatably connected to the bottom of the slope bottom hydraulic jack fixing seat 202, and the slope bottom synchronous driving motor 103 is fixed on the slope bottom hydraulic jack fixing seat 202, and the driving end of the slope bottom synchronous driving motor 103 is connected to the rotating shaft of the slope bottom transverse walking wheel 102 through a connecting device;
[0049] The top walking system 5 includes a top walking track 501, a top lateral walking wheel 502 and a top synchronous driving motor 503; the top walking track 501 is set on the top of the highway, the top walking track 501 is parallel to the bottom walking track 101, a top lateral walking wheel 502 is arranged in the top walking track 501, the top lateral walking wheel 502 is rotatably connected to the bottom of the top hydraulic jack fixing seat 402, the top synchronous driving motor 503 is fixed on the top hydraulic jack fixing seat 402, and the driving end of the top synchronous driving motor 503 is connected to the rotating shaft of the top lateral walking wheel 502 through a connecting device;
[0050] The driving time and driving power of the synchronous driving motor 103 at the bottom of the slope are synchronized with the synchronous driving motor 503 at the top of the slope.
[0051] By setting up the slope bottom walking system 1 and the slope top walking system 5, the main truss 3 is fixed with the slope bottom transverse walking wheels 102 and the slope top transverse walking wheels 502 on the upper and lower sides, so that the main truss 3 can move laterally along the slope bottom walking track 101 and the slope top walking track 501, which is convenient for the subsequent masonry of the arch skeleton prefabricated block 8. The slope bottom transverse walking wheels 102 and the slope top transverse walking wheels 502 are driven by the slope bottom synchronous drive motor 103 and the slope top synchronous drive motor 503, and the driving time and driving power of the slope bottom synchronous drive motor 103 and the slope top synchronous drive motor 503 are synchronized, so that the main truss 3 can maintain the vertical position unchanged when moving horizontally, thereby reducing the adjustment time before re-grooving and ensuring the accuracy of re-grooving.
[0052] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0053] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A highway prefabricated block arch slope protection construction trolley, comprising a slope bottom walking system (1), characterized in that: The bottom-of-slope walking system (1) is provided with a bottom-of-slope height adjustment system (2), a main truss (3) is erected on the top of the bottom-of-slope height adjustment system (2), a top-of-slope height adjustment system (4) is provided at the top of the highway below the top of the main truss (3), a top-of-slope walking system (5) is provided below the top-of-slope height adjustment system (4), an uphill lifting unit (6) is provided at the top of the main truss (3), and a slotted trolley (7) is placed at the bottom of the main truss (3); The uphill lifting unit (6) and the slotting trolley (7) form a slotting unit, and the uphill lifting unit (6) comprises a hoist (601), a lifting wire rope (602) and a connecting device (603); the hoist (601) is fixed on the top of the main truss (3), the hoist (601) is connected to the lifting wire rope (602), the lifting wire rope (602) is fixed with a connecting device (603) at the object placement end, and the connecting device (603) is connected to the slotting trolley (7); The slotting trolley (7) comprises a trolley body (701), a trolley handrail (702), a trolley engine (703), a trolley running wheel (704) and a rotating slotting blade (705); the trolley body (701) is connected to the connecting device (603); the trolley engine (703) and the rotating slotting blade (705) are arranged in the trolley body (701); the driving end of the trolley engine (703) is connected to the rotating slotting blade (705); the rotating slotting blade (705) passes through the bottom of the trolley body (701) and is tightly connected to the slope; the bottom of the trolley body (701) is provided with a trolley running wheel (704); the trolley running wheel (704) is mounted on a track in the main truss (3); and the trolley handrail (702) is fixed to the side of the trolley body (701) away from the connecting device (603).
2. A highway prefabricated block arch slope protection construction trolley according to claim 1, characterized in that: The trolley handrail (702) is provided with a winch switch (7021), a trolley engine switch (7022) and an engine throttle (7023); the winch switch (7021) is electrically connected to the winch (601); the trolley engine switch (7022) is connected to the trolley engine (703); and the engine throttle (7023) controls the output power of the trolley engine (703).
3. The highway prefabricated block arch slope protection construction trolley according to claim 1, characterized in that: The slope bottom height adjustment system (2) comprises a slope bottom hydraulic jack (201), a slope bottom hydraulic jack fixing seat (202), a main truss bottom mounting platform (203) and a slope bottom angle measuring device (204); the slope bottom hydraulic jack (201) is fixed on the slope bottom hydraulic jack fixing seat (202), a main truss bottom mounting platform (203) is fixed on the top of the slope bottom hydraulic jack (201), and a slope bottom angle measuring device (204) is fixed on the main truss bottom mounting platform (203).
4. The highway prefabricated block arch slope protection construction trolley according to claim 1, characterized in that: The slope top height adjustment system (4) comprises a slope top hydraulic jack (401), a slope top hydraulic jack fixing seat (402), a main truss top mounting platform (403) and a slope top angle measuring device (404); the slope top hydraulic jack (401) is fixed on the slope top hydraulic jack fixing seat (402), a main truss top mounting platform (403) is fixed on the top of the slope top hydraulic jack (401), and a slope top angle measuring device (404) is fixed on the main truss top mounting platform (403).
5. The highway prefabricated block arch slope protection construction trolley according to claim 1, characterized in that: The slope bottom walking system (1) comprises a slope bottom walking track (101), a slope bottom transverse walking wheel (102) and a slope bottom synchronous driving motor (103); the slope bottom walking track (101) is erected at the bottom of a highway slope, a slope bottom transverse walking wheel (102) is arranged in the slope bottom walking track (101), the slope bottom transverse walking wheel (102) is rotatably connected to the bottom of a slope bottom hydraulic jack fixing seat (202), the slope bottom synchronous driving motor (103) is fixed on the slope bottom hydraulic jack fixing seat (202), and the driving end of the slope bottom synchronous driving motor (103) is connected to the rotating shaft of the slope bottom transverse walking wheel (102) through a connecting device.
6. The highway prefabricated block arch slope protection construction trolley according to claim 1, characterized in that: The slope top walking system (5) comprises a slope top walking track (501), a slope top transverse walking wheel (502) and a slope top synchronous driving motor (503); the slope top walking track (501) is erected on the top of a highway slope, the slope top walking track (501) is parallel to the slope bottom walking track (101), a slope top transverse walking wheel (502) is arranged in the slope top walking track (501), the slope top transverse walking wheel (502) is rotatably connected to the bottom of a slope top hydraulic jack fixing seat (402), the slope top synchronous driving motor (503) is fixed on the slope top hydraulic jack fixing seat (402), and the driving end of the slope top synchronous driving motor (503) is connected to the rotating shaft of the slope top transverse walking wheel (502) through a connecting device.
7. A highway prefabricated block arch slope protection construction trolley according to claim 5 or 6, characterized in that: The driving time and driving power of the synchronous driving motor (103) at the bottom of the slope are synchronized with the synchronous driving motor (503) at the top of the slope.
8. The highway prefabricated block arch slope protection construction trolley according to claim 1, characterized in that: After the groove is cut, the connecting device (603) is connected to an arched skeleton prefabricated block (8), and the arched skeleton prefabricated block (8) is placed at the bottom of the groove cut in the slope.
9. A highway prefabricated block arch slope protection construction process, characterized in that: The construction using the highway prefabricated block arch slope protection construction trolley as described in any one of claims 1 to 8 comprises the following steps: S1. Measure and lay out the arch frame positions at the top and bottom of the slope, and mark them; S2. Lay channel steel walking tracks at the top and bottom of the slope. The track length should be sufficient for the slotting unit and the uphill lifting unit to travel. S3, move the slotting unit into place, move the main truss to the layout mark and align it, start the slope top and slope bottom height adjustment system according to the designed slope rate and slotting depth, make the main truss reach the same slope rate and appropriate distance, and fix it; at this time, the distance between the rotating blade of the slotting trolley and the slope is adjusted accordingly, and the slotting is now the designed slotting thickness; S4. Prepare the slotting trolley at the bottom of the main truss slope; start the winch switch and the trolley engine switch through the trolley handrail, control the trolley to move upward along the main truss under the lifting of the winch, and at the same time, the engine drives the rotating blade to perform slotting operations; according to the softness and hardness of the slope soil, appropriately increase or decrease the slotting power through the throttle switch; until the trolley moves to the top of the slope, the skeleton slotting is completed; S5, moving the slotting unit to the next frame operation; S6. Move the lifting unit to the slotted part, align the winch lifting system with the slotted part, and adjust the height of the top and bottom of the slope to make the main truss as close to the slope as possible; release the wire rope, tie the arched slope protection prefabricated blocks from the bottom of the slope, start the winch, and lift the prefabricated blocks one by one along the slot. After transporting them to the designed position at the top of the slope, they are manually laid, and then the next block is lifted and laid from top to bottom; S7, grouting and acceptance.