Construction method for embedded steel bar plate of underground main body structure

By designing holes in the reinforcing steel plate and fixing them to the reinforcing steel cage, and using a vibrator to pierce and vibrate the concrete, the problem of the concrete under the embedded steel plate being unable to be vibrated was solved, thus improving the strength and quality of the underground main structure.

CN118911198APending Publication Date: 2024-11-08SHENZHEN MUNICIPAL ENG CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411169147.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

When steel plates are embedded in the structural base slab or structural beam, the concrete pouring below cannot be vibrated, resulting in honeycomb and void phenomena, which affect quality and safety.

Method used

The design involves fixing the reinforcing steel plate to the reinforcing cage, pouring concrete through the holes, and using a vibrator to compact the concrete through the holes to ensure the density of the concrete at the bottom.

Benefits of technology

This improved the density of the concrete, ensuring the strength and quality of the underground main structure and preventing quality defects and accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911198A_ABST
    Figure CN118911198A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of underground main body structures, and discloses an underground main body structure pre-embedded reinforcing steel bar plate construction method, which comprises the following steps: 1) providing a reinforcing steel bar plate, the reinforcing steel bar plate comprises a plate body, a vertically through hole is formed in the plate body, and the bottom of the plate body is connected with a plurality of reinforcing steel bars which are arranged in a bent shape; (2) a reinforcement cage is provided and placed in a mold cavity defined by the formworks, a reinforcement plate is placed at the set position in the mold cavity, the reinforcement plate and the reinforcement cage are fixedly connected into a whole, the reinforcement is located below the plate body, and the mold cavity is provided with a lower portion located below the plate body; (3) in the process of pouring the concrete into the mold cavity, pouring the concrete to the lower part through the hole until the mold cavity is filled with the concrete; (4) the concrete in the mold cavity is vibrated through a vibrating rod, and the vibrating rod penetrates through the hole and extends into the lower portion to vibrate the concrete in the lower portion; and (5) after maintenance is conducted for a set time, the concrete is solidified to form an underground main body structure, and the formwork is dismantled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention patent relates to the technical field of underground main structure, specifically, to a construction method of pre-embedded steel plate of underground main structure. Background Art

[0002] At present, as underground structural engineering technology becomes more and more mature, the depth of foundation pit is also deepening. In the construction of underground main structure, there will be replacement of support and reinforcement of side walls. Among these technical measures, it is inevitable to adopt pre-embedded steel plates in structural walls, structural bottom plates or structural bottom beams. Pre-embedded steel plates in structural walls will not have an adverse effect on the pouring of structural concrete. However, when pre-embedded steel plates are embedded on the structural bottom plate or structural bottom beam, the concrete below the embedded steel plate cannot be vibrated during pouring, and honeycombs and voids will appear in the concrete below, resulting in serious quality defects and even quality accidents. Summary of the invention

[0003] The purpose of the present invention is to provide a construction method for an underground main structure pre-buried steel plate, aiming to solve the problem in the prior art that concrete below the pre-buried steel plate cannot be vibrated during pouring.

[0004] The present invention is implemented in this way: the construction method of the underground main structure pre-buried steel bar plate includes the following construction steps:

[0005] 1) Provide a steel plate, the steel plate comprising a plate body, the plate body is provided with a hole running through it from top to bottom, a plurality of steel bars arranged in a bent shape are connected to the bottom of the plate body, and the plurality of steel bars are arranged at intervals around the periphery of the hole;

[0006] 2) providing a steel cage, placing the steel cage in a mold cavity formed by the template, placing the steel plate at a set position in the mold cavity, and the steel plate and the steel cage are fixedly connected as one, the steel bars are located below the plate body, and the mold cavity has a lower portion located below the plate body;

[0007] 3) During the process of pouring concrete into the mold cavity, pour concrete downward through the hole until the concrete fills the mold cavity;

[0008] 4) Vibrating the concrete in the mold cavity with a vibrating rod, wherein the vibrating rod passes through the hole and extends to the lower part to vibrate the concrete in the lower part;

[0009] 5) After the concrete in the mold cavity is cured for a set time, the concrete solidifies to form an underground main structure, and the template is removed.

[0010] Optionally, in the construction step 5), the underground main structure is an underground floor or an underground ground beam.

[0011] Optionally, in the construction step 5), the plate body is exposed on the surface of the underground main structure, and the steel bars are formed in the underground main structure.

[0012] Optionally, in the construction step 1), the plate body is square in shape, and the hole is formed in the middle of the plate body.

[0013] Optionally, in the construction step 1), the inner end of the steel bar is welded and fixed to the bottom of the plate body, the outer end of the steel bar is extended away from the plate body, and the outer end of the steel bar is bent to form a bent section; in the construction step 2), the outer end of the steel bar extends to the interior of the steel cage.

[0014] Optionally, in the construction step 1), the outer end of the steel bar is tied and fixed to the steel cage, the bent section is welded and fixed to the steel cage, the middle part of the steel bar is passed through the steel cage and tied and fixed to the steel cage, and an installation gap is provided between the plate body and the surrounding side of the steel cage; in the construction step 5), after the concrete solidifies, a spacing portion is formed in the installation gap.

[0015] Optionally, in the construction step 2), a plurality of short bars are provided in the installation interval, the plurality of short bars are arranged at intervals around the outer periphery of the hole, the inner ends of the short bars are welded and fixed to the circumference of the steel cage, and the outer ends of the short bars are welded and fixed to the bottom of the plate body; a spiral wall is convexly provided on the outer periphery of the short bars and spirally arranged along the axial direction of the short bars, the spiral walls enclose a spiral groove, a connecting hole is provided in the spiral wall, and adjacent spiral grooves are connected through the connecting hole;

[0016] In the construction step 5), a plurality of the short bars are built into the spacer, and the concrete fills the spiral groove and passes through a plurality of the connecting holes.

[0017] Optionally, the vibrating rod comprises a vibrating rod body, a plurality of rotating rings arranged for rotation are sleeved on the rod body, and the plurality of rotating rings are arranged at intervals along the axial direction of the rod body; a plurality of swinging rods that swing away from the rod body or toward the rod body are hingedly connected to the circumference of the rotating ring, and a limiting block that limits the swinging rods from the swing limit position of the rod body is provided on the rotating ring;

[0018] The swing rod is provided with a plurality of through holes which penetrate the swing rod transversely, and the plurality of through holes are arranged at intervals along the axial direction of the swing rod, and the penetration directions of adjacent through holes are arranged crosswise; the upper end of the swing rod is hinged to the rotating ring, and the lower end of the swing rod is hinged to a rotating bead which is arranged rotatably;

[0019] In the construction step 4), the plurality of swing rods are closed at the periphery of the rod body, and during the process of inserting the rod body into the concrete, the plurality of swing rods are forced to swing away from the rod body to a set angle until the rod body and the plurality of swing rods are immersed in the concrete;

[0020] During the process of the rod body vibrating the concrete, the rod body drives the multiple swing rods to swing back and forth within a set range, and the rotation reciprocates around the rod body, driving the multiple swing rods to rotate synchronously, and the rotating beads of the swing rods reciprocate synchronously, so as to vibrate the concrete in multiple directions;

[0021] When the rod body is upwardly separated from the concrete, the plurality of swing rods are forced to swing toward the rod body until they are closed around the outer periphery of the rod body.

[0022] Optionally, the underground main structure is an underground base plate, and in the construction step 2), the plate is arranged horizontally.

[0023] Optionally, the underground main structure is an underground bottom beam, and in the construction step 2), the plate body is arranged longitudinally.

[0024] Compared with the prior art, the construction method of the underground main structure pre-buried steel plate provided by the present invention fixes the steel cage and the steel plate in the mold cavity as a whole to ensure the strength of the underground main structure. At the same time, through the design of the holes, concrete is poured to and from the lower part, and the vibrating rod can pass through the holes to vibrate the concrete in the lower part, thus ensuring the vibration quality of the lower part and meeting the density requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the process of the construction method of pre-buried steel bar plate of underground main structure provided by the present invention;

[0026] Figure 2 It is a front view schematic diagram of the plate body provided by the present invention;

[0027] Figure 3 It is a partial schematic diagram of the connection between the steel bar and the plate body provided by the present invention;

[0028] Figure 4 It is a partial schematic diagram of the connection between the plate body and the short ribs provided by the present invention;

[0029] Figure 5 It is a partial schematic diagram of the rod body provided by the present invention. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0031] The implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0032] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0033] Reference Figure 1-5 The figure shows a preferred embodiment of the present invention.

[0034] The method for constructing a pre-buried steel bar plate for an underground main structure provided by the present invention comprises the following construction steps:

[0035] 1) Provide a steel plate, the steel plate comprising a plate body 100, a hole 101 penetrating from top to bottom is provided in the plate body 100, a plurality of steel bars 110 arranged in a bent shape are connected to the bottom of the plate body 100, and the plurality of steel bars 110 are arranged at intervals around the periphery of the hole 101;

[0036] 2) providing a steel cage, placing the steel cage in a mold cavity formed by the template, placing a steel plate at a set position in the mold cavity, and the steel plate and the steel cage are fixedly connected as one, the steel bar 110 is located below the plate body 100, and the mold cavity has a lower portion located below the plate body 100;

[0037] 3) During the process of pouring concrete into the mold cavity, concrete is poured downward through the hole 101 until the concrete fills the mold cavity;

[0038] 4) Vibrate the concrete in the mold cavity with a vibrating rod, the vibrating rod passes through the hole 101 and extends to the lower part to vibrate the concrete in the lower part;

[0039] 5) After the concrete in the mold cavity is cured for a set time, the concrete solidifies to form the underground main structure and the formwork is removed.

[0040] The above-mentioned construction method of pre-buried steel plate for underground main structure fixes the steel cage and the steel plate in the mold cavity as a whole to ensure the strength of the underground main structure. At the same time, through the design of the hole 101, concrete is poured to and from the lower part, and the vibrating rod can pass through the hole 101 to vibrate the concrete in the lower part, thus ensuring the vibration quality of the lower part and meeting the density requirements.

[0041] In construction step 5), the underground main structure is an underground floor or an underground ground beam.

[0042] In construction step 5), the plate body 100 is exposed on the surface of the underground main structure, and the steel bars 110 are formed in the underground main structure. In this way, the connection between the plate body 100 and the concrete solidification body is improved by the steel bars 110, ensuring the overall strength of the underground main structure.

[0043] Specifically, in the construction step 1), the plate body 100 is in a square shape, and the hole 101 is formed in the middle of the plate body 100 .

[0044] In construction step 1), the inner end of the steel bar 110 is welded and fixed to the bottom of the plate body 100, the outer end of the steel bar 110 is extended away from the plate body 100, and the outer end of the steel bar 110 is bent to form a bent section 111; in construction step 2), the outer end of the steel bar 110 extends to the inside of the steel cage. In this way, the overall connection strength is enhanced.

[0045] In the construction step 1), the outer end of the steel bar 110 is tied and fixed to the steel cage, the bent section 111 is welded and fixed to the steel cage, the middle part of the steel bar 110 is inserted into the steel cage and tied and fixed to the steel cage, and there is an installation gap between the plate body 100 and the surrounding side of the steel cage; in the construction step 5), after the concrete solidifies, there is a gap formed in the installation gap. In this way, the connection strength between the steel plate and the steel cage is enhanced.

[0046] In this embodiment, in the construction step 2), a plurality of short ribs 120 are provided in the installation interval, and the plurality of short ribs 120 are arranged at intervals around the outer periphery of the hole 101, the inner ends of the short ribs 120 are welded and fixed to the peripheral side of the steel cage, and the outer ends of the short ribs 120 are welded and fixed to the bottom of the plate body 100; a spiral wall 121 spirally arranged along the axial direction of the short rib 120 is convexly provided on the outer periphery of the short rib 120, and the spiral wall 121 encloses a spiral groove, and a connecting hole 122 is provided in the spiral wall 121, and adjacent spiral grooves are connected through the connecting hole 122;

[0047] In construction step 5), a plurality of short bars 120 are built into the spacer, and concrete fills the spiral grooves and passes through a plurality of connecting holes 122. In this way, the connection between the steel plate and the spacer is strengthened by the design of the short bars 120.

[0048] In this embodiment, the vibrating rod comprises a vibrating rod body 200, on which a plurality of rotating rings 210 are sleeved and arranged in a rotating manner, and the plurality of rotating rings 210 are arranged at intervals along the axial direction of the rod body 200; a plurality of swinging rods 220 that swing away from the rod body 200 or toward the rod body 200 are hingedly connected to the circumference of the rotating ring 210, and a limiting block 230 that limits the swinging rods 220 from swinging away from the rod body 200 is provided on the rotating ring 210;

[0049] The swing rod 220 is provided with a plurality of through holes 221 which penetrate the swing rod 220 transversely. The plurality of through holes 221 are arranged at intervals along the axial direction of the swing rod 220, and the penetration directions of adjacent through holes 221 are arranged crosswise. The upper end of the swing rod 220 is hinged to the rotating ring 210, and the lower end of the swing rod 220 is hinged to a rotating bead 222 which is arranged rotatably.

[0050] In construction step 4), the plurality of swing rods 220 are closed around the outer periphery of the rod body 200. During the process of inserting the rod body 200 into the concrete, the plurality of swing rods 220 are forced to swing away from the rod body 200 to a set angle until the rod body 200 and the plurality of swing rods 220 are immersed in the concrete;

[0051] During the process of the rod body 200 vibrating the concrete, the rod body 200 drives the multiple swing rods 220 to swing back and forth within a set range, the rotating ring 210 reciprocates around the rod body 200, drives the multiple swing rods 220 to rotate synchronously, and the rotating beads 222 of the swing rods 220 reciprocate synchronously to vibrate the concrete in multiple directions;

[0052] During the process of the rod body 200 upwardly separating from the concrete, the plurality of swing rods 220 are forced to swing toward the rod body 200 until they are closed around the outer periphery of the rod body 200. In this way, the concrete can be vibrated in multiple directions, thereby improving the vibration quality and vibration efficiency.

[0053] Specifically, the underground main structure is an underground floor plate, and in the construction step 2), the plate body 100 is arranged horizontally.

[0054] Specifically, the underground main structure is an underground bottom beam, and in the construction step 2), the plate body 100 is arranged longitudinally.

[0055] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method for pre-buried steel plate for underground main structure, characterized in that: The construction steps include: 1) Provide a steel plate, the steel plate comprising a plate body, the plate body is provided with a hole running through it from top to bottom, a plurality of steel bars arranged in a bent shape are connected to the bottom of the plate body, and the plurality of steel bars are arranged at intervals around the periphery of the hole; 2) providing a steel cage, placing the steel cage in a mold cavity formed by the template, placing the steel plate at a set position in the mold cavity, and the steel plate and the steel cage are fixedly connected as one, the steel bars are located below the plate body, and the mold cavity has a lower portion located below the plate body; 3) During the process of pouring concrete into the mold cavity, pour concrete downward through the hole until the concrete fills the mold cavity; 4) Vibrating the concrete in the mold cavity with a vibrating rod, wherein the vibrating rod passes through the hole and extends into the lower part to vibrate the concrete in the lower part; 5) After the concrete in the mold cavity is cured for a set time, the concrete solidifies to form an underground main structure, and the template is removed.

2. The construction method of pre-buried steel plate for underground main structure according to claim 1, characterized in that: In the construction step 5), the underground main structure is an underground floor or an underground ground beam.

3. The construction method of pre-buried steel plate for underground main structure according to claim 1, characterized in that: In the construction step 5), the plate body is exposed on the surface of the underground main structure, and the steel bars are formed in the underground main structure.

4. The construction method of pre-buried steel plate for underground main structure according to claim 1, characterized in that: In the construction step 1), the plate body is in a square shape, and the hole is formed in the middle of the plate body.

5. The construction method of pre-buried steel plate for underground main structure according to claim 1, characterized in that: In the construction step 1), the inner end of the steel bar is welded and fixed to the bottom of the plate body, the outer end of the steel bar is extended away from the plate body, and the outer end of the steel bar is bent to form a bent section; in the construction step 2), the outer end of the steel bar extends to the interior of the steel cage.

6. The construction method of pre-buried steel plate for underground main structure according to claim 5, characterized in that: In the construction step 1), the outer end of the steel bar is tied and fixed to the steel cage, the bent section is welded and fixed to the steel cage, the middle part of the steel bar is passed through the steel cage and tied and fixed to the steel cage, and an installation gap is provided between the plate body and the surrounding side of the steel cage; in the construction step 5), after the concrete solidifies, a spacing portion is formed in the installation gap.

7. The construction method of pre-buried steel plate for underground main structure according to claim 6, characterized in that: In the construction step 2), a plurality of short bars are arranged in the installation interval, and the plurality of short bars are arranged at intervals around the outer periphery of the hole, the inner ends of the short bars are welded and fixed to the circumference of the steel cage, and the outer ends of the short bars are welded and fixed to the bottom of the plate body; a spiral wall is convexly arranged along the axial direction of the short bars on the outer periphery of the short bars, and the spiral walls are enclosed to form a spiral groove, and a connecting hole is provided in the spiral wall, and adjacent spiral grooves are connected through the connecting hole; In the construction step 5), a plurality of the short bars are built into the spacer, and the concrete fills the spiral groove and passes through a plurality of the connecting holes.

8. The construction method of pre-buried steel plate for underground main structure according to any one of claims 1 to 7, characterized in that: The vibrating rod comprises a vibrating rod body, on which a plurality of rotating rings are sleeved, and the plurality of rotating rings are arranged at intervals along the axial direction of the rod body; a plurality of swinging rods that swing away from the rod body or toward the rod body are hingedly connected to the circumference of the rotating ring, and a limiting block that limits the swinging rods from the swing limit position of the rod body is provided on the rotating ring; The swing rod is provided with a plurality of through holes which penetrate the swing rod transversely, and the plurality of through holes are arranged at intervals along the axial direction of the swing rod, and the penetration directions of adjacent through holes are arranged crosswise; the upper end of the swing rod is hinged to the rotating ring, and the lower end of the swing rod is hinged to a rotating bead which is arranged rotatably; In the construction step 4), the plurality of swing rods are closed at the periphery of the rod body, and during the process of inserting the rod body into the concrete, the plurality of swing rods are forced to swing away from the rod body to a set angle until the rod body and the plurality of swing rods are immersed in the concrete; During the process of the rod body vibrating the concrete, the rod body drives the multiple swing rods to swing back and forth within a set range, and the rotation reciprocates around the rod body, driving the multiple swing rods to rotate synchronously, and the rotating beads of the swing rods reciprocate synchronously, so as to vibrate the concrete in multiple directions; When the rod body is upwardly separated from the concrete, the plurality of swing rods are forced to swing toward the rod body until they are closed at the outer periphery of the rod body.

9. The construction method of pre-buried steel plate for underground main structure according to claim 2, characterized in that: The underground main structure is an underground base plate, and in the construction step 2), the plate body is arranged horizontally.

10. The construction method of pre-buried steel plate for underground main structure according to claim 2, characterized in that: The underground main structure is an underground bottom beam, and in the construction step 2), the plate body is arranged longitudinally.