Fabricated building structure and mounting method thereof
By designing a combined structure of prefabricated wall panels and floor slab bodies, using prefabricated steel cages and oblique support to achieve rapid positioning and automatic correction, the problem of low assembly efficiency caused by the many steel bar positioning and post-pouring nodes in the existing technology is solved, and the assembly efficiency is improved and overall assembly strength.
Patent Information
- Application Number
- CN202411272262.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing prefabricated building technology, the positioning requirements of steel bars are strict, resulting in low installation efficiency, and the assembly operation strength is high when the rear pouring node is multi-shot, and the assembly efficiency is low.
A prefabricated building structure is designed, including prefabricated wall panels and floor slab bodies. Through the combination of prefabricated steel cages and oblique support, it can achieve rapid positioning and automatic correction, reduce the use of formwork and steel bar binding workload, and use conical positioning holes to automatically Squeeze correction.
It improves assembly efficiency, reduces assembly operation strength, reduces template installation and disassembly operations, simplifies the steel bar binding process, and improves the overall assembly efficiency.
Smart Images

Figure CN118911277A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present application relate to the technical field of prefabricated buildings, and in particular to a prefabricated building structure and an installation method thereof. Background Art
[0002] Prefabricated structure is the abbreviation of prefabricated concrete structure, which is a concrete structure formed by assembling and connecting prefabricated components as the main load-bearing components. Prefabricated building refers to a building assembled on site using prefabricated components.
[0003] Whether prefabricated components are connected by sleeve grouting or grout anchors, there are very strict requirements on the positioning of steel bars. If there is a large deviation in the steel bars, the upper components cannot be installed in place. After completing the measurement work, the deviated steel bars need to be corrected to ensure the smooth installation of the prefabricated components. Due to the large number of positioned steel bars, the efficiency of correcting them one by one is low.
[0004] After the installation of multiple prefabricated wall panels is completed, it is necessary to tie the steel bars of the post-cast nodes and tie the steel bars between the wall panels. After the tying is completed, the formwork is assembled and then grouting is carried out. The formwork needs to be disassembled later. When there are many post-cast nodes, the assembly work is intense and the assembly efficiency is low.
[0005] In view of this, the present application proposes an assembled building structure and an installation method thereof. Summary of the invention
[0006] In view of the deficiencies in the prior art, an embodiment of the present application provides a prefabricated building structure and an installation method thereof.
[0007] To achieve the above objectives, the embodiments of the present application are implemented through the following technical solutions:
[0008] In a first aspect, an embodiment of the present application proposes an assembled building structure, which comprises a first prefabricated wall panel, a second prefabricated wall panel, a third prefabricated wall panel and a floor slab body, wherein the first prefabricated wall panel comprises two groups of first wall panel bases, the two groups of the first wall panel bases are connected by a first connecting steel bar, a first cavity is formed between the two groups of the first wall panel bases, a first positioning hole and a first through groove are provided at the bottom of the first prefabricated wall panel, both side edges of the first prefabricated wall panel are provided with a first connecting edge, the second prefabricated wall panel comprises two groups of second wall panel bases, the two groups of the second wall panel bases are connected by a second connecting steel bar, and the two groups of the second wall panel bases are connected by a second connecting steel bar. A second cavity is formed, a second positioning hole and a second through groove are provided at the bottom of the second prefabricated wall panel, a second connecting edge is provided on one side of the second prefabricated wall panel, and a first assembly edge is provided on the other side of the second prefabricated wall panel. The third prefabricated wall panel includes two groups of third wall panel bases, the two groups of the third wall panel bases are connected by third connecting steel bars, and a third cavity is formed between the two groups of the third wall panel bases. A third positioning hole and a third through groove are provided at the bottom of the third prefabricated wall panel, a third connecting edge is provided on one side of the third prefabricated wall panel, and a second assembly edge is provided on the other side of the third prefabricated wall panel. A plurality of groups of positioning steel bars are fixedly provided on the floor main body.
[0009] Among them, the cavity structures of the first prefabricated wall panel, the second prefabricated wall panel and the third prefabricated wall panel reduce the dead weight of the prefabricated wall panels.
[0010] As an embodiment, a first casting cavity is formed between the first connecting edge of the first prefabricated wall panel and the first assembling edge of the second prefabricated wall panel, and the first connecting edge and the first assembling edge are adapted to each other to form a closed cavity structure therebetween.
[0011] As an implementation mode, a first prefabricated steel cage is disposed inside the first casting cavity. The first prefabricated steel cage is a prefabricated structure and is used as a skeleton at the connection position of the wall panels to improve the integrity of the concrete component.
[0012] As an embodiment, a second casting cavity is formed between the first connecting edge of the first prefabricated wall panel and the second assembly edge of the third prefabricated wall panel, and the first connecting edge and the second assembly edge are adapted to each other to form a closed cavity structure therebetween.
[0013] As an implementation mode, a second prefabricated steel cage is disposed inside the second casting cavity. The second prefabricated steel cage is a prefabricated structure and is used as a skeleton at the wall panel connection position to improve the integrity of the concrete component.
[0014] As an implementation mode, the first prefabricated wall panel, the second prefabricated wall panel and the third prefabricated wall panel are all fixedly arranged on the floor slab body, and multiple groups of positioning steel bars of the floor slab body are respectively inserted into the first positioning hole of the first prefabricated wall panel, the second positioning hole of the second prefabricated wall panel, and the third positioning hole of the third prefabricated wall panel. The floor slab body includes a prefabricated floor slab base and a cast-in-place floor slab base. Multiple groups of positioning steel bars are preset on the floor slab body to form multiple groups of assembly positions; thereby, rapid positioning of the first prefabricated wall panel, the second prefabricated wall panel and the third prefabricated wall panel is achieved.
[0015] As an implementation mode, a first embedded screw sleeve is provided on the wall surface of the first prefabricated wall panel, a second embedded screw sleeve is provided on the wall surface of the second prefabricated wall panel, and a third embedded screw sleeve is provided on the wall surface of the third prefabricated wall panel. In this embodiment, the inclined supports are connected by embedded screw sleeves, and each prefabricated wall panel is supported by multiple groups of inclined supports.
[0016] As an implementation mode, the first prefabricated wall panel and the main body of the floor slab, the second prefabricated wall panel and the main body of the floor slab, and the third prefabricated wall panel and the main body of the floor slab are all supported by oblique supports, one end of the oblique support is hinged with a first mounting base, the other end of the oblique support is hinged with a second mounting base, the first mounting base is fixed to the wall by screws, and the second mounting base is fixed to the main body of the floor slab by screws, so that the installation and disassembly of the oblique supports are convenient.
[0017] As an implementation mode, the first positioning hole, the second positioning hole and the third positioning hole all include a bottom groove and a positioning groove, and the bottom groove and the positioning groove are transitioned by an arc transition edge; wherein, relying on the conical surface of the inner wall of the positioning hole, the positioning steel bars can be automatically extruded and corrected.
[0018] In a second aspect, an embodiment of the present application provides a method for installing a prefabricated building structure as described in the first aspect, comprising the following steps:
[0019] Step 1: Measure and correct the positioning steel bars on both sides of the installation position, lift the first prefabricated wall panel, the second prefabricated wall panel and the third prefabricated wall panel by hoisting equipment, move the prefabricated wall panels to the designated installation positions and then drop them. When aligning, place a mirror at the installation position of the main body of the floor slab, and align the positioning holes of the wall panels with the positioning steel bars through mirror reflection;
[0020] Step 2: assembling multiple groups of first prefabricated wall panels, multiple groups of second prefabricated wall panels and multiple groups of third prefabricated wall panels as required, forming a first casting cavity between a first connecting edge of the first prefabricated wall panel and a first assembly edge of the second prefabricated wall panel when assembling the first prefabricated wall panel, and placing a first prefabricated steel cage in the first casting cavity for fixing;
[0021] Step 3: When assembling the first prefabricated wall panel and the third prefabricated wall panel, a second casting cavity is formed between the first connecting edge of the first prefabricated wall panel and the second assembly edge of the third prefabricated wall panel, and the second prefabricated steel cage is placed in the second casting cavity and fixed;
[0022] Step 4: Use multiple sets of inclined supports to support between the wall panel and the floor slab body, the first mounting base at one end of the inclined support is mounted and fixed on the wall panel, and the second mounting base at the other end of the inclined support is mounted and fixed on the floor slab body;
[0023] Step 5: The first cavity of the first prefabricated wall panel, the second cavity of the second prefabricated wall panel, the third cavity of the third prefabricated wall panel, the first pouring cavity and the second pouring cavity all form pouring positions, and concrete mortar is poured inside each cavity;
[0024] Step 6: After the concrete solidifies, complete the assembly between the first prefabricated wall panel, the second prefabricated wall panel, the third prefabricated wall panel and the floor slab body.
[0025] Compared with the prior art, the beneficial effects of the embodiments of the present application are:
[0026] 1. In the embodiment of the present application, when assembling the first prefabricated wall panel and the second prefabricated wall panel, a first casting cavity in a closed state is formed between the first connecting edge of the first prefabricated wall panel and the first assembly edge of the second prefabricated wall panel. When assembling the first prefabricated wall panel and the third prefabricated wall panel, a second casting cavity in a closed state is formed between the first connecting edge of the first prefabricated wall panel and the second assembly edge of the third prefabricated wall panel. The prefabricated steel cage is placed in the casting cavity and then grouting is performed, which greatly reduces the use of the formwork and does not require frequent installation and disassembly of the formwork. At the same time, the provision of the prefabricated steel cage reduces the workload of steel bar binding, reduces the intensity of assembly work, and thus improves assembly efficiency.
[0027] 2. The positioning holes in the embodiment of the present application are set as conical structures. The positioning steel bars on the outermost sides are manually corrected to determine the accurate initial position of the prefabricated wall panel. During the continuous downward movement of the prefabricated wall panel, the other positioning steel bars are automatically squeezed and corrected by relying on the conical surface of the inner wall of the positioning hole. There is no need to manually measure and correct all the positioning steel bars, which reduces the workload of positioning steel bar correction, improves correction efficiency, and thus improves assembly efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The above description is only an overview of the technical solution of the embodiment of the present application. In order to more clearly understand the technical means of the embodiment of the present application and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiment of the embodiment of the present application with the accompanying drawings.
[0029] Figure 1 This is a schematic diagram of the structure of the first prefabricated wall panel, the second prefabricated wall panel and the third prefabricated wall panel in the embodiment of the present application;
[0030] Figure 2 This is a schematic diagram of the top view structure of the first prefabricated wall panel in the embodiment of the present application;
[0031] Figure 3 This is a schematic diagram of the structure of the first prefabricated wall panel in the embodiment of the present application when viewed from the top;
[0032] Figure 4 This is a schematic diagram of the top view structure of the second prefabricated wall panel in the embodiment of the present application;
[0033] Figure 5 This is a schematic diagram of the structure of the second prefabricated wall panel in the embodiment of the present application when viewed from the top;
[0034] Figure 6 This is a schematic diagram of the top view structure of the third prefabricated wall panel in the embodiment of the present application;
[0035] Figure 7 This is a schematic diagram of the structure of the top view of the third prefabricated wall panel in the embodiment of the present application;
[0036] Figure 8 This is a schematic diagram of the top view assembly of the first prefabricated wall panel and the second prefabricated wall panel in the embodiment of the present application;
[0037] Fig. 9 This is a schematic diagram of the top view assembly of the first prefabricated wall panel and the third prefabricated wall panel in the embodiment of the present application;
[0038] Fig.10 This is a schematic diagram of the assembly of the first prefabricated wall panel and the floor slab body in the embodiment of the present application;
[0039] Fig.11 A cross-sectional view of the first positioning hole, the second positioning hole, and the third positioning hole in the embodiment of the present application;
[0040] Fig.12 This is a schematic diagram of positioning steel bars according to an embodiment of the present application.
[0041] In the figure:
[0042] 1. First prefabricated wall panel; 2. Second prefabricated wall panel; 3. Third prefabricated wall panel; 4. First casting cavity; 5. First prefabricated steel cage; 6. Second casting cavity; 7. Second prefabricated steel cage; 8. Floor slab body; 9. Oblique support; 11. First wall panel base; 12. First connecting steel bar; 13. First cavity; 14. First connecting edge; 15. First embedded screw sleeve; 16. First positioning hole; 17. First through groove; 21. Second wall panel base; 22. Second connecting steel bar; 23. Second cavity; 24. Second connecting edge; 25. The second embedded screw sleeve; 26, the second positioning hole; 27, the second through groove; 28, the first assembly edge; 31, the third wall panel base; 32, the third connecting steel bar; 33, the third cavity; 34, the third connecting edge; 35, the third embedded screw sleeve; 36, the third positioning hole; 37, the third through groove; 38, the second assembly edge; 81, the prefabricated base of the floor slab; 82, the cast-in-place base of the floor slab; 83, the positioning steel bar; 91, the first mounting base; 92, the second mounting base; 161, the bottom groove; 162, the positioning groove; 163, the arc transition edge. DETAILED DESCRIPTION
[0043] In order to more fully understand the technical content of the present application, the present application will be further introduced and explained in conjunction with the drawings and specific embodiments below; it should be noted that the terms "upper", "lower", "front", "back", "inside", "outside", etc. indicate directions or positional relationships that are not given the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", etc. are used to distinguish different components, etc., and do not represent a sequence, nor do they limit "first" and "second" to being different types.
[0044] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments; based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without making any creative work shall fall within the scope of protection of the present application.
[0045] The embodiment of the present application provides a prefabricated building structure and an installation method thereof, wherein a first casting cavity in a closed state is formed between the first connecting edge of the first prefabricated wall panel and the first assembly edge of the second prefabricated wall panel, and a second casting cavity in a closed state is formed between the first connecting edge of the first prefabricated wall panel and the second assembly edge of the third prefabricated wall panel, thereby reducing the amount of formwork used, and the positioning holes are set to a conical structure, which can automatically extrude and correct the positioning steel bars, thereby solving the technical problems mentioned in the background technology.
[0046] Embodiment 1:
[0047] See also Figure 1-Figure 12 The present embodiment provides an assembled building structure, which includes a first prefabricated wall panel 1, a second prefabricated wall panel 2, a third prefabricated wall panel 3 and a floor slab body 8. The first prefabricated wall panel 1 includes two groups of first wall panel bases 11, the two groups of first wall panel bases 11 are connected by a first connecting steel bar 12, and a first cavity 13 is formed between the two groups of first wall panel bases 11. The bottom of the first prefabricated wall panel 1 is provided with a first positioning hole 16 and a first through groove 17. Both sides of the first prefabricated wall panel 1 are provided with a first connecting edge 14. The second prefabricated wall panel 2 includes two groups of second wall panel bases 21, the two groups of second wall panel bases 21 are connected by a second connecting steel bar 22, and a second cavity 13 is formed between the two groups of second wall panel bases 21. A cavity 23, a second positioning hole 26 and a second through groove 27 are provided at the bottom of the second prefabricated wall panel 2, a second connecting edge 24 is provided on one side of the second prefabricated wall panel 2, and a first assembly edge 28 is provided on the other side of the second prefabricated wall panel 2. The third prefabricated wall panel 3 includes two groups of third wall panel bases 31, and the two groups of third wall panel bases 31 are connected by third connecting steel bars 32, and a third cavity 33 is formed between the two groups of third wall panel bases 31. A third positioning hole 36 and a third through groove 37 are provided at the bottom of the third prefabricated wall panel 3, a third connecting edge 34 is provided on one side of the third prefabricated wall panel 3, and a second assembly edge 38 is provided on the other side of the third prefabricated wall panel 3. A plurality of groups of positioning steel bars 83 are fixedly provided on the floor main body 8.
[0048] A first assembly edge 28 is prefabricated on one side of the second prefabricated wall panel 2, and a second assembly edge 38 is prefabricated on one side of the third prefabricated wall panel 3. The structural shapes and sizes of the first prefabricated wall panel 1, the second prefabricated wall panel 2, and the third prefabricated wall panel 3 are prefabricated according to the requirements of the assembled building. During the on-site assembly process, Figure 8 As shown, when the first prefabricated wall panel 1 and the second prefabricated wall panel 2 are assembled, a first casting cavity 4 is formed between the first connecting edge 14 of the first prefabricated wall panel 1 and the first assembly edge 28 of the second prefabricated wall panel 2, so that the first prefabricated wall panel 1 and the second prefabricated wall panel 2 can be assembled. The assembly connection position forms a closed cavity structure, and grouting can be directly performed inside the cavity without the need to install an additional grouting template.
[0049] like Fig. 9 As shown, when the first prefabricated wall panel 1 and the third prefabricated wall panel 3 are assembled, a second casting cavity 6 is formed between the first connecting edge 14 of the first prefabricated wall panel 1 and the second assembly edge 38 of the third prefabricated wall panel 3, so that the assembly between the first prefabricated wall panel 1 and the third prefabricated wall panel 3 is realized, and the assembly connection position forms a closed cavity structure, and grouting can be directly performed inside the cavity without the need to install an additional grouting template.
[0050] As an embodiment, a first casting cavity 4 is formed between the first connecting edge 14 of the first prefabricated wall panel 1 and the first assembly edge 28 of the second prefabricated wall panel 2. The first connecting edge 14 and the first assembly edge 28 are adapted to each other, and a closed cavity structure can be formed therebetween.
[0051] As an implementation mode, a first prefabricated steel cage 5 is arranged inside the first casting cavity 4 .
[0052] Among them, the first prefabricated steel cage 5 is a prefabricated structure. In order to improve the strength of the grouting structure, before grouting, the first prefabricated steel cage 5 is hoisted and placed in the first pouring cavity 4 and fixed, and then the grouting operation is carried out. The first prefabricated steel cage 5 is used as a skeleton at the wall panel connection position to improve the integrity of the concrete component.
[0053] As an embodiment, a second casting cavity 6 is formed between the first connecting edge 14 of the first prefabricated wall panel 1 and the second assembly edge 38 of the third prefabricated wall panel 3. The first connecting edge 14 and the second assembly edge 38 are adapted to each other, and a closed cavity structure can be formed therebetween.
[0054] As an implementation mode, a second prefabricated steel cage 7 is arranged inside the second casting cavity 6 .
[0055] In this embodiment, the second prefabricated steel cage 7 is a prefabricated structure. In order to improve the strength of the grouting structure, before grouting, the second prefabricated steel cage 7 is hoisted and placed in the second pouring cavity 6 and fixed, and then the grouting operation is carried out. The second prefabricated steel cage 7 is used as a skeleton at the wall panel connection position to improve the integrity of the concrete component.
[0056] Among them, the first prefabricated wall panel 1, the second prefabricated wall panel 2, and the third prefabricated wall panel 3 are all non-solid structures. The first cavity 13 of the first prefabricated wall panel 1 reduces the dead weight of the first prefabricated wall panel 1, and the first cavity 13 is used for grouting after assembly. The second cavity 23 of the second prefabricated wall panel 2 reduces the dead weight of the second prefabricated wall panel 2, and the second cavity 23 is used for grouting after assembly. The third cavity 33 of the third prefabricated wall panel 3 reduces the dead weight of the third prefabricated wall panel 3, and the third cavity 33 is used for grouting after assembly;
[0057] Therefore, the cavity structure of the first prefabricated wall panel 1, the second prefabricated wall panel 2, and the third prefabricated wall panel 3 in this embodiment reduces the dead weight of the prefabricated wall panels, making them more convenient to transport, hoist, and assemble.
[0058] As an implementation mode, the first prefabricated wall panel 1, the second prefabricated wall panel 2 and the third prefabricated wall panel 3 are all fixedly arranged on the floor slab body 8, and the multiple groups of positioning steel bars 83 of the floor slab body 8 are respectively inserted into the first positioning hole 16 of the first prefabricated wall panel 1, the second positioning hole 26 of the second prefabricated wall panel 2, and the third positioning hole 36 of the third prefabricated wall panel 3. The floor slab body 8 includes a prefabricated floor slab base 81 and a cast-in-place floor slab base 82.
[0059] Among them, multiple groups of positioning steel bars 83 are preset on the floor main body 8 to form multiple groups of assembly positions, so as to realize the rapid positioning of the first prefabricated wall panel 1, the second prefabricated wall panel 2 and the third prefabricated wall panel 3. When hoisting the first prefabricated wall panel 1, the second prefabricated wall panel 2 and the third prefabricated wall panel 3, the first prefabricated wall panel 1, the second prefabricated wall panel 2 and the third prefabricated wall panel 3 can be quickly hoisted and moved to the designated position, and installed and aligned.
[0060] As an implementation mode, a first embedded screw sleeve 15 is provided on the wall surface of the first prefabricated wall panel 1, a second embedded screw sleeve 25 is provided on the wall surface of the second prefabricated wall panel 2, and a third embedded screw sleeve 35 is provided on the wall surface of the third prefabricated wall panel 3.
[0061] Among them, embedded screw sleeves are pre-arranged on the first prefabricated wall panel 1, the second prefabricated wall panel 2 and the third prefabricated wall panel 3. The number and position of the embedded screw sleeves are selectively set according to actual needs. After the prefabricated wall panels are positioned, the inclined supports 9 are connected through the embedded screw sleeves, and each prefabricated wall panel is supported by multiple groups of inclined supports 9.
[0062] As an implementation mode, the first prefabricated wall panel 1 and the floor slab body 8, the second prefabricated wall panel 2 and the floor slab body 8, and the third prefabricated wall panel 3 and the floor slab body 8 are all supported by inclined supports 9, one end of the inclined support 9 is hinged with a first mounting base 91, and the other end of the inclined support 9 is hinged with a second mounting base 92, and the first mounting base 91 is fixed to the wall by screws, and the second mounting base 92 is fixed to the floor slab body 8 by screws.
[0063] Among them, Fig.10 As shown, when assembling the inclined support 9, the first mounting base 91 at one end of the inclined support 9 is fixed to the position of the embedded screw sleeve by screws, a hole is drilled at the specified position of the floor main body 8, and the second mounting base 92 at the other end of the inclined support 9 is fixed to the floor main body 8 by expansion screws, thereby realizing the assembly of multiple groups of inclined supports 9, and facilitating the subsequent installation and disassembly of the inclined supports 9.
[0064] Please continue reading Figure 4-Figure 7A first assembly edge 28 is prefabricated on one side of the second prefabricated wall panel 2, and a second assembly edge 38 is prefabricated on one side of the third prefabricated wall panel 3; when assembling the first prefabricated wall panel 1 and the second prefabricated wall panel 2, a first casting cavity 4 in a closed state is formed between the first connecting edge 14 of the first prefabricated wall panel 1 and the first assembly edge 28 of the second prefabricated wall panel 2; when assembling the first prefabricated wall panel 1 and the third prefabricated wall panel 3, a second casting cavity 6 in a closed state is formed between the first connecting edge 14 of the first prefabricated wall panel 1 and the second assembly edge 38 of the third prefabricated wall panel 3, and the prefabricated steel cage is placed in the casting cavity and then grouting is performed, which greatly reduces the use of the formwork, and there is no need to frequently install and disassemble the formwork. At the same time, the workload of steel bar binding is reduced, the assembly work intensity is reduced, and the assembly efficiency is improved.
[0065] The specific structures of the first positioning hole 16, the second positioning hole 26 and the third positioning hole 36 in this embodiment will be described in detail below; please continue to refer to Figure 3 and Fig.11 The first positioning hole 16 , the second positioning hole 26 and the third positioning hole 36 all include a bottom groove 161 and a positioning groove 162 , and the bottom groove 161 and the positioning groove 162 are transitioned by an arc transition edge 163 , and the opening of the bottom groove 161 is relatively large.
[0066] Among them, one group of prefabricated wall panels corresponds to multiple groups of positioning steel bars 83. When correcting the positioning steel bars 83, the positioning steel bars 83 on the outermost sides are manually corrected. When positioning the prefabricated wall panels, the positioning holes on the outermost sides of the bottom of the prefabricated wall panels are aligned with the positioning steel bars 83 on the outermost sides, so that the axes of the positioning steel bars 83 and the positioning grooves 162 coincide with each other; then the prefabricated wall panels are slowly moved down by the lifting equipment. In the process of the prefabricated wall panels continuously moving down, the top ends of the positioning steel bars 83 first extend into the bottom groove 161, and the prefabricated wall panels have a certain weight; if the positioning steel bars 83 at a certain position are in an inclined state, in the process of the prefabricated wall panels moving down, the positioning steel bars 83 will contact the inner wall of the bottom groove 161, and will be deformed under the squeezing action of the inner wall of the bottom groove 161 until the positioning steel bars 83 extend into the positioning groove 162.
[0067] In this embodiment, the positioning steel bars 83 on the outermost sides are manually corrected to determine the accurate initial position of the prefabricated wall panel. During the continuous downward movement of the prefabricated wall panel, the other positioning steel bars 83 are automatically squeezed and corrected by relying on the conical surface of the inner wall of the positioning hole. There is no need to manually measure and correct all the positioning steel bars 83, which reduces the correction workload of the positioning steel bars 83, improves the correction efficiency, and thus improves the assembly efficiency.
[0068] Embodiment 2:
[0069] This embodiment provides an installation method of the prefabricated building structure as described in Embodiment 1, comprising the following steps:
[0070] Step 1: Measure and correct the positioning steel bars 83 on both sides of the installation position, lift the first prefabricated wall panel 1, the second prefabricated wall panel 2 and the third prefabricated wall panel 3 by hoisting equipment, and move the prefabricated wall panels to the designated installation positions and then drop them. When aligning, place a mirror at the installation position of the floor slab body 8, and align the positioning holes of the wall panels with the positioning steel bars 83 through mirror reflection;
[0071] Step 2: Assemble multiple groups of first prefabricated wall panels 1, multiple groups of second prefabricated wall panels 2, and multiple groups of third prefabricated wall panels 3 as required. When assembling the first prefabricated wall panels 1 and the second prefabricated wall panels 2, a first casting cavity 4 is formed between the first connecting edge 14 of the first prefabricated wall panel 1 and the first assembly edge 28 of the second prefabricated wall panel 2, and the first prefabricated steel cage 5 is placed in the first casting cavity 4 and fixed;
[0072] Step 3: When assembling the first prefabricated wall panel 1 and the third prefabricated wall panel 3, a second casting cavity 6 is formed between the first connecting edge 14 of the first prefabricated wall panel 1 and the second assembly edge 38 of the third prefabricated wall panel 3, and the second prefabricated steel cage 7 is placed in the second casting cavity 6 and fixed;
[0073] Step 4: Use multiple sets of inclined supports 9 to support between the wall panel and the floor slab body 8, the first mounting base 91 at one end of the inclined support 9 is mounted and fixed on the wall panel, and the second mounting base 92 at the other end of the inclined support 9 is mounted and fixed on the floor slab body 8;
[0074] Step 5: The first cavity 13 of the first prefabricated wall panel 1, the second cavity 23 of the second prefabricated wall panel 2, the third cavity 33 of the third prefabricated wall panel 3, the first pouring cavity 4 and the second pouring cavity 6 all form pouring positions, and concrete mortar is poured inside each cavity;
[0075] Step 6: After the concrete solidifies, the assembly between the first prefabricated wall panel 1, the second prefabricated wall panel 2, the third prefabricated wall panel 3 and the floor slab body 8 is completed.
[0076] The technical solutions provided in the embodiments of the present application are introduced in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the embodiments of the present application. The description of the above embodiments is only applicable to help understand the principles of the embodiments of the present application. At the same time, for those skilled in the art, according to the embodiments of the present application, there will be changes in the specific implementation methods and application scopes. In summary, the contents of this specification should not be understood as limiting the present application.
Claims
1. An assembled building structure, It is characterized in that The assembled building structure comprises a first prefabricated wall panel (1), a second prefabricated wall panel (2), a third prefabricated wall panel (3) and a floor panel body (8), wherein the first prefabricated wall panel (1) comprises two groups of first wall panel base bodies (11), and the two groups of the first wall panel base bodies (11) are connected by a first connecting steel bar (12); A first cavity (13) is formed between the two groups of the first wall panel base bodies (11); a first positioning hole (16) and a first through groove (17) are provided at the bottom of the first prefabricated wall panel (1); first connecting edges (14) are provided on both sides of the first prefabricated wall panel (1); and the second prefabricated wall panel (2) includes two groups of second wall panel base bodies (21); The two groups of the second wall panel base bodies (21) are connected by a second connecting steel bar (22), and a second cavity (23) is formed between the two groups of the second wall panel base bodies (21); a second positioning hole (26) and a second through groove (27) are provided at the bottom of the second prefabricated wall panel (2); a second connecting edge (24) is provided on one side of the second prefabricated wall panel (2); and a first assembly edge (28) is provided on the other side of the second prefabricated wall panel (2); the third prefabricated wall panel (3) comprises two groups of third wall panel base bodies (31); the two groups of the third wall panel base bodies (31) are connected by a third connecting steel bar (32), and a third cavity (33) is formed between the two groups of the third wall panel base bodies (31); A third positioning hole (36) and a third through groove (37) are provided at the bottom of the third prefabricated wall panel (3); a third connecting edge (34) is provided on one side of the third prefabricated wall panel (3); a second assembly edge (38) is provided on the other side of the third prefabricated wall panel (3); and a plurality of groups of positioning steel bars (83) are fixedly provided on the floor slab body (8).
2. The assembled building structure according to claim 1, It is characterized in that A first casting cavity (4) is formed between the first connecting edge (14) of the first prefabricated wall panel (1) and the first assembly edge (28) of the second prefabricated wall panel (2).
3. The assembled building structure according to claim 2, It is characterized in that A first prefabricated steel cage (5) is arranged inside the first casting cavity (4).
4. The assembled building structure according to claim 1, It is characterized in that A second casting cavity (6) is formed between the first connecting edge (14) of the first prefabricated wall panel (1) and the second assembly edge (38) of the third prefabricated wall panel (3).
5. The assembled building structure according to claim 4, It is characterized in that A second prefabricated steel cage (7) is arranged inside the second casting cavity (6).
6. The assembled building structure according to claim 1, It is characterized in that The first prefabricated wall panel (1), the second prefabricated wall panel (2) and the third prefabricated wall panel (3) are all fixedly arranged on the floor slab body (8), and the plurality of groups of positioning steel bars (83) of the floor slab body (8) are respectively inserted into the first positioning hole (16) of the first prefabricated wall panel (1), the second positioning hole (26) of the second prefabricated wall panel (2), and the third positioning hole (36) of the third prefabricated wall panel (3), and the floor slab body (8) comprises a prefabricated floor slab base (81) and a cast-in-place floor slab base (82).
7. The assembled building structure according to claim 1, It is characterized in that A first embedded screw sleeve (15) is arranged on the wall surface of the first prefabricated wall panel (1), a second embedded screw sleeve (25) is arranged on the wall surface of the second prefabricated wall panel (2), and a third embedded screw sleeve (35) is arranged on the wall surface of the third prefabricated wall panel (3).
8. The assembled building structure according to claim 7, It is characterized in that The first prefabricated wall panel (1) and the floor slab body (8), the second prefabricated wall panel (2) and the floor slab body (8), and the third prefabricated wall panel (3) and the floor slab body (8) are all supported by inclined supports (9); one end of the inclined support (9) is hingedly connected to a first mounting base (91), and the other end of the inclined support (9) is hingedly connected to a second mounting base (92); the first mounting base (91) is fixed to the wall by screws, and the second mounting base (92) is fixed to the floor slab body (8) by screws.
9. The assembled building structure according to claim 8, It is characterized in that The first positioning hole (16), the second positioning hole (26) and the third positioning hole (36) all comprise a bottom groove (161) and a positioning groove (162), and the bottom groove (161) and the positioning groove (162) are transitioned via a circular arc transition edge (163).
10. A method for installing a prefabricated building structure according to any one of claims 1 to 9, It is characterized in that The steps include: Step 1: Measure and correct the positioning steel bars (83) on both sides of the installation position, lift the first prefabricated wall panel (1), the second prefabricated wall panel (2) and the third prefabricated wall panel (3) by lifting equipment, and move the prefabricated wall panels to the designated installation positions and then drop them. When aligning, place a mirror at the installation position of the floor slab body (8), and align the positioning holes of the wall panels with the positioning steel bars (83) through mirror reflection for assembly; Step 2: assembling a plurality of groups of first prefabricated wall panels (1), a plurality of groups of second prefabricated wall panels (2) and a plurality of groups of third prefabricated wall panels (3) as required, when assembling the first prefabricated wall panels (1) and the second prefabricated wall panels (2), forming a first casting cavity (4) between the first connecting edge (14) of the first prefabricated wall panels (1) and the first assembly edge (28) of the second prefabricated wall panels (2), and placing a first prefabricated steel cage (5) in the first casting cavity (4) for fixing; Step 3: When assembling the first prefabricated wall panel (1) and the third prefabricated wall panel (3), a second casting cavity (6) is formed between the first connecting edge (14) of the first prefabricated wall panel (1) and the second assembly edge (38) of the third prefabricated wall panel (3), and the second prefabricated steel cage (7) is placed in the second casting cavity (6) and fixed; Step 4: Use multiple sets of inclined supports (9) to support between the wall panel and the floor panel body (8), the first mounting base (91) at one end of the inclined support (9) is mounted and fixed on the wall panel, and the second mounting base (92) at the other end of the inclined support (9) is mounted and fixed on the floor panel body (8); Step 5: The first cavity (13) of the first prefabricated wall panel (1), the second cavity (23) of the second prefabricated wall panel (2), the third cavity (33) of the third prefabricated wall panel (3), the first pouring cavity (4) and the second pouring cavity (6) all form pouring positions, and concrete mortar is poured into the interior of each cavity; Step 6: After the concrete solidifies, the first prefabricated wall panel (1), the second prefabricated wall panel (2), the third prefabricated wall panel (3) and the floor slab body (8) are assembled.