Photovoltaic roof TPO self-adhesive waterproof roll construction method
Through the construction method of TPO self-adhesive waterproof coil on photovoltaic roof, the problems of imperfect bonding and insufficient wind resistance of traditional metal roof waterproofing measures are solved, and efficient and closed waterproofing effect is achieved, extending the service life of the building and reducing the Maintenance cost.
Patent Information
- Application Number
- CN202410786717.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional metal roof waterproofing measures have problems such as fixing screws that are prone to rust, holes that are prone to water seepage, unstable bonding, and uneven coating thickness. Especially in sea-to-sea areas, the wind is strong all year round, resulting in insufficient wind resistance of photovoltaic roofs and short service life.
The construction method of TPO self-adhesive waterproof coil on photovoltaic roof is adopted, including base cleaning, elastic line positioning, coating adhesive, laying TPO self-adhesive coil, hot air welding of coil joints, detailed node processing and coil end processing to ensure that The firm bonding and sealing of the coil and color steel plate.
It realizes the excellent durability and wind resistance of TPO self-adhesive waterproof coil, forms a closed and self-contained waterproof layer, extends the service life of the building, reduces maintenance costs, improves building quality, and realizes energy-saving and environmental protection. Green construction.
Smart Images

Figure CN118911359A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building waterproof construction, and more specifically to a construction method of a photovoltaic roof TPO self-adhesive waterproof membrane. Background Art
[0002] Traditional metal roof waterproofing measures usually use mechanical fixing or spraying methods, which have many defects, such as easy rusting of fixing screws, easy water seepage in holes, weak bonding, uneven coating thickness and poor waterproofing performance. This is especially true in coastal areas, where winds are strong all year round. Conventional photovoltaic roofs are not wind-resistant enough, resulting in a very short service life of traditional roofs. Summary of the invention
[0003] To solve the above problems, the present invention adopts the following technical solutions.
[0004] A method for constructing a photovoltaic roof TPO self-adhesive waterproofing membrane comprises the following steps:
[0005] Step 1: Clean the base layer and mark the line;
[0006] Step 2: Apply adhesive to the base layer;
[0007] Step 3: Lay TPO self-adhesive rolls. The overlap width of the long and short sides of the rolls is ≥ 100mm. The overlap seams of the lower rolls and the seams of the two adjacent rolls are staggered. The width of the coils should be staggered by at least 500mm; the whole coil should be laid perpendicular to the crest direction of the color steel plate; the coils in the surrounding area of the roof should be laid parallel or perpendicular to the direction;
[0008] Step 4: Hot air welding of coiled material seams;
[0009] Step 5: Detailed node processing;
[0010] Step 6: Coil end processing;
[0011] Step 7: Acceptance;
[0012] Step 8: Photovoltaic panel installation.
[0013] Furthermore, in step one, the base layer is kept clean, dry, and free of debris and sharp objects, and a mop is used to clean the dust on the surface of the color steel plate; before laying large-surface rolls, reasonable layout planning is carried out according to the shape of the roof and the specifications of the color steel plate, and a baseline is set to pop up the positioning line.
[0014] Furthermore, in step 2, a base adhesive is applied on the base where the positioning line is marked and the waterproof membrane is to be laid; a special base treatment agent for TPO self-adhesive membrane is rolled on with a roller, requiring the base to be completely and evenly covered.
[0015] Furthermore, in step three, the waterproofing membrane is pre-laid before laying; when laying the waterproofing membrane, it is laid and overlapped perpendicular to the direction of the water flow on the roof, and the construction is carried out step by step according to the positioning line. After the waterproof base layer is coated with the adhesive, it is left to air for 20 minutes, and when the surface is dry, the membrane is laid;
[0016] After the end of the coil is fixed, peel off the coil isolation film, and then lay the coil self-adhesive; when laying the coil, use a pressure roller to roll and press the air from one side to the other side in the direction perpendicular to the long side of the coil to make the coil and the color steel plate firmly bonded; then pre-lay the second coil and overlap it with the first coil, ensuring that the overlap width is not less than 100mm, and carry out the flow construction work according to this step.
[0017] Furthermore, in step 4, hot air welding is performed on the overlapped and node parts of the coils.
[0018] Furthermore, in step five, detailed node processing includes gutters, downspouts, ridges, skylights, high and low joints, expansion joints, roof pipes and other locations prone to water accumulation and damage. The node parts are all manually repaired and welded with Class H homogeneous TPO, and the corners and corners are made into arcs or splayed angles.
[0019] Furthermore, in step six, the coil end is sealed by hot air welding and sealant.
[0020] Furthermore, in step seven, after the self-inspection is passed, a water test is performed after rain or 2 hours, and if there is no leakage, it is qualified.
[0021] Furthermore, in step eight, the roof photovoltaic support is fixed to the crest of the color steel plate using a vertical lock-edge clamp, and then the photovoltaic equipment is installed.
[0022] Beneficial Effects
[0023] Compared with the prior art, the advantages of the present invention are:
[0024] TPO self-adhesive waterproofing membrane has excellent durability, outstanding wind resistance, and good acid and alkali resistance. The TPO membrane self-adhesive process solves the problems of complex connection between traditional membranes and the base, loose bonding, and easy leakage without damaging the base. Hot air welding makes the overlap between membranes more tight and reliable. The TPO self-adhesive waterproofing membrane construction method is used in the metal roof system to form a closed, self-contained waterproof layer, ensuring the safety of important facilities in the building, ensuring the integrity of the building's waterproofing, reducing the cost of later maintenance of the building, improving the overall quality of the building, and extending the service life of the building, truly realizing energy conservation, environmental protection and green construction in construction projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1It is a construction flow chart of the present invention.
[0026] Figure 2 It is a construction cross-sectional view of the present invention.
[0027] Figure 3 for Figure 2 An enlarged schematic diagram of point A.
[0028] Figure 4 It is a partial schematic diagram of the present invention. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0030] As shown in the figure, the present invention discloses a construction method of a photovoltaic roof TPO self-adhesive waterproof membrane, comprising the following steps:
[0031] Step 1: Clean the base layer and mark the line;
[0032] Step 2: Apply adhesive to the base layer;
[0033] Step 3: Lay TPO self-adhesive rolls. The overlap width of the long and short sides of the rolls is ≥ 100mm. The overlap seams of the lower rolls and the seams of the two adjacent rolls are staggered. The width of the coils should be staggered by at least 500mm; the whole coil should be laid perpendicular to the crest direction of the color steel plate; the coils in the surrounding area of the roof should be laid parallel or perpendicular to the direction;
[0034] Step 4: Hot air welding of coiled material seams;
[0035] Step 5: Detailed node processing;
[0036] Step 6: Coil end processing;
[0037] Step 7: Acceptance;
[0038] Step 8: Photovoltaic panel installation.
[0039] In step one, the base should be clean, dry, free of debris and sharp objects, and the dust on the surface of the color steel plate should be cleaned with a mop. Before laying the large-surface roll material, a reasonable layout plan should be made according to the shape of the roof and the specifications of the color steel plate, and the reference line should be set to pop up the positioning line.
[0040] In step 2, apply the base adhesive on the base where the waterproofing membrane is to be laid with the positioning line. The thickness should be uniform, without exposing the bottom and without gel. Use a roller to apply the base treatment agent for TPO self-adhesive membrane. The base should be completely and evenly covered. Under normal conditions, the amount should be no less than 0.3kg / ㎡. The detailed structural parts can be painted with a paint brush.
[0041] In step 3, to ensure the wind resistance of the coil, the overlap width of the long and short sides of the coil is ≥100mm, and the thickness of the coil is 1.5mm. The overlap seam of the lower coil and the seam of the two adjacent coils should be staggered by 1 / 3 to 1 / 2 of the coil width and at least 500mm. If necessary, the joints should be properly cut; the whole coil should be laid perpendicular to the crest direction of the color steel plate; the coils in the roof periphery can be laid parallel or perpendicular.
[0042] In order to fully release the stress of the roll back, the roll should be pre-laid before laying; when laying the waterproof roll, start laying and overlapping in a direction perpendicular to the water flow of the roof, and gradually construct according to the positioning line. After the waterproof base is coated with the adhesive, let it dry for about 20 minutes, and then lay the roll when the surface is basically dry.
[0043] After the end of the coil is fixed, the isolation film of the coil is gently peeled off, and then the coil is self-adhesive and laid. When laying the coil, the worker uses a pressure roller to roll the air from one side of the long side of the coil to the other side to make the coil and the color steel plate firmly bonded. During the construction process, the bonding fit is checked, and no hollowing, wrinkling, warping, etc. should occur; then the second coil is pre-laid and overlapped with the first coil, ensuring that the overlap width is not less than 100mm, and the flow construction is carried out according to this step.
[0044] In step 4, hot air welding is used at the overlap and node parts of the coils. There are two types of hot air welding: automatic welding and manual welding. Automatic welding uses a semi-automatic temperature-controlled hot melt welding machine, which is mainly used for welding the overlap of two adjacent coils; the welding width is ≥40mm, and the effective welding width is ≥25mm; manual welding uses a handheld welding gun, which is mainly used for welding coils with detailed processing.
[0045] After welding, check whether there are leaks or skipped welds in the welds. There should be molten slurry extruded from the edge of each weld. When there are doubts about the welds or when spot checking the welds, a peeling test can be used. Cut a 3cm wide incision perpendicular to the weld on the TPO coil, tear off the coil at the cut part, and check whether the welding quality is qualified. The joints of the coils laid on the same day should be welded before leaving get off work every day to avoid rain and moisture.
[0046] In step five, detailed node processing includes: gutters, downspouts, ridges, skylights, high and low joints, expansion joints, roof pipes and other locations prone to water accumulation and damage. The node parts are all manually welded with Class H homogeneous TPO. The corners and turning points should be made into arcs or splayed angles to ensure the rigor of the detailed node processing.
[0047] In step six, the coil ends are sealed by hot air welding and sealant.
[0048] In step seven, after the self-inspection is passed, the supervisor and the owner will be organized to conduct a water spray test after rain or 2 hours. It is qualified if there is no leakage.
[0049] In step eight, to ensure the integrity of the waterproof layer 4 of the roof 1, the photovoltaic components are installed without welding, punching or nailing, which will not damage the roof or cause waterproofing problems. This ensures that the photovoltaic construction does not affect the performance of the TPO self-adhesive waterproof membrane. The roof photovoltaic support 2 is fixed to the crest of the color steel plate with an upright lock-edge clamp 3, and then the photovoltaic track, photovoltaic panels and other equipment are installed.
[0050] The present invention was successfully applied in the Ninggang scrap steel intelligent processing and distribution center project. Through this method, waterproof integration and photovoltaic equipment were realized to form a tight whole, which provided a guarantee for the installation and operation of the roof photovoltaic system. In addition, this construction method has fast construction speed, high work efficiency, good waterproof effect and short construction period, which effectively improves the overall aesthetics of the building and has been unanimously praised by the owners.
[0051] This TPO self-adhesive waterproof construction method is suitable for general new, rebuilt and continued metal roof waterproofing projects with common requirements. It is economical, safe, environmentally friendly, pollution-free, and significantly improves the waterproofing quality of metal roofs. It has very strong plasticity and can meet the installation requirements of other components such as photovoltaics.
[0052] The above is only a preferred specific implementation of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and its improved conception within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for constructing a photovoltaic roof TPO self-adhesive waterproofing membrane, characterized in that: The following steps are involved: Step 1: Clean the base layer and mark the line; Step 2: Apply adhesive to the base layer; Step 3: Lay TPO self-adhesive rolls. The overlap width of the long and short sides of the rolls is ≥ 100mm. The overlap seams of the lower rolls and the seams of the two adjacent rolls are staggered. The width of the coils should be at least 500mm apart; the whole coil should be laid perpendicular to the crest direction of the color steel plate; the coils in the surrounding area of the roof should be laid parallel or perpendicular to the direction; Step 4: Hot air welding of coiled material seams; Step 5: Detailed node processing; Step 6: Coil end processing; Step 7: Acceptance; Step 8: Photovoltaic panel installation.
2. A photovoltaic roof TPO self-adhesive waterproofing membrane construction method according to claim 1, characterized in that: In step one, the base layer should be kept clean, dry, and free of debris and sharp objects. Use a mop to clean the dust on the surface of the color steel plate. Before laying large-area roll materials, reasonable layout planning should be carried out according to the shape of the roof and the specifications of the color steel plate, and the baseline and positioning line should be set.
3. A photovoltaic roof TPO self-adhesive waterproof membrane construction method according to claim 1, characterized in that: In step 2, apply the base adhesive on the base where the waterproof membrane is to be laid with the positioning line marked; use a roller to roll on the special base treatment agent for TPO self-adhesive membrane, requiring the base to be completely and evenly covered.
4. A photovoltaic roof TPO self-adhesive waterproof membrane construction method according to claim 1, characterized in that: In step three, the waterproofing membrane is pre-laid before laying; when laying the waterproofing membrane, start laying and overlapping in a direction perpendicular to the water flow direction of the roof, and gradually construct according to the positioning line. After the waterproof base is coated with the adhesive, let it dry for 20 minutes, and when the surface is dry, lay the membrane; After the end of the coil is fixed, peel off the coil isolation film, and then lay the coil self-adhesive; when laying the coil, use a pressure roller to roll and press the air from one side to the other side in the direction perpendicular to the long side of the coil to make the coil and the color steel plate firmly bonded; then pre-lay the second coil and overlap it with the first coil, ensuring that the overlap width is not less than 100mm, and carry out the flow construction work according to this step.
5. A photovoltaic roof TPO self-adhesive waterproof membrane construction method according to claim 1, characterized in that: In step 4, hot air welding is used at the overlap and node locations of the coils.
6. A photovoltaic roof TPO self-adhesive waterproofing membrane construction method according to claim 1, characterized in that: In step five, detailed node processing includes gutters, downspouts, ridges, skylights, high and low joints, expansion joints, roof pipes and other locations prone to water accumulation and damage. The node parts are manually repaired and welded with Class H homogeneous TPO, and the corners and corners are made into arcs or splayed angles.
7. A photovoltaic roof TPO self-adhesive waterproofing membrane construction method according to claim 1, characterized in that: In step six, the coil ends are sealed by hot air welding and sealant.
8. A photovoltaic roof TPO self-adhesive waterproofing membrane construction method according to claim 1, characterized in that: In step seven, after the self-inspection is passed, a water test is conducted after rain or 2 hours, and if there is no leakage, it is qualified.
9. A photovoltaic roof TPO self-adhesive waterproofing membrane construction method according to claim 1, characterized in that: In step eight, the roof photovoltaic support is fixed to the crest of the color steel plate using an upright lock-edge clamp, and then the photovoltaic equipment is installed.
Citation Information
Patent Citations
Passive building flat roof heat preservation and water prevention system and partitioned dry operation construction method
CN109779162A
House roof waterproof construction technology based on waterproof rolls
CN109944399A
Waterproof structure and method for maintaining metal roof with photovoltaic clamp
CN115354805A
Waterproof construction method for changing metal roof into flexible coiled material
CN115749162A
Construction method for repairing of panel roof using TPO sheet
KR102446592B1