Large-area terrace anti-cracking construction device and construction method

Through the combination of the partition formwork and positioning mechanism, the construction process of large-area floors is simplified, the problems of cumbersome construction and long cycle in the existing technology are solved, and the goals of efficient crack resistance and cost reduction are achieved.

CN118911377APending Publication Date: 2024-11-08CHINA MCC17 GRP CO LTD

Patent Information

Application Number
CN202411151648.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-08

Smart Images

  • Figure CN118911377A_ABST
    Figure CN118911377A_ABST
Patent Text Reader

Abstract

The invention discloses a large-area terrace anti-cracking construction device and method, and belongs to the technical field of building construction. According to the method, the to-be-poured area is subjected to bin division through the bin division formwork, and then overall pouring is conducted; after the to-be-poured concrete reaches a certain strength, the bin dividing formworks are taken out, the terrace joints can be formed, secondary joint cutting of the terrace is not needed, the construction difficulty is lowered, the construction period is shortened, and the anti-cracking effect of the terrace is improved. Meanwhile, the bin dividing formwork is clamped and limited through the positioning mechanism, and the bin dividing formwork can be effectively prevented from deviating in the concrete pouring and vibrating process; after all the sub-warehouse formworks are assembled, a string can be used for pulling a straight line, and the position of the clamping plate is adjusted through the second adjusting rod, so that the sub-warehouse formworks are kept on the same straight line, and the straightness of the poured terrace seam can be guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and more specifically, relates to a large-area floor anti-cracking construction device and a construction method. Background Art

[0002] A common problem after the construction of large-surface floor structures is cracks that affect their use. Floor cracks refer to cracks produced by the concrete of the floor structure. Common cracks during construction are divided into cracks produced by the structure itself and cracks caused by external factors. Nowadays, there are relatively mature construction experience in the prevention of cracks in large-area cast-in-place concrete structure floors, such as optimizing the concrete mix design, adopting the "skip bin method" to pour in different bins, choosing a reasonable pouring time, and using temperature-controlled concrete.

[0003] The so-called skip-bin method is to divide large-volume concrete into blocks using the theory of "resistance" and "release". The blocks in the first stage of skip-bin pouring are given time to release stress. The remaining blocks are poured in the later stage to use the concrete properties to resist smaller temperature shrinkage stress, so as to achieve the effect of controlling stress and reducing cracking. For example, the patent CN118110344A discloses a large-volume concrete skip-bin construction method. Although the skip-bin method can achieve a certain anti-cracking effect, during the construction process, it is necessary to plan the route in advance, support the formwork for pouring concrete and dismantle the formwork. The construction period is long and requires a large number of personnel and materials. At the same time, due to the insufficient compaction of the foundation backfill, the quality of the concrete raw materials and the construction process, the anti-cracking effect of the floor is often not obvious.

[0004] For another example, in the patent CN115653240A, a large-area super-wear-resistant concrete floor construction method is disclosed. Although this application can further improve the anti-cracking effect of the floor, the overall construction still adopts the skipping method, and its construction operation is relatively cumbersome, and the disadvantages of a long construction period have not been effectively solved. Therefore, it is of great significance to provide a construction method that is simple to construct, has a short period of time, and has a good anti-cracking effect for large-area floors. Summary of the invention

[0005] 1. Problems to be solved

[0006] In view of the problem that the construction operation of large-area floor in the prior art is relatively cumbersome and the construction period is long, the present invention provides a large-area floor anti-cracking construction device and construction method, which can first be divided into compartments through compartment templates, and then poured as a whole, and finally the compartment templates are taken out to form floor joints; it can not only effectively improve the anti-cracking effect of the floor, but also greatly reduce the construction difficulty and construction time; in addition, the compartment templates can be recycled, which is conducive to reducing construction costs.

[0007] 2. Technical solution

[0008] In order to solve the above problems, the technical solution adopted by the present invention is as follows:

[0009] A large-area floor anti-cracking construction device of the present invention comprises compartment templates continuously distributed along the direction of the concrete floor seam to be constructed, wherein the plurality of compartment templates divide the area to be poured into a plurality of independent cells;

[0010] and positioning mechanisms spaced apart along the extension direction of the floor seam, the positioning mechanisms being used to clamp and limit the compartment templates;

[0011] The positioning mechanism includes a height component and a clamping component arranged on the height component; wherein the height component includes a height plate and a first adjusting rod vertically arranged on the height plate, and the first adjusting rod is used to adjust the height of the height plate in the vertical direction;

[0012] The clamping assembly includes a pair of positioning plates relatively arranged on the elevation plate, the positioning plates are connected to a second adjusting rod arranged transversely, the end of the second adjusting rod extends to a clamping plate connected between the two positioning plates; an accommodating space for placing the compartment template is formed between the two clamping plates, and the second adjusting rod can drive the clamping plate to move to change the distance between the two clamping plates.

[0013] Furthermore, a plurality of slots are provided at the bottom of the compartment template along its length direction, and force transmission rods are provided in the slots and are cross-distributed with the compartment template, and both ends of the force transmission rods extend into two adjacent cells respectively.

[0014] Furthermore, the height of the compartment template is greater than the height of the clamping plate, and a positioning mechanism is provided at least at the connection between two adjacent compartment templates located on the same straight line.

[0015] Furthermore, the first adjusting rod and the second adjusting rod are both threaded rods, and the elevation plate and the positioning plate are both provided with mounting holes for the corresponding threaded rods to pass through; and each threaded rod is equipped with two adjusting nuts.

[0016] Furthermore, a lifting handle is provided on the top of the compartment template, which is used to remove the compartment template from the positioning mechanism after pouring is completed.

[0017] Furthermore, the length of the compartment template is 500-2000mm, the height is 250-300mm, and the thickness is 2-5mm.

[0018] A large-area floor anti-cracking construction method of the present invention comprises the following steps:

[0019] Measurement and setting out: Determine the location and size of the floor joint compartments according to the construction drawings; use thin ropes to position and set out the vertical and horizontal floor joints on the graded gravel layer on site to form horizontal and vertical staggered floor joint positioning lines in the belt casting area;

[0020] Installation of positioning mechanism: Positioning mechanisms are provided at intervals along the positioning line;

[0021] Installation of compartment formwork: insert the compartment formwork into the positioning mechanism and ensure that the ends of two adjacent compartment formworks located in the same straight line are aligned with each other, so as to divide the casting area into multiple independent cells along the distribution direction of the positioning line;

[0022] Tie the steel bars: install the force transmission tie rod in the notch of the compartment formwork, and connect the two ends of the force transmission tie rod to the steel bars in the corresponding cells respectively;

[0023] Pouring: The concrete floor to be constructed is poured as a whole, and the pouring height is flush with the top of the compartment formwork;

[0024] Floor joint construction: After the floor concrete reaches a certain strength, take out the compartment formwork to form the floor joint, and clean, polish and modify the floor joint.

[0025] Furthermore, the specific steps of installing the positioning mechanism are:

[0026] Along the direction of the positioning line, the elevation components are arranged at certain intervals, and the elevation components are fixed in the graded gravel layer through the first adjusting rod; at the same time, the height of the elevation plate is adjusted through the first adjusting rod to keep it consistent with the bottom elevation of the floor structure plate.

[0027] Furthermore, after all the compartment templates are assembled, a thin rope can be used to pull a straight line, and the position of the clamping plate can be adjusted using the second adjustment rod, so that the compartment templates remain on the same straight line.

[0028] Furthermore, in order to facilitate the removal operation of the compartment template, the compartment template needs to be coated with a release agent before installation.

[0029] 3. Beneficial effects

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] (1) The present invention provides a large-area floor anti-cracking construction device, which is divided into compartments by compartment templates and then poured as a whole, which is beneficial to reducing the construction difficulty and construction period, and is also beneficial to ensuring the construction quality; after the poured concrete reaches a certain strength, the compartment templates are taken out to form floor joints, which is beneficial to improving the anti-cracking effect of the floor.

[0032] (2) The large-area floor anti-cracking construction device of the present invention can effectively prevent the compartment formwork from shifting during the concrete pouring and vibration process by clamping and limiting the compartment formwork through a positioning mechanism, thereby ensuring the straightness of the final floor joint; at the same time, through the interval setting of the positioning mechanism and the recyclable use of the compartment formwork, the loss of the formwork is reduced, achieving the purpose of cost reduction, efficiency improvement and green construction.

[0033] (3) The present invention provides a large-area floor anti-cracking construction method, which utilizes a compartment template to divide the area to be poured into multiple independent cells, and then integrally pours the multiple cells after the compartments. Compared with the interval construction of the skip-compartment method, it not only simplifies the construction steps and reduces the construction period; it is also beneficial to ensure the flatness and anti-cracking performance of the large-area floor.

[0034] (4) The present invention provides a large-area floor anti-cracking construction method. Before pouring, the height of the elevation plate is adjusted by a first adjusting rod to keep it consistent with the bottom elevation of the floor structure plate, thereby providing a stable and precise installation platform for the compartment template to facilitate the positioning operation of the compartment template. At the same time, the thickness of the compartment template is consistent with the width of the floor seam, and the height of the compartment template is consistent with the thickness of the floor. After the concrete is poured until it is flush with the top of the compartment template, the pouring operation can be completed, making the entire construction more convenient and quick.

[0035] (5) According to the large-area floor anti-cracking construction method of the present invention, after all the compartment formworks are assembled, a thin rope can be used to pull a straight line, and the position of the clamping plate can be adjusted using a second adjustment rod so that the compartment formworks remain on the same straight line, which is beneficial to ensuring the straightness of the floor joints after pouring. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a structural schematic diagram of a large-area floor anti-cracking construction device of the present invention;

[0037] Figure 2 It is a structural schematic diagram of the positioning mechanism in the present invention;

[0038] Figure 3 A top view of the positioning mechanism of the present invention;

[0039] Figure 4 It is a structural schematic diagram of the compartment template in the present invention;

[0040] Figure 5 It is a schematic diagram of the assembly between the compartment template and the positioning mechanism located on the same floor line in the present invention;

[0041] Figure 6 It is a schematic diagram of the distribution of a large-area floor anti-cracking construction device in the construction area of ​​the present invention;

[0042] Figure 7 The present invention is a construction flow chart of a large-area floor anti-cracking construction method.

[0043] In the figure: 1. compartment template; 11. notch; 12. lifting handle;

[0044] 2. Positioning mechanism; 21. Elevation plate; 22. First adjusting rod; 23. Positioning plate; 24. Second adjusting rod; 25. Clamp; 26. Adjusting nut;

[0045] 3. Force transmission tie rod; 4. Graded gravel layer. DETAILED DESCRIPTION

[0046] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with the accompanying drawings.

[0047] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0048] The present invention is further described below in conjunction with specific embodiments.

[0049] like Figure 1 , Figure 6 As shown, a large-area floor anti-cracking construction device of this embodiment includes a compartment template 1 and a positioning mechanism 2. Among them, the compartment templates 1 are continuously distributed along the direction of the concrete floor joints to be constructed, and the floor joints are overall in a criss-cross tic-tac-toe structure, and the floor joints located on the same straight line are continuously provided with compartment templates 1. In other words, multiple compartment templates 1 distributed in a criss-cross manner divide the area to be poured into multiple independent cells.

[0050] The positioning mechanism 2 is used to provide a stable installation foundation for the compartment template 1 and to limit the compartment template 1 to ensure its stability during the construction process. The distribution of the positioning mechanism 2 is roughly the same as that of the compartment template 1, and both are distributed along the direction of the concrete floor seam to be constructed. The difference is that the positioning mechanism 2 is distributed at intervals rather than continuously.

[0051] The above continuous distribution means that the ends of two adjacent compartment templates 1 located on the same straight line are aligned and close to each other. The interval distribution means that there is a certain distance between two adjacent positioning mechanisms 2 located on the same straight line, and the distance can be confirmed according to the actual situation. However, it should be noted that the distance should not be greater than the length of a single compartment template 1.

[0052] refer to Figure 2 , Figure 3 As shown, the positioning mechanism 2 includes an elevation component and a clamping component. The elevation component serves as the installation base of the clamping component and provides a positioning base for the compartment template 1; the clamping component is arranged on the elevation component to clamp and limit the compartment template 1 to ensure its stability during the construction process. It should be noted that the clamping described here is actually a clearance fit to facilitate the compartment template 1 to be released from the clamping state later.

[0053] The elevation assembly includes an elevation plate 21 and a first adjusting rod 22 vertically arranged on the elevation plate 21 . The first adjusting rod 22 is used to adjust the height of the elevation plate 21 in the vertical direction to change the installation height of the compartment template 1 .

[0054] Specifically, the first adjustment rod 22 is preferably a threaded rod. The elevation plate 21 is a thin plate structure placed horizontally as a whole, and mounting holes for the threaded rods to pass through are provided at its four corners. The first adjustment rod 22 is fixed on the graded crushed stone layer 4 of the construction area after passing through the corresponding mounting holes. At the same time, the first adjustment rod 22 is also equipped with two adjustment nuts 26, which are respectively located on the upper and lower sides of the elevation plate 21, and are used to lock and loosen the first adjustment rod 22, so as to facilitate the adjustment of the position of the elevation plate 21.

[0055] The clamping assembly includes a pair of positioning plates 23 relatively arranged on the elevation plate 21, and the positioning plates 23 are connected to a second adjustment rod 24 arranged in a transverse direction, and the end of the second adjustment rod 24 extends between the two positioning plates 23 and is connected to a clamping plate 25. An accommodating space for placing the compartment template 1 is formed between the two clamping plates 25, and the second adjustment rod 24 can drive the clamping plates 25 to move, so as to change the spacing between the two clamping plates 25 according to the actual thickness of the clamping plates 25, so as to be suitable for the assembly requirements of clamping plates 25 with different thicknesses.

[0056] Preferably, the second adjustment rod 24 is a threaded rod, the positioning plate 23 and the clamping plate 25 are both thin plates placed vertically, and the overall height of the clamping plate 25 is greater than the height of the positioning plate 23. The positioning plate 23 is provided with a mounting hole for the threaded rod to pass through, and the end of the second adjustment rod 24 passes through the corresponding mounting hole and is connected to the clamping plate 25. At the same time, the threaded rod is also equipped with two adjustment nuts 26, which are respectively located on both sides of the positioning plate 23 and are used to lock and loosen the threaded rod to facilitate the adjustment of the position of the clamping plate 25.

[0057] It should be noted that, in this embodiment, although the first adjusting rod 22 and the second adjusting rod 24 both adopt the structure of a screw and a nut, they can also be other existing structures that can elevate the plate 21 and drive the clamping plate 25 to move, which are not listed one by one here.

[0058] refer to Figure 4 As shown, the bottom of the compartment template 1 is provided with a plurality of notches 11 along its length direction, and the notches 11 are provided with force transmission tie rods 3 which are cross-distributed with the compartment template 1, and are preferably distributed perpendicularly to each other. The two ends of the force transmission tie rod 3 extend to two adjacent cells respectively. After the pouring is completed, the force transmission tie rod 3 is left in the pouring structure, which can increase the stress transfer between adjacent concrete blocks, prevent uneven settlement caused by large local force on the concrete floor, and make the adjacent concrete blocks bear force together, which is conducive to ensuring the overall quality of the concrete floor.

[0059] In addition, in order to facilitate the removal of the compartment template 1 after pouring, a lifting handle 12 is provided on the top of the compartment template 1. At the same time, in order to further reduce the difficulty of splicing adjacent compartment templates 1, in this embodiment, the height of the compartment template 1 is greater than the height of the clamping plate 25, and at least one positioning mechanism 2 is provided at the connection between two adjacent compartment templates 1 located on the same straight line. Such a design can not only ensure the stability of the splicing on the basis of as few positioning mechanisms 2 as possible, but also help to ensure the straightness between the compartment templates 1 after splicing.

[0060] refer to Figure 7 As shown, this embodiment also provides a large-area floor anti-cracking construction method, which includes the following steps:

[0061] Step 1: Processing and manufacturing of compartment template 1 and positioning mechanism 2

[0062] The compartment template 1 is made of thin steel plate. The height of the compartment template 1 is consistent with the thickness of the floor, which is generally 250-300 mm. The thickness of the compartment template 1 is the same as the width of the floor seam, which is generally 2-5 mm. The length of the compartment template 1 can be configured to be 500-2000 mm according to needs, for example, 500 mm, 1000 mm, 1500 mm, 2000 mm, etc. The upper part of the compartment template 1 is welded with a threaded steel or round steel with a diameter of about 6 mm as a lifting handle 12. The middle and lower parts of the compartment template 1 are provided with notches 11. The width of the notches 11 needs to meet the installation requirements of the force transmission tie rod 3, and at the same time facilitate the separation between the two in the later stage.

[0063] The elevation plate 21 of the elevation assembly is made of thin steel plate, and the size can be set to 200x100x3 mm. The diameter of the four mounting holes at the corners of the elevation plate 21 can be set to 15 mm. The positioning plate 23 is made of 50x50x5mm steel plate, and a 10mm diameter mounting hole is reserved in the middle. At the same time, the positioning plate 23 is welded and fixed to the elevation plate 21. The four first adjustment rods 22 matched with the elevation plate 21 are made of 10mm diameter threaded rods, and four matching adjustment nuts 26 are selected for the threaded rods.

[0064] The clamping plate 25 is made by cutting a thin steel plate, and the specification size can be set to 80x80x5 mm. The second adjusting rod 24 is made by processing a threaded rod with a diameter of 10 mm and welded to the clamping plate 25; at the same time, the threaded rod is selected with two matching adjusting nuts 26.

[0065] Step 2: Measure and lay out

[0066] According to the construction drawings, the size of the floor joint compartment is generally 6x6 meters or other suitable sizes are selected. On the graded gravel layer 4, a thin rope is used to measure and locate the longitudinal and transverse floor joint positioning lines.

[0067] Step 3: Elevation component installation

[0068] Taking the floor seam positioning line as the center line, set the elevation components at a certain interval, measure and locate the positions of the four mounting holes at the corners of each elevation plate 21, align with the positions of the mounting holes, and drive the four first adjustment rods 22 into the graded gravel layer 4; install the elevation plate 21, use the elevation measuring equipment, and adjust the elevation plate 21 to be consistent with the bottom elevation of the floor structure plate by rotating the adjusting nut 26 up and down, so as to provide an installation interface for the compartment formwork 1, so that the assembly construction of the compartment formwork 1 can be realized quickly and accurately, which is also conducive to improving construction efficiency.

[0069] Step 4: Clamping assembly installation

[0070] Insert the second adjusting rods 24 on both sides of the compartment template 1 into the mounting holes of the positioning plate 23, take the floor seam positioning line as the center line, reserve a certain distance between the two clamping plates 25, and the distance meets the installation requirements of the compartment template 1, and then fix the adjusting nuts 26.

[0071] Step 5: Install the warehouse template 1

[0072] Insert the compartment template 1 in the reserved spacing of the plywood 25 to divide the large area of ​​the floor into independent partition cells in a tic-tac-toe grid pattern; it should be noted that before the compartment template 1 is installed, a release agent can be applied to facilitate the rapid extraction of the compartment template 1 to form a floor seam later;

[0073] Step 6: Adjust the straightness of the compartment template 1

[0074] After the installation of the longitudinal and transverse compartment formwork 1 is completed, a thin rope is used to pull a straight line, and the position of the clamping plate 25 is adjusted by utilizing the mobility of the adjusting nut 26 to keep the compartment formwork 1 on the same straight line. The positioning plate 23 is then spot welded for reinforcement to prevent the compartment formwork 1 from shifting during the concrete pouring and vibration process, thereby ensuring the straightness and aesthetics of the floor joint.

[0075] Step 7: Tie steel bars to the compartment unit panels

[0076] Reinforcement is tied in each independent compartment cell, force transmission tie rod 3 is installed in the notch 11 of the compartment template 1, and both ends of the force transmission tie rod 3 are respectively welded and fixed to the reinforcement in the corresponding cell.

[0077] Step 8: Integral cast-in-place construction

[0078] Multiple cells are combined to construct and maintain a large area of ​​cast-in-place concrete and diamond abrasive surface layer at one time.

[0079] Step 9: Floor joint construction

[0080] After the floor concrete reaches a certain strength, the compartment template 1 is extracted to form a floor joint; a small handheld grinding wheel saw is used to clean, grind and modify the floor joint.

[0081] A large-area floor anti-cracking construction method of the present embodiment adopts a recyclable compartment template 1 to divide the large-area floor into independent cells, which can reduce the impact of floor cracking caused by concrete shrinkage temperature stress, improve the floor crack resistance, and ensure the construction quality. At the same time, multiple cells are cast as a whole, avoiding the drawbacks of the skip-compartment method such as planning the compartment route in advance, supporting the formwork to cast concrete, and disassembling the formwork, thereby improving construction efficiency and saving costs. In addition, after the compartment template 1 is taken out, a floor seam can be directly formed without the need for secondary floor seam cutting, thus avoiding manual and mechanical seam cutting operations.

[0082] The present invention and its embodiments are described schematically above, and the description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. Therefore, if a person skilled in the art is inspired by it and designs a structural method and an embodiment similar to the technical solution without creativity without departing from the purpose of the invention, they shall all fall within the protection scope of the present invention.

Claims

1. A large-area floor anti-cracking construction device, characterized in that: It comprises compartment templates (1) continuously distributed along the direction of the concrete floor joint to be constructed, and the plurality of compartment templates (1) divide the area to be poured into a plurality of independent cells; and positioning mechanisms (2) spaced apart along the extension direction of the floor seam, the positioning mechanisms (2) being used to clamp and limit the compartment template (1); The positioning mechanism (2) comprises a leveling component and a clamping component arranged on the leveling component; wherein the leveling component comprises a leveling plate (21) and a first adjusting rod (22) arranged vertically on the leveling plate (21), and the first adjusting rod (22) is used to adjust the height of the leveling plate (21) in the vertical direction; The clamping assembly comprises a pair of positioning plates (23) arranged relatively on the elevation plate (21), the positioning plates (23) being connected to a second adjusting rod (24) arranged transversely, the end of the second adjusting rod (24) extending to a clamping plate (25) connected between the two positioning plates (23); a receiving space for placing the compartment template (1) is formed between the two clamping plates (25), and the second adjusting rod (24) can drive the clamping plate (25) to move so as to change the distance between the two clamping plates (25).

2. A large-area floor anti-cracking construction device according to claim 1, characterized in that: The bottom of the compartment template (1) is provided with a plurality of notches (11) along its length direction, and force transmission tie rods (3) are arranged in the notches (11) and are distributed crosswise with the compartment template (1), and the two ends of the force transmission tie rods (3) respectively extend into two adjacent cells.

3. A large-area floor anti-cracking construction device according to claim 1 or 2, characterized in that: The height of the compartment template (1) is greater than the height of the clamping plate (25), and a positioning mechanism (2) is provided at least at the connection point of two adjacent compartment templates (1) located on the same straight line.

4. A large-area floor anti-cracking construction device according to claim 1, characterized in that: The first adjustment rod (22) and the second adjustment rod (24) are both threaded rods, and the elevation plate (21) and the positioning plate (23) are both provided with mounting holes for the corresponding threaded rods to pass through; and each threaded rod is equipped with two adjustment nuts (26).

5. A large-area floor anti-cracking construction device according to claim 2, characterized in that: A lifting handle (12) is provided on the top of the compartment template (1) for taking the compartment template (1) out of the positioning mechanism (2) after pouring is completed.

6. A large-area floor anti-cracking construction device according to claim 3, characterized in that: The compartment template (1) has a length of 500-2000 mm, a height of 250-300 mm, and a thickness of 2-5 mm.

7. A construction method for a large-area floor anti-cracking construction device as claimed in any one of claims 1 to 6, characterized in that: The following steps are included: Measurement and setting out: Determine the location and size of the floor joint compartments according to the construction drawings; Use a thin rope to position and set out the vertical and horizontal floor joints on the graded crushed stone layer (4) on site, so as to form horizontal and vertical staggered floor joint positioning lines in the belt casting area; Installation of the positioning mechanism (2): The positioning mechanism (2) is arranged at intervals along the positioning line; Installation of the compartment template (1): insert the compartment template (1) into the positioning mechanism (2), and ensure that the ends of two adjacent compartment templates (1) located in the same straight line are aligned with each other, so as to divide the casting area into multiple independent cells along the distribution direction of the positioning line; Tie the steel bars: install the force transmission tie rod (3) in the notch (11) of the compartment template (1), and connect the two ends of the force transmission tie rod (3) to the steel bars in the corresponding cells respectively; Pouring: The concrete floor to be constructed is poured as a whole, and the pouring height is flush with the top of the compartment formwork (1); Floor joint construction: After the floor concrete reaches a certain strength, take out the compartment template (1) to form the floor joint, and then clean, polish and modify the floor joint.

8. A large-area floor anti-cracking construction method according to claim 7, characterized in that: The specific steps of installing the positioning mechanism (2) are: Along the direction of the positioning line, the elevation components are arranged at certain intervals, and the elevation components are fixed in the graded gravel layer (4) through a first adjustment rod (22); at the same time, the height of the elevation plate (21) is adjusted through the first adjustment rod (22) to keep it consistent with the bottom elevation of the floor structure plate.

9. A large-area floor anti-cracking construction method according to claim 8, characterized in that: After all the compartment templates (1) are assembled, a thin rope can be used to draw a straight line, and the position of the clamping plate (25) can be adjusted using the second adjustment rod (24), so that the compartment templates (1) remain on the same straight line.

10. A large-area floor anti-cracking construction method according to claim 7, characterized in that: In order to facilitate the removal operation of the compartment template (1), the compartment template (1) needs to be coated with a release agent before installation.

Citation Information

Patent Citations

  • Height adjustable type super flat floor divided seam protective formwork system

    CN101265749A

  • Side form supporting system for terrace construction

    CN105735625A

  • Large-are floor construction method

    CN106088530A

  • Large-area super-finishing concrete terrace flatness control device and construction method

    CN113235887A

  • Adjustable template device for floor concrete construction

    CN117759009A

Cited By

  • Ground concrete construction method

    CN119877849A

  • Intelligent construction equipment and method for large-area terrace

    CN120465670A