Tunnel spatial arrangement for large-pipe-diameter heat supply engineering

By using a mountain tunnel to arrange thermal pipelines in the long-distance heating project, combined with maintenance and installation channels and bracket systems, the problem of difficult construction in traditional methods under complex terrain is solved, the reliability and maintenance convenience of the pipeline are achieved, and the Project investment and land acquisition costs.

CN118911702APending Publication Date: 2024-11-08CHINA AVIATION PLANNING AND DESIGN INSTITUTE (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411022461.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In long-term heating projects, the traditional direct buried laying method is difficult to construct and long construction periods due to the long heating distance, large pipe diameters, and many crossing nodes, and cannot be laid under complex terrain. The traditional method is difficult to meet Reliability and maintenance requirements of heating pipes.

Method used

Thermal pipelines are arranged in mountain tunnels, and maintenance and installation channels and bracket systems are set, including fixed and non-fixed brackets, corrugated compensators, return water and water supply pipelines are arranged in layers. The tunnel structure with backward arches and non-backward arches is used to reduce pipe penetration. Crossing, providing convenient access to maintenance and maintenance facilities.

Benefits of technology

It reduces project investment, reduces the difficulty of laying under complex terrain, improves the reliability and maintenance convenience of pipelines, avoids land acquisition and demolition costs, and achieves economical and reasonable tunnel space layout and pipeline installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911702A_ABST
    Figure CN118911702A_ABST
Patent Text Reader

Abstract

The invention provides a tunnel space arrangement for large-pipe-diameter heat supply engineering, which is characterized in that the range from the inner wall of one side of a tunnel to the interior of the tunnel is at least 2.5 meters wide, the range from the vault of the tunnel to the lower part of at least 4 meters high is defined as a maintenance mounting channel, and a heat distribution pipeline is mounted at the distance of at least 600 mm from the inner wall of the other side of the tunnel to the interior of the tunnel; an overhaul road is built at the lowest point of the height of the range defined by the overhaul installation channel, and an illuminator and a fan are installed in the height space 2 meters below the arch crown of the cross section of the tunnel. By digging the tunnel of the large-pipe-diameter heat supply project, pipeline crossing in complex terrains can be reduced, the cost of land acquisition, demolition and the like is avoided, and the project investment is reduced through reasonable internal space arrangement of the tunnel. The method has the advantages of low investment, quick effect and easiness in later maintenance and repair.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground engineering, and in particular to a tunnel space arrangement for a large-diameter heating project. Background Art

[0002] With the implementation of energy conservation and emission reduction policies, local governments at all levels have accelerated the pace of dismantling small boilers with high energy consumption, high pollution and low efficiency. The waste heat utilization project of power plants will become the main heat source for centralized heating in my country in the future because of its characteristics of saving fuel and reducing environmental pollution. This type of long-distance heating project has the characteristics of long heating distance, large pipeline diameter and many crossing nodes. The mountain tunnel for heating needs to consider the layout of the supply and return water pipelines of the heating pipeline and the needs of tunnel maintenance and passage. The pipeline layout needs to consider the overall force structure of the tunnel and the stress requirements of the pipeline itself. The tunnel layout needs to comprehensively consider factors such as linear indicators, environmental protection and project cost.

[0003] The heat source of long-distance heating projects is often located in suburbs or remote areas. The pipeline needs to be transported to the urban area over a long distance (at least 20km). The excavation for laying pipelines is limited, and the construction of tunnels through roads, rivers, and mountains is difficult and takes a long time. It is impossible to lay pipelines in complex terrain, and mountain tunnels provide a convenient way to lay pipelines. The mountain tunnels used for heating pipelines reduce the length of the heating pipelines, ensure the reliability of the heating pipelines, and provide a single-side maintenance channel for easy operation and maintenance. Compared with traditional direct burial laying, although the investment has increased, overhead laying provides convenience for pipeline inspection and operation and maintenance.

[0004] The determination of the clear section of a mountain tunnel must take into account the requirements of the tunnel construction limits, the installation and operation space of the heating pipeline, as well as factors such as the space occupied by the tunnel ventilation, lighting, and operation and management facilities and the necessary margins. At the same time, the stress characteristics of the lining structure, the project cost and other factors must be analyzed and compared to ensure that the adopted clear section meets the functional requirements, is evenly stressed, and is economically reasonable. Summary of the invention

[0005] In order to overcome the problems existing in the prior art, the present invention provides a tunnel space arrangement for a large-diameter heating project.

[0006] A tunnel space layout for a large-diameter heating project, wherein a range of at least 2.5 meters wide from the inner wall of one side of the tunnel into the tunnel and at least 4 meters high from the tunnel arch is defined as a maintenance and installation channel, a thermal pipeline is installed at a distance of at least 600 mm from the inner wall of the other side of the tunnel into the tunnel, a maintenance road is built at the lowest point in the defined range of the maintenance and installation channel, and lighting and fans are installed in a space 2 meters high from the tunnel cross-section arch.

[0007] Furthermore, the tunnel section width ranges from 7.3 to 10.3 meters, and the height ranges from 7.7 to 10.7 meters.

[0008] Furthermore, the tunnel includes a tunnel with an inverted arch section and a tunnel without an inverted arch section.

[0009] Furthermore, the diameters of the thermal pipes are DN1600, DN1400, and DN1200.

[0010] Furthermore, fixed brackets are arranged at both ends of the tunnel for the thermal pipeline, and a plurality of non-fixed brackets are evenly spaced between the two fixed brackets. Corrugated compensators are arranged on the thermal pipelines at both ends of the fixed brackets.

[0011] Furthermore, the one of the multiple non-fixed brackets closest to the fixed bracket is a first guide bracket, and the non-fixed bracket at a certain distance from the first guide bracket is a second guide bracket.

[0012] Furthermore, the distance between the first guide bracket and the corrugated compensator is 4 times the nominal diameter of the pipeline, and the distance between the first guide bracket and the second guide bracket is 14 times the nominal diameter of the pipeline.

[0013] Furthermore, within the cross section of the tunnel, in the space outside the maintenance and installation channel, piers are built downward at the same elevation as the road surface of the maintenance road, and steel supports are arranged on the piers. The thermal pipeline includes a return pipe and a water supply pipe. The water supply pipe is arranged in the lower space of the tunnel, and the return pipe is arranged in the upper space of the water supply pipe. The fixed support and non-fixed support of the water supply pipe are arranged on the piers, under the steel support, and the fixed support and non-fixed support of the return pipe are arranged on the steel support.

[0014] Furthermore, the maintenance road includes a road surface built at the lowest point in the height of the maintenance and installation channel definition range and a roadbed below the lowest point in the height of the maintenance and installation channel definition range, the road surface is laid on the roadbed, and the roadbed is a C25 concrete roadbed.

[0015] The beneficial effect of the present invention is that the present invention provides a solution for power plant waste heat transmission projects with long heating distance, large pipeline diameter, and many crossing nodes. The present invention can reduce the crossing of pipelines in complex terrain by digging tunnels for large-diameter heating projects, avoid costs such as land acquisition and demolition, and reduce project investment through reasonable tunnel internal space layout. It has the advantages of low investment, quick results, and easy later maintenance and repair. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the cross-section arrangement of a tunnel with an inverted arch in a tunnel space arrangement for a large-diameter heating project of the present invention; Figure 2 The present invention is a schematic diagram of the cross-sectional layout of a tunnel without an invert in a tunnel space layout for a large-diameter heating project.

[0017] Explanation of symbols in the accompanying drawings: 1. Maintenance installation channel, 2. Maintenance road, 3. Tunnel, 4. Non-fixed support, 5. Pier, 6. Steel support, 7. Return pipe 8. Water supply pipeline, 9. Road surface, 10. Roadbed. DETAILED DESCRIPTION

[0018] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0019] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on this patent; in order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0020] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as a limitation on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0021] In the description of this patent, unless otherwise clearly specified and limited, if the term "connection" or the like appears to indicate the connection relationship between components, the term should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two components or the interaction relationship between two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0022] A tunnel space layout for large diameter heating projects, such as Figure 1 to Figure 2 As shown, a range of at least 2.5 meters wide from the inner wall of one side of the tunnel 3 into the tunnel and at least 4 meters high from the arch of the tunnel 3 is defined as a maintenance and installation channel 1, a thermal pipeline is installed at a distance of at least 600 mm from the inner wall of the other side of the tunnel 3 into the tunnel, a maintenance road 2 is built at the lowest point of the defined range of the maintenance and installation channel, and lighting and fans are installed in a space 2 meters high from the arch of the tunnel 3.

[0023] In order to transport heat sources over long distances, the traditional method of direct burial of thermal pipelines can be adopted. Direct burial of thermal pipelines is limited in excavation, and the construction of tunnels through roads, rivers, and mountains is difficult and time-consuming. In addition, thermal pipelines cannot be laid in complex terrain. The mountain tunnel is used to provide a convenient way to lay thermal pipelines. The heating pipeline uses the mountain tunnel to reduce the laying length of the heating pipeline and ensure the reliability of the heating pipeline. Compared with the traditional direct burial, although the investment has increased, the overhead laying provides convenience for pipeline inspection and operation maintenance. The method of providing a channel for thermal pipelines in the tunnel needs to consider the requirements of the tunnel construction limit in the tunnel clearance section, the installation and operation space of the thermal pipeline, and the space occupied by the tunnel ventilation, lighting, operation and management facilities and the necessary surplus. At the same time, the stress characteristics of the lining structure, the project cost and other factors should be analyzed and compared to make the adopted clearance section meet the functional requirements, and the stress is uniform and economical. On this basis, the present invention discloses a tunnel space layout for large-diameter heating projects, which is used for the layout of thermal pipelines in tunnels, reduces the crossing of pipelines in complex terrain, avoids costs such as land acquisition and demolition, and reduces project investment through reasonable tunnel space layout.

[0024] Further, if Figure 1 to Figure 2 As shown, the cross-sectional width of the tunnel 3 ranges from 7.3 to 10.3 meters, and the height ranges from 7.7 to 10.7 meters. For a tunnel that can meet the requirements of thermal pipeline layout and provide a single-side maintenance channel for easy operation and maintenance, as well as the stress requirements of the overall force-bearing structure of the tunnel and the pipeline itself, the width and height range of the tunnel 3 that can meet the requirements are shown above. In this embodiment, the clear cross-sectional width of the tunnel is 8.8m and the height is 9.2m.

[0025] Further, if Figure 1 to Figure 2 As shown, the tunnel 3 includes a tunnel with an inverted arch and a tunnel without an inverted arch. The tunnel 3 that meets the above requirements can be a tunnel with an inverted arch or a tunnel without an inverted arch. In this embodiment, the tunnel 3 is a tunnel with an inverted arch.

[0026] Further, if Figure 1 to Figure 2 As shown, the diameters of the thermal pipelines are DN1600, DN1400, and DN1200. Long-distance heating projects have large heating areas and large pipeline sizes. The above three pipe diameters are commonly used in such projects, and can cover almost 90% of long-distance heating projects. In this embodiment, the diameter of the thermal pipeline is DN1400.

[0027] Further, if Figure 1 to Figure 2As shown, fixed brackets are set at both ends of the tunnel for the thermal pipeline, and multiple non-fixed brackets 4 are evenly spaced between the fixed brackets at the two ends, and corrugated compensators are set at both ends of the fixed brackets. Further, the one of the multiple non-fixed brackets closest to the fixed bracket is the first guide bracket, and the non-fixed bracket 100 meters away from the first guide bracket is the second guide bracket. Further, the distance between the first guide bracket and the corrugated compensator is 4 times the nominal diameter of the pipeline, and the distance between the first guide bracket and the second guide bracket is 14 times the nominal diameter of the pipeline. The fixed bracket is used to support the thermal pipeline, and the thermal pipeline is fixed to the fixed bracket. The fixed bracket cannot move, but is only fixed to both ends of the tunnel. Corrugated compensators are set on the thermal pipelines on both sides of the fixed bracket. The corrugated compensators are used to compensate and reduce the thermal stress of the thermal pipeline. The non-fixed bracket can be fixed along the axial and radial directions of the thermal pipeline, can be opened and closed in the radial direction to clamp the thermal pipeline, and can also move in the axial direction to support the stress concentration point of the thermal pipeline. The first guide bracket and the second guide bracket can only move in the axial direction to guide the installation direction of the thermal pipeline. There are fixed brackets at both ends of the tunnel, and two non-fixed brackets are next to the fixed brackets at both ends. These two non-fixed brackets are first guide brackets, which are the first guide brackets behind the fixed brackets at both ends. Then, the non-fixed brackets at a certain distance from the first guide brackets are two second guide brackets. When installing the thermal pipeline in Tunnel 3, the first two ends of the tunnel are installed. The thermal pipeline is first installed on the first guide bracket and the second guide bracket to fix the installation direction of the thermal pipeline. Then the non-fixed bracket is opened to clamp the thermal pipeline and support it. When the length of the riverside tunnel is installed, the thermal pipeline is fixed to the fixed bracket to fix the thermal pipeline. This arrangement of the thermal pipeline support frame can effectively reduce the load-bearing capacity of the tunnel. The nominal diameter of the pipeline is well known in the art, including 1.6 meters, 1.4 meters or 1.2 meters. According to the engineering specifications, the distance between the first guide bracket and the corrugated compensator is set to 4 times the nominal diameter of the pipeline, and the distance between the first guide bracket and the second guide bracket is 14 times the nominal diameter of the pipeline.

[0028] Further, if Figure 1 to Figure 2As shown, in the tunnel cross section, in the space outside the maintenance and installation channel, a pier 5 is built downward at the same elevation as the road surface of the maintenance road, and a steel bracket 6 is arranged on the pier. The thermal pipeline includes a return water pipeline 7 and a water supply pipeline 8. The water supply pipeline 8 is arranged in the lower space of the tunnel, and the return water pipeline 7 is arranged in the upper space of the water supply pipeline. The fixed bracket and the non-fixed bracket 4 of the water supply pipeline are arranged on the pier 5, under the steel bracket 6, and the fixed bracket and the non-fixed bracket 4 of the return water pipeline 7 are arranged on the steel bracket 6. The thermal pipeline includes a return water pipeline and a water supply pipeline. Since the design temperature and pressure of the return water pipeline are low, the return water pipeline is arranged in the upper space. The design temperature and pressure of the water supply pipeline are high, and the pipeline stress is large. The arrangement of the water supply pipeline in the lower space helps to reduce the size of the bracket. The return water pipeline 7 and the water supply pipeline 8 are fixed brackets and non-fixed brackets at different positions, and the first guide bracket and the second guide bracket in the non-fixed bracket are fixedly installed. The installation position is that, in the space outside the maintenance installation channel, a pier 5 is built downward at the same elevation as the road surface of the maintenance road, a steel bracket 6 is arranged on the pier, and the fixed bracket and non-fixed bracket 4 of the water supply pipe are arranged on the pier 5, under the steel bracket 6, and the fixed bracket and non-fixed bracket 4 of the return pipe 7 are arranged on the steel bracket 6.

[0029] Further, if Figure 1 to Figure 2 As shown, the maintenance road 2 includes a road surface 9 built at the lowest point of the maintenance installation channel definition range and a roadbed 10 below the lowest point of the maintenance installation channel definition range, and the road surface 9 is laid on the roadbed 10, and the roadbed is a C25 concrete roadbed. The above specifically defines the structure and position of the maintenance road 2. The roadbed is a C25 concrete roadbed, and 2-4cm grade crushed stone is mixed into the C25 concrete.

[0030] It should be noted that the above specific implementations are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art should understand that various modifications, equivalent substitutions, changes, etc. can be made to the present invention. However, as long as these changes do not deviate from the spirit of the present invention, they should be within the scope of protection of the present invention. In addition, some terms used in the specification and claims of this application are not restrictive, but are only for the convenience of description.

Claims

1. A tunnel space arrangement for a large-diameter heating project, characterized in that: A range of at least 2.5 meters wide from the inner wall of one side of the tunnel (3) into the tunnel and at least 4 meters high from the arch of the tunnel (3) is defined as a maintenance and installation passage (1), a thermal pipeline is installed at a distance of at least 600 mm from the inner wall of the other side of the tunnel (3) into the tunnel, a maintenance road (2) is built at the lowest point of the range defined by the maintenance and installation passage, and lighting and fans are installed in a space 2 meters high from the arch of the tunnel (3) below.

2. The tunnel space arrangement for large-diameter heating engineering according to claim 1 is characterized in that: The cross-sectional width of the tunnel (3) is in the range of 7.3-10.3 meters, and the height is in the range of 7.7-10.7 meters.

3. The tunnel space arrangement for large-diameter heating engineering according to claim 2 is characterized in that: The tunnel (3) comprises a tunnel with an inverted arch section and a tunnel without an inverted arch section.

4. The tunnel space arrangement for large-diameter heating engineering according to claim 3 is characterized in that: The diameter of the thermal pipeline is DN1600, DN1400 or DN1200.

5. The tunnel space arrangement for large-diameter heating engineering according to claim 4 is characterized in that: Fixed brackets are arranged at both ends of the tunnel for the thermal pipeline, and a plurality of non-fixed brackets (4) are evenly spaced between the two fixed brackets. Corrugated compensators are arranged on the thermal pipelines at both ends of the fixed brackets.

6. The tunnel space arrangement for large-diameter heating engineering according to claim 5 is characterized in that: The one of the multiple non-fixed brackets closest to the fixed bracket is a first guide bracket, and the non-fixed bracket at a certain distance from the first guide bracket is a second guide bracket.

7. The tunnel space arrangement for large-diameter heating engineering according to claim 6 is characterized in that: The distance between the first guide bracket and the corrugated compensator is 4 times the nominal diameter of the pipeline, and the distance between the first guide bracket and the second guide bracket is 14 times the nominal diameter of the pipeline.

8. The tunnel space arrangement for large-diameter heating engineering according to claim 7, characterized in that: In the tunnel cross section, in the space outside the maintenance installation channel, a pier (5) is constructed downward at the same elevation as the road surface of the maintenance road, a steel bracket (6) is arranged on the pier, the thermal pipeline includes a return pipe (7) and a water supply pipe (8), the water supply pipe (8) is arranged in the lower space of the tunnel, the return pipe (7) is arranged in the upper space of the water supply pipe, the fixed bracket and the non-fixed bracket (4) of the water supply pipe are arranged on the pier (5) and under the steel bracket (6), and the fixed bracket and the non-fixed bracket (4) of the return pipe (7) are arranged on the steel bracket (6).

9. The tunnel space arrangement for large-diameter heating engineering according to claim 8, characterized in that: The maintenance road (2) comprises a road surface (9) constructed at the lowest point of the maintenance and installation channel definition range and a roadbed (10) below the lowest point of the maintenance and installation channel definition range, the road surface (9) being paved on the roadbed (10), and the roadbed being a C25 concrete roadbed.