Novel supporting structure based on soft rock full-section excavation time domain matching and without lagging jack
By using a combined support structure of steel strip layer, steel cellulose concrete layer and steel mesh in the excavation of full section of soft rock, combined with anchor rods and prestressed anchor cables, the insecure and material support of Class IV surrounding rock tunnels is solved. The problem of waste has achieved effective control of the displacement of the top and waist of the tunnel and the reduction of material usage.
Patent Information
- Application Number
- CN202410979336.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-08
AI Technical Summary
When dealing with Class IV surrounding rock tunnels, the initial support is not safe enough and the material waste is large. The construction period of the traditional soft rock support method is extended, and the displacement of the top and waist of the tunnel cannot be effectively controlled.
A new type of support structure based on full-section excavation of soft rock, including steel strip layer, steel cellulose concrete layer and steel bar mesh, is adopted. Through the combination of anchor rods and prestressed anchor cables, the active constraints and uniform stress distribution of surrounding rocks are achieved. , reduce the initial support time and improve the surrounding rock strength through the steel cellulose concrete layer.
Effectively control the displacement of the top and waist of the tunnel, give full play to the self-supporting ability of Level IV surrounding rock, reduce material usage, shorten the initial support time, and achieve uniform stress distribution.
Smart Images

Figure CN118911715A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a new type of arch-free support structure based on time domain matching of full-section excavation of soft rock. Background Art
[0002] Tunnel engineering is an important part of mountain highway and railway engineering. At present, tunnel engineering mostly adopts the New Austrian Tunneling Method (NATM) for construction, and the support type is a composite support structure of initial support + waterproof board + secondary lining, and the initial support is shotcrete + steel arch frame.
[0003] Although the above support type is suitable for most rock tunnels, it has obvious limitations for some Class IV surrounding rock tunnels. Class IV surrounding rock is between soft rock and hard rock, and its bearing capacity is lower than that of hard rock. If the New Austrian Tunneling Method is used, it is not safe enough and cannot rely on the self-bearing capacity of the surrounding rock. If the traditional soft rock tunnel support method is used, it will cause material waste and extend the construction period. Summary of the invention
[0004] The purpose of the present invention is to provide a new type of support structure without arch frame based on time domain matching of full-section excavation of soft rock, which reduces the initial support time and can effectively control the displacement of the top and waist of the tunnel.
[0005] The present invention adopts the following technical scheme: a new type of support structure without arch frame based on time domain matching of full-section excavation of soft rock, including a steel belt layer, a steel cellulose concrete layer and a steel mesh, wherein:
[0006] The steel mesh is fitted around the inner wall of the excavated section of the tunnel; the side of the steel mesh facing the inner wall of the tunnel is the outside;
[0007] The steel belt layer includes a plurality of arched steel belt bodies, which are used to be arranged at the top of the tunnel and closely fit with the inner wall of the steel mesh; the curvature of each arched steel belt body is consistent with the shape of the top of the tunnel, and the circumferential length is consistent with the circumferential length of the top of the tunnel; the plurality of arched steel belt bodies are sequentially arranged in a sequential fit along the longitudinal direction of the tunnel;
[0008] The steel-cellulose concrete layer covers the inner wall of the steel mesh and the steel belt layer, and is solidified together with the steel mesh and the steel belt layer.
[0009] Furthermore, a plurality of through holes are arranged on the outer wall of each arched steel belt body, and the plurality of through holes are arranged at intervals along the circumferential direction of the arched steel belt body; the anchor rods and prestressed anchor cables are arranged at intervals in the circumferential direction, and the spacing between the two is consistent with the distance between two adjacent through holes; the anchor rods and prestressed anchor cables are arranged in the corresponding through holes.
[0010] Furthermore, the steel belt layer also includes multiple vertical plates, the number of which is twice that of the arched steel belt body. The vertical plates are used to be arranged on the left and right side walls of the tunnel hole, tightly fitting with the inner wall of the steel mesh, and the upper end of each vertical plate fits with the lower end of the arched steel belt body on its side.
[0011] Further, the distance between adjacent through holes located at the top of the arched steel strip body is smaller than the distance between adjacent through holes located at the top of the arched steel strip body.
[0012] Furthermore, a secondary lining is constructed outside the steel-cellulose concrete layer.
[0013] The present invention also discloses a construction method of the above-mentioned new type of support structure without arch frame based on full-section excavation of soft rock in time domain matching, comprising the following steps:
[0014] Step 1: Excavate the tunnel in full section. In the excavated section, lay a steel mesh on the inner wall of the tunnel and attach the steel belt layer to the inner side of the steel mesh.
[0015] Step 2: Insert the anchor rod and prestressed anchor cable from the external surrounding rock into the through hole of the steel belt layer for installation;
[0016] Step 3: spraying steel fiber-doped plain concrete on the steel mesh and steel belt layer to form a steel fiber concrete layer;
[0017] Step 4: Cast and construct the secondary lining on the steel cellulose concrete layer.
[0018] The beneficial effects of the present invention are: 1. The steel belt layer is integrated with the anchor rods and anchor cables. By applying prestress to the anchor rods and anchor cables, it plays a role in actively restraining the displacement of the surrounding rock. The joint force restrains the displacement of the weak parts of the cave roof and the tunnel waist. The stress of the locally weak rock formation is transmitted to the steel belt layer through the anchor rods and anchor cables, and then the stress is evenly distributed to the better rock formation through the anchor rods and anchor cables, which plays a role in uniform stress distribution. It does not change the mechanical properties of the Class IV surrounding rock, gives full play to the self-bearing capacity of the Class IV surrounding rock, and effectively controls the displacement of the top and waist of the tunnel. 2. The laying of steel mesh and the spraying of steel fiber plain concrete improves the strength of the surrounding rock, coordinates the deformation of the surrounding rock, reduces the material consumption of the traditional steel arch frame, and thus reduces the cross-sectional size of the tunnel. 3. Reduces the initial support time. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is the elevation view of the full-section excavation support structure for a Class IV surrounding rock tunnel;
[0020] Figure 2 This is the elevation view of the steel plate belt of the full-section excavation support structure of the Class IV surrounding rock tunnel.
[0021] Among them: 1. Secondary lining; 2. Steel cellulose concrete layer; 3. Steel belt layer; 4. Through hole; 5. Sealing gasket; 6. Anchor rod; 7. Prestressed anchor cable; 8. Steel mesh. DETAILED DESCRIPTION
[0022] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0023] The present invention discloses a new type of support structure without arch frame based on time domain matching of full-section excavation of soft rock, which is suitable for full-section excavation of Class IV soft rock, such as Figure 1 and 2 As shown, it includes: a steel belt layer 3, a steel cellulose concrete layer 2 and a steel mesh 8, wherein:
[0024] The steel belt layer 3 includes a plurality of arched steel belt bodies, which are used to be set at the tunnel vault and closely fit with the inner wall of the steel mesh 8; the curvature of each arched steel belt body is consistent with the shape of the tunnel vault, and the circumferential length is consistent with the circumferential length of the tunnel vault; the plurality of arched steel belt bodies are sequentially arranged in a sequential manner along the longitudinal direction of the tunnel; the side of the arched steel belt body facing the tunnel vault is the outside; the specifications of each arched steel belt body are 10mm thick and 300mm wide. The steel mesh 8 uses steel bars with a diameter of 10mm, a spacing of 100mm×100mm, and is welded to the steel belt layer 3.
[0025] The steel fiber concrete layer 2 covers the inner wall of the steel mesh 8 and the steel belt layer 3, and is solidified with the steel mesh 8 and the steel belt layer 3. The steel fiber concrete layer 2 adopts C25 plain concrete, in which 20% steel fiber is mixed.
[0026] The steel belt layer 3 also includes a plurality of vertical plates, the number of which is twice that of the arched steel belt body. The vertical plates are used to be arranged on the left and right side walls of the tunnel hole, and are closely fitted with the inner wall of the steel mesh 8. The upper end of each vertical plate is fitted with the lower end of the arched steel belt body on its side. Two vertical plates and one arched steel belt body form a group, and their longitudinal lengths are consistent. They are attached to the steel cellulose concrete layer (2) and poured to form a secondary lining.
[0027] A plurality of through holes 4 are arranged on the outer wall of each arched steel belt body, and the plurality of through holes 4 are arranged at intervals along the circumferential direction of the arched steel belt body; the distance between adjacent through holes 4 located at the top of the arched steel belt body is smaller than the distance between adjacent through holes 4 located at the top of the arched steel belt body; on the arched steel belt body, the spacing between the through holes 4 on the left and right sides is 0.5m, and the spacing between the arched top parts is 0.3m.
[0028] The plurality of through holes 4 are located on the same annular line and at the midpoint of the longitudinal direction, and are used to be connected and fixed with the anchor rod 6 and the prestressed anchor cable 7 .
[0029] The anchor rods 6 and the prestressed anchor cables 7 are arranged at intervals in the annular direction, and the spacing between the two is consistent with the distance between two adjacent through holes 4; the anchor rods 6 and the prestressed anchor cables 7 are arranged in the corresponding through holes 4, and the through holes 4 are sealed by sealing gaskets 5.
[0030] The anchor rod 6 is made of ordinary steel bars with a diameter of 28. The anchor rods 6 used on the left and right sides of the tunnel are 12 meters long, and the anchor rods 6 used on the arch are extended to 18 meters.
[0031] The prestressed anchor cable 7 uses 5 bundles of 1×7 steel strands with a nominal diameter of 12.7mm, a tensile strength of 1720MPa, an annular spacing of 1m, and a front-to-back spacing of 1m. The length of the prestressed anchor cables 7 used on the left and right sides of the tunnel is 20m, and the arch length is extended to 30m.
[0032] The present invention also discloses a construction method of a novel supporting structure without an arch frame based on time domain matching of full-section excavation of soft rock, comprising the following steps:
[0033] According to the tunnel design, when the entire tunnel section needs to be excavated at the same time, the full-section excavation method is used. When the tunnel section needs to be divided into different areas for construction, the step excavation method is used.
[0034] Excavation and clearing of construction plane:
[0035] When the excavation method is full-section excavation, the surface and surrounding rock changes are monitored through advance forecasting during the construction process, and the dynamic situation is mastered at any time. According to the excavation contour line of the working face, the drilling trolley is driven to the designated position, the trolley is fixed, and the height of the trolley is adjusted. The full-section excavation is carried out to clear the construction plane;
[0036] When the excavation method is the step excavation method, the surface and surrounding rock changes are monitored through advance forecasting during the construction process, the dynamic situation is kept under control, the step excavation is carried out and the construction plane is cleaned, and the scaffolding is arranged according to the construction height to provide a subsequent working platform. The 9m long excavation trolley is brought into the site, and the step excavation method is adopted within the excavation contour area.
[0037] Step 1: After excavation, a layer of concrete is sprayed on the inner wall of the tunnel for leveling, and the steel mesh 8 and the steel belt layer 3 are welded and hung into a whole, and the arched steel belt body is located at the tunnel vault part.
[0038] Step 2: Anchor rod 6, prestressed anchor cable 7 and steel belt 3 are constructed using different construction platforms. Anchor rod 6 and prestressed anchor cable 7 are installed through the drilled hole. The anchor head end extends to the through hole 4, and the through hole 4 is sealed with a sealing gasket 5. Cement slurry is used to fill the gaps between the sealing gasket 5 and the anchor head, and the anchor is sealed.
[0039] Step 3: Spray 150mm of plain concrete doped with steel fibers on the steel mesh 8 and the steel belt layer 3. The plain concrete doped with steel fibers solidifies together with the steel mesh 8 and the steel belt layer 3 to form a steel fiber concrete layer 2 until the strength reaches the design requirements.
[0040] Step 4: Determine the location and size of the secondary lining, set up scaffolding, arrange the secondary lining steel bars on the steel cellulose concrete layer 2, and bring the lining trolley into the site to seal the area where concrete needs to be poured;
[0041] The secondary lining is symmetrical on both sides, with a height difference of no more than 50cm to prevent bias pressure from damaging the trolley. The pouring process must be continuous to avoid cold joints caused by pauses. The pouring interval is less than one hour. The top is connected to the conveying pipe with a top mold center capping device, and concrete is gradually added to cap the top. When concrete overflows from the observation hole, it indicates that the concrete pouring is completed;
[0042] Secondary lining reinforced concrete maintenance: After the secondary lining concrete strength is greater than 2.5MPa, the formwork is removed. After removal of the formwork, the concrete surface is sprayed with high-pressure water to reduce the hydration heat. The maintenance period is not less than 14 days.
Claims
1. A new type of support structure without arch frame based on time domain matching of full-section excavation of soft rock, It is characterized in that It comprises a steel belt layer (3), a steel cellulose concrete layer (2) and a steel mesh (8), wherein: The steel mesh (8) is arranged in a circular manner on the inner wall of the excavated section of the tunnel; the side of the steel mesh (8) facing the inner wall of the tunnel is the outer side; The steel belt layer (3) comprises a plurality of arched steel belt bodies, which are used to be arranged at the top of the tunnel and closely fit with the inner wall of the steel mesh (8); the curvature of each of the arched steel belt bodies is consistent with the shape of the top of the tunnel, and the circumferential length is consistent with the circumferential length of the top of the tunnel; the plurality of arched steel belt bodies are sequentially arranged in a close fit along the longitudinal direction of the tunnel; The steel-cellulose concrete layer (2) covers the inner wall of the steel mesh (8) and the steel belt layer (3), and is solidified together with the steel mesh (8) and the steel belt layer (3).
2. A novel support structure without arch frame based on time domain matching for full-section excavation of soft rock as claimed in claim 1, It is characterized in that A plurality of through holes (4) are arranged on the outer wall of each of the arched steel belt bodies, and the plurality of through holes (4) are arranged at intervals along the circumferential direction of the arched steel belt body; the anchor rods (6) and the prestressed anchor cables (7) are arranged at intervals in the circumferential direction, and the spacing between the two is consistent with the distance between two adjacent through holes (4); the anchor rods (6) and the prestressed anchor cables (7) are arranged in the corresponding through holes (4).
3. A new type of support structure without arch frame based on time domain matching of full-section excavation of soft rock as claimed in claim 2, It is characterized in that The steel belt layer (3) further comprises a plurality of vertical plates, the number of the vertical plates being twice that of the arched steel belt body, the vertical plates being arranged on the left and right side walls of the tunnel hole, tightly fitting with the inner wall of the steel mesh (8), and the upper end of each vertical plate fitting with the lower end of the arched steel belt body on the side where it is located.
4. A novel support structure without arch frame based on time domain matching of full-section excavation of soft rock as claimed in claim 3, It is characterized in that The distance between adjacent through holes (4) located at the top of the arched steel strip body is smaller than the distance between adjacent through holes (4) located at the top of the arched steel strip body.
5. A new type of support structure without arch frame based on time domain matching of full-section excavation of soft rock as claimed in claim 4, It is characterized in that A secondary lining (1) is constructed outside the steel-cellulose concrete layer (2).
6. A construction method for a new type of support structure without arch frame based on time domain matching for full-section excavation of soft rock according to any one of claims 1 to 5, It is characterized in that The steps include: Step 1: excavate the tunnel in full section, lay a steel mesh (8) on the inner wall of the tunnel in the excavated section, and attach the steel belt layer (3) to the inner side of the steel mesh (8); Step 2: insert the anchor rod (6) and the prestressed anchor cable (7) from the external surrounding rock into the through hole (4) of the steel belt layer (3) for installation; Step 3: spraying steel fiber-doped plain concrete on the steel mesh (8) and the steel belt layer (3) to form a steel fiber concrete layer (2); Step 4: attaching to the steel cellulose concrete layer (2) and pouring to form a secondary lining.