Cooperative air control method for adjusting air window and local ventilator on driving face
By calculating the air volume required and the air volume of local ventilators on the excavation working surface, and using the least squares method to fit the relationship between the air volume passing through the air volume and the opening rate, the problem of coordinated air control of the air window and local ventilators on the excavation working surface is solved. The effect of air supply and power saving on demand is achieved.
Patent Information
- Application Number
- CN202410972625.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
The opening working surface adjustment windows and local ventilators lack a unified method for overflow and opening rate conversion, resulting in the inability to achieve on-demand air supply, resulting in waste of electricity and dust problems.
Provide a joint air control method for adjusting the air window and local ventilator on the excavation working surface. By calculating the air demand volume, the air outlet volume of the local ventilator and the opening rate of the air window, the least squares method is used to fit the conversion relationship to realize the air volume and opening rate of the air window. Coordinated adjustment.
The air supply on demand on the excavation work surface is achieved, power resources are saved, labor calculation costs are reduced, and air volume regulation is improved.
Smart Images

Figure CN118911743A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine ventilation, and in particular to a method for coordinated wind control of adjustable wind windows and local ventilators on an excavation working face. Background Art
[0002] The advancement of the excavation face according to the planned schedule is inseparable from the support of the mine's comprehensive security system, among which the mine ventilation system occupies an important position in the comprehensive security system of the excavation face. It not only ensures the life, health and safety of the workers on the excavation face, but is also an important technical means to prevent and control the excessive concentration of gas and dust on the excavation face. In recent years, the intelligent construction of mines has achieved remarkable results, and the intelligent upgrading and transformation of the ventilation system has also made great progress. Among them, underground local ventilators and ventilation-related equipment and facilities such as dampers and windows have the ability to be remotely controlled from the ground, laying a technical foundation for the excavation face to achieve "air supply on demand". However, there are still many problems in achieving the goal of "air supply on demand" for the excavation face and avoiding the "one wind blowing" phenomenon, as follows: 1. There are many types of adjustable wind windows on the excavation working face on the market, and the wind window opening control methods are diverse. Limited by the objective size of the excavation working face, the sizes of the adjustable wind windows on the excavation working face are also different. For wind windows of different types, sizes, and control methods, the ground host computer software has not formed a unified calculation standard for adjusting the wind window air volume. Although the adjustable wind windows on the excavation working face have remote control capabilities, there is a lack of a unified conversion method between the wind window air volume and the wind window opening adjustment; 2. As the length of the excavation working face continues to increase, the required air volume of the excavation working face also continues to increase. Limited by the current technical conditions of the variable frequency local fan itself, the local fan cannot continuously change frequency as the required air volume increases to meet the required air volume requirements. Therefore, in actual engineering applications, mines usually choose to operate local fans at high power, which not only causes waste of electricity resources, but may also cause dust at the excavation end due to excessive air volume. The reason is that the current local fans and adjustable wind windows of the excavation working face have not formed a good coordinated wind control method. Summary of the invention
[0003] The present invention aims to solve at least one of the technical problems existing in the prior art.
[0004] To this end, the present invention proposes a method for coordinated wind control of the excavation working face by adjusting the wind windows and local ventilators, that is, providing a unified conversion method between the wind window air volume and the wind window opening, which is of great significance for achieving "air supply on demand" at the excavation working face.
[0005] The method for coordinated wind control of the wind window and the local ventilator at the excavation working face according to an embodiment of the present invention comprises the following steps: Step 1: Calculate the required air volume at the excavation working face: The required air volume should be determined according to the highest value of the following calculation results; The first method is to calculate the required air volume based on the number of personnel at the excavation face; The second method: Calculate the required air volume based on the gas concentration at the excavation working face; The third method is to calculate the air volume required for excavation work based on the amount of explosives used; Step 2: Calculation of the air volume of the local fan tunneling head: After the air volume inhaled by the local fan has been lost along the way, the air volume at the side of the local fan wind tube close to the tunneling end is the air volume of the local fan tunneling head; Step 3: Conversion between the wind window over-air volume and the wind window opening rate of the excavation working face: the ratio between the actual opening area of the wind window and the maximum opening area of the wind window is the opening rate of the wind window of the excavation working face; when the opening rate of the wind window is determined, the wind volume of the wind window is the wind window over-air volume of the excavation working face; when the frequency of the local ventilator of the excavation working face is stable, the conversion relationship between the wind window opening rate and the wind window over-air volume is the conversion between the wind window over-air volume and the wind window opening rate of the excavation working face; Step 4: Adjust the wind windows of the excavation working face and coordinate the wind control with the local fans: When the air volume of the excavation working face needs to change, the wind volume of the excavation working face can be changed by changing the frequency of the local fans or adjusting the wind window opening rate. This is the coordinated wind control of the excavation working face by adjusting the wind windows of the excavation working face and the local fans.
[0006] The beneficial effect of the present invention is that the conversion relationship between the air volume and the opening rate of the adjustable wind window is obtained by the least squares method, and then the leakage rate of the local fan per 100 meters is calculated according to the length of the excavation working face, and the required air volume of the excavation working face is calculated according to multiple factors. A method for coordinated wind control of the local fan and the adjustable wind window of the excavation working face to meet the required air volume requirements is further provided. The advantage of this method is that it saves manpower calculation and operation costs, and the ground can be remotely controlled. At the same time, the coordinated wind control method provided by the present invention can save a lot of electricity resources while achieving the goal of "air supply on demand" of the excavation working face.
[0007] According to one embodiment of the present invention, in the first step, the required air volume is calculated based on the number of personnel at the excavation working face, and the calculation formula is:
[0008] The meanings of the symbols in the formula are: It indicates the required air volume of the excavation working face based on the number of workers, in units of ; It indicates the maximum number of workers working on the excavation face at the same time, in units of individuals.
[0009] According to one embodiment of the present invention, in the first step, the required air volume is calculated based on the gas concentration of the excavation working face, and the calculation formula is:
[0010] The meanings of the symbols in the formula are: It indicates the required air volume of the excavation working face based on the gas concentration, in units of ; It represents the average absolute gas emission in the return air flow of the excavation working face, in units of ; The reserve air volume coefficient indicates the uneven gas outburst in the excavation working face.
[0011] According to one embodiment of the present invention, in the first step, the required air volume of the excavation working face is calculated based on the amount of explosives used, and the calculation formula is:
[0012] The meanings of the symbols in the formula are: Indicates the required air volume for the excavation face calculated based on the amount of explosives used, in units of ; It indicates the maximum amount of explosives used for one blast at the excavation face, in kg.
[0013] According to one embodiment of the present invention, in the second step, the air volume of the local ventilator tunneling head is calculated by the formula:
[0014] The meanings of the symbols in the formula are: Indicates the air volume of the local fan duct near the end of the tunneling head, in units of ; Indicates the air volume that the local fan starts to inhale, in units of ; Indicates the air leakage rate of the air duct per 100 meters; Indicates the length of the local fan duct, in meters; After the wind is sucked in by the local ventilator, the air loss rate in the process of flowing along the wind tube to the tunneling end is the wind tube leakage rate per 100 meters. The specific calculation formula for the wind tube leakage rate per 100 meters is:
[0015] Local ventilation fan air intake The average value is calculated from the monitoring data of the wind speed sensor installed in the wind tube near the local ventilation fan; Local ventilation fan air volume The average value is calculated from the monitoring data of the wind speed sensor installed in the wind tube on the side close to the tunneling end.
[0016] According to one embodiment of the present invention, in the third step, the conversion relationship between the adjustment window opening rate and the adjustment window air flow rate is adjusted by least square method for curve fitting, and the specific calculation formula is:
[0017] The meanings of the symbols in the formula are: Indicates the wind volume of the wind window, the unit is ; Indicates adjusting the wind window opening rate, which can be set on the ground host computer; , , It represents the conversion coefficient between the adjustable wind window air volume and the adjustable wind window opening ratio, obtained through actual calculation.
[0018] According to one embodiment of the present invention, the actual air flow of three groups of adjustable wind windows is taken Adjustment of the window opening ratio under the corresponding excess air volume Data, substitute the data into the above conversion formula , we can get:
[0019] Through the above equations, the conversion coefficient of adjusting the wind window air volume and adjusting the wind window opening rate can be calculated: , , .
[0020] According to one embodiment of the present invention, in the fourth step, the wind window of the excavation working face is adjusted to coordinate with the local ventilator to control the wind, and the operation method is as follows: Step 41: Calculate the required air volume at the excavation working face; Step 42: determine whether the local ventilator has variable frequency capability; Step 43: If the local ventilator does not have variable frequency capability, use a wind window to adjust the air volume; Step 44: if the local ventilator has variable frequency capability, the frequency of the local ventilator is graded to further determine whether the required air volume of the excavation working face is within the maximum adjustable range of the wind window; Step 45: If the required air volume of the excavation working face is within the maximum adjustable range of the wind window, repeat step 43; Step 46: If the required air volume of the excavation working face is not within the maximum adjustable range of the wind window, a local fan is used to adjust the air volume.
[0021] According to one embodiment of the present invention, the operation flow of step 43 is as follows: Step 431, using the least square method to obtain a conversion equation for adjusting the window opening ratio and the excess air volume; Step 432: input the required air volume into the ground host computer to obtain the adjusted wind window opening rate; Step 433: input the adjustment window opening rate into the upper computer on the ground, and adjust the wind window air volume of the excavation working face; Step 434, verifying whether the air volume is adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window; Step 435: Air adjustment is completed.
[0022] According to one embodiment of the present invention, the operation process of step 46 is as follows: Step 461: Input the excavation face length on the ground host computer ; Step 462: Calculate the local ventilation fan leakage rate per 100 meters on the ground host computer ; Step 463: Use the air volume required by the excavation face as the air volume of the local ventilator , calculate the local fan suction volume on the ground host computer ; Step 464: Check the user manual of the local ventilator to obtain the corresponding frequency of the local ventilator under this air suction volume; or enter the manual content into the ground host computer in advance, and enter the air suction volume into the ground host computer to obtain the corresponding frequency; Step 465, adjusting the frequency of the local ventilator to the initially allocated local ventilator frequency level according to the frequency that the local ventilator should adjust; Step 466: Verify whether the air volume is adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window; Step 467: Air adjustment is completed.
[0023] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description and the drawings.
[0024] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 It is a schematic diagram of the arrangement of the local ventilator and the regulating wind window of the excavation working face of the present invention; Figure 2 This is a flow chart of the variable frequency wind control method for a local ventilator of the present invention; Figure 3 It is a flow chart of the cooperative wind control method of adjusting wind windows and local ventilators on the excavation working face of the present invention.
[0027] The numbers in the figure are: 1. Mining area air intake tunnel; 2. Mining area return air tunnel; 3. Fresh air flow; 4. Return air flow; 5. Local ventilation fan; 6. Wind duct; 7. Excavation head; 8. Adjustment window; 9. Wind duct air volume sensor; 10. Excavation working face; 11. Methane sensor; 12. Return air tunnel of excavation working face. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] The following describes in detail the method for coordinated wind control of the tunneling working face adjusting wind windows and local ventilators according to an embodiment of the present invention with reference to the accompanying drawings.
[0030] It should be noted that the wind window of the excavation face refers to the automatic wind window with ground remote control capability; the local ventilator of the excavation face mentioned refers to the variable frequency local ventilator with ground remote control capability. The specific control method is that the ground host computer sends control instructions to the wind window and local ventilator of the excavation face, and the local ventilator and wind window automatically respond to the control instructions of the ground host computer.
[0031] See Figure 1 , Figure 2 and Figure 3 The method for cooperatively controlling wind by adjusting wind windows and local ventilators on a tunneling working face of the present invention comprises the following steps: Step 1: Supply air to the excavation face as required and calculate the required air volume of the excavation face: The required air volume of the excavation face is the minimum air volume that the mine must provide to ensure the life, health and working environment of the excavation face workers; the required air volume must be determined according to the highest value of the following calculation results; The first method is to calculate the required air volume based on the number of personnel at the excavation working face. The calculation formula is: (1) The meanings of the symbols in formula (1) are: It indicates the required air volume of the excavation working face based on the number of workers, in units of ; It indicates the maximum number of workers working on the excavation face at the same time, in units of individuals.
[0032] The second method is to calculate the required air volume based on the gas concentration at the excavation working face. The calculation formula is: (2) The meanings of the symbols in formula (2) are: It indicates the required air volume of the excavation working face based on the gas concentration, in units of ; It represents the average absolute gas emission in the return air flow of the excavation working face, in units of , usually taking the average value of the monitoring data of the methane sensor 11; Indicates the spare air volume coefficient of uneven gas outburst in the excavation working face. Usually, it is taken as =1.5~2.5, blasting working face =1.8~2.5.
[0033] Among them, the average absolute gas outflow of the return air flow at the excavation working face is , taking the monitoring data of methane sensors in the tunneling roadway. There are two ways to arrange methane sensors in the tunneling working face: one is the arrangement of the tunneling working face in the coal roadway, semi-coal-rock roadway and rock roadway with gas outburst in gas mines; the other is the arrangement of methane sensors in the double-lane tunneling of high-gas and coal-and-gas outburst mines, and when the tunneling working face length of high-gas and coal-and-gas outburst mines is greater than 800m, methane sensors must be added in the middle of the tunneling roadway. The average absolute gas outburst refers to the middle of the roadway, such as Figure 1 Medium methane sensor 11 ( ) is the average value of the monitoring data.
[0034] The third method is to calculate the required air volume for excavation work based on the amount of explosives used. The calculation formula is: (3) The meanings of the symbols in formula (3) are: Indicates the required air volume for the excavation face calculated based on the amount of explosives used, in units of ; It indicates the maximum amount of explosives used for one blast at the excavation face, in kg.
[0035] Get the required air volume of the excavation working face, that is, the air output volume ,exist In, when The value of is the highest, then the required air volume for the excavation working face is , that is, the air volume ;when The value of is the highest, then the required air volume for the excavation working face is , that is, the air volume ;when The value of is the highest, then the required air volume for the excavation working face is , that is, the air volume .
[0036] Step 2: Calculation of the air volume of the local fan tunneling head: The air volume of the local fan inhaled air after the air volume loss along the way, the air volume out of the local fan duct near the tunneling end is the air volume of the local fan tunneling head; in other words, the air volume of the local fan tunneling head refers to the air volume of the local fan inhaled air after the air volume loss along the way, the air volume out of the local fan duct near the tunneling end. Figure 2 shown.
[0037] The air volume of the local ventilator tunneling head is calculated as follows: (4) The meanings of the symbols in formula (4) are as follows: Indicates the air volume of the local fan duct near the end of the tunneling head, in units of ; Indicates the air volume that the local fan starts to inhale, in units of ; Indicates the air leakage rate of the air duct per 100 meters; It indicates the length of the local fan duct, in meters. The length of the local fan duct is obtained by actual measurement. The air volume loss rate during the process of airflow being sucked in by the local ventilator and flowing along the wind duct to the excavation end is the air leakage rate per 100 meters of the wind duct. In other words, the air leakage rate per 100 meters of the wind duct refers to the air volume loss rate during the process of airflow being sucked in by the local ventilator and flowing along the wind duct to the excavation end.
[0038] The specific calculation formula for the air leakage rate of the air duct per 100 meters is: (5) Local ventilation fan air intake The average value is calculated from the monitoring data of the wind speed sensor installed in the wind tube near the local fan. Specifically, the air intake volume of the local fan The average value is calculated from the monitoring data of the wind tube air volume sensor 9 installed in the wind tube on the side close to the local ventilator.
[0039] Local ventilation fan air volume The average value is calculated from the monitoring data of the wind speed sensor installed in the wind tube near the end of the tunneling; specifically, the air volume of the local fan The average value is calculated from the monitoring data of the wind tube air volume sensor 9 installed in the wind tube on the side close to the tunneling head.
[0040] The specific calculation formula for the local fan suction volume is: (6) The local ventilation fan adjusts the frequency to control the air flow.
[0041] Step 3: Conversion between the wind window air volume and the wind window opening rate at the excavation working face: The ratio between the actual opening area of the wind window and the maximum opening area of the wind window is adjusted to adjust the wind window opening rate of the excavation working face; in other words, the opening rate of the wind window of the excavation working face refers to the ratio between the actual opening area of the wind window and the maximum opening area of the wind window.
[0042] When the opening rate of the adjusting wind window is determined, the air volume of the adjusting wind window is adjusted, which is the air volume of the adjusting wind window at the excavation working face; in other words, the air volume of the adjusting wind window at the excavation working face refers to the air volume of the adjusting wind window when the opening rate of the adjusting wind window is determined.
[0043] When the frequency of the local fan of the excavation working face is stable, the conversion relationship between the opening rate of the regulating wind window and the excessive air volume of the regulating wind window is the conversion between the excessive air volume of the regulating wind window of the excavation working face and the opening rate of the regulating wind window; in other words, the conversion between the excessive air volume and the opening rate of the regulating wind window of the excavation working face refers to the conversion relationship between the opening rate of the regulating wind window and the excessive air volume when the frequency of the local fan of the excavation working face is stable, such as Figure 3 shown.
[0044] Among them, the adjustment of the opening rate of the regulating wind window is essentially the adjustment of the wind resistance of the regulating wind window. When the opening rate of the regulating wind window increases, the wind resistance of the regulating wind window decreases; when the opening rate of the regulating wind window decreases, the wind resistance of the regulating wind window increases. According to the law of wind pressure balance, when the frequency of the local ventilator is stable, the wind pressure of the excavation working face is actually stable. When the wind pressure is fixed, the wind volume and wind resistance of the excavation working face are inversely proportional. However, the conversion relationship between the wind resistance represented by the regulating wind window and the opening area is not consistent for different types of regulating wind windows from different manufacturers. Therefore, the present invention proposes to convert the regulating wind window opening rate with the regulating wind window wind resistance, and further realize the conversion between the regulating wind window opening rate and the regulating wind window over-air volume.
[0045] The conversion relationship between the adjustment window opening rate and the adjustment window air volume is calculated by using the least square method for curve fitting. The specific calculation formula is: (7) The meanings of the symbols in formula (7) are: Indicates the wind volume of the wind window, the unit is ; Indicates adjusting the wind window opening rate, which can be set on the ground host computer; , , It represents the conversion coefficient between the adjustable wind window air volume and the adjustable wind window opening ratio, obtained through actual calculation.
[0046] Take three groups of wind window adjustment to get the actual air volume Adjustment of the window opening ratio under the corresponding excess air volume Data, substitute the data into the above conversion formula , we can get: (8) Through the above equations, the conversion coefficient of adjusting the wind window air volume and adjusting the wind window opening rate can be calculated: , , .
[0047] The conversion formula between the adjustable wind window opening rate and the adjustable wind window excess air volume is obtained. When the adjustable wind window excess air volume needs to be adjusted, the required excess air volume is input into the ground host computer, and the corresponding adjustable wind window opening rate can be calculated according to the above conversion formula. By inputting the adjustable wind window opening rate into the adjustable wind window control system of the ground host computer, the adjustable wind window excess air volume can be remotely controlled.
[0048] Step 4: Adjust the wind window of the excavation working face and coordinate the wind control with the local ventilator: When the required air volume of the excavation working face changes, the local fan frequency conversion or wind window opening rate adjustment is used to change the air volume of the excavation working face, which is the coordinated air control of the excavation working face wind window adjustment and local fan. In other words, the coordinated air control of the excavation working face wind window adjustment and local fan means that when the required air volume of the excavation working face changes, the local fan frequency conversion or wind window opening rate adjustment is used to change the air volume of the excavation working face, such as Figure 3 shown.
[0049] Among them, the length of the excavation working face is always changing during the excavation, and the required air volume of the excavation working face also changes accordingly. However, due to the current technical limitations of the local fan hardware, the local fan cannot always be in linear frequency conversion mode as the length of the excavation working face changes, otherwise it is easy to burn out the motor. At this time, it is necessary to adjust the air volume of the excavation working face by adjusting the opening rate of the wind window. In fact, the required air volume increases slowly with the increase of the length of the excavation working face. In most cases, it is generally preferred to adjust the wind window for air volume control. When the required air volume of the excavation working face increases significantly with the length and even if the wind window opening rate is adjusted to the maximum, it still cannot meet the required air volume requirements, then the local fan will be chosen to control the air volume.
[0050] The local ventilation fan of the excavation working face is set with variable frequency grades. The air volume of each variable frequency grade is set to meet the excess air volume that is greater than or equal to the maximum opening rate of the adjustable wind window under the current frequency and working face length. This ensures that when the maximum opening rate of the adjustable wind window still cannot meet the required air volume of the excavation working face, the air volume can be adjusted by the local ventilation fan without causing excessive air volume and wasting electronic resources.
[0051] The wind window of the excavation working face is adjusted to coordinate with the local ventilator to control the wind. The operation method is as follows: Step 41: Calculate the required air volume at the excavation working face; Step 42, judging whether the air supply of the local ventilator is greater than the required air volume, if the air supply of the local ventilator is greater than the required air volume, then entering step 43; otherwise, the local ventilator is used to adjust the air volume, that is, entering step 44; Step 43: If the air supply of the local fan is greater than the required air volume, determine whether the required air volume is within the maximum adjustable range of the wind window. If so, use the wind window to adjust the excess air volume. Otherwise, enter step 44; if the air supply of the local fan is greater than the required air volume, and the required air volume is within the maximum adjustable range of the wind window, use the wind window to adjust the excess air volume. The specific operation process is as follows: Step 431, using the least square method to obtain a conversion equation for adjusting the window opening ratio and the excess air volume; Step 432: input the required air volume into the ground host computer to obtain the adjusted wind window opening rate; Step 433: input the adjustment window opening rate into the upper computer on the ground, and adjust the wind window air volume of the excavation working face; Step 434, verifying whether the air volume is adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window; when the air volume is adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window, entering step 435; when the air volume is not adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window, manually fine-tuning the wind window opening rate, and then entering step 435; Step 435: Air adjustment is completed.
[0052] Step 44: If the air volume supplied by the local ventilator is less than the required air volume, or if the air volume supplied by the local ventilator is greater than the required air volume but the required air volume is not within the maximum adjustable range of the wind window, the local ventilator is used to adjust the air volume; the operation flow of step 44 is: Step 441: Input the length of the excavation face on the ground host computer ; Step 442: Calculate the local ventilation fan leakage rate per 100 meters on the ground host computer : Step 443: Use the air volume required by the excavation face as the air volume of the local ventilator , calculate the local fan suction volume on the ground host computer ; Step 444: Check the user manual of the local ventilator to obtain the corresponding frequency of the local ventilator under this air suction volume; or enter the manual content into the ground host computer in advance, and enter the air suction volume into the ground host computer to obtain the corresponding frequency; Step 445, adjusting the frequency of the local ventilator to control the wind: adjusting the frequency of the local ventilator to the initially divided local ventilator frequency level according to the frequency that the local ventilator should adjust; Step 446: Verify whether the air volume is adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window; when the air volume is adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window, enter step 447; when the air volume is not adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window, manually fine-tune the wind window opening rate, and then enter step 447; Step 447, air adjustment is completed.
[0053] The present invention aims at the problems that there is a lack of excess air volume conversion method for adjusting wind windows on the excavation working face, and a lack of coordinated wind control method for adjusting wind windows and local ventilators, solves the difficult problem of conversion between adjusting wind window opening area and excess air volume, provides a conversion relationship between the excess air volume of adjusting wind windows on the excavation working face and the wind window opening, further provides a coordinated wind control method for adjusting wind windows and local ventilators on the excavation working face, and proposes a conversion formula between the excess air volume and the opening rate of the adjusting wind windows on the excavation working face. This calculation method directly relates the excess air volume of the wind window to the wind window opening rate, avoiding the influence of various factors such as the wind window opening method and the wind window size; it can theoretically guide the coordinated wind control of the working face, and at the same time provide a basis for the management and control The invention provides certain guidance and inspiration for the development of collaborative wind control program for platform excavation working face; specifically, the least square method is used to obtain the conversion relationship between the air volume passing through the adjustable wind window and the opening rate, and then the leakage rate of the local fan per 100 meters is calculated according to the length of the excavation working face, and the required air volume of the excavation working face is calculated according to multiple factors. A method for collaborative wind control of the local fan and the adjustable wind window of the excavation working face to meet the required air volume requirement is further provided. The advantage of this method is that it saves manpower calculation and operation costs, and the ground can be remotely controlled. At the same time, the collaborative wind control method provided by the present invention can save a lot of electricity resources while achieving the goal of "air supply on demand" for the excavation working face.
[0054] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for coordinated wind control of an adjusting wind window and a local ventilator on an excavation working face, characterized in that: The following steps are involved: Step 1: Calculate the required air volume at the excavation working face: The required air volume should be determined according to the highest value of the following calculation results; The first method is to calculate the required air volume based on the number of personnel at the excavation face; The second method: Calculate the required air volume based on the gas concentration at the excavation working face; The third method is to calculate the air volume required for excavation work based on the amount of explosives used; Step 2: Calculation of the air volume of the local fan tunneling head: After the air volume inhaled by the local fan has been lost along the way, the air volume at the side of the local fan wind tube close to the tunneling end is the air volume of the local fan tunneling head; Step 3: Conversion between the wind window over-air volume and the wind window opening rate of the excavation working face: the ratio between the actual opening area of the wind window and the maximum opening area of the wind window is the opening rate of the wind window of the excavation working face; when the opening rate of the wind window is determined, the wind volume of the wind window is the wind window over-air volume of the excavation working face; when the frequency of the local ventilator of the excavation working face is stable, the conversion relationship between the wind window opening rate and the wind window over-air volume is the conversion between the wind window over-air volume and the wind window opening rate of the excavation working face; Step 4: Adjust the wind windows of the excavation working face and coordinate the wind control with the local fans: When the air volume of the excavation working face needs to change, the wind volume of the excavation working face can be changed by changing the frequency of the local fans or adjusting the wind window opening rate. This is the coordinated wind control of the excavation working face by adjusting the wind windows of the excavation working face and the local fans.
2. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 1 is characterized in that: In the first step, the required air volume is calculated based on the number of personnel at the excavation face, and the calculation formula is: The meanings of the symbols in the formula are: It indicates the required air volume of the excavation working face based on the number of workers, in units of ; It indicates the maximum number of workers working on the excavation face at the same time, in units of individuals.
3. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 1 is characterized in that: In the first step, the required air volume is calculated based on the gas concentration at the excavation working face, and the calculation formula is: The meanings of the symbols in the formula are: It indicates the required air volume of the excavation working face based on the gas concentration, in units of ; It represents the average absolute gas emission in the return air flow of the excavation working face, in units of ; The reserve air volume coefficient indicates the uneven gas outburst in the excavation working face.
4. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 1 is characterized in that: In the first step, the required air volume of the excavation working face is calculated based on the amount of explosives used, and the calculation formula is: The meanings of the symbols in the formula are: Indicates the required air volume for the excavation face calculated based on the amount of explosives used, in units of ; It indicates the maximum amount of explosives used for one blast at the excavation face, in kg.
5. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 1 is characterized in that: In the second step, the air volume of the local ventilator tunneling head is calculated as follows: The meanings of the symbols in the formula are: Indicates the air volume of the local fan duct near the end of the tunneling head, in units of ; Indicates the air volume that the local fan starts to inhale, in units of ; Indicates the air leakage rate of the air duct per 100 meters; Indicates the length of the local fan duct, in meters; After the wind is sucked in by the local ventilator, the air loss rate in the process of flowing along the wind tube to the tunneling end is the wind tube leakage rate per 100 meters. The specific calculation formula for the wind tube leakage rate per 100 meters is: Local ventilation fan air intake The average value is calculated from the monitoring data of the wind speed sensor installed in the wind tube near the local ventilator; Local ventilation fan air volume The average value is calculated from the monitoring data of the wind speed sensor installed in the wind tube on the side close to the tunneling end.
6. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 1 is characterized in that: In the third step, the conversion relationship between the adjustment window opening rate and the adjustment window air flow rate is adjusted by using the least square method for curve fitting, and the specific calculation formula is: The meanings of the symbols in the formula are: Indicates the wind volume of the wind window, the unit is ; Indicates adjusting the wind window opening rate, which can be set on the ground host computer; , , It represents the conversion coefficient between the adjustable wind window air volume and the adjustable wind window opening ratio, obtained through actual calculation.
7. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 6 is characterized in that: Take three groups of wind window adjustment to get the actual air volume Adjustment of the window opening ratio under the corresponding excess air volume Data, substitute the data into the above conversion formula , we can get: Through the above equations, the conversion coefficient of adjusting the wind window air volume and adjusting the wind window opening rate can be calculated: , , .
8. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 1 is characterized in that: In the fourth step, the wind window of the excavation working face is adjusted to coordinate with the local ventilator to control the wind, and the operation method is as follows: Step 41: Calculate the required air volume at the excavation working face; Step 42: determine whether the local ventilator has variable frequency capability; Step 43: If the local ventilator does not have variable frequency capability, use a wind window to adjust the air volume; Step 44: if the local ventilator has variable frequency capability, the frequency of the local ventilator is graded to further determine whether the required air volume of the excavation working face is within the maximum adjustable range of the wind window; Step 45: If the required air volume of the excavation working face is within the maximum adjustable range of the wind window, repeat step 43; Step 46: If the required air volume of the excavation working face is not within the maximum adjustable range of the wind window, a local fan is used to adjust the air volume.
9. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 8 is characterized in that: The operation flow of step 43 is as follows: Step 431, using the least square method to obtain a conversion equation for adjusting the window opening ratio and the excess air volume; Step 432: input the required air volume into the ground host computer to obtain the adjusted wind window opening rate; Step 433: input the adjustment window opening rate into the upper computer on the ground, and adjust the wind window air volume of the excavation working face; Step 434, verifying whether the air volume is adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window; Step 435: Air adjustment is completed.
10. The method for coordinated wind control of the tunneling working face adjusting wind window and local ventilator according to claim 8, characterized in that: The operation flow of step 46 is as follows: Step 461: Input the excavation face length on the ground host computer ; Step 462: Calculate the local ventilation fan leakage rate per 100 meters on the ground host computer ; Step 463: Use the air volume required by the excavation face as the air volume of the local ventilator , calculate the local fan suction volume on the ground host computer ; Step 464: Check the user manual of the local ventilator to obtain the corresponding frequency of the local ventilator under this air suction volume; or enter the manual content into the ground host computer in advance, and enter the air suction volume into the ground host computer to obtain the corresponding frequency; Step 465, adjusting the frequency of the local ventilator to the initially allocated local ventilator frequency level according to the frequency that the local ventilator should adjust; Step 466: Verify whether the air volume is adjusted in place by adjusting the average value of the monitoring data of the wind speed sensor at the wind window; Step 467: Air adjustment is completed.
Citation Information
Cited By
Linkage regulation and control method and system for on-demand air supply of long-distance driving working face
CN120402141A
Ventilation optimization method for underground working environment of coal mine
CN120759619A