Pushing laying construction method for large-pipe-diameter heat supply pipeline in long-distance sleeve

By combining jacks and roller conveyor trolleys to assist in the conveying process, the problems of inconvenient operation and low safety in the construction of large-diameter heating pipelines in long-distance casings have been solved, achieving smooth pipeline laying and efficient construction.

CN118912269APending Publication Date: 2024-11-08JINAN HEATING POWER ENG CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411151945.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Existing technologies are inconvenient to operate and have low safety in the construction of large-diameter heating pipelines within long-distance casings. Furthermore, it is difficult to reliably fix the winch, resulting in high resistance during pipe insertion and making it impossible to complete the construction smoothly.

Method used

A jack is used to provide stable thrust, which, combined with a rolling support bracket and an auxiliary conveying trolley, provides stable support for the large-diameter heating pipe. The heating pipe is pushed section by section, and the combination of the jack and the support bracket enables smooth movement.

Benefits of technology

It enables the smooth laying of large-diameter heating pipes in long-distance casings, improves construction efficiency, facilitates and speeds up operation, ensures construction safety, and avoids the safety risks of personnel entering the casing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912269A_ABST
    Figure CN118912269A_ABST
Patent Text Reader

Abstract

The invention discloses a pushing laying construction method for a large-pipe-diameter heat supply pipeline in a long-distance sleeve, which comprises the following steps of: installing a jack outside the sleeve, and enabling the distance between a sleeve opening and the jack to be greater than the length of the heat supply pipeline; a row of rolling and conveying brackets are arranged between the sleeve and the jack; the first section of heat supply pipe is hoisted to a rolling and conveying bracket in front of the sleeve and is aligned with the opening of the sleeve; an auxiliary conveying trolley is placed below the end, close to the sleeve opening, of the heat supply pipe and fixedly connected with the heat supply pipe; the heat supply pipe is pushed into the sleeve through a jack, and the auxiliary conveying trolley below the heat supply pipe is made to be erected in the sleeve; the second section of heat supply pipe is operated in the same mode and is connected with the first section of heat supply pipe; sequentially laying the heat supply pipes from the rear section to the last section of heat supply pipe; and sand is filled between the sleeve and the heat supply pipe for fixing. The pipe penetrating resistance can be reduced, the large-pipe-diameter heat supply pipeline can be smoothly laid in the long-distance sleeve, operation is convenient, and safety and reliability are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of heating pipe network construction, and in particular to a method for jacking and laying a large-diameter heating pipe in a long-distance casing. Background Art

[0002] Long-distance heating pipeline network refers to a heating system with a pipeline transmission distance of more than 20km and a relay pump station or pressure isolation station, and its heating area is more than 15 million square meters (nominal diameter of the pipeline ≥ DN1200). With the increasing pressure of the atmospheric environment, the heating industry has been exploring more environmentally friendly heating methods, such as using the waste heat resources of thermal power plants for centralized heating. If the production waste heat of large thermal power plants, steel mills and other enterprises around the city is used, it is necessary to build a long-distance heating pipeline network to transport the waste heat to the city for centralized heating. The long-distance heating pipeline network is designed to have a long route, and the environment along the way is complex and diverse. It may pass through farmland, forest land, rivers, railways, roads, existing buildings (structures), etc. At present, when the long-distance heating pipeline network crosses rivers, railways, roads, and existing buildings (structures), the jacking method is often used to construct reinforced concrete casings, and then the heating pipeline is laid into the casing in the jacking working well.

[0003] Chinese invention patent CN114857353A discloses a construction method for inserting a steel-in-steel steam pipe in a jacking pipe, comprising the following steps: pushing the concrete jacking pipe into place; pouring a reinforced concrete cushion layer; installing a trolley stopper; installing a traction limiter; inserting the pipe of the first section of the steel-in-steel steam pipe section; inserting the pipe of the next section of the steel-in-steel steam pipe section; repeating the previous step multiple times until the pipe insertion of multiple sections of the steel-in-steel steam pipe section is completed and the construction is completed. The present invention pours a reinforced concrete cushion layer in the concrete jacking pipe, and applies silicone grease to reduce the friction resistance of the trolley. A pipe insertion trolley is welded at a certain distance at the bottom of the steel-in-steel steam pipe section, and a winch is used to pull and drag it, through the trolley stopper and the traction limiter, so as to ensure that the steel-in-steel steam pipes move forward one by one according to the predetermined route and reach the designed position.

[0004] The above patent effectively controls the phenomenon of preventing the steam pipe from deviating to the left or right during the pipe threading process, and solves the linear control of the overall steam pipe for long-distance pipe threading. However, during the construction of large-diameter heating pipes in long-distance casings, operators are required to enter the casing to cast reinforced concrete cushion layers and insert guide chains or wire ropes. The operation is very inconvenient and unsafe, and it is difficult to reliably fix the winch. The large-diameter heating pipe has a large weight and a large resistance to pipe threading in the casing. As the number of pipe sections inserted into the casing continues to increase, the traction force of the winch is insufficient, and the pipe threading cannot be completed smoothly. Summary of the invention

[0005] The present invention is to overcome the shortcomings of the above-mentioned prior art and provide a method for jacking and laying large-diameter heating pipes in long-distance casings. The present invention uses the stable thrust provided by the jack, the rolling bracket and the auxiliary conveying trolley to provide stable support for the large-diameter heating pipes, and jacks the heating pipes section by section to ensure that they can move forward smoothly and stably, so as to achieve the smooth laying of large-diameter heating pipes in long-distance casings, which is convenient and quick to operate and improves the construction efficiency.

[0006] The technical solution adopted by the present invention to solve the technical problem is: a construction method for jacking and laying a large-diameter heating pipe in a long-distance casing, comprising the following steps:

[0007] Step 1: Install a jack outside the casing so that the distance between the casing opening and the jack is greater than the length of the heating pipe;

[0008] Step 2: Install a row of rolling brackets between the casing and the jack;

[0009] Step 3: Hang the first section of the heating pipe on the rolling bracket in front of the casing and align it with the casing opening;

[0010] Step 4: Place an auxiliary conveying trolley below one end of the heating pipe close to the sleeve opening and fix it to the heating pipe;

[0011] Step 5: Use a jack to push the heating pipe into the casing, and place the auxiliary conveying trolley underneath it in the casing;

[0012] Step 6: Hang the second section of the heating pipe on the rolling bracket in front of the casing and connect it to the first section of the heating pipe;

[0013] Step 7: Place an auxiliary conveying trolley under the connection between the two heating pipes and fix it to the heating pipes;

[0014] Step 8: Use a jack to push the second section of the heating pipe into the casing, and place the auxiliary conveying trolley below the connection in the casing;

[0015] Step 9: Repeat steps 6 to 8, and lay the third heating pipe, the fourth heating pipe, and the last heating pipe in sequence;

[0016] Step 10: Fill sand between the casing and the heating pipe to fix it.

[0017] Preferably, in the step one, a jack is installed on the back wall produced during the construction of the reinforced concrete casing, and the jack is aligned with the pipe opening.

[0018] Preferably, when installing the rolling bracket in step 2, first align the grooved buffer roller groups of multiple rolling brackets arranged side by side one by one and align them with the casing openings, and then fix the steel support of the rolling bracket to the ground; finally, hang the heating pipe onto the grooved buffer roller group of the rolling bracket.

[0019] Preferably, the grooved buffer roller group includes a row of rollers in the middle and two rows of rollers on both sides, the rollers in the middle are arranged horizontally, and the rollers on both sides are arranged inclined outwards.

[0020] Preferably, in step four, the arc-shaped steel plate of the auxiliary conveying trolley is supported on the lower side of the heating pipe and fixedly connected to the heating pipe.

[0021] Preferably, when the heating pipe is pushed by the jack, the small transport tank under the auxiliary conveying trolley is placed on the inner wall of the casing to support the heating pipe in the casing, and the arc-shaped steel plate is installed on the small transport tank through a steel pipe frame.

[0022] Preferably, when the heating pipe is pushed into the casing by using a jack, a margin is reserved at the casing opening to be connected with the next heating pipe.

[0023] Preferably, interface insulation construction is performed at the connection point of the two heating pipes.

[0024] Preferably, the two heat supply seals are fixed by welding and the welds are subjected to non-destructive testing.

[0025] Preferably, the filling sand in step ten is fixed by a dry sandblasting reinforcement process to fill the gap between the casing and the heating pipe tightly and fix the position of the heating pipe in the casing.

[0026] Compared with the prior art, the advantages and positive effects of the present invention are:

[0027] (1) The present invention utilizes the stable thrust provided by the jack, the rolling bracket and the auxiliary conveying trolley to provide stable support for the large-diameter heating pipes, and pushes the heating pipes section by section to ensure that they can move forward smoothly and stably, thereby realizing the smooth laying of large-diameter heating pipes in long-distance casings. This method is not only convenient and quick to operate, but also greatly improves construction efficiency.

[0028] (2) The present invention can reduce the resistance to pipe penetration and realize the smooth laying of large-diameter heating pipes in long-distance casings, which is easy to operate, safe and reliable.

[0029] (3) The present invention does not require operators to enter the casing, thus avoiding possible safety risks. This not only ensures the safety of construction workers, but also ensures the smooth progress of the entire project.

[0030] (4) The auxiliary transport trolley is placed inside the casing to support the heating pipe inside the casing and can slide forward to facilitate the installation of the heating pipe.

[0031] (5) When using a jack to push the first section of the heating pipe into the casing, leave some margin at the casing opening to facilitate connection with the next heating pipe.

[0032] (6) The grooved buffer roller group of the roller conveyor bracket is used to support the heating pipe. The middle roller is set horizontally, and the rollers on both sides are set outwardly inclined, which has good use effect and high efficiency.

[0033] (7) The back wall made during the construction of reinforced concrete casing is used to provide reaction force for the jack used in the construction of heating pipe top push installation, which saves costs and is practical and reliable. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a flow chart of the steps of the present invention;

[0035] Figure 2 is a schematic diagram of the rolling bracket structure;

[0036] Figure 3 This is a schematic diagram of the auxiliary conveying trolley structure.

[0037] Description of reference numerals:

[0038] 1- rolling bracket, 11- grooved buffer roller group, 12- steel bracket, 13- roller;

[0039] 2- auxiliary transport trolley, 21- curved steel plate, 22- steel pipe rack, 23- transporting small tank. DETAILED DESCRIPTION

[0040] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0041] Example

[0042] The present invention is further described below in conjunction with the accompanying drawings, a method for installing a large-diameter heating pipe in a long-distance casing by pushing and laying, such as Figure 1 As shown, the following steps are included:

[0043] Step 1: First make a bracket, fix the jack on the jack bracket, and then install the jack on the back wall made during the construction of the reinforced concrete casing. Use the back wall made during the construction of the reinforced concrete casing to provide reaction force for the jack for the top pushing installation of the heating pipe, and then debug the jack system.

[0044] At the same time, the jack should be aligned with the casing opening, and the distance between the casing opening and the jack should be greater than the length of the heating pipe.

[0045] Step 2: Install a row of rolling brackets 1 between the casing and the jack, and arrange the rolling brackets at a spacing of 2m according to the weight of the heating pipe; when installing the rolling brackets 1, first align the grooved buffer roller groups 11 of multiple rolling brackets 1 arranged side by side one by one, and align them with the casing opening, and then fix the steel support 12 of the rolling bracket 1 to the ground.

[0046] like Figure 2 As shown, the grooved buffer roller group 11 includes a row of rollers 13 in the middle and two rows of rollers 13 on both sides. The rollers 13 in the middle are arranged horizontally, and the rollers 13 on both sides are arranged inclined outwards.

[0047] Step 3: Use a crane to lift the first section of the heating pipe onto the grooved buffer roller set 11 of the rolling bracket 1 and align it with the casing opening.

[0048] Step 4: Place an auxiliary conveying trolley 2 below one end of the heating pipe close to the sleeve opening, support the arc-shaped steel plate 21 of the auxiliary conveying trolley 2 on the lower side of the heating pipe, and fix it to the heating pipe.

[0049] Step 5: Use a jack to push the first section of the heating pipe into the casing, and place the auxiliary transport trolley 2 below it in the casing, that is, the small transport tank 23 below the auxiliary transport trolley 2 is placed on the inner wall of the casing, supporting the heating pipe in the casing and being able to slide forward to facilitate the installation of the heating pipe.

[0050] like Figure 3 As shown, the arc-shaped steel plate 21 is installed on a small transport tank 23 through a steel pipe frame 22.

[0051] When using a jack to push the first section of the heating pipe into the casing, leave a margin at the casing mouth, that is, the rear end of the first section of the heating pipe leaks 50 cm outside the casing to facilitate connection with the next heating pipe.

[0052] Step 6: Use a crane to lift the second section of the heating pipe onto the grooved buffer roller group 11 of the rolling bracket 1 in front of the casing, and align the second section of the heating pipe with the first section of the heating pipe. Use manual welding or automatic welding technology to seal and fix the interface between the first section of the heating pipe and the second section of the heating pipe, and after the weld is qualified by non-destructive testing, at the same time, perform interface insulation construction at the connection between the first section of the heating pipe and the second section of the heating pipe.

[0053] Step 7: Place an auxiliary conveying trolley 2 below the connection between the two heating pipes, support the arc-shaped steel plate 21 of the auxiliary conveying trolley 2 on the lower side of the heating pipes, and fix them to the heating pipes.

[0054] Step 8: Use a jack to push the second section of the heating pipe into the casing, and place the small transport tank 23 under the auxiliary transport trolley 2 on the inner wall of the casing to support the heating pipe in the casing.

[0055] Step 9: Repeat steps 6 to 8, and lay the third heating pipe, the fourth heating pipe, and finally the last heating pipe in sequence.

[0056] Step 10: Fill sand between the casing and the heating pipe to fix it, use dry sandblasting reinforcement technology to fill the gap between the casing and the heating pipe densely, and fix the position of the heating pipe in the casing.

[0057] In the description of the present invention, the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the purpose of describing the present invention rather than requiring the present invention to be constructed or operated in a specific position, and therefore should not be construed as limiting the present invention. The terms "connected" and "connected" in the present invention should be understood in a broad sense, for example, it can be a connection or a detachable connection; it can be a direct connection or an indirect connection through an intermediate component. For those of ordinary skill in the art, the specific meanings of the above terms can be understood according to specific circumstances.

[0058] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes for application in other fields. However, any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A method for jacking and laying a large-diameter heating pipeline in a long-distance casing, characterized in that: The following steps are involved: Step 1: Install the jack outside the casing so that the distance between the casing opening and the jack is greater than the length of the heating pipe; Step 2: Install the rolling bracket (1), and install a row of rolling brackets (1) between the sleeve and the jack; Step 3: hoist the first section of the heating pipe, and hoist the first section of the heating pipe onto the rolling bracket (1) in front of the casing, and align it with the casing opening; Step 4: placing an auxiliary conveying trolley (2), placing an auxiliary conveying trolley (2) below one end of the heating pipe close to the sleeve opening, and fixedly connecting the auxiliary conveying trolley to the heating pipe; Step 5: Push the first section of the heating pipe into the casing using a jack, and place the auxiliary transport trolley (2) below it in the casing; Step 6: hoist the second section of the heating pipe, hoist the second section of the heating pipe onto the rolling bracket (1) in front of the casing, and connect it to the first section of the heating pipe; Step 7: Place an auxiliary transport trolley (2) below the connection between the two heating pipes and fix it to the heating pipes; Step 8: Push the second section of the heating pipe into the casing using a jack, and place the auxiliary transport trolley (2) below the connection in the casing; Step 9: Repeat steps 6 to 8, and lay the third heating pipe, the fourth heating pipe, and the last heating pipe in sequence; Step 10: Fill sand between the casing and the heating pipe to fix them.

2. A method for jacking and laying a large-diameter heating pipeline in a long-distance casing according to claim 1, characterized in that: In the step 1, a jack is installed on the back wall made during the construction of the reinforced concrete casing, and the jack is aligned with the pipe opening.

3. A method for jacking and laying a large-diameter heating pipeline in a long-distance casing according to claim 1, characterized in that: When installing the rolling bracket (1) in the second step, first align the grooved buffer roller groups (11) of the plurality of rolling brackets (1) arranged side by side one by one and align them with the sleeve openings, and then fix the steel bracket (12) of the rolling bracket (1) to the ground; Finally, the heating pipe is hung on the grooved buffer roller group (11) of the rolling bracket (1).

4. A method for jacking and laying a large-diameter heating pipeline in a long-distance casing according to claim 3, characterized in that: The grooved buffer roller group (11) comprises a row of rollers (13) in the middle and two rows of rollers (13) on both sides. The rollers (13) in the middle are arranged horizontally, and the rollers (13) on both sides are arranged inclined outwards.

5. The method for installing a long-distance large-diameter heating pipeline in a casing by pushing and laying according to claim 1 is characterized in that: In the fourth step, the arc-shaped steel plate (21) of the auxiliary conveying trolley (2) is supported on the lower side of the heating pipe and fixedly connected to the heating pipe.

6. A method for jacking and laying a large-diameter heating pipeline in a long-distance casing according to claim 5, characterized in that: When the heating pipe is pushed by the jack, the small transport tank (23) under the auxiliary transport trolley (2) is placed on the inner wall of the casing to support the heating pipe in the casing, and the arc-shaped steel plate (21) is installed on the small transport tank (23) through the steel pipe frame (22).

7. A method for jacking and laying a large-diameter heating pipeline in a long-distance casing according to claim 1, characterized in that: When the heating pipe is pushed into the casing by using a jack, a margin is reserved at the casing opening to be connected with the next heating pipe.

8. The method for jacking installation of a large-diameter heating pipeline in a long-distance casing according to claim 1 is characterized in that: Interface insulation construction is performed at the connection point of the two heating pipes.

9. A method for jacking and laying a large-diameter heating pipeline in a long-distance casing according to claim 1, characterized in that: The two heating pipes are sealed and fixed by welding, and the welds are subjected to non-destructive testing.

10. A method for jacking and laying a large-diameter heating pipeline in a long-distance casing according to claim 1, characterized in that: In the step 10, the filling sand is fixed by using a dry sandblasting reinforcement process to fill the gap between the casing and the heating pipe tightly and fix the position of the heating pipe in the casing.