Blasting treatment method for large triangular ore body

By laying interlaced fan holes on the two working faces of the triangular ore body and adjusting the inclination angle of the holes, the difficulty of blasting treatment of the triangular ore body is solved, a more uniform blasting force distribution and higher blasting efficiency are achieved, and explosives are reduced The issue of waste and rock root retention.

CN118913035AActive Publication Date: 2024-11-08TIANJIN MINING ENG
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411279083.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-08
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

In open-pit mines, the high height and irregular shape of the triangular ore body make it difficult to deal with blasting, especially the blasting of edge lone stones requires a safe and reliable solution, and the drilling rig is limited in height, so it is difficult to recover ore volume after blasting. Traditional blasting The triangular ore body cannot be effectively removed.

Method used

By adopting the joint blasting method, the interlaced fan holes are arranged on the two working faces of the triangular ore body to form a mesh projection surface to achieve a more uniform blasting force distribution, and the inclination angle of the hole is adjusted according to the inclination of the ore body to ensure that Blast thoroughly and avoid waste of explosives.

Benefits of technology

The greater coverage blasting of the triangular ore body is achieved, reducing the possibility of rock roots remaining at the bottom after blasting, improving blasting efficiency and safety, avoiding excessive use of explosives, and ensuring the convenience of ore cleaning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913035A_ABST
    Figure CN118913035A_ABST
Patent Text Reader

Abstract

The invention relates to a blasting treatment method for a large triangular ore body, and relates to the technical field of mining. A blasting treatment method for a large triangular ore body comprises the steps that one side face of the triangular ore body is selected as a first working face, and three rows of fan-shaped holes which are formed in a staggered mode are formed in the first working face in the height direction; a second working face of the other face of the triangular ore body is selected, and three rows of fan-shaped holes which are formed in a staggered mode are formed in the second working face in the height direction; the fan-shaped holes comprise deep holes and shallow holes, and the shallow holes are formed in the edge, away from the junction of the first working face and the second working face, of each row of fan-shaped holes; the fan-shaped holes in the first working face and the second working face are projected, the projection faces are matched with the shape of the bottom face of the triangular ore body, and projection lines of the fan-shaped holes in the first working face in the middle of the bottom face of the triangular ore body and projection lines of the fan-shaped holes in the second working face in the middle of the bottom face of the triangular ore body intersect to form a net. The blasting treatment method for the large triangular ore body has the effects that blasting is thorough, and explosive waste is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of open-pit mining, and in particular relates to a blasting treatment method for a large triangular ore body. Background Art

[0002] With the maturity of modern open-pit mining technology, the development of blasting materials, various explosive properties, rock and soil blasting technology, and network mobile information, the marginal rock blasting treatment plan has a certain foundation.

[0003] The Dazhazi limestone mine belongs to the Qilian Mountains, which is a high mountain terrain with deep valleys, strong cutting, crisscrossing valleys and complex terrain. The ore body is composed of fine-grained limestone and pseudo-oolitic limestone, which is generally hard, dense, complete and stable. There are many cliffs in the exposed part of the ore layer, and irregular triangular ore bodies, fish spine ridges and boulders are formed in many places on the eastern edge, forming a barrier extending from east to west. In the horizontal layered mining, each section mined will have some strip or circular ring ore bodies left around it that cannot be blasted by conventional blasting. Because the ore body is triangular, it is called a triangular ore body.

[0004] Clearing the triangular ore body is a prerequisite for opening up new working faces. The triangular ore body is limited by its external geometric shape. Three sides of the triangular ore body are suspended in the air, and the bottom is triangular fan-shaped. There are two perforated working faces in the west and north. The center can be measured to reach 20 to 30 meters. The bottom width of the west side is 20 to 30 meters, and the bottom width of the north side is 20 to 30 meters, forming a triangular shape.

[0005] On the one hand, the height of the triangular ore body is relatively high, while the height of the drill arm is limited, so the hole layout height is limited. On the other hand, the rock shape is irregular, and it is difficult to recover the ore after blasting. In addition, the Zhongping Highway and Zhonglian Mine Quarry are directly below the edge of the ore body. Clearing the site before detonation is an important task, and the blasting risk needs to be strictly controlled. Therefore, a safe, reliable and reasonable plan needs to be designed for the edge rock blasting construction. Summary of the invention

[0006] We hope to provide a method for implementing joint blasting from two working faces of a triangular ore body, thereby enabling the blasting coverage of the triangular ore body to be greater.

[0007] The present application provides a method for blasting a large triangular ore body, which adopts the following technical solution: A method for blasting a large triangular ore body, comprising the steps of: Selecting one side surface of the triangular ore body as a first working surface, and arranging at least three rows of staggered fan-shaped holes on the first working surface along the height direction; Select a second working surface on the other side of the triangular ore body, and arrange at least three rows of staggered fan-shaped holes on the second working surface along the height direction; The fan-shaped holes include deep holes and shallow holes, and each row of fan-shaped holes forms shallow holes away from the edge where the first working surface and the second working surface meet; The fan-shaped holes on the first working surface and the second working surface are projected to form a projection surface that adapts to the bottom surface shape of the triangular ore body. The projection lines of the fan-shaped holes on the first working surface in the middle of the bottom surface of the triangular ore body and the projection lines of the fan-shaped holes on the second working surface in the middle of the bottom surface of the triangular ore body intersect to form a network.

[0008] By adopting the above technical scheme, the projection lines of the fan-shaped holes on the first working surface in the middle of the bottom surface of the triangular ore body and the projection lines of the fan-shaped holes on the second working surface in the middle of the bottom surface of the triangular ore body intersect to form a network, thereby making the blasting force more evenly distributed from top to bottom, and achieving more thorough blasting during the layered blasting process.

[0009] Optionally, when three rows of fan-shaped holes are arranged on the first working surface along the height direction: The first row of holes is 1 to 2 meters above the horizontal surface of the ore body, with an average hole spacing of 3.2 to 3.5 meters. One or two shallow holes are formed at the edge with a depth of 10.5 to 15.5 meters. Five to ten deep holes are arranged between the junction and the edge with a depth of 17 to 22 meters. The distance between the second row of holes and the first row of holes is between 1.8 meters and 2 meters, the average hole distance is between 3.2 meters and 3.5 meters and the angle is inclined upward, 3 or 6 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 5 to 10 deep holes are arranged between the junction and the edge with a depth of 17 meters to 22 meters; The distance between the third row of holes and the second row of holes is between 1.8 meters and 2 meters, the average hole distance is between 3.2 meters and 3.5 meters, the angle is inclined upward and the inclination angle is greater than the inclination angle of the second row of holes, 3 or 6 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 3 to 6 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters; When three rows of fan-shaped holes are arranged on the second working surface along the height direction: The first row of holes is 1 to 2 meters above the horizontal surface of the ore body, with an average hole spacing of 3.2 to 3.5 meters. Two or four shallow holes are formed at the edge with a depth of 12 to 17 meters. Four to eight deep holes are arranged between the junction and the edge with a depth of 15 to 20 meters. The distance between the second row of holes and the first row of holes is between 1.8 meters and 2 meters, the average hole distance is between 3.2 meters and 3.5 meters and the angle is inclined upward, 2 or 4 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 4 to 8 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters; The spacing between the third row of holes is between 1.8 meters and 2 meters from the second row of holes, and the average hole spacing is between 3.2 meters and 3.5 meters. The angle is inclined upward and is greater than that of the second row of holes. 2 or 4 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters. 5 to 10 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters.

[0010] By adopting the above technical solution, the upward inclination angle of each row of holes on the two working surfaces gradually increases with the increase of height. The first row of holes is parallel to the bottom surface of the triangular ore body and is not inclined, which can make the bottom of the triangular ore body easier to crush and reduce the possibility of rock roots remaining at the bottom of the triangular ore body after blasting. The blasting and crushing of rocks can be cleaned up later.

[0011] Optionally, the center height of the triangular ore body is H=23 meters, the bottom width of the first working face is 22 meters, and the bottom width of the second working face is 20 meters; When three rows of fan-shaped holes are arranged on the first working surface along the height direction: The first row of holes is 1 meter above the horizontal surface of the ore body, with an average hole spacing of 3.2 meters. A shallow hole is formed at the edge with a depth of 10.5 meters, and 5 deep holes are arranged between the junction and the edge with a depth of 17 meters; The second row of holes is 2 meters away from the first row of holes, with an average hole spacing of 3.2 meters. The perforation angle is 15°, 3 shallow holes are formed at the edge with a depth of 12 meters, and 5 deep holes are arranged between the junction and the edge with a depth of 17 meters. The third row of holes is 2 meters away from the second row of holes, with an average hole spacing of 3.2 meters. The perforation angle is 30°, with 3 shallow holes at the edge and a depth of 12 meters. Three deep holes are arranged between the junction and the edge and a depth of 15 meters. When three rows of fan-shaped holes are arranged on the second working surface along the height direction: The first row of holes is 1 meter above the horizontal surface of the ore body, with an average hole spacing of 3.2 meters. Two shallow holes are formed at the edge with a depth of 12 meters, and four deep holes are arranged between the junction and the edge with a depth of 15 meters. The second row of holes is 2 meters away from the first row of holes, with an average hole spacing of 3.2 meters. The perforation angle is 15°, with 2 shallow holes at the edge and a depth of 12 meters. Four deep holes are arranged between the junction and the edge and a depth of 15 meters. The spacing between the third row of holes is 2 meters from that of the second row of holes, with an average hole spacing of 3.2 meters. The upward perforation angle is 30°, and two shallow holes with a depth of 12 meters are formed at the edge. Five deep holes with a depth of 15 meters are arranged between the junction and the edge.

[0012] By adopting the above technical solution, each row is evenly dispersed inside the rock mass and formed into a fan shape, with small resistance lines and plum blossom-shaped holes densely arranged, which can complete the blasting and clearing work of the triangular ore body in one go.

[0013] Optionally, when three rows of fan-shaped holes are arranged on the first working surface or the second working surface along the height direction: The intersection of the middle hole length of the second row of holes on the same working surface and the center height H of the triangular ore body is at the same horizontal height as the starting point of the third row of holes.

[0014] By adopting the above technical solution, the extension point of the explosives in the second row of holes on each working face can reach at least the entrance height of the third row of holes in the center of the triangular ore body, thereby reducing the possibility of rock remaining in the ore body at the entrance height of the third row of holes.

[0015] Optionally, when the angle between any working face and the horizontal plane of the ore body stope is a, and 45°<a≤60°: The end point of the middle hole length in the third row of holes is located on the center height H of the triangular ore body. The middle hole length in the second row of holes on the same working surface passes through the center height H of the triangular ore body and the end point is located on the line connecting the intersection O of the middle hole length in the third row of holes and the center height H of the triangular ore body and the vertex point of the triangular ore body facing the working surface.

[0016] By adopting the above technical scheme, when the inclination angle of the triangular ore body is relatively small, the holes inside the triangular ore body are formed into a triangular cone with a larger apex angle than the apex angle of the triangular ore body, and the blasting surface of the triangular ore body is made to be larger, thereby reducing the situation where the bottom blasting is not thorough and rock layers remain when the inclination angle of the triangular ore body is small.

[0017] Optionally, when the angle between any working face and the horizontal plane of the ore body stope is a, and 60°<a≤75°: A first vertical plane perpendicular to the horizontal plane of the ore body stope is formed, the midpoint of the bottom width of the second working surface, the line connecting the bottom edge of the non-working surface of the triangular ore body and the center height H of the triangular ore body constitute the first vertical plane, and the projections of the three rows of deep holes on the first working surface are located on the first vertical plane; A second vertical plane perpendicular to the horizontal plane of the ore body mining area is formed. The midpoint of the bottom width of the first working surface, the connecting line of the bottom edge of the non-working surface of the triangular ore body and the center height H of the triangular ore body constitute the second vertical plane. The projections of the three rows of deep holes on the second working surface are located on the second vertical plane.

[0018] By adopting the above technical scheme, when the triangular ore body is relatively steep, since the central part of the triangular ore body is the most difficult to blast, a tetrahedral pyramid hole distribution body is formed in the central part of the triangular ore body. By arranging the blasting positions on the entire tetrahedral pyramid, the tetrahedral pyramid can achieve effective blasting while ensuring the blasting effect of the triangular ore body and avoiding the waste of explosives.

[0019] Optional, deep hole single hole charge: Q = q × a × b × H = 0.41kg / m³ × 3.2m × 2m × 23m ≈ 60kg; q represents the unit consumption of explosives, a represents the hole spacing, b represents the row spacing, and H represents the center height of the triangular ore body; The charge amount of a single shallow hole: Q = q × a × W × H = 0.41kg / m³ × 3.2m × 1.06m × 23m ≈ 33kg; q represents the unit consumption of explosives, a represents the hole distance, H represents the center height of the triangular ore body, and W represents the minimum resistance line. The resistance line is the minimum distance between the shallow hole and the free surface, and the free surface is the surrounding plane of the triangular ore body.

[0020] By adopting the above technical solution, the minimum safe distance for flying rocks in this blasting complies with the minimum safe distance for flying rocks in the "Safety Regulations for Blasting" (GB6722-2014).

[0021] Optionally, the first row of holes on the same working surface forms a transmission row, and the second row of holes and the third row of holes form a control row; Control each hole in the first row of holes to form a micro-difference blast, and the micro-difference time is 17 milliseconds; The second row of holes is controlled to form a micro-difference blasting relative to the first row of holes, and the micro-difference time is 42 milliseconds; The third row of holes is controlled to form a micro-difference blasting relative to the second row of holes, and the micro-difference time is 42 milliseconds.

[0022] By adopting the above technical solution, the time difference and detonation point of each hole are adjusted, and large isolated rocks can be blasted and removed at one time.

[0023] Optionally, the rows of holes on the first working surface and the rows of holes on the second working surface are arranged alternately up and down.

[0024] By adopting the above technical solution, the height of the explosive layout is more layered, avoiding blasting from the same height of two working faces, which would cause waste of explosives.

[0025] In summary, the present application includes at least one of the following beneficial technical effects: the holes on the two working faces are arranged crosswise to form a network, so that the blasting force can be distributed more evenly from top to bottom, and the blasting can be more thorough during the layered blasting process; in addition, the inclination angle of each row of holes can be set according to the inclination of the triangular ore body to avoid the appearance of root rock due to incomplete blasting, and at the same time avoid excessive use of explosives, so that the explosives are reasonably configured and the blasting is effective. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the three-dimensional structure of a large triangular ore body embodying the present application; Figure 2 It is a top view of the hole arrangement of a large triangular ore body embodying the present application; Figure 3It is a schematic diagram of micro-difference blasting of a large triangular ore body embodying the present application; Figure 4 It is a structural schematic diagram of another embodiment of a large triangular ore body of the present application; Figure 5 It is a schematic diagram of the relationship between the first working face of a large triangular ore body and the center height H of the triangular ore body embodying the present application.

[0027] Description of reference numerals: 1. First working surface; 2. Second working surface; 3. First vertical surface; 3. Second vertical surface; L1. First row of holes; L10. First row of holes; L2. Second row of holes; L20. Second row of holes; L3. Third row of holes; L30. Third row of holes. DETAILED DESCRIPTION

[0028] The following is combined with Figure 1-Figure 5 This application is described in further detail.

[0029] The embodiment of the present application discloses a method for blasting a large triangular ore body.

[0030] See also Figure 1 and Figure 2 , a blasting treatment method for a large triangular ore body, comprising: Step S1: selecting one side surface of the triangular ore body as the first working surface 1, and arranging at least three rows of staggered fan-shaped holes on the first working surface 1 along the height direction; Specifically, the first working surface 1 includes three rows of holes, the first row of holes L1 includes holes L11, L12, L13... arranged in sequence, the second row of holes L2 includes holes L21, L22, L23... arranged in sequence, and the third row of holes L3 includes holes L31, L32, L33... arranged in sequence.

[0031] Taking the first row of holes L1 as an example, the projections of the holes in the same row on the bottom surface of the triangular ore body are fan-shaped, which is manifested as the lengths of two adjacent holes in the same row of holes have an angle and diverge at the bottom of the holes. Figure 2 In the figure, L11 and L12 are not parallel and have an angle, and the distance between the bottom of the two holes is larger than that between the mouths of the two holes. The projections of the holes in the second row of holes L2 and the third row of holes L3 on the bottom of the triangular ore body are also fan-shaped, which can be specifically referred to the first row of holes L1. The layout of the fan-shaped holes can concentrate the blasting force on the bottom of the ore body of the isolated rock and cover the entire area, which helps to cover the blasting surface more comprehensively, and the rock crushing effect is better to avoid the occurrence of rock retention.

[0032] The three rows of holes are staggered, that is, one of the holes in the third row is arranged above each adjacent two holes in the second row, and one of the holes in the first row is arranged below each adjacent two holes in the second row. As a result, the overall hole arrangement on the working surface is in a plum blossom shape, which can more evenly distribute the blasting force on different parts of the isolated rock, reduce local stress concentration, and thus more effectively break the rock.

[0033] Step S2: selecting a second working surface 2 on the other side of the triangular ore body, and arranging at least three rows of staggered fan-shaped holes on the second working surface 2 along the height direction; Specifically, the second working surface 2 includes three rows of holes, the first row of holes L10 includes holes L101, L102, L103... arranged in sequence, the second row of holes L20 includes holes L201, L202, L203... arranged in sequence, and the third row of holes L30 includes holes L301, L302, L303... arranged in sequence.

[0034] Taking the first row of holes L10 as an example, the projections of the holes in the same row on the bottom surface of the triangular ore body are fan-shaped, which is manifested as the lengths of two adjacent holes in the same row of holes having an angle and diverging at the bottom of the holes. For details, please refer to the first row of holes L1 mentioned above, which will not be described in detail here. The layout of fan-shaped holes can concentrate the blasting force on a specific area of ​​the isolated rock to avoid the occurrence of rock retention.

[0035] The three rows of holes on the second working surface 2 are also arranged in a staggered manner, and the overall hole arrangement on the working surface is also in a plum blossom shape. For details, please refer to step S1, which will not be repeated here.

[0036] Step S3: each row of fan-shaped holes includes deep holes and shallow holes, and each row of fan-shaped holes forms shallow holes away from the edge where the first working surface 1 and the second working surface 2 meet; Specifically, since the boulder has an irregular shape, some parts are long and some parts have corners, the perforation depths are different, and the boulder at the side far away from the junction of the first working surface 1 and the second working surface 2 is generally thinner, so a shallow hole is set.

[0037] Step S4: Project the fan-shaped holes on the first working surface 1 and the second working surface 2, and the formed projection surface adapts to the bottom shape of the triangular ore body. The projection lines of the fan-shaped holes on the first working surface 1 in the middle of the bottom surface of the triangular ore body and the projection lines of the fan-shaped holes on the second working surface 2 in the middle of the bottom surface of the triangular ore body intersect to form a network, thereby making the blasting force more evenly distributed from top to bottom, and in the process of layered blasting, the blasting can be more thorough.

[0038] The blasting treatment method of a large triangular ore body of the present application is applicable to triangular ore bodies with a center height H between 21 meters and 28 meters, a bottom width of the second working surface 1 between 18 meters and 25 meters, and a bottom width of the first working surface 2 between 20 meters and 27 meters.

[0039] When three rows of fan-shaped holes are arranged on the first working surface 1: The first row of holes L1 is 1 to 2 meters high from the horizontal surface of the ore body, with an average hole spacing of 3.2 to 3.5 meters. One or two shallow holes are formed at the edge with a depth of 10.5 to 15.5 meters. Five to ten deep holes are arranged between the junction and the edge with a depth of 17 to 22 meters.

[0040] The spacing between the second row of holes L2 and the first row of holes L1 is between 1.8 meters and 2 meters, the average hole spacing is between 3.2 meters and 3.5 meters, the upward perforation angle is 15° to 29°, 3 or 6 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 5 to 10 deep holes are arranged between the junction and the edge with a depth of 17 meters to 22 meters.

[0041] The spacing between the third row of holes L3 and the second row of holes L2 is between 1.8 meters and 2 meters, the average hole spacing is between 3.2 meters and 3.5 meters, the upward perforation angle is 30° to 45°, 3 or 6 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 3 to 6 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters.

[0042] When three rows of fan-shaped holes are arranged on the second working surface 2: The first row of holes L10 is 1 to 2 meters high from the horizontal surface of the ore body, with an average hole spacing of 3.2 to 3.5 meters. Two or four shallow holes are formed at the edge with a depth of 12 to 17 meters. Four to eight deep holes are arranged between the junction and the edge with a depth of 15 to 20 meters.

[0043] The spacing between the second row of holes L20 and the first row of holes L10 is between 1.8 meters and 2 meters, the average hole spacing is between 3.2 meters and 3.5 meters, the upward perforation angle is 15° to 29°, 2 or 4 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 4 to 8 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters.

[0044] The spacing between the third row of holes L30 and the second row of holes L20 is between 1.8 meters and 2 meters, the average hole spacing is between 3.2 meters and 3.5 meters, the upward perforation angle is 30° to 45°, 2 or 4 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 5 to 10 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters.

[0045] The upward inclination angle of each row of holes on the two working surfaces gradually increases with the increase in height. The first row of holes is parallel to the bottom of the triangular ore body and is not inclined, which can make the bottom of the triangular ore body easier to crush and reduce the possibility of rock roots remaining at the bottom of the triangular ore body after blasting. The broken rocks can be cleaned and blasted later. Since the triangular ore body is relatively high, up to about 20 meters, the drilling height of the drill rig is limited, and it is difficult to drill holes in higher places. Therefore, the third row of holes is tilted upward, and blasting can be carried out on the upper part of the triangular ore body. Since the third row of holes is tilted upward, the height of the third row of holes is used as a plane parallel to the horizontal plane of the ore body mining area. The rocks here are not completely blasted. Therefore, the second row of holes is tilted, and the tilt angle can be smaller than the tilt angle of the third row of holes, so that the blasting of the upper and lower rock layers can be taken into account.

[0046] The following provides a specific treatment method for the blasting treatment of a large triangular ore body of the present application.

[0047] Embodiment 1: Please also read Figure 3 , clearing the triangular ore body is a prerequisite for opening up new working faces. The triangular ore body is limited by its external geometric shape and is suspended on three sides. There are two perforated working faces in the west and north. The highest center is 23 meters, the bottom width of the north is 22 meters, and the bottom width of the west is 20 meters. It is triangular in shape. It is difficult to recover the ore after blasting. In addition, the Zhongping Highway and Zhonglian Mine Quarry are directly below the edge of the ore body. Clearing the site and guarding before detonation is an important task to strictly control the risk of blasting.

[0048] It is planned to use a KQ-110 crawler down-the-hole drill for rock drilling and perforation, and according to the topographical features of the triangular ore body, the perforation area is divided into two working faces, the west and the north. In addition to the different perforation directions, there is a height difference of 1.5m between the west and north perforation working faces (the horizontal heights of the two working faces are different), but the perforation methods of the two working faces are very similar, with plum blossom-shaped perforations, and a distance of 3.2m is reserved between each hole so that they cannot be penetrated and intersected. Each working face has three rows of rock drilling and perforations, each row of holes is evenly dispersed inside the rock mass, and the perforation shape is formed into a fan shape. The perforation depth of each hole is required to be measured according to the shape of the triangular ore body, the perforation angle is between 0° and 45°, the blasthole diameter is 110㎜, and the small resistance line and plum blossom-shaped holes are densely arranged. The total number of perforations is 39. The method of continuous charging in the hole is adopted, and the length of the gun mud blocking of each hole is not less than 3m, so as to complete the blasting and clearing of the triangular ore body in one go.

[0049] The center height of the triangular ore body is H = 23 meters, the bottom of the first working face 1 (the bottom of the north side) is 22 meters wide, and the bottom of the second working face 2 (the bottom of the west side) is 20 meters wide; When three rows of fan-shaped holes are arranged on the first working surface 1 (bottom of the north surface) in the height direction: The first row of holes L1 are drilled in a straight line at a height of 1 meter from the horizontal surface of the ore body, with an average hole spacing of 3.2 meters. Due to the irregular shape of the triangular ore body, a shallow hole with a depth of 10.5 meters is formed at the northeast edge. Five deep holes with a depth of 17 meters are arranged between the junction and edge of the two working faces, for a total of 6 holes.

[0050] The second row of holes L2 is 2 meters away from the first row of holes L1, with an average hole spacing of 3.2 meters. The holes are drilled in an "I" shape with an upward drilling angle of 15°. Three shallow holes with a depth of 12 meters are formed at the northeast edge, and five deep holes with a depth of 17 meters are arranged between the junction and edges of the two working faces, for a total of 8 holes.

[0051] The third row of holes L3 is 2 meters away from the second row of holes L2, with an average hole spacing of 3.2 meters. The holes are drilled in an "I" shape with an upward drilling angle of 30°. Due to the irregularity of the triangular ore body, three shallow holes with a depth of 12 meters are formed at the northeast edge, and three deep holes with a depth of 15 meters are arranged between the junction and edges of the two working faces, for a total of 6 holes.

[0052] When three rows of fan-shaped holes are arranged on the second working surface 2 (bottom of the west surface) in the height direction: The first row of holes L10 are drilled in a straight line and parallel to the rock at a height of 1 meter above the horizontal surface of the ore body (due to the height difference of 1.5 meters between the west and north drilling working faces, the first row of holes L10 of the second working face 2 and the first row of holes L1 of the first working face 2 actually have a height difference due to the different heights of the horizontal surfaces of the mining fields, resulting in an upper and lower staggered setting, and the north side is higher than the west side), with an average hole spacing of 3.2 meters. Due to the irregular edge of the triangular ore body, two shallow holes with a depth of 12 meters are formed at the edge, and four deep holes with a depth of 15 meters are arranged between the junction and the edge, for a total of 6 holes.

[0053] The second row of holes L20 is 2 meters away from the first row of holes L10, with an average hole spacing of 3.2 meters and an upward drilling angle of 15°. Due to the irregularity of the edge of the triangular ore body, two shallow holes with a depth of 12 meters are formed at the edge, and four deep holes with a depth of 15 meters are arranged between the junction and the edge, for a total of 6 holes.

[0054] The third row of holes L30 is 2 meters away from the second row of holes L20, with an average hole spacing of 3.2 meters. The holes are drilled in an "I" shape with an upward drilling angle of 30°. Two shallow holes with a depth of 12 meters are formed at the edge, and five deep holes with a depth of 15 meters are arranged between the junction and the edge, for a total of 7 holes.

[0055] The horizontal plane of the mining field of the first working surface 1 is higher than the horizontal plane of the mining field of the second working surface 2. The height of the first row of holes L1 on the first working surface 1 is higher than the height of the first row of holes L10 on the second working surface 2, and lower than the height of the second row of holes L20 on the second working surface 2. The height of the second row of holes L2 on the first working surface 1 is higher than the height of the second row of holes L20 on the second working surface 2, and lower than the height of the third row of holes L30 on the second working surface 2. The height of the third row of holes L3 on the first working surface 1 is higher than the height of the third row of holes L30 on the second working surface 2, thereby making the rows of holes on the two working surfaces form an up-and-down staggered arrangement.

[0056] Moreover, the angles of the holes in the same row on the first working surface 1 and the second working surface 2 are set to be the same, which can also prevent the first row of holes L10 on the second working surface 2 from punching through the first row of holes L1 on the first working surface 1, prevent the second row of holes L20 on the second working surface 2 from punching through the second row of holes L2 on the first working surface 1, and prevent the third row of holes L30 on the second working surface 2 from punching through the third row of holes L3 on the first working surface 1. At the same time, the blasting force is made at different positions, and the holes in different rows are prevented from penetrating each other, thereby reducing the possibility of faults in the penetrated holes and preventing effective blasting in the penetrated holes.

[0057] The charge amount of a single deep hole is: Q = q × a × b × H = 0.41kg / m³ × 3.2m × 2m × 23m ≈ 60kg; q represents the unit consumption of explosives, a represents the hole spacing, b represents the row spacing, and H represents the center height of the triangular ore body.

[0058] The first working face and the second working face have a total of 26 deep holes (15m-17m) perforated. The estimated amount of deep hole emulsion explosives is: the amount of explosives per hole multiplied by the number of deep holes 60kg×26≈1560.

[0059] The charge amount of a single shallow hole: Q = q × a × W × H = 0.41kg / m³ × 3.2m × 1.06m × 23m ≈ 33kg; q represents the unit consumption of explosives, a represents the hole distance, H represents the center height of the triangular ore body, and W represents the minimum resistance line. The resistance line is the minimum distance between the shallow hole and the free surface, and the free surface is the surrounding plane of the triangular ore body.

[0060] There are 13 deep holes (10m-12m) in total in the first and second working faces. The estimated amount of emulsion explosives for shallow holes is: the amount of explosives for a single hole multiplied by the number of shallow holes 33kg×13≈432kg.

[0061] Charge quantity: Qtotal=1560kg+432kg=1992kg.

[0062] Note: The explosive used is Ø70 coil emulsion explosive.

[0063] The total ore volume of the triangular ore body at the edge of the ore body in the east mining area of ​​the 2595m platform section is about 13,300 tons through measurement and calculation. According to the unit consumption of explosives for daily rock root blasting, q = 0.151 kg / t, the total amount of explosives to be removed by one-time blasting is about 13,300t × 0.151kg / t ≈ 2008kg, which is close to the actual total charge of 1992kg for this blasting, and meets the requirements of safe blasting operation (see the perforation diagram for details). Figure 2 as shown).

[0064] Control of harmful effects of blasting 1. Vibration control measures: Carry out construction strictly according to the designed blasting parameters, strictly control the single-hole charging amount and the maximum single-shot charge amount, ensure the actual maximum single-shot charge amount value for detonation, and control vibration hazards.

[0065] (ii) Explosion debris: R=20Kn2W, R-flying stone safety distance (m) K is a coefficient related to rock properties, topography, geology and climate. It is generally 0.1-1.5. The maximum value is taken when throwing against the wind and the minimum value is taken when throwing away from the wind. This time, the value is 1.0. n is the explosion index of the largest explosive charge, generally ranging from 1.2 to 2.5, and this time it is 1.4; W - the minimum resistance line of a largest medicine pack is 4.5m.

[0066] R=20×1.0×1.4×1.4×4.5=176.4m According to calculation, the minimum safe distance for flying rocks in this blasting is 176.4m, which is in line with the minimum safe distance for flying rocks in the “Safety Regulations for Blasting” (GB6722-2014).

[0067] During the construction process, the plugging must be carried out strictly in accordance with the design parameters to ensure the length and quality of the plugging. When loading the explosives, pay attention to the changes in the free surface. If the holes with changes in the free surface are found, re-measure the length of the resistance line. For holes with too weak resistance lines, abandon them if necessary.

[0068] 3. Toxic gas protection The blasting in this project uses rock expanded ammonium nitrate explosives as positive oxygen balance explosives, and it is open-air blasting. The amount of harmful gases produced by the blasting is extremely small and easy to disperse. The harmful gases from the blasting are basically not considered. However, in order to minimize the harm, workers need to wear labor protection masks before entering for inspection, and are allowed to enter for inspection only after waiting for sufficient time (5 minutes for open-air blasting).

[0069] Please also read Figure 3The first row of each working face is the control row. The delay of each adjacent hole in the control row differs by 17 milliseconds, and the delay of each adjacent row of holes in the transmission row differs by 17 milliseconds. This embodiment performs blasting operations by means of fan-shaped hole arrangement and micro-difference blasting. Determine the time difference and detonation point of each hole, and remove large isolated rocks by blasting at one time. In the later stage, it is achieved to clear large isolated rocks on the slope, eliminate safety hazards to external roads, reduce ore losses, improve the image of the mining face and slope, and summarize a set of practical blasting construction technology solutions for the removal of large convex isolated rocks on the slope.

[0070] Embodiment 2: Please also read Figure 4 and Figure 5 The difference between this embodiment and embodiment 1 is that when three rows of fan-shaped holes are arranged on the first working surface 1 or the second working surface 2 along the height direction: Taking the first working surface 1 as an example, the intersection of the middle hole length L23 of the second row of holes L2 on the first working surface 1 and the center height H of the triangular ore body and the starting point of the third row of holes L3 are at the same horizontal height.

[0071] The purpose of doing this is that since the third row of holes L3 of the triangular ore body is tilted upward to blast the position that the upper drilling rig cannot reach, there is a possibility that the triangular ore body at the same height as the entrance of the third row of holes L3 will not be blasted thoroughly and rock will be left. In order to reduce the occurrence of this situation, the hole depth of the second row of holes L2 can reach the height H at the center of the triangular ore body, and then the extension point of the explosives of the second row of holes L2 in the center of the triangular ore body can reach at least the entrance height of the third row of holes L3 or above, thereby reducing the possibility of rock remaining in the triangular ore body at the same height as the entrance of the third row of holes L3, thereby avoiding the occurrence of secondary blasting.

[0072] Of course, the explosive extension point of any hole in the second row of holes is relative to the adjacent hole in the third row of holes (such as Figure 3 (as shown) should reach the plane where the center height H of the triangular ore body is located and this plane is perpendicular to the bottom of the triangular ore body.

[0073] Embodiment 3: Please also read Figure 4 and Figure 5 The difference between this embodiment and embodiment 2 is that when the angle between any working face and the horizontal plane of the ore body stope is a, and 45°<a≤60°: At this time, the inclination angle of the triangular ore body is small and not steep. The end point of the middle hole length in the third row of holes on any working surface is located on the center height H of the triangular ore body. Taking the first working surface 1 as an example, the middle hole length in the second row of holes L2 on the same working surface passes through the center height H of the triangular ore body and the end point is located on the line connecting the intersection O of the middle hole length in the third row of holes L3 and the center height H of the triangular ore body and the vertex c of the triangular ore body facing the working surface. The other holes in the same row can still be arranged in a divergent fan shape relative to the middle holes, as long as the inclination follows the layout in Example 1.

[0074] Since the triangular ore body is not steep, the center and the bottom are relatively rough and wide, and it is not easy to blast it thoroughly. By making the extended line of the hole depth of the second row of holes L2 exceed the center height H of the triangular ore body and reach the triangular ore body on the other side of the center height H of the triangular ore body, the holes inside the triangular ore body can form a cone with a larger top angle d than the top angle of the triangular ore body, and the blasting holes of the triangular ore body can at least reach the triangular cone, the blasting surface is affected more, thereby reducing the situation where the bottom blast is not thorough and rock layers are left when the inclination angle of the triangular ore body is small.

[0075] Embodiment 4: Please also read Figure 4 and Figure 5 The difference between this embodiment and embodiment 3 is that when the angle between any working face and the horizontal plane of the ore body stope is a, and 60°<a≤75°: At this time, the triangular ore body is relatively steep, and the central area of ​​the triangular ore body is easier to blast than in Example 3, which can avoid excessive use of explosives and waste while ensuring the blasting effect.

[0076] Specifically, a first vertical plane 3 perpendicular to the horizontal plane of the ore body stope is formed, the midpoint of the bottom width of the second working surface 2 and the connecting line of the bottom edge of the non-working surface of the triangular ore body and the center height H of the triangular ore body are located in the same plane and constitute the first vertical plane 3, and the projections of the three rows of deep holes on the first working surface 1 are located on the first vertical plane 3; A second vertical plane 4 is formed which is perpendicular to the horizontal plane of the ore body mining area. The midpoint of the bottom width of the first working face 1, the connecting line of the bottom edge of the non-working face of the triangular ore body and the center height H of the triangular ore body are located in the same plane and constitute the second vertical plane 4. The projections of the three rows of deep holes on the second working face 2 are located on the second vertical plane 4.

[0077] When the inclination angle of the triangular ore body is relatively large, that is, the triangular ore body is relatively steep, by adopting the arrangement method of this embodiment, the holes of the two working faces can be located on the quadrangular pyramid surrounded by the first vertical plane 3, the second vertical plane 4 and the fixed points of the triangular ore body. That is, a quadrangular pyramid hole arrangement body is formed in the center of the triangular ore body. Since the center of the triangular ore body is the most difficult to blast, by arranging the blasting position on the entire quadrangular pyramid, the quadrangular pyramid can achieve effective blasting while ensuring the blasting effect of the triangular ore body, while avoiding the waste of explosives and using explosives reasonably.

[0078] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for blasting a large triangular ore body, characterized in that: Includes steps: Selecting one side surface of the triangular ore body as a first working surface, and arranging at least three rows of staggered fan-shaped holes on the first working surface along the height direction; Select a second working surface on the other side of the triangular ore body, and arrange at least three rows of staggered fan-shaped holes on the second working surface along the height direction; The fan-shaped holes include deep holes and shallow holes, and each row of fan-shaped holes forms shallow holes away from the edge where the first working surface and the second working surface meet; The fan-shaped holes on the first working surface and the second working surface are projected to form a projection surface that adapts to the bottom surface shape of the triangular ore body. The projection lines of the fan-shaped holes on the first working surface in the middle of the bottom surface of the triangular ore body and the projection lines of the fan-shaped holes on the second working surface in the middle of the bottom surface of the triangular ore body intersect to form a network.

2. The blasting treatment method for a large triangular ore body according to claim 1, characterized in that: When three rows of fan-shaped holes are arranged on the first working surface along the height direction: The first row of holes is 1 to 2 meters above the horizontal surface of the ore body, with an average hole spacing of 3.2 to 3.5 meters. One or two shallow holes are formed at the edge with a depth of 10.5 to 15.5 meters. Five to ten deep holes are arranged between the junction and the edge with a depth of 17 to 22 meters. The distance between the second row of holes and the first row of holes is between 1.8 meters and 2 meters, the average hole distance is between 3.2 meters and 3.5 meters and the angle is inclined upward, 3 or 6 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 5 to 10 deep holes are arranged between the junction and the edge with a depth of 17 meters to 22 meters; The distance between the third row of holes and the second row of holes is between 1.8 meters and 2 meters, the average hole distance is between 3.2 meters and 3.5 meters, the angle is inclined upward and the inclination angle is greater than the inclination angle of the second row of holes, 3 or 6 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 3 to 6 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters; When three rows of fan-shaped holes are arranged on the second working surface along the height direction: The first row of holes is 1 to 2 meters above the horizontal surface of the ore body, with an average hole spacing of 3.2 to 3.5 meters. Two or four shallow holes are formed at the edge with a depth of 12 to 17 meters. Four to eight deep holes are arranged between the junction and the edge with a depth of 15 to 20 meters. The distance between the second row of holes and the first row of holes is between 1.8 meters and 2 meters, the average hole distance is between 3.2 meters and 3.5 meters and the angle is inclined upward, 2 or 4 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters, and 4 to 8 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters; The spacing between the third row of holes is between 1.8 meters and 2 meters from the second row of holes, and the average hole spacing is between 3.2 meters and 3.5 meters. The angle is inclined upward and is greater than that of the second row of holes. 2 or 4 shallow holes are formed at the edge with a depth of between 12 meters and 17 meters. 5 to 10 deep holes are arranged between the junction and the edge with a depth of 15 meters to 20 meters.

3. The blasting treatment method for a large triangular ore body according to claim 2, characterized in that: The central height of the triangular ore body is H=23 meters, the bottom width of the first working face is 22 meters, and the bottom width of the second working face is 20 meters; When three rows of fan-shaped holes are arranged on the first working surface along the height direction: The first row of holes is 1 meter above the horizontal surface of the ore body, with an average hole spacing of 3.2 meters. A shallow hole is formed at the edge with a depth of 10.5 meters, and 5 deep holes are arranged between the junction and the edge with a depth of 17 meters; The second row of holes is 2 meters away from the first row of holes, with an average hole spacing of 3.2 meters. The perforation angle is 15°, 3 shallow holes are formed at the edge with a depth of 12 meters, and 5 deep holes are arranged between the junction and the edge with a depth of 17 meters. The third row of holes is 2 meters away from the second row of holes, with an average hole spacing of 3.2 meters. The perforation angle is 30°, with 3 shallow holes at the edge and a depth of 12 meters. Three deep holes are arranged between the junction and the edge and a depth of 15 meters. When three rows of fan-shaped holes are arranged on the second working surface along the height direction: The first row of holes is 1 meter above the horizontal surface of the ore body, with an average hole spacing of 3.2 meters. Two shallow holes are formed at the edge with a depth of 12 meters, and four deep holes are arranged between the junction and the edge with a depth of 15 meters. The second row of holes is 2 meters away from the first row of holes, with an average hole spacing of 3.2 meters. The perforation angle is 15°, with 2 shallow holes at the edge and a depth of 12 meters. Four deep holes are arranged between the junction and the edge and a depth of 15 meters. The spacing between the third row of holes is 2 meters from that of the second row of holes, with an average hole spacing of 3.2 meters. The upward perforation angle is 30°, and two shallow holes with a depth of 12 meters are formed at the edge. Five deep holes with a depth of 15 meters are arranged between the junction and the edge.

4. The blasting treatment method for a large triangular ore body according to claim 2, characterized in that: When three rows of fan-shaped holes are arranged on the first working surface or the second working surface along the height direction: The intersection of the middle hole length of the second row of holes on the same working surface and the center height H of the triangular ore body is at the same horizontal height as the starting point of the third row of holes.

5. The blasting treatment method for a large triangular ore body according to claim 4, characterized in that: When the angle between any working face and the horizontal plane of the ore body stope is a, and 45°<a≤60°: The end point of the middle hole length in the third row of holes is located on the center height H of the triangular ore body. The middle hole length in the second row of holes on the same working surface passes through the center height H of the triangular ore body and the end point is located on the line connecting the intersection O of the middle hole length in the third row of holes and the center height H of the triangular ore body and the vertex point of the triangular ore body facing the working surface.

6. The blasting treatment method for a large triangular ore body according to claim 4, characterized in that: When the angle between any working face and the horizontal plane of the ore body stope is a, and 60°<a≤75°: A first vertical plane perpendicular to the horizontal plane of the ore body stope is formed, the midpoint of the bottom width of the second working surface, the line connecting the bottom edge of the non-working surface of the triangular ore body and the center height H of the triangular ore body constitute the first vertical plane, and the projections of the three rows of deep holes on the first working surface are located on the first vertical plane; A second vertical plane perpendicular to the horizontal plane of the ore body mining area is formed. The midpoint of the bottom width of the first working surface, the connecting line of the bottom edge of the non-working surface of the triangular ore body and the center height H of the triangular ore body constitute the second vertical plane. The projections of the three rows of deep holes on the second working surface are located on the second vertical plane.

7. The blasting treatment method for a large triangular ore body according to claim 3, characterized in that: The charge amount of a single deep hole: Q = q × a × b × H = 0.41 kg / m³ × 3.2 m × 2 m × 23 m ≈ 60 kg; q represents the unit consumption of explosives, a represents the hole spacing, b represents the row spacing, and H represents the center height of the triangular ore body; The charge amount of a single shallow hole: Q = q × a × W × H = 0.41kg / m³ × 3.2m × 1.06m × 23m ≈ 33kg; q represents the unit consumption of explosives, a represents the hole distance, H represents the center height of the triangular ore body, and W represents the minimum resistance line. The resistance line is the minimum distance between the shallow hole and the free surface, and the free surface is the surrounding plane of the triangular ore body.

8. The blasting treatment method for a large triangular ore body according to any one of claims 1 to 7, characterized in that: The first row of holes on the same working surface forms a transmission row, and the second row of holes and the third row of holes form a control row; Control each hole in the first row of holes to form a micro-difference blast, and the micro-difference time is 17 milliseconds; The second row of holes is controlled to form a micro-difference blasting relative to the first row of holes, and the micro-difference time is 42 milliseconds; The third row of holes is controlled to form a micro-difference blasting relative to the second row of holes, and the micro-difference time is 42 milliseconds.

9. The blasting treatment method for a large triangular ore body according to claim 1, characterized in that: The arrangement of the rows of holes on the first working surface and the arrangement of the rows of holes on the second working surface are staggered up and down.

Citation Information

Patent Citations

  • Super-high diagonal symmetric forced grooving method without grooving well

    CN106247877A

  • Stratified filling mining method for mining triangular ore with unstable ore surrounding rocks

    CN110359912A

  • Interactive upward medium-length hole subsequent filling mining method

    CN113775374A

  • Crushed stope deformation section three-center long inclined arrangement hole and ore breaking method

    CN118088190A

  • Double-sector complementary steering method for parallel mining area of strip mine

    CN118498995A